Loading...
HomeMy WebLinkAboutPermit M19-0103 - JOLLIBEE - NEW HOODS AND A/C UNITJOLLIBEE 1372 SOUTHCENTER MALL FINALED M 19-0103 0 Parcel No: Address: ��^�«x "�� Tukwila v�U~� uvu o ��m^���oa Department Development 63OV3outhcenterBoulevard, Suite #10O Tukwila, Washington 98188 Phnne:3V6'431'367U Inspection Request Line: 206'438'9350 Web site: hup://www.TukvvUaVVA.nov MECHANICAL PERMIT 9202470090 Permit Number: M19'0103 Project Name: JOLLIBEE Issue Date: Permit Expires On: l2/l7/ZU19 6/14/28ZO Owner: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT POBOX l30940'QR8BAD,CA, 92013 LIZE||EGKDERREZ 1OUOCORPORATE CENTER DRSUITE CORE CONSTRUCTION BUILDING INC 845547TMAVE S'3EATTLE,WA, 98118 ''' Phone: (206)883-3037 Expiration Date: 5/3/2021 DESCRIPTION OF WORK: 2 NEW HOODS ADDED AND I NREW AC UNIT. Valuation of Work: $50,000.00 Type of Work: REPLACEMENT Fuel type: GAS Fees Collected: $886.6 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKVV|LA Current Codes adopted bythe City ofTukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2015 20152015 2016 2015 National Electrical Code: VVACities Electrical Code: VVA[Z96-46B: WA State Energy Code: Date: 2017 20172017 |hearbycertify that I have read and examined this permit and know the same to be true and correct, All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting ofthis permit does not presume togive authority toviolate orcancel the provisions ofany other state orlocal laws regulating construction orthe performance ofwork, |amauthorized tosign and obtain this development permit a d agree to the conditions attached tnthis permit. Signature: Date: m-2 c— This permit shal I become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection, PERMIT CONDITIONS: l: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 2: H.V.A.C. units rat ed at greater than 2,000 cfm require auto -shutdown devices, These devices shall be separately zoned in the o|amn panel and local U.L. central station supervision is required. (City Ordinance #Z437) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall beequipped with anautomatic shutoff. Automatic shutoff shall beaccomplished byinterrupting the power source of -the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment, Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions, (|M[606.l,5O62.1) 4: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #Z437) 5: Duct detectors shall send asupervisory signal only upon activation, (City Ordinance #l437) 6: All new fire alarm systems or modifications to existing systemsshall have the written approval of The Tukwila Fire Prevention Bureau. Nowork shall commence until afire department permit has been obtained. (City Ordinance #2437)(|FC901,Z) 7: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 8: A Type 1 hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Each required commercial kitchen exhaust hood and duct system required by section 610 of the International Fire Code to have a Type 1 hood shall be protected with an approved automatic fire -extinguishing system installed in accordance with this code. (|F[904.2.land |F[9O4.1l) Avtomaticfire'extinQuishing systems shall comply with UL3OOorother equivalent standards and shall be installed in accordance with the requirements of the listing. (NFPA 96, 10.2.3) 9: All new automatic fire -extinguishing systems and all modifications to existing automatic fire -extinguishing systems shall have fire department review and approval ofdrawings prior toinstallation ormodification. IO: Local Ul.central station supervision is required. (City Ordinance wZ437) ll: All new fire alarm systems ormodifications toexisting systems shall have the written approval ofThe Tukwila Fire Prevention Bureau. Nowork shall commence until afire department permit has been obtained. (City Ordinance #2437)(|F[9Ul2) 12: Anelectrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 13: Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial -type cookinQequipm-ent. Cooking equipment involving vegetable oranima|oibandfats shall beprotected bya Class Krated portable extinguisher, (|F[9O4lZ.S) 14: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906,7 and IFC 906.9) 15: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 16: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 17: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407, 18: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 19: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 20: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 21: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 22: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 23: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 24: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 25: ***MECHANICAL PERMIT CONDITIONS*** 26: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 27: Manufacturers installation instructions shall be available on the job site at the time of inspection. 28: Type 1 Hoods, the required grease duct leakage test and light test shall be performed by a special inspection and testing agency in accordance with I.M.C. Chapter 5. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST 0710 TYPE 1 HOOD AND DUCT Parcel No: Address: ��^�xx m�� �~��vuv^U v~U~� ��n Tukwila Department mfCommunity Development 63VVSouthcenterBoulevard, Suite #10O Tukwila, Washington 98188 Phone:IO6'431'367U Inspection Request Line: %06'438'9350 Web site: http://www.Tukwi[aWA.gov MECHANICAL PERMIT 9202470090 Permit Number: K419'0103 Project Name: ]DLUnEE Issue Date: 12/17/2019 Permit Expires On: 6/14/2020 Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PDBOX l3O94O'[ARi5OAD,CA, 92013 l0OOCORPORATE CENTER DRSUITE 550'pWONTEREYPARK, CA, 91754 CORE CONSTRUCTION LLC 8435 47THAVE S'SEAlTLE,WA, 98ll846Z2 ''' Phone: (626)288-6898 Phone: (206)883-3037 Expiration Date: 5/3/2021 DESCRIPTION OFWORK: 2 NEW HOODS ADDED AND I NREW AC UNIT. Valuation of Work: $50,000.00 Type ofWork: REPLACEMENT Fuel type: GAS Fees Collected: $886.67 Electrical Service Provided by: PUGETSOUND ENERGY Water District: TUKVV|LA Sewer District: TVNWIU\ Current Codes adopted bythe City ofTukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: ized Signa National Electrical Code: VVACities Electrical Code: VVA[Z9646B: Code: ate: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or hot. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state orlocal laws regulating construction orthe performance ufwork. |amauthorized tosign and obtain this development permit and agree 0othe conditions attached tothis permit. Signature: ' ^' / Date: - Print Name: k-f 'I This permit shall become null and void ifthe work isnot commenced within l80days for the date nfissuance, orif the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: The attached set nfmechanical plans have been reviewed byThe Tukwila Fire Marshals Office and are acceptable with the following concerns: 2: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #Z437) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall beequipped with anautomatic shutoff. Automatic shutoff shall beaccomplished byinterrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (|K4C6O6,1,606Il) 4: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #Z437) 6: Duct detectors shall send asupervisory signal only upon activation. (City Ordinance #2437) 6: All new fire alarm systems ormodifications toexisting systems shall have the written approval ofThe Tukwila Fie Prevention Bureau, Nowork shall commence until a fire department permit has been obtained. (City Ordinance #Z437>(|F[9012) 7: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. V: A Type 1 hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors, Each required commercial kitchen exhaust hood and duct system required by section 610 of the International Fire Code to have a Type 1 hood shall be protected with an approved automatic fire -extinguishing system installed in accordance with this code. (|FC9O4Iland |F[9O4.l1) Automatic fire -extinguishing systems shall comply with Ui3OOorother equivalent standards and shall be installed in accordance with the requirements of the listing. (mFPA9O' lU.3) 9: All new automatic fire -extinguishing systems and all modifications to existing automatic fire -extinguishing systems shall have fire department review and approval of drawings prior to installation or modification, 10: Local V1.central station supervision isrequired. (City Ordinanoe#2437) 11: All new fire alarm systems ormodifications toexisting systems shall have the written approval ofThe Tukwila Fire Prevention Bureau. Nowork shall commence until afire department permit has been obtained. (City Ordinance #2437)(|F[9O12) 12: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 13: Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial -type cooking equipment. Cooking equipment involving vegetable oranimal oils and fats shall beprotected bya Class rated portable extinguisher. (|FC9O4.1Z.5) 14: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 15: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances I*2436 and tf2437) 16: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 17: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. 18: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 19: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 20: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 21: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 22: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 23: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 24: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 25: ***MECHANICAL PERMIT CONDITIONS*** 26: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 27: Manufacturers installation instructions shall be available on the job site at the time of inspection. 28: Type 1 Hoods, the required grease duct leakage test and light test shall be performed by a special inspection and testing agency in accordance with I.M.C. Chapter 5. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST 0710 TYPE 1 HOOD AND DUCT CITY OF TUKWILA Community Development. Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.eov Mechanical Permit No. \\Ail° Project No. Date Application Accepted: �Q Date Application Expires: t (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION 1%�I y King Co Assessor's Tax No.: Site Address: 1y4SOUTHCENTER MALL TUKWILA, WA 98188 Suite Number: 368 Floor: LEVEL 1 Tenant Name: JOLLIBEE PROPERTY OWNER Name: EMILY YEE Address: 4905 OLD ORCHARD CENTER STE. 060 City: SKOKIE State: IL Zip:60077 CONTACT PERSON — person receiving all project communication Name: LIZETTE GUTIERREZ Address: 1000 CORPORATE CENTER DRIVE SUITE 550 City: MONTEREY PARK State: CA Zip:91754 Phone: 626-288-6898 Fax: 626-768-7101 Email: Iizette@garyWang,com New Tenant: ❑ Yes ©..No MECHANICAL CONTRACTOR INFORMATION Company Name: TBD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 120 Describe the scope of work in detail: 2 NEW HOODS ADDED AND 1 NEW AC UNIT if -of orce Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement 0 Fuel Type: Electric ❑ Gas ❑✓ Other: HAApplications\Forms-Applications On Line\2016 Applications\Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >I00k btu Floor furnace Suspended/walVfloor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system 1 Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct 2 Ventilation system 2 Hood and duct 2 Incinerator — domestic Incinerator — comin/industrial Unit Type Qty Fire damper 0 Diffuser 13 Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 htu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-l0pm); Testing of backup generators during the day, PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). 'HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE AUTHORIZED AGENT - Signature: Date: Print Name: LIZETTE GUTIERREZ 626-288-6898 Day Telephone: Mailing Address: 1000 CORPORATE CENTER DR. MONTEREY PARK, CA, 91754 City State Zip HAApplications Forrrts-Applicat ions On Line \2016 Applications \Mechanical Permit Application Revised I -4-1 6. docx Revised: January 2016 bh Page 2 of 2 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $4,574.87 D19-0207 Address: 1372 SOUTHCENTER MALL Apn: 9202470090 $2,753.58 . Credit Card Fee $80.20 Credit Card Fee R000.369.908.00.00 0.00 $80.20 DEVELOPMENT $2,587.62 PERMIT FEE R000.322.100.00.00 0.00 $1,715.23 PLAN CHECK FEE R000.345.830.00.00 0.00 $847.39 WASHINGTON STATE SURCHARGE 8640.237.114 0.00 $25.00 TECHNOLOGY FEE $85,76 TECHNOLOGY FEE R000.322.900.04.00 0.00 $85.76 _ EL19-0529 Address 1372 SOUTHCENTER MALL Apn: 9202470090 $585.58 Credit Card Fee $17.06 Credit Card Fee R000.369.908.00.00 0.00 $17.06 ELECTRICAL $541.12 PERMIT FEE MULTI-FAWCOMM R000.322.101,00.00 0.00 $541.12 TECHNOLOGY FEE $27.40 TECHNOLOGY FEE R000.322.900.04.00 0.00 $27.40 M19-0103 Address: 1372 SOUTHCENTER MALL Apn: 9202470090 $786.67 Credit Card Fee $22.91 Credit Card Fee R000.369.908.00.00 0.00 $22.91 MECHANICAL $730.54 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $631.28 PLAN CHECK FEE 8000.322.102.00.00 0.00 $66.11 TECHNOLOGY FEE $33.22 TECHNOLOGY FEE R000.322.900.04.00 0.00 $33.22 PG19-0086 Address 1372 SOUTHCENTER MALL Apn: 9202470090 $449.04 Credit Card Fee $13.08 Credit Card Fee 8000.369.908.00.00 0.00 $13.08 GAS $208,66 PERMIT ISSUANCE BASE FEE 8000.322.100.00.00 0.00 $35.00 PERMIT FEE R000.322.100.00.00 0.00 $143.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $30.66 Date Paid: Tuesday, December 17, 2019 Paid By: ANGEL NG FUNG Pay Method: CREDIT CARD 00092G Printed: Tuesday, December 17, 2019 2:31 PM 1 of 2 CPW SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS 1 ACCOUNT QUANTITY PermitTRAK PAID $4,574.87 PG19-0086 Address: 1372 SOIJTHCENTER MALL Apn: 9202470090 $449.04 PLUMBING . $208.00 PERMIT FEE R000.322.100.00.00 0.00 $173.00 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $35.00 TECHNOLOGY FEE $19.30 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R19328 R000.322.900.04.00 0.00 $19.30 $4,574.87 Date Paid: Tuesday, December 17, 2019 Paid By: ANGEL NG FUNG Pay Method: CREDIT CARD 00092G Printed: Tuesday, December 17, 2019 2:31.PM 2 of 2 Y5 TEM 5 CO TUKWIbu ETRAKIT 6200 SUUTH[ENTER BLVD TUxwILA' WA 98188 206-433-I870 CITY OF TUKWILA 0017340000802374464500 Date: 12/17/2019 0I:30:02 PM CREDIT CARD SALE VISA CARD NUMBER: *********^8317 K TR4N AMOUNT: $4,574.87 APPROVAL [D: 08092G RECORD #: 000 CLERK ID: frankic X {CARDHOLDER'S SIGNATURE) I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy Cash Register Receipt City of Tukwila Receipt Number DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $165.84 M19-0103 Address: 1372 SOUTHCENTER MALL Apn: 9202470090 $100,00 MECHANICAL $ 00.00 PLAN CHECK FEE R000.322.102,00.00 0.00 $100.00 PG19-0086 Address 1372 SOUTHCENTER MALL Apm 9202470090 $65.84 GAS $13.84 PLAN CHECK FEE R000.322.103.00.00 0.00 $13.84 PLUMBING $52.00 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R17965 R000.322.103.00.00 0.00 $52.00 $165.84 Date Paid: Friday, June 21, 2019 Paid By: GARY WANG & ASSOCIATES Pay Method: CHECK 16251 Printed: Friday, June 21, 2019 10:32 AM 1 of 1 Permit Inspections City of Tukwila Permit Number: M19-0103 Applied: 6/21/2019 Approved: 9/24/2019 Issued: 12/17/2019 Finaled: 9/29/2020 Status: FINALED Parent Permit: Parent Project: Details: 2 NEW HOODS ADDED AND I NREW AC UNIT. Description: JOLLIBEE Site Address: 1372 SOUTHCENTER MALL City, State Zip Code:TUKWILA, WA98188 Applicant: JOLLIBEE Owner: WESTFIELD PROPERTY TAX DEPT Contractor: CORE CONSTRUCTION BUILDING INC ®I NSPEC+TIC NS SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS MECH EQUIP EFF Bill Centen Notes: FIRE ALARM BEN HAYMAN Notes: HOOD AND DUCT BEN HAYMAN Notes: FIRE FINAL BEN HAYMAN Notes: 8/13/2020 AM 8/13/2020 TYPE 1 HOOD AND DUCT Lee Sipe PARTIAL 1 APPROVAL 511915 Notes: P/A Duct light test for (2) type 1 hoods. 8/24/2020 AM 8/24/2020 ROUGH IN MECHANICAL Lee Sipe APPROVED 133452 Notes: HVAC system. 9/14/2020 AM 9/14/2020 MECHANICAL FINAL 8i11 Centen NOT APPROVED Notes: 9/15/2020 AM 9/15/2020 TYPE 1 HOOD AND DUCT Bill Centen PARTIAL APPROVAL Tong 4253011115 Notes: `1 Hour Fast Wrap is approved for both grease ducts. Inspected 2 Layers per UL Listing - OK Printed: Tuesday, 06 July, 2021 1 of 2 i1 SUPERION Permit Inspections City of Tukwila 9/29/2020 9/29/2020 REFRIGERATION EQUIP Bill Centen APPROVED Notes: 9/29/2020 9/29/2020 PIPE _DUCT INSULATION Bill Centen APPROVED Notes: 9/29/2020 AM 9/29/2020 MECHANICAL FINAL Bill Centen APPROVED Keith 206 6831414 Notes: 'Fire Final was approved on applicants permit card - Ok 9/29/2020 9/29/2020 TYPE 1DHOOD AND Bill Centen APPROVED Tong 4253011115 Notes: Printed: Tuesday, 06 July, 2021 2 of 2 rI SUPERION r\ City of Tukwila Department of Community Development 11/1/2019 LIZE I I E GUTIERREZ 1000 CORPORATE CENTER DR SUITE 550 MONTEREY PARK, CA 91754 RE: Permit Application No. M19-0103 JOLLIBEE 1372 SOUTHCENTER MALL Dear LIZETTE GUTIERREZ, Allan Ekberg, Mayor Jack Pace, Director In reviewing our current application files, it appears that your permit applied for on 6/21/2019, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Currently your application has a status of APPROVED and is due to expire on 12/21/2019. If you still plan to pursue your project, you are hereby advised to do one of the following: 1) If the plan review is complete for the project and your application is approved, you may pick up the application before the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days. -or- 2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your application. The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension request is granted, you will be notified by mail. In the event that we do not receive your written request for extension or request is denied, your permit application will expire and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M 19-0103 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development July 11, 2019 LIZETTE GUTIERREZ 1000 CORPORATE CENTER DR SUITE 550 MONTEREY PARK, CA 91754 RE: Correction Letter # 1 MECHANICAL Permit Application Number M19-0103 JOLLIBEE - 1372 SOUTHCENTER MALL Dear LIZETTE GUTIERREZ, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to a preferably maximum size of 24x36; all sheets shall be the same size; larger sizes may be negotiable. "New revised" plan sheets shall be the same size sheets as those previously submitted.) "STAMP AND SIGNATURES" (If applicable) For Engineers: "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient (WAC 196-23-010 & 196-23-020). Architects: "date" only not required (WAC 308-12-081). (BUILDING REVIEW NOTES) 1. Sheets M-100 & M-202 refer to codes not used for Washington State. Revise code notes and references to show compliance with 2015 International Mechanical Codes (IMC) and Washington State Energy Codes (WSEC). 2. M-500 note 15A 1-5 note references (including any other code notes) shall show compliance with 2015 IMC and associated WSEC. 3. The COMCHECK compliance forms on sheet M-600 shall not be accepted. Provide a completed 2015 Washington State Energy Code "MECHANICAL SUMMARY" Compliance Form for Commercial Buildings, available online at: https://wseccompliancedocuments.com/index.php on the right side you will see the link "WSEC Documents". Click on that and if you haven't already, you will need to create an account. Sign into the account and there you will find the forms. Note: Contingent on response to these corrections, further plan review may request for additional corrections. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 N., In order to better expedite your i•esobmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted throuRh the mail or by a messenger service. Sincerely, a_A4(C621('-'2 Kandace Nichols Permit Technician File No. M19-0103 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY C, PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M19-0103 PROJECT NAME: JOLLIBEE SITE ADDRESS: 1372 SOUTHCENTER MALL Original Plan Submittal X Response to Correction Letter # 1 DATE: 09/06/19 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AW/ /1k Building Division Public Works 0 r Fire Prevention Structural r Planning Division Permit Coordinator r n PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 09/10/19 Structural Review Required REVIEWER'S TIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/01/2019 Approved Corrections Required (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues LI Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg El Fire Ping 0 PW 0 Staff Initials: 12/18/2013 \1777.71.f,r7 :Ail kg COe PLAN REVIEW ROUTING SLIP PERMIT NUMBER: M19-0103 PROJECT NAME: JOLLIBEE SITE ADDRESS: 1372 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # DATE: 06/21/19 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Aa Building Division Public Works Fire Prevention Structural p Planning Division Permit Coordinator is PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 06/25/19 Structural Review Required DATE; APPROVALS OR CORRECTIONS: Approved DUE DATE: 07/23/19 Approved with Conditions Fl Corrections Required Denied (corrections entered in Reviews (ie: Zoning Issues P Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg il Fire n Ping D PW 0 StaffInitials: 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: ht Li\VA.zuv VA. REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. 07/18/19 M19-0103 Date: Plan Cheek/Permit Number: 0 Response to Incomplete Letter # El Response to Correction Letter # 1 TUKWILA 0 Revision # after Permit is Issued RECEIVED 0 Revision requested by a City Building Inspector or Plans Examiner CITY OF El Deferred Submittal # SEP 0 5 2019 Project Name: JOLLIBEE Project Address: 1 372 SOUTHCENTER MALL Contact Person: Lizette Gutierrez PERMIT CENTER Phone Number: (626)288-6898 Summary of Revision: 1) Refer to sheet M-100 HVAC note 3 and sheet M-202 for revised code. 2) Refer to sheet M-500 note 15A 1-5 and 15A 1-13 for revised notes. 3) Washington compliance forms added, refer to sheet M-600 and M-601 Sheet Number(s): "Cloud" or highlight all areas of revision includin Received at the City of Tukwila Pe 1 it Center by: [i Entered in TRAKiT on ate o vision W: \Permit Center (Rachelle)\Kandsce - Revision Submittal Form doe Revised: August 2815 AP Labor & Industries (httos://ini.wa.dav) r CORE CONSTRUCTION BUILDING INC Owner or tradesperson TAN, HAI-FENG Principals TAN, HAI-FENG, PRESIDENT WA UBI No. 604 433 317 8435 47TH AVE S SEATTLE, WA 98118 206-883-3037 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. CORECCB813KC Effective — expiration 05/03/2019— 05/03/2021 Bond Wesco Insurance Co $12,000.00 Bond account no. 46WB102422 Received by L&I 05/03/2019 Insurance Security National Insurance Policy no. NA167384600 Received by L&I 05/03/2019 Effective date 05/01/2019 Expiration date Until Canceled $1,000,000.00 Effective date 05/01/2019 Expiration date 05/01/2020 Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&l Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent Not allowed to have apprentices. 4 L 410 Indus es �https'//lni wa.gov`, CORE CONSTRUCTION BUILDING INC Owner or tradesperson Principals TAN, HAI-FENG, PRESIDENT Doing business as CORE CONSTRUCTION BUILDING INC WA UBI No. 604 433 317 8435 47TH AVE S SEATTLE, WA 98118 206-883-3037 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. CORECCB813KC Effective — expiration 05/03/2019— 05/03/2021 Bond Wesco Insurance Co Bond account no. 46 W B 102422 $12, 000.00 Received by L&I Effective date 05/03/2019 05/01/2019 Expiration date Until Canceled Insurance Atlantic Cas Ins Co $1,000,000.00 Policy no. L125003868-0 Received by L&I Effective date 01/10/2020 01/15/2020 Expiration date 01/15/2021 Insurance history Savings, No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent No active Washington registered apprentices exist for this business. Washington allows the use of apprentices registered with Oregon or Montana. Contact the Oregon Bureau of Labor & Industries or Montana Department of Labor & Industry to verify if this business has apprentices. HVAC NOTES BUILDING AIR BALANCE MECHANICAL EQUIPMENT SCHEDULE SYMBOLS & ABBREVIATIONS UI. ALL VYUKK ANU MAI LKIA0 SHALL CUMPLY WIIH GUVLKNIN(3 CUUtS, JAttIY UKDI KS ANU KLGULA I IUNS. INSULATION MATERIAL SHALL MEET THE WASHINGTON OR GOVERNING STATE QUALITY STANDARD PER 2018 IECC. 02. ALL MATERIALS AND EQUIPMENT PROVIDED AND/OR INSTALLED SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR, UNLESS OTHERWISE INDICATED, FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK BY THE OWNER. ANY DEFECTIVE MATERIALS OR INFERIOR WORKMANSHIP SHALL BE CORRECTED TO THE ENTIRE SATISFACTION OF THE OWNER. Q z 03. INSTALLATION SHALL CONFORM TO THE 2015 INTERNATIONAL MECHANICAL CODESTMC) AND WASHINGTON STATE ENERGY CODES(WSEC) 04. ELECTRICAL CONTRACTOR SHALL PROVIDE: CONDUIT FOR LINE AND LOW WIRING, SWITCHES, DISCONNECTS, CIRCUIT BREAKERS, AND FINAL CONNECTION ITEMS INDICATED THUS (E.C.). 05. MECHANICAL CONTRACTOR SHALL PROVIDE: TEMPERATURE CONTROLS, LOW VOLTAGE WIRING AND ITEMS INDICATED THUS (M.C.). WIRING SHALL CONFORM TO LOCAL CODES, 06. PLUMBING CONTRACTOR SHALL PROVIDE: CONDENSATE DRAIN FROM A/C UNITS AND/OR EVAP COOLER TO APPROVED DRAIN POINT, WATER PIPING TO EVAP COOLER, GAS CONNECTIONS REQUIRED TO HVAC MARK TONS OSA RA SA EXHAUST MUA PRESSURE RTU-1 2.0000 200 600 800 0 200 RTU-2 2.0000 200 800 0 200 RTU-3 - 3.0000 ---------- 300 -600 -------- ---- 900 1200 0 300 RTU-4 3.0000 300 900 1200 0 300 RTU-5 5.0000 500 1500 2000 0 500 RTU-6 6.0000 600 1800 2400 0 600 MUA-1 1 OW - 1 1000 MUA-2 280D 2 2800 MUA-3 1800 3 1800 EF-1 1000 0 -1000 EF-2 3000 0 -3000 EF-3 COLUMN TOTALS 7700 6300 8400.000000 2400 6400 0 0 -2400 1300 BUILDING AIR FLOW =+ 1300 CFM (UNDER POSITIVE PRESSURE) EQUIPMENT, SPECIFIED ON THE PLANS, AND ALL FINAL CONNECTIONS. 07. MECHANICAL CONTRACTOR SHALL INSULATE ALL SUPPLY AND RETURN AIR DUCTS AS REQUIRED BY 20181ECC. SIZES INDICATED ON PLANS ARE CLEAR INSIDE DIMENSION. 08. FLEXIBLE DUCT SHALL BE THERMAFLEX OR EQUAL, METAL SPIRAL WIRE ENCASED IN PLASTIC LINER, INSULATED, AND COVERED WITH A PVC JACKET. MINIMUM U.L. APPROVED CONDUCTANCE OF 022 AT 75 DEGREES FAHRENHEIT WITH A MAXIMUM LENGTH OF 5-8 FT., DUCT SHALL BE CONNECTED TO TRUNK OR BRANCH DUCT PER DETAIL. 09. CONCEALED CONDITIONED SUPPLY AND RETURN AIR DUCTS SHALL BE INSULATED (EXCEPT FOR RIGID EXPOSED UNIT ELECTRICALLY INTERLOCK EXHAUST FAN SUPPLY FAN MAKE-UP AIR EF-2/EF-3 RTU 2/4/5/6 MUA-2/MUA-3 DIFFUSERS, GRILLES & REGISTERS DUCTS) WITH ONE -AND -ONE HALF INCH (1-1/2") THICK, 0.75 POUND DENSITY GLASS FIBER DUCT WRAP WITH REFLECTIVE VAPOR SEAL, FASTENED TO DUCTWORK WITH 16 GA. WIRE SPACED AT 12" ON CENTER (SPACING TO BE 6" ON CENTER FOR FITTINGS). RETURN DROPS FROM RT-2 & RT-3 TO HAVE NEW LINING, PINNED AND GLUED W/ 1" INSULATION PER INDUSTRY STANDARDS. FOR RUNOUTS LESS THAN 10 FT IN LENGTH TO AIR TERMINALS OR AIR OUTLETS THE RATED R-VALUE OF INSULATION SHALL NOT EXCEED R-3.5. 10. DUCTWORK DIMENSIONS SHOWN ARE CLEAR INSIDE DIMENSIONS. ALL SUPPLY AND RETURN DUCTWORK SHOWN 15 TO BE INSULATED WITH 2" DUCT WRAP, INCLUDING THE TOP OF THE DIFFUSERS. DUCT WORKS IN UNCONDITIONED SPACE THE INSULATION SHALL HAVE A MINIMUM R-VALUE OF 8. INSULATED FLEXIBLE DUCT MAY BE USED IN MAXIMUM LENGTHS OF 5-0" PER BRANCH RUN. THE BALANCE OF THE RUN SHALL BE HARD PIPE WITH 2" INSULATED SLEEVE. 11. ALL SHEETMETAL DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH UMC, AND APPLICABLE LOCAL CODES. TAPE ALL TRANSVERSE AND LONGITUDINAL JOINTS, TAKEOFFS ON SUPPLY, RETURN, AND EXHAUST DUCTS. RIGID DUCTWORK SHALL BE GALVANIZED STEEL. 12. WHERE INTERIOR OF DUCTWORK IS VISIBLE THRU AN AIR OUTLET, INSIDES OF DUCT SHALL BE PAINTED WITH A FLAT BLACK PRIMER. ALL GRILLS AND DIFFUSERS SHALL BE REMOVABLE. INSTALL TURNING VANES IN ALL 90 DEGREES DUCT ELBOWS (EXCEPT GREASE DUCTS), INSTALL SPIN -IN TAKEOFF WITH VOLUME DAMPER AT A/C UNIT DUCT CONNECTIONS AND SEAL AIRTIGHT. 13. CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL DUCTWORK WITH CEILING AND ROOF FRAMING, AND COOPERATION AMONG THE TRADES IN MAINTAINING MANUFACTURERS RECOMMENDED CLEARANCES FOR ALL ITEMS OF EQUIPMENT. 14. ANY EQUIPMENT THAT IS SUBSTITUTED SHALL FIT IN THE SPACE PROVIDED WITH ADEQUATE ROOM FOR SERVICING, INCLUDING SUBSTITUTE EQUIPMENT NAMED IN THE SPECIFICATIONS, CONTRACTOR SHALL SUBMIT A 114" SCALE DRAWING OF ALL EQUIPMENT SUBSTITUTED. 15. FLEXIBLE DUCT SHALL BE OWENS CORNING INSULATION OR EQUAL WITH A MINIMUM R-VALUE OF 8. DUCTWORK SHOWN IS FINISHED O.D. DIMENSION AND TO BE INSULATED W/ 1 1 /2"DUCT WRAP (R-8 MIN), INCLUDING DIFFUSERS. RETURN DROPS FROM RT-2 & RT-3 TO HAVE NEW LINING, PINNED AND GLUED W/ 1" INSULATION PER INDUSTRY STANDARDS. I & APPLY CCWI-181 OR EQUIVALENT TO ALL SEAMS AND JOINTS ON ROOFTOP DUCTWORK. 17. ALL DUCTWORK PENETRATING FIRE SEPARATIONS SHALL HAVE A FIRE DAMPER CONFORMING TO THE RATING OF THE AREA BEING PENETRATED. 18. HVAC SYSTEMS SHALL MEET CONTROL REQUIREMENTS PER 20181ECC. 19. WEATHER PROTECTION FOR OPENINGS TO BE GALVANIZED STEEL. 20. AUTOMATIC TEMPERATURE CONTROL DEVICE FOR REGULATION OF SPACE TEMPERATURE SHALL BE CAPABLE OF BEING SET FROM 55 TO 85 DEGREES F., HAVING THE ABILITY TO OPERATE THE HEATING AND COOLING AND HAVING THE CAPABILITY OF TERMINATING ALL HEATING AT A TEMPERATURE NO MORE THAN 70 DEGREES F. CONTROL DEVICE SHALL HAVE LOCKING COVER AND KEY. 21. ALL HVAC DUCT TO BE GALVANIZED STEEL RIGID DUCT. THE LAST 6-8 FEET OF EACH RUN TO BE CLASS 1 FLEX DUCT(EXCEPT FOR EXPOSED DUCTS), FOR SOUND PURPOSES ONLY. 22. A COPY OF THE AIR BALANCE REPORT SHALL BE PROVIDED TO THE CITY BUILDING INSPECTOR AT THE TIME OF THE FINAL MECHANICAL INSPECTION. AIR SUPPLY DIFFUSER SCHEDULE MARK DESCRIPTION NECK FACE CFM MAX ROUND DUCT DIFF. OR © & © SIZE DIMENSION RANGE NC CONNECTION OR SYMBOL EQUIV. RECT...DUCT �_,. 6 X 6 UP TO 125 20 W DIA. z 1-WAY BLOW w v O p 8 X 8 x 126 - 200 20 9" DIA. N lox10 201-300 20 12" DIA. 2-WAY BLOW =�� II aZ N dW Q 3 O U 12 X 12 z 00 301 - 450 20 14" DIA. ��< U z<- 3-WAY BLOW 16X16 0°+ 451-700 20 16" DIA. t O h m V E:2 18X18 1- Lj�Y 701-900 25 18" DIA. I u - 0 O LLrU 4-WAY BLOW a NOZ z 11 NOTES: 1 T-BAR CEILING DIFFUSERS SHALL BE 24"x 24 PERFORATED FACE DIFFUSERS WITH FOUR (4) '.. DIRECTIONAL (FULLY ADJUSTABLE) AIR PATTERN MODULAR CORES W/ EQUAL AIR FLOW IN ALL FOUR DIRECTIONS. RETURN & EXHAUST DIFFUSER SCHEDULE UP TO 100 15 6" DIA. '.. OZ z 101 -200 15 9" DIA. 4- Z o EXI O 82 0RETURN --�" UCH 201-300 15 12" DIA. Z U <w 301 - 500 20 14" DIA. win z p m 15 X 15 r 507 - 700 2p 16" DIA. u' O Cwl U Z< � aO + -- O 18 X 18 U ti 801 - 1000 25 20" DIA. EXHAUST Q 0 U. w 22 X 22 < U 1000 - 1500 25 24" DIA. <¢ O �OZ Q �?n NOTES: Ol ALL RETURN AIR REGISTERS SHALL HAVE OUTER BLADES PARALLEL TO THE LONG DIMENSION. IN DUCTED APPLICATIONS, ALL VOLUME DAMPERS SHALL BE MOUNTED A MINIMUM & AWAY FOR O2 REGISTERS. ITEM --------------- DESCRIPTION ROOFTOP UNIT (EXISTING) RTU EXISTING 2 TONS 1 AIR FLOW: 800 CFM @ Q5" ESP TOTAL COOLING: 24 MBH (EXISTINGI HEATING: 48MBH INPUT, 38 MBH OUTPUT ELECTRIC: 208/23OV-10-60, MCA: 18.0, MAX FUSE: 25 nRTU 2 VERIFY WITH SUPPLIER EXISTING RELIEF SYSTEM. (EXISTING) ROOFTOP UNIT (EXISTING) RTU EXISTING 3 TONS 3 AIR FLOW: 1200 CFM @ 0.5" ESP TOTAL COOLING: 36 MBH (EXISTING) HEATING: 48MBH INPUT, 38 MBH OUTPUT RTU ELECTRIC: 208/230V-30-60, MAX FUSE: 35 4 VERIFY WITH SUPPLIER EXISTING RELIEF SYSTEM. (EXISTING) ROOFTOP UNIT (EXISTING) RTU EXISTING 5 TONS 5 AIR FLOW: 2000 CFM @ 0.5" ESP TOTAL COOLING: 60 MBH (EXISTING) HEATING: 125 MBH INPUT, 100 MBH OUTPUT ELECTRIC: 208/230V-30-60, MCA: 31.0, MAX FUSE: 45 VERIFY WITH SUPPLIER EXISTING RELIEF SYSTEM. ROOFTOP UNIT 6 TONS TRANE MODEL YHC072F3RLA RTU AIR FLOW: 2,400 CFM @ 1.0" ESP, MIN. OSA: 600 CFM b COOLING CAP: 72 MBH: (6 TON) (R-410) NATURAL GAS HEATING CAP: 64MBH I/P. (NEW) ELECTRIC: 220V-30-60, MCA: 32.3, MAX FUSE: 50 OPERATING WT: 822 LBS.(incl. economizer & curb weight) PROVIDE 14" SEISMIC CURB, DISCONNECT SWITCH, ECONOMIZER WITH FDD, LOW LEAKAGE AHU. SCHEDULE TO RUN CONTINUOUSLY WHEN OCCUPIED. WHEN UNOCCUPIED CLOSE CIA DAMPER CYCLE TO MAINTAIN UNOCCUPIED SETPOINT. VERIFY WITH SUPPLIER RELIEF SYSTEM. '.. MAKE-UP AIR UNIT (EXISTING) MUA CAPTIVEAIRE MODEL AI-D.500-G15 HEATING (MBH): 63.8 INPUT, 204.4 OUTPUT 1000 CFM (@- 0.5" E.S.P., RPM - 848 (EXISTING) ELECTRICAL:: 208/230V-30-60, 0.5 HP OPERATING WT: 562 LBS PROVIDE UNIT W/ BCAKFLOW PREVENTOR @ WATER SUPPLY MUA MAKE-UP AIR UNIT CAPTIVEAIRE MODEL A2-D.500-20D-MPU AIRFLOW: 2,800 CFM @ 0.5" E.S.P, RPM=1277, 2 COOLING CAP: 36.1 MBH, HEATING INPUT) 328.7 MBH ELECTRICAL: 219V-30-60, 2 H.P., 15 FLA. (NEW) WITH FULL CRATING, INSULATED BLOWER SECTION, 3 TON MODULAR PACKAGE COOLING, MCA 9.1A , MOCP: 15A,PACKAGE UNIT AC CONTROLS, PROGRAMMABLE T-STAT, CONDENSER SUPPORT, CURB AND RAIL, INTAKE HOOD WITH EZ FILTERS. UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH EF-2 OPERATING WT: 1,715 LBS. MAKE-UP AIR UNIT MUA CAPTIVEAIRE MODEL A I -D.250-15D-MPU AIRFLOW: 1,800 CFM @ 0.5" E.S.P, RPM=2071 3 COOLING CAP: 23.0 MBH, HEATING INPUT: 211.3 MBH ELECTRICAL: 219V-30-60,2 H.P., 6.1 FLA. (NEW) WITH FULL CRATING, INSULATED BLOWER SECTION, 5 TON MODULAR PACKAGE COOLING, MCA 9.1A , MOCP: 15A, PACKAGE UNIT AC CONTROLS, PROGRAMMABLE T-STAT, CONDENSER SUPPORT, CURB AND RAIL, INTAKE HOOD WITH EZ FILTERS. UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH EF-3 OPERATING WT: 1,359 LBS. GREASE EXHAUST FAN ON ROOF (EXISTING) EF CAPTIVEAIRE MODEL NCA8FA 1 1,000 CFM @ 1.25" E.S.P., 1753 RPM ELECTRICAL: 219/30/60, 0.5 H.P '.. (EXISTING) UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH MUA-1. OPERATING WT: 90 LBS. GREASE EXHAUST FAN ON ROOF CAPTIVEAIRE MODEL DU200HFA 3,000 CFM @ 2.0" E.S.P., 1272 RPM 2 ELECTRICAL: 208V/30/60, 5.0 H.P, 15.0 FLA. WITH GREASE BOX AND GREASE CUP, VARIABLE SPEED CONTROL, WEATHERPROOF DISCONNECT (NEW) AND VENTED HINGED CURB, UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH MUA-2, RTU-4, AND RTU-5. OPERATING WT: 211 LBS. EF GREASE EXHAUST FAN ON ROOF CAPTIVEAIRE MODEL DU 180HFA 2,400 CFM @ 2.0" E.S.P., 1345 RPM 3� ELECTRICAL.208V/30/60, 2.0 H.P, &I FLA. WITH GREASE BOX AND GREASE CUP, VARIABLE SPEED CONTROL, WEATHERPROOF DISCONNECT (NEW) AND VENTED HINGED CURB. UNIT SHALL BE ELECTRICALLY INTERLOCKED WITH MUA-3, RTU-2, AND RTU-6, OPERATING WT: 156 LBS. LEGEND SYMBOL ABBREVI- ATION DESCRIPTION DOUBLE SINGLE -SA - SA SUPPLY AIR DUCT - - RA - RA RETURN AIR DUCT - EA - EA EXHAUST AIR DUCT -OA- CIA OUTSIDE AIR DUCT TRANSITION - RECTANGULAR TO RECT- ANGULAR a TRANSITION - RECTANGULAR TO ROUND ELBOW W/TURNING VANE 6-�6L (L) LINED DUCT, DUCT SIZE WITH L FOR SINGLE LINE __�-- l ri RISE IN DIRECTION OF AIRFLOW �IrR �l I 1-1 IT- DROP IN DIRECTION OF AIRFLOW DUCT ENCLOSURE IN GYPSUM BOARD FOR 2 HOURS RATING FLEXIBLE DUCT THERMOSTAT, +44 A.F.F. ® SUPPLY AIR DUCT -SECTION ® RETURN, EXHAUST, OR OUTSIDE AIR DUCT -SECTION ® ROUND DUCT OR STACK -SECTION 12XI2CR 360 12"X 12" NECK PERFORATED CEILING REGISTER,360 CFM 6X6R 150 6"X 6" PERFORATED CEILING REGISTER, 150 CFM 12XB WR 250 12"X 8" WALL REGISTER 250 CFM CD CONDENSATE DRAIN CR CEILING REGISTER MA MAKE-UP AIR OD OVERFLOW DRAIN -SD SO DUCT MOUNTED SMOKE DETECTOR TO SHUT-OFF FAN, PER IMC 2016. THRU THROUGH TYP. TYPICAL " --°o SET) COMBINATION SMOKE & FIRE DAMPER - -I VIVID MANUAL VOLUME DAMPER (E) EXISTING (N) NEW (R) RELOCATE TG TRANSFER GRILLE DU 1" DOOR UNDERCUT ® POC POINT OF CONNECTION GREASE DUCT AIR VELOCITY CALC HOOD SIZE AREA (SF) CFM VELOCITY (FPM) #1 120 0.811 1,500 1,910 # 1 160 1.368 3,000 2,149 #2 160 1.396 2,400 1,719 F I L P/1 SEPARATE PERMIT Porrntt No. V �! REQUIRED FOR: Plan review approval Is subject to errors and omissions. Approval of construction documents does Mechanical ElBefriCal not authorize the violation of any adopted code or PtUmbing ordinance Receipt of approved Field Copy and (� Gas Piping con sacKnowledged: OityofTukwila eyi BUILDING DIVISION �C+tv or uK ifvTr�a BUILDING DIVISION REVIEWED FOR CODE CO MPLIANCE 23. ALL DUCT GAGES SHALL CONFORM TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS -METAL AND - ELECTRICAL AND WEIGHT INFORMATION FOR REFERENCE ONLY. REFER/VERIFY WITH ELECTRICAL APPROVED AND STRUCTURAL PLANS. FLEXIBLE. - INSTALL EQUIPMENT ON VIBRATION ISOLATORS. 1 iii���c - SUBSTITUTION OF EQUIPMENT REQUIRES APPROVAL FROM THE ARCHITECT AND OWNER. SEP 23 2019 24. ALL KITCHEN EXHAUST DUCTS SHALL BE CARBON STEEL. - REFER CAPTIVEAIR E, PLANS FOR ADDITIONAL EQUIPMENT INFORMATION. ($1^J City Of Tukwila BUILDING DIVISION REVISIONS No Maa.oes seal! be maae to the scope Of worn wrtnow peo: aporoval of the Tukwila Building Division. NOTE: Revlslbns will redutre a new plan submittal and may include additional plan review. RECE(VE:D - --- CITY Oi- TLIK"NILA SEP 0 S 2019 PERMIT CENTER CORRECTION LTR#V1 19te DT" CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP 4 0 RE 3 a C v�sbn ct Plum En. in c� i 940 E. KATE LLA AVENUE ANANEIM, CALIFORNIA 92805 P (M) 385-1835 F(714) 385-1834 wxw.Wu�ppo9P.am STAMP G�PR D. A. °< �oF WAsy/4c z Pp y34218� �Fss DNA LTt EXP. 03/19/20 PROJECT NAME/ADDRESS: Mllob@@ TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE NO. DATE IDESCRIPTION 1 020719 JBID ISSUE 2 022519 JBID ISSUE QQ 053119 CORPORATE REVISIONS 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL z 071119 MECHANICAL CORRECTION 071919 ELECTRICAL CORRECTIONS 072519 BUILDING CORRECTIONS 5 090519 2ND RESUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEET CONTENT HVAC GEN NOTES SHEET NO M-1 00 CONSTRUCTION KEYNOTES: OHOOD BACKING WALL TO BE CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS. O PROVIDE REMOTE CONTROL THERMOSTAT FOR RTU-6. UNIT ALONG WALL AS INDICATED ON THE PLAN. CONTRACTOR TO VERIFY IN FIELD LOCATIONS OF THERMOSTATS FOR RTU-1 THRU RTU-5. O DUCTS SHALL BE INSTALLED WITH NOT LESS THAN 2 PERCENT SLOPE ON HORIZONTAL RUNS UP TO 75 FEET. ® NOT USED. O5 DUCTS SHALL BE CONSTRUCTED OF AND SUPPORTED BY CARBON STEEL NOT EXCEEDING 0.060 OF AN INCH IN THICKNESS OR STAINLESS STEEL NOT LESS THAN 0.048 OF AN INCH IN THICKNESS. © PROVIDE OPENING AT THE SIDES OR AT THE TOP OF THE DUCT, WHICHEVER IS MORE ACCESSIBLE, AND AT CHANGE OF DIRECTION, OPENINGS SHALL BE PROTECTED BY APPROVED ACCESS CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 510.3.7. [NFPA 96:7.3.1, 7.3.21 O7 PROVIDE 2 LAYERS OF 3M1 FIRE BARRIER DUCT WRAP 615+. ® NOT USED. Og THE HOOD CANOPIES SHALL EXTEND A MINIMUM 6" OVER EACH EDGE OF THE COOKING SURFACE. 10 EXHAUST DUCTS SHALL BE EQUIPPED WITH BACK -DRAFT DAMPERS, 1 1 GREASE HOODS LESS THAN 18" FROM COMBUSTIBLE CONSTRUCTION SHALL BE SEPARATED BY ONE HOUR FIRE -RESISTIVE MATERIAL. HVAC GENERAL NOTES: 1. THE CONTRACTOR AND SUB -CONTRACTORS SHALL BE RESPONSIBLE FOR REVIEW OF THE GENERAL NOTES, SPECIFICATIONS AND ALL OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND/OR OWNER OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. DUCTWORK AND PIPING SHALL BE ROUTED TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. 3. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW INSTALLATION DURING WORK. CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER. 4. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 5. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING IS SHOWN AT APPROXIMATE LOCATIONS. CONTRACTOR SHALL FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND SHALL MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. CONTRACTOR SHALL FIELD VERIFY FINAL EQUIPMENT LOCATIONS TO INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. 6. REFER TO ARCHITECTURAL DRAWINGS FOR ALL RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE HVAC SYSTEM. CHASES AND PENETRATIONS INTENDED FOR DUCTWORKAND PIPING ROUTINGS SHALL BE VERIFIED WITH ARCHITECTURAL DRAWINGS PRIOR TO INSTALLATION. 7. FINAL LOCATION OF HOOD CONTROL PANEL AND ANSUL CABINET TO BE DETERMINED IN THE FIELD BY OWNER'S REPRESENTATIVE AND APPROVED BY LOCAL CODE AUTHORITY. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL WIRING BETWEEN PANEL. VERIFY LOCATION OF PANEL PRIOR TO WIRE AND CONDUIT INSTALLATION. 8. CONTRACTOR SHALL INSTALL ALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN OR NOTED. 9. CONTRACTOR SHALL SEAL ALL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. CONTRACTOR SHALL FIREPROOF ALL PENETRATIONS THROUGH FIRE RATED COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS, 10. CONTRACTOR SHALL COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION REQUIREMENTS. 11. LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES SHALL BE ADJUSTED AS REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. 12. FURNISH AND INSTALL FIRE AND/OR FIRE/SMOKE DAMPERS IN DUCTWORK AT CEILINGS AND WALLS AS REQUIRED BY BUILDING CODE AUTHORITY HAVING JURISDICTION. FIRE AND FIRE/SMOKE DAMPERS SHALL CONFORM TO NFPA AS APPLICABLE. 13. CONTRACTOR SHALL FURNISH AND INSTALL WALL AND/OR DUCT ACCESS PANELS OR DOORS FOR ACCESS TO ALL FIRE AND/OR FIRE/SMOKE DAMPERS. DAMPER SHALL BE MINIMUM SIZE OF 6" BY 6" AND SHALL BE INSTALLED WITHIN 12" OF DAMPER. PROVIDE A REMOVABLE DUCT SECTION WHERE DUCT SIZE IS TOO SMALL FOR A 6" BY 6" ACCESS DOOR. 14. THERMOSTATS SHALL BE LOCATED AND SET BY MECHANICAL CONTRACTOR AND WIRED IN CONDUIT BY ELECTRICAL CONTRACTOR. VERIFY EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. MOUNTING HEIGHTS SHALL MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. 15. ALL BRANCH DUCT CONNECTIONS AND TAKE -OFFS TO INDIVIDUAL DIFFUSERS, REGISTERS AND GRILLES SHALL HAVE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR/ROUND BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT. 16. REFER TO SPECIFICATIONS FOR FLEXIBLE DUCT, DUCT INSULATION AND RIGID DUCT REQUIREMENTS. 17. ALL BALANCING DAMPERS SHALL BE ACCESSIBLE FOR BALANCING CONTRACTOR TO PERFORM AIR BALANCE. 18. ALL EQUIPMENT VENTS AND FLUES SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR PER EQUIPMENT MANUFACTURERS RECOMMENDATIONS AND EQUIPMENT SPECIFICATIONS. PENETRATIONS THROUGH ROOF SHALL BE HELD A MINIMUM OF 10'-0" FROM HVAC EQUIPMENT FRESH AIR INLETS AND 2'-0" FROM ROOF PARAPETS, 19. CONTRACTOR SHALL FURNISH AND INSTALL A NEW SET OF AIR FILTERS IN ALL UNITS JUST BEFORE TURNING SYSTEM(S) OVER TO OWNER. 20. CONTRACTOR SHALL PROVIDE VOLUME DAMPERS FOR ANY EXISTING SUPPLY OR RETURN DUCT WITHOUT THEM I REVIEWED FOR CODE COMPLIANCE APPROVED SEP 23 2019 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA JUN 2 1 2019 PERMIT CENTER l�jl9 DlQ3 �% SCALE: HVAC FLOOR PLAN 1/4„_V-D„ CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS, THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP s. TEC'f = a dvu,on Of Plump Eng;neern;, Ina 914 E. KATELLA AVENUE ANAHEIM. CALIFORNIA 92085 P (714) 385,1835 F(714) 385.1834 xmw.Mu�IF9 T.wm STAMP M. 5�e OF IV W A HTOC Q Po y 57274 FFss�NALIEE�0\�4 EXP. 09/10/19 PROJECT NAME/ADDRESS: JWI'B*b@@ TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS /ISSUE DATE NO. DATE DESCRIPTION 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL r JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY I PEI PEI SHEET CONTENT HVAC FLOOR PLAN SHEET NO M-201 GENERAL NOTES 1. TERMINATE ALL VENTS AND FLUES A MINIMUM OF 10'-U' AWAY FROM ALL OUTSIDE AIR INTAKES. 2. DISCHARGE AIR FROM ALL ROOF MOUNTED EXHAUST FANS SHALL BE A MINIMUM OF 10'-0" AWAY FROM ALL OUTSIDE AIR INTAKES. 3. MOUNT HVAC EQUIPMENT ON ROOF CURBS PROVIDED WITH UNITS. 4. COORDINATE LOCATION OF HVAC EQUIPMENT WITH ALL OTHER TRADES. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS. CONSTRUCTION NOTES 1. SITE INSPECTION: GC/CONTRACTOR SHALL VISIT THE WORK SITE PRIOR TO SUBMISSION OF HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITION AND THE EXACT NATURE AND EXTENT OF WORK. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. NO CHANGES IN CONTRACT WILL BE MADE TO ACCOMMODATE OR ALLOW EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TO THOROUGHLY MAKE THE EXAMINATION. 2. GC SHALL BE RESPONSIBLE FOR OBTAINING AND PAY FEE FOR ALL NECESSARY PERMITS. 3. COORDINATE ALL WORK WITH OTHER TRADES. . REVIEWED FOR CODE COMPLIANCE APPROVED SEP 23 2019 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 0 5 20i9 PERMIT CENTER SCALE: ROOF PLAN 1 1/4 a CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP 4 0 a1N£2P Id a � vision c.` Piurep Engreedng, Inc. 914 E. I(ATELLA AVENUE ANAH EIM, CALIFORNIA 92805 P (714) 385-1835 F(214) 385.1834 w«w.a�m�9lao.o�m STAMP pRD.A.p �G�oE WASy ' 0 Po y 34218elols p ,Fss�MALTLENG\�� EXP. 0�/t9/20 .I PROJECT NAME/ADDRESS: TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE NO. DATE DESCRIPTION 1 020719 BID ISSUE 2 022519 BID ISSUE T 053119 CORPORATE REVISIONS 3 061819 1ST PERMIT SUBMrTTAL 4 061819 HEALTH SUBMITTAL s 071119 MECHANICAL CORRECTION 071919 JELECTRICAL CORRECTIONS 072519 BUILDING CORRECTIONS 5 090519 2ND RESUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY .II. PEI PEI SHEET CONTENT HVAC ROOF PLAN SHEET NO ............. M-202 IZ44111.11-NIvi EXHAUSTPLENUM _ TOTAL HOODC ONFiG. HNOD TAG MODEL LENGTH COOKING TOP. TAL SUPPL S CFM _- _ —6M () EM _ � �DTH LENG. HEIGHT DIA CFM VEL S P CFM Ri HOOD END To ! ROW END T RO GONSTRUCTIOTI 1 1 5430 _-� 4 _ t2R t9t� t2'ti" 3000 BOGY ND-2-PSP F I Deg ( 4' 1 12 15001 1910 -0788 REND i 43055 ALONE Where Exposed I 4830 i 450 _ - { --__ 430 j J 1 12'0' Deg 24D0 4" 16' 2400 1719 1 -0797 ! 1800 ND-2-PSP F 1 .1- I -. I I_ L. ES ALONE mere Ezposetl ALONE ALONE HOOD. TYPEHEIGHT LENGTH I EFFICIENCY @ 7 MICRONS QTY. NO. Captrale Solo Filter .. Qg ���------. TAG 20 i6" 85% See F lter Spec. I 4 2 1 i Captrale Solo Filter 9 20 is" 85% See Filter Spec. 4 HOOD OPTIONS HNODA TAG OPTION RIGHT END STANDOFF (FINISHED) 1 Wide W Long i ted 1 STRUCTURAL FRONT PAN EL 2 STRUCTURAL FRONT PANEL N. 7 2 TAG I POS Front Front I [LENGTH WIDTH HEIGHT TYPE WIDTH I —MUA 12 MUA t2 168" 1 20 6" MUA 12 1 ! MUA 12 156 18 T MUA f 12 _ --,__-MUA I t2 LENG. DIA 28 1 CFM S.P. 700 0185 I- 28 28 700 I_0185 1 700 0186 24 24' I 24' 700 �- 0185 600 0162 I 600 0 162 � 600 I 016T'_� PATENT NUMBERS AC-PSP (United States) - US Patent 7963830 B2 AC-PSP Wall (Canada)):CA CA Patent 2820509 AC-PSP Island (Canada) - CA Patent 2520330 W WIRE ____._ FIRESYSTEM -_-I - ! ELECTRICAL � S --- SWITCHES 1FIRE H001 —SYSTEMHANG] TYPE LOCATION GVARD, SIZE TYPE SIZE 1 MODEL# QUANTITY PIPING � WGH' L55 Series E26 NO Left 12"x54'x30 SC 3t1i10FP Lig tt NO 883 an j L55 Series E26 NO Right 12"x48"x30" SC-311110FP 1 Light tFan 765 NO '':,� LBS GREASE DUCT TEST (2015 IMC 506.3.2.5) Prior to the use or concealment of any portion of a grease duct system, a leakage test shall be performed. Ducts shall be considered concealed where installed in shafts or covered by coatings or wraps that prevent the ductwork from being visually inspected on all sides. The permit holder shall be responsible to provide the necessary equipment and perform the grease duct leakage test. A light test shall be performed to determine that all welded and brazed joints are liquid tight. A light test shall be performed by passing a lamp having a power rating of not less than 100 watts through the entire section of ductwork to be tested. The lamp shall be open to emit light equally in all directions perpendicular to the duct walls. A test shall be performed for the entire duct system, including the hood -to -duct connection. The duct work shall be permitted to be tested in sections, provided that every joint is tested. For listed factory -built grease ducts, this test shall be limited to duct joints assembled in the field and shall exclude factory welds. Type I Hood Special Inspections Type I hoods and ducts shall be inspected by approved inspection agencies that satisfy the requirements as to qualifications and reliability. Final inspection reports from such approved agencies of the Type I hood and duct shall be accepted by the code official after the special inspections of hood and duct have been completed. (2015 IMC SECTION 107 & IMC 506.3.2.5) 1- LAYER OF INSULATION FACTORY INSTALLED IN - LOY END STANDOFF MEETS 0" REQUIREMENTS CLEARANCE -- TO COMBUSTIBLE SURFACES, i� 3• _ �_ I - I, —}- 012" U L tetl LEE Seri E26 Canopy Hght E.rtu H gh Terri, A11—y J — J- t2-12-1 I 12' __ —_— 24" —__ _ 24" { 24,—_...___. 24 ...— _____ 2C 24" -- , sit 314" -- -- -- � - ]] 112 � � 36.314" 42• LIGHTING FORACPEP JOC R 3C93515-Hoof #1 INPUT: 12oV AG.1 Phase. 5N60Ht, 3.5 Watts per IIgM. TO CONTROL LIGHTS WITH HOOD LIGHTSWITCH, WIRE PER HOOD ELECTRICAL CONTROL PANEL SCHEMATIC, TOCONTROLUGHTS WITH BUILDING LIGHT SNATCH WIRE BLACK AND WH TE WIRE TO A 120VAC SERVICE - END TO END ACPSPS REQUIRE 120VAC FIELD WRING NG FROM JDOX TO J BOX. REPLACE LIGHTS WITH LED LIGHTS ONLY. =%LAIC ✓IE4:% _. hs'od .-,- I_ 1 1I,00' LQNG NOTE: AOdi6onal hanHing angles provitled for hootls 12' antl longer. LES SERIES Us CANOPY LIGHT FIXTURE - - HIGH TEMP ASSEMBLY, INCLUDES CLEAR THERMAL er AND SHOCK RESISTANT GLOBE TES FIXTURE) EXHAUSTBRER _� I 1 HANGING ANGLE ATTAOHING PLATES SUPPLY RISER iMTH f-`SEE HOOD TABLE VOLUME DAMPER i T 1 L r--T STEELOPEN FORSTAINLESS TEDPA 23f4" STEEL PERFORATED PANEL 20"CAPTHATE SOLO FILTER WITH HOOK � --camp 3" INTERNAL STANDOFF- —. `\\� 1y HE--� LED I 30' ITTS THE RESPON-11. Y NOM. OF THE ARCHITECTIOWNER TO ENSURE THATTHE HOODCLEARANCE FROM UAFTED­COMBUSTIBLE - ----I — {_ AND COMBUSTIBLE MATERIALS 1 IS IN COMPLIANCE WITH LOCAL CODE REQUIREMENTS. I j GREASE DRAIN _. WTH REMOVABLE CUP :. 46.(E MAX I - I I ! � so" EQUIPMENT BY OTHERS II 7 :_EO'TION ➢IEN' — MODEL_ 5130ND-__2_PSP—F HOOD 1 PLENUM PROTECTION - NOZZLE DUCT PROTECTION NOZZLE DETECTORS - �1 �/�...... APPLIANCEPROTECTION REMOTE MANUAL NOZZLE`�` NOZZLE PULL STATION REMOVABLE STAINLESS STEEL SERVICE DOOR \ , OPTIONAL PRE -TIRED ELECTRICAL AL STRIPS, AGENTTANK - �\ I-IHASALBOXWI ORSAN OVERLOAD 3-PHASE CONTACTORS AND OVERLOADS FANANDLIGHT (IF APPLICABLE) OEM RELEASE/ - CONTROL PANEL BRACKETASSEMBLY T)IIG4L A SUL R-102 S}'STEAI LAYOUT o d N REVIEWED FOR CODE COMPLIANCE APPROVED SEP 23 I'll • DATE: I/25/2019 City of Tukwila DWG.#: BUILDING DIVISION 3693515 DRAW AHJ-86 SCALE: Y� — MASTER DRAWING R'EC.EIL' -Li - - CITY OF TUKWIL. su3ta ` z; SHEET NO. PERMIT CEit1'T ER M RN CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. I i I adlso o Pl.— En,1:ne_fng Inc. 914 E. KATELLA AVENUE ANAHEIM. CALIFORNIA 92805 P (714) 385 1835 F(]14) 385 1834 wrm.g0mpgmup.com REVISIONS / ISSUE DATE NO DATE DESCRIPTION _ 3 061819 1 ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL -------------- _________ _______ E----------------- I JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY� PEI PEI SHEET CONTENT KITCHEN HOOD DETAILS 13'-000'Oveall LengN - P—H VIEW —i_ 12 u-1'C LONG__48'CIM1ID-:?-PSP NOTE: AtltliUonal M1an9�+N angles pl0vketl for trootls 12' antl longer. PLENUM PROTECTION NOZZLE OPTIONAL PRE -WIRED ELECTRICAL TERMINAL BOX WITH TERMINAL STRIPS, 3-PHASE CONTACTORS AND OVERLOADS (IF APPLICABLE) FAN AND LIGHT CONTROLPANEL TyP)CAL ANSUL R-102_S}:S7E,IJ LA)-0UT LIGHTING FOR ACPSP Job x 3E93515- Haotl x2 INPUT: 120V AC,1 Phase, 501fi0Hz, 3.S Watts Per light. TO CONTROL LIGHTS WITH HOOD LIGHT SWITCH, WIRE PER HOODELECTRICALCONTROLPANELSCHEMATIO TO CONTROL LIGHTS WITH BUILDING LIGHT SWITCH, WIRE BtACKANO WHITE WIRE TO A 120VAC SERVICE. ND TO END ACPSPS REQUIRE 120VAC FIELD WIRING FROM J"BOX TO J-SOX, REPLACE LIGHTS WITH LED LIGHTS ONLY. I REMOTE MANUAL �I. PULL STATION REMOVABLE STAINLESS STEEL SERVICE DOOR AGENTTANK '— OEM RELEASE/ BRACKETASSEMBLY IT IS THE RESPONSIBILITY OF THE ARCHITECTIOW NER TO ENSURETHAT THEHOODCLEARANCE FROM LIMITE—OMBUSTIBLE —" AND COMBUSTIBLE MATERIALS IS IN COMPLIANCE MATH LOCAL CODE REQUIREMENTS, GREASE DRAM WITH REMOVABLE CUP L55 SERIES UB CANOPY LIGHT FIXTURE - HIGH TEMP ASSEMBLY, INCLUDES CLEAR THERMAL AND SHOCK RESISTANT GLOBE NUG FIXTURE) ATTACHING PLATES SUPPLY RISER WITH VOLUME DAMPER 235%OPEN STAINLESS 2311 STEEL PERFORATED PANEL SECTIOA1 PlEJI' - J70DEL 4830T'D-2-PS.P.-F - /100D _ ____r 2 N19-0, RECEIVED CITY CIF TUKWIL. Jum ? w=PN tT CEj`4 1 ER CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP -------------- i 4 0 atl sic.VP-' p E.g needing, In. ABA E. CALIF A AVENUE A NAHEIM. CAL(FO R NIA 92834 P I)14j 3851835 FI]14) 3851834 wxxGempgmu0.cam REVISIONS ( ISSUE DATE NO- DATE DESCRIPTION 3 061819 1ST PERMIT SUBMITTAL_ 4 061819 HEALTH SUBMITTAL JOB NUMBER j MEP # 1901069� DRAWN BY CHECKED BY r PEI PEI SHEET CONTENT (KITCHEN HOOD DETAILS REVISIONS any rdry 7,Yr vra1a77vv JoD ^auxs��ro -- I _ 'SONES TAG FAN UNIT MODEL # CFM ESP. RPM H P R H P 0 VOLT FLA j ( DISCHARGE WEIGHT VELOCITY (LBS.) DU200HFA 3000 r2000 ) 1272 5000 I22380 3 20B 15.0 730 FPM 'i 211 22 DU180HFA 240� 1345 ! 2,000 1,2440 3 1 208 6.1 ( 554 FPM 15B ( 17.9 UNIT TAG FAN UNIT MODEL # CONDENSER TONNAGE VOLTAGE PHASE FREQUENCY MCA NO NO. I 3 I � A2-D.500-20D MPU � 1 I 5 208 230 3 PHASE � fi0 Hz 214 Amp! 4 I At D 250-1 SD MPU I 1 1 _ 3 208 230 1 3 PHASE I60 Hz 14.5 Amp! U4 FA AT IIVFOR11-ITION h1)P.3G9 I5 FAN JL-_ MIN I UNIT ( TAG FAN UNIT MODEL # BLOWER HOUSING CFM DESIGN ESP. RPM H.P. B.H.P. NO D.5,. - _ - I 3SA2-0D-20D-MPU 20MF 2-MOD A2-U.500 2000 2800 0.500 ( 1277 j 2.000 1.0680 I 4 At D.250-15D MPU 15MF-I-MOD At-D.20 1000 1800 0.50D 2071 12,000 1.2740 C43 FIRED L1fA7i£ UP d,1' UAtI(J FAN INPUT OUTPUT NOT TAG gTUs BTUS TEMP. RISE REQUIRED INPUT GAS PRESSURE GAS TYPE 3 328696 I 302400 100 tleg F 7 in w c- tb in w e I Na 277304 199400 _100 deg F - _ -_ 7 in c - 14 m w c Natural SUPPLY FAN UNIT TAG EXHAUST - -'"-T NO. GREASE GRAVITY WALL SIDE GRAVITY MOTORIZED WALL CUP DAMPER MOUNTIDISCHARGEI DAMPER DAMPER MOUNT 1 YES -. YES �. 3 --� 4 1__ ...YES ----I � I .--L.-_. YES I 1 NO AN EIGHT ITEM SIZE 1 1 #7 41 LBS J Curb 26.500"W 26500Lx 20.000H Vented H'nged 2 1 # 2 _ 1 37 LBS f Curb .. 26.500"W..26.500"L x 20.000"H Vented 3 I # - �i� 27 LBS j Rail I 6.000"W x 37.00D"L x 20.000"H -#3 4 # 4 I 107 LBS 1 63 LBS Curb Curb 31000"WX79DD0"Lx20.O0OH Isulated 21 000"W x 77 000'L x 20.000 H I ulated # 4 Rail 16 000"W x 21.000"L x 20.000 I . MAX. FUSE I MIN. WIRE RLA SIZE I SIZE SEER uwl v� u!L COOLING COIL WEIGHT VOLT ILA ENTERING OB ENTERING WB LEAVING DB LEAVING WB SENBIBLE LATENT (LBS.) .'TOTAL CAPACITY; TEMP. TEMP TEMP TEMP CAPACITY - CAPACITY 208 6.1 87.0°F 64.0°F 71.7°F 59.8°F 36.1 MBH ! 282 MBH T9 MBH 1 1504 i 1 4 M t 640°F 71.6°F 59.9°F 23.0 MBH 8,2 MBH .8 BH 203 208 6.1 87.0°F � ( � I CAN #3 A2-D.SDO-20D MPU - HEATER L DIRECT GAS FIRED HEATED MAKE UP AIR UNIT FAN 91 OU200HFA-EXHAUST FAN BURNER EFFICIENCY(%)I y 92 3 92 3. DOWN DISCHARGE -AIR FLOW RIGHT-> LEFT 4_ COOLING INTERLOCK RELAY. 24VAC COIL. 120V CONTACTS. LOCKS OUT BURNER CIRCUIT WHEN AC IS ENERGIZED. 5. MOTORIZED BACK DRAFT DAMPER 22 75' X 24' FOR SIZE 2 STANDARD 8 MODULAR HEATER UNITS WIEXTENDEO SHAFT. STANDARD GALVANIZED CONSTRUCTION,3I4'REARFLANGE,LOWLEAKAGE, LF120SACMATORINCLUDM 6. LOW FIRE START ALLOWS THE BURNER CIRCUIT TO ENERGIZE AMEN THE MODULATION CONTROL IS IN A LOW FIRE POSITION, FEATURES: DIRECT DRIVE CONSTRUCTION (NO BELTSIPULLEYS) ROOF MOUNTED FANS -RESTAURANT MODEL UL705AND UL762 AND ULC-5645 VARIABLESPEEDCONTROL -INTERNALWIRING WEATHERPRODF DISCONNECT -THERMAL OVERLOAD PROTECTION (SINGLE PHASEI - HIGH HEAT OPERATION 300`F LUIRT) - GREASE CLASSIFICATION TESTING NORMAL TEMPERATURE TEST 2 EXHAUST FAN MUSTOPERATE CONTINUOUSLY WHILE EXHAUSTING AIR AT 3BOT (149°C) UNTIL ALL FAN PARTS HAVE REACHED THERMAL EQUILIBRIUM, AND WITHOUTANY DETERIORATING EFFECTS TO THE FAN WHICH -.1. CAUSE UNSAFE OPERATON. EXHAUST FAN MUSTOPERATE CONTINUOUSLY WHILE EXHAUSTING BURNING GREASE VAPORS 15 MINUTES WTHOUTTHE FAN DECOMING DAMAGED TO ANY EXTENTTHAT COULD CAUSE AN UNSAFE CONDITION. OPTIONS GREASE BOX. DUCTWORK BETWEEN -- EXHAUST RISER ON HOOD AND FAN (BY OTHERS) 9. DX COOLING INTAKE AIR THERMOSTAT AND RELAYS MOUNTED IN UNIT -SET POINT FOR THERMOSTAT SHOULD BE 85°F. 10, 5 TON, SINGLE CIRCUIT MODULAR PACKAGED COOLING OPTION FOR SIZE 2 MODULAR PACKAGED UNIT. INCLUDES CONDENSER, DX COIL, FILTERIDRYER KIT, THERMAL EXPANSION VALVE, R410A REFRIGERANT, AND REFRIGERANT PIPING. (2,000TO3.000CFM) NOT BUILT MIT OPPOSITE SIDE CONTROLS OR OPPOSITE AIRFLOW DIRECTION. CONDENSERS REQUIRE SEPARATE 208V, 3 PHASE POWER SUPPLY UNLESS ORDERED WITH SINGLE POINT CONNECTION. COIL=3EZ1001R 11. DOWNTURN PLENUM FOR SIZE 2 COOLING COIL MODULE -REQUIRED FOR DOWN DISCHARGE COOLING COIL APPLICATIONS 12. SEPARATE t20VAC WIRING PACKAGE FOR MAKE-UP AIR UNITS. OPTION MUST BE SELECTED WHEN MOUNTING VFD IN PREWRE PANEL OR WITH DCV PACKAGE. PROVIDES SEPARATE 1- INPUT TO SUPPLY FAN, THIS 120V SIGNAL MUST BE RUN BY ELECTRICIAN FROM DCV TO NOR SWITCH, NOTE: SUPPLY DUCT MUST BE INSTALLED TO MEET SMACNA STANDARDS, A MINIMUM STRAIGHT DUCT LENGTH MUST BE MAINTAINED DOWNSTREAM OF UNIT DISCHARGE UNLESS OTHERWISE SPECIFIED. 00 NOT RELY ON UNITTO SUPPORT DUCT IN ANYWAY, FAILURE TO PROPERLY SIZE DUCTWORK MAY CAUSE SYSTEM EFFECTS AND REDUCE PERFORMANCE OF THE EQUIPMENT SUGGESTED STRAIGHT DUCT SIZE IS 20' x 2W x 7Y LONG, 2: L . iJl - 4 LIFTING LUG 20 F.Co'NENi WRB I~_ _- a,- ------ SUPPLY SIOE HEATER INFORMATION: WIN T E R TE MPE R ATUR E=20°F. TE MP. RISE - INO°F. BTUs GAITUTATED OFF STANDARD AIR DENSITY OUTPUT BTU, AT ALTITUDE OF 0.0 A,=302400 INPUT BTUSATALTITUDEOFEIE B.-URS96 SS PITCHED DRAIN PAN ') 2�`� 261l2 VENTED CURB 20. 20 GAUGE \` STEEL CONSTRUCTION 3" FLANGE ROOFOPENING 26 28 DIMENSIONS �_/ PITCHED CURBS ARE AVAILABLE 0.. FOR PITCHED ROOFS. 0° SPECIFY PITCH: 12" EXAMPLE: 7/12 PITC H = 30° S LOPE F (6 0o 00 h 1 N 0 g E Typical Drain Tap Install Recommended Cooling Coil Drain Trap Configuration BUILCity D NG D of VISION ila DATE: 1/25/2019 i _NO Unions DWG.#: 3693515 �ee�oVE µy - a r- ���� DRAWN AHJ-86 E: 2 M'n --- / 1 / SCALE: 3/1.. - 1, p„ Notes: MASTER DRAWING 1)1"diameter PVC Pipe only RECEIV FD � 2) Use only low profile Couplings3> Add clean out as SRUwn CITY OF T U K W I L. r- i 3 4 1 2^ pE9I ;Y16 SHEET NO. 3 CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. 4W PLUNFeTT. atl fP�mpE .:Sloe 9,4 E. KATELLA AVENUE A NAHEIM, CA L IFORNIA 92805 P (714) 385.1835 F(714) 385 1534 wmv.NuRp3mUDswn REVISIONS! ISSUE DATE N0. I DATE IDESCRIPTION 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEET CONTENT KITCHEN HOOD DETAILS - - — - -- - --- — --------------------------------- - -------------- ------------------------ - - -------- - ------------------------------ -- - REVISION L\ ILI 26 1/2" ti 26 1/2" FAN #2DUlNIHFA EXHAUST FAN FEATURES: VENTED CURB as a. ROOF MOUNTED FANS RESTAURANT MOO EL UL705 AND UL762 AND UECrGSPr 20GAUGE VARIABLE SPEED CONTROL STEEL INTERNALYdRING CONSTRUCTION WEATHERPROOF DISCONNECT ERVAI OVERLOAD 1ROTECTIONGINGLIE PHASE)HIGH HEAT OPERATION EPWF (149-C) Y FLANGE -CRCASECLASSIFICATIO TESTING 333/4 NORNALTEMPERNIONETEST EXHAUST FAN MUSTOPERATE CONTINUOUSLY WHELE XHAUSIDS TRAT3EHIPFC—C) 26 DIMENSIONS UNTILALIFFA PARTSHAVEREACHED 7M 22,1. THERMALI EQUILIBRIUM, AND ANY ROOF OPENING UF26 DETERIORATING E FECTSTOTFEFANVVRCH GREASE DRAIN WOULD CAUSE UNSAFE OPERATION, 1, ABN0RMrA­JE TEST PITCHED CURBS ARE AVAILABLE 2 —�� I - EXHAD T FAN MUST OPERATE CONTINUOUSLY FOR PITCHED ROOFS. VVELF EXHATSTING BURNING GREASE VAPORS 0. ATERG F (316-C)FOR A PERIOD Of SPECIFY PITCH: u �2 jE SE UNSAFE. CONDITION, lZINEYES VVITHOUT THE FAN BECOMING 'SLOPE E AGEDT ANY EXTENTIRATCOULD CAUSE EXAMPLE: 7112 PITCH 3D AN OPTIONS GREASE BOX Ct DUCTWORK BETWEEN EXHAUST RISER ON HOOD AND FAN (BY OTHERS) FAN eI A-250-15OMED - HEATER 1jDIRECTGAS FIRED HEATED MAKEUP AIR UNIT WITH 1—PRECTDRIVE FAN INTAKE HOOD VATH FE FILTERS 3, DOWN DISCHARGE -AIR FLOW RIGHT -+ FEEL 112 4, COOLING INTERLOCKREICAY. EIVACCOIL —CONTACTS, LOCKS OUT BURNER CIRCUIT WHEN AC IS ENERGIZED 1. 5 MOTORIZED BACK DRAFT DAMPER IT X IT FOR SIZE I STANDARD It MODULAR HEATER UNITS VVEXTENDED SHAFT, STANDARD GALVANIZED BeONSTRUCTION.314 R�RF�NGE,L�L��GE,TFBI�SACNATORINC�DED B B. ,1LOINFIRE START. ALLOWS THE BURNER CIRCUIT TO ENERGIZE WHEN THE MODULATION CONTROL IS IN LOW FINE POSITION 7GAS PRESSURE CRUDE, 0.3B. 2,5' DIAMETER, — THREAD SIZE is 8. GASP ESGUGEGAUGE,-ETO-IENCHE$VVC 2 V DIAMETER. 1/4-THREAD SIZE IL DX COOLING INTAKE AN THERMOSTAT AND RELAYS MOUNTED IN UNIT -SET PONY FOR THERMOSTAT SHOULD BE 85°F. 03 ja ITON, SINGLE CIRCUIT MODULAR PACKAGED COOLING OPTION FOR SIZE 1 MODULAR PACKAGED UNIT. INCLUDES CONDENSER, DR COIL, HIFTERANYISFUKIT. THERMAL EXPANSION VALVE, R410A REFRIGERANT, AND REFRIGERANT PIPING. (1,IWTO1G00CFM) NOT BUILT WITH OPPOSITE SIDE GO TROLSOROPPOSCIPEANFI-OVIDIRECTION. CONDENSERS REQUIRE SEPARATE 208V, 3 PHASE POWER SUPPLY UNLESS ORDERED WITH SINGLE POINT CONNECTION. CO—REERIDIN II. COOLING COIL MODULE -REQUIRED FOR DOWN DISCHARGE COOLING COIL APPLICATIONS 12 SEPARATE 120VAC WIRING PACKAGE FOR MAKE-UP AIR UNITS, OPTION MUST BE SELECTED RVIFER MOUNTING VFD IN PREVVIRE PANEL OR WITH DCV PACKAGE PROVIDES SEPARATE 120VAC INPUTTO SUPPLY FAN, THIS 120V SIGNAL MUST BE RUN BY ELECTRICIAN FROM DCV TO MUA SWITCH. SUPPLY SIDE HEATER INFORMATION, NOTESUPPLY DUCT MUST BE INSTALLED TO MEET SMACRA STANDARDS, A MINIMUM STRAIGHT DUCT LENGTH MUST BE MAINTAINED DOWNSTREAM OF WINTER TEMPERATURE =2d-F. TEMP, BEE 1— U IT DISCHARGE UNLESS OTHERWISE SPECIFIED DO NOT RELY ON UNIT TO SUPPORT DUCT IN ANY WAY. FAILURE TO PROPERLY SIZE DUCTWORK MAY TLY, CALCULATED OFF STANTARDAIR DENSITY CAUSE SYSTEM EFFECTS AND REDUCE PERFORMANCE OF THE EQUIPMENT, OUTPUT BTUs ATALTITUDEOFOG C-194400 SUGGESTED STRAIGHT DUCT SIZE IS 14', 14- x 4W LONG INPUT BTUs ATALTITUDE OFRO ­21-4 CURB CUTER WALL — ---- -------- — --------- DISCHARGE OPENING - ----------------- AIRFLOW AIRELOW T COOLING COIL MODULE S 9;IT TL — ----- - 7— I" MET CONNECTION FOR SS PITCHED DRAIN PAN FLEX CONDUIT FOR FIELD WIRING Sol.. 1111' - - 4111' aSnT 4RIRE ---------- 71 > LIFTING LUG 200 !� AIR DIRECT FIRED MODULE 'LOW COIL _ CONDENSER ACC (SERVICE DISCONNECT 00 GOOESS CE A= 0) T_ CE DISCONNECT aREHIEF V DISCONNECT C. BLOWEPJMOTOR 1/4" NET AINFLOW F=� F 113111 -6 ACCESSOOOR 2 24 R E 4" SERVICE C CL Q LEARANCE REQ. j Is 11C� 4'9 a 111� 41' 1 _,.CmMBM FACHT 20' EQUIPMENT CURB DUCT 1, G, 131 SIT MIR, 11 QRSUNNI REVIEWED FOR COMPLIANCE CODE COMPLIANCE R L PIP 0 .1 N_e V D ­APPROW APPROVED DATE: 1/25/2019 Typical Dram Trap Rated Recommended Cooling Coil Drain Trap Configuration SEP 23 2019 DWG.#: 3693515 No Unions I City of Tukwila DRAWN AHJ-86 BUILDING DIVISION BY: NO ____7—, SFALE- MASTERDRAWING RECEIVED Notes 1) 1" diameter PVC Pipe Only CITY OF TUKWILA 2 UED.Glyl—profilprofile 3� Add Clean out as Shcv,n JUN 2 1 200 PERMIT CENTER SHEET NO. ---------------- -- — --- ------- ------------------ 4 CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION 0 NSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. ZIA'; n mm,omp_ n.- API1- TG�TE 8 --o! Z-FE­ A a'Pump; PP Engnnenr.q RE. 914 E. KATELLA AVENUE ANAHEI M' CA L IFORNIA 92805 A (71413WI835 F(714) 385-1834 REVISIONS / ISSUE DATE NO. DATE 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL F=F=� JOB NUMBER MEP # 1901069 L DRAWN BY CHECKED BY SHEET CONTENT .KITCHEN HOOD DETAILSI L -------- --------------------- _-- — REVISIONS £\ha—t F— Wm'10g DRAWING NUMBER EJ(N389 35tb-t JOB 643515 �Jolli➢ee-NMriIa WA-revfle sH DATE IP 3f/15ROf9 MODEL Dt,_ooxPa Etihaust F— Wning JOB 369361b-✓pll@ee-Tbknta WA-revf OM EXN 125/S0f9 DLt6oBrA 'MNGNUMBER 36935i5-2 MODEL DII-PCt FIr d Heater l\irl il^ DRAVANG NUMBER 36435153 OF JOB 3693616-JOWbee-Takwlla WA-revf SHIP DATE 5npig MODEL .v- �oD-_aD-vav 12 D I—Wl.t— M'mg IMNG NUMBER ORA RP36935f53 JOB 3693515-Joii,Dee-TUkMlBWA�revf sH '2 D IP DgTE - . 00 1/252018 MODEL 6 D UPV 0 _ - Inyu opions, - keo eQms ,ATIFNi1f31 EtECiR C10.N. Oxxccnax+; xxacr PowBRTO rxE DRDP E..x,xV: ao M�OP.M'5 x«�.nelaum wwNanw rnsa cmaxtle,�ro�•aamy 120 V t PH. ° 1 ul � li I 240 V i PH. 208/460l600 V 3PH. l ae¢) �y I Ins,a ee Doums v/ � eK �'fAB Oft -peso>� - .BN tnt'ut) aR SVJat �� �R ,s Y - _ 5 fli o - D ifv,c .x,m.a.w - T\ \\\� a I I I 3 � ratertmnm arw w�Paxa« m 3 -_i Lam 0_ _ �Ibn trcauon idrm wroe,Ew:a, IaI ., OBAt nwQJ rm, a� IJ I,�^ C+ N — E wa, Narva,��xmu m s war t,.,.4�.xme,,..aA Izl _.__..--_-_ 4-B� _________ y._� 208/230V 3PH � I m I Po+vERiROMOEDe re � r > a r a e i reM x�a,»�hw I,I a »7aP9 w 9 a R a G ,a wet � � I Lpx�xsER, d m ,- wao ft m DDNDTGDxNEGrPoxDExsERPDwEaDRDP9rGNBLxExLDxTA ----- DLPaLRADEbr�,ER3DRwna _ m u 12-' A 1 ,em cau C w fay -xa e ~ >sm ( / u L �,� � ETO�AJ s as xma.n > ,a Baw,Dsr snP 3�vao-;s.p°•u ,s Fxw,Dsr anP soa9.3Pa,Fu ,a I �, >� zxP acaxara,rw O m N rnd INN j m`a� isc F .II R ,a ioRw.noN. crRtMOP.soa +e Etecm cu A _npx TO —I 11A +a I_I i Ei9ctRro Ox '" ~ � of Mal=c- co clA_=son i zo oexorsmrERRuvnRlxa - oErrorEs xo - o=xo?E°s�efowxxs ---- oExorEs xreRxuwR xc I —� u, I __. .._. DFzr De area xraRxuv4Rxc xore9 ¢' -g0 wRsw)oR (-�F ZD v s I � ^reRld xusu ox xieai sine ; oG ry et awe se.aar 33 ex _ �� I� �I reRu xat tt coxrvscnox ,a mm at az aR eo � Dlreot Flrea Heater Iw;D� JOB 693515-Joilibee-TVMAIa WA-revt a 36935f5-Jollibee uMMta WA-mvt- IruaDuftt;GO mtrmg JO T ORAV.'NGNVMBEft OF3693515< AT+ExnoN EtEem GAIN DROP ioRDscoxxEcrc oxxccnox SIP GATE i25R0i9 MODEL nioJbo iSDfiPU s ._I y _ +'^ - - ^OM_a!3iEx? ta.,rateaoaemmo- SHPDA MODEL AI-D2 DRAVr1N. NUMBER RP36935i5d fY1511pf9 ,51-i>D-UPV 720 V i PH 240 V 1 PH 206/460/600 V 3PH ^, �I iea OPrms + l v .___ J I Rory 4vTxry e�� \„e9 iA \xsa e9 9 /I a BN —� xv/ da ¢3 nz trvetzo- .aw, •.•,•,� ,"• s -' """"- —" 208/230V 3PH � PoxeR FRom DSD urBDBREARER I !GN _ �y oR vrm srn..r w ura awmmo ,9 ' �qAl„ III ! i Psaz RE,a, 9 0 u.,o wenmwr . /,a-s r5/�sx 14 R AlNN I� I R'At <- pus FEL ♦ ( ma.m.v sa ai.vrv�s xOTLONNFCi0DN0EN5ERPoWER DROPS TO KBLHENC IXPACNAGESTARn:ft9ORVFD6 SA f z. c swm a.xs.w x ; ,s Fgptgz3 wRl wxl ^" I� P a, Deftlren oo � — See �aboVed fe I V � j1� Datxxw,rER V Iul I �' HE J - W6� ro v axw9oeva s,xa L —_ Sn Naa:aowle •) Pwa co oo .,o v^lalah� FLA i� Co � of ucn=vvsA conot etoP=xoA !(D az x �s 0 r2 �Vaas o-xorEs:x!BRxAtwRlxB � � —' saDseoox as RD LnIATORs oasLwDxc aR atatx Et s Pa PD rs.a5 •x.eKK m - Px-RI Plx. REVIEWED FOR CODE COMPLIANCE I I APPROVED i SEP 23 2019 DATE: 1/25/1019 City of Tukwila WG16 BUILDING DIVISION - DRAWN AHJ-66 BY: SCALE: 3/4• — V-0" MASTER DRAWING RECEIVED CITY OF T UKWILA gUIi SHEET NO. PERMIT CENTER CITY SUBMITTAL_ BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. atl P'um E t q inc. 914 E. KATELLA AVENUE ANAHE IM. CA L IFORNIA 9f305 P (Jt 4) 385 me Flit') 385 nu I vnsw.qu,ggtoopcom REVISIONS / ISSUE DATE N0. DATE DESCRIPTIO 3 061819 1ST PERMIT SUBMITTAL 4 1 0618191 HEALTH SUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEET CONTENT iKITCHEN HOOD DETAILS REVISIONS ELECTPLCAL PACK —AGE — Tob# 36.93575___ SWITCHES FANS CONTROLLED TAG __ _- NO. PACKAGE# LOCATION -_ OPTION LOCATION QUANTITY H.P. VOLT 03 Left Utility Cabinet Left 1 Light - --- - - --_Exhaust 3 5.000 208 11 15.0 3 UtilityTYPE 1 SC-311110FP l Cabinet -- -_I Hood # 1 1 Fan I Smart Pus Controls Thermostatic Control Supply 3 2.000 08 6L1 / -. - - -_--- -- Right 1 Light I ( Exhaust j 3 2.0007 208 j 6.1 04- -Utility Cabinet R 2 SC-311110FP Utility Cabinet Right IL Hood # 2 -` Smart Fa 1 n Controls Thermostatic Control Supply 3 2.000 208 6.1 E --__-_._...._..Fa I I I > ,LB I,;O _-,,,-,ce ! SC-311110FP 3693515 - JG '" Jot"bee Tukw'la WA revl DESCRIPTION OF OPERATION 4rM awn= wa=a a W as PA. w,�nnwf�.,.� F 9ne y= f,0rva tNSTAu, a"+fst"e aaPf..�sEMoroaR (b« =r« u NaN eareRO o REDFORvsEw 0 �° """ : ry 1rzsrz0t9 ECPN1-t A B C UNLESS SPECIFIED OTHER4NSE, ALL FACTORY AC WIRING 16 AVJG. ALL FACTORY D E F G DC WIRING I8AWG, O o ! H MOTOR POWER CIRCUIT t I FACTORY WIRING SCHEMATIC OrBOARDS � " � ' " L� d y 1 J9 120V Ex. 1 OCV Rev. 2.1000 HMI Rev. 2 10 00 _ ' i4 2 N1-1a' � Nt t CONTROL ` 00 � 2 NIG L §M _t_ C . A ts0 HP S.00D IJ r'I� 2 BREAKER PANEL TO PRIMARY CONTROL PANEL -- R[uOve JVMPER MAKE UPAIR ON PG MUA2 E1 ; ` DAMPER (Il1A C} - --- JU3i i I THEFOLLOWINDCONNECT DUS MAY OR MAY NOTBE - BK 2}- - BK GAS- 3 . ' t20V Ht=LINE, • - - - N7=NEUTRAL, I5A mm.. BREAKER. DO NOT -� 24VI 6 9 10.111213 �4I J 3PH lL Ulit g t 200V t/L2f eK '.Vrt2 3oA tM K�NIlT3 �' Ijt�1 P10001 P'Ot NIA P.:so 1101141 -20 VAC 24RDC 1 RELAY RELAY m Res onstb 'Electrician P N ' BREAKER SIZE SHOWNISTHEMAXIMUMALLOWEO ••• PROVING LILIL3-Ck -'- -- -- ) %�C iO INTERLOCK 'LOW VOLTAGE CONNECTION FOR rulruvPs t!}.�t- L REQUIRED BASEOONJOBSITE sPECIFIcanolus _ --_ KT�. 4�. ___ LJiS^5------f.1fS='}- 3 CONNECT TO SHUNTTRIP24V 1 2 3.4 5 F) I];I J6 '_.-_ -tJj II' KJLt �1 P10] 00 P'De. 90 �C,�f�j� C I BREAKER A_N_E_I. PRIMARY CONTROL PANEL P CAMPER INTERLOCK.YNRE ooxorunr , MULTIPLE SUPPLY ON THE SAME rwrn er om>xs ZONE IN SERIES. SHOULD ( CONTROLPANEL U6T ]1- HOT TO SHUNTCOIL SHU jC01L ! -_ NEUTRAL FROM SHUNT COL Z r-- B _ f..... LSL. 6'I - '� PCUI % _.. BREAKER. SEE INSTALLATION P�1 -DG NtL C mi n.' mil-• �t31N _ 150; 010 IT P194: 225 SOU CGI,! 65 = .._. _-. _ 4-( H1_Z] BREAKER IPH � HAVE CONPNUITY WHEN DAMPER I " SIGNAL FOR )- - _ N1 ' -' � EXTERNAL sr TERM NAL IS ENERGIZED BK -H-1-I ($ ._i SCHEMATIC FOR - ADDITIONAL RED.o VFD'ESVAOZNDs-I MTR AUP-3 COMPONENT LIST - -- 120V --- - -I `--i NQ-� G`ND 1 5 15A CC, TROLPOWER. DO NOT MRE --- NOTRI UIRE H NOT REQUIRED FOR ALL UNITS. (SEE MAKE UP AIR SCHEMATIC. Is SHUNT TRIP IN FIRE CONDIFORE t 1 ( �'i !-' ( ,.�- - -- - cR PANEL LID---{:-.�}- --_ (._ - zzz O C) y/G M-2 o 3 H ( 4 !� f um I F -6t -xoao 00-01 N8E E PngN - U +S TO GFCI OR SHUNTTRIP BREAKER. 1STAR GHT eREA%E RSHAREDWrcoNTROL --__--- --I (CONTROL PANELLID}J- ,,,__ COMMON - NORMALL OPEN_ ! li SPARE FIRE I :- - - 2 I :3 - ECPMOJ J3 nelgne as sy cna nzf 2D8 (L5 T :vm SA L5 ! l l "W L R GFQ+ II P10 - to P03.8D0 Xx4 O LL E WER.SN1TCH xt L -Z�GI� _ _ BREAKER3PH „-.T L2R s CONTROL PANEL TO ACCESSORY ITEMS Responsibility, Elec6ician ry. �.AR . - SPARECO CTS LL MA SYSTEM DR qRZ WrIEN BYSIEM SARMED R EDTHCV : CON]ACT TARE useoroosaALAeLE EQUIPMENT OR PR"DE SIGNALS. (NOTFOR aUa IT A.. MLET I BE NAREDORECPTT`TENL SVL r M'o1M1 e naKw+u EOL120A ale a - =PN:Ea.nbA-nempn RJ4swnI�J ECPM0IUAISYCfWN r rJ4 J3 U5,' 1 U2 KK Lt CV2 -':12 1 WLz. W 00 P108: P131 NIA Pt5001 P410lol 543 a xsJ+onfea0 (O 'E vOi - L3-� MCA ta0A - _ L 1-- GNR-1 MOCP.�30A ._- CONTROL PANEL COMPONENTTHE a= -1 M CROS`MTCH 1 ALPRM NIP TOMAR)MTCH LOCATED i INANSUo"NEMA ( I_- VFD: ESV152NO2T%85)t P4t0 2t5 RD, y qaP _ C v 0. EXH-1 SM-1 ET VFD QUC C HECTOR I N o GO 1ROL0 PA E _-i C 2NCO o� BMSS TCH (CONTROL PAN f Ni _ C NO 1 i4 J f _ 1 -�I iSa I+IkASVFOiPF.@L _ Z tx -- _ -- 1 4 x L4 _ BREAKER 3PH S E - f - ___. _- - FIRE SYSTEM C7 Imo,/�_ -L IMPEF TOCOITTAR) TO L I�i - AL ESNATCH WILL CTI-ZONE1 FANS AND J 115 i lISA42 _ I 268V -- T e MICROS C yAREARt TO NORMALLY CLOSEO(2). ..FTS - J7 120V p m Mca BA m 15A p'J MOCP r -SSLIP-3 ;c To AR+ SNouL01iAVE XP, N I O n _ 1 r CONnNUItt NHENARMED L4:NOaFFIBK.B1KI ANG _ RD 1 FIT - R QUICK CON ECTOR II N ONE MS2_ F MORE A VA E NOODUGNTS 3 BF9 i 'JUMPER c IN eAENESAC SHOWN •t C_/2N0 15 lEF1 ; K BREAKER PANEL TO FANS - -' Responsibility: Electrician -C NTROL PA EL "J t'ALLSAUS S ACTORIPPRED_-- II 1) O �;I CONNECTION Ii--- tiJ BREAKER PANEL FANS 1- ( " SNATCHES 6 BL a 14 3PNASE - - POWER TO ( NODDLtGHTst O 20&230 - G- D - CON 6N6ER SUP-3 COND 1 � J N - BLACK I _., 0 TROLP NEL L B1 mot; � 'r� C I 1 To � AR7� ��-�N7 0 _ - I :6 CONTROL PANEL TO FANS HOOD LIGHTS r Np }I- -GREEN -.- J 1400Ax IINNEET OF HOOD iCONTROLPANELEIIA -- -. To rTE 18_t-NIRETOCONTROLROARD NSTALL ROOM TEMP 17 LEGEND F0DN1nWG ,_ FACICRYWWIKG a—YN-YEllAN B. BLUE GY OT3Y `-a Z "z RaRED M t; Responsibility: Electncian • •kITCHEN TEMP SENSORNROOM A FR EA DRY CONTACTS(SHOWN DE -ENERGIZED) NETIUSE OR GtEPH PRMARY PANEL FANS Q l FAN. OtEx., SENSOR ,S TH" DONOTINSTALL SENSOR ION TNECEILING GRID SEE MANUAL ONTSCL PANEL r Tf M UP AIR INTERLOCK autor IN WG RA11 f� C.\,/OFF' THTH FIRE. ROC3YROGRE's- VM�Nf48L51R� t4 SE1 famv LIMRET09 W� -` N10�i-` 71=� �DLtCT SENSOR To SENSORYM0UN1£DIN E%HAUST DUCT RISERt $ i`R EFt'% K PANEL COOLING Joll be T kvA. _ .-_ vFO Qufc K -i - WIRETO CONNECTOR 20 MUST HAVE ITS DUiT DISCONNECT - ___ __-- (CONTROL PANEL �T3A—R.MWNTEEMEXHAUST J ECPMo3 FflN.;,� _ SSAR SECONDARY PPNEL COOLINOIF DHSG311110FP FILL I L..t - 00 NOT SHARECONDUITI i ECOOWN UI TO (-TSB ij FACTORY WIRED TEMPERANRE HWDt NECE DUCTSENsoe ( RISER2 WCi N F3.P n Loae WAA9 U22 vn. xms - a SM 2 V2 a r xMv WIRETQ �� - _ e CONTROL PANEL M1IATUH HOT _ _ BLAOK � TNEUTHAL 9 xvERTERWtta PHrsE REOFors usE VFD QUICK L 3F_1 -`�- o e �� CONNECTOR CJ ty1l ! -' L.�N1 (- f GND - •p. I ��_ __x _] IFVFDMOUNTEDIN OOD —.N'f1TE� TO LIGHT " �' PSP LED INPUT GROUND _--GREEN 1 - -- -- LIGHTS CONNISITO REEPECPVE HOOD _' UORTHO IT UR NOTE'DO NOT VA RE IN SER ESWTH I-MOUCE v� 2NDPANEL,WREEF MUST H VE ITS OWN CONDUIT SIGNAL FROM PANEL DONOTSHARECONDURI WITH ECPMST 10 l y ' Ss93515 fTORY 1, )ENDS__ 20x18x8b260,.E „- - nvv :I ECP 11-2 JOB NO C L I s'EER SC-311110FP 3693515 1""'-" Jot Dee-nke:aWA-revt L DESCRIPTION OF OPERATION: ----_ +.: 3' ar INSTALL aPnasewtwned b.+F+naw F.n+sapAN Fanswaamnrx rgnnafx.r-ae Fan ztorvoninmmraeagcmw,ed. naomfemaearvressrvarznwea r- w kN °MM m R "e se"o'e"xEoe RED °R°se TMV ° �eeP A B C UNLESS SPECIFIED OTHERWASE, ALL FACTORY AC WIRING 16 AMID ALL FACTORY D E F G DC WIRING 18AWG. z --__- H MOTOR POWER CIRCUIT I 'I FACTORY IMRING SCHEMATIC Cl RCUIT BOARDS rzo19 z2-t 1 J9 120V CV Rev.2.10.00 t - - BREAKER PANEL TO PRIMARY CONTROL PANEL aemove JeMPEa ! MAKE UP AIR ON PCB-- MUA 20NE1 _ DAME LL1A(i r- {J�'O I ��D]j SHUNT COL I -'--" _ CONTROL. S"[-- -- - Hor rosnuNrco>_L: �__ -'- NEUTRAL FROM SHUNT COIL __ I SIGNAL FOR UN L. I-._� L r� �N1 1. Nt1r BK z= 9�81_ 2.'- K��A$T 7- —. GAS '3�I��r -_:, 4t - _ CONTROL INPUT - 120V H1-LINE, N1-NEUTRAL, t5A a - - o, m. BREAKER. DONOT � i - I 24V8 910t1121314� 6'7� @K. P j,��� Um 208V2_,t8 �� a -LJ-, �� GNOr�-K MTR EXH-2 HP 2.Wo ploo-0t P1�10t0 P103:62, NMI Rev. 2.t0.00 - - RDa 12ovac z4 VDQ RELAY RELAY o a Responsibility: ElectnGien - BREAKER SIZE SHOWN IS TH E MAXIMUM ALLOWED ?•• r PROV NG ILtB tt -.. .___ - ___ LOW VOLTAGE CONNECnoN FOR � �ey INTERLOCK WxoT�xFVz6 n EXTERNAL STTERM NAL IS ENERGIZED SHUNTTRIP IN FIRE CONDITION. 2 KIS BK tn_S-, 5� .Sr;- CONNECT TO I1_ ♦ 24V - SHUNTTRIP -' �',OC-^ Jg �, - i�� 1 cU NVt L2 P1 p1og: 9) P13t: NlA fQc�'_ -01 L E _ BREAKER PANEL PRIMARY CONTROL PANEL �- E _ L DAMPER NTERLOCK. WIRE FNunaromses MULTTPLE SUPPLY ON THE SAME (EONG IN SERIES, SHOULD -__- _� F' ___._-a, t__ LSL, B - - FIR PS-01 INSTALLATION N AC ml n" _ Kii L3M Ili Pt50'Ot 25 j COr.I 0 co,,` 6 5 - 4 14 - go-+ N1 �l i BREAKER 1PH DAMPER IS PROVEN OPEN. NOT REQUIRED FOR ALL UNITS. '�` GO MON CONTROL PANEL [_iCZ!_ �H2 - ---- M -_ NORMALLY OPEN SPARE FfRE pCU?%t BK -�IT II B 'r "{,�� SCHEMATIC FOR ADDITIONAL RED. o AO Poi 2Pro VFD'ENtSRNozYXBSTt MTR. SUP.4 150 TLIIST 120V - ww -'- -r GN_D_� tsA CONTROL POWER 00 NOT WIRE - _ BREAKER._ GFCI GGHRT SEE MAKE-UP AIR SCHEMATIC ! •, Ia ._.-._ SPARECONTACTSWLLMAKE C2T0 SYSTEM DRY Ars-St SYSTEM SARMEDTNEY CON(ACTCo OWTM I'll _� GR PANEL LID :I--- -_ - J -_ z i 14 AWG $M- G EPTX K LET ZoeV �L5p � ' BK"Vn2 .et :2000 Po 0t P O:N/A OOENE _ OLX L - ! SOTHOODUBREAKERS BARED WICONTROL t POWER.I-CDLIGHTxt - --ROYn BUILDING FIREGRA" ALARM WHICH MUST BEtNURE DRECRYLTOIHEANSUL NIt1APNG SNATCHLOCAIED NANSVLAUTOMPN) ! aI:cPM6a Ja nambe a4aral,a naa mmme ne¢w;neoL+2oA mena 15A L(Cj�� GNDPVR Wft3 off' �U2 �- L P1038D0 oT oo Pt ' Pxm°�ee cs-t {� e TO ACCESSORY ITEMS emssWTc wPN: EOLI2DA"n emPH RJ45 putt Ecsr cl+aN L, L�-) L '8J 3o o1A QO BREAKER 3PH --- _._ E _ -�L23 - ]6A ;�' as -�GIVff7 �� Responsibility: Electrician 1$ ,PANEL N COMPONENM - CONTROL PA_Et-__ p _-_ C No 1R0 N )H - .CON PA �� To t IITjj - EXTERNAL :SIGNALSWITCHTHRouc BMs ZONEIFANSAND _ ! J4 J3 rJ5":'l v , 3m '- Flol: so. vF0 Esalszxmyxes 2 Jt P4to: zt6 �* = N3tt10➢I510 R4a '. •- 00 00 . MOCP 15A I• EXH 2 SM 1 I MICROSVAICHI CONTROL PANEL WILLACPVATE SYNTCH (LIGHTS !iSa P: PNACPcaiP£%PL I- WIRE TO VFD QUICK CONNECTOR - - 8 �4NOoff ! 'kIRE SYSTEM 4 .. �} BREAKER 3PH :- _ 208V O (, MICROSWRCH t Al iW' EC --CO ON i TO NORMALLY LPSED (2) J% 120V 4r ')ACA ]6A -- - -- -- L6 10 MOCP: t5A - - - _Q-',' C TOARt SHWLD NAVE MS 4:N0W CONPNUITY WHEN ARMED. ' 1 c,,i�2:Na �� 1 - p R{ 8-' B-Q H1 ^ SUP-4 SM-2 - _ I HARE TO VFD OUICK CONNECTOR I IL �I IF MORE THAN ONE j- FNRESEYSTEM, HARE MS2�4:N0 o�°rF 5 r1�8i1.[2� Bl HWOybHi6 W1'N1 LCEl 3 BK-„-�._EF w� _ SE IEBASSHOWNI 1C`/G2 No I - BK_ 4_ F O St � i � ~ BREAKER PANEL TO FANS _ CONTROLPANEL j 4 ( ALLS`NPCHESFACTORYVA1RE0 I� Responsibility: Electrician TO 1] ICAT5 CONNECTION ( �J PANEL FANS 5 `• SWITCHES �-_ BL �LRD1 '/. PR F POWER TO DA-1- ue CONDENSER -SUP_4 j O UGNT81 CONTR C-B17�- B C µ- � nN AR1 V'-•- (RA-1 I tiNi Is COND 1 To (` W1 t{ - - - "'"t'E L - -GREEN- H000 Lc s ND Y- LEGEND - _ 14 WMA% RE O bOX ON TOPO OW I - F ���� .5 nK-aAQc w+-taFUY G CONTROL PANEL TO FANS i] coNwOL ANa. TtA - �.- _ - - O TO-1 BOARD.INSTALL �ROOMTE P 17 B48RGV.N Eft R1�E REVIEWED FOR Responsibility: Electnclan kITCHENTEMP SENSOR NROOMAWAY FROM HEAT SENSOR SOURCES. DO NOTfNSTALLSENSOR L D CON TS($H ) OWN DE ENERGIZ - ED EURT R9.SIRPE R'�'M�SRG£ CO DE COMPLIANCE I- FAN 02 Loaf Wlin9P U -O� 2 ITT I (CONTROL PANEL `T�I{_F�_ auNG GRID, MANUALT MAKE UP AN INTERLOCK, JUMPER __EFt>B FAN 0\(OFF.ra)CRi81Rfc �.�. 111TN PIKE W,yg, yr}{g,yTrE{ APPROVED DAT,EO I /2 J�ZO1 --L-�•_ - fM z.'� SM-1 V1 �_ �v IP NAME TO -[11T1 - J v -`CK t 1 �p } (-T28 _f - IREI .DUCT SOEN80R SENSORYMOUNTEOIN E%HAU3�T DUCT RRt 8 Is --Jj PANEFCAOOLING NIbe T SEP 23 2019 3693515 -_! - CONNECTOR / RETD REP LIGHTS ; ECPM83 _ EF1+' RK SG 311716FP 20 MUST HAVE ITS OWN CONDUIT DISCONNECT DO NOT SHARE GO !rpry NOL pgNEL MARCH OT _ _BLACK HOOD EIRRAL WHITE To L SECONOARYPANELCCOLINGIFNECESEARY D arse CI Of Tukwila DRAWN AHJ-86 FAR• a wBW ny Uz /. LIGHT GROUND GREEN PSP LED INPUT - - WRETD aDXOTTNO ° BUILDING DIVISION E i � IMs I —PSP t x0n TNr SM2 V2 T TTTI - VJIRETO w2 1� - 'v ' LIGHTS CON ECTTO RESPECPVE HOOD - uG ccac EF�3xQT WRENSERIESKUHHODDUGHTS. 9 ! u�eFo oa 05EmY W a SCALE. 3/4' 1' 0 VFD EECTC P �SF1 OONN I N1- g' au- �' +- J 1l_ Ee IF VfD MOUNTED �- E T"EFOLL MAP DNGCONNECPONS MAP OR MAY NOT BE ` BAeEOON JOBSTE MASTER DRAWING 2ND PANEL, WIRE IF MUST HAVE ITS OWN CONDUIT SIGNAL FROM PANEL DDNOT SHARE CONDUIT( (=EQUIREO BPECIFlCAPONS r� RECEIVE W HECPMD3, 0 E o .t Et 3693515 CITY OF TUKWILA 20 x 18x,8B2 BOX �AOTORY 7125@019 orc ECP azz Bill 21 2-319 SHEET NO. AERNUT CENTER 6 I 'iak4aA'" i CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. 4W advIC�O:P;um4E i' p E.J' J. C. 914 E. KATELLA AVENUE ANAHEIM, CA LIFORNIA 928D5 P (714) 385-HIS FUIG 385-1834 I REVISIONS / ISSUE DATE H3 1061819 1STPERMiTSUBMITTAL I 4 061819 HEALTH SUBMITTAL JOB NUMBER _7 MEP # 1901069 ' _i DRAWN BY CHECKED BY PEI PEI _J SHEET CONTENT KITCHEN HOOD DETAILS 9WIR ROUND DUCT GAUGE SELECTION FOR GALVANIZED STEEL DUCT DIAMETER INCHES SPIRAL SEAM INCHES (GAUGE) LONGITUDINAL SEAM INCHES (GAUGE) 3-8 28 28 9-14 28 26 15 - 26 26 24 27 - 36 24 22 REFER TO SMACNA STANDARDS FOR DUCT CONSTRUCTION, ANCHORAGE, SEISMIC SUPPORTS AND BRACING. TYPICAL SQUARES O HANGER STRAP 1 RECTANGLE DUCT SCHEDULE BELOW) 11 G.I. DUCT HANGER 21X2"Xl6 GA. DIAGONAL 1" b'-0" O.C. SCHEDULE 45' 5/8" 0 MACHINE B BRACE EVERY OTHER HANGER ALTERNATE SIDES, IF DISTANCE BELOW FOR SIZE BELOW SUPPORTING STRUCTURAL MEMBER IS LESS 12" DIAGONAL BRACE MAY BE OMITTED. 2 X 2 X 16 GA. G.I. DIAG # 10 SMS (TYP.) BRACE ALTERNATE SIDES EVERY HANGER 1-i"MIN DUCT STRAP, SA ROUND DUCT SEE PLANS NOTE: —I AS HANGER STRAP FOR SIZE. WHERE DUCT IS 6 SF. OR LARGER IN CROSS SECTIONAL AREA, USE 2 1/2"X2 1/2"XI6 GA. VERTICAL ANGLE IN PLACE OF HANGER @ SEISMIC BRACE. NOTE: EQUIPMENT MUST BE SUPPORTED OR HUNG FROM A UNISTRUT SYSTEM OR TRUSS SYSTEM. DO NOT ATTACH TO UNDERSIDE OF THE ROOF. WHERE DUCT IS LARGER THAN 28"0 USE 2 1/2'X2 1/2" 16 GA. VERTICAL ANGLE IN PLACE OF HANGER STRAP AT EACH SEISMIC BRACE. MAX. HALF OF DUCT MAX. LOAD EA. PERIMETER (P=DUCT PERIMETER) HANGER HANGER SIZE HANGER SPACING P/2 = 39' 260 LBS. 1"x10" GA. 10'-0" O.C. P/2 = 77' 420 LBS. 1 1 /8" x10" GA. 10'-0" O.C. P/2 = 96' 700 LBS. 2" x10" GA. 10'-0" O.C. P/2 = 120" 1100 LBS. 2"x10" GA. 10'-01, O.C. DUCT SIZE MAX. LOAD EA. HANGER STRAP SIZE MAX. SPACING UP THRU 19' 260 LBS. 1"x18" GA. 10'-0" O.C. 11"TO 18" 420 LBS. 1 1/2"x10" GA. 10'-0" O.C. 19" TO 24" 420 LBS. 1 1 /2" I G' GA. 10'-0" O.C. 25" TO 36" 420 LBS. 1 1 /2-x10" GA. 45' SEAL WITH SECURE ROOF - JACK TO CURB FLASHING AND COUNTER FLASHING 1/4"xl/4" WIRE MESH BIRDSCREEN 1'-0" MIN ABV. FIN. ROOF LINE CANT STRIP --DUCT -SEE PLANS CURB FOR SIZES NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR TYPE OF ROOF CONSTRUCTION. 2. SEE ARCHITECTURAL DRAWINGS FOR ROOFING / FLASHING INFORMATION. PLAN OR SIDE VIEW DUCT CONSTRUCTION AND DUCT SUPPORT DETAIL 3 ROOF JACK DETAIL 2 DUCT TRANSFORMATION L 1 REMOVABLE COVER WITH 1/2' OVERLAP UPPER AND LOWER HEMMED EDGES ALL SIDES HALVES WITH TOP HALF ON OUTSIDE MAKE-UP AIR UNIT ROUND OR RECTANGULAR VOLUME DAMPER (DOWN DISCHARGE) FLEXIBLE ROUND BRANCH DUCT DUCT # 12 GA. HANGER WIRE PROVIDE UV PROTECTION O (4-REQUIRED PER DIFFUSER) ON REFRIGERANT PIPING 24 GA. GALVANIZED ENCLOSURE ON ROOF. FOR FLEXIBLE PIPES. LEAD SOLDER ALL SEAMS. SUPPORT SCREWS STAINLESS STEEL VIEW "A" SHALL HAVE NEOPRENE WASHERS. MAIN DUCT 45 DEG. VIBRATION ISOLATOR O O SCREW TYPE CLAMP ZT SLOPE STRAIG SUPPLY AIR FLOW ROOF GRID 2X ROOF CURB ( SPRAY IN PLACE POLYURETHANE FOAM RETURN/EXHAUST SHEET METAL DUCT AIRFLOW COLLAR (16 GA.MIN.) FIBER CANT STRIP 1 -0 BUILT UROOFING PER NOTES: r 8 SPECIFICATIONS FURNISH THIS TYPE CONNECTION WHEN SINGLE LINE DUCTWORK I� SEE DUCT THRU CEILING INDICATED AS THIS( ) FOR BRANCHES WITH LESS THAN 25% OF ROOF DETAIL TOTAL AIR FLOW SPONGE SUR FACE LAY -IN GASKET (ALL AROUND) MOUNTED TEE BAR 4 DIFFUSER ROUND OR RECTANGULAR DUCT BRANCH CONN. 7 ROOFTOP MAKE-UP AIR UNIT 6 CEILING DIFFUSER INSTALLATION 5 PIPE PENETRATION SHROUD 4 CAP LEAD FLASHING ROOFING CAULK WITH ROOF MASTIC 3-VANDELPROOF SET SCREWS WATERPROOF PERMASEAL STEEL REINFORCING BOOT KEEP MIN. 12' AWAY FROM ADJACENT BLDG OR BLDG OSA INTAKE OPENING AROUND FANm } ANGLE IRON 1/2" U-BOLT BUILDING STRUCTURA MEMBER BOLT TO STEEL OR SCREW TO WOOD STRUCTURES 40" MIN. C J CODE APPROVED GREASE PORT WITH — COLLECTION TROUGH OR CARTRIDGE 16 GA. CARBON STEEL DUCT. 18" MIN. NEOPRENE GASKET, FASTEN FAN TO C MIN. 18"CLEAR TO COMBUSTIBLES AT PER FAN TERMINATION OF I-HR WRAP TO 2x6 - - RIMS. (TYP) DOUBLE JOIST AROUND ROOF DECI OPENING (TYP.) FIRE RATED ACCESS PANEL WITH SIGN "ACCESS 1 -HOUR FIRE WRAP DO NOT OBS RUCT'PANEL- DUCT THRU ROOF DETAIL 9T -- METAL FLASHING SOLID —TYP. HOOD LIGHT W/ SHIELD INSIDE HOOD, UL 18" APPROVED (IF INSTALLED) HOOD LESS THA HAND DAMPER WITH 12" FROM CEILING 20 GA. S/S MTL. HOOD W/ WHEN HOOD IS LESS SQUARER LOCKING TYPE INDICATOR BE FLASI-WiONOLID REMOVABLE GREASE FILTER THAN UT" BELOW QUADRANT ON HAT CEILING, EXTENDED FIRE SECTION. RATED CEILING (TYPE END BEARIN "X" GYPBOARD) 18" BEYOND THE HOOD ON 1/3 W. 5" MIN. GREASE CONTAINER OPEN SIDE DUCT BRAN 48" MAX AUTO FIRE EXTINGUISHER (SEPARATE PERMIT BY FIRE EXTINGUISHER CO.) 45 DEG. CL INCH COLLAR LL FLAT RMTL.ING 24 GA. MAIN DU S/S b'-g" b" MIN. b" MIN, ' SUPPLY +I AIR FLOWHAUST RETURN/EXHAUST COOKING EQUIPMENT AIR FLOW l rFIN. FLOOR 6- RECTANGULAR DUCT CONNECTION r131 TYP. ELEVATION OF EX H. HOOD & BLOWER (12 KEEP MIN. 12' AWAY FROM ADJACENT BLDG OR BLDG OSA INTAKE OPENING AROUND FAN } 16 GA. CARBON STEEL DUCT. MIN. I9' CLEAR TO COMBUSTIBLES AT TERMINATION OF I -FIR WRAP TO 2x6 RIMS. (TYP) m1IN' 6" 3" MIN. 48" MAX �-- 3" MIN. I COOKING EQUIPMENT MTL STUD WALL W/ 5/8" TYPE "X" GYP. BD. ON BOTH SIDE } 40" MIN. \ ' MIN. 18" ROOF DECK FIRE RATED ACCESS PANEL WITH SIGN ACCESS PANEL - DO NOT OBSTRUCT' REMOVABLE S.S. BAFLE GREASE FILTER W/ HANDLES QTY. 2(16x 16) & I(]6x20) AUTO FIRE EXTINGUISHER (SEPARATE PERMIT BY FIRE EXTINGUISHER CO.) —MTL HOOD 20 GA. S/S — FILTERS SHALL BE INSTALLED AT AN ANGLE NOT LESS THAN 45' FROM HORIZONTAL — MTL WALL FLASHING 24 GA. S/S SHEET MTL. �_ 6' TYP. @ ALL OPEN SIDES TYP. SECTION OF EXH. HOOD & DUCT C11 /21N. SQUARE ROD VELDED TO BLADE UASQ:4- I \—INDICATING HANDLE LOCKNUT COLLAR SAME AS DUCT SIZE 151NCH TO 20 INCH DIAMETER 1xlxl/8INCH ANGL END BEARING RING WITH 9/32 INCH DIAMETER HOLES 14 GAGE BLA �,,,..,\„\,J'— -P `; VAN STONE FLANGE 1/2 INCH SQUAR ROD WELDED TO 12 INCH, 16 GAGE COLLAR BLADE ROUND VOLUME DAMPER LARGER THAN 14 IN. DIAM 8 1/41NCH DIA. SET SCREW 1 INCH x 1/81NCH GALVANIZED STRAP SPOTWELD 6 GAGE VANIZED BLADE REVIEWED FOR o CODE COMPLIANCE APPROVED 1/41NCH LESS THAN SEP 23 2019 3/81NCH SQ. ROD DUCT DIAMETER SECTION A -A City of Tukwila —END BEARING BUILDING DIVISION 3/8 INCH RECEIVL;� LA CITY OF TUKWILA PERMIT CENTER REGULATOR GASKET LOCKNUT INDICATING HANDLE PLAN ROUND VOLUME DAMPER UP TO 14 IN. DIAM 10 CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP 4 0 a dw� .1 V`�RpEg.e mg, In^ 914 E. KATELLA AVENUE ANAHEIM. CAL IFORNIA 92805 P'IU4 3M 1835 F(]14) 385-1334 xxw.qumpgmupwm STAMP M. WAS �c0�� z 57274 t oFFSS 6NA 1- UP. 09/10/19 PROJECT NAME/ADDRESS: TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE NO. DATE DESCRIPTION 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEET CONTENT HVAC DETAILS SHEET NO M-00 PARALLEL TO ANGLEORUNISTRUT JOIST STRUCTUREISSTRUCTURE PARALLEL TOtAREAS 6" HANGERSTRAPSEE NOTE tENER OPTIONAL ROUBOLTAND CONCEALEDNUT SHEET METAL V MIN t+— SCREWS SEE (MAX. 36"0) ANGLE OR UNOTE 2. (TYP)60"(MAX) SHEETMETAL ROUND SCREW A(MAX. 24"0) FASTENER TYPES RECTANGULAR DUCT PERPENDICULAR PERPENDICULAR TO STRUCTURE TO STRUCTURE BOTTOM OF THREADED STRUCTUR BOTTOM OF STRUCTURE ROD (TYP) HUNG WITHIN 6LOADSMUSTSEOF PANEL POINTS HUNG WIVAUST BE HUNG THIN 6" OF TWISTSTRAPjFpASTENER 16 GA GALV. STEEL NOT USED 4 NOT USED 3 PANEL POINTS BAND (2" WIDE) ANGLE OR UNISTRUT ROUND DUCT STEEL STEEL ALLOWABLE ANCHOR ZONE ALLOWABLE ANCHOR ZONE — FINISHED SLAB FINISHED SLAB f d EQ OPENENNO NO PENETRATION V:::::�NOTIIES PENETRATION ZONES FOR HANGER FOR HANGER NO PENETRATION EQ ZONES FOR HANGER ATTACHMENTS ATTACHMENTS ZONES FOR HANGER ATTACHMENTS ATTACHMENTS HANGER STRAP TWIST STRAP SEE NOTE i. SHEETMETAL LASTENE 1" MIN. F— SCREWS SEE FASTENERS S NOTE 2. (TYP) 16 GA. GALV. STEEL MAX. 24"0 BAND 2"WIDE 60" MAX NOTES: ROUND DUCT 1, USE THREADED ROD FOR ALL DUCTS LARGER THAN 60" WIDE. NOTES: 2. SHEET METAL SCREWS MAYBE OMITTED IF HANGER STRAP IS CONTINUOUS AND LOOPS UNDER ENTIRE DUCT. 7. FOR DUCTS LARGER THAN 36"0, USE TWO HANGER RODS, WIRES OR STRAPS TO SUPPORT DUCT FROM EACH SIDE. CONCRETE CONCRETE NOT USED 8 NOT USED 7 RECTANGULAR DUCT SUPPORT DETAIL 6 ROUND DUCT SUPPORT DETAIL 5 METALLIC OR NON-METALLIC BAND ROUND BUTTERFLY DAMPER WITH OVER INSULATION (TYP) REMOTE CABLE OPERATOR TA MELLIC OR METALLIC OR NON-METALLIC BAND OVER INSULATION (TYPICAL) NON-METALLIC BAND INSULATED DUCT MP) t" 6" t^ pp RM GEAR SQUARE SHAFT HIGH EFFICIENCY TAKEOFF EXTERNALLY SOCKET INSULATED INSULATED DU NUTDRIVER FOR 114" DRIVE FOIL TAPE AT INSULATION JOINT CEILING FRAMING PRE -INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT LINEAR SLOT DIFFUSER KINKING AND SHARP TURNS SIDEVIEW GYP CEILING CABLE FROM REMOTE SEE NOTE 7. OPERATOR TO DAMPER SHEET METAL SUPPLY PRE -INSULATED FLEXIBLE REFER TO SIDE VIEW PLENUM WITH 1/2" DUCT AS INSTALL �'----�\ HICK INTERNAL REMOTE OPERATOR ( ( INSULATION PERMANENTLY SEALED SEALED AND SUPPORTED TO PREVENT \ � KINKING AND SHARP TURNS J METALLIC OR NON-METALLIC CEILING DIFFUSER BAND (TYPICAL) MANUFACTURED OPPOSED = BLADE DAMPER IN NECK DRILL ONE (314) INCH DIAMETER HOLE IN PATTERN DEFLECTOR TO ALLOW ACCESS TO REMOTE DAMPER OPERATOR CEILING END VIEW NOTES: I. EXTENDHARD METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5'-0". PROVIDE RIGID 90° ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN T-0"LENGTH LIMITATION. NOTES: Z COORDINATE EXACT LENGTH AND LOCATION OF SLOT DIFFUSER WITH ARCHITECTS REFLECTED CEILING 1. EXTENDRIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT PLAN. EXCEED 5'-0". PROVIDE RIGID 90°ELBOW WHERE REQUIRED TO KEEP FLEXIBLE 3. ALL FLEXIBLE DUCT OFFSETS SHALL MAINTAIN A RADIUS OF 1.5 TIMES THE DIAMETER AND SHALL BE A DUCT WITHIN 5' O" LENGTH LIMITATION. MINIMUM OF TZ' AND MAXIMUM OF 5'-0" IN LENGTH. NOT USED 12 NOT USED 11 LINEAR SLOT DIFFUSER DETAIL 10 HARD CEILING DIFFUSER DETAIL 9 METALLIC OR NON-METALLIC BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND ADJUSTABLE PITCH MOTOR SHEAVE DAMPER LOCK WITH EXTENSION 45° HIGH EFFECT NCY ON BELT DRIVE UNITS PROVIDESOLIDSTATESPEED FOIL TAPE AT INSULATED DU TAKE -OFF WITH SQUARE FLEXIBLE DUCT (MAXIMUM TO ROUND FITTING FASTEN TO STRUCTURE CONTROL WITH DIRECT DRIVE INSULATION JOINT OF 5' W WITH ONE 90° MOTOR & DRIVE OUT OF FAN ELBOW) AIR STREAM SHEETMETAL DUCT MOTOR DOME 1" BAND CLAMP RUBBER ISOLATOR U.l. APPROVED CONNECT TO AIR ALL ALUMINUM WHEEL HUB DISCONNECT SWITCH SEE NOTE i. DEVICE NECK. & HOUSING UNDER HOOD UNLESS OTHERWISE CB PRE -INSULATED FLEXIBLE NOT D FLEX DUCT IS DISCHARGE DOME W/ MOTOR VENTILATION BIRDSCREEN OPENING DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SAME SIZE AS AIR DEVICE NECK IC PRESSURE STATIC PRESSURE PROBE SUPPORTED TO PREVENT FOR FIRE RATED CEILINGS, PROVIDE FIRE RATED JACKET I/8" KINKING AND SHARP TURNS TO COMPLETELY COVER DIFFUSER CONE. SEAL FOIL TO PRE-FAB ALUM. ROOF CURB --'-'-- W/2" RIGID INSULATION AND METALLIC IC NON-METALLIC CONE WITH FIBER REINFORCED TAPE. BAND (TYPICAL) PULL INNER LINER OVER TAKE -OFF COLLAR & TAPE SECURELY IN PLACE. PULL EXTERNAL INSULATION RUBBER GASKET BETWEEN CURB & """"' BUILT-IN CANT (PROVIDE PROVIDE 1"THICK, R8 FIBERGLASS INSULATION TO SKIN OVER COLLAR AND LINER &TAPE SECURELY IN FAN HOUSING RAISED CANT AS REQ'Oj CEILING DIFFUSER WITH VOLUME COMPLETELY COVER DIFFUSER CONE WHERE PLACE. SLICE EDGE OF TAPE AT 4S° ANGLE TO DAMPER, FIRE DAMPER OR SCHEDULED OF SPECIFIED. PREVENT GAPPING AND LEAKAGE. APPLY MINIMUM ANCHOR FAN TO CURB SEAL ALL COMBINATION VOLUME/FIRE 1/2" WIDTH STAINLESS STEEL BAND OVER CURB PENETRATIONS —�� DAMPER AS SCHEDULED =� DOUBLE -SIDED TAPE TO COMPRESS AND SEAL FLEX TO COLLAR. RUN FLASHING UP UNDER MINIMUM 8" TO ROOF SURFACE FAN BASE SET CURB IN ROOFING CEILING SEE NOTE 2. NOTES: L .` nECEI ✓ D CEMENT AND FASTEN TO t. TO AVOID CITY OF TUKWILA TO AVOID VISIBLE OPENINGS AND SECURE FITTING SUITABLY FOR PRESSURE VLSI INS ACCURATELY, FITTING UITALL FOR PRESSURE CLASS, BACKDRAFT DAMPER ROOF STRUCTURE- SEE ARCH.8, , 99 �� STRUCTURAL PLANS FOR DETAILS NOTES: 2 2. INSTALL FLEXIBLE DUCT IN AS STRAIGHT A RUN AS POSSIBLE. USE LONG RADIUS Y: (L10 'J EXHAUST AIR DUCT 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED Y-0". PROVIDE RIGID 90° ELBOW WHERE REQUIRED TO KEEP FLEXIBLE BENDS INNER LINER R& OUTER INSULATION SKIN WITE POSSIBLE. PULL DUCT TIGHTAT APE & METAL CLAMPS.BOTH ENDS AND BOTH 5-p� y �� I-� PERMIT CENTER DUCT WITHIN 5'-0" LENGTH LIMITATION. 2. PROVIDE RIGID ROUND-TO-OVALTRANSITION WHEN PLENUM HAS OVAL CONNECTION. .r O NOT USED 16 ROOF MOUNTED EXHAUST FAN DETAIL 15 LAY -IN TILE TYPE CEILING DIFFUSER DETAIL 14 45° LATERAL FLEXIBLE DUCT TAKE OFF DETAIL 13 VeMll I Ki CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP 4 0 a d.—n c`. Rump Er n=_er.nq, 1n^.. 914 E, KAT ELLA AVENUE ANANEI M, CALIFORNIA 92005 P (71413851835 F(114) 335�1334 xma.qumpgro�.car STAMP M. W A H�T��i Po q 57274 FOSS DNA LT E E��\�4 EXP. 09/10/19 PROJECT NAME/ADDRESS: qMllbe@ TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE—� N0. DATE DESCRIPTION 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL COD/L Ii 3 201 JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEETCD.. CONTENT HVAC DETAILS SHEET NO M-401 SECTION 15: HEATING, VENTILATING, AND AIR CONDITIONING: ]SAT GENERAL INSTRUCTIONS. 15A 1-1 GENERAL REQUIREMENTS. ALL REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. EACH CONTRACTOR SHALL BE RESPONSIBLE TO BECOME THOROUGHLY FAMILIAR WITH ALL ITS CONTENTS AS TO REQUIREMENTS WHICH AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES ALL MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. 15A 1-2 INSPECTION OF SITE. THE CONTRACTOR SHALL PERSONALLY INSPECT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK 15 TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. 15A 1-3 MATERIAL AND WORKMANSHIP. ALL MATERIAL AND APPARATUS SHALL BE NEW AND IN FIRST CLASS CONDITION. ALL WORKMANSHIP SHALL BE OF THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. ALL INSTALLATIONS SHALL BE MADE IN A MANNER THAT WILL COMPLY WITH APPLICABLE CODES AND LAWS. ANY ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, ALL MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTABLE. 15A 1-4 COORDINATION. COORDINATE ALL WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. ANY COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE ALL CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. THE CONTRACTOR SHALL KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, AND SHALL EXECUTE HIS WORK IN SUCH A MANNER AS NOT TO INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BETAKEN IN PREFERENCE TO SCALE DIMENSIONS. THE CONTRACTOR SHALL TAKE THEIR OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR; THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS WHICH COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION. THE CONTRACTOR SHALL PROVIDE MATERIALS WITH TRIM WHICH WILL FIT PROPERLY THE TYPES OF CEILING, WALL, OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN CONFORMANCE WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. ALL EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE STANDARDS AS SET FORTH BY THE UNIFORM CODES, BOCA CODES, International Mechanical Code 2015 (IMC 2015), Mechanical Code 2015 of Washington(WSEC).. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICANS WITH DISABILITIES ACT (ADA), AMERICAN GAS ASSOCIATION (AGA) AND/OR ALL OTHER APPLICABLE CODES AND ORDINANCES. THE -CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. CERTIFICATES OF INSPECTION, WHERE REQUIRED, SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR AND FURNISHED TO THE OWNER. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY VIOLATION OF THE LAW. THE CONTRACTOR SHALL MAINTAIN ALL NECESSARY SIGNAL LIGHTS AND GUARDS FOR THE SAFETY OF THE PUBLIC. 15A 1-6 PROTECTION OF EQUIPMENT AND MATERIALS. CONTRACTOR SHALL STORE AND PROTECT FROM DAMAGE ALL EQUIPMENT AND MATERIALS AFTER DELIVERY TO JOB SITE. COVER WITH WATERPROOF, TEAR - RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL WHICH HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND. KEEP PREMISES BROOM CLEAN AT ALL TIMES FROM FOREIGN MATERIAL CREATED UNDER THIS CONTRACT. ALL PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. 15A 1-7 SUBSTITUTIONS. THE SPECIFICATION PROVIDES THAT THE BASE BID OF ALL CONTRACTORS SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED. THE CONTRACTOR SHALL, IF HE DESIRES TO SUBSTITUTE OTHER THAN SPECIFIED MATERIAL, SUBMIT IN ALTERNATE PROPOSAL FORM, WITH HIS BID, A LIST OF SUCH ITEMS INDICATING ITEM, MANUFACTURER, MODEL NUMBER, AND THAT AMOUNT TO BE ADDED OR DEDUCTED FROM THE BASE BID IF THE OWNER ELECTS TO ALLOW SUBSTITUTION. EACH SUCH MATERIAL SUBSTITUTION ITEM SHALL BE SEPARATELY LISTED IN ORDER THAT PROPER CONSIDERATION MAY BE GIVEN. IN ANY EVENT, ONLY THE SPECIFIED MATERIAL SHALL BE PROPOSED UNDER THE BASE BID. THE TERMS "APPROVED", "APPROVED EQUAL", OR "EQUAL" SHALL MEAN APPROVED BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE, NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE AND VERIFY WITH ALL OTHER TRADES THAT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. THE CONTRACTOR SHALL INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN HIS BID IF ANY DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15A 1-8 OPERATION AND MAINTENANCE INSTRUCTIONS. THIS CONTRACTOR SHALL, DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF ALL EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT, THIS BROCHURE SHALL INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND DESCRIPTIVE LITERATURE ALL AS FURNISHED BY THE EQUIPMENT MANUFACTURER. MANUAL SHALL INCLUDE AN INSIDE COVER SHEET THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, MECHANICAL CONSULTANT, GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND AN INDEX OF CONTENTS. ALL LITERATURE SHALL BE BOUND IN APPROVED BINDERS AND THREE COPIES SUBMITTED TO THE OWNER AT THE TERMINATION OF THE WORK. CONTRACTOR SHALL PROVIDE "AS -BUILT' DRAWINGS (SEE SPECIAL CONDITIONS). CONTRACTOR SHALL ALSO PROVIDE ADEQUATE VERBAL INSTRUCTIONS OF SYSTEM OPERATION TO OWNER'S REPRESENTATIVE AT THE TERMINATION OFTHE WORK. 15A 1-9 GUARANTEE. GUARANTEE AGAINST DEFECTIVE WORKMANSHIP AND MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL PAYMENT. GUARANTEE SHALL INCLUDE MATERIAL TO BE REPLACED AND ALL LABOR REQUIRED. THE WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLATION, AND COMPLETE CONNECTION OF PLUMBING SYSTEMS AS HEREIN DESCRIBED AND INDICATED ON THE DRAWINGS, INCLUDING NEW PLUMBING FIXTURES AND UTILITY SERVICE CONNECTIONS, AS REQUIRED. BY SIGNING THIS CONTRACT, THE CONTRACTOR ACKNOWLEDGES THAT HE HAS ACQUAINTED HIMSELF WITH THE SITE AND THE EXISTING CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED, AND THE DRAWINGS AND SPECIFICATIONS PERTAINING THERETO, AND HE INDICATES THAT HE WILL COMPLY WITH THE REQUIREMENTS AND INTENT OF ALL PERTINENT DOCUMENTS IN THE PERFORMANCE OF THE WORK. THIS SHALL INCLUDE A GUARANTEE OF FREE CIRCULATION OF LIQUIDS THROUGHOUT THE PLUMBING SYSTEM AS INTENDED WITHOUT LEAKS, NOISE, OR WATER HAMMER. 15A 1-10 CUTTING, PATCHING AND ROUGH -IN. THE CONTRACTOR SHALL DO ALL CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION, AND SHALL OBTAIN PERMISSION FROM THE ARCHITECT BEFORE DOING ANY CUTTING. STRUCTURAL MEMBERS SHALL NOT BE DISTURBED WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. ALL HOLES SHALL BE CUT AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. ALL PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND CONSTRUCTION, AND ANY AREAS DISTURBED BY WORK PERFORMED UNDER THIS CONTRACT SHALL BE NEATLY REPAIRED AND REFINISHED TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT 15A 1-1 I ACCESS DOORS. PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED FOR ACCESS OR MAINTENANCE TO ALL CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. DOORS SHALL HAVE CONCEALED HINGES, SCREWDRIVER -TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS, OR EQUAL. OBTAIN ARCHITECT'S APPROVAL OF TYPE AND LOCATIONS BEFORE ORDERING. ISA 1-12 PENETRATIONS. SEAL ALL FLOOR, WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT. CAULK AROUND MECHANICAL PENETRATIONS WITH 3M CP-25 FIRE BARRIER CAULK THICKNESS AS REQUIRED AND RECOMMENDED BY MANUFACTURER TO MAINTAIN FIRE RESISTANCE RATING OF FIRE -RATED ASSEMBLIES. PIPING PENETRATIONS THROUGH ROOFS SHALL BE PROVIDED WITH PREFABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR APPROVED FILTERS SHALL BE FARR 30/30 THROWAWAY TYPE, OR AS OTHERWISE INDICATED. ALL AIR UNITS SHALL HAVE FILTERS INSTALLED ANY TIME THEY ARE OPERATED BEFORE FINAL ACCEPTANCE. PROVIDE EXTRA SET OF FILTERS AND INSTALL IN UNITS JUST BEFORE TURNING OVER BUILDING TO OWNER. MANUFACTURED BY DUSTSTOP, FARR, CAMBRIDGE, OR APPROVED EQUAL. PARTICULATE MATTER FILTERS OR AIR CLEANERS HAVING A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF NOT LESS THAN 6 FOR DUCTED AIR HANDLERS AND NOT LESS THAN 4 FOR DUCTLESS MINI -SPLIT SYSTEMS SHALL BE PROVIDED UPSTREAM OF ALL WETTED SURFACES. THROUGH WHICH AIR IS SUPPLIED TO AN OCCUPIABLE SPACE. / SUPPLIED TO AN OCCUPIABLE SPACE. - ALL LINE VOLTAGE WIRING SHALL BE FURNISHED BY THE ELECTRICAL CONTRACTOR. ALL LINE VOLTAGE CONTROL AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL ALSO BE FURNISHED BY THE ELECTRICAL CONTRACTOR. ALL LOW VOLTAGE CONTROL WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL PROVIDE WIRING DIAGRAMS TO THE ELECTRICAL CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. THIS CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT (FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. 15A I-15 REFRIGERANT AND OIL. FURNISH AND INSTALL FULL REFRIGERANT AND OIL CHARGE IN ALL NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN IT FOR FULL TERM OF THE GUARANTEE. 15A1-16 FINAL TESTING AND ADJUSTMENTS. TENANT'S INDEPENDENT CONTRACTOR SHALL PERFORM TEST READINGS ON ALL FANS, UNITS, COILS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF AIR. A TESTING AND BALANCING REPORT SHALL BE MADE REPORTING ALL AIR QUANTITIES, FAN AND UNIT TEST READINGS, ETC_ OF THE FINAL COMPILATION OF DATA. REPORTS SHALL BE SUBMITTED TO THE TENANT AND LANDLORD FOR EVALUATION AND APPROVAL BEFORE FINAL INSPECTION OF THE PROJECT. AIR FLOWS SHALL BE BALANCED TO WITHIN PLUS/MINUS 10%OF DESIGN REQUIREMENTS ALL EQUIPMENT SHALL BE ADJUSTED TO OPERATE AS INTENDED BY THE SPECIFICATION. ALL BEARINGS SHALL BE LINED UP. BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM SHALL BE REPLACED WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO THE OWNER. ALL THERMOSTATS AND CONTROL DEVICES SHALL BE ADJUSTED TO OPERATE AS INTENDED. ADJUST BURNERS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ALL ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. ADJUST ALL AIR DEVICES TO SUPPLY THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN ALL SPACES. CALIBRATE, SET, AND ADJUST ALL AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF ALL INTERLOCK SYSTEMS, AND OPERATION OF ALL SAFETY CONTROLS. 15A 1-17 EQUIPMENT FURNISHED BY OTHERS. THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR OWNER TO COMPLETE INSTALLATION OF ALL COOKING EQUIPMENT, WASHING EQUIPMENT, ETC., FURNISHED BY OTHERS. IN LOCATIONS AS INDICATED ON THE DRAWINGS AND/OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE FLUES, VENTS, INTAKES, ASSOCIATED ROOF JACKS AND CAPS TO OUTDOORS, DAMPERS, IN -LINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH -IN DIMENSIONS, AND SHALL VERIFY SAME WITH ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS. 15A 1-18 MISCELLANEOUS REMODELING WORK. PROVIDE ALL ITEMS OF HVAC SYSTEMS MODIFICATION REQUIRED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT. ALL EXISTING HVAC EQUIPMENT INTENDED FOR REUSE SHALL BE THOROUGHLY CLEANED AND REFURBISHED AS REQUIRED FOR PROPER OPERATION INCLUDING REPLACEMENT OF FILTERS, BELTS, MOTORS, REMOTE CONTROLS, AND SAFETY INTERLOCKS. 15A 1-19 EXISTING SHELL SPACE CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING MECHANICAL WORK SHOWN ON THE MECHANICAL PLANS AND THE MECHANICAL DEMOLITION SHOWN ON THE ARCHITECTURAL PLAN. ACTIVE LANDLORD OR OTHER TENANTS SERVICES ENCOUNTERED IN WORK SHALL BE PROTECTED AND SUPPORTED. IF EXISTING SERVICES NOT ANTICIPATED REQUIRE RELOCATION, CONTACT THE TENANT'S CONSTRUCTION MANAGER IMMEDIATELY. ALL COST FOR REPAIRS OF DAMAGES TO ACTIVE LANDLORD OR OTHER TENANT SERVICES DURING CONSTRUCTION SHALL BE PAID FOR BY THE CONTRACTOR CAUSING THE DAMAGE. TIE-INS AND MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE WITH MINIMUM INTERRUPTION OF LANDLORD OPERATION AND DURING HOURS SPECIFIED BY THE LANDLORD. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING EXACT WORKING HOURS OF THE WORK WITH THE LANDLORD PRIOR TO SUBMITTING HIS BID. THE CONTRACTOR SHALL INCLUDE IN HIS BID, ALL PREMIUM TIME REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN NORMAL WORKING HOURS, ALL SUCH WORK MUST BE COORDINATED WITH THE LANDLORD. 15A2 INSULATION AND SHEET METAL WORK. 15A 2-1 DUCT INSULATION. PROVIDE DUCT LINER IN ALL RECTANGULAR SUPPLY AND RETURN AIR DUCTWORK. LINER SHALL BE 3 POUND DENSITY FIBERGLASS, CERTAINTEED CORP.'TOUGHGARD" OR OWENS-CORNING "AEROFLEX DUCT LINER. LINER SURFACE SHALL SERVE AS A BARRIER AGAINST INFILTRATION OF DUST AND DIRT, SHALL MEET ASTM C 665 FOR FUNGI RESISTANCE AND SHALL BE CLEANABLE USING DUCT CLEANING METHODS AND EQUIPMENT OUTLINED BY NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA) DUCT CLEANING GUIDE. INSTALL WITH MASTIC AND MECHANICAL FASTENERS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. SHEET METAL MUST BE INCREASED BY LINER THICKNESS IN BOTH DIRECTIONS WHERE LINER IS INSTALLED. SEE DRAWINGS FOR LOCATION, THICKNESSES, ETC. CONCEALED RIGID ROUND SUPPLY, RETURN, AND OUTSIDE AIR DUCTWORK, AND ALL RECTANGULAR OUTSIDE AIR DUCTWORK SHALL BE COVERED WITH DUCT WRAP, CERTAINTEED OR EQUAL OWENS-CORNING, 3/4 POUND DENSITY, WITH HEAVY-DUTY FOIL-SCRIM-KRAFT FACING, AND WITH ALL JOINTS TAPED WITH 3" WIDE FOIL TAPE. ALL INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. ALL CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL. 15A 2-2 DUCTWORK. FURNISH AND INSTALL ALL GALVANIZED STEEL DUCTWORK AND HOUSINGS AS SHOWN ON DRAWINGS. ALL DUCTWORK SHALL BE IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. REINFORCE ALL HOUSINGS AND ALL DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5'-6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8'-W. DUCTWORK SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS; METAL SIZE MUST BE INCREASED TO ALLOW FOR LINER THICKNESS. DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. ALL OFFSETS IN DUCTWORK OF 45 DEGREES OR MORE SHALL HAVE AIRFOIL TYPE TURNING VANES OF SAME GAUGE AS DUCTWORK AND SHALL BE RIGIDLY FASTENED WITH GUIDE STRIPS. VANES IN DUCTWORK OVER 30" DEEP SHALL BE INSTALLED IN MULTIPLE SECTIONS WITH VANES NOT OVER 30" LONG AND SHALL BE RIGIDLY FASTENED. ALL FANS, BLOWERS, UNITS, ETC. SHALL BE CONNECTED TO DUCTWORK WITH NEOPRENE COATED GLASS CLOTH CANVAS CONNECTIONS, DURO-DYNE, ELGEN, VENTFABRIC OR EQUAL. ALL CANVAS CONNECTIONS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. PROVIDE BALANCING DAMPERS WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. WHERE ACCESS TO DAMPERS THROUGH A HARD CEILING IS REQUIRED, COORDINATE ACCESS DOOR LOCATION WITH ARCHITECT, OR A- CONTRACTOR'S OPTION, A YOUNG'S REGULATOR CONCEALED VOLUME DAMPER WITH EXTENSION ROD AND CEILING OPERATOR MAY BE USED. COORDINATE CEILING OPERATOR LOCATION WITH ARCHITECT. SPUTTER DAMPERS SHALL BE CONTROLLED BY LOCKING OC G QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE, FACTORY MADE BY RUSKIN, AEC, AIR BALANCE, OR APPROVED EQUAL. OUTSIDE AIR DAMPERS SHALL BE RUSKIN MODEL CD-50, GREENHECK, AIR BALANCE. OR APPROVED EQUAL. PROVIDE FLEXMASTER MODEL STO OR EQUAL 45 DEGREE RECTANGULAR/ROUND SIDE TAKEOFF FITTING WITH MODEL SLBO DOUBLE BEARING DAMPER WITH INSULATION BUILD OUT FOR ALI. ROUND DUCTWORK BRANCH TAKEOFFS TO INDIVIDUAL AIR DEVICES. ROUND OR OVAL DUC-WORK SHALLM B ESE CO UNITED WE R SCOO EQUAL, SHEETMETAL WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TOAND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2" W.G.): SIZE GAUGE 14" & UNDER 28 15" THRU 26" 26 SPIROSAFE PREMANUFA.CTURED DUCTWORK AND FITTINGS MAY BE SUBSTITUTED' FOR SPECIFIED ROUND BRANCH DUCTWORK, AT CONTRACTORS OPTION. HEAVY LIQUID JOINT SEALANT MAY BE OMITTED ON SPIROSAFE DUCTWORK. LOW PRESSURE (DUCT FRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. FITTINGS LARGER THAN 24" IN DIAMETER SHALL BE CONTINUOUSLY WELDED. FITTING GAUGE SHALL BE 22 GAUGE FOR 36" FITTINGS AND UNDER, 20 GAUGE FOR ALL LARGER SIZES. ALL 90 DEGREE TEES SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1"TO 6" W.G.) DUCTWORK AS RECOMMENDED BY SMACNA. 15A 2-3 FLEXIBLE DUCT. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1"TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8, THERMAFLEX TYPE GKM, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U1.181 CLASS 1, ACOUSTICAL INSULATED DUCT, 1-1/2" (R-4.2) FIBERGLASS INSULATION. FLEXIBLE DUCTWORK SHALL HAVE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LENGTH, AND SHALL BE INSTALLED STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. 15A 2-4 FLUES. WHERE FLUES ARE INDICATED ON THE DRAWINGS, FURNISH AND INSTALL METALBESTOS TYPE "B" MODEL QC OR RV DOUBLE WALL GAS VENT FLUES FROM THE VARIOUS ITEMS OF GAS -FIRED EQUIPMENT UP TO METALBESTOS FLUE CAPS ABOVE THE ROOF. SINGLE WALL FLUES ARE UNACCEPTABLE. FLUES SHALL BE COMPLETE WITH ALL NECESSARY FITTINGS, CONNECTORS, FLASHING CONE, STORM COLLAR, THIMBLE SUPPORTS, GUY WIRES, AND OTHER ACCESSORIES, AND SHALL BE INSTALLED AS RECOMMENDED BY THE MANUFACTURER, AND IN CONFORMANCE WITH APPLICABLE CODES. FLUES SHALL BE FLASHED WATERTIGHT AT THE ROOF LINE. 15A 2-5 AIR DEVICES. PROVIDE ALL AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY CARNES, METAL-AIRE, KRUEGER, TITUS, TEMPMASTER, OR E.H. PRICE. AIR DEVICES SHALL BE SELECTED TO LIMIT ROOM NOISE LEVEL TO NO HIGHER THAN NC-30 UNLESS OTHERWISE SHOWN. PROVIDE ALL DEVICESWITH A SOFT PLASTIC GASKET TO MAKE AN AIRTIGHT SEAL AGAINST THE MOUNTING SURFACE. CONTRACTORSHALL COORDINATE FINAL LOCATION, FRAME, AND MOUNTING TYPE OF ALL AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS. 15A 2-6 FIRE DAMPERS. PROVIDE FIRE DAMPERS WHERE SHOWN ON DRAWINGS, AND AS REQUIRED BY CODE ENFORCING AUTHORITY. DAMPER RATINGS SHALL BE AS REQUIRED TO MAINTAIN THE FIRE AND/OR SMOKE RATINGS NOTED ON THE ARCHITECTURAL DRAWINGS. FIRE DAMPERS SHALL CONFORM TO NFPA-90A AND UBC STANDARD 43-7 WITH RECOMMENDED STEEL SLEEVES, 165°F FUSIBLE LINK, SPRING CATCHES AND NON -CORROSIVE BEARINGS. DAMPERS SHALL BE U.L. LISTED, MANUFACTURED BY RUSKIN, GREENHECK, AIR BALANCE, CESCO, UNITED AIR OR NAILOR INDUSTRIES. PROVIDE ACCESS DOOR IN DUCT FOR INSPECTION AND SERVICE TO FIRE DAMPER AND FUSIBLE LINK. 15A 2-7 LOUVERS, PLENUMS, SCREENS. INTAKE AND EXHAUST AIR LOUVERS SHALL BE RUSKIN MODEL ELF375X OR EQUAL GREENHECK, PENN, AMERICAN WARMING & VENTILATING. CESCO, INDUSTRIAL LOUVERS OR LOUVERS & DAMPERS AS SCHEDULED ON THE DRAWINGS. COORDINATE EXACT SIZE AND LOCATION WITH ARCHITECTURAL DRAWINGS. LOUVERS SHALL BE STATIONARY, WITH MILL FINISH. LOUVERS SHALL HAVE EXTRUDED ALUMINUM BLADES, 0.080" WALL THICKNESS, 45 DEGREE BLADE ANGLE, BLADES ON 5" CENTERS; FRAME SHALL BE EXTRUDED ALUMINUM, 0.080" WALL THICKNESS; WITH EXPANDED FLATTENED ALUMINUM BIRDSCREEN. LOUVERS SHALL HAVE A MINIMUM FREE AREA OF 45%, WITH A MAXIMUM AIR PRESSURE DROP OF 0.1" AT FREE AREA VELOCITY. PROVIDE BIRDSCREENS AND/OR INSECT SCREENS ON ALL LOUVERS, DUCTS, HOODS, FANS, AND OPENINGS TO THE OUTDOORS AS SCHEDULED AND/OR NOTED ON THE DRAWINGS. BIRDSCREENS SHALL BE NO. 19 GAGE GALVANIZED STEEL, 1/2"MESH ALUMINUM MESH. INSECT SCREENS SHALL BE ALUMINUM MESH. 15A 2-8 EXHAUST AIR SYSTEMS. ROOF MOUNTED UPBLAST EXHAUST FANS FURNISHED BY THE OWNER SHALL BE CAPTIVE-AIRE, COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH IN HOUSING, DRAIN TROUGH, BIRDSCREEN AND VENTED ROOF CURB. CEILING MOUNTED EXHAUST FANS SHALL BE AS SCHEDULED ON THE DRAWINGS, OR EQUAL. COOK. PENN, CARNES, OR JENN-AIR, COMPLETE WITH ISOLATED BLOWER UNIT AND CEILING GRILLE. PROVIDE DISCONNECT SWITCH, BACKDRAFT DAMPER, DISCHARGE DUCT, ROOF JACK, AND NEOPRENE VIBRATION ISOLATORS WITH ALL - THREAD HANGING RODS. 15A 2-9 KITCHEN EXHAUST AIR SYSTEMS. DUCTS CONNECTING TYPE I EXHAUST HOODS TO EXHAUST FANS SHALL BE If 16 GAUGE BLACK IRON WITH CONTINUOUSLY WELDED JOINTS AND CLEAN -OUT DOORS. DUCT SHALL BE ENCLOSED IN FIREPROOF ENCLOSURE PER LOCAL CODE REQUIREMENTS. SLOPE DUCT BACK TOWARDS HOOD AT MINIMUM OF 1/4" PER LINEAL FOOT. AT CONTRACTOR'S OPTION, A UL LISTED CONCENTRIC DUCTWORK PACKAGE MAY BE USED ON LIEU OF THE WELDED BLACK IRON DUCT FOR CONNECTING HOOD TO EXHAUST FAN, DUO-AIRE OR EQUAL. MANUFACTURER SHALL PROVIDE UL LISTING NUMBER AND VERIFICATION CERTIFICATE AS A PART OF THE SHOP DRAWING SUBMITTAL. DUCT PACKAGE SHALL BE INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. EXHAUST HOODS FURNISHED BY THE OWNER SHALL BE CAPTIVE-AIRE SINGLE SHELL STAINLESS STEEL; ICBO APPROVED AND UL CERTIFIED FOR AIR QUANTITIES AS SHOWN ON DRAWINGS AND IN CONFORMANCE WITH MANUFACTURER'S DATA. MANUFACTURER SHALL PROVIDE UL LISTING NUMBER AND VERIFICATION CERTIFICATE AS A PART OF THE SHOP DRAWING SUBMITTAL. HOOD SHALL BE IN CONFORMANCE WITH NFPA BULLETIN 96 AND UL STANDARD 710, AND SHALL BE 18 GAUGE STAINLESS STEEL WITH ALL WELDS POLISHED. HOOD SHALL CONTAIN FULL LENGTH STAINLESS STEE. FILTER HOLDER WELDED TO HOOD WITH INTEGRAL DRIP TRAP AND U.L. CLASSIFIED, X-AIR STAINLESS STEEL FILTERS INSTALLED AT 45 DEGREES FROM HORIZONTAL. PROVIDE VAPORPROOF INCANDESCENT LIGHTS, AND CONTROL PANEL WITH PILOT LIGHTS AND SWITCHES FOR FAN AND LIGHTS. HOOD PACKAGE SHALL INCLUDE 3" FILLER PANEL AT WALL, AND STAINLESS STEEL CLOSURE PANELS FROM TOP OF HOOD TO FINISHED CEILING. MAKEUP AIR UNIT FURNISHED BY THE OWNER SHALL AS SCHEDULED ON THE DRAWINGS, WITH FACTORY WIRED CONTROL CENTER WITH ALL DISCONNECT SWITCHES, MAGNETIC STARTERS, CONTROLS, ETC., MOUNTED IN AN ENCLOSURE, ALUMINIZED STEEL HOUSING WITH BAKED ENAMEL FINISH, AND VIBRATION ISOLATORS. PROVIDE A REMOTE CONTROL PANEL WITH SWITCHES FOR FAN AND LIGHTS. COORDINATE CONTROLS WITH HOOD AND EXHAUST FAN SUPPLIER. REMOTE PANEL SHALL FLUSH MOUNT IN WALL. HOOD SUPPLIER SHALL PROVIDE PRE -PIPED ANSUL OR APPROVED EQUAL WET CHEMICAL TYPE FIRE EXTINGUISHING SYSTEM FOR EACH HOOD AS SCHEDULED ON DRAWINGS COMPLETE WITH HOOD NOZZLES, WET CHEMICAL CYLINDERS, PIPING, ETC. AND ALL ACCESSORIES TO PROVIDE AN APPROVED, OPERATING SYSTEM. PROVIDE MANUAL PULL STATIONS) AT LOCATIONS SHOWN ON THE DRAWINGS. SYSTEM SHALL BE IN FULL CONFORMANCE WITH NFPA-96. HOOD SUPPLIER SHALL PROVIDE MECHANICAL OR ELECTRICAL GAS SHUTOFF VALVE TO SHUTOFF FUEL OR POWER SOURCE TO COOKING EQUIPMENT UPON DETECTION OF FIRE. VALVE SHALL HAVE A CLEARLY MARKED OPEN/CLOSED INDICATOR. VALVE SHALL BE INSTALLED BY THE PLUMBING CONTRACTOR. 15A3 HVAC EQUIPMENT. 15A 3-1 ROOFTOP UNITS (GAS FIRED HEAT) TRANE "VOYAGER" MODEL YCD ELECTRIC COOLING, GAS HEATING ROOFTOP UNITS AS SCHEDULED ON THE DRAWINGS, OR EQUAL CARRIER, COMPLETE WITH FACTORY INSTALLED DIRECT -DRIVE HERMETIC COMPRESSORS WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION, CRANKCASE HEATER, AND LOW PRESSURE SWITCHES; DIRECT EXPANSION COOLING AND CONDENSING COILS, 10.1 MINIMUM EER RATING (COOLING); CENTRIFUGAL EVAPORATOR BLOWER; AIR FILTER RACK WITH 7THICK THROWAWAY FILTERS (8.5-25 TON UNITS ONLY)• PROPELLER TYPE CONDENSERN FAN; STEEL HEAT EXCHANGER, 807 MINIMUM AFUE RATING (HEATING), FORCED COMBUSTION AIR BLOWER; COMPLETE FACTORY INSTALLED MICRO -PROCESSOR CONTROLS INCLUDING ANTI -SHORT CYCLE TIMERS, TIME DELAY RELAYS AND MINIMUM "ON" TIME CONTROLS, 100%SAFETY GAS SHUTOFF, DIRECT SPARK IGNITION SYSTEM; BUILT-IN THERMAL OVERLOAD PROTECTION ON ALL MOTORS AND COMPRESSORS; MANUAL OUTDOOR AIR DAMPER (25%MAX.); FACTORY INSTALLED LOW AMBIENT CONTROLS DOWN TO 0°F; WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER -RESISTANT BAKED ENAMEL FINISH; MINIMUM 14" HIGH INSULATED DOWNFLOW ROOF CURB; SINGLE POINT ELECTRICAL POWER CONNECTION. THERMOSTAT SHALL BE HONEYWELL OR EQUAL ELECTRONIC PROGRAMMABLE TYPE, SEVEN-DAY MODEL, MANUAL CHANGEOVER, SWITCHING SUBBASE, MULTI -STAGE AS REQUIRED TO MATCH UNIT COOLING/HEATING STAGING. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A UL LISTED DUCT TYPE SMOKE DETECTOR IN SUPPLY AIR AND RETURN AIR DUCTWORK AS REQUIRED BY CODE TO SHUT DOWN ROOFTOP UNIT UPON DETECTION OF SMOKE. UNIT SHALL BE COMPLETE WITH MANUFACTURER'S ONE YEAR GUARANTEE ON ALL COMPONENTS PLUS AN ADDITIONAL FOUR YEAR GUARANTEE ON THE COMPRESSORS AND HEAT EXCHANGERS. 15A4 TEMPERATURE CONTROLS. 15A 4-1 TEMPERATURE CONTROLS THE HVAC EQUIPMENT SUPPLIER SHALL INCLUDE WITH HIS EQUIPMENT PACKAGE A SYSTEM OF CONTROLS INCLUDING ALL THERMOSTATS, AND ALL RELAYS REQUIRED TO PROVIDE THE DESIRED SEQUENCE OF OPERATION. HE SHALL ALSO PROVIDE INTEGRATED WIRING DIAGRAMS SHOWING INTERCONNECTIONS BETWEEN FIELD INSTALLED EQUIPMENT AND PACKAGE WIRING FURNISHED WITH THE HVAC EQUIPMENT. SMOKE DETECTORS WITH UL LISTING (OR HEAT DETECTORS, IF PERMITTED BY CODE) SHALL BE PROVIDED FOR EACH UNIT TO SHUT DOWN SUPPLY FAN UPON ACTIVATION. EQUIPMENT SUPPLIER SHALL PROVIDE ALL SUPERVISION AND ON -JOB CHECKOUT SERVICE AS REQUIRED TO ASSURE THAT INSTALLATION BY THE ELECTRICAL CONTRACTOR MEETS ALL REQUIREMENTS OF THE SPECIFICATION. MANUFACTURERS AND MODEL NUMBERS ARE LISTED FOR REFERENCE AS TO QUALITY AND FEATURES REQUIRED FOR THE CONTROL DEVICES. PROVIDE CONTROL DEVICES BY BARBER-COLMAN. HONEYWELL, JOHNSON CONTROLS, TRANE OR WHITE RODGERS WITH QUALITY AND FEATURES AS INDICATED. SEVEN DAY PROGRAMMABLE, OCCUPIED/UNOCCUPIED THERMOSTATS FOR MULTIPLE STAGES OF HEATING AND COOLING SHALL BE HONEYWELL SERIES T7300 THERMOSTAT WITH Q7300 SUBBASE. PROVIDE HONEYWELL TG512A1009 GUARDS FOR PROGRAMMABLE TYPE THERMOSTATS. 15A4-2 SEQUENCE OF OPERATION. COORDINATE WITH ELECTRICAL CONTRACTOR TO PROVIDE ALL FINAL CONNECTIONS TO LANDLORD HVAC AND FIRE ALARM SYSTEMS AS REQUIRED. ROOFTOP UNIT CONTROL: ROOFTOP UNIT SUPPLY AIR FAN SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS TO MAINTAIN MINIMUM VENTILATION. ROOM THERMOSTAT SHALL CYCLE STAGE(S) OF COOLING AND GAS HEATING TO MAINTAIN SETPOINT (75 DEGREES FAHRENHEIT, ADJUSTABLE). DUCT MOUNTED SMOKE DETECTORS SHALL SHUTDOWN ALL ROOFTOP UNIT(S) UPON ALARM FROM ANY SINGLE ROOFTOP UNIT. REFERENCE OTHER EQUIPMENT SEQUENCES FOR INTERLOCK REQUIREMENTS WITH ASSOCIATED EQUIPMENT. MAKEUP AIR UNIT: MAKEUP UNIT SUPPLY AIR FAN SHALL BE ENERGIZED WHEN EXHAUST FAN(S) ARE ENERGIZED. MAKEUP UNIT SUPPLY AIR FAN SHALL BE DE -ENERGIZED BY ANY KITCHEN EXHAUST HOOD FIRE EXTINGUISHING SYSTEM, IF HEAT IS PROVIDED FOR MAKEUP AIR UNIT, DUCT MOUNTED DISCHARGE AIR TEMPERATURE SENSOR SHALL MODULATE HEATING TO MAINTAIN HEATING SETPOINT OF REMOTE TEMPERATURE SELECTOR (65 DEGREES FAHRENHEIT ADJUSTABLE). DUCT MOUNTED DISCHARGE TEMPERATURE SENSOR SHALL BE MOUNTED WITHIN THE MAKE UP AIR DUCTWORK UPSTREAM OF ALL BRANCHES WITHIN LEASE SPACE. KITCHEN EXHAUST HOOD FAN CONTROL: IF MORE THAN ONE KITCHEN EXHAUST FAN IS PROVIDED, INTERLOCK KITCHEN EXHAUST FANS SO THEY OPERATE TOGETHER. KITCHEN EXHAUST FAN(S) SHALL BE ENERGIZED BY THE KITCHEN EXHAUST HOOD CONTROL PANEL WITH SWITCH. CONTROL PANEL TO BE PROVIDED BY THE EXHAUST HOOD SUPPLIER, AND INSTALLED BY ELECTRICAL CONTRACTOR. COORDINATE INSTALLATION WITH THE ELECTRICAL CONTRACTOR, INTERLOCK ROOFTOP UNITS) WITH THE MAKE-UP AIR UNIT SO THE ROOFTOP UNIT'S SUPPLY AIR FAN 15 ENERGIZED WHEN THE MAKE-UP AIR UNIT IS ENERGIZED. INTERLOCK THE MAKE-UP AIR UNIT WITH THE KITCHEN EXHAUST FAN(S) SO THE MAKEUP AIR UNIT SUPPLY AIR FAN IS ENERGIZED WHEN THE KITCHEN EXHAUST FAN(S) ARE ENERGIZED. THE KITCHEN EXHAUST FAN SHALL CONTINUE TO RUN IF THE KITCHEN EXHAUST HOOD FIRE EXTINGUISHING SYSTEM IS ACTIVATED UNLESS SPECIFICALLY REQUIRED OTHERWISE BY LOCAL CODE AUTHORITY. NOTE: REFER TO MECHANICAL PLANS, DETAILS, AND EQUIPMENT SCHEDULES FOR SPECIFICATIONS FROM THIS SHEET AS APPLICABLE. REVIEWED FOR CODE COMPLIANCE APPROVED SEP 23 2019 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 0 5 2019 PERMIT CENTER -0103 CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP mu CA d isicn CT PNmp En3 neericg. Inc 914 E. KATELLA AVENUE A NAHEIM. CALIFORNIA 92805 A (7141385�1835 F(714) 385.1634 —w—p— STAMP p,R D A. p F WASy��G2�o z �o P 34218 O �R- �Ess ON AL EKE, 03/19/10 PROJECT NAME/ADDRESS: Mllbw TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE NO. DATE DESCRIPTION 1 020719 BID ISSUE 2 022519 BID ISSUE 053119 CORPORATE REVISIONS 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL z 071119 MECHANICAL CORRECTION A 071919 ELECTRICAL CORRECTIONS -17 072519 BUILDING CORRECTIONS 5 090519 2ND RESUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI 1 PEI SHEET CONTENT MECH SPECIFICATIONS SHEET NO M-Soo 2015 Washinaton State Enerav Code Comnliance Forms for Cnmmerriai R7 and Ra nvar s �tndo< and till Rt 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Project Information Project Title: Joilibee Tukwila Data 7/18/2019 Applicant Information. Provide contact immolation for individual who can respond to For Building Dept. Use jnquidea. about compliance form information provided. Company Name, Gary Wang& Associates, Inc. Company Address: 1000 Corporate Center Dr., Suite 660 Applicant Name: Llzette Gutierrez Applicant Phone: (626) 288-6898 - ext 127 office( (626) 768-7101 fax Project Description ❑ New Building ❑ Building Addition I] Tenant Improvement ❑ System Retrofit ❑ No System Changes Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SLIM, MECH-CHK end C407 EmergyAradysls forms required. ❑+ Load Calculation summary ❑ MECH-LOAD-CALC Form Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating, cooling or ventilating needs. ffa load calculation summary is provided with the permit documents that includes all applicable compliance information than the MECH-LOAD-CALC form is not required. Q Mechanical Plans ❑ MECH-EQ Forms (TBD) Mechanical Schedules indicate location of equipment compliance information. if provided on plans than MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ fables. ❑ DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and fire station occupancies) All occupied, Conditioned areas shall be served by a DOAS that delivers required ventilation air in a mer annthat does not require space conditioning fan operation. Space conditioning fans cycled off when no heating or Cooling is 2gWred. Dedicated Outdoor Air ❑ Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, Exception 1) System Requirements and ❑ 2) Ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS (C403.6, Exception High Efficiency VAV Q DOAS included in project, although not required (occupancy not office, retail, education, library of fire station) Alternate ❑ DOAS related allowances included in project: ❑ Prescrptive vertical fenestration maximum area allowance increased to 40% per C402.4.1.4 with 100% of conditioned Floor area in building served by DOAS. ❑ Exception to air economizer per C403.3 Exception i, include MECH-ECONO form. I] Project includes HVAC air distribution systems that provide heating anrllor cooling Ifyes. provide a MECH-FANSYS -SUM form. Pan Power ❑ For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds Shp. If yes, provide a separate MECH-FANSYS farm for each HVAC system exceeding the 5 horsepower threshold. Refer to Section C403.2.11 and MECH-FANSYS-DDC for requirements and exceptions. ❑ Hydronic chilled water ❑ Water -loop heat pump ❑ No hydrod. systems HVAC Hydronic Systems ❑ Hydrenic heating water ❑ Geothermal ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% ofheating and Calling capacity to be equipment listed in tables C403.2.3(1)-(9) orair-to-water heat pumps and heat recovery chillers. Ali equipment listed in tables C403.23(1)-(7) most be 15% mare efficient than C406 Additional m requirements, All stand atone supply, return, and exhaust fans over 1hp must have FEQ a 71 and most be selected wdhin 10% ofmaximum tota7ar static pressure. Efficiency Options - ❑ C406.6 Dedicated outdoor air system (DOAS) Mechanical Requires 90% ofconditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a manner that does not require space Conditioning fan operation. ❑ C406.7 Reduced energy in service water heating Rome- 90% offloor area be in occupancy types listed in C406.7.1 and that 60% of annuaf hot water energy use be provided by heat pump, waste heat recovery or solar water -heating systems. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 2 of 7 Project Title: Joilibee Tukwila Date 7/18/2019 The following aformi a m is necessary to check a permit application for compliance with the mechanical systems and equ pmenl requ lemenis of the Washington State Energy Code, Commercial Provisions. Applicable Code Section Code Provision Information Required- Most be happens documents Location in Building Department esNA nz Documents Notes Stairway and she vent Indicate location of stairway and shaft vent dampers on plans; verify dampers are Class 1 - C403.2.4.3 dampers motorized; is, to HVAC System Controls for additional requirements For systems serving areas, 25.000 at or spanning more than one foot, that include areas that - are expected to be occupied non -simultaneously; identify isolation zone areas on plans and NA C403.2.4.4 Zane isolation dampere locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Car= for additional requirements Forcwling systems with humidification equipment that are alsoreq,tax]to have air - NA 0403.2.3.4 Humidifli lion economizer, indicate hieddif n is adiabatic (diced evaporative or fog atomization), or exw Oon taken Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible Tocomply with atltlisonalefficiency package option, calculate the per-ntage of heating and M-100 Yes 4062.1 G4032.3 HVAC system selection cooling equipment in the anject(based on output priority) mat do not have a re -turtling WEEDlisted efficiency; shall be less than 10%to comply C406.22 Minimum equipment To comply with additional efficiency package option, Indicate that it listed hoofing ad wolfing M-100 You Cites 2.3 efficiency equipment have a rated efficiency that exceeds WSEC listed efficiency by at least l 5% To comply with additional efficiency package option, intliwte rated EEG of stand alone fans is z M-100 Y¢s C4062.3 Minimum fan efficiency 71; indiwtethese fans are sized somefaneficienoyaldesign conditions is within 10%ofm. C403.2.11.3 Unixum total m static effiden HVAC System Controls lndiwte locations of thememsmtic and humidity control devices and me zones they serve on - plans, including Perimeter system zones Where adjawnt (neighboring) zones are Controlled by separate thermostats linducting perimeter systems used to offset heat gain or toss), and are Connected by permanent Thermostatic Commis openings > 10%of either zone at are indicate controls wnfguretl to prevent adjacent zones NA C403.2.4.1 (mennosmts and from operating in connicting modes (on in heat, other in Coop; applies to adjacent perimeter humidistafe) zones. adjacent nonperimeter zones, and adjacent perimeter and nonpenower zones If -appf)Wg Ex-plion 2 to nonpenmeter s adjacent to perimeter zones, indicate that - selpocti iots and headband in these nowdinoted so Cooling in a mmucleter tie does not occur until the tempemture In that zone is SY higher than the adi-at perimeter zone temperature in heating Heat pump supplementary Indicate staged beating operation with compression as the first stage of heating and - NA C403.14.1.1 heat coast emenEll heating controlled with outdoor belroul temperature set to 40-F or less lndiwte zonemermostaticwnlrois configured with 5-F minimum deatlband for systems that M-201 Yes C403.2.4.1.2 Dead-bd Control both heating and Cooling Useparate heating and cooling systems wkh separate themiodagc control devices are used to - serve a zone indicate locations of both fteelostatic central devices and the zone they serve NA C40324.13 Selpoini marine resmction on more (thrmlosIds) Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heafing and Cooling C403.2.4.2 Auomatic intliwte zano theamostalic controls configured with required automatic setback and manual C403.2.4.2.1 setback and overtide functions, Setback temperature and Control method (automatic time clack or C4032422 shutdown programmable Controls); note exceptions taken Indicate system trope s that adjust equipment start time required to bring each area served up C403.2.4.2.3 Automatic (optimum) start to design temperature just prior to scheduled occupancy C40124.3 Outdo., supply air dampers lndiwte automafic wntrois configured to close 05A damper during unoccupied equipment operation; not inducting economizer cooling, night flush or IMC required OSA I exhaust Stakway and shaft liar Indicate method of activation of ddwaw and cha"ant dampers (fire alarm or interruption of - NA C403.2.4.3 dam P ors P ower) Fors stems sewing areas , 25000 at orspellers more man one foot that include areas that - NA C403.2.4.4 Zone isolation Cotr nols m expected to be occupied non -simultaneously: n dicate senirols that allow Car independent space conditioning of isolation zones: or exception taken Indicate occupancy sensing or timer switch controls configured to automatically shot off C403.2.12 Heating outside a building heating system when area sorvad is unoccupied Indicate, automatic wntrois configured to shut of system when pavemenl temperatureex..ds C403.2.4,5 Snow melt systems 50-F and no predp Fallon is falling, and when outdoor air temperature exceeds 40-F Freeze prmtectoo system Indicate automatic wnVols to shut off system when outtlmor temperature exceeds 40`F, w C403.2,4.6 wntrois wncatesproled Ouitl from freezing For hotels and motels with over 50 guest rooms, indicate automatic cenirols serving guest - NA C403.2.4.9 Group Ri hotel /motel rooms that are capable of setback (heating) and set-up (wolfing) of temperature setpoint by at guest rooms (east 5°F; indicate central method - activated by mareentry Car wpanc sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 2n15 Waahinntnn Shia Fnn nv (;nda (:mm�Lanevm Fnrmc fnr l:nm n,ai R old nne rnrbrdinn R2 R Rn nvcr 3 etnriee and aiiR1 Equipment Type (a) ❑' Hot water heating tank(s) ❑Instantaneous ❑ No service water systems Service Water Heating Systems ❑ Heal exchange from space hwt boiler or ❑ Dedicated boiler central hot water/steam Dis Distribution Type (s) ❑ Circulation System ❑ On -demand Commissioning Commissioning is required for: ❑' Mechanical systems per C408,2 ❑ Service water heafing systems per C408.4 Irmitolred, commissioning shall be conjoined for all applicable systems regardless of7ndividual equipment capacity. Exceptions to commissioning requirements: ❑ Total output Capacity of all mechanical space conditioning systems in he building do not exceed 240,000 Btu/h cooling or 300,000 Stuff heading Mechanical systems Commissioning not required. (] Capacity of largest service water heating system in building does not exceed 200,000 Bluth. Service water heating systems commissioning not required Low Energy and Semi -Heated Spaces (Net.6 and 7) Peak Space Space Area Served, Heating Capacity, BtWh Cooling Capacity, Bluth Conditioning Capacity, Compliance Type Location in Plants) Space(.) Served square feet (Note 4) (Note 5) Btulh-sf Check" Notes RTU45 Cook Area 800 64,000 72,000 90,00 Note 4 - Provide total installed heating output Capacity of systems serving Low Energy or Semi -Heated space(s) in blob - Note 5- Provide total installed cooling capacity ofsystem serving Low Energy space(.) in Shen. Not allowed forsemi-heded spaces- Enter 0 dno costing. Note 6 - Rater to Section C402. 1.1 Low Energy Building. Intalted peak space conditioning capacity, heating or cooling, may not exceed 3.4 6tulb-sf.. Note 7- Refer to Section C402. 1. 1.1 and Semi -Heated Space definition in Chapter 2 Total heating output capacity may Cat exceed 8 Blelb-sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under sent -heated, 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stones and all R1 - Page 3 of 7 Project Title: Joilibee Tukwila Jodie 7/18/2019 The following information is necessary to check a permit application for wmpiiance with the mechamCal systems and equipment requirements of the Washington State Energy Code, Cma m umal Provisions. Applicable Code Section Care Provision let .an.for, Required- Most be in pound documents Lowlionin Dowmenls Building Department Notes C403.2A.10 Group R2 / R3 dwelling For primary space conditioning system, intliwte 5-2 progmmmabie I ,Can tals capable of two C403.2.4,11 units, Group R2 sleeping setback pedals per day; for all thermostats indicate pumose (heating only, wolfing only, or units both), required temperature range and at minimum a 10'F deatlband; or exception taken Indicate method of ventilation air delivery (natural or mechanical) for each zone If mcbmaically delivered, indicate that systems are configured to provide not mare Oran 150°% - NA C403.2.6 Ventilation ref, but at least the minimum required volume of outdoor air to each zone par IMC, ASHRAE C4012.11.4 62.1 or other applicable wile (WAC. OSHA, etc); or exception taken If delivered via natural ventiiation, identify required step., IMC Including minimum - openab]e area to the outdoors or qualifying adjoining spaces Identify spaces, 500 dwith occupant lead 125 peopie11.000 of per IMC; for each space - Demand comrolled indicate whether it is served by an HVAC system with total design OSA 13,00) ofe. and I or NA C403.2.6.2 ventilation the system has modide economaer or automatic modulating modulating OSA damper; indcte OSA Controls are wn6gured to provide demand controlled ventilation or provide sir min Po 9 documentation for applied exception Far gyms, classrooms, auditoriums and conference rooms > 500 sf, lndiwte occupancy -based - NA C403.2.6,3 Occupancy sensors OSA control when space is unoccupied and method (closes 06A damper or dens of equipment); v alternate means provided to automatically reduce OSA when space is partially wupied C403.2.6.4 Enclosed loading dock For enclosed loading docks, indicate ventilation i exhaust system method of activation (gas C403.2 AA ventilation detection system for CO and NO2, or occupancy sensors), and control method (staged or modulating) NA C403.2.6.4 Endosed parking garoge For enclosed parking garages, intliwte ventilation / exhaust system activated by gas detection C403.2.6.,12 vremIdion system for CO and NO2, and control method (staged or modulating); or exception taken Provide Calculations that show a balanced accounting of total kitchen exhaust linciude all hoods) with % of: supply air, transfer air from adjacent spews, and make-up air, if applicable, NA C403.2.7.1 Kitchen exhaust hoods indicate that direct make-up air to each hood tices not exceed 10/ of hood exhaust For kitchens with total hood exhaust exceeding 2,000 rim, indicate exhaust air Cate per Table - - C403.2.7.1 and wmpti.nm memod (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements Variable flow wpaciry- For HVAC fan motors a 7.5 hp, indicate method of variable flow control (VSD, or equivalent - NA C403.2.13 HVAC system fans conool method that reduces design air volume by 50%at 1/3 static design pressure); note xception taken DX air handler v,n,b,, For OX air handlers winco enomizer andcoolingwpa61y165,00061Wmb h, indilenuerof - cooling control Cooing stages provided d emod (multiple wllmos d f r variable speed NA C403.3.1 (Underintegratetl _compressors}; um displacement{wpacty tl f )as%of fulloatl Economizer) Intliwm control memod (cooking Capacity Controlled in response b scow mmFerature, space - tempereture controlled by modulating supply airflow, or both) For DX air handlingmceivilh...lin capacity 2 g apac ty 65,W0 Bluth and evaporafveantl chilled - water air handling units with fang 0.25 hp, indicate whether system is single nne or multiple zone and related control method (cooling capacity controlled in response In slope tempemture, space temperature is controlled by mod.ldirg supply airflow, or Cam) For mechanical cooling systems (includes DX and chilled water sells) that coned cooling - capacity in loops... to spa- temperature - Provide A minimum of two dag... f fan pieumb NA C403.2.11.5 Fan aimow control indicate minimum fan speed is s 66%of full speed drawing s 40%of full speed fan power during periods of low willing or ventilation only For other mechanical Fallingsystems includes OX and chilled water calls m. twmrois ace Y p - temperature modulating airflow in lieu of or addition nV Ilin o Brit in p y g ( o gCap response Y los ace diem erasure -Provide fan controls for motlulatin9 supply airllow'indcate minimum P P fan speed is 5 50°o of full speed drawing 530% of full speed fanan power during prices of low Cooling or ventilation only; or ex-ptimn taken Prowdewntral and zone level DDC controls as required based on system appil-lion, No C4012.4.12 �...ayevaubumbllffla. �odpreity or size ffirshodpand other quaifiwion per Table C40324.121 _ Identifyall CDC system input I output control points; indicate prpab liry for Vending and - mphical display Ducting Systems Indicate on plans mat all ductwork is constructed and sealed per IMC M400 11 Yes C403.2.8.1 C403.2.8.3 Duct-nnsuaton __._____ For2.S an p leakage aedslso,i tdudwork meets airleakage requirements per __._.-.. and or, mmeerste C402.5 and vapor, retaNer requirements per, me IBC ar, M400 Yes C403.2.8.3 Dud pressure classifications Identify location of low, medium and high pressure ductwork on plans M-20t NA CAO3.2.8.3.3 High pressure dect leakage lndiwte high pressure duct leakage testing requirements- stars; provide died results to - test jurisdiction when completed ®- • a,r a 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories ®A® A and all RRevised January 2017 Project Title: Joilibee Tukwila Date 7/19/2019 The following information shall be included in the load calculation program summarysubmitted with the permit documents. if a load calculation summary is not available, provide the required information below. For Building Dept. Use Equip.. ID Areas) Served Heating Design Load in Bluth (Note 1) Cooling Design Load in Bluth (Note 1) Calculation Method (Note 2) Notes RTU-6 Cook Area 64,000 72,000 ASHRAE183 Ivore 7 - uesrgn man snarl account rot me Building envelope, lighting, ventilation and occupancy loads ofthe space(s) served by the mechanical system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer load calculation program, worksheet (identity source), or equivalent computation procedure in accordance with ASHRAE Standard 183. and R3 over 3 stories and all R1 - Page 1 of 7 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment umuimments of the Washington State Energy Code, Commercial Provisions, Aesnona Cade Section Cotle Provisimn Infamous. Refined- Must be in pound documents Location in 8uildirg Department Dawm¢nts Notes Equipment - Sizing, Performance and Type Identify equipment to be used in manufacturing. industrial or Commercial processes that do not M-100 Yes C403.1 Exempt process equipment provide spew conditioning; inenlfiy provisions applicable to this equipment per G403.1 exception Provide load calculations performed per ASHRAE Still 183 or equivalent, using design M-600 Yes r403.2.1 Load calculations parameters per C302 and Appendix C; include load adjustments to account for energy recovery Equipment and system Indicate that output capacities of heating and cooling equipment and systems are no "'Ner M-100 Yes C403.2.2 uig man the smallest available equipment size that exceeds the calculated loads; note exceptions taken C403..3. HVAC equipment Provide equipment schedules onplans m late MECH-EQ forms indicatin orw p grype, supply, M-600 Yes C403.2.3.2 Performance requirements rated and WEED minimum effidencies for all heating and cooling equipment; indude supply C403.2.13.1 (etfrdency) and OSA rims and opemfing hours for all air systems; identify heating and coding equipment dial tices not have a wmespontling WEED minimum efficiency (manufacturer mled) List all motors z 1112 hp (mat are not integral to A mled piece of equipment) in me mechanical M-t 00 C405.8 or eleclrwl e9uipment schedules on plans; lndiwte hp. rpm, number o(poles and rated Yes C403 2 t4 ElecVic moto, Mdanay ..do,. or exception applied For fractional hp motors(1H2-thp), indicate whether they are an electronlCaily commutated M-100 Yes C403,2.11.1 Fan power limitation For all applicable HVAC systems with total fan motor he> Shp, verify fan system motor hp or - I bhp complies with fan power limits per equations in Table 04012.11.1(1), provide MECH- EANSYS forth for each system NA C403.2,11.2 Motor nameplate hp For all applicable HVAC systems with total fan motor hp> Shp, indicate fan Calton spedfetl are the smallest available motor hp size great,, Man fan bhp, note exceptions taken For all applicable HVAC systems with total fan motor hp> Shp, identify In equipment schedule - NA C4012.11.3 Fan efficiency all tans required to comply with fan efficienry Ford. and indicate mled EEG is a 67, or exception taken; indicate these fans am sized so total efficiency, is within 15% of the fan um total efficiency NA C403.2.11.4 Gmup R occupancy exhaust For all exhaust fans e 400 din in Group R coomemdes, intliwte in equipment schedule the fan efiwcy fan flow one and of carry (chMvaff), or exception taken; refer to Table C403.2.11.4 (CE-57) Variable flow capacity For fan motors a 7.5 he indicate method of variable flow Control (VSD or equivalent method) in - NA C403.2.13 fans equipment schedule, or exception taken; for equivalent method for an HVAC system refer to HVAC System Controls for additional requirements NA C403.2.3 Maximum air cooled chiller For chilled water plants and buildings with> 500 tons of wolfing Capacity, indicate air-ceoled - - wpadly Castle capadtyis,100tons,dexceptiontaken CODE EVIEWED FOR COMPLIANCE Large Capacity poling For buildings will, a 300 tons of building capadly, Indicate method of multistage or variable -J NA C403.4 systems capacitywntrol(VSD,mulplestagedcompressors,a,maxcapacityofanysingleuna<66% of the Iota]} APPROVED Nonstandard water-cooled For water-cooled centrifugal chillers not designed for operation at standard conditions, provide - NA C4032.3.1 wntrif vial chillers wkulations tlooumeding maximum full load and part load rated equipment performance requirements SEP 23 2019 C403,2.13.1 Centrifugal fan open -circuit For open-ducuf wntrifugai fan cooling lowers win z 1, 100 Son capacity, indicate cooling - C403.4.3.2 Calling lowers towels wmplywilh efficiencyrequirements for axial fans n rcuit bodur, towers ityofTukwila For single toilers with> 500,000 Etch capacity, indicate mulfi stage or modulating burner - NA 040142 Largewpacilyboer Far boiler system Uixgs, or multiple)paciy.Indicate turn dorwnmfio _ C4014.2.5 systems per Table C403.4.2.5and method (multiplesie putbelem,motlulatingbolers, BUILDING DIVISION Combination Varabieflowcapaciry- For pump momm 2 T5hp, indicate method of variable few sparked fVSD or equivalent method) - NA C403.2.13 pumps in equipmenlschetlde,orex-ptlon taken; for equiveleal method tar a hydroniccystem refer m Hydronic System Controls for additional requirements C403.2.3 Gas and 004red forced as For forced airfumaces wM capacity a 225,000 Bluff and all t h ters, ind' to in - frmaceaadimitheside equipment schedule mtenn Rent Ignition or [to, flue in draft d pe nd rated) cket loss RECEIVED NA C403.2.4.8 Combustion heafing heafing equipmentwnth m4,,twpadty> 225,000 Bfum, intliwte modulating For combustbbusfon - equipment or das.dwmseni mln CITY OF TUKWILA NA C4032.3.3 Packagequipmec heabn9! all pa enlpmenta0008tufi wolfing Capacity and any mount of - wolingequipment healingfy heat healing is heat pump; include in equipment schetluies mp;locude in SEP 0 Z019 NA 0403.212 Heeling ouksid. a building Indicate systems providing heating In mumnclosm]oaided, occupied spaces are radiant - systems refer to HVAC System Controls for additional requirements Yes C403.2.7.1 KRchen exhaust hoods Indicate on plans the type, only and exhaust air rate of each kitchen hood, refer to HVAC M-100 Syslam Controls far addnbnai monnuonta All PERMIT CENTER Outdoor supply air, exhaust intliwte lowfons of OSA inks, and exhaust and relief pope dam plans; indicate Pars on M-202 Yes C403.2.4.3 and relief dampers wheIN a Class rtwtodzetl, or ampere are gravity and exception taken (include leakage Oildmfs0; public HVAC System Controls for adch.bai requirements for OSA dampers Indicate locations of return air dampers mat are integral to esenmmizer opemton; verify M-201 Yes C403.2.4.3 Relum air dampers dampace are motorized: indicate whether dampers are Class 1, or within packaged equipment eligible ter leakage rating exception (include leakage puling, dolsh CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP Y' O{i _ - roc a di nFsicn of Plump Eeginee up Inc. 914 E. KATELLA AVENUE ANANEIM, CALIFORNIA 92805 P (714) 30-1635 F(714) 3054834 iwapulplexpove muum m r� ee STAMP AR Q A. p 4G�pF WAsy J O I 34218 � oALTEENG\��� EXP. 03/19/20 PROJECT NAMElADDRESS: TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS t ISSUE DATE NO. DATE DESCRIPTION 1 020719 BID ISSUE 2 022519 BID ISSUE QQ 053119 CORPORATE REVISIONS 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL 071119 MECHANICAL CORRECTION 071919 ELECTRICAL CORRECTIONS 072519 BUILDING CORRECTIONS F52 090519 2ND RESUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PE I SHEET CONTENT ENERGY SHEETS SHEET NO 2 M-600600 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 4 of 7 2015 Tlashinglon State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stores and all Rl -PaigCSof7 Mechanical;Permit;Plans;;Ctiecklist : „ , , MECH�CHK 2015 Washington State Energy Code Mechanical PeriniYPlans<Ghecklist ':" "'. ;,., : , ;MECH-CHK Ped ct Title: Joilibee Tukwila Date 7/18/2019 The following information is necessary to check a permit application for compliance with the mechanical systems antl equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Cotle Section Code Provision Information Requiretl - Must be in permit documents Location in Doc ems Building Department Notes For supply and return ductwork located in unconditioned space orouldcom, indicate R-value of — insulation on ductwork on plans; identify climate no; note exceptions taken For supply d,ml rk located in conditimmil space, identify if design supply temperalure is < -- C4032.8.1 N4 C403.2.8.2 Duct insulation 5SF or, 105°F and indicate ft-value of msulabon on this tludpti work on plans; note exceon taken For OSA ductwork h h and plenums, indicate R-value of insulation on these elements on — lans per Table C4021 3 for steel famed wails, note exception taken Piping Systems indicate design temperalure range of fluid Conveyed in piping and thickness of insulation (in — NA C403.2.9 Piping insulation noheon hydros c piping plans; or except on taken NA 1 C403.2.9.1 Piping insular on expeend to weather id tale method of protection of pipe insulation from damage / degradafon on hydronic piping lank — Economizers Identify in equipment schedules an plans or in MECH-EQ farms as cooling systems requiring ahem le.rcontrols M-600 Yes C403.3 Air economize, required q Provide MECH-ECONO/orm Intliehn stems ul I'¢m a exceptions, inclutlin g — Nose with water -side economizer in lieu of air emnom'zerrnd Cote neplans eligible ception(s) taken and measures to comply with except on(s) NA C403.3.1 Integrated economizer meref m - air and water Indicate i r antl watered, emomMeMs configured for partial mating memt on even where additional mechanical Cooling is required to ,at the load — NA C403.3.2 Economizer healing system Verify control method dHVAC systems with economizers does not increase building healing impact -air and wafer energy usage during normal operation M-100 Yes C403.3.3.1 All t Indicate modulating OSA and aster air dampers are configured to provide up to 100%OSA economizerw pacify for cooling M-100 Verily mechanical cooling controls are interlocked with air economizer mntrois so the outside C403.3.1 air damper remains in 100% open position Cohn coo ling oling is also required to meet the cooling toad, until the leaving sir temperatures � 45°F M-100 Yes C403.3.3.2 com Integrated air enaizer Fars stems Cotten li t 165,000 Btuihl veri that Control ofecomalizer dam y o tag wpaci y y pers is not based only on mixed air temperatureexception taken MTOU NA C403.3.3.3 Air emnomizer high limit controls indicate high limit shutoff won I method and required high limit per Table C403.3.3.3 Far eligible systems where water -side economizer may be provided in lieu of air emnomizer, — NA C403.3.4.1 Wateremnamizercapacity indicate system is capable of 100% design cooling capacity at STE db/45°F wb OSA temperatures NA C403.3.4.2 Water emnomizer indicate pressure drop across gemming coils and heat exchangers in water emnomizer — pressure drop system do not exceed pressure drop limit NA C403.3.1 DX avum handling equipment oofol For DX air handlers with emnomizer and calling Capacity z 65,000 Btulh, refer to HVAC System Controls for requirements — DX equipment emnomizer For OX air handlers will, economizer and cooling capacity 154,0008ruth, provide a fault -- NA C403.2.4.7 tapir deicfon and detection and dogresfcs(FED)system to monitor amnmmizer system operation and report diagnostics faults Systems Requiring Energy Rerovery For systems with design OSA .5,000 char, or design supply air cfm antl% OSA exceeding the — values n Tables C403 5.1(1) or (2) indicate Mm... l air ER method xmpt'on taken with Energy reenvery(ER)- supporting Calculations _ _ ., Yea C403.5.1 vent ition/exhaust For rooms served b muff le systems will, aggregate des, OSA, 5.000 rim, or a y P 9n ,indicate systems Tablestions .1(1)or (2), indicate desist airy metararid%OSAon takengihbuipposln exhaust air ER method; or exception taken with supposing Calculations Indicate ER mled effCdirCnCC that increases OSA enihalpy by z 50 % based on delta between OSA and return air enthalpies al design conditions M-100 Laboratory exhaust systems For buildings wish total lab exhaust, 5,000 cfm, intliwte method of energy recovery used to — NA C403.2.7.2 (energy recovery] precondition Imomtary make-up air, ER da iveness (min 25°F); or alternative method per xopten (VAV exhaust, dankeenditi... d makeup, or CERM calculation) For buildings with pelts or spas with water sada area. 200 If, indicate exhaust air ER — C404.10.4 Pods and permanent spas method and use of waste heat (preheat ventilation air pact water or service hot water); or NA (under eimerstaystems exception taken C404.1IL (energy recovery) intliwte ER system has the rated effectiveness and is configured to decrease the exhaust air — temperature at design conditions by z 36°F Far buildings with Image steam heating systems, indicate Condensate water ER — NA C403.5.2 Energymobody- steam Condename systems For buildings that use off -site generated steam where condensate is not returned to the — suarceindicate on -site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Project Title: mlilbee Tukwila Dale 7/18/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Cotle Secfon Cotle Provision Information Requiretl- Must be in permit dnumenls Lowfonin Duccome s Notes Buiitling Department C403.7, Application of single duct Indicate VAV terminal p powers yserve perms Npes on tans; very in- d terminal inks only ter NA NA Item 11 antl fan -powered terminal units es with envelope loads; verify all other zones are served by single dud terminal units C403.7, Fan-powemd terminal unit intlicale DEC Controls are configured to automafwliy reset the primary supply air cfm setpoint N0. Item 12 primary air reset of all fampowered terminal units to the minimum required to maintain ventilation during ccupied heating or deatlbantl, based upon the VAV air handling unit LISA ventilation fraction For spaces. 150 at with compact density 125 people / 1000 at, traded. spew Is served by a — NA C403.7, Item 13 High occupancy space controls dedicated terminal ,It with DCV Central that meatelerminal unit ventilation setpoint; also indicate occupancy snsor control that automatically reduces minimum ventilation to zero and sets back room heating and booting selpoints by z WE For server, electronic equipment, telecom or similar spaces with cooling loads> 5Wlsf, — NA C403.7, Dediedad HVAC indicate spaces are served by independent HVAC systems that are separate from HPVAV Item 14 systems systems serving rest of building; tiled. dedicated HVAC systems have air emnomizer commis or energy recovery per C>103.3 Exception 9 Indicate whether systems are served by a high efficiency heating water plant, or high — efficiency chilled water plant If complying via high efficiency heating water plant: indicate all VAV terminals have hydronic — healing mils served by heatng water syetem with either gas -flied boilers) with thermal C403.7, efficiency_ 90%, air -to -water heat pumps, or heal recovery chiilers NA It.. 15 CenUal plant efficiency Ifcomplyinghi high chilled wafer lent Indicate all VAV air hantliers have oolin via 9 Y P g oils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at lease 2 3 25% per Table 0403 (7) (note water-cooled IPLV is max, all others are min); indicate mailed chiller or compressor in plant is 5 20%of total plant opacity, or provide thermal sto rage sized for 5 20%of toil plant capacity 0403.7. Fault detection and Indicate DDC system inciudes a fault detection and tliagnosfcs(FDD) System configured to — NA Item i6 tliagnos[iw omm' operation and provide fault reporting dummied parameters for all VAV air handlers rid VAV or terminal units In the HPVAV s stem HVAC Equipment Energy Use Metering HVAC equipment energy For new buildings ,50,000sf and building add,lime , 25,000 at, verify energy use metering of — NA C409.3.1 metering all equipment used to provide space heating antl mall dehumidification antl ventilation will be provided per C409;intlicale equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires — mnlrol functions and I or configuration to padfm, specific vend oes arerequired to be Snipe of mechanical copi'oned; Forbuildings wiN a 240,000 grWh tail output mating opacity or z 300,000 Bw/h total output heating rapacity, indicate that all mechanical systems regardless of individual capacity are — NA C408.2 systems commissioning required to be commissioned; or provide building heatng I cooling Capacity Calculation demonstrating eiigibiiiy for Meandon Indicate in plans antl specifications that Cx per C408 is required tar all applicable mechanical — systems; Include general summary with at a minimum of items t thru 4 of the Cx plan per C408.1.2 -- C403.2.10 C408.1.1 Commissioning including: nandwe desorption of activities, responsibilities of the Cx team, schedule of NA C408.1.2 requirements in mostrudion activities including verification of project close out documentation per C1036o . and nflid of C408A.4.2 comments interest plan (if required); C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure — C408.1.4.2) shall be Completed by the Certified Cx Professional and provided to the owner prior to the final mechanical inspection. Air system and hydronic Indium in plans that air and fluid flow rates shall be tested and balanced within the tolerances yes C408.22 system balancing defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses. then adjusted to meet design flow, Conditions MAOO yes C4082.2.1 Air system balendng Indicate devices that provide the Capability to balance all supply air outlets, zone terminate and devices air handling equipment requiring system balancing Md00 Hydronic system balancing Indicate devices that provide the Capability to isolate, balance and measure flow moos. all No C408.2.2.2 deviws hydronic equipment equineg system balancing including heating and cooling coils and pumps No C408.2.3 Functional pedommnce Identify in plans and specifcations the intended operation of ail equipment and controls during testing criteria all modes of operation, including interfacing between new and exie ieTh a main systems Project Close Out Documentation Doc.arxer im and pmjed Indicate in plans that project close out documentation, and training of building operations Yes I C103.8 close out submittal personnel is required for all mechanical components, equipment antl systems governed by this cede; indicate close cot aocumentalion shall include: ramid documents, OSM manuals, M-100 M-500 requirements applicable WSEC compliance forms and mOuldime M-500 Project Title: JoflRam Tukwila Date 7/18/2019 The following informafon is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington Site Energy Code, Commercial Provisions. Applicable Cotle Belgian Provision Information Required -Must be in permit documents Location in Dom ME Building Department Notes For buildings with food service, meat or deli departments that have 2 500,000 Btu/h of remote — refrigeration capacity far coolers / freezers, indicate condenser ER antl use of mptured energy (service water healing, space heating, or dehmaidifcatem reheating) NA C403.5.3 Enegyrecovery- For buildings with z 40,000 d Conditioned Near area and with • f,D00,000 Bwlh ofrerade — coder/freezermedensers refngeratonCapacity far moiers/freezers, indicate condenser ER and use of captured energy for service water heating and also for space hearing, or dehumidification reheating For bindings With 24-hour operason and w I. 11,500000 Bunch of heat mjl Untapedy and — NA C403.5.4 Energy recovery- condenser systems design service hot water load1250000 BLUM,'ndiwte Condenser Eft to pre -heat service water, or exception taken Provide wioldi .. show rig the amount of recovered heat that is ut lized (60%of peak heat refection load or preheat m2Lse water to 85°F). Hydronic System Controls For hydronic system pump movers 17.5 hp, indicate method of vemid, flow Control (VSD or — C403.2.13 Variable flow mntroi - equivalent method that requires z 30%design wafage.150%design fluid flow); note NA C403.4.2.7 hydronic system pumps exception taken identiywheiher hytlron'coleh DDC confois antl asseraated manner rip p peed — onrrol difemntial press hyd is demand, etc) For bo'Iersih 12Tvtlebultling heating,md'cate commis that proude heating water — momerature setback based on outdoor temperature For heatng and chilled water sydemsz 300,000 Btulh, indicate systems are configured to — C403.2.5 Hydronic system setback automatimliymset supply water temperature based upon demand; or exception taken. If system pump motor hp z 3 tarp, also indicate murals automatically reduce flow by a 50% NA C403.4.2.4 and part load controls For chilled water systems (z 300,000 Blu/h, pump motor hp? 3 hp) that serve walercletl m — matery air ontlihners, Indicate VSD or staged pumps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, ar to maintain a minimum differemii pressurerexmptiontaken NA C403A.2 Boiler sequencing Indicate automatic Controls that sequence operation or multiple bolters — NA 0403.4.E Hot gas bypass limitation For cooling equipment will, hot gas bypass, provide either multiple step unloading or ontinuous capacity in dulafnn; Indicate bypass capacity per Table C403.4.6 — NA C403A.2.2 1pipe changeover indicate changeover deMdbantl(min 15°F), heating /carding made scheduling and changeover — systems temperature range (limit 30°F) NA C403.4.2.6 Chiller /boiler plant pump led iestacontrols are configured to MA.Rafcaliy reduce overeli plant flow and shut-off now — isolation through individual chiilers and boilers when not in use - For coaling towers with fan molars? 7.5 hp, ireffed, VSD and method to adjust fan speed — C403.2.13.1.1 (adjusled based on leaving fluid temperature or mndenser temperature / pressure of heat NA C403.4.3.1.1 Heal rejection equipment - orm— n device) _ C403.4.3.I.2 variable flow mntroi For umbpff, Can heat reJoel ion equipment with VSD, indicate controls that comp all fans m niean — NA C403.4.3.3 Heat rejection equipment- Indicate memcimNt cooling towers WIN multiple pumps or VSD mntroi are designed so all Cooling lower flow wmtloam cells can be con in parallel NA C403A.2.3.1 Water loop heat pump- Intliwte capability of central equipment to provitlemmimum 20'F water supply temperature — tleadband demband between heat rejection and heat addition modes: or exception taken Water loop heaipump- Indicatetype of cooling tower(open or closed-circuit) in equipment scheaule,'ndicate method NA C403.4.2.3.2.1 heat rejection equpment, used to Got system heat loss when heat rejections not needed Zane 4 Water loop beat pump For men -or closed-cimuit Cooling towers, provide a heat exchanger that separates the cooling NA C403.4.2.3.2. heal rejection equipment. Zone 5 lower and heat pump Imp NA C4...4.2.3.3 Water loopheatpump- Forhydronicheatpump systems with trial system powe.lohp,intliwte2-wayisolet!= — isolarea valves valves on each heat imp antl vadabi flows stem canfnl Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30116, Prescriptive 7/1/2016 For buildings with d1iretail,education, library and ire station spars. identify these spaces — NA C403.6 Dedicated outdoor air an plans; indicate that ventilation air in each occupied space is provided via a DOAS System; C403.6.3 systems or document Compliance with C403.6.3 Impracticality; or exception taken (buildings Complying Mill C402.4.1.4 or Cease may act utilize excapGons) Energy recovery ventilation For all DOAS systems, intliwte exhaust air ER method; or e,mpU,n taken with supposing — NA C403.6.1 DOAS calmlations. Indicate ER rated effectiveness that increases 08A enthalpy by a 50 % based oa with delta between OSA and return air enthalpies at design Conditions. In eete equipment associated with the delivery of one level heating and coaling (fans, — Heating / cooling system hydronic pumps, primary air dampers, etc) are confgured to shut off, and central equipment is NA C403.8.2 —"Is with DOAS configured to win down, when there is no Call for heatng or ending in lee zone they serve Ifappiying Exception to heating/cooling fans used for air mixing in the space during deatlbantl — periods, include fan watts per cfin in equipment schedule _ _.__. _.___.__..... ..... «.,...,a .,....r �.,., Project Title: Jallibee Tukwila Date 7/18/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. yeea'aa. ie a.q Code Section11 Code -Vale. Inf arratin Required - Must be M permit douments Location in Documents Building Department Notes C402A.1.4 increased prends e ' NA C403.6 ee maximum i ice Indicate that all occupied. Conditioned spaces are served by a DOAS per C403.6 fenestration area with DOAS Additional EfficiencyPackage ice Option, Dedicated Outside Air SyStems(DOAS) NA C4DS6 Building provided with To comply with add bona) effaency package option, Indicate that 90%or more of all occupied, — DOAS mntli(oned s aces are served b a DOAS per C403.6 Multiple Zone Air Systems Arsystems sewing multiple identity supplyar systemsserving multiple zones and the zones they serve on plans; indicate — NA C403.4s VAV and method of primary air control; or provide supporting documentation for applied exception to VAV Provide equipment schedules on pmrso,MECH-EQ fortnihatild all VAV air termmais and — types For each air terminal include: maximum airflow rates far primary supply n — VAV systems serving NA Cd03.4.4 muttipia zones :peak healing and zone peak cooling; maximum airflow during reheating, recoiling or mixing: oliN a mixing: minimum airflow rate to mamtam required venGtaGon. and the basis for Nese values if IMC ar ASHRAE 62.1 multiple zone equation's basis for minimum flow rates, provide calculation on plans NA C403AAA Single duct VAV terminal Indtwi smite duct terminal units are configured to reduce primary supply air before reheating — units or retooling NA C403.4.4.2 Dual duct systems - terminal For systems with separate warts air and Cool air ducts, indicate terminal units are Configured to units mdum the new from one dud to minimum before miring with air from the other duct Indicate locamns of dud stage pressure sensors on plans; include at least one sensor per — major dud brooch; verify wntrollersetpointpcessure at each sensor is 51.2 inch w.g. NA C403.4.1A VAV system sift ptesrsannsors- For systems wall zone level DDC, indicate controls are configured to monitor zone damper — C403A.1.2 o d DDC set points and reset static pressure setpoint based on the zone requiring most pressure; include positions tom Control logic that auat ecily minds and generates an alarm if any zone excessively dimes reset logic. and allows building manualls to exclude zones from read logic Multiple -zone VAV system For systems with zone cotrols level DDC words. indicate nareconfigured to aulomafcaff — NA C403.4.4.3 vsublafon optimization reduce outdoor airfow in response to changes in system ventilation efficiency; or exception mnlrols taken NA C403.4.4.4 VAV system supply air reset tntlicate controls automatcaly reset supply air marpemwre in response to building loads or outtlmtairtem emwre; or exm OR taken — Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 BOAS Exception 2, must comply with all 16 provisions NA C403], Ai come-u , Indicate system is configured for 100% air emnomizer operation and complies with all related HIMI errequireamme per C403.3(withent economizer exceptions) NA C403.7, Direct digital Controls (DDC) Provide DDC mnlrols for ail mmponents of system; identify all DDC system Input output ,tam 2 Control points; intliwte capabliy for trending and graphical display For systems with minimum OSA, 2,500 rim, indicate nidoor ai flow monitoring sudden that — NA C403.7, Omdmr airflow me ... ms OSA intake under all load contlfiona; intliwte mall sequence that increases or item 3 measurement and reduction dues system OSA cfm based on VAV terminal feedback of wa fildion efficency (per G403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C403.7, Supply airflow measurement For systems wN, m n mum OSA> 2,500 efm, mtliwi supply Wife, monitoring station capable Item4 of measuring supply air delivered to VAV terminals under all load conditions C403.7, Zone immune and Verify maximum area served by a single HEVAV system is 5 50,000 0, or one entire floor NA Item 5 ximum area served ma ' whichever is greater in aamfon it. system serves, 25.000 sf, that Includes areas that are expected w be occupied non -do ulinnuslY, indicate zone isolation Controls per C403.2.4.4 NA Cwo Interiorl..m u cam, Verify Nat VAV term Is y, gin o g per design supply air serving tenor m tin driven loads are sketl Ifem6 6 design supply air temperature temperature that is 5°F higher than VAV terminals serving exterior zones C403.7, Maximum air lerninal inlet Identify air terminals with minimum primary airflow setpoint,, 50%of maximum Impart in — NA Item 7 velocity imm merit schedule or MECH-EQ form; indicate all terminal inlet velocity does not exceed 900 film C413NA , Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC — it.. em8 36 NA C403.7, Maximum allowable system Verify fan system bhp Is 590%of the on, limit per Op6n 2 equation in Table C403.2.11ALI), — item 9 brake horsepower provide MECH-FANSYS forth for each system Indicate all sends and parallel terminal fans have decima ly commutated motors; indicate — NA C403.7, Fan -powered terminal unit DDC control system is configured to vary air terminal fan speed as a function of the load; Item 10 motor and control indicate in speed during penotls of low heating, low cooling, or vnfialion my 1s1111, 01 peak design air flow or provide supporting doumeni6on for applied exception REVIEWED FOR CODE COMPLIANCE APPROVED SEP 23 2019 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 0 3 2019 PERMIT CENTER -j 103 jk ". Y'd, a, y:.w S4 CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS. THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. -- MEP a dvvi lm offrPlump Engineering. Inc. 914 I EKATE LLA AVENUE ANAHEM, CALIFORNIA 92805 P (714) 385-1835 FLTU) 385-1834 wnw.PlumpguiP.corn STAMP PR U A, p �G�p4 WASy/�G�yO J O A Po q 34218 � �Fs f�/STERE s/08A L EIS EXP. 03/19/20 PROJECT NAME/ADDRESS: Mllobw TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS / ISSUE DATE NO. DATE DESCRIPTION 1 020719 BID ISSUE 2 022519 BID ISSUE A 053119 CORPORATE REVISIONS 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL 2 071119 MECHANICAL CORRECTION A 071919 ELECTRICAL CORRECTIONS 072519 BUILDING CORRECTIONS 5 090519 2ND RESUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI I PEI r SHEET CONTENT ENERGY SHEETS SHEET NO 2 L1,IMA L60 Comments/Assumptions: i.21HigImpact (Tier 1) L7, Metlum Impart MOr 2mpact T1era I 'ukwila - Repo'rtdate•;: 02/66/ 99, iangW,1901069 Jollibee TukwillaAACAD\MechamcaRjI3 TukW(Iz CkmCheck.cck - Page 7 of S]; Additional Comments/Assumptions: mpact (Tier.2 Medn7m Impact {Tier 2) 1 yH)ghdd) , 3 !Low Impact (Tier 3) Project Title; Jollibee Tukwila I Report dates 02/06/19 Data filename: ):\Gary Wang\M,1901069 )oiiibee Tukwllla\HCAD\Mecbanica(UB Tukwila Camcheckcck Page 10 of 11 Section. 4, Final inspection`t:ompifes7 CammentstAssuniptlons C408.2.3. HVAC control systems have been OComplies 2 tested to ensure proper operation, �ODoes Not , [FI1011 ;calibration and adjustment of controls._ONot Observable; �NOt Applicable C408.2.3. !Economizers have been tested to 1OComplies 3 %ensure proper operation. ';Oboes Not [F13211 ^[]Not Observable; ONot Applicable C408.2.4 t Preliminary commissioning report OComplies (F12911 'completed and certified by registered 1ODoes Not .design professional or approved _[]Not Observable. :agency. :Oh(otAppflcabie C40825;: Furnished HVAC as -built drawings OComplies 1,.'-.submitted within 90days ofsystep? ODoes Not �accePtance. ONot-Observable ONotAppiicabia C40&2.5. An airand)or hydronk system OComplies 3 balancing report is provided for HVAC ODoes Not iF14314systems. 'Not Observable ONot Applicable C408.2.5: -;Final commissioning report due to ,OComplies 4 building owner within 90 days at Section. # Rauyb•in Eiectricat Inspection Comprties? CotzamentsiA4sstintptitirts t,405,,6" w- Lovoltagedry-type disEdbutta -Ocompiies (EL26F, %,electric transformers meet the []Does Not ,minimum efficiency requirements of :[]Not Observable:: ?Table C405.6. ONot Applicable CA05,7 . Electric motors meet the minimum OComplies _ Requirement will be met.. [EL27J1 - efficiency requirements of Tables ODoes Not C405.7(1) through C405.7(4). ONot Observable .Efficiency verified through certification' -under an approved certification ONot Applicable program or the equipment efficiency •ratings shall be provided by motor .. manufacturer (where certification +. rprograms donot exist). C4p58^2':Escalators and moving warkscomply 'OComplies :Exception: Requirement does not apply. it OS.8,2:. with ASMEA17.11CSA B44 and have 'ODoes Not )L 'automatic C..tm15 Configured to (EL281� speed to the minimum, -[]Not Observable: .'reduce :. permitted speed in accordance with Not Applicable ASME A17,11CSA 644 or applicable local code when not conveying _` .. passengers...._- CQ05,9 Total voltage drop across the _ ...___.__________.._._s.............._____.__.._._....__......-________..... OCompiles CECgit combination of feeders and branch Oboes Not . dcircuits — 5%. {[]Not Observable' 'ONot Applicable Additional Comments/Assumptions. :. (� H19h (mpact {Tletl) 2 Med'+um impact (Tier 2) , 3., Low Immm�act(Tiet3) project T'itle_�Joliibae Tukwila Report date: 02105114 Data. la ame;)• Ga ry W-an9AM.1901069JoilibeeTukWIlaVCADV\Mechanical S Tukw(Ia Co Check c .k Page 8 of Project Title: Jollibee Tukwila Report date: 02105/18 Data filename: ):\Gary Wang\M.1901069 Jollibee TukwiilaV\CAD\MechanicalU6 Tukwila ComCheck.ak - Page 11 of li Section � .. #- -pinaff+xspett#on: ' Gzltnplles3 CommentslASsum�ppfurtis_. & $equip C303:3, Furnished O&M manuals for HVAC :Ocomplies 0406.2s5. ;systems within 90 days of system []Goes Not 3 3 `- [FlBI -acceptance. []Not Observable :ONot Applicable -. C403.2,2 �. HVAC systems and equipment 'OComplies : Requirement will be met.. [F127]3` >capacity noes not exceed calculated jOOoes Not ;loads, ONot Observable C4032.4.: Heating and cooling to each zone is []Complies : Requirement will be met,. 1 -controlled by a thermostat control. 'ODoesNot 1FT471s; . Minimum one humidity control device ONot Observable; per installed humidification/dehumidification ONotApplWable ;system. C4014.1: Thermostatic controls have 5 IF OComplies .Requirement will be met. 2 deadband', ODoes Not (FI3813. QNot Observable . �OComplies _ONot Applicable 0403.2.4. 'Temperature controls have setpoint :Requirement will be met. 1.3 .overlap restrictions. ODoes Not (F1201s ONot Observable-; ;[]Not. Applicable C403.2,4, !Each zone equipped with setbacV. -11BoMPII.s 'Requirement . will be met 2 ,controls using automatic time clock or .Oboes Not (F13913 programmable control system. - []Not Observable ONot Applicable - C403.2A. -Aukomabc Controls: Setback to S51F .00omplies : Requirement will be met. 2.11 ;' ' (beat) and 85°F (cool); 7-day clock, 2- QOaes Not. C403,2,4: hour occupant override,l0-hour ONot Observable 2,2 tF14013 ;backup ONotApplicable C403.2.4. - Systems include optimum start ❑Complies ' Requirement will be met: 23 - �cdntrols. ODoes Not :(]Not Observable; 'ONot Applicable C408A.1 `Building operations and maintenance OComplies ;Requirement will be met. [FI5711 :documents will be provided to the 'ODoes Not owner. Documents will cover ervabl e ONot Observable .manufacturers` information, specifications, programming ONotApplicable pP' =procedures and means ofJliustrating to owner how building, equipment and systems are Intended to be installed, maintained, and operated, C408.2,1 Commissioning plan developed by !OComplies 11`I281i registered design professional or -ODoes Not approved. agency. ONot Observable ONot Applicable C408.2.3. HVAC equipment has been tested to OComplies 1 :ensure proper operation.: ,ODoes Not [F131]t ONot Observable; -.ONbt Applicable (1(High Impact (Tier 1) (2,110edium Impact (Tier 2}. (-3 i law Impact (Tier3) I Project Tine: ollibee ukwila J T port dake: 0 _ Re2106 Datafilename: JciGary Wang}M.1901069 Jollibae Tuicx(1(aV4CAD\MechanicalUB Tukwila ComCfieck.cck. Page -9 of REVIEWED FOR— CODE COMPLIANCE APPROVED SEP 23 2019 City of Tukwila BUILDING DIVISION CITY OF TUKWILA .iUi13 2 0 /0's PERMIT CENTER e CITY SUBMITTAL BUILDING DEPARTMENT REVISIONS HAVE NOT BEEN ADDED TO THESE CONSTRUCTION DRAWINGS, THE ARCHITECT AND HIS CONSULTANTS ASSUME NO RESPONSIBILITY FOR CONSTRUCTION BIDS OR CONSTRUCTION PERFORMED FROM THESE DRAWINGS. MEP 0 d1v umpdEry: ,,. � g, inc. Sid E. KATELLA AVENUE ANANEIM, CALIFORNIA 92805 P (714) 385­5 F(]14) 3831836 xxw.plumrgra0.cam uuu�.i�.. munuuuu.uu. STAMP NM. AA,, WASy/�� i Q P 57274 'DNA L1 ENE. 09/10/19 PROJECT NAME/ADDRESS: TUKWILA, WA SPACE 372 & 368 LEVEL 1 WESTFIELD SOUTHCENTER 1374 SOUTHCENTER MALL TUKWILA, WA 98188 REVISIONS /ISSUE DATE NO. DATE DESCRIPTION 3 061819 1ST PERMIT SUBMITTAL 4 061819 HEALTH SUBMITTAL JOB NUMBER MEP # 1901069 DRAWN BY CHECKED BY PEI PEI SHEET CONTENT ENERGY SHEETS .,.,. SHEET NO M-601