Loading...
HomeMy WebLinkAboutPermit M19-0144 - INDUSTRIAL REVOLUTION - DUCTLESS SPLIT SYSTEM WITH NEW SAME CAPACITY SYSTEMINDUSTRIAL REVOLUTION 5835 SEGALE PARK C DR M19-0144 Parcel No: Address: \'~ �°^�xx °~� Tukwila x���� ��o vK�x����va Department of Community Development 630OSmuthcentwrBoulevard, Suite #10U Tukwila, Washington 9D1Q8 Phone:2U6-432'367O Inspection Request Line: 2O6'438'935O Web site: http://www.TukwilaWA.gov 3523049115 Project Name: INDUSTRIAL REVOLUTION MECHANICAL PERMIT Permit Number: M19'0144 Issue Date: 2/10/2020 Permit Expires On: 8/8/2820 Owner: Contact Person: Name: Address; ]E5SE[MUT|[H 32O2[STNE, AUBURN, WA, 98OO2 Contractor: Name COMFORT MECHANICAL INC License No: COMFOM1004DA Lender: Name: Address: ''' Phone: (425)251-9840 Expiration Date: 3/18/2020 DESCRIPTION OF WORK: REPLACE (l) DUCTLESS SPLIT SYSTEM WITH NEW SAME CAPACITY SYSTEM. Valuation of Work: $4,754.00 Type ofWork: REPLACEMENT Fuel type: ELECT Fees Collected: $272.04 Electrical Service Provided by: PUGET SOUND ENERGY Water District: H|GHUNE Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA\Cities Electrical Code: VVAC286-468: WA State Energy Code: 017 2017 2017 2015 Permit Center Authorized Signature: �?'~J0 n�0 | headbyoertify that | have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions cfany other state o/local laws regulating construction orthe performance ofwork. |amauthorized tosign and obtain this development permit and agree tothe conditions attached tothis permit. Signature: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended orabandoned for aperiod of180days from the last inspection. PERMIT CONDITIONS: l: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. ]: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based nnsatisfactory completion nf this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City ofTukwila Building Department (206-431'367O). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OFPERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation ofany ofthe provisions of the building code orofany other ordinances ofthe City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances ofthe City ofTukwila shall not bevalid. The issuance ofapermit based onconstruction documents and other data shall not prevent the Building Official from requiring the correction oferrors in the construction documents and other data. 8: `MECHANICAL PERMIT [OND|T|ONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (ZU6/43l'367O). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (2O6)438'9350 0703 K4ECH EQU|PEFF 1800 MECHANICAL FINAL 0809 P|PE/DUCT|NSUL4T|ON 0705 REFRIGERATION EQUIP 0701 BOUGH')Nk8ECHAN|CAL r CITY OF TUKWIEX Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: 07 0 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax, **please print** SITE LOCATION King Co Assessor's Tax No.: Site Address: Et; 5 S ate- Park Dr;ve- C. Suite Number: Floor: Tenant Name: #1,0141S jot ReVeliti4;e0 New Tenant: Yes PROPERTY OWNER Name: Address: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: ‘reSS '1- C11'44 rC• fl Address: s c. ti-sc- a- S c-- wet fro criar City: State: Zip: Phone: Fax: Email: S 0 )-nrV-1-1 cgoin MECHANICAL CONTRACTOR INFORMATION Company Name: ce...,..re r4. Ai ea.,. h i ca Address: 3zoi c.... s.i. Ng City: Ah, r.,.., State: WA ZiP:41g001 Phone: z z c( cm yo Fax: Contr Reg No.: Date: Date: clAsyi Tukwila Business License No.: Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Regia.,.. 0) las I N- Sys ?/ ne.w 564dle c 0,19 c, y s/s4441 Use: Residential: New Replacement Commercial: New fl Replacement Fuel Type: Electric Gas 0 Other: \Applicat ionsTurms-Applicatiuns On Line12016 ApplicationsMcchanical Permit Application Rcviscd I-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Noise: Mechanical units need to be in compliance with the Tukwila Noise Code. Maximum permissible sound levels are based on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within a house at night in a residential zone it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) 57 dB(A) 60 dB(A) Commercial 57 dB(A) 47 dB(A) 60 dB(A) 65 dB(A) Industrial 60 dB(A) 50 dB(A) 65 dB(A) 70 dB(A) *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, Saturday, Sunday and State -recognized holidays. A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-1Opm); Testing of backup generators during the day. PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWr€R,OR AUT ORIZED AGENT: Signature: Print Name: Te—S.Sc. Date: g/Z 7//ff Day Telephone: Li 2 Zici" Y Mailing Address: City State Zip liMpplications1Forins-Applications On Line \ 2016 ApplicationsNeehanieal Permit Application Revised 1-4-I6.docz Revised: January 2016 bh Page 2 of 2 Cash Register Receipt City of Tukwila Receipt Number DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $272.04 M19-0144 Address: 5835 SEGALE PARK C DR Apn: 3523049115 $272.04 Credit Card Fee $7.92 Creditd Fee R000.369.9080000 0,00 $7.92 MECHANICAL $253.96 PERMIT ISSUANCE BASE FEE R000.322.100,00.00 0.00$3315 . PERMIT FEE R000.322.100.00.00 0.00 $170.02 PLAN CHECK FEE R000.322,102.00.00 0.00 $50.79 TECHNOLOGY FEE $10.16 TECHNOLOGY FEE R000.322,900.04,00 0.00 $10.16 TOTAL FEES PAID BY RECEIPT: R18442 $272,04 Date Paid: Wednesday, August 28, 2019 Paid By: JESSE A CHUTICH Pay Method: CREDIT CARD 418232 Printed: Wednesday, August 28, 2019 12:23 PM 1 of 1 CO TUKWILA ETR4xIT 8200 SOUTM[EmTER OLVD TUKWILA' W4 98188 286'4]]'1870 CITY OF TUKWIL4 Date; 08/28/2019 12:2]:2] PM [nsoIT CARD SALE VISA CARD NUMBER: ******+**+7666 K TRom AMOUNT: $272.04 APPROVAL O}: 418232 RECORD #; 800 CLERK ID: Laurie Thank you! Customer Copy INSPECTION RECORD Retain a copy with permit PECTION NO, PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 Permit Inspection Request Line (206) 438-9350 670 Project: M i4et% Type of Inspection: 11 Address: Date Called: Special Instructions- %Date Wanted: .2. —1 ` .,. a.m. p.m. Requester: Phone No: proved per applicable codes. 11 Corrections required prior to approval. COMMENTS REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. City of Tukwila Department of Community Development 1/2/2020 JESSE CHUTICH 3202 C ST NE AUBURN, WA 98002 RE: Permit Application No. M19-0144 INDUSTRIAL REVOLUTION 5835 SEGALE PARK DR C Dear JESSE CHUTICH, Allan Ekberg, Mayor Jack Pace, Director In reviewing our current application files, it appears that your permit applied for on 8/28/2019, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Currently your application has a status of APPROVED and is due to expire on 2/28/2020. If you still plan to pursue your project, you are hereby advised to do one of the following: 1) If the plan review is complete for the project and your application is approved, you may pick up the application before the date of expiration. At the time of permit issuance the expiration date will automatically be extended 180 days. -or- 2) If the plan review is not completed submit a written request for application extension (7) seven days in advance of the expiration date. Address your extension request to the Building Official and state your reason(s) for the need to extend your application. The Building Code does allow the Building Official to approve one extension of up to 90 days. If it is determined that your extension request is granted, you will be notified by mail. In the event that we do not receive your written request for extension or request is denied, your permit application will expire and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M I9-0144 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COP'( PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M19-0144 PROJECT NAME: INDUSTRIAL REVOLUTION SITE ADDRESS: 5835 SEGALE PARK C DR X Original Plan Submittal Response to Correction Letter # Revision # after Permit Issued DATE: 08/28/19 Revision # before Permit Issued DEPARTMENTS: i‘PS- iffAi Building Division Public Works 3-41 n AiA AYA— Fire Prevention Structural Li Planning Division Permit Coordinator LI 1 PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 08/29/19 Structural Review Required REVIEWER'S INITIALS: DATE: C APPROVALS OR CORRECTIONS: DUE DATE: 09/26/2019 Approved ri Approved with Conditions 10*/ Corrections Required (corrections entered in Reviews) Denied (ie: Zoning Issues r Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire D Ping Q PW D Staff Initials: 12/18/2013 COMFORT MECHANICAL INC c Howe Espiiii.)1 Contact Search L&I I r Page 1 of 2 I f. Safety & Health Claims & Insurance Washington State Department of Labor & Industries A-4 Index Help My _/ I Workplace Rights Trades & Licensing COMFORT MECHANICAL INC Owner or tradesperson Principals JACKSON, SHIRLEY A, PRESIDENT JACKSON, HERB J, VICE PRESIDENT Doing business as COMFORT MECHANICAL INC WA UBI No. 601 954 041 3202 C ST NE AUBURN, WA 98002 425-251-9840 KING County Business type Corporation Governing persons HERB J JACKSON SHIRLEY A JACKSON; Certifications & Endorsements License Verify the contractors active registration license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. COMFOM1015LA Effective .-- expiration 06/01/1999— 04/25/2020 Bond Lexon Ins Co Bond account no. 9816017 $6,000,00 Received by L&I Effective date 06/04/2012 06/01/2012 Expiration date Until Canceled Insurance Federated Mutual Ins Co $1,000,000.00 Policy no. 9828233 Received by L&I Effective date 06/05/2019 06/01/2019 Expiration date 06/01/2020 Insurance history Help us improve hups://secure.lni.wa.gov/verify/Detail.aspx?UB1=601954041&LIC—COMFOMI015LA&SAW= 9/5/2019 Parcel Number 352304-9115 Name SEGALE PROPERTIES LLC Site Address 5811 SEGALE PARK - C DR 98188 Legal NEW PARCEL "Brr DESCRIBED AND DELINEATED IN CITY OF TUKWILA BOUNDARY LINE ADJUSTMENT NO L 15-0023 RECORDING NO 20150716900001 (BEING A PORTION OF NW QTR SW QTR AND NW QTR SE QTR AND SE QTR SE QTR STR 35-23-04) a Parkway Supercenter �.. w W lew rhooJS7�8t 6 Cdstcd: Dr I t° k a 3 161 � 980h , i4`5 S980th St' S renry St n£,'I Y `' 2nd St le In Christianef school p th w �. 5835 Sagale Park Drive C S:Glacfer f St �rit.11 �'k3 W BrlscDP fR* - l _;� � 5. 190th St - J I; o- S 193rd st _.: I 5 194th St is 4 I y ,03' .. '� s'74•tfi'st. , ' -"'= -. _ _ ._ s 19stii.5t: ---_ PROJECT DESCRIPTION: 1. REPLACE (1) 1.5—TON DUCTLESS SPLIT SYSTEM WITH NEW 1.5 TON DUCTLESS SPLIT SYSTEM INCLUDING ROOFTOP CONDENSING UNIT AND INDOOR AIR HANDLER TO SERVE SERVER ROOM. GENERAL NOTES: 1. SYSTEM DOES NOT HAVE ECONOMIZER PER IMC403.3.1 EXCEPTION 10. 2. INSTALL GFCI OUTLET WITHIN 25' OF CONDENSING UNIT. 3. CONDENSING UNIT TO SIT ON 4X4 PRESSURE TREATED WOOD SLEEPERS. 4. PROVIDE COMMISSIONING REPORT. HVAC Equipment -- • ���®tea : t • t �®� V E PERMIT ED FOR: ecUkal [� Plumbing Gas Piping City of Tukv.Na BUILDING DMSION Mechanical Summary ' MECH-SUMI 2015 Washi i on Stele Errer Cotle Com (lance Forms for CommercAal Buiidin inUutli R2 d R3 over 3 atodes end ell Ri Revised Jamery 2017 Project Information Project Title: Industrial Revolution Applicant /,formation. provide cooled Information rorindividual who can respond to inqurnas about compliance form information provkled. Data 1/1/2015 For Building Dept. Use Company Name: COMFORT MECHANICAL Company Address: 3202 C ST HE AUBURN, WA 98002 Applicant Name: JESSE CHUTICH Applicant Phone: 425 251 9840 Project Description Bdefiydesarfbe mechenkel systems in the text box provided ❑Total Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2, MECH-SUM, MECH-CHIC and C407 EnagyAnelysk forms required. ❑New Building ❑Building Addition ❑Tenant improvement (]System Retrofit ❑No System Changes Replace (1) ductless split system vdlh new like system. Design Load Calculations ❑ Load calculation summary ❑ MECH-LOAD-CALC Form Provide design load calculations for as mechanical systems and equipment serving the building heeling, cling or ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable compliance Information then the MECH-LOAD-CALC mom is not required. Mechanical Schedules 2 Mechanical Plans ❑ MECH.EQ Forma (TBD) Indicate location of equipment compliance infom effort. "provided on plans then MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ tables. Dedicated Outdoor Air System Requirements and High Efficiency VAV Alternate ❑ DOAS is required per C403.6 effective July 1. 2017 (office. retail, education, Ili and fire station occupancies) All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation afrin a manner that does nct require space aondllioning fen operation. Space conditioning fens cycled o"when no healing or coaling is required. ❑ Ventilation provided vie natural ventilation per 2015 IMC in Ileu of DOAS (C403.6, Exception 1) ❑ Ventilation and space conditioning provided by a Hi system per C403.7 in lieu of DOAS (C403.6, Exception ❑ DOAS included in project although not required (occupancy not office, retail, education, library or fire station) ❑ DOAS related allowances Included in project: ❑ Prescriptive vertical fenestration maximum area allavance increased to 40% per C402.4.1 4 vith 100%of conditioned floor area In building served by DOAS. ❑ Exception to air economizer per C403.3 Exception 1, Include MECH-ECONO form. Fan Power Q Project. includes HVAC air distribution systems that provide hearing end/or coolimg "yes, provide a MECH-FANSYS SUM mom. ❑ For one or more systems, the total fan motor nameplate hind ell fans in HVAC system exceeds Shp. if yes, provide a seperato MECH-FANSYS A m, foresch HVAC system exceed og the 5 horsepowerthreshold. Referfo Section C403.2.11 and MECH-FANSYS-DOC formquiremenls antl exceptions. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Water -loop heat pump Q No hydronic systems ❑ Hydronic heating water ❑ Geomermel C406 Additional Efficiencyselec Options - Mechanical ❑ C406.2 More efficient HVAC equipment and fan systems Requires 90% ofhealing and coding capacity to be equipment listed In tables C403.2.3(1)-(9) or air-lo-weterheat pumps and heat recovery chillers. All equipment listed in tables C403.2.3(i)-(7) must be 15%mom efficient than minimum requirements. All standalone supply, return, and exhaust fans over fill, must have FEQ a 71 and must be eel within 10% ofinez mum foisl or static pressue. ❑ C406.6 Dedicated outdoor air system (DOHS) Requires 00% of conditioned floorerea to be served by a DOAS per C403.6 that delivere requvatl venttieflon afrin a manner that does not require specs conditioning fan operation. ❑ C408.7 Reduced energy in service water heating Requires 90% of boor eme be in occupancy types listed in 0406.7.1 and that 60%of annual hot walerenergy, use be provided by heat pump, waste heat mco-yor so armtenheeting systems.