Loading...
HomeMy WebLinkAboutPermit PG19-0191 - RYDER TUKWILA - REPLACE WATER HEATER, NEW PLUMBING FIXTURES, GAS PIPING CONNECTIONRYDER TUKWILA 17850 WEST VALLEY HWY Apn: 3623049062 FINALED 07/21/2021 PGI 9-0191 CITY OF TUK Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Plumbing/Gas Permit No. P9iq ---08 Project No. Date Application Accepted: Date Application Expires: PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted For plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: King Co Assessor's Tax No.: 88 17850 West Valley Highway, Tukwila, WA Suite Number: 80199 Floor: Tenant Name: Ryder Tukwila New Tenant: [i] Yes ..No PROPERTY OWNER Name: Ryder - Tukwila Address: 17850 West Valley Highway City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Chase Nordhoy Address: 311 1st Avenue South City: Seattle State: WA Zip' 98104 Phone: (206) 324-4800 Fax: Email: chase.nordhoy@jacksonmain.com PLUMBING CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of Project (contractor's bid price): $ 40,000 Scope of Work (please provide detailed information): Demolish existing office water heater and plumbing fixtures including toilets, lavatories and showers. Provide new water heater and new plumbing fixtures for office area. Connect new gas piping from existing gas meter to new gas -fired radiant heaters in shop area. Building Use (per Int'l Building Code): V-B Occupancy (per Intl Building Code): Utility Purveyor: Water: B/F-1 Sewer HiiApplicationsiForms-Applications On Linei201 1 Applications \Plumbing Permit Application Revised 8-9-11.docic Revised: August 2011 Page 1 of 2 Indicate type of plumbing fixtures and/o s piping outlets being installed and the quantit:,,Aow: Fixture Type: Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap 3 Sinks 3 Rain water system — per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory 4 Urinal Water heater and/or vent 1 Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet 4 !industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain 2 Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period ■ot to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR THOR ED AGENT: Signature: Print Name: Matt Laase Mailing Address: 311 1st Avenue South Day Telephone: Seattle City Date: 12/13/2019 (206) 324-4800 WA 98104 State Zip naApplications'Forms-Applications On Line'.2011 Applications\ Plumbing Permit Application Revised 8-9-1 I.docx Revised: August 2011 Page 2 of 2 Cash Register Receipt City of Tukwila Receipt Number R19290 DESCRIPTIONS ACCOUNT QUANTITY I PAID $122.75 PermitTRAK PG19-0191 Address: 17850 WEST VALLEY HWY Apn: 3623049062 $122.75 GAS $37.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $37.00 PLUMBING $85.75 PLAN CHECK FEE R000.322.103.00.00 0.00 $85.75 TOTAL FEES PAID BY RECEIPT: R19290 $122.75 Date Paid: Friday, December 13, 2019 Paid By: JACKSON MAIN ARCHITECTURE, P.S Pay Method: CHECK 51509 Printed: Friday, December 13, 2019 12:34 PM 1 of 1 Permit Number: PG19-0191 Applied: 12/13/2019 Issued: 2/18/2021 Status: FINALED Parent Permit: Parent Project: Details: Approved: 12/26/2019 Finaled: 7/21/2021 Description: RYDER TUKWILA Site Address: 17850 WEST VALLEY HWY City, State Zip Code:TUKWILA, WA 98188 Applicant: RYDER TUKWILA Owner: RYDER TRUCK RENTAL INC Contractor: GPH LLC DEMOLISH EXISTING OFFICE WATER HEATER AND PLUMBING FIXTURES INCLUDING TOILETS, LAVATORIES, AND SHOWERS. PROVIDE NEW WATER HEATER AND NEW PLUMBING FIXTURES FOR OFFIC AREA. CONNECT NEW GAS PIPING FROM EXISTING GAS METER TO NEW GAS -FIRED RADIANT HEATERS IN SHOP AREA. SCHEDULED DATE COMPLETED DATE LIST OF INSPECTIONS TYPE INSPECTOR RESULT REMARKS UNDERGROUND Bill Centen Notes: 2/22/2021 AM 2/23/2021 GROUNDWORK Bill Centen APPROVED 425-231-6719 Notes: 3/1/2021 PM 3/2/2021 ROUGH -IN PLUMBING Bill Centen APPROVED 425-231-6719 Notes: 6/8/2021 6/8/2021 _ GAS PIPING FINAL Bill Centen NOT APPROVED Notes: 1, Not ready for on the shop side at this time 6/8/2021 AM 6/8/2021 PLUMBING FINAL Bill Centen NOT APPROVED] 425-231-6719 Notes: 1. install missing (2) seismic straps for new HWT. 2. Missing drain pan under HWT and discharge plumbing into an approved location. 3. Insulate water lines 4. Install ADA restroom signs. 6/25/2021 6/25/2021 BACKFLOW - WATER Eric Pritchard PARTIAL APPROVAL Notes: Inspected two RPBA assemblies: 1-1/2" Watts 009M2QT (existing) on shop water service line - air gap under vent needs to meet minimum 2 x pipe diameter (3"). 2" Watts LF009M2QT (new) on office water service line, installed correctly. Need passing backflow test report from certified BAT prior to final approval. Printed: Thursday, 21 October, 2021 1 of 2 6/28/2021 6/28/2021 ROUGH -IN GAS PIPING Bill Centen APPROVED Notes: 6/28/2021 AM 6/28/2021 GAS PIPING FINAL Bill Centen APPROVED 425-231-6719 Notes: 6/28/2021 AM 6/28/2021 PLUMBING FINAL Bill Centen PARTIAL. APPROVAL 425-231-6719 Notes: 1. Need to address small leak at 3" Copper standpipe inside access opening by vertical stair chase. 6/28/2021 6/28/2021 BACKFLOW - WATEP Eric Pritchard APPROVED Notes: Approved - see notes and attachments under permit D19-0393. 7/21/2021 AM 7/21/2021 PLUMBING FINAL Bill Centen APPROVED 425-231-6719 Notes: Printed: Thursday, 21 October, 2021 2 of 2 #1 PERMIT MORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG19-0191 DATE: 12/13/2019 PROJECT NAME: RYDER TUKWILA SITE ADDRESS: 17850 WEST VALLEY HWY X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: 119$ 414) C Vr-)3 1,1 Building Division II -htwls— Fire Prevention Structural P P Planning Division Permit Coordinator • PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 12/17/19 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved U Approved with Conditions Corrections Required 1. (corrections entered in Reviews) Denied (ie: Zoning Issues DUE DATE: 1/14/2020 Li Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 2/18/2021 GPH LLC CIPLabor & Industries_Ups://Ini.wa g4Yl GPH LLC Owner or trades erson Principals GILBERT, JOSHUA DONALD, PARTNER/MEMBER GILBERT, TIFFANIE DEAN E, PARTNER/MEMBER Doing business as GPH LLC WA UBI No. 604 461 681 5845 OCEANVIEW BLVD NE BREMERTON, WA 98311 360-990-1266 KITSAP County Business type Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active Meets current requirements. License specialties PLUMBING License no. GPHLLL"811ME Effective — expiration 07/05/2019— 07/05/2021 Bond Lexon Ins Co Bond account no. 9825577 $6,000.00 Received by L&I Effective date 07/05/2019 06/28/2019 Expiration date Until Canceled Insurance Ohio Security Ins Co $1,000,000.00 Policy no. BKS60025518 Received by L&I Effective date 05/07/2020 06/28/2019 Expiration date 06/28/2021 Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&l tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Certifications & Endorsements OMWBE Certifications No active certifications exist for this business. Apprentice TraininS Agent No active Washington registered apprentices exist for this business. Washington allows the use of apprentices registered with Oregon or Montana. Contact the Oregon Bureau of Labor & Industries or Montana Department of Labor httos://secure.Ini.wa_aov/verifv/Detail.asox?UBI=604461681 &LIC=GPHLLL*811 ME&SAW= 1/2 PIPING ELEMENTSNALVING DV 114 FM D '4 x QFS QTT QPT/PS 1 QQ I1 T • VB u 0 a -OFCO jWCO ,co OVTR • O 0 • VALVE CHECK VALVE BALANCING VALVE SOLENOID VALVE PRESSURE REDUCING VALVE (PRV) FLOW METER AUTOMATIC FLOW CONTROL VALVE DIRECTION OF FLOW DIRECTION OF PITCH -RISE OR DROP STRAINER STRAINER WITH BLOW OFF VALVE UNION ANCHOR GUIDE FLOW SWITCH TEMPERATURE TRANSMITTER PRESSURE TRANSMITTER OR PRESSURE SWITCH PRESSURE GAUGE THERMOMETER AQUASTAT GAUGE WITH GAUGE COCK & SIPHON (STEAM) GAS PRESSURE REGULATOR TEMPERATURE/PRESSURE TEST PORT BASKET STRAINER STEAM TRAP EXPANSION JOINT VACUUM BREAKER FLEXIBLE CONNECTOR WATER METER GAS METER PUMP BACKFLOW PREVENTION DEVICE (REDUCED ZONE) BACKFLOW PREVENTION DEVICE (DOUBLE CHECK VALVE ASSEMBLY) WATER HAMMER ARRESTER HOSE BIBB ROOF DRAIN FLOOR DRAIN FLOOR SINK CLEAN -OUT (FLOOR) CLEAN -OUT (WALL) CLEAN -OUT PIPE CONTINUES PIPE CAP VENT THRU ROOF TRENCH DRAIN PIPE RISING UP PIPE DROPPING DOWN PIPE CONNECTION PIPE CONNECTION DOWN REFERENCE SYMBOLS ///////// Allk MX.X AHU-XXXI Alk Jil J NEW MECHANICAL WORK EXISTING MECHANICAL WORK EXISTING MECHANICAL WORK TO BE DEMOLISHED ENLARGED PLAN BORDER MATCHLINE SECTION IDENTIFIER DETAIL OR DRAWING IDENTIFIER REVISION CLOUD INDICATES WHERE SECTION APPEARS INDICATES REVISION & NUMBER FLAG NOTE EQUIPMENT IDENTIFIER POINT OF CONNECTION NORTH ARROW MECHANICAL ACCESS PLUMBING LINE DESIGNATION SYMBOLS DOMESTIC COLD WATER (POTABLE) - - DOMESTIC HOT WATER (POTABLE ) DOMESTIC HOT WATER CIRCULATING (POTABLE) IRRIGATION WATER SANITARY WASTE VENT PIPING RL RAIN WATER LEADER ORL OVERFLOW RAIN WATER LEADER GENERAL NOTES: GENERAL: 1. COORDINATE MECHANICAL WORK WITH ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL AND LANDSCAPE WORK SHOWN ON OTHER CONTRACT DOCUMENTS. PROVIDE ADDITIONAL OFFSETS FOR COORDINATED INSTALLATION WHERE REQUIRED. 2. COORDINATE HVAC, PLUMBING AND FIRE PROTECTION WORK PRIOR TO INSTALLATION. DUCTWORK AND EQUIPMENT ACCESS TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE. 3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL". 4. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF DUCTS, PIPES, CONDUITS, SUSPENDED EQUIPMENT, ETC., IN MECHANICAL ROOM ACCESS SPACES. 5. COORDINATE EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE DUCT AND PIPING DIMENSIONS BEFORE FABRICATION. 6. PROVIDE MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION OF MECHANICAL SYSTEMS. 7. LOCATE VALVES, WATER HAMMER ARRESTERS, CLEANOUTS, DAMPERS, CONTROLS AND SIMILAR COMPONENTS SO THAT THEY ARE ACCESSIBLE. PROVIDE ACCESS DOORS FOR MECHANICAL EQUIPMENT INSTALLED BEHIND WALLS, ABOVE INACCESSIBLE CEILINGS AND BELOW FLOORS. COORDINATE ACCESS DOOR LOCATIONS WITH ARCHITECT/ENGINEER. INSTALL TAG ON CEILING GRID FRAME TO INDICATE LOCATION AND TYPE OF EQUIPMENT THAT REQUIRES MAINTENANCE. PROVIDE 16 GA, STEEL, FLUSH TYPE ACCESS DOOR WITH CONCEALED HINGE AND SLOT SCREWDRIVER TYPE CAM LATCH. PROVIDE FACTORY PRIMED IN PAINTED SURFACE AREAS FOR FIELD PAINTING. PROVIDE STAINLESS STEEL FOR ALL OTHER AREAS. PROVIDE UL LISTED AND LABELED DOOR WHERE FIRE -RESISTANCE RATING IS INDICATED ON DRAWINGS. ACCESS DOOR SHALL BE SIZED SO THAT ADJACENT EQUIPMENT IS ACCESSIBLE. PROVIDE ACUDOR, ELMDOR, MILCOR, OR APPROVED. 8. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY THAT ATTACHMENT POINTS ON EQUIPMENT AND STRUCTURE CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS IMPOSED. 9. MAINTAIN INDICATED FIRE AND SMOKE RATING OF WALLS, PARTITIONS, CEILINGS, AND FLOORS AT MECHANICAL PENETRATIONS. SEAL PENETRATIONS WITH FIRESTOP MATERIAL. PROVIDE MATERIAL IN ACCORDANCE WITH ASTM E 814 AND UL 1479 3M OR APPROVED. COMPLY WITH REQUIREMENTS SPECIFIED IN DIVISION 07. 10. REFER TO TYPICAL DETAILS PROVIDED IN THIS DWG SET FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR CONFORMANCE WITH DETAILS. 11. LOCATIONS AND SIZES OF FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER TRADES INVOLVED. INCLUDE IN THE COST OF MECHANICAL WORK, CUTTING, CORING, PATCHING AND PAINTING OF EXISTING WALLS, CEILINGS, FLOORS AND ROOFS AS REQUIRED TO ACCOMMODATE WORK AS INDICATED IN THE MECHANICAL CONTRACT DOCUMENTS, UNLESS SPECIFICALLY SHOWN ON ARCHITECTURAL DRAWINGS. 12. PROVIDE ELASTOMERIC FOAM MATERIAL ON MECHANICAL EQUIPMENT THAT PRESENT A SAFETY HAZARD. PAINT FOAM MATERIAL WHITE. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS. 14. CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS CAUSE BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT. BEFORE SUBSTANTIAL COMPLETION, CLEAN EQUIPMENT, FIXTURES, EXPOSED DUCTS, PIPING AND SIMILAR ITEMS. 15. PROVIDE EQUIPMENT THAT FITS INTO THE SPACE ALLOTTED AND ALLOWS ADEQUATE ACCEPTABLE CLEARANCE FOR INSTALLATION, REPLACEMENT, ENTRY, SERVICING AND MAINTENANCE. COORDINATE WITH OTHER TRADES TO ENSURE NO CONFLICT WITH REQUIRED CLEARANCES. 'CIRCULATING PUMP SCHEDULE TAG SYSTEM LOCATION MANUFACTURER / MODEL SERVED CP-1 DOMESTIC HOT WATER CLOSET 118 BELL & GOSSETT / SERIES 100 HP 1 /12 RPM (RPM) 1725 ELECTRICAL FLA VOLTAGE/PHASE (AMPS) V/0 1.75 I 120/1 NOTES ,NOTES: 1) PROVIDE WITH PROGRAMMABLE TIMER CONTROLS FOR PROGRAMMED SHUTDOWN. EXPANSION TANK SCHEDULE TAG ET-1 SYSTEM SERVED DOMESTIC HOT WATER LOCATION MANUFACTURER/MODEL AMTROL / THERM-X-TROL ST-25V VOLUME ` SYSTEM CONN (GAL) (IN) 10.3 3/4 NOTES 16. PROVIDE OFFSETS IN PIPING WHERE PLUMBING/PIPING WALL IS LOCATED DIRECTLY ABOVE STRUCTURE. OFFSET PIPING INTO CASEWORK OR SHAFT TIGHT TO WALL AND BACK INTO WALL ONCE BELOW STRUCTURE. REFER TO STRUCTURAL DRAWINGS. 17. BUILDING SPACE IS LIMITED. STRONG ATTENTION TO DETAIL AND CARE MUST BE TAKEN WHEN DEVELOPING SHOP DRAWING SO ROUTING IS COORDINATED WITH OTHER DISCIPLINES. 18. MATERIALS WITHIN PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723. 19. MECHANICAL EQUIPMENT, PACKAGED UNITS, CONTROL PANELS, MOTOR STARTER, MOTOR CONTROLLERS, VARIABLE FREQUENCY DRIVES AND SIMILAR EQUIPMENT SHALL CARRY A SHORT CIRCUIT CURRENT RATING (SCCR) EQUAL TO OR GREATER THAN AVAILABLE FAULT CURRENT DELIVERED FROM ELECTRICAL SYSTEM. INCLUDE VISIBLE FACTORY NAMEPLATE FOR SUCH EQUIPMENT INDICATING SCCR OF EQUIPMENT IN ACCORDANCE WITH UL 1995 AND UL 508A. PLUMBING: 1. DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING FIXTURES, PLUMBING FITTINGS AND ALL OTHER APPURTENANCES IN CONTACT WITH DRINKING WATER SHALL BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN SECTION 3874 OF THE SAFE WATER DRINKING ACT. LEAD-FREE SHALL MEAN (A) NOT CONTAINING MORE THAN 0.2 PERCENT LEAD WHEN USED WITH RESPECT TO SOLDER AND FLUX; AND (B) NOT MORE THAN A WEIGHTED AVERAGE OF 0.25 PERCENT LEAD WHEN USED WITH RESPECT TO WETTED SURFACES OF DOMESTIC WATER TUBE, PIPE, FITTINGS, JOINING MATERIALS, SPECIALTIES, PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PLUMBING FITTINGS. 2. PROVIDE WATER HAMMER ARRESTORS IN DOMESTIC WATER PIPING IN ACCORDANCE WITH PDI-WH 201. 3. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH BACKFLOW PREVENTER, WATER PRESSURE REDUCING VALVE, CONTROL VALVE, SOLENOID VALVE AND PUMP. PROVIDE SHUTOFF VALVE ON EACH SIDE OF STRAINER. 4. VALVES, EXPANSION FITTINGS/LOOPS, AND PIPING SPECIALTIES SHALL BE FULL SIZE OF PIPE UNLESS NOTED OTHERWISE. ENERGY CODE: (WASHINGTON STATE ENERGY CODE) 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD EFFICIENCIES LISTED IN THE WASHINGTON STATE ENERGY CODE. 2. PIPING AND DUCT INSULATION: COMPLY WITH THICKNESS AND TYPES LISTED IN THE WASHINGTON STATE ENERGY CODE. 3, DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND LONGITUDINAL SEAMS PER THE WASHINGTON STATE ENERGY CODE. 4. RECORD DRAWINGS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 5. OPERATION AND MAINTENANCE MANUALS: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 6. MAINTENANCE STAFF SYSTEMS OPERATIONAL TRAINING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 7. SYSTEM BALANCING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 8. MECHANICAL SYSTEMS COMMISSIONING: PROVIDE PER THE WASHINGTON STATE ENERGY CODE. 9. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED TO COMPLY WITH THE WASHINGTON STATE ENERGY CODE. CONTRACTOR IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. 10. BUILDING PRESSURE TESTING: COORDINATE PHASING OF BUILDING ENVELOPE LEAKAGE TESTING WITH MECHANICAL SYSTEM SCOPES OF WORK. TEMPORARILY CAP SYSTEMS AS REQUIRED TO FACILITATE LEAKAGE TESTING SCOPE OF WORK. NON-STRUCTURAL MECHANICAL COMPONENTS: 1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2012 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-10. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. ELECTRIC WATER HEATER SCHEDULE TAG LOCATION ( MANUFACTURER/MODEL EWH-1 CLOSET 118 ;-BRADFORD WHITE / E32-50S-3 THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. 2. 2012 IBC 1613.1 SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-10, EXCLUDING CHAPTER 14 AND APPENDIX 11A. 3. 2012 IBC 1705.11 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS. 4. HANGERS AND SEISMIC BRACING FOR THE MECHANICAL SYSTEMS SHALL BE DESIGNED AND PROVIDED BY THE MECHANICAL CONTRACTOR. REFER TO CONTRACTOR SHOP DRAWINGS FOR LOCATIONS OF EQUIPMENT AND HUNG MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN LOADS FOR HUNG MECHANICAL SYSTEMS WITH THE GENERAL CONTRACTOR AND OTHER TRADES THAT MAY BE IMPACTED. EXISTING MECHANICAL: 1. WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. 2. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 3. WHERE INDICATED, DUCTWORK AND PIPING OR PORTIONS OF DUCTWORK AND PIPING SHALL BE REUSED. REFER TO DRAWING PLANS FOR POINTS OF CONNECTIONS. 4. PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL SYSTEMS WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GENERAL CONTRACTOR AND PROVIDE ALL NECESSARY PIPE, DUCT AND EQUIPMENT SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS FOR THE DURATION OF THE WORK. DEMOLITION: 1. TAKE CAUTION IN DEMOLITION OF MECHANICAL EQUIPMENT. 2. CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ALL PIPING, DUCTWORK, AND EQUIPMENT INDICATED ON DRAWINGS INCLUDING ALL ASSOCIATED INSULATION, HANGERS, VALVES, PLENUM WALLS, DAMPERS, WIREMOLD, WIRING, CONTROLS, AND APPURTENANCES ASSOCIATED WITH EACH PIECE OF EQUIPMENT. 3. EXISTING CONTROL PATHWAYS MAY BE RE -USED. COORDINATE CONTROLS DEMO WORK PRIOR TO DEMOLITION. REMOVE ALL EXISTING THERMOSTATS SHOWN ON THE DRAWINGS ALONG WITH ASSOCIATED WIRING AND RACEWAYS. 4. WHERE EXISTING ITEMS PENETRATE A WALL OR ROOF, CONTRACTOR SHALL PROVIDE INFILL AT (E) PENETRATIONS THROUGH WALL/ROOF WITH LIKE MATERIALS. PATCH & REPAIR TO MATCH SURROUNDING SURFACES INCLUDING PAINT, CAPACITY RECOVERY AT 60°F (GAL) (GPH) 50 84 5. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT OF EXISTING MECHANICAL EQUIPMENT WHERE REQUIRED BY DEMOLITION OR ALTERATION OF EXISTING STRUCTURE DURING CONSTRUCTION. COORDINATE WITH GC AND PROVIDE NECESSARY SUPPORTS AND HANGERS TO MAINTAIN INTEGRITY, SAFETY AND PROPER OPERATION OF EXISTING MECHANICAL SYSTEMS. 6. THE OWNER HAS THE RIGHT TO RETAIN OWNERSHIP OF ANY MATERIALS BEING REMOVED. DELIVER ITEMS TO THE OWNER'S REPRESENTATIVE AS INDICATED IN THE CONTRACT DOCUMENTS. NOTIFY OWNER IN WRITING AT LEAST 7 DAYS IN ADVANCE OF DEMOLITION. TEMP SETTING (F)__._. 120 CAPACITY (KW) 12 CW HW INLET ; OUTLET (IN) ' (IN) 1-1/4" 1-1/4" ELECTRICAL_ FLA VOLTAGE/PHASE (AMPS) (V,I3) 50 20t/3 PLUMBING SHEET LIST P0.01 PLUMBING LEGEND, SCHEDULES AND NOTES P1.01 PLUMBING DEMOLITION FLOOR PLAN - LEVEL 01 P1.02 PLUMBING DEMOLITION FLOOR PLAN - LEVEL 02 P2.01 PLUMBING FLOOR PLAN - LEVEL 01 P2.02 PLUMBING FLOOR PLAN - LEVEL 02 SEPARATE PERMIT RE Ft IiFOP,: �echanicel iectrical Plumbing (� Sas Piping City of Tukwila BUILDING DIVISION DIMENSIONS OPERATING NOTES (DIAxHT) WEIGHT 11nIN) (LBS.) i 22x47 650 1,2 NOTES: 1) PROVIDE WITH HEAT TRAPS ON SUPPLY AND DISCHARGE LINES. PLUMBING FIXTURE SCHEDU TAG FIXTURE MANUFACTURER / MODEL CONNECTIONS W V CW HW P-1 WATER CLOSET KOHLER / "HIGHLINE CLASSIC" K-3519 4" 2" 2" 2" 2" 2" 1/2" 3/4" 1/2" - - 1/2" P-2 P-3 URINAL KOHLER / "DEXTER" K-5452 LAVATORY KOHLER / "GREENWICH" K-2032 P-4 P-5 SHOWER DELTA MONITOR SERIES 2" 2" 1/2" 1/2" 1/2" 1/2" KITCHEN SINK JUST / SL-ADA-2122-A-GR 2" 2" TP TRAP PRIMER PPP, INC. / P-2 - 1/2" - FD FLOOR DRAIN JAY R. SMITH / 2010 2" 2" - NOTES: 8,9 1,2,3,4,7 1,2 1,2_. 1) REFER TO ARCH. DRAWINGS FOR CLEARANCES AND MOUNTING HEIGHTS. 2) ALL PLUMBING FITTINGS AND FIXTURES SHALL BE LEAD-FREE EXCEPT THOSE EXPLICITLY EXEMPTED IN SECTION 3874 OF THE SAFE WATER DRINKING ACT. 3) PROVIDE WITH AMERICAN STANDARD 4101.350 FAUCET. 4) PROVIDE WITH SLOAN EBF-85 FAUCET, POWERS e480 MIXING VALVE, MCGUIRE 155 GRID DRAIN, CHROME KEYED STOPS AND ACCESSORIES. 5) PROVIDE WITH 12"x12" STAINLESS STEEL ACCESS PANEL. 6) PROVIDE WITH NICKEL BRONZE, SQUARE TOP. 7) PROVIDE WITH CONCEALED ARM CARRIER. 8) PROVIDE WITH URINAL CARRIER. g) PROVIDE WITH SLOAN "ROYAL" 186, 0.125 GPF. n 2, RECEIVED CITY OF TUKWILA. DEC 1 3 2019 PERMIT CENTER ACKSON 1 MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206,324.4800 WWW.JACKSONMAIN.COM METRIX ENGINEERS 123 aara AYE sr, ME 100 425_Z.2.1272 �, w oem� ...J".aiuq,mm RYDER SYSTEMS, INC. T- QULI WX O L- = O3: (j) F- CV Et V'o I..L W 0 >- cc a rn a PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 19039 SM BD SM PLUMBING LEGEND, SCHEDULES & NOTES P0.01 JACKSON I MAIN ARCHITECTURE P.S. ©2015 EXISTING STORAGE EXISTING RENTAL MANAGER EXISTING PARTS ROOM EXISTING FLEX ROOM EXISTING RENTAL LOBBY EXISTING LOCKER ROOM/RR _ EXISTING RESTROOMS EXISTING ELECTRICAL EXISTING SERVICE MANAGER EXISTING WASH BAY AUXILERY EXISTING WASH BAY AUXILERY EXISTING LUBE ROOM EXISTING EXISTING SHOP WASH BAY PLUMBING DEMOLITION FLOOR PLAN - LEVEL 01 1/8" =1'-0" GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. 2. COORDINATE SHUTDOWN OF ANY SYSTEMS WITH OWNER PRIOR TO START OF WORK. FLAG NOTES: DEMOLISH EXISTING PLUMBING FIXTURES IN EXISTING RESTROOMS AND LOCKER ROOMS. CAP ALL EXISTING PIPING FOR FUTURE RECONNECTION TO NEW FIXTURES WHERE POSSIBLE. 2D EXISTING GAS METER TO REMAIN. 13 DEMOLISH EXISTING WATER HEATER. : REMOVE ALL EQUIPMENT IN EXISTING WASHBAY AUXILIARY ROOM AND CAP ALL PIPING FOR FUTURE CONNECTION TO NEW EQUIPMENT. RECEIVED CITY OF TUKWILA DEC 1 3 2019 PERMIT CENTER ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.374 4800 WWW.JACKSONMAIN.COM METRIX ENGINEERS 725 POIIEu w¢ S7. SIM too .]�17Ymi RYDER TUKWILA rnw 5 n. C9 z W co J 00 W O 5 co Lo D PROJECT NO.: 19039 PROJECT MGR.: SM DRAWN BY: BD CHECKED BY: SM PLUMBING DEMOLITION FLOOR PLAN - LEVEL 01 P1.01 JACKSON I MAIN ARCHITECTURE P.S. 2015 II rr 7 1 1 I k-2.---iii---tii---re II EXISTING 1-- II L___ BREAKROOM .1 , \ LILCO__ if r \ ,' EXISTING I , I ELEC./MECH. I I EXISTING I \ I CONFERENCE , ..... ....1 ROOM -I • 'r------- OE Mini OHM 11111r r - -,-- \ I_ / \ EXISTING II, ...... ....1 STORAGE 1 ....,_ OPEN OFFICE - - PLUMBING DEMOLITION FLOOR PLAN - LEVEL 02 :OPEN TO' BELOW 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. 2. COORDINATE SHUTDOWN OF ANY SYSTEMS WITH OWNER PRIOR TO START OF WORK, FLAG NOTES: DEMOLISH EXISTING PLUMBING FIXTURES IN EXISTING BREAKROOM AND RESTROOMS. CAP ALL EXISTING PIPING FOR FUTURE RECONNECTION TO NEW FIXTURES WHERE POSSIBLE. RECEIVED CITY OF TUKWILA DEC 1 3 2019 PERMIT CENTER ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206 324 4800 WWWJACKSONMAIN,COM METRIX ENGINEERS zisr.perat szoi, sum too ...425-33..= RYDER SYSTEMS, INC. RYDER TUKWILA >- w w u_ F- 1- CL 0 C\I 0 r-O LL PROJECT NO.: 19039 PROJECT MGR.: SM DRAWN BY: BD CHECKED BY: SM PLUMBING DEMOLITION FLOOR PLAN - LEVEL 02 P1.02 JACKSON MAIN ARCHITECTURE P.S. 2015 A.1 1/2" HV/ UP 1/2''CW UP 1/2" CW UP STAR 1 114 8.9 CLOSE ARTS ROOM 3/4" CW UP 3/4" HW UP OFFICE 117 1%2"`` UPJ 1/2" UP—J It 2" CW N 1 P-5 STO', x GE. 11 • _. 3/4" CW : W DN 113 (480 MBH) STAIR 2 \-1-1/2" (360 MBH) 19 \_.1-1/4" (120 MBH) �-1" (60 MBH) w\-1"(60MBH) 3/4" CW DN ELECTRIC 120 ::o TRUE NORTH 1-1/4" (240 MBH) \--1-1/4" (120 MBH) � �UH• 1" (60 MBH) w\-1" (60 MBH) PLUMBING FLOOR PLAN - LEVEL 01 1/8" =1'-0" \-1-1/4" (120 MB 1" (60 MBH) 1" (60 MBH) 5.6 1-1/4" (120 MBH) IUH-8I WASH BAY 1" (60 MBH) AUXILIARY 1 107 WASH BAY -AUXILIARY 2 106 LUBE ROOM 104 WASH BAY 105 I UH-8I \-1" (60 MBH) GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. 2. COORDINATE SHUTDOWN OF ANY SYSTEMS WITH OWNER PRIOR TO START OF WORK. FLAG NOTES: EXISTING GAS METER TO REMAIN. TOTAL GAS LOAD = 480 MBH @ 250' EFFECTIVE LENGTH 12 f. PROVIDE NEW ELECTRIC WATER HEATER WITH EXPANSION �" TANK AND CIRCULATING PUMP. r 3��j ROUTE HOT AND COLD WATER PIPING UP TO FIXTURES ON VV'' SECOND FLOOR ABOVE. CONNECT NEW WASTE AND VENT PIPING TO EXISTING. >> PROVIDE NEW HOT AND COLD WATER PIPING TO FIRST FLOOR FIXTURES IN SHOWER AND TOILET ROOMS. CONNECT NEW WASTE AND VENT PIPING TO EXISTING. I� PROVIDE 1/4-TURN VALVE AT 6" ABOVE HEIGHT OF COUNTER FOR COFFEE MACHINE. RECEIVED CITY OF TUKWILA DEC 1 3 2019 ='ERMIT CENTER p/cfo/qf ACKSON I MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206.324.4800 WWW.JACKSONMAIN.COM METRIX ENGINEERS 7,mnon, N57 A. SUITE 100 ...4r�2 RYDER SYSTEMS, INC. RYDER TUKWILA h W LO CO BUILDING PERMIT SE O Z PROJECT NO.: PROJECT MGR.: DRAWN BY: CHECKED BY: 19039 SM BD SM PLUMBING FLOOR PLAN - LEVEL 01 P2.01 JACKSON I MAIN ARCHITECTURE P.S. ©2015 I I TAR1 1..114 OFFICE • - 211 :11 EMPLOYEE BREAKROOM 201 OFFICE 205 ! ' 207 OFFICE 209 FLEX SPACE 213 B C OFFICE 202 FD RESTROOM -4 204 P-3 n tar 14 TP ELECJMECH. 206 • OFFICE 208 - - OFFICE 210 , I CONFERENCE ROOM 212 kft MI/my 4 OPEN TO BEL,W SHOP MEZZANINE 200 PLUMBING FLOOR PLAN - LEVEL 02 1/8" = 1,0" 'OPEN TO BELOW GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. 2. COORDINATE SHUTDOWN OF ANY SYSTEMS WITH OWNER PRIOR TO START OF WORK. FLAG NOTES: [>. HOT AND COLD WATER PIPING FOR ALL SECOND FLOOR FIXTURES TO FED FROM FLOOR BELOW. CONNECT NEW WASTE AND VENT PIPING TO EXISTING. 1:>. PROVIDE 1/4-TURN VALVE AT 6" ABOVE HEIGHT OF COUNTER FOR ICE MAKER. >. PROVIDE 1/4-TURN VALVE AT 6" ABOVE HEIGHT OF COUNTER FOR COFFEE MACHINE. RECEIVED CITY OF TUKWILA DEC 1 3 2019 PERMIT CENTER PG /9 Om ACKSON 1 MAI RCHITECTUR 311 FIRST AVENUE SOUTH SEATTLE, WA 98104 t 206 324 4800 WWWJACKSONMAIN COM 11011ETRDC ENGINEERS ZriAL st"' RYDER SYSTEMS, INC. O ›- L < (1&) u 1.1.1 j x IF- DOLLrf 0 CNI r,- 0 "c1" DESCRIPTION ING PERMIT 9 PROJECT NO.: 19039 PROJECT MGR.: SM DRAWN BY: BD CHECKED BY: SM PLUMBING FLOOR PLAN - LEVEL 02 P2.02 JACKSON MAIN ARCHITECTURE P.S. (0 2015