Loading...
HomeMy WebLinkAbout24-001 - Active Construction - Green River Trail Improvements24-001 Council Approval 12/11/24 Contract C_9 AGREEMENT FORM CONTRACT NO. THIS AGREEMENT is made and entered into on thisloth day of January City of Tukwila, Washington ("Owner") and Active construction, Inc. Now, therefore the parties agree as follows: 24-001 , 202g by and between the ("Contractor"). 1. Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled Green River Trail Improvements, Project No. 91810403, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1- 04.2 of the Supplemental General Requirements. 2. Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 3. Completion Date. Contract time shall commence upon Owner's Notice to Proceed date. The Work under this Agreement shall be completed within the time specified in the Proposal. If the Work under this Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to Owner as specified in the Proposal. 4. Attomey's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees. 5. Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement, except as expressly provided in this Agreement. 6. Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for all purposes be deemed an original. CITY OF TUKWILA, WASHINGTON Active Construction, Inc. (Owner)—DocuSignedby: (Contractor) By: �rrPDs t M4AS it tt4ds' B "-8EE24380545B44C... y: Thomas McLeod, Mayor 1/10/24 Attest: This 10th day of January (..--BocuSiyoed by: Ol '-88678483CB594E7... , 20 24 APPROVED AS TO FORM BY ASSISTANT CITY ATTORNEY 1/10/24. APPROVAL ON FILE. Address for giving notices: 6200 Southcenter Boulevard Tukwila WA 98188 Title: David Ceccanti, President Attest: This 28`"day of Di2C_CNiKiner 20 23 Aman.- G. S:mpso � ne Contractor's License No. AC-TI-VCI-164-JL Address for giving notices: Physical Address: 5110 River Road East, Tacoma, WA 98443 Mffiiing Address: T O tiox 43U, I'uyaflup, vv. 98371 Provided _o Builders Exchange of WA, GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Inc. For usage Conditions Agreement see www.bxwa.cori - Always Verify Scal Contract C-2 PAYMENT AND PERFORMANCE BOND Bond to City of Tukwila, Washington Bond No. 023229710 We, Active Construction, Inc. , and Liberty Mutual Insurance Company , (Principal) (Surety) a Massachusetts corporation, and as a surety corporation authorized to become a surety upon Bonds of Contractors with municipal corporations in Washington State, are jointly and severally bound to the City of Tukwila, Washington ("Owner"), in the penal sum of One Million, Twenty Thousand, Twenty and No/100 Dollars ($ 1,020,020.00 ), the payment of which sum, on demand, we bind ourselves and our successors, heirs, administrators, executors, or personal representatives, as the case may be. This Payment and Performance Bond is provided to secure the performance of Principal in connection with a contract dated , 20_ , between Principal and Owner for a project entitled Green River Trail Improvements, Contract No. 91810403 ("Contract"). The initial penal sum shall equal 100% of the Total Bid Price, including sales tax, as specified in the Proposal submitted by Principal. NOW, THEREFORE, this Payment and Performance Bond shall be satisfied and released only upon the condition that Principal: • Faithfully performs all provisions of the Contract and changes authorized by Owner in the manner and within the time specified as may be extended under the Contract; • Pays all laborers, mechanics, subcontractors, lower tier subcontractors, material men, and all other persons or agents who supply labor, equipment, or materials to the Project; • Indemnifies and holds Owner, its officers, and agents harmless from and against all claims, liabilities, causes of action, damages, and costs for such payments for labor, equipment, and materials by satisfying all claims and demands incurred under the Contract, and reimbursing and paying Owner all expenses that Owner may incur in making good any default by Principal; and • Indemnifies and holds Owner harmless from all claims, liabilities, causes of action, damages and costs, including property damages and personal injuries, resulting from any defect appearing or developing in the material provided or workmanship performed under the Contract. The indemnities to Owner shall also inure to the benefit of the Consulting Engineers and other design professionals retained by Owner in connection with the Project. The liability of Surety shall be limited to the penal sum of this Payment and Performance Bond. No change, extension of time, alteration, or addition to the terms of the Contract or to the Work to be performed under the Contract shall in any way affect Surety's obligation on the Payment and Performance Bond. Surety hereby waives notice of any change, extension of time, alteration, or addition to the terms of the Contract or the Work, with the exception that Surety shall be notified if the Contract time is extended by more than twenty percent (20%). If any modification or change increases the total amount to be paid under the Contract, Surety's obligation under this Payment and Performance Bond shall automatically increase in a like amount. Any such increase shall not exceed twenty-five percent (25%) of the original amount of the Payment and Performance Bond without the prior written consent of Surety. GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Contract C-3 This Payment and Performance Bond shall be governed and construed by the laws of the State of Washington, and venue shall be in King County, Washington. IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical counterparts this 26th day of December , 20 23. Active Construction, Inc. Liberty Principal Signature of Authorized Official b&vid f^ecccyv4-i -Vrestd��ni Title ual Insurance Company Surety Signature of Authorized Official By Holli Albers, Attorney -in -Fact .. Attorney in Fact (Attach Power of Attorney) Name and address of local office of Propel Insurance agent and/or Surety Company: 1201 Pacific Avenue, Suite 1000 Tacoma, WA 98402 Surety companies executing bonds must appear on the current Authorized Insurance List in the State of Washington per Section 1-02.7 of the Standard Specifications. GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Liberty Mutual., SURETY This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies'), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Aliceon A. Keltner, Alyssa J. Lopez, Amber Lynn Reese, Amelia G. Burrill, Andrew James Carretto, Annelies M. Richie, Audrey M. Turner, Brandon K. Bush, Brent E. Heilesen, Carley Espiritu, Christopher Amos Hayes, Christopher Kinyon, Cynthia L. Jay, Dana Marie Brinkley, Diane M. Harding, Donald Shanklin, Jr., Edward Sims, Eric A. Zimmerman, Holli Albers, Jacob T. Haddock, James B. Binder, Jamie L. Marques, Julie R. Truitt, Justin Dean Price, Kari Michelle Motley, Katharine J. Snider, Lindsey Elaine Jorgensen, Lois F. Weathers, Michael Mansfield, Misti M. Webb, Sara Sophie Sellin, Sarah Whitaker, Tamara A. Ringeisen all of the city of Tacoma state of WA each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 20th day of July , 2023 Certificate No: 8210464 - 023049 By: Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company David M. Carey, Assistant Secretary State of PENNSYLVANIA County of MONTGOMERY ss On this 20th day of July , 2023 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. Commonwealth of Pennsylvania- Notary Seal Teresa Pastella, Notary Public Montgomery County My commission expires March 28, 2025 Commission number 1126044 Member, Pennsylvania Association of Notaries By: /.l--2 d0)) !/ 2� (le) Teresa Pastella, Notary Public This Power of Attomey is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV -OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 28th day of November , 2023 . By: Renee C. Llewellyn, Assistant Secretary ) 0 .` • c c �- E co U a) Q � aN O >.— CD o < O c, 5 O N Oco `N a Q •a c 6 Uf O Q) ca 0 a) LL n. LMS-12873 LMIC QCIC WAIC Multi Co 02/21 Proposal P-8 Failure to return this Declaration as part of the bid proposal package will make the bid nonresponsive and ineligible for award. NON -COLLUSION DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and to have agreed to the provisions of this declaration. NOTICE TO ALL BIDDERS To report rigging activities call: 1-800-424-9071 The U.S. Department of Transportation (USDOT) operates the above toll -free "hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such activities. The "hotline" is part of USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. SR DOT Form 272.OJGI EF o7r2o11 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Proposal P-9 NON -COLLUSION DECLARATION STATE OF WASHINGTON ) ) ss. COUNTY OF KING ) The undersigned, being first duly sworn, on oath states that the person, firm, association, partnership, joint venture, or corporation named in the Bid Proposal has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the City of Tukwila project named Green River Trail Improvements, Project No. 91810403 T 1G-17O t- PA/4- Name of Firm Signature of Authorized Official -D4140 e,ozzAtriv iPie3S IP rt1 Title Si ned and savor to be• re me on this 1g day of / t/nlmee , 20 �t1 _mit Signature of Notary Public in and for the State of Washington, residing at LSMANWAy 6014 - My appointment expires: I SEAL ;�j�STRljC�. SEAL n.- 4gHIN61..:. To report bid rigging activities call: NOTARY . PUBL\C Z. NOTICE TO ALL BIDDERS'-.,rT� .''' OP . 0 ,:. 1-800-424-9071 The U.S. Department of Transportation (USDOT) operates the above toll -free "hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such activities. The "hotline" is part of USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Proposal P-10 RESPONSIBLE BIDDER DETERMINATION FORM Attach additional sheets as necessary to fully provide the information required. 40.n v 5`71gu ` 77t J /- Name of Bidder: Address of Bidder: City ���� State Zip Cale Contractor's License No. /11 l7I—V/-1'/'k1GWAState UBI No. C2730/33 Dept. of L&I License Bond Registration No. ilt/i36-27o Worker's Comp. Acct. No. -2-49.i93.E—CO Bidder is a(n): 0 Individual 0 Partnership 0 Joint Venture "Incorporated in the state of List business names used by Bidder during the past 10 years if different than above: N/A • Bidder has been in business continuously from lg6.2 L. Year Bank Reference litr aUI ,Viree 17/z/L 2S3 5 ' f / 7 Bank Account Officer Officer's Phone No. No. of regular full-time employees: I KO Number of projects in the past 10 years completed: !/ ahead of schedule 07 on schedule behind schedule Bidder has had experience in work comparable to that required for this Project: As a prime contractor for years. Asa subcontractor for & years. List the supervisory personnel to be employed by the Bidder and available for work on this project (Project Manager, Principal Foreman, Superintendents, and Engineers): Name Title G�i2 CF n77 PM. How Long With Bidder ingiqiutm li?D ��- cG1OLO 5m406-4/N I'll r- 20 IQIGI� Fe7R.ra4 FdPgi If lu 1 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Proposal p_11 Name the Surveyor to be used on this Project, who will directly supervise all surveying activities. Attach a resume outlining the experience and qualifications of the Surveyor. Is the Surveyor licensed in the State of Washington (a PLS)? gj Yes ❑ No Surveyor's Name: List all those projects, of similar nature and size, completed by Bidder within the past 10 years. Include a reference for each. Any attached preprinted project listing must include all this information. Bidder must have at least 10 years experience working on projects of similar nature and size. Year Contract Project Name Completed Amount Owner/Reference Name and Phone List all projects undertaken in the last 10 years which have resulted in partial or final settlement of the Contract by arbitration or litigation in the courts: Total Claims Amount of Contract Arbitrated Settlement Name of Client and Project Amount or Litigated of Claims N/A - Has Bidder, or any representative or partner thereof, ever failed to complete a contract? .No ❑ Yes If yes, give details: Has Bidder ever had any Payment/Performance Bonds called as a result of its work? Xr No ❑ Yes If yes, please state: Project Name N/P Contracting Party Bond Amount GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Proposal P-12 Has Bidder ever been found guilty of violating any State or Federal employment laws? No 0 Yes If yes, give details: Has Bidder ever filed for protection under any provision of the federal bankruptcy laws or state insolvency lawsNo0 Yes If yes, give details: Has any adverse legal judgment been rendered against Bidder in the past 5 years? ›Er -No 0 Yes If yes, give details: Has Bidder or any of its employees filed any claims with Washington State Workman's Compensation or other insurance company for accidents resulting in fatal injury or dismemberment in the past 5 years? t-No 0 Yes If yes, please state: Date Type of Injury Agency Receiving Claim N/A The undersigned warrants under penalty of Perjury that the foregoing information is true and accurate to the best of his/her knowledge. The undersigned authorizes the City of Tukwila to verify all information contained herein. Signature of Bidder Title: i'sl Date: /l/2goA3 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Proposal P-13 PROPOSED EQUIPMENT AND LABOR SCHEDULE (Use additional sheets if required) Equipment to be used: DESCRIPTION/TYPE YEAR CONDITION OWN/RENT i V Labor to be used: tZ/V%D/UJS L/ 5D/eDzS! D 17j/ 14771/E 57VIt 77D _.ivy Name of Bidder Signature of Authorized Official Title GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Liberty Mutual® SURETY This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY Certificate No: 8210464 - 023049 KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Aliceon A. Keltner, Alyssa J. Lopez, Amber Lynn Reese, Amelia G. Bunill, Andrew James Carretto, Annelies M. Richie, Audrey M. Turner, Brandon K. Bush, Brent E. Heilesen. Carley Espiritu, Christopher Amos Hayes, Christopher Kinyon, Cynthia L. Jay, Dana Marie Brinkley, Diane M. Harding, Donald Shanklin, Jr., Edward Sims, Eric A. Zimmerman, Holli Albers, Jacob T. Haddock; James B. Binder, Jamie L. Marques, Julie R. 'Truitt. Justin Dean Price, Kari Michelle Motley, Katharine J. Snider, Lindsey Elaine Jorgensen. Lois F. Weathers, Michael Mansfield, Misti M. Webb. Sara Sophie Sellin, Sarah Whitaker_ Tamara A. Ringeisen all of the city of Tacoma state of WA each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 20th day of July , 2023 State of PENNSYLVANIA County of MONTGOMERY ss On this 20th day of July , 2023 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company By: Commonwealth of Pennsylvania - Notary Seal Teresa Pastella, Notary Public Montgomery County My commission expires March 28, 2925 Commission number 1126044 Member, Pennsylvania Association of Notaries David M. Carey, Assistant Secretary Bye pe_a,4) Ltaft) Teresa Pastella, Notary Public This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV —OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may he necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in - fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is iniull force -arts effect and has not been revoked. - - IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 26th day of December , 2023- LMS-12873 LMIC OCIC WAIC ulti Co 02/21 By: Renee C. Llewellyn, Assistant Secretary 0 U cE o> U w >c Q a0 Q7 � cE O O O Lei C ao 0 CV 00 cCD (0= U Low LL a Proposal P-14 PROPOSED SUBCONJ�RACTORS Name of Bidder 4GT7U/ (�!/N.S7UG7 OA% - In accordance with RCW 39.30.060 as amended, every bid that totals $1 million or more shall include below the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of: HVAC (heating, ventilation, and air conditioning); plumbing as described in chapter 18.106 RCW; and electrical as described in chapter 19.28 RCW, or to name itself for the work. The Bidder shall not list more than one subcontractor for each category of work identified, unless subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. Failure of the Bidder to submit as part of the bid the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the prime contract bidder's bid nonresponsive and, therefore, void. The successful Bidder must have the written permission of the Owner to make any change to this list. Percent of total bid to be performed by Bidder 6:4) Name [1.6- srIwzt Frec 2 ic_ Acz 4 PJI& Metc, 1/E etrOlgoom GL-• Schedule/Bid Item Numbers Subcontractor will perform GrG?72/64z, - 8.1": S"D, 5/ 5712aG Srl�L BRA / U,46 % of Total Bid 4 5 % D GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Federal Aid Contract Provisions and Forms C-14 i �;Washington State / Department of Transportation Disadvantaged Business Enterprise Utilization Certification To be eligible for Award of this Contract the Bidder shall fill out and submit, as a supplement to its sealed Bid Proposal, a Disadvantaged Business Enterprise (DBE) Utilization Certification. The Contracting Agency shall consider as non- responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided For in the proposed Contract. Refer to the Instructions on Page 2 when filling out this form or the Bid may be rejected. An example form has been provided on Page 3. The successful Bidder's DBE Utilization Certification shall be deemed a part of the resulting Contract. Box 1: A -77VE t 713'17214t/77jJ T1VG. certifies that the DBE firms listed below have been contacted regarding participation on this project. If this Bidder is successful on this project and is awarded the Contract, it shall assure that subcontracts or supply agreements are executed with named DBEs. (If necessary, use additional sheets.) Box 2: gN Avg 7 f7/L /(i{e' 01/617101-TS Column 1 Name of DBE (See instructions) Column 2 Project Role (Sea instructions) Column 3 Description of Work (See instructions) Column 4 Dollar Amount Subcontracted to DBE (Sec instructions) Column 5 Dollar Amount to be Applied Towards Goal (See instrudwns) 6-el N ets C rdR.i, Goy ��-e CP�ci- ,,fr-93, �95 �.�93 Disadvantaged Business Enterprise b 7v'J0 Condition of Award Contract Goal Box 3 Total DBE Commitment Dollar Amount lDa/3, t7QO Box 4 5 ❑ By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DBE participation to meet the COA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with Section 1-02.9 of the Contract DOT Form 272-056 Revised 03'2016 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Federal Aid Contract Provisions and Forms C-22 Local Agency Name 774eN1114 Local Agency Address b ZDD 5ornmgm OL WJL lgb/g$ Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended To Be Submitted with the Bid Proposal Project Name G J Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating. ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being nonresponsive and therefore void. Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (it) be performed by a lower tier subcontractor who will not contract directly with the bidder. Subcontractor Name Work to be performed Subcontractor Name Work 10 be performed Subcontractor Name Work to be performed Subcontractor Name Work to be performed Subcontractor Name Work to be performed Be:I-se-11A2+ C__ .S7uL S��L- -1/E 0-i7tXoom -GGt/Y18/Ny' //o1//7e-ie6- /11ecNfq/J/(dqi 1/144 " Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project. DOT Form 271-015A Reviseo 0612020 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Federal Aid Contract Provisions and Forms C-23 � Washington State Tar Department of Transportation Contractor Certification Wage Law Compliance - Responsibility Criteria Washington State Public Works Contracts FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD I hereby certify, under penalty of perjury under the laws of the State of Washington, on behalf of the firm identified below that, to the best of my knowledge and belief, this firm has NOT been determined by a final and binding citation and notice of assessment issued by the Washington State Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three (3) years prior to the date of the Call for Bids. Bidder Name 14&n vv 57 �7arl. il� Name of Contractor/Bidder - Print full legal entity name of firm By. Signature of authorized person Title: fg11)Y1"� PFIV/ 2 giu- 7 Print Name of person making certifications for firm Place: -774c rnAl G - Title of person signing certificate Print city and state where signed Date Nov. ZS, 2023 Form 272-009 08+2017 GREEN RIVER TRAIL IMPROVEMENTS City of Tukwila October 2023 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal Date of Issue: Bid Submittal Date: Date of Opening: ADDENDUM NO. 1 City of Tukwila Green River Trail Improvements City Project No. 91810403 November 20, 2023 November 28, 2023 9:30 AM November 28, 2023 10:00 AM Notice to All Planholders: This Addendum No. 1, containing the following revisions additions, deletions, and/or clarifications, is hereby made part of the Plans and Contract Provisions (Contract Documents) for the above -named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. PROPOSAL Page P-3 Delete and REPLACE with attached Revised Sheet. See Item Numbers 44 and 45 area for deletion. SPECIAL PROVISIONS Pages SP-39, SP-40-42, SP-73 Delete and REPLACE with attached Revised Sheets. See strike -through text related to Item Numbers 44 and 45 area for deletion. CONTRACT PLANS 1. Sheet Numbers UD 401 — Replace Delete and REPLACE with attached Revised Sheet. See clouded area for revisions. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. All bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the space provided on the Proposal Signature Sheet or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to acknowledge receipt of the Addendum may be considered as an irregularity in the Bid Proposal and the City reserves the right to determine whether the bid will be disqualified. Sincerely, 1—DoeuSlgned by: Mari petAAn.t.%wvui �— 510BE1991 D9C4D9... Hari Ponnekanti, P.E. Director/City Engineer Receipt acknowledged and conditions agreed to this Bidder: Signature day of MY • , 20_� Addendum No. 1 Project No. 91810403 November 20, 2023 Page 1 of 1 Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal cn w 0 0 0_ z_ 0 z 0 w • F w J 0 z U H U O O 0 D 0 d cn O O w r w 0 0 m ma Contract Value $ 2,755,519.00 V D) V co r_ C7 y) $ 1,899,487.74I $ 624,692.85 $ 1,346,423.94 C7 r. N V ry E9 $ 49,000.00I $ 1,085,705.60 $ 568,807.35 (D N O O] 69 Ca) C) C )) o O (A $ 2,454,497.20I (D (n O o EH V N O ac0 N CJ 69 $ 214,275.75I $ 468,940.65 $ 6,560,548.46 $ 419,206.01 (( N M O V M 63 M U) (n m CO- CO Ea O N O 0 (A D) [h 7 (�) C) (n EA I $ 2,069,196.55 I (() aD CO COC) 4) $ 2,732,360.14 I $ 21,454,696.00 $ 2,481,952.96 $ 5,415,690.47 r- 0 a) 0— 0 (H $ 2,116,312.1 a 7 N (0O CI EA $ 2,523,400.00 o O O) 0 O) 0 fA $ 1,747,742.90 $ 265,118.00 $ 1,522,533,93 $ 527,710.56 I d C 0 a-- 0 (360) 438-2639 (360) 753-8484 (360) 426-4232 (360) 438-2639 (360) 753-8484 O C7 O (7 V O0 M 253-853-7618 (253) 798-2728 (253) 798-6165 (253) 365-6730 (360) 753-8484 (253) 851-6170 (253) 922-9315 (360) 753-8568 (253) 798-2725 (253) 922-2489 (425) 452-4170 (206) 440-4699 (253) 573-7879 (253) 798-2725 (360) 570-6761 (253) 798-2725 (360) 528-8022 N C7 N (O V O M (360) 867-2300 O 0 r r O) (D o on 1(360) 753-8721 N (O CO CO V C) N (360) 867-2300 (360) 438-2639 (360) 867-2300 (253) 591-5500 (360) 438-2639 (360) 754-5855 (253) 798-6165 (360) 438-2639 (253) 798-2728 Job Description Owner Owner Rep Mullen Road Extension City of Lacey Roger Schoessel Harrison Avenue Improvements City of Olympia Jim Rioux/Fran Eide Skokomish Alternate Access Road Skokomish Tribe Dave Nichols Westbound Britton Parkway City of Lacey Roger Schoessel Henderson Blvd Sanitary Sewer & Water Main Realignment City of Olympia Jim Rioux Carpenter Road Reconstruction City of Lacey Dale Mix I Cushman Trail Culvert Repair City of Gig Harbor Maureen Whitaker Warren Creek Pierce County Helmut Schmidt Neadham Road Setback Levee Pierce County Ingo Kuchta VIC 1-5 Puyallup River Bridge - Sidewalk Ramps WSDOT Dennis Steinberg 18th Ave Half Street Improvements City of Olympia Jim Rioux 56th St. NW/Pt. Fosdick Dr NW Street Improvements City of Gig Harbor Marcos McGraw 70th Ave. E. Phase 2 City of Fife Ken Gill Capitol Way Overlay Improvements City of Olympia Brett Bures Puyallup River Floodplain Restoration at Fennel Creek Pierce County AI Zehni 62nd Ave E Sidewalk and Sheffield Trail and 20th St E Crosswalk City of Fife Russ Blount West Lake Sammamish Parkway Phase 11-90 Roundabout to SE 34th St City of Bellevue Carl Haslam NB SR 167 to NB 1-405 Major Drainage Repair WSDOT Broch Bender IWilkeson Creek Access Road Puyallup Tribe Andrew Strobel 'Orville Road Engineered Log Jam Setback Revetment Pierce County Al Zehni Mark Carson Larchmont Wetland Reserve Pierce County Al Zehni 'Taxiway C & North Taxiway W Rehab & Terminal Entrance Widening Port of Olympia Bill Helbig Reservation Road Reconstruction Skokomish Tribe Dave Nichols Chehalis Western Trail Phase 3 Thurston County Matt Unzelman Middle Fork Snoqualmie River Road US DOT Craig Sanders (Boulevard Rd & 22nd Ave City of Olympia Rolland Ireland Upper Clear Creek Mitigation Site Port of Tacoma Dave Myers Delphi Road Safety Improvements Thurston County Matt Unzelman 'Chambers Lake Stormwater Treament Facility City of Lacey Roger Schoessel Salmon Creek Bridge L-4 Replacement Thurston County Matt Unzelman 'Tacoma Pedestrian Crossing Improvement City of Tacoma Mark D'Andrea Golf Club Road Extension City of Lacey Roger Schoessel Capitol Blvd - M Street City of Tumwater John Norman Needham Road In -Stream ELJ Mitigation Project Pierce County Ingo Kuchta Willamette Drive NE & 31st Ave Improvements City of Lacey Roger Schoessel Fennel Creek Property Restoration Phase 2 / 1408-124 Pierce County Helmut Schmidt SR7 Muck Cr Trib-Nisq Riv Remove Barrier WSDOT Completion Date 0 NNNNCSINNNNNNNNNIN 0 s- 0 .- 0 N 0 C0 0 M 0 N O N 0 N O (7 0 CO 0 CO 0 C) O 2013 C7 0 C) 0 N 2013 C] O N C7 0 N 2014 V 0 N V' 0 N 0 N 2014 2017 2014 2017 2014 )D O N V) 0 N ' 2016 2015 vl 0 N 4) 0 N ' 2016 2015 a Q 10-001 0 O 110-016 1 9 O 9 - LII 9 CD 9 111-009 I 9 r 112-004 I 9 N 9 N 9 N 9 (NI 9 N 112-024 112-028 113-002 113-010 we- 9 C) cO 9 M 13-017 13-020 13-022 9 01 14-004 4 9 4 4 v. 4 C v 14-019 14-024 15-003 15-004 15-007 15-008 Active Construction, Inc. Confidential Updated: 10/9/2023 U 0) w O 0 0 a z_ 0 z w 1- w J a 2 • O z U 0) CO U O O_ - U ~ o D U O d' w O tY 0DO 05 W U J W O U 0 n ama Contract Value $ 424,259.901 CO c0 to cr (O 0) fA $ 1,963,562.151 $ 1,212,212.00 LO CO O) O V O) O) v) O 0 O (1) (p O (O (D 69 $ 2,167,099.24 $ 434,756.39 $ 3,354,711.99 $ 422,422.00 $ 2,064,974.00 $ 167,072.00 0 0 r- (`') n 0) 0) $ 4,489,832.49 $ 785,785.00 $ 1,706,337.47 $ 11,103,565.00 0 0 co CO CO CO (A 0 0 (O c0 (D (n CO (O 69 $ 1,344,808.89 $ 505,043.93 $ 1,583,397.89 O O (`O N CO N N fR $ 1,418,750.00 O O CO V 6O c0 '7 00 (fl J$ 14,667,509.00 $ 3,336,041.00 $ 1,251,545.00 O O O) n (O O O) 0) $ 3,040,502.00 ro 00 N a0 CO ,- cO ,- CO O O O O O N (D (O Hi $ 2,528,000.00 I O O O O 0 O '? CI N fA $ 576,000.00 O 0 O O O O (fl N 0) $ 2,925,542.81 Phone (253) 922-9315 (360) 867-2300 (425) 413-8800 (360) 337-5777 (360) 754-5855 (253) 798-7250 (360)528-8000 (360) 867-2300 (360) 754-5855 (360) 705-7337 (360) 407-9302 0) co 0)) I- O CO (360) 754-5855 (206) 477-4552 (206) 477-4552 1(253) 798-4233 1(206) 431-2450 (360) 458-8499 [(253)835-2723 (360) 893-2219 (503) 419-2130 1(253) 931-3000 (360) 427-9670 1(253) 798-7250 I(360) 867-2300 (360) 876-4407 (360)753-8721 (253) 798-2725 (360) 754-5855 1(253) 922-9315 1(253) 922-9315 1(425) 452-4367 1(253) 798-4233 (253) 798-2725 I(360) 407-9302 0) 0) v in co 0) (O N Owner Rep —_ C Y Matt Unzelman Kim Scattarella Steve Nichols John Norman Henry Gertje Tyson Carpenter Matt Unzelman John Norman Robert Christopher Doug McCudden John Norman John Norman "O 7 ¢ N C 0 'O 7 a CO C 0 Greg Hess Cindy Knighton Maryanne Zukowski Christine Mullen Bryan Condon - Engineer (Matthew Larson Sarah Grice (Henry Gertje Matt Unzelman (Mike Pleasants C CO N CO O CC AI Zehni 'John Norman - a) Y = 0) Y 'Diane Sheesley CO N N ❑ Greg Hess AI Zehni Doug McCudden Paul Marrinan Owner City of Fife Thurston County City of Maple Valley Kitsap County City of Tumwater Pierce County Port of Olympia Thurston County City of Tumwater WSDOT Dept of Enterprise Services E&AS City of Tumwater City of Tumwater King County King County Pierce County City of Tukwila City of Yelm City of Federal Way City of Orting King County Airport City of Auburn Mason County Pierce County Thurston County City of Port Orchard 'City of Olympia Pierce County City of Tumwater li 0 a City of Fife City of Tacoma City of Bellevue Pierce County Pierce County Dept of Enterprise Services E&AS City of Puyallup Job Description Firwood Condos Stormwater System & Wapato Creek House Removal WARC Access Road 216th Ave SE Roadway Improvements SE 272nd (SR 516) to SE 283rd St Manchester Stormwater Retrofit and Traffic Improvements - Phase 3 Tumwater Blvd/I-5 SB Ramp Improvements Project Park Avenue South - 125th Street South to Garfield Street South Cleanwater Centre Site Work Tilley Road Curve Culvert Replacement Tyee Drive Extension / Israel Road Improvements Project SR 302 - 1.15 Miles S of E Victor Road Major Drainage Emergency Vehicle Operations Course (EVOC) Kirsop Road Maintenance Project Capitol Blvd & U Street Pedestrian Improvements East Lake Sammamish Master Plan Trail South - Segment A Fairwood West HOA Pipe Replacement 78th Avenue E & 184th Street Intersection 40th - 42nd Avenue South - Phase 3 1st Street SW Improvements 21st Avenue Pedestrian Improvements Washington Ave. Two Way Left Turn Lane Improvements Runway Safety Improvements Vashon Island M Street SE Improvements Cloquallum Road MP 5.85 to 6.60 Bridge #28183-A Replacement 8th Ave E North Fork Muck Creek Rich Road SE Phase 2 Tremont Street Widening Boulevard Road and Morse -Merryman Roundabout Orville Road Engineered Log Jam Setback Revetment Phase 2 70th Avenue Sewer and Water Extension 66th Avenue Improvements 8th Street E & 54th Ave E Culvert East 25th Street Improvements Lower Coal Creek Flood Hazard Reduction 22nd Avenue and 152nd Street Intersection Ball Creek Flood Plain Revetment EVOC Skid Pan Repair - WA State Patrol Training Course Clarks Creek Channel Stabilization c ta 0) N a E❑ 0 U (O N CO 0 N (0 0 N (0 a N t- 0 N 2017 r 0 N N 0 N 2017 ti 0 N (0 0 N 2017 2017 2018 2018 2018 CO 0 N 2017 2017 GO 0 N 2017 2017 2017 2018 r0 0 N 0) 0 N c0 0 N 2018 2018 2018 CO 0 N 2018 00 0 N 2019 2018 2019 co 0 N Job # r7 O 9 to 0 9 (D lD 0 4 (D N` 0 9 CO 00 O 9 (D M 9 (D ct 9 (D I16-018 1 O N 9 (D - N 9 (D O N 9 (O (D N 9 CO 01 N Q CO O el 9 (D I17-001 N 0 9 n I,- O 9 I,- CO 0 9 n 01 0 9 Is O 9 n N 9 r VI 9 N` V 9 n ID 9 t` (D 9 N CO < 9 n a N 9 N- H) N 9 I- CO N 9 I I17-032 N O 9 co a O 9 03 (D O 9 CO 0) O 9 CO 118-010 9 03 I18-014 Updated: 10/9/2023 0) N W 0 re a_ Z_ 0 0 W 1- W J U O Z U - 1- U O _O -, U ~ O D 0 cc d re - M CO 00 W CC U W H m U ° Q O a Contract Value $ 1,560,560.00 $ 2,213,213.00 $ 336,336.00 $ 742,742.00 0 0 00 O CO (» $ 2,484,484.00 $ 2,376,376.00 0 0 M M a) 1� a fA $ 613,613.00 $ 2,942,942.00 $ 1,309,309.00 $ 5,920,920.00 $ 2,920,820.00 0 0 1- ,- N N.- fA $ 2,709,933.00 0 0 (O 1 (D P v s- EA 0 0 N V N '7 v (f) $ 414,414.00 $ 2,154,154.00 0 0 M CO CO- CO co f9 $ 1,063,550.50I 0 0 N tO N CO (O s- M 0 0 c0 r O CO r` CO $ 1,148,153.361 $ 2,838,783.00 $ 2,422,172.00 I $ 9,467,467.00 $ 1,245,245.00 $ 7,280,625.00 0 0 a) N a) U) s- fA I $ 1,305,305.00 $ 3,955,955.00 I $ 2,244,696.26 I $ 2,566,334.88 ' $ 4,759,759.00 $ 2,058,058.00 $ 2,281,183.00 $ 3,894,894.00 Phone (360) 754-5855 (360) 754-5855 (360) 426-4232 (253) 835-2723 (360) 407-7979 (360) 570-6786 (253) 798-7250 (425) 204-4403 (360) 438-2639 1(253) 581-1912 I(206) 263-9325 1(360) 438-2639 (425) 452-4868 (425) 495-1577 (425) 452-4230 (253) 594-7871 (360) 438-2639 (206) 263-9325 (425) 888-7653 (360) 740-1175 (253)798-6157 '(425) 452-4170 ((425) 413-8800 (253) 502-2225 (360) 426-1151 (360) 432-5750 1(360) 867-2300 1(425) 452-4230 1(425) 452-7905 1(253) 835-2723 1(253) 798-7250 1(253) 983-7795 1(360) 561-1715 1(425) 295-0500 1(253) 856-5508 1(253) 460-5411 1(360) 473-5323 (360) 754-4140 Owner Rep John Norman John Norman Dave Nichols Christine Mullen Hamed Khalili Brian Whitehouse Greg Hess Stewart Shusterman Aubrey Collier Mark Burlingame Mark Hoge Aubrey Collier Jim Stockwell Evelyn Pao Jun Suk An Lisa Oestreich Aubrey Collier Mark Hoge 0 O 2 E 0 F- Malcolm Bowie David Davis Dale Lydin (Terry Wright 'Steve Hoffman (Wendy Smith 'Danette Brannin 'Matt Unzelman Jun Suk An Paul Krawczyk 'Christine Mullen Arnie Shepard `Eric Swanstrom 'Kristin Williamson 'Monica Thompson Tim Laporte 'Jack Ecklund 'Andrea Archer -Parsons Brandon Hicks Owner City of Tumwater City of Tumwater SkokomishTribe City of Federal Way Dept of Enterprise Services E&AS WSDOT Pierce County Renton School Dist City of Lacey Town of Steilacoom King County City of Lacey City of Bellevue 1- 0 O co City of Bellevue City of Tacoma City of Lacey King County City of North Bend Lewis County Pierce County Surface Water City of Bellevue City of Maple Valley City of Tacoma Port of Shelton Mason Transit Authority Thurston County City of Bellevue City of Bellevue City of Federal Way Pierce County City of Lakewood SPSSEG City of Sammamish City of Kent City of University Place City of Bremerton City of Tumwater Job Description Desoto Street Stabilization and Rehabilitation Capitol Blvd Israel Rd to 73rd Ave Reservation Road Sidewalk Military Road S & S 298th St. Compact Roundabout Capitol Campus Utility Renewal SR510 Meridian Rd SE Roundabout and Paving 62nd Avenue NW & 144th St NW Intersection McKnight Middle School Field Improvements Lebanon Street Extension Steilacoom Blvd SW Improvements 55th Ave S at Bingamon Creek Culvert Replacement College Street and 22nd Ave Roundabout Lower Coal Creek Flood Hazard Reduction - Group 3 SR520 80th Ave to 108th 150th Newport Way Roadway Improvements SWM Drainage & Traffic Safety Improvements College Street and Yelm Super T Pavement Rehabilitation Westside Highway SW Roadway Repair Park Street Roundabout Highway Safety Improvement Program Phase 2 Orville Rd ELJ Setback Revertment Ph 2B Lakemont Blvd SE Repairs & 164th Ave SE and SE SE Kent-Kangley Road / 242nd Avenue SE Intersection Improvements Hosmer Holding Basin Maintenance Sanderson Field Runway Pavement Overlay Construction Log Yard Rd And SR 3 Roundabout Construction Mullen Road - Lacey City Limits to Carpenter Road 100th Ave NE and NE 10th St Roundabout SE Newport Way Somerset Blvd to 150th Ave SE South Dash Point Road Improvements Orting-Kapowsin E - Orville Rd E to 264th St E Onyx Drive Roadway Improvements South Prairie Floodplain and Off -Channel Restoration Project Big Rock State Park Site B Ph. 1 Improv. Willis Street and 4th Avenue S Roundabout Cirque Drive West Phase 3 Roadway Improvements Kitsap Lake Elementary Safe Routes to School Citywide NHS Resurfacing Completion Date co O N a) 0 N co 0 N 2019 a) 0 N a) CDO N 2020 1 2019 2019 o) N 2019 O N 0 N 2019 2019 a) O N 2019 2020 2019 2020 o) O N 2019 2019 2019 rn O N 2020 2020 N 0 N 2020 2020 2020 2020 2020 O N 0 N 2020 2021 2021 N O N 2021 n o 18-017 CO a- 4 00 0 N R 0o e- 118-023 l 18-026 M M 4 W 119-001 1 M 0 4 a) (O 0 4 a) h 0 4 a) (0 O 4 T 0 ....... 4 a) R a) Or 4 D) N 4 a) a) R a) I- R a) 0) 4 O 0 N 4 0) CO 4 0) N N R 01 M N 4 a) 1.- N R 01 CO N 4 W a) N 4 01 in co) 4 O h () 4 a) s Or 4 01 N V 4 01 N Or g 0) N 0 o O I20-009 0 c- 0 c- T. 00 I20-014 (D 9 N D1 o N 120-021 Active Construction, Inc. Confidential N O N (0 a Updated: 10/9/2023 co co W a' 0 W' a z_ 0 0 z w F w J a 2 • 0 Z U 0) — � H UU ▪ O D 0 a LL CO p O U d W IZ 0 W J U ▪ � 7 ¢ana Contract Value $ 15,323,323.00 $ 1,259,259.00 0 O ui N .0- (0 0) N co (A $ 7,570,570.00 $ 2,069,069.00 $ 945,377.00 $ 1,725,725.00 $ 1,250,145.00 0 o 0i 0 r W 0 r- H (A $ 320,320.00 0 0 H 0) N N I� (A $ 358,358.00 I 0 0 of (D V 0) (0 V N 69 $ 2,822,822.00 $ 6,237,237.00 0 0 r� I� (n N f� III (A $ 3,479,479.00 0 o o (0 CO O CO m 1- (A $ 1,477,477.00 $ 2,985,985.00 0 O 0 0 Cr O 0 V V 63 $ 2,488,573.00 $ 2,168,441.18 $ 6,605,605.00 $ 2,124,124.00 0 o of (0 V 0) (0 "4 .- (A 0 0 (0 _ (D — (O (9 $ 6,857,857.00 I 0 0 (0 0 O (0 (h o N ED 0 0 (o O .00 (0 0 V (A $ 2,498,498.00 $ 466,466.00 $ 9,449,449.00 $ 646,646.00 0 0 (0 NI- (0 V (0 N (9 $ 1,175,175.00 $ 3,684,684.00I $ 965,965.00 Phone (360) 394-9882 (253) 798-6157 (253) 952-3299 (425) 452-4170 (360) 565-0620 (253) 798-4228 (360) 473-5758 (206) 263-9325 (425) 430-7200 (360) 740-2671 (360) 438-2639 (360) 876-4407 (425) 452-4870 (253) 798-6165 (360) 473-2312 1(253) 759-3544 (253) 964-8121 (360) 867-2292 (206) 423-1063 (206) 423-1063 (425) 452-4870 (360) 473-2312 (253) 853-7620 (253) 591-5519 (253) 798-6157 (360) 330-7512 (425) 452-4550 (206) 263-2164 (253) 835-2722 (360) 337-5777 (360) 473-5758 (253) 856-5508 (206) 263-6813 (425) 837-3410 (509) 576-6480 (425) 413-8800 (206) 423-1063 (253) 798-6157 Owner Rep (Josh Ranes 'David Davis (Jeremy Metzler Dale Lydin 'Dan McKernan Al Zehni Gunnar Fridriksson Mark Hoge IHebe Bernardo (Aubrey Collier Chris Hammer Mike Rodni lingo Kutchta A CO ❑ Gus Lim Marcus Storvick Victor Daggs Victor Daggs Gregory Lucas N g CO ❑ Aaron Hulst Toney Mathison David Davis Patty Page Greg Lucas David Shaw John Mulkey Theresa Smith Gunnar Fridriksson Nancy Yoshitake Megan Saunders (Matt Ellis Mike Shane Amy Shaw (Victor Daggs David Davis Owner City of Poulsbo Pierce County Surface Water City of Edgewood City of Bellevue WSDOT (Pierce County Surface Water City of Bremerton King County City of Renton Lewis County City of Lacey (City of Port Orchard City of Bellevue Pierce County Surface Water City of Bremerton City of Ruston City of Dupont Thurston County King County King County City of Bellevue [City of Bremerton City of Gig Harbor City of Tacoma Pierce County Surface Water City of Centralia [City of Bellevue King County City of Federal Way Kitsap County City of Bremerton City of Kent 1King County City of Issaquah City of Yakima City of Maple Valley King County Pierce County Surface Water Job Description Johnson Parkway & SR 305 Roundabout, Noll Corridor - South Segment Orville Road Engineered Log Jam Setback Revetment Phase 2C Edgewood Community Park Mountains to Sound Greenway Trail Phase 2 US 101, Morse Creek Vicinity Safety Improvements Huge Creek Culvert Replacement Kitsap Way Culvert Replacement Maury Island Open Space Remediation Lake Washington Loop Trail Stowell Road MP 0.57 Bridge Scour Repair Capitol City Golf Course WWW Improvements Sidney Ave Sewer Repair 112th Ave NE Corridor Improvements Upper Nisqually River Levee Revetment Retrofit Oyster Bay Beach Sewer Upgrade North 53rd Street Improvements - Pearl to Bennett Dupont - Steilacoom Road Improvements Vail Road SE Improvements Phase 2 S 277th Bridge No. 3126 Replacement Coal Creek Bridge No. 3035A 130th Ave NE Station Area Park and Ride Kitsap Way (SR310) and Warren Avenue (SR303) Traffic Signal and Multimo Harborview Drive and Stinson Ave Intersection (City of Gig Harbor) Revitalizing Tacoma's Brewery District ,Orville Road Engineering Logjam Revetment Phase 2B Year 2 ,Harrison Avenue Improvements NE Spring Blvd - 130th Ave NE to 132nd Ave NE Lake to Sound Trail Segment C SeaTac Lakota Middle School SRTS Olympiad Drive Culvert Replacement Price Road and Brentwood Drive Culvert Replacements 84th Street Slump Repair Jan Road Levee 2nd Ave SE & SE Bush St Intersection Naches River Water Intake SE 231st Street Extension 218th Street SE Roadway Preservation I22-019 I 2022 Clear Creek Habitat Restoration C 0 y a; C CO E❑ 0 U IN PROGRESS N o N N 0 N 2022 N 0 N N 0 N N 0 N 2021 - N 0 N 2021 2021 2021 2021 N 0 N 2023 2021 2022 2022 N N 0 N 2023 2023 2022 2022 2023 N N 0 N 2022 0 N 0 N 2023 2023 2022 N NNNOIN 0 NNNOIN N 0 N 0 N 0 N 0 2022 N N 0 N #k c I20-024 20-026 N c N In c N I20-032 O 9 N I21-002 O 9 N I21-004 O 9 N I21-007 21-009 o N I21-012 21-013 21-014 n 9 N! I21-018 21-021 21-023 21-024 N 9 N N 9 N I21-030 0 9 N l") 9 N 0 9 N a 9 N I21-042 22-004 22-009 22-011 22-013 22-015 22-016 22-017 22-018 Active Construction, Inc. Confidential O a) (00 a Updated: 10/9/2023 N U1 w LL' C7 0 o_ _Z Z ❑ w w 0 a • 0 ZU O7 - H U OOF 0 D U d CO 0j0 0 0 W rX U W J o m ¢ma Contract Value $ 1,153,153.00 $ 3,833,023.00 0 0 0 O (a O) O V 0 $ 2,715,715.00 $ 1,098,098.00 0 0 (0 rn Q) ui CO 0) fA $ 4,062,062.00 $ 867,530.90 $ 12,150,150.00 $ 23,242,242.00 $ 2,378,378.00 $ 1,181,181.00 $ 1,556,545.00 $ 1,943,943.00 $ 805,805.00 $ 5,575,575.00 $ 6,229,229.00 0 0 o o O) (ri V (D (A $ 3,418,150.00 $ 739,739.00 $ 542,542.00 $ 6,660,352.06 (n (0 o V (n 1` O) N (A $ 2,665,665.00 o 0 Di (0 N o) (0 N co- (A 0 0 o rn 0 o o) 0 .- EA $ 1,552,552.00 $ 478,478.00 $ 2.257.257.00 $ 6,412,412.00 $ 974,974.00 $ 1,416,416.00 0 0 Di o cn O .- N9 0 0 n o) (D r 0) CO fA $ 897,897.00 Phone (425) 757-6657 (360) 867-2292 (360) 473-5758 (360) 867-2292 (425) 837-3415 (360) 725-9757 (360) 753-8297 (360) 754-4140 1(425) 452-2027 (360) 705-7835 I(206) 275-7655 (253) 983-7852 (253) 856-5561 (253) 581-1912 (425) 413-8800 (253) 307-9894 (503) 799-0934 (360) 902-8500 (206) 477-7555 (360) 705-7835 (509) 662-4068 (360) 615-5668 (360) 786-5497 (425) 556-2792 (253) 798-6647 (360) 565-0620 (253) 888-4711 (206) 263-6813 (360) 473-5758 (253) 245-6196 (503) 548-1496 (425) 430-7298 (253) 835-2718 (425) 430-7208 Owner Rep Jake Lund Betsy Severtsen Marcus Storvick (Gunnar Fridriksson Marcus Storvick (Isabel Diaz Sanh Ho (Brian Philumalee Bill Lindauer (Kyle Potuzak Johnathan Mouhanna Lia Klein (Stacey Reding Drew Holcolm (Mark Burlingame Amy Shaw Danika Washington Justin Isle Brett Taylor 'Tom Early (Paul Mason (Kyle Burtis Eric Palmer Bill Richardson N O z C O 0 Q (Andrew Robson Ben Ford Kathee Sewell (Megan Saunders Gunnar Fridriksson Craig Moore, Parametrix Kari Nichols Michael Sippo John Cole Jonathan Chavez Owner City of Olympia City of Renton Thurston County City of Bremerton Thurston County City of Issaquah WA Parks & Rec City of Olympia City of Tumwater City of Bellevue LWSDOT City of Mercer Island City of Lakewood City of Kent Town of Steilacoom City of Maple Valley WSDOT Cowlitz Indian Tribe Washington State Parks King County WSDOT East Wenatchee City of Enumclaw Thurston County City of Redmond Pierce County WSDOT Port of Tacoma King County City of Bremerton City of Puyallup Lity of Roslyn City of Renton City of Federal Way City of Renton Job Description Yauger Park Field Renovations Philip Arnold Park Site Improvements US 12 & Sargent Road Roundabout Pine Road Basin Stormwater Improvements Woodard Creek Retrofit Site Newport Way NW Improvements Schaefer State Park Relocate Campground State Ave Safety Improvements 1-5 / Trosper Rd / Capitol Blvd Reconfiguration 124th Ave NW & Ichigo Way to Northup Way SR 516 Barnes Creek Fish Passage Sunset Hwy & 77th Ave SE Intersection Springbrook Park South 240th St & Russell Rd TIB Sidewalk Rainier Street Pavement Preservation Witte Road Phase 3 South SR 7 Unnamed Tributaries to South Creek 1Cispus-Yellowjacket PH Restoration Sunset Beach Shelter and Site Upgrades Cougar Mountain Precipice Trailhead Dev. iSR508, 0.3 Miles E of Bergen Road Embankment Repair Safe Routes to School: Kenroy Elementary/Sterling Intermediate/East Wenat Boise Creek Restoration at Enumclaw Golf Course Black Lake Belmore Rd Bridge A.R. 156th Avenue NE Cycle Track Foothills Trail — East Puyallup & McMillan Trailhead Improvements SR 20/Kearney St I/S — Roundabout Administration Building Electric Vehicle Charging Stations Rainbow Bend Mitigation Project Washington & 11th Street Improvements Wildwood Sidewalk Link Phase 3 - 31st Ave SE to 26th Ave SE Pennsylvania Place Bottleneck & Stormwater Treatment Retrofits Downtown Core Streetscape Phase II 27th Ave SW at SW 344th St Compact Roundabout 1Burnett South Sidewalk & Utilities Replacement Completion Date 2023 IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS IN PROGRESS # o I22-020 N 9 N N N 9 N N I22-027 O N 9 N 04 O M 9 N N N CO 9 N 01 I22-034 22-036 22-037 CO 9 N N 0) COO 9 N N I22-043 22-044 N 0 M N I23-004 23-005 N 9 M N CO 9 M N Y7 9 M N I23-017 CO 9 CO N 01 9 M 01 N 9 M N I23-022 23-023 23-026 h N 9 M N I23-028 23-030 — M 9 M 04 I23-033 23-034 1- M O 01 N 123-040 Active Construction, Inc. Confidential Updated: 10/9/2023 Revised 11/15/2023 ACTIVE CONSTRUCTION, INC. CURRENT EQUIPMENT LIST (by Categories) 141 241 254 261 1992 2004 2005 2000 KW/T800 Silverado 1500 Silverado 2500 IH 4700 Dump KENWORTH Dump Truck S576882 CHEVROLET Pickup - finger CHEVROLET 4X4 Pickup Nick IH 6 YARD DUMP 1 HTSCABP8YH240445 263 2000 IH 4700 Dump IH 6 YARD DUMP 1HTSCABP5YH240452 264 2000 IH 4700 Dump IH 6 YARD DUMP 1HTSCABP4YH240457 268 269 270 271 273 274 282 2005 2005 2005 2005 2005 2005 2005 3500 3500 3500 3500 Silverado 1500 COLORARO 3500 CHEVROLET Flatbed Pete CHEVROLET Flatbed Nate B CHEVROLET Flatbed Spare CHEVROLET Flatbed Ryan C CHEVROLET Pickup Flagger CHEVROLET Pickup Flagger CHEVROLET Flatbed Matt h 318 2001 IH 2674 DUMP IH 12 YD DUMP 1HTGLATT91H348046 322 2006 3500 CHEVROLET Flatbed eric k 328 2006 T300 KW SERVICE/CRANE CORY 338 2007 3500 CHEVROLET Flatbed FLAGGER 340 2001 IH 4700 Dump IH 6 YARD DUMP 1HTSCABP51H366140 341 2001 IH 4700 Dump IH 6 YARD DUMP 1HTSCABP11H366152 349 380 386 2007 1996 2005 Silverado 2500 KW T800 KW T800 CHEVROLET 4X4 Pickup Linda h KENWORTH Dump Truck J673443 KENWORTH Tractor SD R096702 398 2006 F150 4X4 FORD Pickup 4X4 going 400 406 416 429 441 442 445 449 451 1993 2003 2001 1993 2013 2013 2008 2014 2014 F150 F150 Tahoe L9000 FORD 3500 3500 Silverado 1500 Silverado 1500 Silverado 1500 FORD Pickup Flagger FORD Pickup Flagger Chevy Tahoe GPS BRETT S FORD Dump Trk 1FDZU9OXOPVA39192 CHEVROLET Flatbed Tony E CHEVROLET Flatbed Eugene CHEVROLET Pickup Matt N CHEVROLET4X4 Pickup Frank CHEVROLET 4X4 Pickup Kevin A 471 2015 3500 CHEVROLET Flatbed Matt N 474 476 2011 2016 Silverado 1500 3500 CHEVROLET4X4 Pickup Flagger CHEVROLET Flatbed Nate F 477 2016 3500 CHEVROLET Flatbed Jacob B L. 1992 Towma 150 1988 ATCO r152 1996 TrailKing 181 1997 NWBS 188 1985 NWBS EQUIP Trailer— 1P9DT6T29NG162139 10' x 40' Mob. Off. — GR3268588 TK50 Trailer— 1TKCO2633TM055834 10' x 42' Mob. Off. — 97648 12' x 50'Mob. Off. — 85243 207 2000 EAGLE Trailer - 1C9BE2318YP694654 265 266 267 278 284 297 2003 2004 2004 2004 2005 1977 TK18 TK18 TK18 TK18 TD14 Dorsey 300 1977 Dorsey 301 1977 Dorsey Eq. Trailer 1TKCO24213M112400 Pen Light Eq. Trailer 1TKCO24225B078143 Pen Light Eq. Trailer 1TKCO24205B078142 Pen Light Eq. Trailer 1TKCO24265B078145 Pen Light Eq. Trailer 4ZETD202251007074 (Mini Ex) 28' Van Trailer 127782 28' Van Trailer N36809 28' Van Trailer 127736 28' Van Trailer 127733 302 1977 Dorsey 26' Van Trailer 127756 303 1977 Dorsey 28' Van Trailer 127743 304 1980 Trlmo 28' Van Trailer V9006618 305 1991 Trlmo 28' Van Trailer DAE2M9005954 306 307 308 1991 1991 1991 Trlmo Trlmo Trlmo 28' Van Trailer 1H4V02813LJ006936 28' Van Trailer 1H4V02818LJ006950 Eugene 28' Van Trailer DAE1M9005895 Tom D 309 1991 Trlmo 28' Van Trailer DAE9M9006003 310 311 321 362 418 448 469 472 491 1991 1991 1999 2003 2012 2014 2014 2011 2016 GE GE TK18 Sidedump CARGO TrailKing 500 TrailKing CARGOMATE 12x56 Office Trailer 033489 12x56 Office Trailer 084236 Eq. Trailer 1TKCO2421XM116811 Pen Light Sidedumper Trailer 1YPFS42353P001189 6X12 BOX TRAILER 5NHUCH21XDT437924 TK110HDG LOWBOY Trailer — 54885 MQ 500 Gallon Water Trailer TK12 MINI Trailer— 72530 PIPE TRAILER-BL714TA2 499 1998 STURDYWELD PUP TRAILER-1S9CA544XWL189980 532 537 2005 2019 Olympic Trailking 30Tdt-3 1 CPTF36395T997398 axle TKFA1-1TKR00513LM013677 35 478 2016 3500 CHEVROLET Flatbed Darrin M 53 1990 185DPQ SULLAIR Air Compr. — 4101220 480 2017 PB 337 LUBE TRUCK 2NP2HJ7X4HM393017 134 1994 XAS-90DD ATLAS COPCO Air Compr. - 603.087 481 2017 F150 FORD JAMIE I 208 1998 185 IR Air Compr. - 291031UFI221 489 2017 1500 chevrolet 1500 Zac Gustafson 256 2000 185 IR Air Compr. - 30919OUBK221 492 2003 T800b Kenworth RUSS 389543 272 2000 185 IR Air Compr. - 309191UBK221 495 2017 F250 4X4 Ford F250 Tom Detray 316 2000 185 IR Air Compr. - 312742UBK221 500 2018 T880 KENWORTH 1XKZP4TX0JJ211847 317 2000 185 IR Air Compr. - 309192UBK221 502 2017 RAM 1500 DODGE RAM Randy Ausbun 389 2004 185 IR Air Compr. - 347487UG0820 503 2018 337 PETERBILT lube trk 2NP2HJ7X9JM497315 541 2006 185 IR Air Compr. - 36591xxaqb34 504 2018 1500 SILVERADO 1500 - BACH 9 505 2017 2500 SILVERADO UTILITY TRUCK Jarred D 399 2008 PWRSCRN WAR-1800-PID00123C86D05172 508 2017 F450 FORD FORMENS TRUCK John N 405 2007 SOAKER ASCPWW-24 Wheel Wash 1Z9WWW163312 509 2017 F450 FORD FORMENS TRUCK Joey R 473 2011 MSE 10000 GAL WATER TOWER 200701 510 2016 1500 SILVERADO -Marina 3 511 2017 F450 FORD FORMENS TRUCK Jesse 206 1999 MultiQuip 25-29 KW/DSL Generator - 7101849 515 2018 1500 silverado- rick Johnson 214 1998 MultiQuip 150 KW Generator - 3678574 518 2013 F750 FORD MECH TRUCK ANDERSON 216 1999 MultiQuip 25 KW Generator - 7101822 519 2015 1500 silverado- TOMMY PELTON 235 1999 MultiQuip 45 KVA Generator - 000359 521 2018 1500 silverado- Greg Mundell 366 2004 MultiQuip 25 KW Generator - 8100786 522 2019 523 2019 4500 C4500 -Greg Blocker 4500 C4500 -JJ hiblar 5 530 2019 4500 C4500 -Kevin Aalmo 335 2005 AMIDA AL4000 Light Tower EYF05024 533 2018 1500 Chevrolet 1500-Eddie P 347 2005 AMIDA AL4000 Light Tower DVF03031 538 2008 F750 Ford F750 Flatbed 1 462 2004 AMIDA AL4000 Light Tower ETF08054 540 2020 1500 Chevrolet Chris Roberts 463 2004 AMIDA AL4000 Light Tower ETF20826 544 2019 1500 Chevrolet Eric Johnson 464 2004 AMIDA AL4000 Light Tower ETF20752 545 2019 1500 Chevrolet James Nokell 559 2010 Allmond 0765PRO08 547 2019 4500 Chevrolet Chris N 560 2010 magnum MLT3060 1215336 548 2019 2500 Chevrolet Niko P 561 2010 magnum MLT3060 1215336 549 2020 F250 551 552 563 564 568 2016 2020 2021 2021 2021 T250 T270 3500 1500 4500 Ford - spare Chevrolet Brian J Ford Van - Bill Ward Kenworth- Jacob Kisor Dodge Ram - Greg G Chevrolet New 71 2008 8 245 373 381 401 402 2004 2008 2005 2012 2012 HIPER LITE TOP CON HIPER LITE TOP CON TOP CON GPS Rover/Base Sys 295-0204,0276-Z51324 GPS Rover/Base Sys 388-1140, 388-1154 GPS Rover/Base Sys 295-1057, 295-1064 14G Grader 3DMC-SQ 757-12629, 422-7521 850J Dozer 3DMC-SQ 757-12676, 422-7368 403 2012 TOP CON GPS Rover/Base Sys800-10123,10048-Z51308 438 2012 TOP CON GPS Rover/Base Sys 391-0710, 391-0615 439 2012 TOP CON GPS Rover/Base Sys 800-10155, 800-10154 455 2014 TOP CON 650J Dozer 3DMC-SQ 1077-11505, 534-1247 475 2016 TOPCON GPS Rover/Base Sys 800-21064 01090901 10 Revised 11/15/2023 ACTIVE CONSTRUCTION, INC. CURRENT EQUIPMENT LIST (bv Categories) YEAR MODEL EQUIPMENT DESCRIPTION YEAR MODEL EQUIPMENT DESCRIPTION 159 1997 416C CAT Backhoe & Comp. — 5YN0857 51 1989 WA450 KOMATSU Wheel Loader — 20186 160 1997 416C CAT Backhoe & Comp. — 5YN01309 203 1980 530-80 CHAMP 8,000 lb Fork Lift - 880337 161 169 1997 1998 416C 416C CAT Backhoe & Comp. — 5YN01304 CAT Backhoe & Comp. — 5YN04932 275 289 2000 2005 763 WA480-5 BOBCAT Loader/Sweeper 512253989 KOMATSU Wheel Loader—A37119 170 1998 416C CAT Backhoe & Comp. — 5YN04933 352 2007 644J JD Wheel Loader- 610911 171 237 257 258 259 1998 1999 2005 2005 2005 416C 416C 420D 420D 420D CAT Backhoe & Comp. — 5YN04934 CAT Backhoe & Comp. — 4ZN16759 CAT Ext.Backhoe OFDP20782 Pen Light CAT Ext.Backhoe OFDP20704 Pen Light CAT Ext.Backhoe- OFDP21455 360 410 424 435 440 2007 2011 2011 2012 2012 WA380-6 644 K 644K 644 K 644K KOMATSU Wheel Loader — 53350 JD Wheel Loader - 634890 JD Wheel Loader - 633731 JD Wheel Loader - 648774 JD Wheel Loader - 638676 260 279 2005 2005 420D 420D CAT Ext.Backhoe OFDP21495 Pen Light CAT Backhoe 4in1 Bkt-OFDP22993 470 488 2012 2014 724K 644K 280 2005 420D CAT Backhoe- OFDP23007 512 2017 L110H 294 320 2005 2006 420D 420E CAT Backhoe- OFDP25283 CAT Backhoe & Comp HLS00762 513 535 2017 2019 644K 644K JD Wheel Loader - 649056 JD Wheel Loader - 661680 Volvo wheel loader-631328 JD Wheel Loader - 1dw644kzpHF681762 JD Wheel Loader-1DW644KZPKF696544 332 2006 420E 415 2008 420E CAT Ext.Backhoe & Comp OHLS00885 CAT Ext.Backhoe & Comp OHLS07280 554 2021 644L 16 JD Wheel Loader -DW644LZPLL707978 425 2008 420E CAT Ext.Backhoe & Comp OHLS07326 73 1989 SV91 D SAKAI Roller/Comp. — 30312 456 2017 420E CAT Ext.Backhoe & Comp OHLS07701 90 1989 RD880V WACKER Roller/Comp. — 0629601040 542 2008 420F CAT .Backhoe & Comp hwc01987 110 1990 SV91D SAKAI Roller/Comp. — 30332 20 145 1990 SV91TF SAKAI Roller/Comp. — 30679 232 2001 D8R RIP CAT Dozer - 07XM04969 244 2000 SV200D SAKAI Roller - 20130 I 243 2004 650H LGP DEERE Dozer- T0650HX927178 283 2004 SV510D SAKAI Roller- 1630156 288 2005 850J WLT DEERE DOZER - X112088 292 2004 SV510D SAKAI Roller - 1630154 314 2006 650J LGP DEERE DOZER - TO650JX122939 319 2004 SV510D SAKAI Roller - 1631076 359 2006 650J XLT DEERE DOZER - 121024 374 2004 SV510D SAKAI Roller - 1630274 370 2007 650J LGP RIP DEERE DOZER - 143146 437 1999 BW135AD BOMAG Roller 101650121220 384 2006 650J LGP RIP DEERE DOZER - 133089 RAKE EARS GPS 490 2016 CA3500 DYNAPAC-10000168CHA018959 385 2002 650H LT DEERE DOZER - 902006 517 2014 SD115 VOLVO-S115O0O0S235090 390 2005 650J LGP DEERE DOZER-112295 12 391 2006 650J LGP RIP DEERE DOZER-117775 RAKE EARS 246 2002 550LC JOHN DEERE Excavator — FF0550X950071 434 2013 850K WLT DEERE DOZER-238380 286 2005 ZX330 HITACHI Excavator— FF01HHQ034868 436 2006 450J LT DEERE DOZER-128097 323 2006 ZX120 HITACHI Excavator/Thumb — FFO1S1Q070054 452 2006 650J LGP DEERE DOZER-111590 324 2006 ZX160 HITACHI Excavator —FF01F1O006488 494 2017 550K LGP DEERE DOZER - 313841 346 2007 ZX160 HITACHI Excavator — F F01 F1O006637 14 351 2007 ZX160 HITACHI Excavator — FF01 F1O006712 124 1980 Frght FREIGHTLINER Water Truck CB413HP19286 353 2007 ZX200-3 HITACHI Excavator — FFOOAST320015 226 1990 KW T800 KW Water Tank Truck On Road J530098 354 2007 ZX350-3 HITACHI Excavator — FFOOAS P920124 229 1988 KW T800 KW Water Tank Truck On Road S519113 355 2007 ZX350-3 HITACHI Excavator— FF01V7Q051683 367 1996 L9000 FORD FORD Water Truck 1 FTYS95WOTVA29164 379 2005 ZX200 HITACHI Excavator/Thumb — FFOOARH310654 376 1993 KW T800 KW Water Tank Truck On Road J597051 392 2006 225C LC DEERE Excavator/Thumb — FF225CX500240 453 1984 VOLVO 4000 GAL WATER TRUCK 395 2006 ZX450 HITACHI Excavator-FF016JQ011406 454 1995 KW T800 4000 GAL WATER TRUCK 397 2008 ZX240-3 HITACHI Excavator/Thumb — FFOOASU420022 514 2000 international 4000 gallon water truck 417 2011 ZX200-3 HITACHI Excavator/Thumb — 320793 8 420 2013 ZX50-3 HITACHI Mini Ex - 277280 459 2006 A30D VOLVO Off Road Truck 74180 421 2013 ZX50-3 HITACHI Mini Ex - 277282 460 2006 A30D VOLVO Off Road Truck 74465 422 2013 ZX50-3 HITACHI Mini Ex - 277753 461 2008 A30E VOLVO Off Road Truck 72045 430 2013 ZX50-3 HITACHI Mini Ex - 277089 465 2008 A30E VOLVO Off Road Truck 72046 431 2013 50D JOHN DEERE Mini Ex - 277857 468 2008 A30F VOLVO Off Road Truck 82044 433 2013 ZX350-5 HITACHI Excavator — 930411 5 443 2007 TB145 220 1992 623E CAT Scraper - 6C1300553 444 2014 135D JOHN DEERE Exc. - 303077 383 1990 623E CAT Scraper - 6YF0147 450 2014 ZX50-3 HITACHI Mini Ex - 277823 396 1996 623F CAT Scraper - 6BK00277 466 2014 ZX210-5 HITACHI Excavator/Thumb-330411 3 47 1989 8B LAYMORE Sweeper — 2209881386 131 167 1993 1993 RB38 RB38 ROSCOE Sweeper — 32729 ROSCOE Portable Broom — 32976 330 371 2005 1999 8B RB48 LAYMORE Sweeper -29470 ROSCOE Sweeper — 35939 372 377 2001 2007 8HC 8HC LAYMORE Sweeper— 28482005 LAYMORE Sweeper— 9862-007 7 479 2013 770GP DEERE 1DW770GPVCE649863 484 2011 160M2 CAT 0R9L00109 2 531 556 2012 2020 RH3075 DJI road grinder 1208002 PHANTOM 4 546 562 2016 2021 whacker Husqavarna DPU 6555HE 10543213 LG 400 20202200251 467 2006 ZX200 HITACHI Excavator— FF01G6Q312087 483 2016 EC160EL VOLVO EXCAVATOR/THUMB- 310068 485 2016 50G DEERE MINI-284496 486 487 2016 2016 50G ECR145EL DEERE MINI-284713 VOLVO EXCAVATOR/THUMB- 310316 493 496 2016 2017 ECR58D zx245-6 VOLVO EXCAVATOR/THUMB-210273 HITACHI EXCAVATOR700056 497 506 2017 2018 50G 85G DEERE MINI 1FF050GXCGH285646 DEERE 85G 1FF085GXPHJ019478 507 2017 305C Volvo 305C 110737 516 2017 305C Volvo 305C 110708 WITH BLADE 520 2019 470G DEERE 470G 236074 534 2019 85G DEERE 85G 1FF085GXVKJ020949 536 2019 308 CATIPILLAR-0GG800153 543 555 2016 2020 ECR145EL ZX350-6 VOLVO-VCER145V00310556 HITACHI-FF1SCQ068429 565 566 2004 PC750-7 2021 245G KOMATSU --20003 DEERE- 1FF245GXCL 801846 567 2021 ZX35U-5 HITACHI -1 HTKHPVH822408 43 424 lhru 429 wanco message board 6 TUC Pedestrian/Bicycle Bridge Vicinity Overview NEARLY COMPLETE COMPLETED I ! 63. LO 0 0 0) n E O U N N E a) O 0 E a> a) N 0 0 0 O Z CO a`) CO PENDING CONSTRUCTION • • • • • • • • Green River Trail Widening CITY OF TUKWILA CAPITAL PROJECT SUMMARY COMMENT: 2023 to 2028 PROJECT: Green River Trail Improvements Project No. 91810403 Construct a widened trail section between the west landing of the Southcenter Pedestrian Bridge and the DESCRIPTION: shared use path on Christensen Road. Includes illumination, CCTV, and provides the fiber connection to the Pedestrian Bridge for operation of CCTV and communication to the light controllers and ped/bike counter. JUSTIFICATION: Wider trail section is needed to accommodate the intermingling of trail and bridge users by providing a wider trail and improved safety features. STATUS: Designed and permitted as part of the TUC Pedestrian/Bicycle Bridge. MAINT. IMPACT: Reduced pavement repairs, increased maintenance for illumination and CCTV upkeep. Project is a subset of the TUC/TOD Ped Imprvmt Project (90710405), the TUC Ped/Bike Bridge Project (90510403) and Baker Blvd Non -Motorized (91610409). All permitting and mitigation was completed as part of the Ped Bridge project. Permitting expires in 2022, delays past this date would need new permit approvals. PSRC grant application in 2018 unsuccessful. Apply for ped/bike grant in 2020. FINANCIAL Through Estimated (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 0 Land (R/W) 0 Const. Mgmt. 235 235 Construction 1,062 1,062 TOTAL EXPENSES 0 0 1,297 0 0 0 0 0 0 1,297 FUND SOURCES TAP Grant 989 989 Proposed Grant 0 Mitigation Actual 0 Traffic Impact Fees 0 Parking Tax 0 0 308 0 0 0 0 0 0 308 TOTAL SOURCES 0 0 1,297 0 0 0 0 0 0 1,297 Project Location 5,aU 5j s,an i �, _ a , /. _.- ��� r —CP ! Nii, v— 1 tikMd nwr _II _ 'e} lit —77-r4 g Tilfarr r. D.\1111 4 j' y s es Sl yy f es r1 $ Y ......- 11 2023 - 2028 Capital Improvement Program