HomeMy WebLinkAboutCOW 2024-02-26 Item 4B - Update - Allentown Truck Reroute Environmental Impact Statement (EIS)COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's review
Council review
2/26/24
GL
ITEM INFORMATION
ITEM NO.
4.B.
STAFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 2/26/24
AGENDA ITEM TITLE Allentown Truck Reroute Environmental Impact Study (EIS) Update
CATEGORY ® Discussion
Mtg Date 2/26
Motion
Altg Date
Resolution
Altg Date
❑ Ordinance
Mtp Date
Bid Award
AI Date
❑ Public Hearing
Alt p Date
❑ Other
Altg Date
SPONSOR ❑ Council ❑ Mayor ❑ Admin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Police ElPW
SPONSOR'S
SUMMARY
Staff will update Council on the Allentown Truck Route EIS project and discuss the three
remaining alternatives.
REVIEWED BY
❑ Trans&Infrastructure Svcs ❑ Community Svcs/Safety ❑ Finance & Governance
❑ LTAC ❑ Arts Comm. ❑ Parks Comm.
DATE: COMMITTEE CHAIR:
LJ Planning & Community Dev.
❑ Planning Comm.
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
2/26/24
MTG. DATE
2/26/24
RECORD OF COUNCIL ACTION
ATTACHMENTS
Informational Memorandum dated 2/23/24
HDR Three Alternatives Presentation
Draft Cost Estimates
7
8
City of Tukwila
Public Works Department - Hari Ponnekanti, Director/City Engineer
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
TO: Committee of the Whole
FROM: Hari Ponnekanti, P.E., Public Works Director/ City Engineer
BY: Adam Cox, P.E., Interim Traffic Engineer
CC: Mayor Thomas McLeod
DATE: February 23, 2024
SUBJECT: Allentown Truck Reroute Environmental Impact Study (EIS) Update
ISSUE
Project update on the Allentown Truck Reroute EIS.
BACKGROUND
Burlington Northern Santa Fe (BNSF) owns an Intermodal facility that transports containers from trucks
to railroad and vice versa. This facility is located within the Tukwila City Limits in Allentown community.
The intermodal facility is adjacent to Interstate 5 (1-5) and just south of King county international airport,
also known as Boeing field. BNSF calls this facility South Seattle yard.
City of Tukwila and BNSF jointly funded a study conducted by David Evans, Associates in March of
2015. The study produced a draft report in November of 2016. As part of this study Open houses were
conducted and community input was collected. The following 5 alternatives were studied at that time:
1. S 112' Street
2. Airport Way
3. S 124th Street
4. Gateway Drive- north leg
5. 48t" Ave S
In 2021, Council allocated $1.3 million to hire a project manager and consultant to produce an
Environmental Impact Statement (EIS), updated cost estimates and more robust community
engagement.
In December 2022, HDR Inc. began work on the Allentown Truck Reroute EIS. The project objective is
to consider alternative routes for the freight truck traffic that accesses the BNSF multi -modal facility
through the Allentown neighborhood, causing adverse effects such as noise, vibration, vehicle
emissions, surface water pollution, and unsafe conditions for pedestrians and bicyclists.
HDR studied the original five options and produced a set of slightly revised alternatives for the City to
consider:
1. S 112" Street
2. Airport Way S
3. 48' Ave S or alternative
4. MLK Jr Way & 129" St Bridge
5. New elevated roadway to S 129' St
ANALYSIS
The project team evaluated the five truck reroute alternatives. This involved incorporating newly
acquired information from BNSF into the alternative designs, reassessing how well each of these
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
9
Title or Addressee
Date
Page 2
revised alternatives aligns with our project objectives, and determining the feasibility of each alternative
— that is, whether it can be constructed, permitted, and funded, while also addressing the needs of both
the City and Allentown.
As part of our evaluation of the alternatives, we have concluded that two of them, Alternative 1 and
Alternative 5, are not feasible for the following reasons:
Alternative 1 - extending east from S 112th St in the Seattle City Light utility corridor:
• Seattle City Light's recent statement that they will not permit the city to use the utility corridor.
• The proposed location for the gateway for freight trucks would conflict with BNSF's essential
operations.
• The route would have adverse impacts on wetlands.
• There is potential for disturbance to archaeological resources.
• The route's proximity to the Duwamish Hill Preserve would likely lead to noise and aesthetic
impacts.
Alternative 5 - entering the BNSF facility via a new elevated roadway connecting to the S 129th St.
Bridge:
• The proposed elevated roadway crossing over BNSF's facility would require a support column,
which would conflict with railway operations and hinder track reconfiguration.
• The construction process for the elevated roadway would require substantial disruption to BNSF
operations over an extended period.
The project team has further developed the design of the three remaining alternatives and provided
updated cost estimates.
NEXT STEPS
The project team will continue to assess the 3 remaining alternatives moving forward to the preferred
most defensible alternative. The team will take the information and start the Washington State
Environmental Policy Act (SEPA) protocol.
RECOMMENDATION
Discussion Only.
ATTACHMENT:
HDR three alternatives presentation
Draft Allentown Cost Estimate
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
10
Allentown Truck Reroute EIS Project
BHSFSOUTH SEATTLE
IHTERMODAL FACILITY
N
Project Update Agenda
• Discuss Coordination Activities with BNSF
• Review the modified alternatives
• Go over Next Steps in EIS process
Project Activities
Meetings with BNSF to discuss impacts to site and what revisions to
internal operations may be needed with the various alternatives
-\
CO
Project Activities
Meetings with BNSF to discuss impacts to site and what revisions to
internal operations may be needed with the various alternatives
01
CY)
, 7 ' ' / ff / '• 4i% ' .. .
_- . .w-7.• ,' al #i,.. lv-t, • - T'%.44, - •
- .--.41*--
r . %
• ?IP . ,r NNW .. • DcwAlh A I C. -. Otrwamish River'
'' f
._ . .
•""
corm '
Sft ‘:'N\ RETA,Nomil
• X \ \\\\
RAILROAD AVE TO SE RAISED 70 NEW
PROPOSED INTERSECTION GRADE
PROPOSED RELOCATION OF
CHECK-INtalECX-OUT LOCATION
OF INTERMOVAL FACILITY
_.
CO
\� `\\` \\\
\ \NAN \ -
BRIDGE 'NIDENING TO
ACCOMM1OORTE EXTRA
TRUCK LANE•
PROPCsrn
Skr :NAL ILE li
N
0
n.)
-%.
N
IV
Next Steps
Q
-3-4 MONTHS
Scoping
7ii
PHASE I ALTERNATIVES ANALYSIS PHASE 2
-9 MONTHS
Draft
EIS
a
-3 MONTHS
Final
EIS
Notice of
Final EIS
1
BNSF SOUTH SEATTLE
INTERMODAL FACILITY
N
()
24
ALTERNATIVES SUMMARY TABLE
Alternative
Construction
Cost (M)
Right of Way
Cost (M)
Railroad Cost
(M)
Total Cost (M)
Alternative 2
110$-125$
40$-50$
14$-18$
164$-193$
Alternative 3A
40$-52$
3$-5$
2$-3$
45$-60$
Alternative 3B
34$-44$
5$-7$
2$-3$
41$-54$
Alternative 4
120$-130$
3$-5$
At$
125$-138$
<e''
25
26
City of Tukwila Allentown EIS
Alternative 2: Airport Way S
ASSUMPTIONS:
1) Cost is based upon LESS than 5% level design
2) No roadway modeling has been completed, only plan and profile alignments
3) Does not include Hazardous soils
4) Does not included Hazardous material abatement in building demolition
5) Railroad cost includes imbedded track section
6) ROW acquisition cost was estimated based on property's appraisal value +20%
7) Partial acquisition cost was estimated based on the percent area to be acquired from the total area.
8) ROW does not include any potential relocation cost.
$117,648,070.00
$43,727,240.00
$15,000,000.00
Total Alternative Cost I $176,375,400.00
SUMMARY OF COST ESTIMATE
TOTAL CONSTRUCTION ITEMS (Sections 1 thru 11)
Construction Engineering & Contingencies
Engineering % of Sections 1 thru 11
Total Engineering Costs
10%
$ 117,648,065
$ 11,764,806
$ 11,764,806
ROADWAY/STRUCTURE ITEMS
Section 1 Preparation
Mobilization
Removal Items
Survey
Subtotal Section 1
Section 2
Grading
Roadway Excavation
Gravel Borrow Including Haul
Subtotal Section 2
Subtotal Sections 2 thru 9 times 10%
Subtotal Sections 2 thru 9 times 5%
Section 3 Drainage / Stormwater
Roadway Conveyance / Flow control and Treatment
Site Stormwater
Subtotal Section 3
Section 4 Utilities (Sanitary / Water / Power / Communication
Utility Relocation
Subtotal
Section 4
Section 5 Surfacing
Crushed Surfacing Base Course (9")
Subtotal Section 5
Section 6 Pavement
Subtotal Section 6
Section 7 Erosion Control and Planting
TESC
Subtotal Section 7
L.S.
L.S.
L.S.
775,182
4,490 TO
L.S.
1
00,000
2% $
,273,502
6,751
25
11,627,735
202,068
475,200
2,600,000
1,974,706
259,450 TON $ 40 $ 10,378,000
289,050 TON $
L.S.
110 $ 31,795,500
2% $ 1,974,706
12,001,278
11,829,803
3,075,200
1
,974,706
10,378,000
31,795,500
1,974,706
Section 8 Traffic Items
Signals
Lighting/Illumination
Traffic Control (% based on specific conditions)
Signing/Striping
Staging
Subtotal Section 8
1 EACH $ 650,000 $
10 EACH $ 10,000 $
L.S. 1% $
L.S. 1% $
L.S. 1% $
650,000
95,040
987,353
987,353
987,353
3,707,099
Section 9 Structural Items
Modify Existing Bridge Abutment
1 L.S $ 8,000,000 $ 8,000,000
8,000,000
Subtotal non-LS items
Subtotal LS items
65,823,543
6,911,472
Section 9 Minor Items/Contingencies
Subtotal Sections 2 thru 10 times % Minor Items
Subtotal Sections 2 thru 10 times % Contingencies
L.S.
L.S.
20% $
30% $
13,164, 709
19,747,063
Subtotal Section 9
Page 5
$ 32,911,772
27
City of Tukwila Allentown EIS
Alternative 3A: Gateway Dr To 48TH PL S
ASSUMPTIONS:
1) Cost is based upon LESS than 5% level design
2) No roadway modeling has been completed, only plan and profile alignments
3) Does not include Hazardous soils
4) Does not included Hazardous material abatement in building demolition
5) Railroad cost includes imbedded track section.
6) ROW acquisition cost was estimated based on property's appraisal value +20%
7) Partial acquisition cost was estimated based on the percent area to be acquired from the total area.
8) ROW does not include any potential relocation cost.
9) Unit cost of the new bridge is based on a similar bridge over the river adjacent to this site.
10) Cost assumes ground improvement required for the new bridge.
11) Cost assumes no staged construction required for the new bridge.
Railroad Cost
$44,905,890.00
$3,380,200.00
$2,000,000.00
SUMMARY OF COST ESTIMATE
TOTAL CONSTRUCTION ITEMS (Sections 1 thru 12)
Construction Engineering & Contingencies
Engineering % of Sections 1 thru 10
Total Engineering Costs
15%
$44,905,888.35
$ 6,735,883
$ 6,735,883
Quantity Units Unit Cost Item Cost
Section Cost
ROADWAY/STRUCTURE ITEMS
Section 1 Preparation
Mobilization
Removal Items
Survey
Subtotal Section 1
Section 2 Grading
Roadway Excavation
Gravel Borrow Including Haul
Subtotal Section 2
Subtotal Sections 2 thru 9 times 10%
Subtotal Sections 2 thru 9 times 5%
Subtotal Sections 2 thru 9 times 1.5%
L.S.
L.S.
L.S.
10% $ 2,906,101
5% $ 1,453,050
1.5% $ 435,915
7,671 CY $ 30 $ 2 0,122
19,352 TONS $ 45 $ 870,852
4,795,066
Section 3 Drainage / Stormwater
Conveyance / Flow control and Treatment 3,986 L.F. $ ,800
Subtotal Section 3 $ 1,195,800
Section 4 Utilities (Sanitary / Water / Power / Communication)
Utility Relocation
Subtotal Section 4
Section
Structures
CIP Wall
Traffic Barrier and Moment Slab
Metal Railing
Roadway Bridge Structure
Subtotal Section 5
Section 6 Surfacing
Crushed Surfacing Base Course
Subtotal Section 6
Section 7 Pavement
HMA
Concrete Sidewalk
Subtotal Section 7
Section 8 Erosion Control and Planting
029 S. 180 $ 1,985,206
0 L• 500 $ 920,000
L.F. 150 $ 276,000
S.F. 900 $ 9,350,100
8,310 TON $ 40 $ 332,400
13,060 TON $ 110 $ 1,436,600
1,355 S.Y. $ 100.00 $ 135,544
TESC L.S. 3% $ 994,483
Subtotal Section 8
994,483
12.531.306
$ 332,400
1,572,144
$ 994,483
Section 9 Traffic Items
Cement Conc. Curb and Gutter
Signals
Lighting/Illumination
Traffic Control (% based on specific conditions)
Signing/Striping
Beam Guardrail Type 31
Beam Guardrail Anchor Type 10
Beam Guardrail Type 31 Non -Flared Terminal
Staging
Subtotal Section 9
4,968 L.F. $ 89 $ 442,152
1 EACH $ 650,000 $ 650,000
16 EACH $ 10,000 $ 159,440
1 L.S. 7% $ 2,320,461
1 L.S. 3% $ 994,483
1,369 L.F $ 58 $ 79,402
4 EACH $ 2,000 $ 8,000
4 EACH $ 5,300 $ 21,200
1 L.S. 5.00% $ 1,657,472
$ 6,332,610
Section 10 Multi Use Path
Roadway Excavation
HMA
Crushed Surfacing Base Course
Flood Protection Walls
6480 CY $ 30 $ 194,400
222 TON $ 110 $ 24,400
200 TON $ 40 $ 8,007
15120 S.F. $ 250 $ 3,780,000
4,006,807
Subtotal for non-LS items
Subtotal for LS items
22,099,626
6,961,382
Section 10 Minor Items/Contingencies
Subtotal Sections 1 thru 9 times % Minor Items
Subtotal Sections 1 thru 9 times % Contingencies
Subtotal Section 10
L.S.
L.S.
20% $ 4,419,925
30% $ 6,629,888
$ 11,049,813
28
Page 1
City of Tukwila Allentown EIS
Alternative 3B: Improvements to 48th PL S
ASSUMPTIONS:
1) Cost is based upon LESS than 5% level design
2) No roadway modeling has been completed, only plan and profile alignments
3) Does not include Hazardous soils
4) Does not included Hazardous material abatement in building demolition
5) Railroad cost includes imbedded track section
6) ROW acquisition cost was estimated based on property's appraisal value +20%
7) Partial acquisition cost was estimated based on the percent area to be acquired from the total area.
8) ROW does not include any potential relocation cost.
9) Unit cost of the new bridge is based on a similar bridge over the river adjacent to this site.
10) Cost assumes ground improvement required for the new bridge.
11) Cost assumes no staged construction required for the new bridge.
I
$34,262,900.00
$5,650,800.00
$2,000,000.00
Total Alternative Cost
$41,913,700.00
SUMMARY OF COST ESTIMATE
TOTAL CONSTRUCTION ITEMS (Sections 1 thru 12)
Construction Engineering & Contingencies
Engineering % of Sections 1 thru 10
Total Engineering Costs
15%
$ 34,262,898
$ 5,139,435
5,139,435
ROADWAY/STRUCTURE ITEMS
Section 1 Preparation
Mobilization
Removal Items
Survey
Subtotal Section 1
Section 2 Grading
Roadway Excavation
Gravel Borrow Including Haul
Subtotal Section 2
Section
Drainage
Stormwater
Conveyance / Flow control and Treatment
Subtotal Section 3
Subtotal Sections 2 thru 9 times 10%
Subtotal Sections 2 thru 9 times 5%
Subtotal Sections 2 thru 9 times 1.5 %
Section 4 Utilities (Sanitary / Water / Power / Communication)
Utility Relocation
Subtotal Section 4
Section 5 Structures
CIP Walls
Traffic Barrier and Moment Slab
Metal Railing
Roadway Bridge Structure
Subtotal Section 5
Section 6 Surfacing
Crushed Surfacing Base Course
Subtotal Section 6
Section 7 Pavement
HMA
Concrete Sidewalk
Subtotal Section 7
Section 8 Erosion Control and Planting
L.S. 10% $ 2,217,336
L.S. 5% $ 1,108,668
L.S. 1.5% $ 332,600
3,687 CY $ 30 $ 1 0,596
26,955 TONS $ 45 $ ,212,967
4,468 L.F.
687
0 L.
L.F.
S.F.
,400
3% $
180 $ 2,103,699
500 $ 860,000
150 $ 258,000
900 $ 8,283,600
5,910 TON $ 40 $ 236,400
9,430 TON $ 110 $ 1,037,300
1,776 S.Y. $ 100.00 $ 177,611
TESC L.S. 3% $ 758,784
Subtotal Section 8
3,658,604
1,340,400
758,784
11.505.299
$ 236,400
1,214,911
$ 758,784
Section 9 Traffic Items
Cement Conc. Curb and Gutter
Signals
Lighting/Illumination
Traffic Control (% based on specific conditions)
Signing/Striping
Beam Guardrail Type 31
Beam Guardrail Anchor Type 10
Beam Guardrail Type 31 Non -Flared Terminal
Staging
Subtotal Section 9
3,652 L.F. $ 89 $ 325,028
1 EACH $ 650,000 $ 650,000
18 EACH $ 10,000 $ 178,720
1 L.S. 7% $ 1,770,496
1 L.S. 3% $ 758,784
1,006 L.F $ 58 $ 58,348
4 EACH $ 2,000 $ 8,000
4 EACH $ 5,300 $ 21,200
1 L.S. 5.00% $ 1,264,640
$ 5,035,217
Section 10 Multi Use Path
Subtotal for non-LS items
Subtotal for LS items
16,861,870
5,311,489
Section 10 Minor Items/Contingencies
Subtotal Sections 1 thru 9 times % Minor Items
Subtotal Sections 1 thru 9 times % Contingencies
Subtotal Section 10
L.S.
L.S.
20% $
30% $
3,372,373.99
5,058,560.99
$ 8,430,935
Page 2
29
City of Tukwila Allentown EIS
Alternative 4: New Bridge From SR-900 (MLK Jr Way) to S 129th ST
ASSUMPTIONS: 1) Cost is based upon LESS than 5% level design
2) No roadway modeling has been completed, only plan and profile alignments
3) Does not include Hazardous soils
4) Does not included Hazardous material abatement in building demolition
5) Railroad cost includes imbedded track section
6) ROW acquisition cost was estimated based on property's appraisal value +20%
7) Partial acquisition cost was estimated based on the percent area to be acquired from the total area.
8) ROW does not include any potential relocation cost.
9) Unit cost of the new bridge is based on a similar bridge for the Deleware River Bridge project.
10) Cost assumes no ground improvement required for the new bridge.
11) Cost assumes no staged construction required for the new bridge.
12) Existing bridge area is 930'x33' and is approximated from the arial photo using Google Map.
13) Unit cost of the existing bridge removal is based on the WSDOT BDM ($50) with additional risk factor (1.5) for bridge over
railroad and 1-5.
$122,723,260.00
$3,636,380.00
$2,000,000.00
SUMMARY OF COST ESTIMATE
TOTAL CONSTRUCTION ITEMS (Sections 1 thru 12)
Construction Engineering & Contingencies
Engineering % of Sections 1 thru 10
Total Engineering Costs
Quantity
ROADWAY/STRUCTURE ITEMS
(Section 1 Preparation
Mobilization Subtotal Sections 2 thru 9 time
Removal Items Subtotal Sections 2 thru 9 ti
Survey Subtotal Sections 2 thru 9
Subtotal Section 1
Section 2 Grading
s 1.5%
12% $ 14,726,791
L.S.
L.S.
L.S.
Roadway Excavation _ 151, • CY $
Gravel Borrow Including Hau
Subtotal Section 2
Section 3 Drainage / Stormwater
Conveyance / Flow control and Treatment
Subtotal Section 3
31,261 TONS $
10,190 L.F.
14,726,791
it Cost - m Cost Section Cost
7,825,611
3,912,806
1,173,842
20 $ 3,038,919
30 $ 9,937,800
$300 $ 3,057,000
12,912,259
12,976,719
3,057,000
Section 4 Utilities (Sanitary / Water / Power / Communication)
Utility Relocation
Subtotal Section 4
L.S.
3% $ 2,839,940
2,839,940
Section 5 Structures
SE Walls
Soldier Pile Wall
Traffic Barrier and Moment Slab
Metal Railing
Roadway Bridge Structure
Remove Existing Bridge
Noise Wall (10' height)
Subtotal Section 5
28,320
26,000
1,190
1,190
48,360
30,690
10,400
S.F. $
S.F. $
L.F. $
L.F. $
S.F. $
S.F. $
S.F. $
70 $ 1,982,400
250 $ 6,500,000
500 $ 595,000
150 $ 178,500
600 $ 29,016,000
75 $ 2,301,750
150 $ 1,560,000
42,133,650
Section 6 Surfacing
Crushed Surfacing Base Course 6,480 TON $ 40 $ 259,200
Subtotal Section 6 $ 259,200
30
Section 7 Pavement
HMA
Concrete Sidewalk
Subtotal Section 7
13,430 TON $
670 S.Y. $
110 $
100.00 $
1,477,300
67,000
1,544,300
Section 8 Erosion Control and Planting
TESC
Subtotal Section 8
L.S.
3% $ 2,839,940
$
2,839,940
Section 9 Traffic Items
Cement Conc. Curb and Gutter
Signals
Lighting/Illumination
Traffic Control (% based on specific condition
Signing/Striping
Beam Guardrail Type 31
Beam Guardrail Anchor Type 10
Beam Guardrail Type 31 Non -Flared Termina
Staging
Subtotal Section 9
1,200 L.F. $ 55 $
4 EACH $ 650,000 $
41 EACH $ 10,000 $
1 L.S. 7% $
1 L.S. 3% $
1,000 L.F $ 58 $
1 EACH $ 2,000 $
1 EACH $ 5,300 $
1 L.S. 5.00% $
66,000
2,600,000
407,600
6,626,526
2,839,940
58,000
2,000
5,300
4,733,233
$
17,338,598
Subtotal non-LS items
Subtotal LS items
63,109,769
15,146, 344
!Section 10 Minor Items/Contingencies
Subtotal Sections 1 thru 9 times % Minor Items
Subtotal Sections 1 thru 9 times % Contingencies
!Subtotal Section 10
L.S.
L.S.
0 $ 12,621,953.70
$ 18,932,930.56
$ 31,554,884
31