Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M19-0185 - FATIGUE TECHNOLOGIES - SUPPLY & RETURN DIFFUSERS REPLACEMENT AND EXTEND EXHAUST DUCT
FATIGUE TECHNOLOGIES 401 ANDOVER PARK E APN: 0223400050 EXPIRED 05/25/2021 M19-0185 Parcel No: Address: �~^� � Tukwila ^U e~�~�����n o��x����oa Deportment of Community Development 6300 SmuthoenterBoulevard, Suite #100 Tukwila, Washington 9A188 Phone: 206'431'3670 Inspection Request Line: 206'438'9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0I23400050 Permit Number: W419-0185 Project Name: FATIGUE TECHNOLOGIES Issue Date: 11/26/2019 Permit Expires On: 5/24/2020 Owner: Name-, Address: Contact Person: Address: 33S3O1ST VVAS#1U2'FEDERAL WAY, WA, 98003 Contractor: Name: DBGENERAL CONTRACTORS INC Address: 1DD267ZNDAVE S,KENT,WA, 98O3Z License No: DBGENG{94309 Lender: Name: ''' Phone: (263)945-8204 Phone: (253)736-2980 Expiration Date: 10/9/2020 DESCRIPTION OFWORK: REPLACE THE SUPPLY & RETURN DIFFUSERS WITH NEW. EXTEND EXISTING EXHUST DUCT OVER TO THE ,W|[ROVVAVEl Valuation of Work: $2,70D.00 Type ofWork: REPLACEMENT Fuel type: ELECT Fees Collected: $24S.69 Electrical Service Provided by: PUGETSOUND ENERGY Water District: TUKVV|LA Sewer District: TUKVV|LA Current Codes adopted bythe City oJTukwila: international Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: as Code: Permit Center Authorized Signature: National Electrical Code: VVACities Electrical Code: VVACZ96-468: WA State Energy Code: Da 2017 2017 2017 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of thispe state orlocal laws re development per Signature: ~7 Print Name: / es not j resume to give authority to violate or cancel the provisions of any other onstr ction or the performance of work. I am authorized to sign and obtain this he conditions attached to this permit. Date: 1,�"m/v�_��~�� This penni�fshall become null and void ifthe work isnot commenced within 18Odays for the date ofissuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City ofTukwila Building Department (2U6-43l'367O). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OFPERMIT: The issuance orgranting ofapermit shall not beconstrued tnbeapermit for, oran approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances ofthe City ofTukwila shall not bevalid. The issuance ofapermit based onconstruction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: `MECHANICAL PERMIT CONDITIONS' 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (ZU6/431-367O). lO: Manufacturers installation instructions shall be available on the job site at the time ofinspection. PERMIT INSPECTIONS REQUIRED 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUK1IC1 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov iechanical Permit No. Project No. Date Application Accepted: Date Application Expires: 11-7-4 (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Jo' 7".Z _TN Site Address: King Co Assessor's Tax No.: 4/0 b o VeC POr4 E Tenant Name: PTZ TA JS'fr; e S PROPERTY OWNER Name: ,a-4) •D 0 Cre e .5 Address: ,ro 1 Av 64 et,— ?Ark, 4E City: rState: a )6A, Wit- ziP•fefi el CONTACT PERSON — person receiving all project communication Name: .11../fit4 es b4i4 e ____________ Address:I 5.s.....5,0 / City: A State: Zip: recrsvg Phone: Email: I) kt e Suite Number: Floor: New Tenant: D Yes ir.. No MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ gi 7b O. Describe the scope of work in detail: 14t 7e Supp e.d.J A/ e Lk're.t. f1e4°51 r., T ehir . 4 . . Use: Residential: New 0 Replacement El . • • ,. • , ..,- - -. - . ** Commercial: New• 0 Replacement El • , . . , Fuel Type: Electric...!..0 -. • Gag —.....0 • Other: ' • ! HAApplicationaorms-Applications On Linel2016 Applications \Mechanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator - domestic Incinerator- comm/industrial . , Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment . : • • • • •• •A. IA n • Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 htu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu , .... ' r ' -* —• - . • 1*, ,... Noise: .,„•.“. .. .4 • ._ : \- . Mechanical units need to be in compliance with the Tukwila Noise Code. Maxirhum pe,rmissible.sound levels are based•on from where the sound is created and where the sound is heard. Additionally, if sound can be heard from within i hotisj it‘niglit in 'a l'esidentiAl zbne it may not be allowed. For more details, see TMC 8.22 District of Sound Producing Source District of Receiving Property Residential, Daytime* Residential, Nighttime Commercial Industrial Residential 55 dB(A) 45 dB(A) • 57 dB(A) . 60413(A) Commercial 57 dB(A) 47 d(A) 60 C713(A) 65 dB(4) Industrial 60 dB(A) 50. dKA) ' ' .65 di3(A). . - " 701:1B(A) • . *Daytime means 7AM-10PM, Monday through Friday and 8AM-10PM, SAurday, Sun dy•and State-recogniz d.tto dais. • A few sounds are exempt from the noise code, including: • Warning devices; • Construction and property maintenance during the daytime hours (7am-10pm); • Testing of backup generators during the day. • *I • • • • • „ V , . • . * PERMIT APPLICATION NOTES - 44 ••• y 7 • .,,t• • .• ‘'• ••• Value of construction - in all cases, a value of construction amount should be entered by tlie applicant. This figure will be reviewed and is subject 6 7, '7% • ••• • . • •. . • • to possible revision by the permit center to comply with current fee schedules. '‘ el • . Expiration of plan review - applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additionaLberiods,not to•e4ceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (currenledition). . 7.; •, ' • ). • • I HEREBY CEItTIFY THAT 1-HAVE READ AD:EXAMINED Tait APPLICATION AND:KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAW OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY POR THJS11VRMIT. . BUILDING 0 .ii(i IZED AGEN Signature: Date: //... 6— /7 Print Na e: -1-4 44 e •-‹ -D4411 eA/ Day Telephone: 2s3 -993--,Ce904/ Mailing Address: SS.S.....rd /aay City , State Zip "11114!,• , 1 • •, * 1-1AApplicalionsIlorms-Applications On Line\2016 A-pplicatiorsAhlochanical Permit Application Revised 1-4-16.docx Revised: January 2016 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY I PAID $245.69 M19-0185 Address: 401 ANDOVER PARK E Apn: 0223400050 $245.69 Credit Card Fee $7.16 Credit Card Fee R000.369.908.00.00 0.00 $7.16 MECHANICAL $229.36 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PERMIT FEE R000.322.100.00.00 0.00 $150.34 PLAN CHECK FEE R000.322.102.00.00 0.00 $45.87 TECHNOLOGY FEE $9,17 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R19028 R000.322.900.04.00 0.00 $9.17 $245,69 Date Paid: Thursday, November 07, 2019 Paid By: JAMES DAHLEN Pay Method: CREDIT CARD 095907 Drintnri. Tho ircrinu NInticamhar n7 7n1Q 1 .11.7 PM 1 nf 1 'WULF 0TUKWLAETRAKIT 6200 SOUTH[ENTER BLVD TUKWILA' WA 98188 286'433'1870 CITY OF TUKWILA Date: 11/07/2019 81;46;52 PM [nEozT CARD SALE VISA CARD NUMBER: **********I010 K TRAN AMOUNT: $245.69 APPROVAL [D: 095907 RECORD #: 000 CLERK ID: Bill Thank you! Customer Copy INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY' OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pro' it: m Type of Inspection: Address. Date Called: Special Instructions: . _ Date Wanted: a.rn. p.m. Requester: Phone No: 7 Approved per applicable codes. COMMENTS: Corrections required prior to approval. Inspector: Date: —1 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must 6e paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. tu-16ERMIT WORD COPY C) PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M19-0185 DATE: 11/07/19 PROJECT NAME: FATIGUE TECHNOLOGIES SITE ADDRESS: 401 ANDOVER PARK E X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: k) Pc* t\\\, uiding Division Public Works Fire Prevention Structural Planning Division Permit Coordinator 1111 PRELIMINARY REVIEW: Not Applicable (110 approval/review required) DATE: 11/12/19 Structural Review Required REVIEWER'S NITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 12/10/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire Ping LJ PW Ej Staff Initials: 12/18/2013 %tee Pq. or7 CI Labor & industnes (https://ini.wa,qov) Contractors DB GENERAL CONTRACTORS INC Owner or tradesperson Principals BEDNARIK, DEWAINE, PRESIDENT Doing business as DB GENERAL CONTRACTORS INC 18026 72ND AVE $ KENT, WA 98032 253-736-2980 KING County WA UBI No, Business type 602 650 709 Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active Meets current requirements. License specialties GENERAL License no. DBGENGC943O9 Effective — expiration 09/29/2006-- 10/09/2020 Bond DEVELOPERS SURETY & INDEM CO Bond account no. 743855C $12,000.00 Received by L&I Effective date 09/29/2008 09/281'2006 Expiration date Until Canceled Insurance Union Insurance Company $1,000,000.00 Policy no. CPA 6036748 - 22 Received by L&I Effective date 09/25/2019 09/28/2019 Expiration dale 09/2812020 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice Training Agent PROJECT NOTES TYPICAL ABBREVIATIONS LAND USE SUMMARY PROJECT CODE SUMMARY SITE PLAN DRAWING INDEX 0SEPARATEERMITOR:Me_ cicalIt ingipingwilaVISION MAY 25 2021 Mill- r • • • © • • 1 •111 1 31 1 •• .t� ,t I R7A ; 1 101 1 FTI BREAK ROOM OWNER CONTRACTOR DB GENERAL CONTRACTORS 18026 72ND AVE S. KENT, WA 98032 P, 253,736.2980 CONTACT: JAKE HATFIELD JAKE@DB-GC.COM ARCHITECT URBANAOD A R C H I T E C T S 1936 FIRST AVENUE SOUTH SEATTLE, WA 98134 P 206 274 8020 CONTACT: JIM BROWN JBROWN@URBANADD.COM ELECT -�@ APPROVED - NOV 2 City Of Tukwila I PROJ DIVISION 100% CONSTRUCTION DOCUMENTS SEPTEMBER 6,2019 ISSUE # I ADD. REVISION DATE ' 1 PERma CENTER SHEET GENERAL INFORMATION Al mO 3 O O DEMO ALL CASEWORK & HOT WATER HEATER CLOSET DEOM ACT CEILING CONFIRM IF SOFFIT IS O i r �A t V 1 `V 51'-111/4' r CEILING AND LIGHTING TO BE DEMO'D (Av0,fyl �, aoo cFN� � XiStiny �Xlt-tSj D N 2 DEMO PLAN va=r-p CD 64' - 9" 52' -4' V.I.F. 4._0. UPPER AND LOWER CASEWORK 6'•0" 14'-0' 4'-0" CUR AVANIT"BOX" i HWH pft< 2 �pNnl<G r A %rNln ve ���f udK AKl.x ^� 1 A3.1 3 1 ( I S L') /v OFFIT ABOVE SOFFIT ABOVE 47G) S r S ! /N Z4 I l CA)3,,rJf _ CONFERENCE ROOM 2 1 BREAK ROOM SEE 11A2.1 FOR � O O O 10'`0 A3A FURNITURE PLAN -fil 2 300 c�/'� 5 6 A3.1 �s�vll �a0�o �F/0" DEMO NOTES 1. THE ARCHITECT HAS NO KNOWLEDGE OF AND SHALL NOT BE HELD LIABLE FOR ANY ASBESTOS OR OTHER HAZARDOUS MATERIALS ON THE JOBSITE. IF ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE DISCOVERED DURING CONSTRUCTION, ISOLATE THE AFFECTED AREA AND CONTACTTHE OWNER FOR FURTHER INSTRUCTIONS BEFORE PROCEEDING. 2. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS PERTAINING TO SAFETY OF PERSONS, PROPERTY AND ENVIRONMENTAL PROTECTION. 3. PROVIDE AND MAINTAIN BARRICADES, LIGHTING AND GUARDRAILS AS REQUIRED BY APPLICABLE CODES AND REGULATIONS TO PROTECT BUILDING OCCUPANTS AND WORKERS. 4. CEASE OPERATIONS AND NOTIFY THE OWNER IMMEDIATELY IF SAFETY OF STRUCTURE APPEARS TO BE ENDANGERED. DO NOT RESUME OPERATIONS UNTIL SAFETY IS RESTORED. S. PROTECT THE EXISTING BUILDING AND SURROUNDING AREA FROM DAMAGE DURING THE COURSE OF DEMOLITION AND CONSTRUCTION. CONTRACTOR ASSUMES RESPONSIBILITY FOR IMMEDIATE RESTORATION, REPAIR, OR REPLACEMENT IF DAMAGES OCCUR. 6. IF DEMOLITION IS PERFORMED IN EXCESS OF THAT REQUIRED, THE CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF AFFECTED AREAS AT NO COST TO THE OWNER. 7. ERECT AND MAINTAIN DUSTPROOF PARTITIONS AS REQUIRED TO PREVENT THE SPREAD OF DUST, FUMES AND SMOKE, ETC. TO OTHER PARTS OF THE BUILDING. ON COMPLETION, REMOVE PARTITIONS AND REPAIR ANY DAMAGED SURFACES TO MATCH ADJACENT SURFACES. 8. TAKE ADEQUATE PRECAUTIONS TO SECURE THE PREMISES AND ALL STORED MATERIALS FROM TRESPASSING, THEFT, AND VANDALISM. 9. PREVENT MOVEMENT OR SETTLEMENT OF STRUCTURE(S) TO THE MAXIMUM EXTENT FEASIBLE. PROVIDE AND PLACE BRACING OR SHORING AS NECESSARY FOR SAFETY AND SUPPORT OF THE STRUCTURE. LIABILITY FOR MOVEMENT, SETTLEMENT, DAMAGE OR INJURY DUE TO CONSTRUCTION ACTIVITY IS ASSUMED BY THE CONTRACTOR. 10. INSPECT EXISTING CONDITIONS PRIOR TO DEMOLITION AND DETERMINE IF ANY REFRIGERANT LINES, OIL, GAS, OR OTHER HAZARDOUS MATERIALS ARE PRESENT THAT REQUIRE SPECIFIC REMOVAL OR DISPOSAL METHODS TO COMPLY WITH ALL APPLICABLE ENVIRONMENTAL AND SAFETY REGULATIONS. 11. ARRANGE DISCONNECTION, REMOVAL, AND CAPPING OF ANY UTILITY SERVICES AS NECESSARY. NOTIFY THE OWNER AND AFFECTED UTILITY COMPANY IN ADVANCE AND OBTAIN APPROVAL PRIOR TO BEGINNING WORK. 12. PLACE MARKERS INDICATING THE LOCATION OF DISCONNECTED SERVICES AND VERIFY ALL SERVICE LINES AND CAPPING LOCATIONS ON PROJECT RECORD DOCUMENTS. 13. REMOVE EXISTING FINISHES AND PREPARE SURFACES FOR REPLACEMENT FINISHES WHERE NEW MATERIALS ARE SCHEDULED OR REMOVAL IS REQUIRED TO MAINTAIN UNIFORM SURFACE DIMENSIONS U.O.N. 14. DEMOLISH OR REMOVE EXISTING BUILDING ELEMENTS AS NECESSARY TO ACCOMMODATE NEW LAYOUT, INCLUDING PARTITIONS, EQUIPMENT, AND FIXTURES U.O.N. WHERE THE PROPOSED LAYOUT CONFLICTS WITH ELEMENTS NOT DESIGNATED FOR REMOVAL, VERIFY DEMOLITION REQUIREMENTS WITH ARCHITECT PRIOR TO PROCEEDING. 15. REMOVE ANY ABANDONED OR UNUSED ELECTRICAL, MECHANICAL, AND PLUMBING SYSTEM COMPONENTS TO THE MAXIMUM EXTENT POSSIBLE EXCEPT WHERE SUCH REMOVAL WOULD REQUIRE DAMAGING OR DEMOLISHING OTHER BUILDING ELEMENTS NOT DESIGNATED FOR REMOVAL U.O.N. CAP, SEAL, AND/OR PROVIDE PROTECTIVE TERMINATIONS AT THE EXTENTS OF ALL REMOVED COMPONENTS IN ACCORDANCE WITH CODE REQUIREMENTS. 16. MAINTAIN POSSESSION OF ANY SALVAGE MATERIALS BEING REMOVED FROM THE WORK AREA AND VERIFY INTENDED USE WITH OWNER AND ARCHITECT U.O.N. LEGALLY DISPOSE OF REFUSE, DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. 17. BURNING OF MATERIALS ON SITE IS PROHIBITED, 18. A WASTE DIVERSION REPORT IS REQUIRED BY SEATTLE PUBLIC UTILITIES FOR ALL PROJECTS EXCEEDING 750 SF OR $75,000 AND SHALL BE SUBMITTED BYTHE CONTRACTOR FOLLOWING COMPLETION OF CONSTRUCTION. MAINTAIN RECORDS AS REQUIRED FOR REPORTING. REFER TO THE SPU WEBSITE FOR DISPOSAL, HAULING, RECYCLING, AND WASTE DIVERSION REQUIREMENTS. REMOVE TOOLS AND EQUIPMENT FROM SITE UPON COMPLETION OF WORK. LEAVE CONTRACT AREAS AND SITE CLEAN, ORDERLY AND ACCEPTABLE FOR NEW CONSTRUCTION LEGEND ® EXISTING WALL O NEW WALL FTI BREAK ROOM OWNER FTI INDUSTRIES 401 ANDOVER PARK E, TUKWILA, WA 98188 URBANAOO A R C 1 1 T E r T S 1936 FIRST AVENUE SOUTH SEATTLE, WA 98134 P 206 274 8020 CONTACT: JIM BROWN JBROWN@URBANADD.COM STRUCTURAL ENGINEER M+P ENGINEER ELECTRICAL ENGINEER PROJECTINFO REVIEWEp FOR CODE COMPLIANCE APPROVED PEON 2 5 2019 100% City of Tukwila CONSTRU !/1NIM S SEPTEMBER 6,2019 ISSUE # ADD. REVISION DATE 1 1 Revision 1 8/29/2019 nFICEIVEn CITY OFTURWILA N DEMO PLAN /FLOOR PLAN t BREAK ROOM A2mO CONFERENCE - NORTH PAINT CEILING & STRUCTURE PNT-3 CONFERENCE -WEST 'r=,'a �1BREAK ROOM - SOUTH CEILING A .,...,111 .._.....-_. _.._ , TURE PI EL CHAN �1 CONFERENCE- EAST V2 1- i1 CONFERENCE -SOUTH '_ , 0 0'` GYM EXHUAST-FAM- UPPER CABINET MICROWAVE i1 UPEER CABINET & EXHAUST FAN FTI BREAK ROOM OWNER FTI INDUSTRIES 401 ANDOVER PARK E, TUKWILA, WA 98188 CONTACT: JAKE HATFIELD JAKE@DB-GC.COM ARCHITECT URBANAOO A R C H I T E C T S 1936 FIRST AVENUE SOUTH SEATTLE, WA 98134 P 206 274 8020 CONTACT: JIM BROWN JBROWN@URBANADD.COM STRUCTURAL ENGINEER M+P ENGINEER ELECTRICAL ENGINEER PROJECTINFO A301