HomeMy WebLinkAbout24-001 - Active Construction - Green River Trail Improvements24-001
Council Approval 12/11/24
Contract C_9
AGREEMENT FORM
CONTRACT NO.
THIS AGREEMENT is made and entered into on thisloth day of January
City of Tukwila, Washington ("Owner") and Active construction, Inc.
Now, therefore the parties agree as follows:
24-001
, 202g by and between the
("Contractor").
1. Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for
the project entitled Green River Trail Improvements, Project No. 91810403, including all changes to the
Work and force account work, in accordance with the Contract Documents, as described in Section 1-
04.2 of the Supplemental General Requirements.
2. Payments. Owner shall pay Contractor at the unit and lump sum prices, and by force account as
specified in the Proposal according to the Contract Documents as to time, manner, and condition of
payment The payments to Contractor include the costs for all labor, tools, materials and equipment for the
Work.
3. Completion Date. Contract time shall commence upon Owner's Notice to Proceed date. The Work
under this Agreement shall be completed within the time specified in the Proposal. If the Work under this
Agreement is not completed within the time specified, as detailed in the Contract Documents, Contractor
shall pay liquidated damages and all engineering inspection and supervision costs to Owner as specified
in the Proposal.
4. Attomey's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing
party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees.
5. Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this
Agreement, except as expressly provided in this Agreement.
6. Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each
of which shall for all purposes be deemed an original.
CITY OF TUKWILA, WASHINGTON Active Construction, Inc.
(Owner)—DocuSignedby: (Contractor)
By:
�rrPDs t M4AS it tt4ds' B
"-8EE24380545B44C... y:
Thomas McLeod, Mayor 1/10/24
Attest:
This 10th day of January
(..--BocuSiyoed by:
Ol
'-88678483CB594E7...
, 20 24
APPROVED AS TO FORM BY
ASSISTANT CITY ATTORNEY 1/10/24.
APPROVAL ON FILE.
Address for giving notices:
6200 Southcenter Boulevard
Tukwila WA 98188
Title: David Ceccanti, President
Attest:
This 28`"day of Di2C_CNiKiner 20 23
Aman.- G. S:mpso � ne
Contractor's License No.
AC-TI-VCI-164-JL
Address for giving notices:
Physical Address: 5110 River Road East, Tacoma, WA 98443
Mffiiing Address: T O tiox 43U, I'uyaflup, vv. 98371
Provided _o Builders Exchange of WA,
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Inc. For usage Conditions Agreement see www.bxwa.cori - Always Verify Scal
Contract C-2
PAYMENT AND PERFORMANCE BOND
Bond to City of Tukwila, Washington
Bond No. 023229710
We, Active Construction, Inc. , and Liberty Mutual Insurance Company ,
(Principal) (Surety)
a Massachusetts corporation, and as a surety corporation authorized to become a surety upon
Bonds of Contractors with municipal corporations in Washington State, are jointly and severally
bound to the City of Tukwila, Washington ("Owner"), in the penal sum of
One Million, Twenty Thousand, Twenty and No/100
Dollars ($ 1,020,020.00 ), the payment of which sum, on demand, we bind ourselves
and our successors, heirs, administrators, executors, or personal representatives, as the case
may be. This Payment and Performance Bond is provided to secure the performance of Principal
in connection with a contract dated , 20_ , between Principal and
Owner for a project entitled Green River Trail Improvements, Contract No. 91810403
("Contract"). The initial penal sum shall equal 100% of the Total Bid Price, including sales tax, as
specified in the Proposal submitted by Principal.
NOW, THEREFORE, this Payment and Performance Bond shall be satisfied and released only
upon the condition that Principal:
• Faithfully performs all provisions of the Contract and changes authorized by Owner in
the manner and within the time specified as may be extended under the Contract;
• Pays all laborers, mechanics, subcontractors, lower tier subcontractors, material men,
and all other persons or agents who supply labor, equipment, or materials to the Project;
• Indemnifies and holds Owner, its officers, and agents harmless from and against all
claims, liabilities, causes of action, damages, and costs for such payments for labor,
equipment, and materials by satisfying all claims and demands incurred under the
Contract, and reimbursing and paying Owner all expenses that Owner may incur in
making good any default by Principal; and
• Indemnifies and holds Owner harmless from all claims, liabilities, causes of action,
damages and costs, including property damages and personal injuries, resulting from
any defect appearing or developing in the material provided or workmanship performed
under the Contract.
The indemnities to Owner shall also inure to the benefit of the Consulting Engineers and other
design professionals retained by Owner in connection with the Project.
The liability of Surety shall be limited to the penal sum of this Payment and Performance Bond.
No change, extension of time, alteration, or addition to the terms of the Contract or to the Work to
be performed under the Contract shall in any way affect Surety's obligation on the Payment and
Performance Bond. Surety hereby waives notice of any change, extension of time, alteration, or
addition to the terms of the Contract or the Work, with the exception that Surety shall be notified
if the Contract time is extended by more than twenty percent (20%).
If any modification or change increases the total amount to be paid under the Contract, Surety's
obligation under this Payment and Performance Bond shall automatically increase in a like
amount. Any such increase shall not exceed twenty-five percent (25%) of the original amount of
the Payment and Performance Bond without the prior written consent of Surety.
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Contract C-3
This Payment and Performance Bond shall be governed and construed by the laws of the State
of Washington, and venue shall be in King County, Washington.
IN WITNESS WHEREOF, the parties have executed this instrument in two (2) identical
counterparts this 26th day of December , 20 23.
Active Construction, Inc. Liberty
Principal
Signature of Authorized Official
b&vid f^ecccyv4-i -Vrestd��ni
Title
ual Insurance Company
Surety
Signature of Authorized Official
By Holli Albers, Attorney -in -Fact ..
Attorney in Fact
(Attach Power of Attorney)
Name and address of local office of Propel Insurance
agent and/or Surety Company: 1201 Pacific Avenue, Suite 1000
Tacoma, WA 98402
Surety companies executing bonds must appear on the current Authorized Insurance List in the State of
Washington per Section 1-02.7 of the Standard Specifications.
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Liberty
Mutual.,
SURETY
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies'), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Aliceon A.
Keltner, Alyssa J. Lopez, Amber Lynn Reese, Amelia G. Burrill, Andrew James Carretto, Annelies M. Richie, Audrey M. Turner, Brandon K. Bush, Brent E. Heilesen,
Carley Espiritu, Christopher Amos Hayes, Christopher Kinyon, Cynthia L. Jay, Dana Marie Brinkley, Diane M. Harding, Donald Shanklin, Jr., Edward Sims, Eric A.
Zimmerman, Holli Albers, Jacob T. Haddock, James B. Binder, Jamie L. Marques, Julie R. Truitt, Justin Dean Price, Kari Michelle Motley, Katharine J. Snider,
Lindsey Elaine Jorgensen, Lois F. Weathers, Michael Mansfield, Misti M. Webb, Sara Sophie Sellin, Sarah Whitaker, Tamara A. Ringeisen
all of the city of Tacoma state of WA each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 20th day of July , 2023
Certificate No: 8210464 - 023049
By:
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
David M. Carey, Assistant Secretary
State of PENNSYLVANIA
County of MONTGOMERY ss
On this 20th day of July , 2023 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
Commonwealth of Pennsylvania- Notary Seal
Teresa Pastella, Notary Public
Montgomery County
My commission expires March 28, 2025
Commission number 1126044
Member, Pennsylvania Association of Notaries
By:
/.l--2 d0)) !/ 2� (le)
Teresa Pastella, Notary Public
This Power of Attomey is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV -OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attomey, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 28th day of November , 2023 .
By:
Renee C. Llewellyn, Assistant Secretary
) 0
.` •
c
c �-
E
co
U
a)
Q �
aN
O
>.—
CD
o
< O
c,
5
O N
Oco
`N
a
Q
•a
c
6
Uf
O Q)
ca
0 a)
LL n.
LMS-12873 LMIC QCIC WAIC Multi Co 02/21
Proposal P-8
Failure to return this Declaration as part of the bid proposal package
will make the bid nonresponsive and ineligible for award.
NON -COLLUSION DECLARATION
I, by signing the proposal, hereby declare, under penalty of
perjury under the laws of the United States that the following
statements are true and correct:
1. That the undersigned person(s), firm, association or corporation has
(have) not, either directly or indirectly, entered into any agreement,
participated in any collusion, or otherwise taken any action in restraint of
free competitive bidding in connection with the project for which this
proposal is submitted.
2. That by signing the signature page of this proposal, I am
deemed to have signed and to have agreed to the provisions
of this declaration.
NOTICE TO ALL BIDDERS
To report rigging activities call:
1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll -free
"hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone
with knowledge of possible bid rigging, bidder collusion, or other fraudulent
activities should use the "hotline" to report such activities.
The "hotline" is part of USDOT's continuing effort to identify and investigate
highway construction contract fraud and abuse and is operated under the
direction of the USDOT Inspector General. All information will be treated
confidentially and caller anonymity will be respected.
SR
DOT Form 272.OJGI EF
o7r2o11
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Proposal P-9
NON -COLLUSION DECLARATION
STATE OF WASHINGTON )
) ss.
COUNTY OF KING )
The undersigned, being first duly sworn, on oath states that the person, firm, association,
partnership, joint venture, or corporation named in the Bid Proposal has (have) not, either directly
or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any
action in restraint of free competitive bidding in connection with the City of Tukwila project named
Green River Trail Improvements, Project No. 91810403
T 1G-17O t- PA/4-
Name of Firm
Signature of Authorized Official -D4140 e,ozzAtriv
iPie3S IP rt1
Title
Si ned and savor to be• re me on this 1g day of / t/nlmee , 20 �t1
_mit
Signature of Notary Public in and for the State of Washington, residing at LSMANWAy 6014 -
My appointment expires: I
SEAL
;�j�STRljC�.
SEAL
n.-
4gHIN61..:.
To report bid rigging activities call:
NOTARY
. PUBL\C Z.
NOTICE TO ALL BIDDERS'-.,rT� .''' OP . 0 ,:.
1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll -free "hotline" Monday
through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid
rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such
activities.
The "hotline" is part of USDOT's continuing effort to identify and investigate highway construction
contract fraud and abuse and is operated under the direction of the USDOT Inspector General.
All information will be treated confidentially and caller anonymity will be respected.
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Proposal P-10
RESPONSIBLE BIDDER DETERMINATION FORM
Attach additional sheets as necessary to fully provide the information required.
40.n v 5`71gu ` 77t J /-
Name of Bidder:
Address of Bidder:
City ���� State Zip Cale
Contractor's License No. /11 l7I—V/-1'/'k1GWAState UBI No. C2730/33
Dept. of L&I
License Bond Registration No. ilt/i36-27o Worker's Comp. Acct. No. -2-49.i93.E—CO
Bidder is a(n): 0 Individual 0 Partnership 0 Joint Venture "Incorporated in the state of
List business names used by Bidder during the past 10 years if different than above:
N/A •
Bidder has been in business continuously from
lg6.2
L.
Year
Bank Reference litr aUI ,Viree 17/z/L 2S3 5 ' f / 7
Bank Account Officer Officer's Phone
No.
No. of regular full-time employees: I KO
Number of projects in the past 10 years completed: !/ ahead of schedule 07 on schedule
behind schedule
Bidder has had experience in work comparable to that required for this Project:
As a prime contractor for years.
Asa subcontractor for & years.
List the supervisory personnel to be employed by the Bidder and available for work on this project
(Project Manager, Principal Foreman, Superintendents, and Engineers):
Name Title
G�i2 CF n77 PM.
How Long With Bidder
ingiqiutm li?D ��-
cG1OLO 5m406-4/N I'll r- 20
IQIGI� Fe7R.ra4 FdPgi If lu 1
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Proposal p_11
Name the Surveyor to be used on this Project, who will directly supervise all surveying activities.
Attach a resume outlining the experience and qualifications of the Surveyor. Is the Surveyor
licensed in the State of Washington (a PLS)? gj Yes ❑ No
Surveyor's Name:
List all those projects, of similar nature and size, completed by Bidder within the past 10 years.
Include a reference for each. Any attached preprinted project listing must include all this
information. Bidder must have at least 10 years experience working on projects of similar nature
and size.
Year Contract
Project Name Completed Amount
Owner/Reference Name and Phone
List all projects undertaken in the last 10 years which have resulted in partial or final settlement
of the Contract by arbitration or litigation in the courts:
Total Claims Amount of
Contract Arbitrated Settlement
Name of Client and Project Amount or Litigated of Claims
N/A -
Has Bidder, or any representative or partner thereof, ever failed to complete a contract?
.No ❑ Yes If yes, give details:
Has Bidder ever had any Payment/Performance Bonds called as a result of its work?
Xr No ❑ Yes If yes, please state:
Project Name
N/P
Contracting Party Bond Amount
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Proposal P-12
Has Bidder ever been found guilty of violating any State or Federal employment laws?
No 0 Yes If yes, give details:
Has Bidder ever filed for protection under any provision of the federal bankruptcy laws or state
insolvency lawsNo0 Yes If yes, give details:
Has any adverse legal judgment been rendered against Bidder in the past 5 years?
›Er -No 0 Yes If yes, give details:
Has Bidder or any of its employees filed any claims with Washington State Workman's
Compensation or other insurance company for accidents resulting in fatal injury or
dismemberment in the past 5 years? t-No 0 Yes If yes, please state:
Date Type of Injury Agency Receiving Claim
N/A
The undersigned warrants under penalty of Perjury that the foregoing information is true and
accurate to the best of his/her knowledge. The undersigned authorizes the City of Tukwila to
verify all information contained herein.
Signature of Bidder
Title: i'sl Date: /l/2goA3
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Proposal
P-13
PROPOSED EQUIPMENT AND LABOR SCHEDULE
(Use additional sheets if required)
Equipment to be used:
DESCRIPTION/TYPE
YEAR
CONDITION
OWN/RENT
i
V
Labor to be used: tZ/V%D/UJS L/ 5D/eDzS! D 17j/
14771/E 57VIt 77D _.ivy
Name of Bidder
Signature of Authorized Official
Title
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Liberty
Mutual®
SURETY
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
Certificate No: 8210464 - 023049
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Aliceon A.
Keltner, Alyssa J. Lopez, Amber Lynn Reese, Amelia G. Bunill, Andrew James Carretto, Annelies M. Richie, Audrey M. Turner, Brandon K. Bush, Brent E. Heilesen.
Carley Espiritu, Christopher Amos Hayes, Christopher Kinyon, Cynthia L. Jay, Dana Marie Brinkley, Diane M. Harding, Donald Shanklin, Jr., Edward Sims, Eric A.
Zimmerman, Holli Albers, Jacob T. Haddock; James B. Binder, Jamie L. Marques, Julie R. 'Truitt. Justin Dean Price, Kari Michelle Motley, Katharine J. Snider,
Lindsey Elaine Jorgensen. Lois F. Weathers, Michael Mansfield, Misti M. Webb. Sara Sophie Sellin, Sarah Whitaker_ Tamara A. Ringeisen
all of the city of Tacoma state of WA each individually if there be more than one named, its true and lawful attomey-in-fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 20th day of July , 2023
State of PENNSYLVANIA
County of MONTGOMERY ss
On this 20th day of July , 2023 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
By:
Commonwealth of Pennsylvania - Notary Seal
Teresa Pastella, Notary Public
Montgomery County
My commission expires March 28, 2925
Commission number 1126044
Member, Pennsylvania Association of Notaries
David M. Carey, Assistant Secretary
Bye pe_a,4)
Ltaft)
Teresa Pastella, Notary Public
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV —OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may he necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is iniull force -arts effect and
has not been revoked. - -
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 26th day of December , 2023-
LMS-12873 LMIC OCIC WAIC
ulti Co 02/21
By:
Renee C. Llewellyn, Assistant Secretary
0 U
cE
o>
U w
>c
Q
a0
Q7 �
cE
O
O O
Lei C
ao
0 CV
00
cCD
(0=
U
Low
LL a
Proposal P-14
PROPOSED SUBCONJ�RACTORS
Name of Bidder 4GT7U/ (�!/N.S7UG7 OA% -
In accordance with RCW 39.30.060 as amended, every bid that totals $1 million or more shall include below
the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for
performance of the work of: HVAC (heating, ventilation, and air conditioning); plumbing as described in
chapter 18.106 RCW; and electrical as described in chapter 19.28 RCW, or to name itself for the work. The
Bidder shall not list more than one subcontractor for each category of work identified, unless subcontractors
vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which
alternate. Failure of the Bidder to submit as part of the bid the names of such subcontractors or to name
itself to perform such work or the naming of two or more subcontractors to perform the same work shall
render the prime contract bidder's bid nonresponsive and, therefore, void.
The successful Bidder must have the written permission of the Owner to make any change to this list.
Percent of total bid to be performed by Bidder 6:4)
Name
[1.6- srIwzt Frec 2 ic_
Acz
4 PJI&
Metc,
1/E etrOlgoom GL-•
Schedule/Bid Item Numbers
Subcontractor will perform
GrG?72/64z, - 8.1": S"D, 5/
5712aG Srl�L
BRA
/ U,46
% of
Total Bid
4 5 %
D
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage
Conditions Agreement see www.bxwa.com - Always Verify Scal
Federal Aid Contract Provisions and Forms C-14
i
�;Washington State
/ Department of Transportation
Disadvantaged Business
Enterprise Utilization Certification
To be eligible for Award of this Contract the Bidder shall fill out and submit, as a supplement to its sealed Bid Proposal,
a Disadvantaged Business Enterprise (DBE) Utilization Certification. The Contracting Agency shall consider as non-
responsive and shall reject any Bid Proposal that does not contain a DBE Utilization Certification which properly
demonstrates that the Bidder will meet the DBE participation requirements in one of the manners provided For in the
proposed Contract. Refer to the Instructions on Page 2 when filling out this form or the Bid may be rejected. An
example form has been provided on Page 3. The successful Bidder's DBE Utilization Certification shall be deemed a
part of the resulting Contract.
Box 1: A -77VE t 713'17214t/77jJ T1VG. certifies that the DBE firms listed below have been contacted
regarding participation on this project. If this Bidder is successful on this project and is awarded the Contract, it shall
assure that subcontracts or supply agreements are executed with named DBEs. (If necessary, use additional sheets.)
Box 2: gN Avg 7 f7/L /(i{e' 01/617101-TS
Column 1
Name of DBE
(See instructions)
Column 2
Project Role
(Sea instructions)
Column 3
Description of Work
(See instructions)
Column 4
Dollar Amount
Subcontracted
to DBE
(Sec instructions)
Column 5
Dollar Amount
to be Applied
Towards Goal
(See instrudwns)
6-el N ets
C rdR.i,
Goy ��-e CP�ci- ,,fr-93,
�95
�.�93
Disadvantaged Business Enterprise b 7v'J0
Condition of Award Contract Goal Box 3
Total DBE Commitment Dollar Amount lDa/3, t7QO
Box 4
5 ❑ By checking Box 5 the Bidder is stating that their attempts to solicit sufficient DBE participation to meet
the COA Contract goal has been unsuccessful and good faith effort will be submitted in accordance with
Section 1-02.9 of the Contract
DOT Form 272-056
Revised 03'2016
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Federal Aid Contract Provisions and Forms C-22
Local Agency Name 774eN1114
Local Agency Address
b ZDD 5ornmgm OL
WJL lgb/g$
Local Agency Subcontractor List
Prepared in compliance with RCW 39.30.060 as amended
To Be Submitted with the Bid Proposal
Project Name G J
Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the
work of structural steel installation, rebar installation, heating. ventilation and air conditioning, plumbing, as described in
Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform
the same work will result in your bid being nonresponsive and therefore void.
Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation,
rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as
described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.
To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is
listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (it) be
performed by a lower tier subcontractor who will not contract directly with the bidder.
Subcontractor Name
Work to be performed
Subcontractor Name
Work 10 be performed
Subcontractor Name
Work to be performed
Subcontractor Name
Work to be performed
Subcontractor Name
Work to be performed
Be:I-se-11A2+ C__
.S7uL S��L-
-1/E 0-i7tXoom
-GGt/Y18/Ny'
//o1//7e-ie6- /11ecNfq/J/(dqi
1/144
" Bidder's are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered
electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical
current is connected during the project.
DOT Form 271-015A
Reviseo 0612020
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Federal Aid Contract Provisions and Forms C-23
� Washington State
Tar Department of Transportation
Contractor Certification
Wage Law Compliance - Responsibility Criteria
Washington State Public Works Contracts
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL
MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD
I hereby certify, under penalty of perjury under the laws of the State of Washington, on behalf of the firm
identified below that, to the best of my knowledge and belief, this firm has NOT been determined by a final
and binding citation and notice of assessment issued by the Washington State Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully
violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three
(3) years prior to the date of the Call for Bids.
Bidder Name
14&n vv 57 �7arl. il�
Name of Contractor/Bidder - Print full legal entity name of firm
By.
Signature of authorized person
Title: fg11)Y1"�
PFIV/ 2 giu- 7
Print Name of person making certifications for firm
Place:
-774c rnAl G -
Title of person signing certificate Print city and state where signed
Date Nov. ZS, 2023
Form 272-009
08+2017
GREEN RIVER TRAIL IMPROVEMENTS
City of Tukwila
October 2023
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Date of Issue:
Bid Submittal Date:
Date of Opening:
ADDENDUM NO. 1
City of Tukwila
Green River Trail Improvements
City Project No. 91810403
November 20, 2023
November 28, 2023 9:30 AM
November 28, 2023 10:00 AM
Notice to All Planholders:
This Addendum No. 1, containing the following revisions additions, deletions, and/or clarifications, is
hereby made part of the Plans and Contract Provisions (Contract Documents) for the above -named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
PROPOSAL
Page P-3
Delete and REPLACE with attached Revised Sheet. See Item Numbers 44 and 45 area for
deletion.
SPECIAL PROVISIONS
Pages SP-39, SP-40-42, SP-73
Delete and REPLACE with attached Revised Sheets. See strike -through text related to Item
Numbers 44 and 45 area for deletion.
CONTRACT PLANS
1. Sheet Numbers UD 401 — Replace
Delete and REPLACE with attached Revised Sheet. See clouded area for revisions.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
All bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the space
provided on the Proposal Signature Sheet or by signing in the space provided below and
submitting the signed addendum with the bid package. Failure to acknowledge receipt of the
Addendum may be considered as an irregularity in the Bid Proposal and the City reserves the right to
determine whether the bid will be disqualified.
Sincerely,
1—DoeuSlgned by:
Mari petAAn.t.%wvui
�— 510BE1991 D9C4D9...
Hari Ponnekanti, P.E.
Director/City Engineer
Receipt acknowledged and conditions agreed to this
Bidder:
Signature
day of MY • , 20_�
Addendum No. 1
Project No. 91810403
November 20, 2023
Page 1 of 1
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
cn
w
0
0
0_
z_
0
z
0
w
•
F
w
J
0
z U H
U
O O 0
D 0 d
cn
O O
w r
w
0
0 m
ma
Contract Value
$ 2,755,519.00
V
D)
V
co
r_
C7
y)
$ 1,899,487.74I
$ 624,692.85
$ 1,346,423.94
C7
r.
N
V
ry
E9
$ 49,000.00I
$ 1,085,705.60
$ 568,807.35
(D
N
O
O]
69
Ca)
C)
C ))
o
O
(A
$ 2,454,497.20I
(D
(n
O
o
EH
V
N
O
ac0
N
CJ
69
$ 214,275.75I
$ 468,940.65
$ 6,560,548.46
$ 419,206.01
((
N
M
O
V
M
63
M
U)
(n
m
CO-
CO
Ea
O
N
O
0
(A
D)
[h
7
(�)
C)
(n
EA
I $ 2,069,196.55 I
(()
aD
CO
COC)
4)
$ 2,732,360.14 I
$ 21,454,696.00
$ 2,481,952.96
$ 5,415,690.47
r-
0
a)
0—
0
(H
$ 2,116,312.1
a
7
N
(0O
CI
EA
$ 2,523,400.00
o
O
O)
0
O)
0
fA
$ 1,747,742.90
$ 265,118.00
$ 1,522,533,93
$ 527,710.56 I
d
C
0
a--
0
(360) 438-2639
(360) 753-8484
(360) 426-4232
(360) 438-2639
(360) 753-8484
O
C7
O
(7
V
O0
M
253-853-7618
(253) 798-2728
(253) 798-6165
(253) 365-6730
(360) 753-8484
(253) 851-6170
(253) 922-9315
(360) 753-8568
(253) 798-2725
(253) 922-2489
(425) 452-4170
(206) 440-4699
(253) 573-7879
(253) 798-2725
(360) 570-6761
(253) 798-2725
(360) 528-8022
N
C7
N
(O
V
O
M
(360) 867-2300
O
0
r
r
O)
(D
o
on
1(360) 753-8721
N
(O
CO
CO
V
C)
N
(360) 867-2300
(360) 438-2639
(360) 867-2300
(253) 591-5500
(360) 438-2639
(360) 754-5855
(253) 798-6165
(360) 438-2639
(253) 798-2728
Job Description Owner Owner Rep
Mullen Road Extension City of Lacey Roger Schoessel
Harrison Avenue Improvements City of Olympia Jim Rioux/Fran Eide
Skokomish Alternate Access Road Skokomish Tribe Dave Nichols
Westbound Britton Parkway City of Lacey Roger Schoessel
Henderson Blvd Sanitary Sewer & Water Main Realignment City of Olympia Jim Rioux
Carpenter Road Reconstruction City of Lacey Dale Mix I
Cushman Trail Culvert Repair City of Gig Harbor Maureen Whitaker
Warren Creek Pierce County Helmut Schmidt
Neadham Road Setback Levee Pierce County Ingo Kuchta
VIC 1-5 Puyallup River Bridge - Sidewalk Ramps WSDOT Dennis Steinberg
18th Ave Half Street Improvements City of Olympia Jim Rioux
56th St. NW/Pt. Fosdick Dr NW Street Improvements City of Gig Harbor Marcos McGraw
70th Ave. E. Phase 2 City of Fife Ken Gill
Capitol Way Overlay Improvements City of Olympia Brett Bures
Puyallup River Floodplain Restoration at Fennel Creek Pierce County AI Zehni
62nd Ave E Sidewalk and Sheffield Trail and 20th St E Crosswalk City of Fife Russ Blount
West Lake Sammamish Parkway Phase 11-90 Roundabout to SE 34th St City of Bellevue Carl Haslam
NB SR 167 to NB 1-405 Major Drainage Repair WSDOT Broch Bender
IWilkeson Creek Access Road Puyallup Tribe Andrew Strobel
'Orville Road Engineered Log Jam Setback Revetment Pierce County Al Zehni
Mark Carson
Larchmont Wetland Reserve Pierce County Al Zehni
'Taxiway C & North Taxiway W Rehab & Terminal Entrance Widening Port of Olympia Bill Helbig
Reservation Road Reconstruction Skokomish Tribe Dave Nichols
Chehalis Western Trail Phase 3 Thurston County Matt Unzelman
Middle Fork Snoqualmie River Road US DOT Craig Sanders
(Boulevard Rd & 22nd Ave City of Olympia Rolland Ireland
Upper Clear Creek Mitigation Site Port of Tacoma Dave Myers
Delphi Road Safety Improvements Thurston County Matt Unzelman
'Chambers Lake Stormwater Treament Facility City of Lacey Roger Schoessel
Salmon Creek Bridge L-4 Replacement Thurston County Matt Unzelman
'Tacoma Pedestrian Crossing Improvement City of Tacoma Mark D'Andrea
Golf Club Road Extension City of Lacey Roger Schoessel
Capitol Blvd - M Street City of Tumwater John Norman
Needham Road In -Stream ELJ Mitigation Project Pierce County Ingo Kuchta
Willamette Drive NE & 31st Ave Improvements City of Lacey Roger Schoessel
Fennel Creek Property Restoration Phase 2 / 1408-124 Pierce County Helmut Schmidt
SR7 Muck Cr Trib-Nisq Riv Remove Barrier WSDOT
Completion
Date
0
NNNNCSINNNNNNNNNIN
0
s-
0
.-
0
N
0
C0
0
M
0
N
O
N
0
N
O
(7
0
CO
0
CO
0
C)
O
2013
C7
0
C)
0
N
2013
C]
O
N
C7
0
N
2014
V
0
N
V'
0
N
0
N
2014
2017
2014
2017
2014
)D
O
N
V)
0
N
' 2016
2015
vl
0
N
4)
0
N
' 2016
2015
a
Q
10-001
0
O
110-016 1
9
O
9
-
LII
9
CD
9
111-009 I
9
r
112-004 I
9
N
9
N
9
N
9
(NI
9
N
112-024
112-028
113-002
113-010
we-
9
C)
cO
9
M
13-017
13-020
13-022
9
01
14-004
4
9
4
4
v.
4
C
v
14-019
14-024
15-003
15-004
15-007
15-008
Active Construction, Inc. Confidential
Updated: 10/9/2023
U
0)
w
O
0
0
a
z_
0
z
w
1-
w
J
a
2
• O
z U 0)
CO
U
O O_ -
U ~ o
D U O
d' w O
tY
0DO
05
W U
J W
O
U 0 n
ama
Contract Value
$ 424,259.901
CO
c0
to
cr
(O
0)
fA
$ 1,963,562.151
$ 1,212,212.00
LO
CO
O)
O
V
O)
O)
v)
O
0
O
(1)
(p
O
(O
(D
69
$ 2,167,099.24
$ 434,756.39
$ 3,354,711.99
$ 422,422.00
$ 2,064,974.00
$ 167,072.00
0
0
r-
(`')
n
0)
0)
$ 4,489,832.49
$ 785,785.00
$ 1,706,337.47
$ 11,103,565.00
0
0
co
CO
CO
CO
(A
0
0
(O
c0
(D
(n
CO
(O
69
$ 1,344,808.89
$ 505,043.93
$ 1,583,397.89
O
O
(`O
N
CO
N
N
fR
$ 1,418,750.00
O
O
CO
V
6O
c0
'7
00
(fl
J$ 14,667,509.00
$ 3,336,041.00
$ 1,251,545.00
O
O
O)
n
(O
O
O)
0)
$ 3,040,502.00
ro
00
N
a0
CO
,-
cO
,-
CO
O
O
O
O
O
N
(D
(O
Hi
$ 2,528,000.00 I
O
O
O
O
0
O
'?
CI
N
fA
$ 576,000.00
O
0
O
O
O
O
(fl
N
0)
$ 2,925,542.81
Phone
(253) 922-9315
(360) 867-2300
(425) 413-8800
(360) 337-5777
(360) 754-5855
(253) 798-7250
(360)528-8000
(360) 867-2300
(360) 754-5855
(360) 705-7337
(360) 407-9302
0)
co
0))
I-
O
CO
(360) 754-5855
(206) 477-4552
(206) 477-4552
1(253) 798-4233
1(206) 431-2450
(360) 458-8499
[(253)835-2723
(360) 893-2219
(503) 419-2130
1(253) 931-3000
(360) 427-9670
1(253) 798-7250
I(360) 867-2300
(360) 876-4407
(360)753-8721
(253) 798-2725
(360) 754-5855
1(253) 922-9315
1(253) 922-9315
1(425) 452-4367
1(253) 798-4233
(253) 798-2725
I(360) 407-9302
0)
0)
v
in
co
0)
(O
N
Owner Rep
—_
C
Y
Matt Unzelman
Kim Scattarella
Steve Nichols
John Norman
Henry Gertje
Tyson Carpenter
Matt Unzelman
John Norman
Robert Christopher
Doug McCudden
John Norman
John Norman
"O
7
¢
N
C
0
'O
7
a
CO
C
0
Greg Hess
Cindy Knighton
Maryanne Zukowski
Christine Mullen
Bryan Condon - Engineer
(Matthew Larson
Sarah Grice
(Henry Gertje
Matt Unzelman
(Mike Pleasants
C
CO
N
CO
O
CC
AI Zehni
'John Norman
-
a)
Y
=
0)
Y
'Diane Sheesley
CO
N
N
❑
Greg Hess
AI Zehni
Doug McCudden
Paul Marrinan
Owner
City of Fife
Thurston County
City of Maple Valley
Kitsap County
City of Tumwater
Pierce County
Port of Olympia
Thurston County
City of Tumwater
WSDOT
Dept of Enterprise Services
E&AS
City of Tumwater
City of Tumwater
King County
King County
Pierce County
City of Tukwila
City of Yelm
City of Federal Way
City of Orting
King County Airport
City of Auburn
Mason County
Pierce County
Thurston County
City of Port Orchard
'City of Olympia
Pierce County
City of Tumwater
li
0
a
City of Fife
City of Tacoma
City of Bellevue
Pierce County
Pierce County
Dept of Enterprise Services
E&AS
City of Puyallup
Job Description
Firwood Condos Stormwater System & Wapato Creek House Removal
WARC Access Road
216th Ave SE Roadway Improvements SE 272nd (SR 516) to SE 283rd St
Manchester Stormwater Retrofit and Traffic Improvements - Phase 3
Tumwater Blvd/I-5 SB Ramp Improvements Project
Park Avenue South - 125th Street South to Garfield Street South
Cleanwater Centre Site Work
Tilley Road Curve Culvert Replacement
Tyee Drive Extension / Israel Road Improvements Project
SR 302 - 1.15 Miles S of E Victor Road Major Drainage
Emergency Vehicle Operations Course (EVOC)
Kirsop Road Maintenance Project
Capitol Blvd & U Street Pedestrian Improvements
East Lake Sammamish Master Plan Trail South - Segment A
Fairwood West HOA Pipe Replacement
78th Avenue E & 184th Street Intersection
40th - 42nd Avenue South - Phase 3
1st Street SW Improvements
21st Avenue Pedestrian Improvements
Washington Ave. Two Way Left Turn Lane Improvements
Runway Safety Improvements Vashon Island
M Street SE Improvements
Cloquallum Road MP 5.85 to 6.60
Bridge #28183-A Replacement 8th Ave E North Fork Muck Creek
Rich Road SE Phase 2
Tremont Street Widening
Boulevard Road and Morse -Merryman Roundabout
Orville Road Engineered Log Jam Setback Revetment Phase 2
70th Avenue Sewer and Water Extension
66th Avenue Improvements
8th Street E & 54th Ave E Culvert
East 25th Street Improvements
Lower Coal Creek Flood Hazard Reduction
22nd Avenue and 152nd Street Intersection
Ball Creek Flood Plain Revetment
EVOC Skid Pan Repair - WA State Patrol Training Course
Clarks Creek Channel Stabilization
c
ta
0) N
a
E❑
0
U
(O
N
CO
0
N
(0
0
N
(0
a
N
t-
0
N
2017
r
0
N
N
0
N
2017
ti
0
N
(0
0
N
2017
2017
2018
2018
2018
CO
0
N
2017
2017
GO
0
N
2017
2017
2017
2018
r0
0
N
0)
0
N
c0
0
N
2018
2018
2018
CO
0
N
2018
00
0
N
2019
2018
2019
co
0
N
Job #
r7
O
9
to
0
9
(D
lD
0
4
(D
N`
0
9
CO
00
O
9
(D
M
9
(D
ct
9
(D
I16-018 1
O
N
9
(D
-
N
9
(D
O
N
9
(O
(D
N
9
CO
01
N
Q
CO
O
el
9
(D
I17-001
N
0
9
n
I,-
O
9
I,-
CO
0
9
n
01
0
9
Is
O
9
n
N
9
r
VI
9
N`
V
9
n
ID
9
t`
(D
9
N
CO
<
9
n
a
N
9
N-
H)
N
9
I-
CO
N
9
I
I17-032
N
O
9
co
a
O
9
03
(D
O
9
CO
0)
O
9
CO
118-010
9
03
I18-014
Updated: 10/9/2023
0)
N
W
0
re
a_
Z_
0
0
W
1-
W
J
U O
Z U
- 1-
U
O _O -,
U ~ O
D 0 cc
d
re - M
CO
00
W CC U
W
H m
U °
Q O a
Contract Value
$ 1,560,560.00
$ 2,213,213.00
$ 336,336.00
$ 742,742.00
0
0
00
O
CO
(»
$ 2,484,484.00
$ 2,376,376.00
0
0
M
M
a)
1�
a
fA
$ 613,613.00
$ 2,942,942.00
$ 1,309,309.00
$ 5,920,920.00
$ 2,920,820.00
0
0
1-
,-
N
N.-
fA
$ 2,709,933.00
0
0
(O
1
(D
P
v
s-
EA
0
0
N
V
N
'7
v
(f)
$ 414,414.00
$ 2,154,154.00
0
0
M
CO
CO-
CO
co
f9
$ 1,063,550.50I
0
0
N
tO
N
CO
(O
s-
M
0
0
c0
r
O
CO
r`
CO
$ 1,148,153.361
$ 2,838,783.00
$ 2,422,172.00
I $ 9,467,467.00
$ 1,245,245.00
$ 7,280,625.00
0
0
a)
N
a)
U)
s-
fA
I $ 1,305,305.00
$ 3,955,955.00
I $ 2,244,696.26
I $ 2,566,334.88
' $ 4,759,759.00
$ 2,058,058.00
$ 2,281,183.00
$ 3,894,894.00
Phone
(360) 754-5855
(360) 754-5855
(360) 426-4232
(253) 835-2723
(360) 407-7979
(360) 570-6786
(253) 798-7250
(425) 204-4403
(360) 438-2639
1(253) 581-1912
I(206) 263-9325
1(360) 438-2639
(425) 452-4868
(425) 495-1577
(425) 452-4230
(253) 594-7871
(360) 438-2639
(206) 263-9325
(425) 888-7653
(360) 740-1175
(253)798-6157
'(425) 452-4170
((425) 413-8800
(253) 502-2225
(360) 426-1151
(360) 432-5750
1(360) 867-2300
1(425) 452-4230
1(425) 452-7905
1(253) 835-2723
1(253) 798-7250
1(253) 983-7795
1(360) 561-1715
1(425) 295-0500
1(253) 856-5508
1(253) 460-5411
1(360) 473-5323
(360) 754-4140
Owner Rep
John Norman
John Norman
Dave Nichols
Christine Mullen
Hamed Khalili
Brian Whitehouse
Greg Hess
Stewart Shusterman
Aubrey Collier
Mark Burlingame
Mark Hoge
Aubrey Collier
Jim Stockwell
Evelyn Pao
Jun Suk An
Lisa Oestreich
Aubrey Collier
Mark Hoge
0
O
2
E
0
F-
Malcolm Bowie
David Davis
Dale Lydin
(Terry Wright
'Steve Hoffman
(Wendy Smith
'Danette Brannin
'Matt Unzelman
Jun Suk An
Paul Krawczyk
'Christine Mullen
Arnie Shepard
`Eric Swanstrom
'Kristin Williamson
'Monica Thompson
Tim Laporte
'Jack Ecklund
'Andrea Archer -Parsons
Brandon Hicks
Owner
City of Tumwater
City of Tumwater
SkokomishTribe
City of Federal Way
Dept of Enterprise Services
E&AS
WSDOT
Pierce County
Renton School Dist
City of Lacey
Town of Steilacoom
King County
City of Lacey
City of Bellevue
1-
0
O
co
City of Bellevue
City of Tacoma
City of Lacey
King County
City of North Bend
Lewis County
Pierce County Surface Water
City of Bellevue
City of Maple Valley
City of Tacoma
Port of Shelton
Mason Transit Authority
Thurston County
City of Bellevue
City of Bellevue
City of Federal Way
Pierce County
City of Lakewood
SPSSEG
City of Sammamish
City of Kent
City of University Place
City of Bremerton
City of Tumwater
Job Description
Desoto Street Stabilization and Rehabilitation
Capitol Blvd Israel Rd to 73rd Ave
Reservation Road Sidewalk
Military Road S & S 298th St. Compact Roundabout
Capitol Campus Utility Renewal
SR510 Meridian Rd SE Roundabout and Paving
62nd Avenue NW & 144th St NW Intersection
McKnight Middle School Field Improvements
Lebanon Street Extension
Steilacoom Blvd SW Improvements
55th Ave S at Bingamon Creek Culvert Replacement
College Street and 22nd Ave Roundabout
Lower Coal Creek Flood Hazard Reduction - Group 3
SR520 80th Ave to 108th
150th Newport Way Roadway Improvements
SWM Drainage & Traffic Safety Improvements
College Street and Yelm Super T Pavement Rehabilitation
Westside Highway SW Roadway Repair
Park Street Roundabout
Highway Safety Improvement Program Phase 2
Orville Rd ELJ Setback Revertment Ph 2B
Lakemont Blvd SE Repairs & 164th Ave SE and SE
SE Kent-Kangley Road / 242nd Avenue SE Intersection Improvements
Hosmer Holding Basin Maintenance
Sanderson Field Runway Pavement Overlay Construction
Log Yard Rd And SR 3 Roundabout Construction
Mullen Road - Lacey City Limits to Carpenter Road
100th Ave NE and NE 10th St Roundabout
SE Newport Way Somerset Blvd to 150th Ave SE
South Dash Point Road Improvements
Orting-Kapowsin E - Orville Rd E to 264th St E
Onyx Drive Roadway Improvements
South Prairie Floodplain and Off -Channel Restoration Project
Big Rock State Park Site B Ph. 1 Improv.
Willis Street and 4th Avenue S Roundabout
Cirque Drive West Phase 3 Roadway Improvements
Kitsap Lake Elementary Safe Routes to School
Citywide NHS Resurfacing
Completion
Date
co
O
N
a)
0
N
co
0
N
2019
a)
0
N
a)
CDO
N
2020 1
2019
2019
o)
N
2019
O
N
0
N
2019
2019
a)
O
N
2019
2020
2019
2020
o)
O
N
2019
2019
2019
rn
O
N
2020
2020
N
0
N
2020
2020
2020
2020
2020
O
N
0
N
2020
2021
2021
N
O
N
2021
n
o
18-017
CO
a-
4
00
0
N
R
0o
e-
118-023 l
18-026
M
M
4
W
119-001 1
M
0
4
a)
(O
0
4
a)
h
0
4
a)
(0
O
4
T
0
.......
4
a)
R
a)
Or
4
D)
N
4
a)
a)
R
a)
I-
R
a)
0)
4
O
0
N
4
0)
CO
4
0)
N
N
R
01
M
N
4
a)
1.-
N
R
01
CO
N
4
W
a)
N
4
01
in
co)
4
O
h
()
4
a)
s
Or
4
01
N
V
4
01
N
Or
g
0)
N
0
o
O
I20-009
0
c-
0
c-
T.
00
I20-014
(D
9
N
D1
o
N
120-021
Active Construction, Inc. Confidential
N
O
N
(0
a
Updated: 10/9/2023
co
co
W
a'
0
W'
a
z_
0
0
z
w
F
w
J
a
2
• 0
Z U 0)
— � H
UU ▪ O
D 0 a
LL
CO
p O
U d
W IZ 0
W J
U ▪ � 7
¢ana
Contract Value
$ 15,323,323.00
$ 1,259,259.00
0
O
ui
N
.0-
(0
0)
N
co
(A
$ 7,570,570.00
$ 2,069,069.00
$ 945,377.00
$ 1,725,725.00
$ 1,250,145.00
0
o
0i
0
r
W
0
r-
H
(A
$ 320,320.00
0
0
H
0)
N
N
I�
(A
$ 358,358.00 I
0
0
of
(D
V
0)
(0
V
N
69
$ 2,822,822.00
$ 6,237,237.00
0
0
r�
I�
(n
N
f�
III
(A
$ 3,479,479.00
0
o
o
(0
CO
O
CO
m
1-
(A
$ 1,477,477.00
$ 2,985,985.00
0
O
0
0
Cr
O
0
V
V
63
$ 2,488,573.00
$ 2,168,441.18
$ 6,605,605.00
$ 2,124,124.00
0
o
of
(0
V
0)
(0
"4
.-
(A
0
0
(0
_
(D
—
(O
(9
$ 6,857,857.00 I
0
0
(0
0
O
(0
(h
o
N
ED
0
0
(o
O
.00
(0
0
V
(A
$ 2,498,498.00
$ 466,466.00
$ 9,449,449.00
$ 646,646.00
0
0
(0
NI-
(0
V
(0
N
(9
$ 1,175,175.00
$ 3,684,684.00I
$ 965,965.00
Phone
(360) 394-9882
(253) 798-6157
(253) 952-3299
(425) 452-4170
(360) 565-0620
(253) 798-4228
(360) 473-5758
(206) 263-9325
(425) 430-7200
(360) 740-2671
(360) 438-2639
(360) 876-4407
(425) 452-4870
(253) 798-6165
(360) 473-2312
1(253) 759-3544
(253) 964-8121
(360) 867-2292
(206) 423-1063
(206) 423-1063
(425) 452-4870
(360) 473-2312
(253) 853-7620
(253) 591-5519
(253) 798-6157
(360) 330-7512
(425) 452-4550
(206) 263-2164
(253) 835-2722
(360) 337-5777
(360) 473-5758
(253) 856-5508
(206) 263-6813
(425) 837-3410
(509) 576-6480
(425) 413-8800
(206) 423-1063
(253) 798-6157
Owner Rep
(Josh Ranes
'David Davis
(Jeremy Metzler
Dale Lydin
'Dan McKernan
Al Zehni
Gunnar Fridriksson
Mark Hoge
IHebe Bernardo
(Aubrey Collier
Chris Hammer
Mike Rodni
lingo Kutchta
A
CO
❑
Gus Lim
Marcus Storvick
Victor Daggs
Victor Daggs
Gregory Lucas
N
g
CO
❑
Aaron Hulst
Toney Mathison
David Davis
Patty Page
Greg Lucas
David Shaw
John Mulkey
Theresa Smith
Gunnar Fridriksson
Nancy Yoshitake
Megan Saunders
(Matt Ellis
Mike Shane
Amy Shaw
(Victor Daggs
David Davis
Owner
City of Poulsbo
Pierce County Surface Water
City of Edgewood
City of Bellevue
WSDOT
(Pierce County Surface Water
City of Bremerton
King County
City of Renton
Lewis County
City of Lacey
(City of Port Orchard
City of Bellevue
Pierce County Surface Water
City of Bremerton
City of Ruston
City of Dupont
Thurston County
King County
King County
City of Bellevue
[City of Bremerton
City of Gig Harbor
City of Tacoma
Pierce County Surface Water
City of Centralia
[City of Bellevue
King County
City of Federal Way
Kitsap County
City of Bremerton
City of Kent
1King County
City of Issaquah
City of Yakima
City of Maple Valley
King County
Pierce County Surface Water
Job Description
Johnson Parkway & SR 305 Roundabout, Noll Corridor - South Segment
Orville Road Engineered Log Jam Setback Revetment Phase 2C
Edgewood Community Park
Mountains to Sound Greenway Trail Phase 2
US 101, Morse Creek Vicinity Safety Improvements
Huge Creek Culvert Replacement
Kitsap Way Culvert Replacement
Maury Island Open Space Remediation
Lake Washington Loop Trail
Stowell Road MP 0.57 Bridge Scour Repair
Capitol City Golf Course WWW Improvements
Sidney Ave Sewer Repair
112th Ave NE Corridor Improvements
Upper Nisqually River Levee Revetment Retrofit
Oyster Bay Beach Sewer Upgrade
North 53rd Street Improvements - Pearl to Bennett
Dupont - Steilacoom Road Improvements
Vail Road SE Improvements Phase 2
S 277th Bridge No. 3126 Replacement
Coal Creek Bridge No. 3035A
130th Ave NE Station Area Park and Ride
Kitsap Way (SR310) and Warren Avenue (SR303) Traffic Signal and Multimo
Harborview Drive and Stinson Ave Intersection (City of Gig Harbor)
Revitalizing Tacoma's Brewery District
,Orville Road Engineering Logjam Revetment Phase 2B Year 2
,Harrison Avenue Improvements
NE Spring Blvd - 130th Ave NE to 132nd Ave NE
Lake to Sound Trail Segment C SeaTac
Lakota Middle School SRTS
Olympiad Drive Culvert Replacement
Price Road and Brentwood Drive Culvert Replacements
84th Street Slump Repair
Jan Road Levee
2nd Ave SE & SE Bush St Intersection
Naches River Water Intake
SE 231st Street Extension
218th Street SE Roadway Preservation
I22-019 I 2022 Clear Creek Habitat Restoration
C
0
y a;
C CO
E❑
0
U
IN PROGRESS
N
o
N
N
0
N
2022
N
0
N
N
0
N
N
0
N
2021
-
N
0
N
2021
2021
2021
2021
N
0
N
2023
2021
2022
2022
N
N
0
N
2023
2023
2022
2022
2023
N
N
0
N
2022
0
N
0
N
2023
2023
2022
N
NNNOIN
0
NNNOIN
N
0
N
0
N
0
N
0
2022
N
N
0
N
#k
c
I20-024
20-026
N
c
N
In
c
N
I20-032
O
9
N
I21-002
O
9
N
I21-004
O
9
N
I21-007
21-009
o
N
I21-012
21-013
21-014
n
9
N!
I21-018
21-021
21-023
21-024
N
9
N
N
9
N
I21-030
0
9
N
l")
9
N
0
9
N
a
9
N
I21-042
22-004
22-009
22-011
22-013
22-015
22-016
22-017
22-018
Active Construction, Inc. Confidential
O
a)
(00
a
Updated: 10/9/2023
N
U1
w
LL'
C7
0
o_
_Z
Z
❑
w
w
0
a
• 0
ZU O7
- H
U
OOF 0
D U d
CO
0j0
0 0
W rX U
W J
o m
¢ma
Contract Value
$ 1,153,153.00
$ 3,833,023.00
0
0
0
O
(a
O)
O
V
0
$ 2,715,715.00
$ 1,098,098.00
0
0
(0
rn
Q)
ui
CO
0)
fA
$ 4,062,062.00
$ 867,530.90
$ 12,150,150.00
$ 23,242,242.00
$ 2,378,378.00
$ 1,181,181.00
$ 1,556,545.00
$ 1,943,943.00
$ 805,805.00
$ 5,575,575.00
$ 6,229,229.00
0
0
o
o
O)
(ri
V
(D
(A
$ 3,418,150.00
$ 739,739.00
$ 542,542.00
$ 6,660,352.06
(n
(0
o
V
(n
1`
O)
N
(A
$ 2,665,665.00
o
0
Di
(0
N
o)
(0
N
co-
(A
0
0
o
rn
0
o
o)
0
.-
EA
$ 1,552,552.00
$ 478,478.00
$ 2.257.257.00
$ 6,412,412.00
$ 974,974.00
$ 1,416,416.00
0
0
Di
o
cn
O
.-
N9
0
0
n
o)
(D
r
0)
CO
fA
$ 897,897.00
Phone
(425) 757-6657
(360) 867-2292
(360) 473-5758
(360) 867-2292
(425) 837-3415
(360) 725-9757
(360) 753-8297
(360) 754-4140
1(425) 452-2027
(360) 705-7835
I(206) 275-7655
(253) 983-7852
(253) 856-5561
(253) 581-1912
(425) 413-8800
(253) 307-9894
(503) 799-0934
(360) 902-8500
(206) 477-7555
(360) 705-7835
(509) 662-4068
(360) 615-5668
(360) 786-5497
(425) 556-2792
(253) 798-6647
(360) 565-0620
(253) 888-4711
(206) 263-6813
(360) 473-5758
(253) 245-6196
(503) 548-1496
(425) 430-7298
(253) 835-2718
(425) 430-7208
Owner Rep
Jake Lund
Betsy Severtsen
Marcus Storvick
(Gunnar Fridriksson
Marcus Storvick
(Isabel Diaz
Sanh Ho
(Brian Philumalee
Bill Lindauer
(Kyle Potuzak
Johnathan Mouhanna
Lia Klein
(Stacey Reding
Drew Holcolm
(Mark Burlingame
Amy Shaw
Danika Washington
Justin Isle
Brett Taylor
'Tom Early
(Paul Mason
(Kyle Burtis
Eric Palmer
Bill Richardson
N
O
z
C
O
0
Q
(Andrew Robson
Ben Ford
Kathee Sewell
(Megan Saunders
Gunnar Fridriksson
Craig Moore, Parametrix
Kari Nichols
Michael Sippo
John Cole
Jonathan Chavez
Owner
City of Olympia
City of Renton
Thurston County
City of Bremerton
Thurston County
City of Issaquah
WA Parks & Rec
City of Olympia
City of Tumwater
City of Bellevue
LWSDOT
City of Mercer Island
City of Lakewood
City of Kent
Town of Steilacoom
City of Maple Valley
WSDOT
Cowlitz Indian Tribe
Washington State Parks
King County
WSDOT
East Wenatchee
City of Enumclaw
Thurston County
City of Redmond
Pierce County
WSDOT
Port of Tacoma
King County
City of Bremerton
City of Puyallup
Lity of Roslyn
City of Renton
City of Federal Way
City of Renton
Job Description
Yauger Park Field Renovations
Philip Arnold Park Site Improvements
US 12 & Sargent Road Roundabout
Pine Road Basin Stormwater Improvements
Woodard Creek Retrofit Site
Newport Way NW Improvements
Schaefer State Park Relocate Campground
State Ave Safety Improvements
1-5 / Trosper Rd / Capitol Blvd Reconfiguration
124th Ave NW & Ichigo Way to Northup Way
SR 516 Barnes Creek Fish Passage
Sunset Hwy & 77th Ave SE Intersection
Springbrook Park
South 240th St & Russell Rd TIB Sidewalk
Rainier Street Pavement Preservation
Witte Road Phase 3 South
SR 7 Unnamed Tributaries to South Creek
1Cispus-Yellowjacket PH Restoration
Sunset Beach Shelter and Site Upgrades
Cougar Mountain Precipice Trailhead Dev.
iSR508, 0.3 Miles E of Bergen Road Embankment Repair
Safe Routes to School: Kenroy Elementary/Sterling Intermediate/East Wenat
Boise Creek Restoration at Enumclaw Golf Course
Black Lake Belmore Rd Bridge A.R.
156th Avenue NE Cycle Track
Foothills Trail — East Puyallup & McMillan Trailhead Improvements
SR 20/Kearney St I/S — Roundabout
Administration Building Electric Vehicle Charging Stations
Rainbow Bend Mitigation Project
Washington & 11th Street Improvements
Wildwood Sidewalk Link Phase 3 - 31st Ave SE to 26th Ave SE
Pennsylvania Place Bottleneck & Stormwater Treatment Retrofits
Downtown Core Streetscape Phase II
27th Ave SW at SW 344th St Compact Roundabout
1Burnett South Sidewalk & Utilities Replacement
Completion
Date
2023
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS
#
o
I22-020
N
9
N
N
N
9
N
N
I22-027
O
N
9
N
04
O
M
9
N
N
N
CO
9
N
01
I22-034
22-036
22-037
CO
9
N
N
0)
COO
9
N
N
I22-043
22-044
N
0
M
N
I23-004
23-005
N
9
M
N
CO
9
M
N
Y7
9
M
N
I23-017
CO
9
CO
N
01
9
M
01
N
9
M
N
I23-022
23-023
23-026
h
N
9
M
N
I23-028
23-030
—
M
9
M
04
I23-033
23-034
1-
M
O
01
N
123-040
Active Construction, Inc. Confidential
Updated: 10/9/2023
Revised 11/15/2023
ACTIVE CONSTRUCTION, INC.
CURRENT EQUIPMENT LIST (by Categories)
141
241
254
261
1992
2004
2005
2000
KW/T800
Silverado 1500
Silverado 2500
IH 4700 Dump
KENWORTH Dump Truck S576882
CHEVROLET Pickup - finger
CHEVROLET 4X4 Pickup Nick
IH 6 YARD DUMP 1 HTSCABP8YH240445
263
2000
IH 4700 Dump
IH 6 YARD DUMP 1HTSCABP5YH240452
264
2000
IH 4700 Dump
IH 6 YARD DUMP 1HTSCABP4YH240457
268
269
270
271
273
274
282
2005
2005
2005
2005
2005
2005
2005
3500
3500
3500
3500
Silverado 1500
COLORARO
3500
CHEVROLET Flatbed Pete
CHEVROLET Flatbed Nate B
CHEVROLET Flatbed Spare
CHEVROLET Flatbed Ryan C
CHEVROLET Pickup Flagger
CHEVROLET Pickup Flagger
CHEVROLET Flatbed Matt h
318
2001
IH 2674 DUMP
IH 12 YD DUMP 1HTGLATT91H348046
322
2006
3500
CHEVROLET Flatbed eric k
328
2006
T300 KW
SERVICE/CRANE CORY
338
2007
3500
CHEVROLET Flatbed FLAGGER
340
2001
IH 4700 Dump
IH 6 YARD DUMP 1HTSCABP51H366140
341
2001
IH 4700 Dump
IH 6 YARD DUMP 1HTSCABP11H366152
349
380
386
2007
1996
2005
Silverado 2500
KW T800
KW T800
CHEVROLET 4X4 Pickup Linda h
KENWORTH Dump Truck J673443
KENWORTH Tractor SD R096702
398
2006
F150 4X4
FORD Pickup 4X4 going
400
406
416
429
441
442
445
449
451
1993
2003
2001
1993
2013
2013
2008
2014
2014
F150
F150
Tahoe
L9000 FORD
3500
3500
Silverado 1500
Silverado 1500
Silverado 1500
FORD Pickup Flagger
FORD Pickup Flagger
Chevy Tahoe GPS BRETT S
FORD Dump Trk 1FDZU9OXOPVA39192
CHEVROLET Flatbed Tony E
CHEVROLET Flatbed Eugene
CHEVROLET Pickup Matt N
CHEVROLET4X4 Pickup Frank
CHEVROLET 4X4 Pickup Kevin A
471
2015
3500
CHEVROLET Flatbed Matt N
474
476
2011
2016
Silverado 1500
3500
CHEVROLET4X4 Pickup Flagger
CHEVROLET Flatbed Nate F
477 2016 3500
CHEVROLET Flatbed Jacob B
L. 1992 Towma
150 1988 ATCO
r152 1996 TrailKing
181 1997 NWBS
188 1985 NWBS
EQUIP Trailer— 1P9DT6T29NG162139
10' x 40' Mob. Off. — GR3268588
TK50 Trailer— 1TKCO2633TM055834
10' x 42' Mob. Off. — 97648
12' x 50'Mob. Off. — 85243
207
2000
EAGLE
Trailer - 1C9BE2318YP694654
265
266
267
278
284
297
2003
2004
2004
2004
2005
1977
TK18
TK18
TK18
TK18
TD14
Dorsey
300 1977 Dorsey
301
1977
Dorsey
Eq. Trailer 1TKCO24213M112400 Pen Light
Eq. Trailer 1TKCO24225B078143 Pen Light
Eq. Trailer 1TKCO24205B078142 Pen Light
Eq. Trailer 1TKCO24265B078145 Pen Light
Eq. Trailer 4ZETD202251007074 (Mini Ex)
28' Van Trailer 127782
28' Van Trailer N36809
28' Van Trailer 127736
28' Van Trailer 127733
302
1977
Dorsey
26' Van Trailer 127756
303
1977
Dorsey
28' Van Trailer 127743
304
1980
Trlmo
28' Van Trailer V9006618
305
1991
Trlmo
28' Van Trailer DAE2M9005954
306
307
308
1991
1991
1991
Trlmo
Trlmo
Trlmo
28' Van Trailer 1H4V02813LJ006936
28' Van Trailer 1H4V02818LJ006950 Eugene
28' Van Trailer DAE1M9005895 Tom D
309
1991
Trlmo
28' Van Trailer DAE9M9006003
310
311
321
362
418
448
469
472
491
1991
1991
1999
2003
2012
2014
2014
2011
2016
GE
GE
TK18
Sidedump
CARGO
TrailKing
500
TrailKing
CARGOMATE
12x56 Office Trailer 033489
12x56 Office Trailer 084236
Eq. Trailer 1TKCO2421XM116811 Pen Light
Sidedumper Trailer 1YPFS42353P001189
6X12 BOX TRAILER 5NHUCH21XDT437924
TK110HDG LOWBOY Trailer — 54885
MQ 500 Gallon Water Trailer
TK12 MINI Trailer— 72530
PIPE TRAILER-BL714TA2
499
1998
STURDYWELD
PUP TRAILER-1S9CA544XWL189980
532
537
2005
2019
Olympic
Trailking
30Tdt-3 1 CPTF36395T997398
axle TKFA1-1TKR00513LM013677
35
478
2016
3500
CHEVROLET Flatbed Darrin M
53
1990
185DPQ
SULLAIR Air Compr. — 4101220
480
2017
PB 337
LUBE TRUCK 2NP2HJ7X4HM393017
134
1994
XAS-90DD
ATLAS COPCO Air Compr. - 603.087
481
2017
F150
FORD JAMIE I
208
1998
185
IR Air Compr. - 291031UFI221
489
2017
1500
chevrolet 1500 Zac Gustafson
256
2000
185
IR Air Compr. - 30919OUBK221
492
2003
T800b
Kenworth RUSS 389543
272
2000
185
IR Air Compr. - 309191UBK221
495
2017
F250 4X4
Ford F250 Tom Detray
316
2000
185
IR Air Compr. - 312742UBK221
500
2018
T880
KENWORTH 1XKZP4TX0JJ211847
317
2000
185
IR Air Compr. - 309192UBK221
502
2017
RAM 1500
DODGE RAM Randy Ausbun
389
2004
185
IR Air Compr. - 347487UG0820
503
2018
337
PETERBILT lube trk 2NP2HJ7X9JM497315
541
2006
185
IR Air Compr. - 36591xxaqb34
504 2018 1500
SILVERADO 1500 - BACH
9
505
2017
2500
SILVERADO UTILITY TRUCK Jarred D
399
2008
PWRSCRN
WAR-1800-PID00123C86D05172
508
2017
F450
FORD FORMENS TRUCK John N
405
2007
SOAKER
ASCPWW-24 Wheel Wash 1Z9WWW163312
509
2017
F450
FORD FORMENS TRUCK Joey R
473
2011
MSE
10000 GAL WATER TOWER 200701
510 2016 1500
SILVERADO -Marina
3
511
2017
F450
FORD FORMENS TRUCK Jesse
206
1999
MultiQuip
25-29 KW/DSL Generator - 7101849
515
2018
1500
silverado- rick Johnson
214
1998
MultiQuip
150 KW Generator - 3678574
518
2013
F750
FORD MECH TRUCK ANDERSON
216
1999
MultiQuip
25 KW Generator - 7101822
519
2015
1500
silverado- TOMMY PELTON
235
1999
MultiQuip
45 KVA Generator - 000359
521
2018
1500
silverado- Greg Mundell
366
2004
MultiQuip
25 KW Generator - 8100786
522 2019
523 2019
4500 C4500 -Greg Blocker
4500 C4500 -JJ hiblar
5
530
2019
4500
C4500 -Kevin Aalmo
335
2005
AMIDA
AL4000 Light Tower EYF05024
533
2018
1500
Chevrolet 1500-Eddie P
347
2005
AMIDA
AL4000 Light Tower DVF03031
538
2008
F750
Ford F750 Flatbed 1
462
2004
AMIDA
AL4000 Light Tower ETF08054
540
2020
1500
Chevrolet Chris Roberts
463
2004
AMIDA
AL4000 Light Tower ETF20826
544
2019
1500
Chevrolet Eric Johnson
464
2004
AMIDA
AL4000 Light Tower ETF20752
545
2019
1500
Chevrolet James Nokell
559
2010
Allmond
0765PRO08
547
2019
4500
Chevrolet Chris N
560
2010
magnum
MLT3060 1215336
548
2019
2500
Chevrolet Niko P
561
2010
magnum
MLT3060 1215336
549 2020 F250
551
552
563
564
568
2016
2020
2021
2021
2021
T250
T270
3500
1500
4500
Ford - spare
Chevrolet Brian J
Ford Van - Bill Ward
Kenworth- Jacob Kisor
Dodge Ram - Greg G
Chevrolet New
71
2008
8
245
373
381
401
402
2004
2008
2005
2012
2012
HIPER LITE
TOP CON
HIPER LITE
TOP CON
TOP CON
GPS Rover/Base Sys 295-0204,0276-Z51324
GPS Rover/Base Sys 388-1140, 388-1154
GPS Rover/Base Sys 295-1057, 295-1064
14G Grader 3DMC-SQ 757-12629, 422-7521
850J Dozer 3DMC-SQ 757-12676, 422-7368
403
2012
TOP CON
GPS Rover/Base Sys800-10123,10048-Z51308
438
2012
TOP CON
GPS Rover/Base Sys 391-0710, 391-0615
439
2012
TOP CON
GPS Rover/Base Sys 800-10155, 800-10154
455
2014
TOP CON
650J Dozer 3DMC-SQ 1077-11505, 534-1247
475
2016
TOPCON
GPS Rover/Base Sys 800-21064 01090901
10
Revised 11/15/2023
ACTIVE CONSTRUCTION, INC.
CURRENT EQUIPMENT LIST (bv Categories)
YEAR
MODEL
EQUIPMENT DESCRIPTION
YEAR
MODEL
EQUIPMENT DESCRIPTION
159
1997
416C
CAT Backhoe & Comp. — 5YN0857
51
1989
WA450
KOMATSU Wheel Loader — 20186
160
1997
416C
CAT Backhoe & Comp. — 5YN01309
203
1980
530-80
CHAMP 8,000 lb Fork Lift - 880337
161
169
1997
1998
416C
416C
CAT Backhoe & Comp. — 5YN01304
CAT Backhoe & Comp. — 5YN04932
275
289
2000
2005
763
WA480-5
BOBCAT Loader/Sweeper 512253989
KOMATSU Wheel Loader—A37119
170
1998
416C
CAT Backhoe & Comp. — 5YN04933
352
2007
644J
JD Wheel Loader- 610911
171
237
257
258
259
1998
1999
2005
2005
2005
416C
416C
420D
420D
420D
CAT Backhoe & Comp. — 5YN04934
CAT Backhoe & Comp. — 4ZN16759
CAT Ext.Backhoe OFDP20782 Pen Light
CAT Ext.Backhoe OFDP20704 Pen Light
CAT Ext.Backhoe- OFDP21455
360
410
424
435
440
2007
2011
2011
2012
2012
WA380-6
644 K
644K
644 K
644K
KOMATSU Wheel Loader — 53350
JD Wheel Loader - 634890
JD Wheel Loader - 633731
JD Wheel Loader - 648774
JD Wheel Loader - 638676
260
279
2005
2005
420D
420D
CAT Ext.Backhoe OFDP21495 Pen Light
CAT Backhoe 4in1 Bkt-OFDP22993
470
488
2012
2014
724K
644K
280
2005
420D
CAT Backhoe- OFDP23007
512
2017
L110H
294
320
2005
2006
420D
420E
CAT Backhoe- OFDP25283
CAT Backhoe & Comp HLS00762
513
535
2017
2019
644K
644K
JD Wheel Loader - 649056
JD Wheel Loader - 661680
Volvo wheel loader-631328
JD Wheel Loader - 1dw644kzpHF681762
JD Wheel Loader-1DW644KZPKF696544
332 2006 420E
415 2008 420E
CAT Ext.Backhoe & Comp OHLS00885
CAT Ext.Backhoe & Comp OHLS07280
554 2021 644L
16
JD Wheel Loader -DW644LZPLL707978
425
2008
420E
CAT Ext.Backhoe & Comp OHLS07326
73
1989
SV91 D
SAKAI Roller/Comp. — 30312
456
2017
420E
CAT Ext.Backhoe & Comp OHLS07701
90
1989
RD880V
WACKER Roller/Comp. — 0629601040
542
2008
420F
CAT .Backhoe & Comp hwc01987
110
1990
SV91D
SAKAI Roller/Comp. — 30332
20
145
1990
SV91TF
SAKAI Roller/Comp. — 30679
232
2001
D8R RIP
CAT Dozer - 07XM04969
244
2000
SV200D
SAKAI Roller - 20130 I
243
2004
650H LGP
DEERE Dozer- T0650HX927178
283
2004
SV510D
SAKAI Roller- 1630156
288
2005
850J WLT
DEERE DOZER - X112088
292
2004
SV510D
SAKAI Roller - 1630154
314
2006
650J LGP
DEERE DOZER - TO650JX122939
319
2004
SV510D
SAKAI Roller - 1631076
359
2006
650J XLT
DEERE DOZER - 121024
374
2004
SV510D
SAKAI Roller - 1630274
370
2007
650J LGP RIP
DEERE DOZER - 143146
437
1999
BW135AD
BOMAG Roller 101650121220
384
2006
650J LGP RIP
DEERE DOZER - 133089 RAKE EARS GPS
490
2016
CA3500
DYNAPAC-10000168CHA018959
385
2002
650H LT
DEERE DOZER - 902006
517
2014
SD115
VOLVO-S115O0O0S235090
390 2005 650J LGP
DEERE DOZER-112295
12
391
2006
650J LGP RIP
DEERE DOZER-117775 RAKE EARS
246
2002
550LC
JOHN DEERE Excavator — FF0550X950071
434
2013
850K WLT
DEERE DOZER-238380
286
2005
ZX330
HITACHI Excavator— FF01HHQ034868
436
2006
450J LT
DEERE DOZER-128097
323
2006
ZX120
HITACHI Excavator/Thumb — FFO1S1Q070054
452
2006
650J LGP
DEERE DOZER-111590
324
2006
ZX160
HITACHI Excavator —FF01F1O006488
494
2017
550K LGP
DEERE DOZER - 313841
346
2007
ZX160
HITACHI Excavator — F F01 F1O006637
14
351
2007
ZX160
HITACHI Excavator — FF01 F1O006712
124
1980
Frght
FREIGHTLINER Water Truck CB413HP19286
353
2007
ZX200-3
HITACHI Excavator — FFOOAST320015
226
1990
KW T800
KW Water Tank Truck On Road J530098
354
2007
ZX350-3
HITACHI Excavator — FFOOAS P920124
229
1988
KW T800
KW Water Tank Truck On Road S519113
355
2007
ZX350-3
HITACHI Excavator— FF01V7Q051683
367
1996
L9000 FORD
FORD Water Truck 1 FTYS95WOTVA29164
379
2005
ZX200
HITACHI Excavator/Thumb — FFOOARH310654
376
1993
KW T800
KW Water Tank Truck On Road J597051
392
2006
225C LC
DEERE Excavator/Thumb — FF225CX500240
453
1984
VOLVO
4000 GAL WATER TRUCK
395
2006
ZX450
HITACHI Excavator-FF016JQ011406
454
1995
KW T800
4000 GAL WATER TRUCK
397
2008
ZX240-3
HITACHI Excavator/Thumb — FFOOASU420022
514
2000
international
4000 gallon water truck
417
2011
ZX200-3
HITACHI Excavator/Thumb — 320793
8
420
2013
ZX50-3
HITACHI Mini Ex - 277280
459
2006
A30D
VOLVO Off Road Truck 74180
421
2013
ZX50-3
HITACHI Mini Ex - 277282
460
2006
A30D
VOLVO Off Road Truck 74465
422
2013
ZX50-3
HITACHI Mini Ex - 277753
461
2008
A30E
VOLVO Off Road Truck 72045
430
2013
ZX50-3
HITACHI Mini Ex - 277089
465
2008
A30E
VOLVO Off Road Truck 72046
431
2013
50D
JOHN DEERE Mini Ex - 277857
468
2008
A30F
VOLVO Off Road Truck 82044
433
2013
ZX350-5
HITACHI Excavator — 930411
5
443 2007 TB145
220
1992
623E
CAT Scraper - 6C1300553
444
2014
135D
JOHN DEERE Exc. - 303077
383
1990
623E
CAT Scraper - 6YF0147
450
2014
ZX50-3
HITACHI Mini Ex - 277823
396
1996
623F
CAT Scraper - 6BK00277
466
2014
ZX210-5
HITACHI Excavator/Thumb-330411
3
47
1989
8B
LAYMORE Sweeper — 2209881386
131
167
1993
1993
RB38
RB38
ROSCOE Sweeper — 32729
ROSCOE Portable Broom — 32976
330
371
2005
1999
8B
RB48
LAYMORE Sweeper -29470
ROSCOE Sweeper — 35939
372
377
2001
2007
8HC
8HC
LAYMORE Sweeper— 28482005
LAYMORE Sweeper— 9862-007
7
479
2013
770GP
DEERE 1DW770GPVCE649863
484
2011
160M2
CAT 0R9L00109
2
531
556
2012
2020
RH3075
DJI
road grinder 1208002
PHANTOM 4
546
562
2016
2021
whacker
Husqavarna
DPU 6555HE 10543213
LG 400 20202200251
467 2006 ZX200
HITACHI Excavator— FF01G6Q312087
483
2016
EC160EL
VOLVO EXCAVATOR/THUMB- 310068
485
2016
50G
DEERE MINI-284496
486
487
2016
2016
50G
ECR145EL
DEERE MINI-284713
VOLVO EXCAVATOR/THUMB- 310316
493
496
2016
2017
ECR58D
zx245-6
VOLVO EXCAVATOR/THUMB-210273
HITACHI EXCAVATOR700056
497
506
2017
2018
50G
85G
DEERE MINI 1FF050GXCGH285646
DEERE 85G 1FF085GXPHJ019478
507
2017
305C
Volvo 305C 110737
516
2017
305C
Volvo 305C 110708
WITH BLADE
520
2019
470G
DEERE 470G 236074
534
2019
85G
DEERE 85G 1FF085GXVKJ020949
536
2019
308
CATIPILLAR-0GG800153
543
555
2016
2020
ECR145EL
ZX350-6
VOLVO-VCER145V00310556
HITACHI-FF1SCQ068429
565
566
2004 PC750-7
2021
245G
KOMATSU --20003
DEERE- 1FF245GXCL 801846
567
2021
ZX35U-5
HITACHI -1 HTKHPVH822408
43
424 lhru 429
wanco message board
6
TUC Pedestrian/Bicycle Bridge Vicinity Overview
NEARLY COMPLETE
COMPLETED
I !
63.
LO
0
0
0)
n
E
O
U
N
N
E
a)
O
0
E
a>
a)
N
0
0
0
O
Z
CO
a`)
CO
PENDING CONSTRUCTION
•
•
•
•
•
•
•
•
Green River Trail Widening
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
COMMENT:
2023 to 2028
PROJECT: Green River Trail Improvements Project No. 91810403
Construct a widened trail section between the west landing of the Southcenter Pedestrian Bridge and the
DESCRIPTION: shared use path on Christensen Road. Includes illumination, CCTV, and provides the fiber connection to
the Pedestrian Bridge for operation of CCTV and communication to the light controllers and ped/bike counter.
JUSTIFICATION: Wider trail section is needed to accommodate the intermingling of trail and bridge users by providing a
wider trail and improved safety features.
STATUS: Designed and permitted as part of the TUC Pedestrian/Bicycle Bridge.
MAINT. IMPACT: Reduced pavement repairs, increased maintenance for illumination and CCTV upkeep.
Project is a subset of the TUC/TOD Ped Imprvmt Project (90710405), the TUC Ped/Bike Bridge Project
(90510403) and Baker Blvd Non -Motorized (91610409). All permitting and mitigation was completed as part of
the Ped Bridge project. Permitting expires in 2022, delays past this date would need new permit approvals.
PSRC grant application in 2018 unsuccessful. Apply for ped/bike grant in 2020.
FINANCIAL Through Estimated
(in $000's)
2021 2022 2023
2024
2025
2026
2027
2028
BEYOND TOTAL
EXPENSES
Design
0
Land (R/W)
0
Const. Mgmt.
235
235
Construction
1,062
1,062
TOTAL EXPENSES
0
0
1,297
0
0
0
0
0
0
1,297
FUND SOURCES
TAP Grant
989
989
Proposed Grant
0
Mitigation Actual
0
Traffic Impact Fees
0
Parking Tax
0
0
308
0
0
0
0
0
0
308
TOTAL SOURCES
0
0
1,297
0
0
0
0
0
0
1,297
Project Location
5,aU
5j
s,an
i
�, _ a ,
/. _.-
���
r
—CP
!
Nii,
v—
1 tikMd
nwr _II
_
'e}
lit
—77-r4
g
Tilfarr
r.
D.\1111
4
j' y
s es Sl
yy
f
es
r1 $
Y ......-
11
2023 - 2028 Capital Improvement Program