Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M19-0053 - HOLLISTER - DOWNSIZE STORE
HOLLISTER 857 SOUTHCENTER MALL M19-0053 \ Parcel No: Address: �~^�xx ^�� Tukwila ".�~� v�n v ��nx��Kna Departmentmf Community Development 63OVSouuhcpnterBoulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431'3670 Inspection Request Une�206'43R'9350 Web site; http://www.TukwilaWA.gov 9202470010 857SOUTH[ENT[8MALL Project Name: HOLLISTER MECHANICAL PERMIT Permit Number: M19'0053 Issue Date; 7/25/2019 Permit Expires On: 1/21/2020 Owner: Address: WESTFIELD PROPERTY TAX DEPT POBOX l3O94O,CARilBAD N1|, 92013 Contact Person: Name: AMY0EKEVERS Phone; (616)493'9334 Address: 7S-6OTHSTSW, VVYOK4|NG,MI, 49548 Contractor: Name: EVERGREEN REFRIGERATION LLC Phone: (200)763'1744 ([ON5T) Address: 7276KENYDNST,SEAJTLE'WA, 98108 Expiration Date: 1/6/2020 License No: L ender: DESCRIPTION OFWORK: DOWN SIZE OF EXISTING HOLLISTER STORE. Valuation ofWork: $87,000.00 Type ofWork: REPLACEMENT Fuel type: ELECT Fees Collected: $1,302.89 Electrical Service Provided by: PUGETSOUND ENERGY Water District: TUKVV|LA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code; Permit Center Authorized Signa National Electrical Code: WA State Energy Code: NACities Electrical Code: VVACZ9646B: 2015 2015 2017 v I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: V Date: 1 17-,5 (Pt Print Name: K fL \y r k This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST f's CITY OF TUKK__,1 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov No Mechaitical Permit . . Mi al 003- Project No, Date Applicatiott Acceted: p * ' /4-2, ll Date Application Expires: (For °lice use on1),) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: 7.-;(1 &kyrAiNciAtr MU Tenant Name: 1--\koWnIce r PROPERTY OWNER , Name: v" \\co_ scalt.0 \oe qA ,..1 jimmy e_1(2.. Address: Agoc IL)\& Oftivet i,._Q uopke‘ City: lid t State: \ k...., Zirkotol el CONTACT PERSON —person receiving all project communication Name: Cityvit• 6‘.A State: Wk k Zip: qc1,0 Phone \Dv& i33tA Fax: _ Email: oum.uke mcn King Co Assessor's Tax No.: Suite Number: 142) Floor: New Tenant: fl Yes .No MECIIANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ .1 0 0 0 Describe the scope of work in detail: W\5-4-Le o Use: Residential: Residential: New 0 Commercial: New Fuel Type: Electric LJ Replacement Replacement Gas fl Other: H: \ Applications \Forms -Applications On Line \ 2016 Applications'Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heatIrefrig/cooling system Air handling unit <10,000 cfrn Unit Type Qty Air handling unit >10,000 chn Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator - comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment F.A 404 I It Ay tore3 Boller/Compressor 0-3 hp/100,000 btu 3- I 5 hp/500.000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 504 hp/1,750.000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based an from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see 'TMC 8.22 *Dayti District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) e earls 7AM-10PM, onday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. ON Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition), I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING ER OR AUTBOrED AGENT: Signature: Print Name: Mailing Address: ti20 z Date: tie 1C1 Day Telephone: W) L{q Stale Zip 14:\ArphouionsfonsrApphcanam OA Ime2016 ApplicatiovisIdectaelmi Pens* Application Ravised 1-4-1 Revisal. lawny 2016 bb Page 2 of 2 ; DESCRIPTIONS ACCOUNT QUANTITY PAID $15,604.49 PermitTRAK D19-0103 Address: 857 SOUTHCENTER MALL Apn: 9202470010 $11,955.45 DEVELOPMENT $11,604.55 PERMIT FEE R000.322.100,00.00 0,00 $7,017.91 PLAN CHECK FEE R000.345.830.00.00 0.00 $4,561.64 WASHINGTON STATE SURCHARGE B640,237.114 0.00 $25.00 TECHNOLOGY FEE $350.90 TECHNOLOGY FEE R000.322.900.04.00 0.00 1 $350,90 EL19-0282 Address: 857 SOUTHCENTER MALL Apn: 9202470010 $2,153.75 ELECTRICAL $2,070.91 PERMIT FEE MULTI-FAM/COMM R000.322,101.00.00 0.00 $1,656.73 PLAN CHECK FEE R000,345.832.00.00 0,00 $414.18 TECHNOLOGY FEE $82.84 TECHNOLOGY FEE R000.322.900.04.00 0.00 $82.84 M19-0053 Address: 857 SOUTHCENTER MALL Apn: 9202470010 $1,302.89 MECHANICAL $1,252.78 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0,00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $969.07 PLAN CHECK FEE R000.322,102.00.00 0.00 $250.56 TECHNOLOGY FEE $50.11 TECHNOLOGY FEE R000.322.900,04.00 0.00 $50.11 PG19-0051 Address: 857 SOUTHCENTER MALL Apn: 9202470010 $192.40 PLUMBING $185.00 PERMIT FEE R000.322.100.00.00 0.00 $113.00 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $35.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $37.00 TECHNOLOGY FEE $7.40 TECHNOLOGY FEE TOTAL. FEES PAID BY RECEIPT: R17306 R000.322.900.04.00 0.00 $7.40 $150604.49 Date Paid: Tuesday, April 02, 2019 Paid By: PRECISION PERMIT SERVICES Pay Method: CHECK 16499 Printed: Tuesday, April 02, 2019 10:22 AM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr j t: � ' a of #ns tion• ' TeSt- d ress: Date Called: 5pee coal Instructions: Date Wanted:/as G a.m. p.m. Requester: 'Phone No: proved per applicable codes. MMENTS: Corrections required prior to approval. A 4 REINSPECTJON FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:/ Type Ins action_'' Addre s: Date Called: S�nstructions: p ' Date Wanted: a.m. .m., Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS c,„c icrC, Inspector: Dater / 20/, REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd,. Suite 100, Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431670 Permit Inspection Request Line (206) 438-9350 Project: Type nspection: Address: B5'7 � ' 4 Date Called: Special Instructions: l/ ""14.- am C/~ ,date 'Wanted: a.m. Requester Phone No: Approved per applicable codes. ns required prior to approval. COMMENTS: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Gail to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: Date Called: Special Instructions: Date Wanted: Q ! -- a.m. p.m. Requester: Cc D Phone No: ...e) '26 4 - i zi--74/ Approved per applicable codes. Corrections required prior to approval. COMMENTS: f fi-'IeT11et- L.- Ok ' a R©VA/) c ,uC7 ct 5L PX `1 FP3 $ i F'P-- 121 .2 4 Ce3/1-J '4 T? OA 7 UA /i ____- � PL 7 r Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Corrections required prior to approval. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro' t: Ins ect:�!/''Izootik *etrilkaftter, A�ciress: � � Date Ca Special Instructions: .. Date Wanted: a.m. p.m. Requester: Phone No: EjApproved per applicable codes. COMMENTS: h • P a..a 1211 P 3 1t REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., e 100. Call to schedule reinspection` IIQ 7 2o 1-7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Address: pal Instructions: Type of Inspection: Da Requeste Phone No: LIApproved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: CGL. ) Date REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Cast to schedule reinspection. Project Name: Location: Architect: Engineer: Contractor: EAGLE TEST & BALANCE COMPANY AABC CERTIFIED 8/5 E. Main Cushing, OK 74023 Phone: 918-225-1668 Fax: 918-225-1687 13047 S.E. 47th Place Bellevue, WA 98006 Phone: 425-747-9256 Fax: 425-641-5662 TEST AND BALANCE REPORT Hollister Store #31620 857 South Center, Seattle, WA 98188 Evergreen Refrigeration Project Number: ETB-19-2480 This is to certify that Eagle Test & Balance has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these tests are herein recorded. Associated Air Balance Council Certification Number: 93-02-01 Date: 10/30/2019 Form #89010 RECEIVED CITY OF TUKWILA NOV 1 4 2019 ley\ D05/6 PERMIT CENTER1 EAGLE TEST & BALANCE COMPANY Project Name: Hollister Store #31620 System: FP-1 ,.eaea,awc AIR DISTRIBUTION '1 EST SHEET Project #: ETB-19-2480 Date: 10/30/2019 Term # Room # Term Term Factor Design FPM Design CFM Test FPM or CFM Final Final Type Size Test 1 Test 2 Test 3 FPM CFM FP-1 100% C Heat 1 SD-4 10" 1.0 220 60 100 200 200 2 SD-4 10" 1.0 220 55 80 200 200 3 SD-4 10" 1.0 220 50 75 210 210 4 SD-4 10" 1.0 220 50 80 200 200 5 SD-4 10" 1.0 220 50 80 205 205 6 SD-1 10" 1.0 220 70 140 220 220 7 SD-1 10" 1.0 220 110 190 220 220 8 SD-1 10" 1.0 220 130 240 215 215 9 SD-1 10" 1.0 190 120 230 180 180 10 SD-1 10" 1.0 220 15 250 200 200 11 SD-1 10" 1.0 220 125 235 220 220 12 SD-1 10" 1.0 220 115 185 230 230 13 SD-1 10" 1.0 220 110 160 240 240 Total 2830 1180 2245 2740 Total 2740 Remarks: Form #1.5.10 2 EAGLE TEST & BALANCE COMPANY Project Name: Hollister Store #31620 System: FP-2, FP-3 ,r1a.easc AIR DISTRIBUTION 1EST SHEET Project #: ETB-19-2480 Date: 10/30/2019 Term # Room # Term Term Factor Design FPM Design CFM Test FPM or CFM Final Final Type Size Test 1 Test 2 Test 3 FPM CFM FP-2 100% C Heat 1 SD-1 10" 1.0 250 120 180 230 230 2 SD-1 10" 1.0 250 125 190 250 250 3 SD-1 10" 1.0 220 90 135 205 205 4 SD-1 10" 1.0 220 95 150 210 210 5 SD-1 10" 1.0 220 140 215 220 220 6 SD-1 10" 1.0 220 165 250 230 230 7 SD-1 10" 1.0 220 160 245 220 220 8 SD-1 10" 1.0 220 165 250 230 230 Total 1820 1060 1615 1795 Total 1795 FP-3 100% C Heat 1 SD-2 10" 1.0 300 160 290 290 2 SD-2 10" 1.0 300 160 300 300 3 SD-3 8" 1.0 200 190 220 220 4 SD-1 10" 1.0 220 210 200 200 5 SD-1 10" 1.0 220 140 210 210 6 SD-1 10" 1.0 220 145 220 220 7 SD-1 10" 1.0 275 120 280 280 8 SD-1 10" 1.0 275 105 250 250 9 SD-1 10" 1.0 275 155 285 285 Total 2285 1385 2255 Total 2255 Remarks: Form #1.5.10 L,c3MIT COORP COP PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M19-0053 PROJECT NAME: HOLLISTER SITE ADDRESS: 857 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # DATE: 04/02/19 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Prt,-)Cd *5-t Building Division III Public Works P Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 04/04/19 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Corrections Required (corrections entered in Reviews) Denied (ie: Zoning Issues DUE DATE: 05/02/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire D Ping E] PW E] Staff Initials: I 2/18/2013 1-lo11te 1:1 Contact Safety & Health Claims & Insurance Washington State Department of Labor & Industries [Search L&I I ' Index Fiolp Workplace Rights Trades & Licensing EVERGREEN REFRIGERATION LLC Owner or tradesperson Principals PATTON, RODGER, PARTNER/MEMBER PATTON, MATTHEW, PARTNER/MEMBER Patton, Adam, PARTNER/MEMBER Patton, Douglas, PARTNER/MEMBER EVERGREEN REFRIGERATION LLC, PARTNER/MEMBER PATTON, DAVID, PARTNER/MEMBER (End: 01/21/2014) Doing business as EVERGREEN REFRIGERATION LLC WA UBI No. 602 512 953 727 S KENYON ST SEATTLE, WA 98108 206-763-1744 KING County Business type Limited Liability Company Governing persons MATTHEW ALAN PATTON ADAM PATTON; DOUGLAS PATTON; RODGER PATTON; Certifications & Endorsements OMWBE Certifications No active certifications exist for this business, Apprentice Training Agent Not allowed to have apprentices. License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. EVERGRL954R2 Effective — expiration 01/06/2006— 01/06/2020 Bond Merchants Bonding Co (Mutual) Bond account no. WA15097 Active, Meets current requirements. $12,000 00 Received by L&I Effective date Help us improve / 12/15/2011 01/01/2012 Expiration date Until Canceled Insurance Nationwide Mutual Ins Co $1,000,000.00 Policy no. ACP 3037246151 Received by L&I Effective date 07/24/2018 07/31/2018 Expiration date 07/31/2019 Nationwide Mutual Ins Co Policy no. ACP 3018338030 $1,000,000.00 Received by L&I Effective date 07/20/2018 07/31/2018 Expiration date 07/31/2019 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Public Works Requirements Workplace safety and health Vashington State Dept. of Labor & Industries. Use of this site is subtect to the laws of the state of Washington. Help us improve COMMON A OR K RESULTS FOR HEATING VENTILATING AIR CONDITIO\ING SECTION 230500 A. NOTE: I. ANY REFERENCE TO TENANT'S OR OWNER CONSTRUCTION MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO OWNER. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 23. 3. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEN DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THE WORK AND THE WORK OF THE SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE THE SUBCONTRACTORS WITH A COMPLETE SET OF B►D DOCUMENTS. 4. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THE WORK AND THE WORK OF HIS SUB- CONTRACTORS WORK TO COMPLY WITH THE OWNER SCHEDULE AND THE PROJECT COMPLETION DATE. 5. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS SHALL BE BROUGHT TO OWNER'S ATTENTION. THERE ARE NO SUBSTITUTIONS. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. . REFER TO RESPONSIBILITY SCHEDULE ON THIS SHEET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. B. SCOPE OF WORK RESPONSIBILITIES SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. HVAC UNITS, EQUIPMENT, AND APPURTENANCES (UNLESS NOTED OTHERWISE). B. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. D. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). E. TESTING, ADJUSTING, AND BALANCING. 2. BEFORE STARTING WORK, THE CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS. 3. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. C. EQUIPMENT FURNISHED BY OWNER I. THE FOLLOWING EQUIPMENT IS FURNISHED BY OWNER AND INSTALLED BY THE CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER TO RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. A. RTU'S, AHU'S, VAV BOXES, ROOF CURBS, MIXING BOXES, POWER EXHAUST FANS. B. TOILET EXHAUST FANS, RELIEF FANS, RETURN AIR FANS. C. BASEBOARD, CABINET AND ELECTRIC UNIT HEATERS. D. GENERAL REQUIREMENTS I. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR OWNER SHALL BE PROVIDED BY THE CONTRACTOR. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH 15 USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR 15 RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER 15 MORE STRINGENT. 7. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF THE MECHANICAL SYSTEMS. 8. THE CONTRACTOR SHALL COORDINATE FLOOR, WALL AND ROOF PENETRATIONS, LOUVER SIZES, ETC. WITH GENERAL TRADES. q. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES PRIOR TO FABRICATION OF ANY WORK. 10. THE CONTRACTOR MUST HAVE A SENIOR FOREMAN WITH A MINIMUM OF FIVE YEARS COMMISSIONING EXPERIENCE IN BOTH HVAC AND CONTROLS PRESENT AT STARTUP. II. THE CONTRACTOR SHALL FILL OUT COMPLETELY AND SUBMIT TO THE CONSTRUCTION MANAGER THE MECHANICAL SUPPLIER STARTUP CHECKLIST FOR EACH RESPECTIVE PIECE OF EQUIPMENT INSTALLED PRIOR TO SCHEDULING THE HVAC CONTROL STARTUP. 12. MECHANICAL SHOP DRAWING SUBMITTALS TO BE SENT TO OWNER'S CONSTRUCTION MANAGER. 13. MECHANICAL EQUIPMENT NOTED IN THE MECH. RESPONSIBILITY SCHEDULE HAS BEEN PRE -PURCHASED BY THE OWNER ft THE CONTRACTOR IS TO OBTAIN AN OWNER SUPPLIED MATERIALS (OSM) SCHEDULE TO ARRANGE RECEIPT, OFF LOADING AND MOVING OF ALL OSM TO THE JOBSITE. ALL EQUIPMENT SHALL BE DELIVERED TO THE JOBSITE ADDRESS, UNLESS OTHER ARRANGEMENTS ARE MADE THROUGH OWNER'S PURCHASING REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION OR I WEEK PRIOR TO THE SCHEDULED OSM SHIPPING DATE. 14. CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK, NOT BEING USED OR SHOWN TO REMAIN, IS FULLY REMOVED AND NOT ABANDONED. 15. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. I. PROVIDE ACCESS FOR ALL LANDLORD AND TENANT EQUIPMENT, SUCH AS, FIRE it SMOKE DAMPERS, SMOKE DETECTORS, BALANCING DAMPERS, VAV BOX CONTROLS, ELECTRICAL JUNCTION BOXES REQUIRING PERIODIC INSPECTION AND/OR SERVICE THAT ARE LOCATED WITHIN THE OWNER'S SPACE OR REQUIRE SERVICE ACCESS THROUGH THE OWNER'S SPACE. IN AS -BUILT DOCUMENTS, LABEL ACCESS DOORS AND PANELS, 24x24 MECH. GRILLES UTILIZED FOR ACCESS WITH THE NAME OF THE EQUIPMENT ACCESSIBLE AT THAT POINT. DEMONSTRATE ACCESS TO ALL LANDLORD HIDDEN EQUIPMENT FOR THE LANDLORD'S FIELD REPRESENTATIVE PRIOR TO CLOSING IN THE CEILING. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF CEILING GRILLES, REGISTERS AND DIFFUSERS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS. REFER TO A4.2 CEILING DEVICE PLAN TO LOCATE AIR pi ND GRILLES. REVIEWED FOR CODE COMPLIANCE APPROVED 1t2019 City of Tukwila BUILDING DIVISION SEPARATE PEP►IT AND APp !\L SEPARATE PE REQUIRED FOR; [j Mechanics > Elect'ic& Plutnbin9 Gas Piping City of Tukwila . BUILDING DIVISION 17. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF CEILING GRILLES, REGISTERS AND DIFFUSERS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS. 18. DUCTWORK SHALL NOT BE LOCATED OVER THE TOP OF ANY ELECTRICAL PANELS OR EQUIPMENT. Ic1. DESIGN OF THE NON -DUCTED RETURN AIR PLENUM CEILING IS BASED ON THE REQUIREMENT THAT ALL MATERIALS IN THE RETURN AIR PLENUM CEILING ARE ALL LABELED AS PLENUM RATED AND MEET THE FLAME t SMOKE SPREAD REQUIREMENTS FOR PLENUM INSTALLATION AND THE APPROVAL OF A RETURN AIR PLENUM FROM THE LANDLORD. IF THE CONDITIONS CANNOT BE MET, TTHE CONTRACTOR SHALL STATE THE AMOUNT TO BE ADDED TO THE BASE BID FOR A TOTALLY DUCTED RETURN AIR SYSTEM. 20. CONTRACTOR 15 RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE CONTRACTOR 15 RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS SHALL BE AWARDED FOR TIE-IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. 21. THE CONTRACTOR SHALL FURNISH AND INSTALL IDENTIFICATION ON ALL ROOFTOP EQUIPMENT. PROVIDE PLASTIC LAMINATED PLATE OR STENCIL WITH 2" HIGH BLACK LETTERS, INDICATING TENANTS NAME AND SPACE NUMBER. VERIFY ACTUAL REQUIREMENTS WITH LANDLORD. 22. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. 23. PROVIDE ACCESS FOR ALL LANDLORD AND TENANT COMPONENTS REQUIRING PERIODIC INSPECTION AND SERVICE THAT ARE LOCATED WITHIN THE SPACE OR REQUIRE ACCESS THROUGH THE SPACE. DEMONSTRATE ACCESS TO ALL HIDDEN COMPONENTS FOR THE LANDLORD'S HELD REPRESENTATIVE PRIOR TO OCCUPANCY. 24. CONDENSATE DRAIN FROM RTU. MINIMUM DRAIN SIZE TO BE I". CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5 X UNITS TOTAL STATIC PRESSURE, MINIMUM 5" DEEP. DRAIN SHALL TERMINATE AT MOP BASIN WITHIN TENANT SPACE. SUPPORTS FOR CONDENSATE LINES TO BE 411x4"x12" TREATED BLOCKING SET IN MASTIC ON MODIFIED BITUMEN PAD. PIPE SUPPORTS TO BE SPACED NO MORE THAN 6'-0" APART. ROOFTOP/EXTERIOR PIPING TO ROOF DRAIN SHALL BE COPPER. REFER TO DETAIL ON PI.I. E. CODES I. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THE CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY OWNER TO THE CONTRACTOR. F. LICENSES, PERMITS, INSPECTIONS & FEES I. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. 2. FURNISH TO THE OWNER CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. G. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO OWNER CONSTRUCTION MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR OWNER'S CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE GENERAL CONTRACTOR AND THE SUB- CONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. 3. PROVIDE 6 COPIES OF SHOP DRAWINGS, PRODUCT DATA, EQUIPMENT CUTS, PERFORMANCE CURVES, SOUND DATA, DIMENSIONS, SERVICE CLEARANCE REQUIREMENTS, WEIGHTS, ETC. FOR ALL SCHEDULED EQUIPMENT, FIXTURES, DEVICES, ETC. 4. ONE ( I ) ELECTRONIC COPY MAY BE PROVIDED AT CONTRACTOR'S OPTION FOR SUBMITTAL. 5. PROVIDE TWO COPIES OF OPERATION AND MAINTENANCE MANUAL FOR EACH PIECE OF EQUIPMENT, INCLUDING CONTROL DIAGRAMS, INTERNAL WIRING DIAGRAMS, ETC. TO THE LANDLORD AND TENANT (4 COPIES TOTAL), ALL BOUND INTO 3-RING BINDERS. EACH BINDER SHALL INCLUDE WARRANTIES, STORE NAME, NUMBER, ADDRESS, INSTALLING CONTRACTOR, AND SERVICE CONTACT INFORMATION. H. GUARANTEE THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WR►TING) OF THE INSTALLATION BY OWNER'S CONSTRUCTION MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 2. OWNER SHALL PROVIDE A COMPLETE 12 MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT PROVIDED BY OWNER, INC. AND OWNER VENDORS. THE CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONEYS SHOULD BE INCLUDED IN THE BID. I. RECORD DRAWINGS I. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH A5: A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. B. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS. D. APPROVED EQUIPMENT SUBSTITUTIONS. E. CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY OF THE MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL DRAWINGS INCLUDED SHALL BE STAMPED "DO NOT REMOVE" AND SHALL BE PLACED IN A DRAWING TUBE LOCATED NEXT TO THE ELECTRICAL PANEL. SEE ARCHITECTURAL DRAWINGS FOR EXACT TUBE LOCATION. 3. TWO COPIES OF THE "AS -BUILT" REDLINES SHALL BE PROVIDED TO THE CONSTRUCTION MANAGER FOR INCLUSION IN THE FINAL "AS -BUILT" SET. J. DISCREPANCIES IN DOCUMENTS DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO ADVISE OWNER'S CONSTRUCTION MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID, OTHERWISE, OWNER CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SI-IALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. K. PHASING REQUIREMENTS I. THE CONTRACTOR IS TO INCLUDE IN THE BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBING AND SPRINKLER SERVICE IN OPERATION, CONTRACTOR MUST SCHEDULE IN WRITING WITH OWNER'S CONSTRUCTION MANAGER AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. L. DEMOLITION I. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK. 2. THE CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND/OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL. M. SLEEVES THE CONTRACTOR SI-IALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SI-IALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND/OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THE FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SI-IALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. N. FINAL HVAC INSPECTIONS I. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, OWNER SHALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. 2. CONTRACTOR SHALL PROVIDE CERTIFICATES OF INSURANCE TO TENANT AND LANDLORD. SUBMIT TWO COPIES OF ALL TEST REPORTS TO THE TENANT AND TWO TO THE LANDLORD. GENERAL DUTY VALVES SECTION 230523 A. VALVES BALL VALVES UP TO AND INCLUDING 2" SHALL BE BRONZE, ONE PIECE BODY, FULL PORT, 600 PSI, STAINLESS STEEL BALL, PTFE TEFLON SEATS AND STEM SEAL, LEVER HANDLE AND BALANCING STOPS, SOLDER OR THREADED ENDS WITH UNION. 2. BALL VALVES LARGER THAN 2 1/2" SHALL BE BRONZE, TWO PIECE BODY, FULL PORT, 600 PSI, STAINLESS STEEL BALL, PTFE TEFLON SEATS AND STEM SEAL, LEVER HANDLE AND BALANCING STOPS, THREADED ENDS WITH UNION. 3. SWING CHECK VALVES, 2-INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM 8 62 WITH HORIZONTAL SWING, Y-PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. 4. SWING CHECK VALVE, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. 5. COMBINATION BALANCING AND SHUTOFF VALVES: CIRCUIT SETTER WITH LOCKING SET POINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 4 M MANUAL. REFER TO MECHANICAL DETAIL SHEETS. 6. CONTROL VALVES: a. CONTROL VALVES 2" AND SMALLER SHALL BE EQUAL PERCENTAGE CONTROL VALVES. b. TWO-WAY MODULATING: 5 PSID OR TWICE THE LOAD PRESSURE DROP, WHICHEVER IS MORE. c. THREE WAY MODULATING: TWICE THE LOAD PRESSURE DROP, BUT NOT MORE THAT 5 PSID. 7. ACCEPTABLE MANUFACTURERS BY WATTS, APOLLO, BELIMO OR EQUAL. HANGERS AND SUPPORTS SECTION 23052g A. HANGERS AND SUPPORTS I. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK 15 NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR 3. THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED. 5. PROVIDE DOUBLE LOCK NUTS ON ALL TREADED RODS. WHEN UNISTRUT 15 USED SQUARE WASHERS ARE ALSO REQUIRED. 6. SEE SHEET MI.OI FOR SEISMIC HANGER DETAILS AND SPECIFICAITONS AS REQUIRED. B. DUCT HANGERS I. HANGER SPACING DUCT FACE AREA FROM 0 TO 4 SQ. FT. HANGERS 98" O.C. MAX DUCT FACE AREA FROM 4 TO 10 SQ. FT. HANGERS 72" O.G. MAX DUCT FACE AREA FROM 10 AND GREATER HANGERS 48" O.C. MAX 2. WHERE DUCTS ARE LESS THAN 2 SQ. FT. IN FACE AREA, HANGERS SHALL BE NOT LESS THAN I"xI/16" STRAP STEEL. 3. WHERE DUCT ARE GREATER THAN 2 SQ. FT. IN FACE AREA. HANGERS SHALL BE NOT LESS THAN I"x1/8" STRAP STEEL. 4. WHERE DUCT ARE 8 SQ. FT. IN FACE AREA. HANGERS SHALL BE BRACED BY I"xl"xl/8" STEEL ANGLES ALL AROUND, SPACED NO MORE THAN FOUR FEET ON CENTERS. 5. WHERE DUCTS ARE OVER 48" WIDE. THE HANGERS SHALL BE BROUGHT DOWN UNDER THE DUCT SIDES 4" AND FASTENED TO THE BOTTOM. SELF -TAPPING, SHEET METAL SCREW C. PIPE HANGERS HANGER SCHEDULE COPPER PIPING - TYPE 'L' PIPE SIZE ROD SIZE MAX. SPACING THRU 3/4 IN 3/8 6 I I N 3/8 6 I I /4 I N 3/8 8 11 /2 I N 3/8 6 2 IN 3/8 q 2 1/2 IN 1/2 q 3 IN 1/2 10 4 IN 1/2 10 HANGER SCHEDULE - STEEL PIPING PIPE SIZE ROD SIZE MAX. SPACING FOR WATER MAX. SPACING FOR STEAM, GAS OR AIR IIN 3/8 7 q I 1/4 IN 3/8 IO q 11 /2 I N 3/8 10 q 2 1 N 3/8 10 13 2 1/2 IN 1/2 12 13 3 IN 1/2 12 15 4 I N 5/8 14 17 VIBRATION CONTROLS HVAC PIPING EQUIPMENT SECTION 230548 A. VIBRATION ISOLATION DEVICES I. VIBRATION ISOLATION DEVICES WITH SUPPORTS BETWEEN VIBRATING EQUIPMENT AND THE STRUCTURE (FANS, AIR HANDLERS, ETC.). 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 3. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING" THE ISOLATOR. 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 5. CONSULT MANUFACTURER FOR APPLICATION DATA. B. FLEXIBLE CONNECTIONS I. FLEXIBLE COLLARS IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND DUCTS OR CASINGS. FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE- COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. C. FLEXIBLE AIR DUCT FLEXIBLE AIR DUCT SHALL BE I" INSULATED CLASS I AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. 2. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITHOUT PRIOR APPROVAL FROM OWNER CONSTRUCTION MANAGER UNLESS NOTED OTHERW ISE. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5'-0" IN LENGTH AT ANY ONE LOCATION. 4. NO FLEXIBLE DUCTWORK UPSTREAM OF VAV BOX IDENTIFICATION HVAC PIPING AND EQUIPMENT SECTION 230553 A. EQUIPMENT LABELS/PIPE MARKERS 1. FURNISH AND INSTALL PIPE 1 DENT I FICAT ION MARKERS ON ALL PIPES INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BE A MINIMUM OF I-I/2" X 5" AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI). MARKERS SHALL BE MANUFACTURED BY CHAMPION AMERICA INC. 800-521-7000, OR EQUAL. 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CHILLED WATER RETURN, CHILLED WATER SUPPLY, CONDENSATE, HOT WATER RETURN, 140T WATER SUPPLY, CONDENSER WATER RETURN, CONDENSER WATER SUPPLY, REFRIGERANT LIQUID, REFRIGERANT SUCTION, AND DIRECTION OF FLOW ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT. 3. FURNISH AND INSTALL EQUIPMENT IDENTIFICATION PLACARDS OR PAINTED STENCILS ON ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT. PLACARDS / STENCILS SHALL BE A MINIMUM OF 3" LETTERING AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/ASME 13.1. MARKERS SHALL BE MANUFACTURED BY SETON NAME PLATE CORP, W.H. BRADY, 3M, OR EQUAL. STENCILS SHALL BE PAINTED WITH BLACK SEMI -GLOSS ENAMEL ON LIGHT BACKGROUND OR WHITE ENAMEL ON DARK BACKGROUND. 4. q. IDENTIFY AIR DUCT AND PIPING A MAXIMUM 20' ON CENTER, AND EACH SIDE OF PENETRATING WALL AND A MINIMUM OF ONCE FOR EACH FLOOR RISER 5. AND IN EACH ROOM. 6. PROVIDE A VALVE TAG, MINIMUM 2" DIAMETER BRASS, FOR EACH SHUT-OFF OR COMBINATION BALANCE AND SHUT-OFF VALVE IN EACH SYSTEM; CONDENSER, CHILLED, HEATING HOT WATER, STEAM AND CONDENSATE RETURN. TAG SHALL INCLUDE SYSTEM IDENTIFICATION AND SEQUENCE NUMBER. PROVIDE A FRAMED COPY OF VALVE TAG CHART AND SCHEDULE IN CHILLER ROOM, MAIN AIR HANDLING UNIT ROOMS (MEZZANINE AND 2ND FLOOR), AND 1 COPY FOR LANDLORD'S USE. COORDINATE NUMBERING SYSTEM WITH LANDLORD. k PAW ACHE LABELSNTO i Tk (;tUl aT. Lns v Aial . A A I V 5QUIPMENT SCHEDULED. BALANCING SECTION 2305g3 TESTING, ADJUSTING, AND BALANCING I. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO IS A CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANC1NG SHALL BE INCLUDED IN THE BID. TESTING AND BALANCING CONTRACTOR TO BE LANDLORD APPROVED. 2. FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO OWNER CONSTRUCTION MANAGER 3 WEEK PRIOR TO MERCHANDISING DATE. 3. THE CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS EACH MONTH 4. 13BtitiiS Z; T 41IIEif4 WIDI:I Q"11IVE6 FRIORITIMINEFEC11-16NDTUNG. INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. 6. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO OWNER'S CONSTRUCTION MANAGER FOR APPROVAL. THE GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO OWNER. SUBMIT ONE COPY OF FINAL APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO OWNER. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT OWNER DEEMS NECESSARY AT NO ADDITIONAL COST TO OWNER. DUCT AIOR ( INSULATION SECTION 230713 A. DUCTWORK INSULATION INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA qOA. 2. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. ALL DUCTWORK IN EXPOSED CEILING PLENUM SPACES SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF I I/2" THICK, I# DENSITY (R=5.6) DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. EXPOSED DUCTWORK IN OPEN CEILING SPACES NEED NOT BE INSULATED. 3. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. 4, EXTERNALLY LOCATED DUCTWORK THERMAL INSULATION SHALL BE WEATHER -PROTECTED. INSULATION FOR THE TOP SURFACE OF HORIZONTAL DUCTS SHALL BE FACTORY PREPARED TO PROVIDE A FALL OF 1:25. THE MINIMUM THICKNESS OF INSULATION SHALL BE MAINTAINED, INCLUDING AT ALL FLANGES AND SUPPORTS. FINAL FINISH SHALL BE ALUMINIUM SHEETING AS REQUIRED. SPECIAL CARE SHOULD BE TAKEN TO AVOID ELECTROLYTIC CORROSION. THE JOINTS USED ON ADJACENT METAL SHEETS SHALL BE SELECTED FROM ONE OF THE TYPES SHOWN IN SMACNA STANDARDS. BLIND REVETS OR SCREWS SHALL BE SPACED NOT MORE THAN 4" APART. AT THE JUNCTION BETWEEN PRE -FORMED INSULATING MATERIALS ANS FIXED STEELWORK, THE JOINT SHALL BE PACKED WITH MINERAL FIBRE TO ACCOMODATE DIFFERENTIAL THERMAL MOVEMENT. THE CLADDING SHALL BE ADDITIONALLY SECURED WITH METAL BANDING AT 18" ON CENTER. THE BANDING SHALL BE SELECTED TO COMPLEMENT THE SHEET CLADDING AND NOT CONTRIBUTE TO DI -ELECTRIC CORROSION. 5. EXPOSED DUCTWORK SHALL BE INTERNALLY LINED CLOSED CELL ELASTOMERIC FOAM DUCT LINER. MANUFACTURER: ARMSTRONG WORLD INDUSTRIES INC. MODEL AP ARMAFLEX SA DUCT LINER. OR DURKFLEX FE. b. INSULATION: NFPA q0A/q0B SELF -ADHERING CLOSED CELL ELASTOMERIC FLEXIBLE INSULATION MEETING ASTM C177 OR C518, ASTM E-q6 25/50 SURFACE BURNING, ASTM E-84 MICROBIAL GROWTH, ASTM C1071, ASTM G2I AND G22, ODOR EMISSIONS ASTM C665. c. K VALUE MAXIMUM 0.25 AT 75 DEG. F, 0.037 AT 24 DEG. C. d. WATER VAPOR TRANSMISSION MAXIMUM OF 0.05 PERM -INCHES. 6. INSULATION SHALL BE AS INSTALL PER APPROVED MANUFACTURER'S GUIDELINES. 6. INSULATION SHALL BE AS MANUFACTURED BY ARMSTRONG, JOHNS MANVILLE, KNAUF OR CERTAIN TEED. A 2. SEQUENCE OF OPERATION FOR HVAC SYSTEM SECTION 230g93 A. SEQUENCE OF OPERATIONS THE ENERGY MANAGEMENT SYSTEM (EMS) HAS A BUILT IN TIME CLOCK WHICH SHALL BE SET FOR OCCUPIED AND UNOCCUPIED HOURS. THE EMS SHALL CONTROL EVERY PIECE OF PRIMARY NVAC EQUIPMENT. UPON A LOSS OF SIGNAL FROM EMS, THE CONTROL BOARD IN EACH PIECE OF PRIMARY HVAC EQUIPMENT SHALL MAINTAIN A SET POINT OF 71°F IN THE COOLING MODE, AND 68°F IN THE HEATING MODE. THE EMS SHALL CONTROL THE LIGHTING AS WELL AS THE NVAC UNIT(5) AND SHALL BE EQUIPPED WITH TWO HOUR OVERRIDE PUSH-BUTTON TO TURN THE LIGHTS ON DURING UNOCCUPIED HOURS. EMS SHALL ALSO HAVE A LAN CONNECTION FOR REMOTE MONITORING AND CONTROLLING. 2. SENSOR OPERATION: EACH UNIT SHALL HAVE TEMPERATURE SENSORS. THE TEMPERATURE SENSOR SHALL AVERAGE THE SPACE TEMPERATURE AND SHALL HAVE A DEAD BAND SETTING OF +/-1°F. THE SENSORS ARE NOT CONTROL DEVICES, THE EMS WILL CONTROL THE UNIT(S). 3. COOLING MODE: DURING OCCUPIED HOURS, THE SALES AND NON -SALES AREA SHALL BE MAINTAINED AT A TEMPERATURE OF 71°F. DURING UNOCCUPIED HOURS, ALL AREAS SHALL BE MAINTAINED AT 80°F. AIR CONDITIONING UNITS SHALL MODULATE TO SATISFY ROOM THERMOSTAT SET POINT. EQUIPMENT SERVING VIDEO WALL MONITORS AND CABINET TO BE SET TO OCCUPIED MODE DURING ALL HOURS OF THE DAY. 4. HEATING MODE: DURING OCCUPIED HOURS, THE SALES AND NON -SALES AREAS SHALL BE MAINTAINED AT 68°F. DURING UNOCCUPIED HOURS, ALL AREAS SHALL BE MAINTAINED AT 65°F. AIR CONDITIONING UNITS SHALL MODULATE TO SATISFY ROOM THERMOSTAT SET POINT. 5. VENTILATION AIR MODE: DURING OCCUPIED HOURS, THE TOILET EXHAUST SYSTEM SHALL OPERATE UNDER EMS TIME SCHEDULE. DURING UNOCCUPIED HOURS, THE TOILET EXHUAST SYSTEM SHALL REMAIN SHUT. 6. FRESH AIR WITH HEAT RECOVERY: DURING OCCUPIED HOURS, THE FRESH AIR DAMPER SHALL BE DRIVEN OPEN, AHU SHALL ENERGIZE AND CONTINUE TO OPERATE. SUPPLY AIR WILL RECOVER SOME HEAT FROM EXTRACT AIR FLOW THROUGH AIR TO AIR HEAT EXCHANGER INTEGRAL WITH AHU. HEATING TO BE SUPPLEMENTED BY AN ELECTRIC HEATING COIL WITH STEP OR THERMISTOR CONTROL TO MAINTAIN SET POINT OF 52°. ELECTRIC HEATER SHALL BE PROVIDED WITH A FAN RUN ON TIMER TO DISSIPATE AND RESIDUAL HEAT BEFORE SHUTDOWN. DURING UNOCCUPIED HOURS, THE OUTSIDE AIR DAMPER SHALL REMAIN FULLY CLOSED AND AHU DE -ENERGIZED. 7. MORNING START-UP MODE: FOR ONE HOUR BEFORE OCCUPIED HOURS, THE EMS SHALL CALL FOR THE START UP CYCLE. DURING START-UP CYCLE, THE UNIT(S) WILL RUN ONLY IF COOLING AND / OR HEATING IS CALLED FOR TO REACH DESIRED SET POINTS. FRESH AIR AHU SHALL REMAIN DE -ENERGIZED. 8. EMERGENCY HEAT MODE (IF PLENUM SENSOR INSTALLED): IF THE PLENUM SENSOR REPORTS A TEMPERATURE UNDER 50°C THE EMS SHALL GO INTO ALARM AND TURN ALL THE LIGHTS ON IN THE SPACE. SMOKE ALARM: IF ANY SMOKE DETECTOR SIGNALS SMOKE, THE EMS SHALL GO INTO ALARM. REFRIGERATION PIPING AND SPECIALITES SECTION 232300 R ' - IGERANT PIPING: THIS 'NTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGE T PIPING STEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR FAN 'ITS IF APPL BLE. PIPING: A REFRIGE T PIPING SHALL BE TYPE "L" HARD DRAWN COP: TUBING (ASTM B5: TUBING SHALL BE CLEAN, GAPPED AND NIT' EN CHARGED. 8. C. ALL FITTIN • ND JOINTS SHALL BE WROUGHT COPPER ' CAST BRONZE (ANSI BI6.22). • LL COPPER TO COPPER JOINTS SHAL BRAZED WITH A COPPER-PHOSP `•US ALLOY AND ALL OTHER JOINTS ALL BE BRAZED WITH SILFOS-5 ALLOY. ALL ELBOWS ARE 4 BE LONG RADIUS TYPE. 3. INSTALLATION: A. SUCTION LINES SHALL RISERS TO MEET THE MANUFACTURER'S RECOM 4. B. C. D. VE ADEQUATE LIFT T UIREMENTS OF FUEL NDATIONS. BRAZE ALL JOINTS WITH S WORKING TOWARD THE OUT SHALL BE BROKEN LAST. A SOLDERING AND ANY TIME THE CAPPED AND SEALED BEFORE L PRESSURE TEST FOR LEAKS WITH LEAKING JOINTS AND RETEST UN SYSTEM TO 200 MICRONS OF M R-22 AND A INERT GAS TO 41 DETECTOR. ALL LEAKING JO LEAKS EXIST. TURN ON CR COMPRESSOR TO BE SUR COMPRESSOR. UPON COMPLETION OF INSULATION IS APPLI REPRESENTATIVE 5 AND/OR DOUBLE SUCTION ONDITIONS AND EQUIPMENT 05-5 START - AT THE INDOOR UNIT AND R UNIT. E SEALS ON THE OUTDOOR UNIT ROGEN EED SHALL BE USED DURING ALL ST IS OPEN. ALL OPEN LINES SHALL BE I . THE SITE DURING CONSTRUCTION. INERT GAS AT TO 410 PSID. REDO YSTEM IS TIGHT. EVACUATE ENTIRE U CHARGE SYSTEM WITH 25 PSI OF SI A RETEST SYSTEM WITH HALIDE LEAK S MUST COMPLETELY RESEALED UNTIL NO CASE HEA •5 24 HOURS PRIOR TO STARTING LL REFRIGERA LIQUID IS OUT OF THE STING, BUT BEFORE THE PIPING MUST BE I HE LOCAL GOVERNING AUT REFRIGERANT PIPING ECTED BY A ITY AS NECESSARY. INSULATE THE R IGERANT SUCTION LINES AND C WITH RUBATEX ' ARMSTRONG I INCH THICK PIPE IN SPREAD RATI OF NOT MORE THAN 25 AND A SMOK MORE THAN IN ACCORDANCE WITH INDUSTRY STANDA INSULATE T HOT GAS (LIQUID) LINES OR ANY HOT GAS APPLICAB . APPLY 2 COATS OF U.V. PROTECTANT/SEAL INSULAT EXPOSED TO WEATHER. INSPECT! A. CON ' ACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING EMATIC TO T OCAL EQUIPMENT MANUFACTURER FIELD REPRESENTATIVE F ROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION PIPING, IS CONTRACTOR MUST CALL THE LOCAL EQUIPMENT MANUFACTURE SPECTOR FOR FIELD INSPECTION OF WORK PERFORMED AT AtF EXPE ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY EQUIPMENT MANUFACTURER FIELD REPRESENTATIVE MUST BE CORRECTED T NO ADDITIONAL CHARGES TO IMF. ENSATE LINES ONLY ATION WITH FLAME VELOPED OF NOT S. DO NO YPASS LINES IF ON ALL HVAC AIR DISTRIBUTION SECTION 233000 A. SUPPLY AIR TAKEOFF FITTINGS 1. CONICAL OR "BELL -MOUTH" TAKEOFFS W/ DAMPERS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS AND DETAILS ON SHEET MI.3 B. DAMPERS I. MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. 2. OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18" LONG ORANGE MARKER TAPE. COLLARS MUST BE INSTALLED OVER EXTERNAL INSULATION TO ALLOW FREE MOVEMENT. SEE ADDITIONAL DETAILS ON MECHANICAL DETAIL DRAWING. 3. NO VOLUME DAMPERS UPSTREAM OF VAV BOX. 4. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR, RELIEF AIR, OR RETURN AIR DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. C. FIRE DAMPERS I. PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED AND MEET ALL CODE REQUIREMENTS. 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIR STREAM AND A I65°F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH AND INSTALL ACCESS DOORS AS NECESSARY. 3. ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND CODE REQUIREMENTS. D. TOILET EXHAUST SYSTEM ALL DUCTWORK AND/OR CONNECTIONS TO LANDLORD SYSTEM NECESSARY FOR A COMPLETE TOILET EXHAUST SYSTEM. DUCT AORK SECTION 233113 A. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED I. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SKETCH MUST BE SUBMITTED INDICATING SIGNIFICANT DEVIATIONS FROM DESIGN AND MUST BE APPROVED BY OWNER'S CONSTRUCTION MANAGER PRIOR TO FABRICATION OR INSTALLATION. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (1E. UMC, BOCA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: 2" W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2" W.G., NEGATIVE. EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: CLASS B - 3" N.G. RETURN AND EXHAUST DUCTS: CLASS C - 2" W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. 4. ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCK SEAM CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND DUCTWORK SIZES 13" DIAMETER AND SMALLER MAY BE SNAP- LOCK CONSTRUCTION. ALL EXPOSED ROUND DUCTWORK SHALL BE SPIRAL LOCK SEAM REGARDLESS OF SIZE. ALL SNAP LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. DUCTWORK SHALL BE AS MANUFACTURED BY UNITED MCGILL, SEMCO, OR APPROVED EQUAL. 5. ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK WHEN ABOVE CEILING CLEARANCES PERMIT AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; ALL SUPPLY AND RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR . WHERE ROUND DUCT SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK TO OWNER FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. 6. AS A MINIMUM, CROSS BREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/8" WIDE X 3/16" DEEP ON 12" CENTERS TO PREVENT VIBRATIONS, REGARDLESS OF DUCT GAUGE. 7. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS OVER 36" IN LENGTH. INSTALL FACTORY MANUFACTURED SINGLE THICKNESS TURNING VANES IN ALL OTHER ELBOWS. 8. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. cl. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM I-1/2"XI-I/2" XI/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 10. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS- FIBER FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. II. SOFT ELASTOMER BUTYL GASKET TO SEAL FLANGED JOINTS. 12. DUCT TRANSITIONS SHALL NOT EXCEED SPECIFICALLY NOTED OTHERWISE. ADHESIVE BACKING SHALL BE USED 30 DEGREES SLOPE EXCEPT AS 13. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION 15 EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY OWNER CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES nocr BE USED A5 ACCESS LOCATIONS WHEN WITHIN 31-011 OF DEVICE. 14. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAW I NGS . WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED DEVICE (1 E. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. REFER TO DETAILS. 15. TRANSITION DEVICES SHALL BE INSTALLED AT MANUFACTURER'S RECOMMENDED POSITIONS. B. MEDIUM PRESSURE DUCT WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RAT I NG OF 6 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WI TH THE 3. CONNECTIONS TO THE LANDLORD'S MEDIUM PRESSURE DUCTWORK SHALL BE MADE WITH "LO-LOSS" SADDLE TEE TAPS BY UNITED MCGILL CORP., OR AS OTI-IERW ISE REQUIRED BY THE LANDLORD. 4. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, kl ITH THE EXCEPTION TI-IAT ALL MEDIUM PRESSURE DUCTWORK MUST BE WRAPPED INSULATION, NOT LINED. DIFFUSERS, REGISTERS AND GRILLES SECTION 233713 A. An DEVICES PROVI DE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH AS INDICATED. 2. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CEILING PLAN. 3. APPROVED MANUFACTURERS: TITUS IS SPECIFIED. NO SUBSTITUTIONS. HVAC EQUIP 'TNT SECTION 238000 A. HVAC EQUPMENT a. GC WILL SCHEDULE A REPRESENTATIVE FROM HVAC SUPPLIER TO START UP UNITS PER THE CONSTRUCTION SCHEDULE/FITCH TRACK. THE PURPOSE OF THE MECHANICAL STARTUP IS TO VERIFY PROPER OPERATION AND SET UP OF THE EQUIPMENT. b. FA I LURE TO HAVE A REPRESENTATIVE FROM THE HVAC SUPPL I ER AT STARTUP W ILL VOI D THE MANUFACTURER'S WARRANTY AND GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR ALL WARRANTIES PURCI-IASED BY 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE TRAPPED IN ACCORDANCE WITH MANUFACTURER'S DATA. CONTRACTORS INSTALLING DAIKIN EQUIPMENT SHALL BE DI CERTIFIED. 4. COMPRESSORS SHALL BE FULLY HERMETIC, SCROLL TYPE WITH FACTORY SPRING -SHOCK MOUNTED OR SPRING MOUNTED FOR VIBRATION ISOLATION. ALL COMPRESSORS SHALL HAVE CRANKCASE HEATERS AND SAFETIES FOR HIGH AND LOW HEAD PRESSURES. 5. SECONDARY DRAIN PANS ARE REQUIRED TO BE STAINLESS STEEL AND INSTALLED BENEATH INDOOR AIR CONDITIONING EQUIPMENT (ACU) USING WATER AS THE REFRIGERANT. SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO A TUND1SH ADJACENT TO A MOP BASIN OR AS SPECIFIED ON PLANS. SECONDARY PANS ARE NOT REQUIRED FOR ANY DUCTLESS TYPE UNIT. IF A DUCTED ACU IS PLACED OVER A SALES AREA, SECONDARY DRAIN PANS ARE REQUIRED NO MATTER THE TYPE OF REFRIGERANT USED. IF ANY ACU IS PLACED ABOVE ELECTRICAL EQUIPMENT SECONDARY DRAIN PANS ARE REQUIRED REGARDLESS OF REFRIGERANT USED. 6. THREE SETS OF FILTERS SHALL BE USED DURING CONSTRUCTION. CHANGE FILTERS JUST BEFORE COMMISSIONING AIR BALANCE AND AFTER FINAL STORE CLEANING. 7. FILTERS PROVIDED ARE TO MATCH TYPE AND SPECIFICATIONS OF THE OEM. 8. FILTERS ARE TO BE EASILY ACCESSIBLE. q. AT THE END OF CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A LIST IDENTIFYING THE UNITS AND CORRESPONDING FILTER TYPES AND SPECIFICATIONS TO THE A*F PM. 10. F I LT ER RACKS OF STANDARD SIZE ARE TO PROVIDED FOR ALL DUCTED UNITS. II. CONDENSATE DRAIN FRON INDOOR AIR CONDITIONING UNITS. MINIMUM DRAIN SIZE TO BE I". CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5 X UNITS' TOTAL STATIC PRESSURE. DRAIN SHALL TERMINATE AT CLOSEST TUNDISH WITHIN TENANT SPACE. PIPE SUPPORTS TO BE SPACED NO MORE THAN 70" APART. CITY OF TUKWILA APR 02 2019 PERMIT CENTER 14) CO cse) 0 mmils C=O 0 : o: to I Lu co T.D. TENANT DIRECTIVE 0 Lu CZ 0 L.D.- LANDLORD DIRECTIVE 0 a. -J LU CO cv co cc 0 1- 0 Liu cp 11.1 cr rl a5 3: cc 0 Lit CO co co Plot dote: 21 November 2018 AID DEVICE. SC--EDULE - SALES AREA REFERENCE MAKE MODEL TYPE SIZE (mm) MAX PRESSURE DROP (IN. W.G.) MAX NOISE CRITERIA (NC) MOUNTING FINISI-I NOTES FACE NECK SD -I KRUEGER PLQ PLAQUE DIFFUSER 24'x24" 10"0 0.1 25 LAY -IN T-BAR F23 35-BLACK SD-2 KRUEGER PLQ PLAQUE DIFFUSER 24"x24" I0" 0 0.1 25 LAY -IN T-BAR F23 35-BLACK PROVIDE WITH NCF23 MOUNTING FRAME SD-3 KRUEGER PLQ PLAQUE DIFFUSER 24"x24" 8"o 0.1 25 LAY -IN T-BAR F23 35-BLACK PROVIDE WITH NCF23 MOUNTING FRAME RG-1 KRUEGER 585 SINGLE DEFLECTION GRILLE 24"X24" - 0.1 35 LAY -IN T-BAR F23 35-BLACK PROVIDE WITH 35 DEGREE DEFLECTION. RG-2 KRUEGER S85 FIXED DEFLECTION STEEL GRILLE 12"x12" I0"x10" 0.1 25 SURFACE MOUNT 35-BLACK PROVIDE WITH NCF23 MOUNTING FRAME FOR RG IN FITTING ROOM. PROVIDE WITH 35 DEGREE DEFLECTION. RG-3 KRUEGER 585 FIXED DEFLECTION STEEL GRILLE 16"x16" I4"x14" 0.1 25 SURFACE MOUNT 35-BLACK 1° FILTER FRAME INSTALL IN VIDEO SNACK DOOR. PROVIDE WITH 35 DEGREE DEFLECTION. AIR DEVICE SCHEDULE - \O\ -SALES AREA REFERENCE MAKE MODEL TYPE SIZE (mm) MAX PRESSURE DROP (IN W.G.) MAX NOISE CRITERIA (NC) MOUNTING FINISH NOTES FACE NECK SD-4 KRUEGER PLQ PLAQUE DIFFUSER 24"x24" 10110 0.1 25 LAY -IN T-BAR F23 44-BRITISH WHITE RG-4 KRUEGER 585 SINGLE DEFLECTION GRILLE 24"X24" - 0.1 35 LAY -IN T-BAR F23 44-BR ITISH WHITE EG-I KRUEGER 585 SINGLE DEFLECTION GRILLE 12"X12" 6"o 0.1 35 SURFACE MOUNT 44-BRITISH WHITE EG-2 KRUEGER 585 SINGLE DEFLECTION GRILLE 12"Xl2" 4"(1) 0.1 35 SURFACE MOUNT 44-BRITISH WHITE AIR DEVICE SCHEDULE SCALE: NONE OV DER SJ°PLIED FA\ POAIERED V.A.V. BOX IkITH ELECTRIC HEAT SCHEDULE TAG MANUFACTURER MODEL INLET DIAM COOLING HEATING HEATING COIL UNIT ELECTRICAL NOTES MAXIMUM AIRFLOW MINIMUM AIRFLOW PRIMARY AIRFLOW FAN AIRFLOW TOTAL AIRFLOW VOLT/PH STAGES KW VOLT/PHASE MCA MOCP FPB- I CARRIER 45MN3 12 2800 550 2860 1200 2800 480/3 2 12.0 480/3 21. 12 25 I -6 FP8-2 CARRIER 45MN3 12 1820 550 1820 1200 1820 480/3 2 12.0 480/3 21.g2 25 1-6 FPB-3 CARRIER 45MN3 12 2285 550 2285 1200 2285 480/3 2 12.0 480/3 21.c12 25 1-6 NOTES: I. 480/60/3 DOOR INTERLOCKING DISCONNECT SWITCH 2. MAIN POWER FUSING 3. TRANSFORMER FOR 24V CONTROL SWITCH 4. LOW PRESSURE DROP MERV-8 FILTERS MOTOR STARTER REHEAT CONTACTS FLOW RING. NOTE AIR BALANCING CONTRACTOR TO CALL EMS FOR HVAC CONTROLS MAXIMUM AIRFLOW CALIBRATIONS. SEE CONTROL SHOP DRAWINGS FOR EMS CONTACT INFORMATION. STARTUP SHALL BE SCHEDULED AND COMPLETED BY THE GC. THE GC SHALL COMPLETE THE STARTUP DOCUMENT PROVIDED BY THE ANF PM. 5. G. TOILET EXHAUST FAN SCHEDULE KEY: CENT. -CENTRIFUGAL; PROP. -PROPELLER; F.C.-FORWARD CURVE; B.I.-BACKWARD INCLINED; A.F.-AIR FOIL REFERENCE MODEL MANUFACTURER EXTRACT DUTY (CFM) STATIC HEAD (IN. W.G.) CONFIGURATION APPLICATION ELECTRICAL REQUIREMENTS MAX NOISE CRITERIA (dBA) LOCATION NOTES VOLTAGE (V) PHASE CURRENT (A) TEF-I 705Q15D LOREN COOK 175 .125 CENTRIFUGAL FAN TOILET EXHAUST / JANITOR CLOSET EXXAUST 120 1 0.6 55 INLINE MOUNTED FAN TO BE CONTROLLED BY RESTROOM OCCUPANCY SENSOR City Name Seattle IAP Location Washington Latitude 47.5 Deg. Longitude 122.3 Deg. Elevation 449.0 ft Summer Design Dry -Bulb 85.0 °F Summer Coincident Wet -Bulb 65.0 °F Summer Daily Range 18.3 °F Winter Design Dry -Bulb 23.0 °F Winter Design Wet -Bulb 19.2 °F Atmospheric Clearness Number 1.05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 Local Time Zone (GMT +/- N hours) 8.0 Consider Daylight Savings Time No Simulation Weather Data NfA Current Data is 2001 ASHRAE Handbook Design Cooling Months January to December Air System Information Air System Name ................................... VAV 57 Equipment Class .................................. PKG ROOF Air System Type VAV Sizing Calculation Information Calculation Months Jan to Dec Sizing Data Calculated Central Cooling Coil Sizing Data Total coil load 12.8 Tons Total coil load 153.5 MBH Sensible cot load 136.4 MBH Coil CFM at Jul 1500 6039 CFM Max block CFM at Jan 2100 6039 CFM Sum of peak zone CFM 6039 CFM Sensible heat ratio 0.889 CFMffon 472.2 ft2/Ton 587.8 BTU/(hr- ft2) 20.4 Water flow @ 10.0 °F rise N/A Preheat Coil Sizing Data No heating coil loads occurred during this calculation. Supply Fan Sizing Data Actual max CFM at Jan 2100 6039 CFM Standard CFM 5942 CFM Actual max CFM/ft2 0.80 CFM/ft2 BTU/(hr• ft' °F) hours Number of zones 2 Floor Area 7518.0 ft2 Location Seattle IAP, Washington Zone CFM Sizing Peak zone sensible Toad Space CFM Sizing Individual peak space Toads Load occurs at Jul 1500 OA DB / WB 85.0 / 65.0 °F Entering DB /WB 78.3/64.3 °F Leaving DB / WB 57.0 / 55.7 °F Coil ADP 54.6 °F Bypass Factor 0.100 Resulting RH 57 % Design supply temp. 57.0 °F Zone T-stat Check 0 of 2 OK Max zone temperature deviation 1.0 °F Fan motor BHP 0.00 BHP Fan motor kW 0.00 kW Fan static 0.00 in wg DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 1500 COOLING OA DB / WB 85.0 °F / 65.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F ZONE LOADS Details Sensible (BTU/hr) Latent (BTU/hr) Details Sensible (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 - 0 ft2 - - Wall Transmission 0 ft2 0 - 0 ft2 0 - Roof Transmission 0 ft2 0 - 0 ft2 0 - Window Transmission 0 ft2 0 - 0 ft2 0 - Skylight Transmission 0 ft2 0 - 0 ft2 0 - Door Loads 0 ft2 0 - 0 ft2 0 - Floor Transmission 7518 ft2 0 - 7518 ft2 0 - Partitions 0 ft2 0 - 0 ft2 0 - Ceiling 0 ft2 0 - 0 ft2 0 - Overhead Lighting 539 W 1477 - 0 0 - Task Lighting 5299 W 15290 - 0 0 - Electric Equipment 9898 W 31445 - 0 0 - People 172 34711 34400 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 0% 8292 0 10% 0 0 » Total Zone Loads - 91215 34400 - 0 0 Zone Conditioning - 111670 34400 - -73 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 70% 0 - 0 0 - Plenum Lighting Load 5% 92 - 0 0 - Return Fan Load 6039 CFM 0 - 2191 CFM 0 - Ventilation Load 2191 CFM 24639 -17335 795 CFM 39141 0 Supply Fan Load 6039 CFM 0 - 2191 CFM 0 Space Fan Coil Fans - 0 - - 0 - Duct Heat Gain / Loss 0% 0 - 0% 0 - » Total System Loads - 136401 17065 - 39067 0 Central Cooling Coil - 136401 17076 - 0 0 Preheat Coil - 0 - - 0 - Terminal Reheat Coils - 0 - - 39063 - » Total Conditioning - 136401 17076 - 39063 0 Key: Positive values are clg loads Negative values are htg loads Positive values are htg loads Negative values are clg loads REVIEWED FOR CODE COMPiliANCE APPROVED City ,4 •17;.1,eat BUtLDN&Rllt1 G MECHANICAL LOAD CALCULATIONS SCALE: NONE AO. PROJECT MANAGER COMMISSIONING A. GENERAL A.I. ALL REFERENCES TO THE TERM "OWNER" REFER TO ABERCROMBIE 4 FITCH, A$F, OR HOLLISTER. A.2. ALL REFERENCES TO THE TERM "VENDOR" REFER TO THE OWNER SUPPLIED HVAC 4 CONTROLS COMMISSIONING VENDOR. A.3. ALL REFERENCES TO THE TERM "PROGRAM" REFERS THE HVAC $ CONTROLS COMMISSIONING PROGRAM. A.4. ALL REFERENCES TO "ALC" REFER TO THE A$F OWNER SUPPLIED ENERGY MANAGEMENT SYSTEM VENDOR AUTOMATED LOGIC CONTROLS. B. PURPOSE B.I. A$F HAS IMPLEMENTED AN OWNER SUPPLIED HVAC 4 CONTROLS COMMISSIONING PROGRAM TO GUARANTEE ALL NEW STORES ARE 100% COMMISSIONED AT THE PUBLISHED STORE TURNOVER DATE. C. EXPECTATIONS C.I. THE VENDOR IS EXPECTED TO WORK IN A METHODICAL AND PROFESSIONAL MANNER. C.2. THE VENDOR SHALL FOLLOW ALL LOCAL, COUNTRY, LANDLORD, 4 A$F RULES/REGULATIONS. C.3. THE VENDOR IS REQUIRED TO PROVIDE ALL NECESSARY LABOR, MATERIALS, 4 EQUIPMENT TO COMPLETE THE PROGRAM. THE VENDOR IS RESPONSIBLE FOR COORDINATING ALL SITE VISITS WITH THE GENERAL CONTRACTOR. C.4. THE VENDOR IS RESPONSIBLE FOR ALL TRAVEL ARRANGEMENTS. C.5. THE VENDOR IS RESPONSIBLE FOR ACCESSING AND DOWNLOADING THE LATEST REVISION OF SHOP DRAWINGS, EQUIPMENT SUBMITTALS, AND CONSTRUCTION DOCUMENTS FOR EACH SITE VISIT. C.6. THE VENDOR SHALL MAKE ONE SITE VISIT FOR EACH STORE. THE VISIT SHALL COORDINATE WITH THE A$F CONSTRUCTION SCHEDULE. C.7. THE VENDOR SHALL REVIEW THE CONSTRUCTION SCHEDULE ON A WEEKLY BASIS TO PLAN AND COORDINATE TRAVEL TO SITES AS REQUIRED. C.8. THE VENDOR SHALL CHECK IN 4 OUT WITH THE GC SITE SUPERINTENDENT EACH DAY OF THE SITE VISIT. C.9. THE VENDOR SHALL REVIEW, IN PERSON, ALL DEFICIENCIES WITH THE GC'S SUPERINTENDENT PRIOR TO LEAVING THE SITE EACH DAY. C.10. THE VENDOR SHALL SUBMIT A DAILY SITE VISIT REPORT VIA EMAIL TO THE A$F CONSTRUCTION TEAM. C.II. THE VENDOR SHALL COMPLETE AN HVAC 4 CONTROLS INSPECTION REPORT, FORM DEFINED BY A$F, THAT LISTS ALL DEFICIENCIES WITH PHOTOS OF EACH DEFICIENCY. REVIEW THE REPORT WITH THE GC'S SITE SUPERINTENDENT AND HAVE THEM SIGN THE REPORT. SUBMIT THE REPORT VIA EMAIL TO THE A$F CONSTRUCTION TEAM WITHIN 24 HOURS OF LEAVING THE JOBSITE. C.12. THE VENDOR SHALL WORK WITH THE GC, ALC, 4 HVAC EQUIPMENT MANUFACTURERS TO RESOLVE ALL DEFICIENCIES. D. PM SITE VISIT #2 - MECHANICAL REVIEW D.I. AUDIT THE INSTALLED HVAC EQUIPMENT VERSUS THE APPROVED GC SUBM ITTALS. D.2. AUDIT THE GC FIELD INSTALLATION VERSUS THE CONSTRUCTION DOCUMENTS. THE REVIEW SHALL INCLUDE BUT NOT BE LIMITED TO: D.2.I. HVAC EQUIPMENT (INDOOR It OUTDOOR) D.2.2. ROOF CURBS 4 PENETRATIONS D.2.3. PIPING (REFRIGERANT, CONDENSER, CONDENSATE, CHILLED WATER, POTABLE WATER, STEAM, NATURAL GAS, ETC. ) D.2.4. DUCTWORK D.2.5. SEISMIC HANGARS (IF APPLICABLE) D.2.6. VIBRATION ISOLATORS D.2.7. AIR DEVICES (DIFFUSERS, GRILLES, VCD'S, ETC.) D.2.8. INSULATION (DUCTWORK, PIPING, ETC.) D.2.g. MAINTENANCE ACCESSIBILITY (FILTERS, COILS, MOTORS, ISOLATORS, ETC.) D.2.10. FIRE DAMPERS) D.2.1I. CONTROLS MECHANICAL EQUIPMENT SCHEDULES SCALE: NONE E AO' PROJECT MANAGER COMMISSIONING VENDOR COMMISSIONING D. PM SITE VISIT #2 - MECHANICAL REVIEW D.3. AUDIT THE GC CONTROLS FIELD INSTALLATION VERSUS THE ALC SHOP DRAWINGS. THE REVIEW SHALL INCLUDE BUT NOT BE LIMITED TO: D.3.I. EQUIPMENT INSTALLED (EMS PANEL, SENSORS, ETC.) D.3 .2. CONTROLS CABLE PULLED 4 LABELED D.3 .3. NOTIFY A$F IMMEDIATELY IF CABLE IS NOT INSTALLED OR INSTALLED CABLE IS NOT WHAT ALC PROVIDED D.4. PRODUCE HVAC 4 CONTROLS INSPECTION REPORT TO BE SAVED IN JOB'S SITE VISIT FOLDER. E. PM VISIT #3 - EQUIPMENT START UP AND AIR/WATER. E.I. AUDIT THAT ALL DEFICIENCIES IN THE PM SITE VISIT #2 REPORT ARE RESOLVED DURING PM VISIT #3. IF ALL (TERMS ARE NOT COMPLETE PM SHOULD REVIEW WITH THE GC'S SITE SUPERINTENDENT BEFORE LEAVING THE SITE. E.2. REQUEST * OBTAIN A COPY OF THE HVAC EQUIPMENT STARTUP REPORT(S) WITH SIGNATURE OF MANUFACTURER'S REPRESENTATIVE WHO PERFORMED THE STARTUP FROM GC 4 SAVE TO STORE FOLDER IN NOT COMPLETE UNTIL AFTER PM VISIT #3, PM TO OBTAIN REPORT AS SOON AS STARTUP 15 COMPLETE. F. COMMISSIONING SITE VISIT COMMISSIONING F.I. AUDIT THAT ALL DEFICIENCIES IN THE PM SITE VISIT #3 REPORT ARE RESOLVED BY THE FIRST DAY OF THE SITE VISIT. IF ALL ITEMS ARE NOT COMPLETE, IMMEDIATELY REVIEW THE DEFICIENCIES WITH THE GC'S SITE SUPERINTENDENT AND CONTACT A$F. F.2. CONTACT ALC'S CUSTOMER SERVICE LINE (PHONE #: (678) 797-5088) AND COMPLETE A POINT-TO-POINT AUDIT OF THE CONTROLS SYSTEM WITH ALC. F.3 TERMINATE ALL CONTROLS CABLES INTO THE EMS PANEL AND CONTROL DEVICES PER THE ALC SHOP DRAWINGS * HVAC EQUIPMENT SUBMITTALS. THE FOLLOWING IS A LIST ITEMS TO TERMINATE. ITEMS SHALL INCLUDE BUT NOT LIMITED TO: F.3.1. EMS SPACE TEMPERATURE SENSOR(S) F.3.2. EMS RELATIVE HUMIDITY SENSOR(S) F.3.3. EMS SUPPLY AIR TEMPERATURE SENSOR(S) F.3.4. EMS OUTDOOR AIR SENSOR(S) F.3.5. PROGRAMMING EQUIPMENT MANUFACTURER GATEWAY. F.3.6. EMS CHILLED, HOT, AND CONDENSING WATER SENSOR(S) F.3.7. EMS CURRENT OPERATED SWITCHES) F.3.8. EMS CONTROLS WIRE AND POWER: FOR ALL NON-DAIKIN I-IVAC EQUIPMENT. THIS WILL INCLUDE, BUT NOT LIMITED TO, CARRIER, TRANE, YORK, LENNOX, ETC F.3.g. EMS CONTROLS WIRE: FOR ALL THIRD PARTY EXHAUST, SUPPLY OR CIRCULATION PUMPS. F.3.I0. ALL MODBUS CONNECTIONS F.4. NOT INCLUDED IN SCOPE: F.4.1. ELECTRICAL OR POWER TERMINATIONS TO THE EMS PANEL AND LIGHTING CONTACTORS F.4.2. INSTALLING THE EMS PANEL, UNITARY PANELS, OR SENSORS F.4.3. PROVIDING OR INSTALLING THE COMMUNICATION OR CONTROLS CABLE F.4.4. FIRE PROTECTION OR FIRE ALARM SYSTEMS F,5. THE VENDOR IS TO REMAIN ON SITE UNTIL THE STORE HAS BEEN 100% COMMISSIONED. VENDOR SHALL NOT LEAVE THE SITE UNTIL 100% COMMISSIONED UNLESS APPROVED BY A$F'S PROJECT MANAGER. F.G. PRODUCE HVAC $ CONTROLS INSPECTION REPORT DAILY AND HAVE THE REPORT SIGNED BY THE SITE SUPERINTENDENT OR DELEGATED PERSONNEL A. GC CHARGE BACK A.l. A $2000.00 BACK CHARGE WILL BE APPLIED TOWARDS THE GC CONTRACT FOR ALL ADDITIONAL DAYS REQUIRED ON SITE DUE TO GC ISSUES. TO INCLUDE BUT NOT LIMITED TO COSTS TO CHANGE FLIGHT, HOTEL, AND PER DIEM. COMMISSIONING SPECIFICAITONS I SCALE: NONE 1-0053 riEGEiVEf CITY OF TUK ILA APR 02 2019 PIN1lAIT r`Clllrr ,. l !j O O CCOO -CV -I�p I M Z cfl Q CO nic Z Om= II" NI CAI PI gima sommi 0 0 z f w w Z 0 z T.D.- TENANT DIRECTIVE L.D.- LANDLORD DIRECTIVE 0 -J V 0 J Z W -J CI W ♦0 v, J V U W O STORE 31620 T MASTER DATE: OCT-2 'd' CC Um' V F"a t1.1� U 'ono M co 0 cc (/) F- Q Z CC 0 U W LL -• ▪ eAlme c9) O▪ Wljw _ ao (n 11.18.020.31620 SHEET M1.20 Plot date: 22 March 2019 � K� H r 6.00/ TEF-I) 15# J.8) EXISTING LANDLORD SUPPLY AIR DUCTWORK LANDLORD TOILE EXISTING 18"4 EXHAUST NAlt\I 2800 CFM EXISTING LANDLORD SUPPLY AIR DUCTWORK 4 T�I�Y SD -I \ IGO 1. \ EXISTING IS"(P LANDLORD TOILET EXHAUST MAI I A I/ V j J 10"4 DN w/ DAMPER 10"� 228)5 CFM FP- 2 1820 CFM SD-1 220 mu10"4 H i icoo G.1 G MECHANICAL PLAN 17 6� REVIEWED FOR CODE COMPLIANCE APPROVED APR 11 2019 City of Tukwila BUILDING DIVISION t \1 \ 18.8 18.82 711111,.. rMINIM 7 omoo 0ao� £ 't I E 00 00 t— — N O_ �t � C] >- cfl M Z tp Q m ci= w z imme O nimil M mia a C:11 F— Ct IZ 0) 0 Z z w M ~ � V)NI—�;7: W=M(n m L ' o ~ —i 0 D O M V) 0 cL 0 T.D. TENANT DIRECTIVE L.D.- LANDLORD DIRECTIVE ISSUE DATES w t-- a 0 m N 8 w I- 0 w w 1- c() GENERAL PLAN NOTES MECHANICAL PLAN NOTES MECHANICAL PLAN SYMBOL LEGEND I. COORDINATE ROUTE OF DUCTWORK WITH SUPPORTS FOR LIGHTING IN ALL SALES AREA. REFER TO ELECTRICAL LIGHTING PLAN FOR FURTHER INFORMATION. 2. TEMPERATURE SENSORS TO BE MOUNTED 48" AFFL UNLESS OTHERWISE NOTED. 3. ALL NON -SALES AREA GRILLES SHALL BE MOUNTED AT I2'-0". 4. ALL MECHANICAL EQUIPMENT SHALL BE LABELED HCO-XXX-# (WHERE XXX IS THE EQUIPMENT DESIGNATION, ACU, CU, EF, ETC.) IN ACCCORDANCE WITH THE LABELING REQUIREMENTS IN SPEC BOOK. LANDLORD NOTES TENANT SHALL MAINTAIN A MINIMUM OF 6" UNOBSTRUCTED CLEARANCE HEIGHT IN RETURN AIR PLENUM ABOVE CEILIING ALLOWING FOR AIR FLOW BACK TO LANDLORD AIR CONDITIONING UNIT INSTALL ALL DUCTWORK AS TIGHT TO STRUCTURE AS POSSIBLE, ROUTE TO AVOID LIGHT FIXTURES. MAINTAIN DUCT HEIGHTS TO ACCOMMODATE CEILING HEIGHTS. REFER TO REFLECTIVE CEILING PLAN. 0 0 0 0 0 0 LOCATE REMOTE SENSOR WHERE SHOWN. CONTRACTOR SHALL VERIFY EXACT CONTROL TYPE AND REQUIREMENTS WITH LANDLORD'S REPRESENTATIVE. PROVIDE NEW MEDIUM PRESSURE DUCT TAP INTO EXISTING LANDLORD'S SUPPLY AIR TRUNK. COORDINATE ALL REQUIREMENTS WITH LANDLORD'S REPRESENTATIVE. CONNECT TENANT'S EXHAUST DUCTWORK INTO LANDLORD'S EXISTING TOILET EXHAUST MAIN. INSTALL MAKEUP AIR GRILLE IN ACCESS DOOR. DOOR TO BE INSTALLED OPPOSITE OF RETURN GRILLE. STUB DUCT TO OPEN AREA ABOVE RESTROOM FOR EXHAUST FAN MAKE UP AIR. CONNECT INTO EXISTING MEDIUM PRESSURE DUCT TAP AND CONNECT TO NEW VAV BOX. SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SD X DESIGNATION XXX CFM DIFFUSER DESIGNATION TOILET EXHAUST W SHUT-OFF VALVE SUPPLY AIR DIFFUSER GRILLE. SHADING DENOTES DIRECTIONAL BLOW TABS. SD SUPPLY DIFFUSER BALANCE VALVE RG RETURN GRILLE PIPE UNION z z RETURN AIR GRILLE EG EXHAUST GRILLE 2-WAY TEMPERATURE CONTROL VALVE AIR CURTAIN Y-TYPE STRAINER EXHAUST GRILLE TOILET EXHAUST FAN REFRIGERANT SUPPLY [DXS] EFIX EXHAUST FAN EXHAUST FAN REFRIGERANT RETURN [DXR] 711 4 WAY CASSETTE TYPE FAN COIL UNIT ACU AIR CONDITIONING UNIT CHILLED WATER SUPPLY [CHWS] KAHU) AIR HANDLING UNIT CHILLED WATER RETURN [CHNR] CONDENSING UNIT CONDENSATE LINE [CD] i 0 � U W � LI.lcn VJCO °(tea V Cc CI V CO U- F-wF-- Q OW ) co CO w Z Q 0 m 0 z 0 SCALEI /4"=1 ALC EMS SENSOR CHRV) HEAT RECOVERY VENTILATION C DUCT CAP OUTDOOR AIR SENSOR ATTACHED TO NORTH SIDE OF OA INTAKE HOOD WITH SUN SHIELD MD MOTORISED DAMPER DUCT, FLEXIBLE CONNECTION DC SMOKE EXTRACT DAMPER CONTROLLER C DUCT TRANSITION EMS ENERGY MANAGEMENT SYSTEM PANEL (EMS) $ I-IVAC SYSTEM PANEL SOUND ATTENUATION VCD VOLUME CONTROL DAMPER C 0- DUCT DROP $ RISE, ROUND -On um FD FIRE DAMPER C›< RETURN AIR DUCT RISE / DROP SUPPLY AIR DUCT RISE / DROP l9 BD BALANCE DAMPER CONNECT TO EXISTING AT THIS POINT SPIN -IN FITTING ff In■ul FSD SD COMBINATION FIRE/SMOKE DAMPER REC! ;rEii SMOKE DAM ` OF ` L K W ELA 11.18.020.31620 SHEET APR 02 2019 ADDRESSABLE DUCT SMOKE DETECTOR PERMIT CENTER M2.00 Plot date: 22 March 2019 INS AT DU TO COVE NOTES: WRAP INSULATION SPIN -IN FITTING: WITH DAMPER, EXCEPT IN PLASTERBOARD CEILINGS, DAMPER IN NECK MINIMUM RADIUS EQUAL TO THE FLEX DUCT DIAMETER WRAP INSULATION ABOVE THE CEILING DIFFUSERS HANGER STRAPS ROUND SHEET METAL DUCT WITH 1.5" WRAP INSULATION. ROUND DUCT (FLEX ONLY IN VERTICAL) BAND CLAMP AND THREE SHEET METAL SCREWS THROUGH HELIX OF FLEXIBLE DUCT LINER (TYPICAL) FLEXIBLE DUCT: INSULATED, ONLY IN �. �LERTICAL CEILING DIFFUSER: SET THROW AS SHOWN ON PLANS DIFFUSER MOUNTING DETAIL SCALE: NONE OUTSIDE DIMENSION 23", I9", 17" OR 11" INSIDE DIMENSION NOTE: ROUGH -IN OPENING SIZES: NOMINAL 12"x 12" = 12 I/2"x 12 1/2" NOMINAL 24"x 24" = 24 I/2"x 24 I /2" NOMINAL 24"x 12" = 24 l/2"x 12 1/2" NOMINAL IS"x 18" = 18 I/2"x 18 1/2" NOMINAL 20"x 20" = 20 I/2"x 20 I/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING DRYWALL CEILING STEEL MOUNTING FRAME DRYWALL MOUNTING FRAME DETAIL M2.00 SCALE: NONE OUTSIDE AIR CONNECT TO NEW COOK OUTSIDE AIR AKE DUCT SIZE AS TED ON SHEET IELD VERIFY ION. SMOKE DETECT PROVIDE ANTI -VIBRATION MOUNTING PAD (TYPICAL). SQUARE WASHER ON TOP AND BOTTOM OF UNISTRUCT / CRANES: (TYP IRSPLrf SYSTEM DX COOLI NON -SALES CEILING MANUFACTURER. R NUMBERS AND 2. PROVIDE 1" A INDICATED 3. SUPPLY WITH Vi a) "4. GALVANIZED STEEL ALL -THREAD HANGER ROD SPRING HANGER WITH RUBBER SNUBBER. SIZE FOR 120% OF WEIGHT OF SUSPENDED LOAD. LOCATED 3FT MIN. FRO RUB; •'3'< 313 R4HU PROVIDED WITH SPRING HANGER AD STRU OUBLE NUT TOP SUPPOR AND BOTTOM PER AHU (TYPICAL). MANUFACTUR RIC HEATING AIR HANDLII �M M VIDE ONAL RAL HANNEL LECT SHOWN WITH PROPER SERVICE 6` AA AS TO SHEET M3.0 FOR ADDITIONAL INI TI E AMA ■. ' RICAL REQUIREMENTS PRIOR TO INSTALFL IONPDITIONAL DE TICAL DUCT LINING IN SUPPLY AND RETURN DUCTS FROM UNIT GONNE 4 PECIFICATIONS. RETURN AIR DUCT CONNECTIONS TO ANU SHALL BE MADE FULL SIZE OF EQUIPM IBLE DUCT CONNECTIONS AT UNIT. TRANSITION TO SIZES SHOWN ON PLANS. ELBOWS E TIIICItliiCC TL�n`II WIN W HANGER UNIT TO LEVEL INSTALL PROVI DE STRUCTURAL SUPPORT CHANNEL PER AHU MANUFACTURER'S RECOMMENDATIONS IF UNISTRUCT IS USED OPEN FACE TO FACE DOWN ACU MOUNTING DETAIL SCALE: NONE CK OPENING BETWEEN ROOF DECK AND DUCTS IRE CURB CAVITY WITH FIBERGLASS ION. PROVIDE SHEETMETAL ENCLOSURE ENETRATION OF METAL ROOF DECK $ HOLD INSULATION IN PLACE. EQUIPMENT ROOF CURB SHIM LEVEL. I. ROOF MOUNTED HVAC UNIT. RTU TO BE IN ' LED IN LANDLO BE DONE BY A LANDLORD APPROVED C' ACTOR AT GCS EXP BOOK FOR ADDITIONAL INFORMATION • TRACTOR MUST VERIFY REQUIREMENTS PRIOR TO INSTAL . COORDINATE ROOF PENETRA LANDLORD APPROVED ROOFING ' 'TRACTOR. PROVIDE ALL NECESSARY PENETRATION, ROOF PATCH► ETC. PROVIDE I" ACOUSTICAL ' LINING IN SUPPLY AND RETURN DUCTS FROM U INDICATED IN SPECIFIC,' • 5 SUPPLY AND RETU R DUCT CONNECTIONS TO RTU SHALL BE MADE FULL SIZE 0 FLEXIBLE DUCT r 1 ECTIONS AT UNIT. DUCTWORK SHALL BE INSTALLED FROM UNIT CO THE VERTICAL OP FROM THE UNIT. TRANSITION TO SIZES SHOWN ON PLANS. ELBOWS THICKNESS ING VANES INSTALLED. COORDIN • WITH LANDLORD ROOFING CONTRACTOR. T FROM STRUCTURE ABOVE OMMENDED BY VIEW- VW f\t`l ILL 5 5 N TO POINTS OPENING HAVE FLEXIBLE DUCT CONNECTION (TYPICAL) ROOF FRAMINGSEE STRUCTURAL DRAWINGS ESIGNATED ROOF ZONE. ALL ROOF WORK TO REFER TO DRAWING AI.00 AND SPEC L NUMBERS AND ELECTRICAL AND NEW CURB PLACEMENT WITH ONENTS FOR ROOFING ONNECTION TO POINTS UIPMENT OPENING WITH TIONS FULL SIZE IN HAVE DOUBLE ROOFTOP UNIT INSTALLATION DETA SCALE: NONE DEL ES5B TO (2) UNIT IFY AND NNITN SUPPLY DUCT CONCENTRIC TEE FITTING FLAT OVAL DUCT BRANCH TAKE -OFF SIMLAR SUPPLY DUCT CONCENTRIC SPIN -IN FI RECTANGULAR TO ROUND DUCT ECCENTRIC TEE FITTING RETURN OR EXHAUST DUCT B BRANCH DUCT TAKE -OFF DETAIL M2.00 SCALE: NONE 12" 1-1IG1-I PR SUPPORT PAT SPAN AT LEAST STRUCTURAL MEMB APPROX. 9'-0". FIELD COORDINATE EXACT LOC DUCT MAIN 4" MIN 8" MIN DUCT COLLAR TURNE FLANGE OF GRILLE APPEARANCE. FASTENER OPPOSED BLADE DAMPER NOTES: I. GAUGE OF SHEET METAL SHAL DUCT COLLAR IS ABLE TO SUPP GRILLE $ DAMPER AND BE LEVEL. ACCEPT FLUSH E SUCH THAT WEIGHT OF OPEN CEILFIG SUPPLY REGISTER DUCT CONVECTION DETAIL SCALE: NONE RICATED EQUIPMENT MALL OPERATIONS MANAG ROOFING MATERIAL EXISTING ROOF DECK NOTES: AIR COOLED DX CONDENSING UNI BY MANUFACTURER. PROVIDE OPERATIONAL SYSTEM. FIE THE MANUFACTURER'S FOR ACCU SELECTION REQUIREMENTS PR 2. INSTALL NEW R AND MAKE FOR ADDI WORK ROOF. INSTALL WITH PROPER SER PIPING, VALVES, AND ACCESSORIES NEC ERIFY EXACT LOCATION OF ACCU, ACU, AND P ESENTATIVE FOR ACTUAL REFRIGERANT LINE SIZES LOAD INFORMATION. CONTRACTOR MUST VERIFY MODEL 0 INSTALLATION. GERANT LINES FROM THE AIR HANDLING UNIT'S DX COIL TO AIR COOL L CONNECTIONS. REFER TO MECHANICAL SPECIFICATIONS, "REFRIGERANT PI AL REQUIREMENTS. ROOF PENETRATIONS TO BE COORDINATED WITH THE LANDL E DONE BY THE LANDLORD'S ROOFING CONTRACTOR AT THE MECHANICAL CONTRACTOR SPRING VIBRATION ISOLATOR (BOLTED DOWN) CLEARANCE AREA AS RECOMMENDED RY FOR A COMPLETE AND ROUTE PRIOR TO CONSULTING IRED. REFER TO SHEET MI.I2 ERS AND ELECTRICAL X CONDENSING UNIT " ON SHEET MI.I AND ALL ROOF PENSE. ROOF MOUNTED EQUIPMENT DETAIL SCALE: NONE CLEAN CONNECT CONDENSATE ROOF 5" MIN. TRAP DEPTH CAP ISTING IN ON I. ALL DUCT FLEXIB AND P ROOF TOP UNI NEOPREN FACTURER'S F CURB FLASHING ROOF STEEL PING, OR ELECTRICAL CONNECTIONS TO UNIT BELOW ONNECTIONS. CUT INSULATION, GYPSUM BOARD, ROOFING AL DECKING PENETRATIONS TIGHT TO ITEM PENETRATING R RATION OPENINGS WITH GLASS FIBER INSULATION. SHALL HAVE ULATION, PACK ALL RTU CONDENSATE DRAIN DETAIL SCALE: NONE STRAP HANGER HANGER STRAPS 4 SHEETMETAL SCREWS PER DUCT HANGER (MIN.) SIZE BOLTS) FOR LOAD- TRAPEZE HANGER ANGLES HANGER RODS, WIRES OR STRAPS DUCT HANGING DETAIL M2.00 SCALE: NONE 4 AIR FLOW (MIN.) 1'-0" SHEET METAL PLENUM BOX. SUPPORT FROM STRUCTURE ABOVE 1II11111IIII RETURN AIR REGISTER (LAY -IN FRAME) ** - 10" OR MAX THAT CLEARANCE ALLOWS. DOUBLE LOCK NUT THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "C" THIS SHEET. H RESTROOM RETURN GRILLE MOUNTING DETAIL SCALE: NONE OPEN DRAIN PAN NOTES: I. INSTALL CONDENSATE DRAIN PIPE INSTALL CONDENSATE DRAIN T INSTALL CONDENSATE DRAIN CONDENSATE PIPING. SECONDARY CONDENSA CONDENSATE PIPING MIN. I" CONDENSATE DRAIN PAN PIPING. RUN DRAIN TO MOP BASIN WITH I" AIR GAP AT TUNDISH. SECONDARY DRAIN PAN WET SWITCH BY EMS VENDOR. ANU TO NEAREST TUNDISH. MI ITN DEPTH OF 1.5 X UNITS TOTAL STA AT A SLOPE OF In PER 4" TO THE NEAREST DRAIN SIZE TO BE 1". RESSURE, MINIMUM 6" DEEP. PPROVED RECEPTOR. INSULATE ALL RAIN PAN WET SWITCH TIED INTO "LITTLE GIANT" CONDE OT INSTALLED WITH REQUIRED SLOPE. PUMP REQUIRED IF ACU SECONDARY DRAIN PAN DETAIL SCALE: NONE PRIMARY AIR FLOW BALANCING TAPS TRANSITION TO OVAL OR RECTANGULAR DUCT SAME SIZE AS VAV BOX CONNECTION SIZE. 4 x DIA. MIN. LENGTH MEDUIM PRESSURE DUCT FLEX CONNECTION NOTE: SINGLE DUCT VAV BOX. UNIT IS TO BE SUSPENDED FROM STRUCTURE. REFER TO SCHEDULE ON SHEET M3.0. VERIFY INLET AND OUTLET CONNECTION SIZES AND INCLUDE DUCT TRANSITIONS AND FLEX DUCT IN BID. CONTRACTOR TO VERIFY AND PROVIDE ALL LANDLORD REQUIRED CONTROLS FOR A COMPLETE INSTALLATION. i PRIMARY AIR DAMPER LOW PRESSURE /-- DUCT, TRANSITION TO DUCT SIZE SHOWN ON DRAWINGS DISCHARGE ilik AIR FLOW ACTUATOR 4 CONTROLS ALLOW 21-0"" MIN. CLEARANCE FOR CONTROL ACCESS VAV BOX DETAIL SCALE: NONE VANES PRE -ASSEMBLED ON RUNNER PLATES PLATE SAME GAUGE AS DUCT USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS OVER 36" IN LENGTH SQ. ELBOW WITH TYPE "A" DOUBLE THICKNESS VANES PLATE SAME GAUGE AS DUCT VANES PRE -ASSEMBLED ON RUNNER PLATES USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS LESS THAN 36" TURNING VANES LENGTH INSTEAD DUCT SIZE UNDER 36" IN LENGTH SQ. ELBOW WITH SINGLE THICKNESS VANES D TURNING VANES DETAIL M2.00 SCALE: NONE SECURE BASE W/ LAG SCREWS MINIMUM OF 2 PER CURB 0.C. E METAL DECK —` DUCT INSULATION SEE SPECIFICATION NOTES: COOK MODEL TR INTAKE OR EQUAL NT GASKET PREFABRICATED ROOF CURB ROOFING SECURE CURB TO DECK W/ SCREWS 12" O.C. MIN. OF 2 PER SIDE 3"x3"xl/4" ANGLE FRAMING 4) SIDES RACTOR TO COORDINATE INSTALLATON WITH ROOFER FOR PROPER QUENCE TO PERMIT FLASHING AND COUNTERFLASHING INSTALLATION. AIR INTAKE/EXHAUST HOOD DETAIL SCALE: NONE Y2" EXT. PLYWOOD WITH I-9/I6" RIGID INSULATION RIGID INSULATION 18 GA. GALVANIZED STEEL CLOSURE AS REQUIRED GALVA COV A STEEL COUNTER SWING RUBBER GROMMET AROUND PIPE 14 GA. STEEL PLATE 30" SQ. PLUG WELD AT EACH RIB AND 8" O.C. ALONG EDGES REFRIGERANT PIPE CURB DETAIL SCALE: NONE SWING JOINT CONNECTION (TYP.) NOTE: 1. PIPING INST 2. CONDENS 3. REFER BAL AUTOMATIC AIR VENT 45° CONNECTION TO MAIN (ABOVE COIL). PROVIDE DIELECTRIC UNION FOR ALL DISSIMILAR METAL CONNECTIONS ,-SHUT-OFF BALL VALVE (TYP. TEMPERATU"E Y-TYPE GAUD 0 TO `—T SUPPL RETUR SIZE P PLA HOSE END DRAIN CONNECTION TYP.) COND IND FLOO TRAP PER MANUFACTURER'S RECOMMENDATIONS CT TO AIN ATION SHALL NOT RESTRICT EQUIPMENT ACCESS. PAN NOT REQUIRED FOR HOT WATER. SPEC BOOK FOR BALANCING VALVE (BV) SPECIFICATION. VALVE REQUIIRED TO BE FULL SIZE OF PIPING 2-WAY COIL PIPING DETAIL SCALE: NONE MANUAL BALANCE VALVE (BV) TEMPERATURE CONTROL VALVE WITH ACTUATOR. (2 PSI-5 PSI ALLOWABLE PRESSURE DIFFERENTIAL RANGE) ACTUATOR TO BE BELIMO LF24-SR-S 2-10VDC, WITH 24VAC POWER, RING RETURN TO OPEN STUB SHEET METAL DUCT 6" UP SAME SIZE AS NECK OF GRILLE. FIRE DAMPER WHERE INDICATED ON PLANS. SCALE: NONE AI RCURTAI N RETURN SUPPLY THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED EILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "C" THIS SHEET. NON -DUCTED RETURN SYSTEM AIR CURTAIN DETAIL SCALE: NONE INSIDE FRONT SETTINGS: I. DOMESTIC SENSOR SETTINGS: I.I. 20-2-01: SETTING USED WHEN 1.2.20-2-02: SE f 1 ING USED WHEN ONLY T SENSOR). 1,3.20-2-03: SETTING USED WHEN ONLY THE RE 1.4.22-1-03: St 1 I ING USED TO CHANGE TI/T2 FR SHUTDOWN. 1.5.22-5-02: St 1 1 ING USED FOR ROOM TEMP V 2. ADDRESSING INDOOR UNITS 2.1. TO ADDRESS THE INDOOR UNITS DOWN TO GROUP ADDRESS (NO GATEWAY 15 POWERED ON), ADDRESSED. 2.1. BACNET INSTANCE NUM CONTROL SHOP DRA 2.2. ACU CENTRALIZED CONTROL SHOP 2.3. REFER TO ADDITION 2.4. REMOT DR 2.5. P OTE CONTROLLER SENSOR ARE USED. USED (TYPICAL KRC TEMPERATURE OLLER SENSOR 15 USED. AULT TO NORMALLY CLOSED FOR SMOKE ALARM ESS AND HOLD CA E AIRNET ADDRESS. GR E ONE UNIT 1-00 AND THE N TO GET INTO FIELD SETTINGS MODE, SCROLL DDRESS CANNOT BE SET UNLESS BACNET 01 UNTIL ALL UNITS HAVE BEEN , IP ADDRESS, SUBNET MASK AND DEFA TROL GROUP ADDRESS TO BE SET SO ACU BACN WINGS, M1.00 AND A4F INTERNAL PROCESS "DAIKIN BACNET PROGRA FORMATION. TROLLERS TO BE LABELED AS SHOWN ON SHEET. GET NUMBERING FR E 24V, 50KVA TRANSFORMER MOUNTED IN PANEL ATIONAL SENSOR SETTINGS: 20-04-03: SETTING USED TO SET CONTROLLER SETTING "TEMPERATURE CONTROL AND CHANG PARAMETER' ATEWAY ADDRESS TO BE PER RESSES ARE AS SPECIFIED IN FIELD PROCESS" FOR TROL SHOP .�. GJ-10-VL• JL I I Ir1l VJLV 1 VR 111411 J I A 1 I. V1`11 I J (W(. 11_) L./NI 1 J j. 3H i C SSY 1°EMNITPANEL DETAIL SCALE: NONE AUTOMATIC AIR VENT SHUT-OFF BALL VALVE (TYP.) SWING JOINT CONNECTION (TYP.) NOTE: I. PIPING INSTALL 2. CONDENSATE 3. REFER TO BALANCE C LVE COND 45° CONNECTION TO MAIN (ABOVE COIL). PROVIDE DIELECTRIC UNION FOR ALL DISSIMILAR METAL CONNECTIONS PRESSURE GAUGE (TIP.) Y-TYPE SIZE PER PLANS ERAT E UGE. HOSE END DRAIN CONNECTION TYP.) RECT OOR DRA TRAP PER MANUFACTURER'S RECOMMENDATIONS ALANCE VALVE (BV TO MATCH PRESSURE LOSS OF N SHALL NOT RESTRICT EQUIPMENT ACCESS. NOT REQUIRED FOR 1-10T WATER. BOOK FOR BALANCING VALVE (BV) SPECIFICATION2_ REQUIRED TO BE FULL SIZE OF PIPING. 24V SPRIN FAIL OP 3-WAY COIL PIPING DETAIL SCALE : NONE MANUAL BALANCE VALVE (BY) TEMPERATURE CONTROL VALVE WITH ACTUATOR . (2 PSI -5 PSI ALLOWABLE PRESSURE DIFFERENTIAL RANGE) CTUATOR TO BE OW ER, TURN TO 1)(111- 005:3 L.D.- LANDLORD DIRECTIVE 03 ce 0 0 ct C,= WI PIM ; CeJ 141 EMMEN 14 C=O " 0 0 Lil Ln 14/ N ES tai CO T.D.- TENANT DIRECTIVE CO CO LLI CC 0 OF rLiKIVILA EMI CENTER w 1.11 0 z.J; c0 0 co Idsh a5 ?: cc 0 LU LLI 14.9 1— ..1 OD occ c) qe uJ 00 co LLI LU 11.18.020.31620 SHEET M6.00 Plot date: 22 March 2019