Loading...
HomeMy WebLinkAboutPermit PL16-0054 - CITY OF TUKWILA / PUBLIC WORKS - FORT DENT PARK BNSF SEWER RELOCATION / SHORINE TREE REMOVAL AND VEGETATION CLEARINGFORT DENT BNSF SEWER RELOCATION 14800 STARFIRE WAY PL1 6-0054 Li 6-0071 TREE PERMIT City of Tukwila Allan Ekberg, Mayor Department of Community Development - Jack Pace, Director August 9, 2017 NOTICE OF DECISION TO: Michael Cusick, Public Works Senior Program Manager City of Tukwila 6300 Southcenter Blvd. Tukwila WA 98188 This letter serves as a notice of decision and is issued pursuant to TMC 18.104.170 on the following project and permit approval. I. PROJECT INFORMATION Project File Number: L16-0071 Applicant: Mike Cusick Type of Permit: Tree Permit Project Description: Request to approve removal of three sugar maples in an area near the Green river, to be replaced with 24 trees in another area on the west side of Fort Dent Park. Location: 14600 Interurban Ave S. Associated Files: PL15-0030 Comprehensive Plan Commercial/Light Industrial Designation/Zoning District: Public Notice: Notice of Application sent out to neighboring parcels within 500' and to agencies with jurisdiction. 1I. DECISION SEPA Determination: The City SEPA Responsible Official has previously determined that this application does not require a SEPA threshold determination because it is categorically exempt. Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov L16-0071 Fort Dent Park BNSF Sewer Relocation Shoreline Tree Removal and Vegetation Clearing Permit Decision on Substantive Permit: The City Planning Supervisor has determined that the application for a Tree Permit does comply with applicable City and State Code requirements and has approved the application with the following conditions: • Planting and maintenance shall be in accordance with best management practices for landscaping to ensure the vegetation's Tong -term health and survival per TMC 18.54.130.3.c(3). • Trees should be planted as specified in the attached planting detail, entitled "TREE w/ BERM (EXISTING SOIL MODIFIED)". • Three inches of compost should be placed on top of soil in planting area and incorporated (rototiilled) to a depth of at least 10 inches. • Entire planting area should be mulched with 3-4 inches of medium bark or wood chips. Mulch should not be placed against the trunks of the trees — leave a 4 inch circle around the trunk un-mulched. • Trees should be watered weekly during the dry months (generally July -September or as necessary depending on conditions) for the first two growing seasons. Applicant shall submit annual photos of all five (5) trees to the city's Urban Environmentalist to ensure proper maintenance and a 100% survival rate for three years following initial landscaping inspection. III. FINDINGS This tree clearing permit application is a request to remove three (3) sugar maple trees and replace them with twenty-four (24) trees. Per TMC 18.44.080 in the shoreline jurisdiction, each tree removed with a diameter over 20" must be replaced with eight (8) trees. Replacement trees will include a mix of Western Red Cedar, Douglas Fir, Pacific Willow and Sitka Willow, 30 in total, to be located along a nearby riverbank as an expansion of the Interurban Avenue Shoreline Improvement project, L14-0022. As of August 9th, 2017, the 30 replacement trees have been planted and will undergo monitoring for five years as outlined in the Decision section of this document. Karen Walter, Watersheds and Land Use Team Leader for the Muckleshoot Indian Tribe Fisheries Division, provided comments regarding the tree replacement plan. Ms. Walter was concerned that the original Interurban Avenue Shoreline Improvement (L14-0022) project did not provide the required number of replacement trees for that project, and that the proposed 30 additional trees for L16-0071 would not meet the replacement needs for both projects. After speaking with Ross Widener, the landscape contractor for L14-0022, it was found that 30 replacement trees were required for L14-0022 and 24 replacement trees were required for L16-0071. A total of 60 trees have been planted, meeting the replacement planting needs for both projects. Phone: 206-433-1800 • Email: Mayor@TukwitaWA.gov • Website: TukwilaWA.gov L16-0071 Fort Dent Park BNSF Sewer Relocation Shoreline Tree Removal and Vegetation Clearing Permit IV. YOUR APPEAL RIGHTS The Decision on this Permit Application is a Type 1 decision pursuant to Tukwila Municipal Code §18.104.010. Other land use applications related to this project may still be pending. One administrative appeal to the City Hearing Examiner of the Decision on the Permit itself is permitted. A party who is not satisfied with the outcome of the Hearing Examiner appeal process may file an appeal in King County Superior Court from the Hearing Examiner's decision. V. PROCEDURES AND TIME FOR APPEALING To appeal the Planning Supervisor's decision on the Permit Application, a written notice of appeal must be filed with the Department of Community Development within 14 days of the issuance of this Decision. The requirements for such appeals are set forth in Tukwila Municipal Code Ch. 18.116. All appeal materials shall be submitted to the Department of Community Development. Appeal materials MUST include: 1. The name of the appealing party. 2. The address and phone number of the appealing party; and if the appealing party is a corporation, association or other group, the address and phone number of a contact person authorized to receive notices on the appealing party's behalf. 3. A statement identifying the decision being appealed and the alleged errors in the decision, including any specific challenge to an MDNS. 4. The Notice of Appeal shall identify (a) the specific errors of fact or errors in application of the law in the decision being appealed; (b) the harm suffered or anticipated by the appellant, and (c) the relief sought. The scope of an appeal shall be limited to matters or issues raised in the Notice of Appeal. 5. Appeal fee per the current fee schedule, additional hourly charges may apply. In addition all hearing examiner costs will be passed through to the appellant. VI. APPEAL HEARINGS PROCESS Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov L16-0071 Fort Dent Park BNSF Sewer Relocation Shoreline Tree Removal and Vegetation Clearing Permit Any administrative appeal regarding the Permit shall be conducted as a closed record hearing before the Hearing Examiner based on the information presented to the Planning Supervisor who made the original decision. No new evidence or testimony will be permitted during the appeal hearing. Parties will be allowed to present oral argument based on the information presented to the Planning Supervisor before their decision was issued. The Hearing Examiner's decision on the appeal is the City's final decision. Any party wishing to challenge the Hearing Examiner's decision on this application must file an appeal pursuant to the procedures and time limitations set forth in RCW Ch. 36.70C. If no appeal of the Hearing Examiner's decision is properly filed in Superior Court within such time limit, the Decision on this permit will be final. VII. INSPECTION OF INFORMATION ON THE APPLICATION Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at the Tukwila Department of Community Development, 6300 Southcenter Blvd., Suite 100, Tukwila, Washington 98188 from Monday through Friday between 8:30 a.m. and 5:00 p.m. The project planner is Max Baker, who may be contacted at (206) 431-3683 for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes. Contact the King County Assessor's Office for further information regarding property tax valuation changes. Max Baker, Assistant Planner Department of Community Development City of Tukwila Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov Michael Cusick From: Andrea Cummins Sent: Wednesday, May 03, 2017 4:11 PM To: Michael Cusick Cc: Maxwell Baker Subject: Planting Plan Attachments: Interurban Planting-Plan.pdf Hi Mike, Attached is the proposal for the Ft. Dent planting that we visited today. It shows two locations, so I am not sure if we just missed the second due to blackberry regrowth or if they were never planted. Might ask Ross if he planted both sites, as I don't remember. The only tricky catch here that I see is that in the response from the City to the Tribe for the Interurban project, we said that we would plant 51 trees (only 30 were required) for that project. That means that technically there were only 9 additional planted for your project, which wasn't enough. I don't know that it will come up, but in case she says something, you may need to be prepared to have Ross go and plant 10 more trees. Again, I think it is ok as technically only 30 were required, it is just the fact that we told them we were planting 51 for that project and now we are effectively changing our minds. Does that make sense? We can chat about it next week if you would like, but for now I would say submit your photos and map via Max and we will go from there. A Andrea Cummins Urban Environmental Specialist, City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 andrea.cummins@tukwilawa.gov 206.431.3663 Tukwila: The City of opportunity, the community of choice. 1 LANDSCAPING DECLARATION I, SS W I le-Ver , declare as follows: 1. I am the a) owner or authorized agent of the owner of the property, or (circle one) b) landscape architect who prepared the approved landscape plan, or landscape contractor hired to install the approved plantings, responsible for executing the approved landscape plan for the property located at Fort 0e4,i+ , Tukwila, Washington. 2. The permits obtained for this project include: Building Permit D Land Altering Permit MI - Design Review Permit L - Other Permit S ore (me_ 51/ LOA 1/11- I a l peAie lerjvleon+ ()el- WI 1 j- 3. I certify that the landscaping and irrigation devices shown on the approved landscaping plans for this property have been installed in conformance with those plans as documented in the Landscape Checklist. 4. I understand that changes to any of the following aspects of the approved landscape plan require a revision to the plans and approval by the City of Tukwila. a) Minimum number of trees, shrubs and ground cover; b) Location of required plantings or planting areas; c) Substitution of species required by permit conditions to mitigate environmental impacts; d) Compliance with the Tree Ordinance for sensitive areas. NOTE: If any of these items have been changed do not sign this Declaration until a revised landscape plan has been approved by the Tukwila Department of Community Development. I declare under penalty of perjury under the laws of the State of Washington that the preceding is true and correct. Dated F ,c, Zo 17 at k- v H"" , Washington. Signature LANDSCAPING CHECKLIST Checklist to accompany Landscaping Declaration: Yees/ No L� ❑ Size of installed plants is per approved plan. IE(❑ Spacing of installed plants is per approved plan. Lid ❑ Approximate location of trees, shrubs and ground cover is per the approved plan. Note: if the size of the nursery pots of ground cover are increased and therefore fewer pots have been installed attach a description showing how the proposed changes meet Landscape Code standards. Substitutions The following species have been substituted after approval by the Department of Community Development. Number of Plants Approved Species Installed Species Size Number of Plants Tree Species Western Red Douglas Fir Pacific Willow Sitka Willow _ Cedar (Thuja (Pseudotsuga (Salix lucida) (Salix sitchensisl menziesii) plicata) Number of trees required 10 10 5 5 - Number of trees installed 20 20 10 10 - Number of existing trees to be preserved 0 0 0 0 Number of existing trees left N/A N/A N/A N/A - Shrub Species - - - - - Number of shrubs required - - - - - Number of shrubs installed - - - - - Groundcover Species - - - - - Number of ground cover plants required _ - Number of ground cover plants installed - - - Number of Plants Tree Species Western Red Douglas Fir pacific Willow Sitka Willow -- (Pseudotsuga Cedar (Thuja (Salix lucida) (Salix sitchensis) menziesii) plicata) Number of trees required 10 10 5 5 - Number of trees installed 20 20 10 10 - Number of existing trees to be preserved 0 0 0 0 - Number of existing trees left N/A N/A N/A N/A - Shrub Species - - - - - Number of shrubs required - - - - - Number of shrubs installed - - - - - Groundcover Species - - - - - Number of ground cover plants required Number of ground cover plants installed _ r� on this at* of J u uui& Department Of Community Development AFFIDAVIT OF DISTRIBUTION I, ` Y"c,I V1 , HEREBY DECLARE THAT: 15) Notice of Application Notice of Decision Notice of Public Hearing Notice of Public Meeting Determination of Non- Significance Mitigated Determination of Non - Significance Determination of Significance & Scoping Notice Short Subdivision Agenda Notice of Application for Shoreline Mgmt Permit Shoreline Mgmt Permit Board of Appeals Agenda Packet Board of Adjustment Agenda Packet Official Notice Notice of Action Other: Was mailed to each of the addresses listed/attached aV1Ua , IM- day of v Project Name: k r) MA\ N$Q.\%. Project Number: U (cr- o Al Associated File Number (s): Mailing requested by: Utd6ey- Mailer's signature: W:\PLANNING\DEVELOPMENT REVIEW MANUAL\2. LAND USE APPLICATIONS REVIEW PROCESS\5. PUBLIC NOTICE PROCEDURES\MAILING\AFFIDAVIT OF DISTRIBUTION.DOC Mailed Notice of Application postcard 1/31/17 • Muckleshoot Indian Tribe — Fisheries Program • Department of Ecology — NW Regional Office • WA Fisheries & Wildlife • KC Assessor's Office City of Tukwila Notice Of Application Shoreline Tree Removal at 14800 Starfire Way # L16-0071 Project Planner: Max Baker at 206.431.3683 or Max.Baker@Tukwilawa.gov File# L16-0071 Applicant: Michael Cusick for City of Tukwila Property Owner: BNSF Project Location: 14800 Starfire Way Project Description: Tree permit to remove three trees due for the installation of a proposed force sewer main under and adjacent to BNSF railroad tracks. Due to site constraints, 22 replacement trees will be installed in an area along Interurban Ave. to the west of Fort Dent Park. The sewer repair project is exempt from a Shoreline Substantial Development Permit per WAC 173-27-040(2)(b). Your written comments on the project are requested and can be delivered to Dept. of Community Development, 6300 Southcenter Blvd, Suite 100, Tukwila WA 98188. Comments must be received by 5:00p.m. on February 15, 2017. You may view the application, request a copy of any decision, comment on the project, and learn your appeal rights by contacting the project planner listed above, or by visiting our offices Monday through Friday, 8:00am to 5:00 pm at DCD, 6300 Southcenter Blvd, Suite 100, Tukwila WA 98188. City of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director December 6, 2016 Mr. Maxwell Baker City of Tukwila 6300 Southcenter Blvd., Suite #100 Tukwila, WA 98188 Subject: Fort Dent Park BNSF Sewer Relocation Shoreline Tree Removal and Vegetation Clearing Permit #L16- 0071 Project #: 915 30101 Dear Mr. Baker: Below is the scope of work for the Fort Dent Park BNSF Sewer Relocation. In 1975 the City of Tukwila constructed a 4" diameter sanitary sewage line within the shoreline setback area in a steel sleeve under the BNSF (BN) railroad tracks that conveyed sewage from Fort Dent Park to the King County Metro sewer treatment plant on the east side of Monster Road (see exhibit 1). The BN is planning to install a third set of track and is requiring the City of Tukwila to extend their existing steel sleeve under their tracks (see exhibit 2). The proposed sewer line needs to connect to the existing sewer lines, and it is not possible to extend the sleeve for the existing sewer pipe under tracks and keep the Fort Dent Park sewer system in operation. The City of Tukwila is proposing the installation of a new 6" diameter sanitary sewer line parallel to the existing King County and Tukwila sewers that cross under the BN tracks (see exhibits 3 and 4). The proposed sewer line requires the removal of 3 sugar maple trees for the installation of an approximate 140'x40' boring pit on the west side of the BN tracks in the Green River shoreline setback area. It is not possible to have the boring pit outside of the shoring line setback area and save the 3 sugar maple trees (see exhibit 5). On the east side of the project, the bore pit is outside of the shoreline set back. The steel sleeve will be installed by drilling between the 2 pits under the BN tracks, and the 2 pits will be the only excavations for the project. During the excavation of the 2 bore pits, a professional archaeologist, meeting the requirements of the State of Washington, will be on site to monitor for native artifacts exposed during construction (see exhibit 6). After the project is completed, the disturbed areas will be restored to match the conditions prior to construction. The 3 sugar maple trees will be replaced with 24 trees in an area near the Green River, on the west side of Fort Dent Park, under the Shoreline Substantial Development Permit L14-0022 (exhibit 7). Please contact me if you have any questions. Sincerely, ill Mike Cusick, P.E. Senior Program Manager - Sewer/Water (206)-431-2441 enclosures (W:PW Eng/Other/Mike Cusick/Letter Max Baker FortDent Tree Removal 120616) 6300 Building 6300 Southcenter Boulevard Suite 100 F Tukwila, WA 9818S o 206 433-0179 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 3 5 0: 2 5 20 I 5 10 5 0 -.77/.7-4227-e7-5.7&e?7-1-1)i/. I 4v:Lift*".P • , t 1 \ \ \ 1..417 Ir/ Lot •••ii \ A \ . 1 1 Pro,oc.5.1,-/ C/;74eci• 417:.'") • -4 r c!“,4 I I ' 7.•„! I ' • tO1 • // RA • • 1(11. eI kl • " ' : ; .1; ' 1 • ,f (X:••••••-• r son:, 4.1 I. • ; s‘111., TI'51 ^Loi 3/4 if p 'th.fq) c-i (1' /Sa • -- - •!Tej Attr;1- I • I- • See 57,711. 6 ti 1 ••• V7Cral e.ow k' A . N.14 t k OF Pal 1E ‘5.06 1 • • A.//74220 • .E4456.;/70 \„ • es,!.ee /E. /5.70 \ L i.e. -11.00- T.cir. E. I f 91 ••• • A.1.47•-g4rcp• - 6.fg • ,1,_‘•,L- • '• • See Sht /2 . ` S 414-2 • • • • • ,'-‘1:)(41K r 61?E-511/41". RIVER . . •._ • • - • - • , f.s• • , , • • Et 214 Ap?r thMl...h Exie?:re Over -,fre.,0 0.50 i(O?A/7e fro" 7- e/ass 2) jvt -/$r/- 1 9.55re"...54e. 7.95-id-NA!. ..54•OlfoO MitigniotE RAPERIMM •ENCHNEEFUNICif STRSEETO•WATEIN-139WER-PAr.4KS•lill..714.0iNpra• ; •-:.• GINA - ,••• . E .1., 654,78/ ..14/1e.wokee Rog? Rrket Of:0.63/ 0 r,„ • . oF QR5GMJD TEST Pi I-5 . ARE AN,P.OxliAgE v;my. &r-f. SPEC'S E0f5..60PlotS AJD.T(5.PT 13 N 5 20 t.-1 1 ' 20'5eei easi.. JcArlaii 0,-.405rered n 000 REVD.% LIMIT CITY1.1141T Az s : fr1/457/•1o/ .01.,..v.”74, profile ore,- • • - - • -2/2 145 Pee:0 I //6's - 247' Simi CebirXj • i Optri Cot 1 Jscised et.Aogered 7420 M./Pe-4511i; 1 Point /‘•;•71 -.4tft .4 to tib,-.7 ts2 ;See 85eo/ `de Iron P.* 4 Point N.1 /74,522 - / • - •• .501 ; ) 11 4 Point • • 51-60 35! 50' 20 1 5 10 SCALE 5 VERT. I". 5" HORIZ. 1".50' SANITARY SEWER TRUNK LINE EXHIBIT 1 remora Cr.)074.3 0 30 25 20 15 10 5 0 tit t1 .� O Point 1:f ;74•, 522 E. t.65!G93 aJUTy .4 Poir,. J.E. 7-2,6a L1MIT is .ek•s- 2-/4 F6/ee //J)5. (MP. arc•; E, bt;tg Fror^d wir Ppe - rnrid 4 MH f2�Y,i53-f�SfJ. •+Etis/.;?;$urrlS Ui`i%fires 4`Ductile Iron PrpC2 SCALE VERT. I"=5. H0R1Z. i=50' •-EniciilEi�ev-uNirJ l'REETi3• WATE:i•13.E.WER•PARKf6.4UfL.DING• - . �ont'ory Mrri7hzYk j ;.£ ZLC3 "Fhi Ji.W - LE. 20.53-•'43'E LO917JQ1.e.3;O`.:$C,AlNG9..1t1.TE3T- pira- E .�AQPROXIM,gY.6- BGfi1NG '.SIJaST:f'.11' LOBS.; -• (35 8"CP( a5O ''•28. rG. 6 '•r ./4.G0 (C-1r-2) 'ff,$ 2-75•-oGP� 1 /E;/554 •'8.w .( .r /Er•sf /.20-Gk/fra/Y.r:/AC EYS.Ka8N OU76_ /S $9UIF1 6RADY WAY tizg =24t°50 *SOON. WASNINGTON WOO 72-W,,., *-•lbaa M/;: Ste . S t..4----`-j 39 FC''(Ca sTIJr, •.00% GF.. !4O7/-e-j-,14.r 4 rE t F - /92 -12" xi. E.. ::G'O.t7l7ect -20 fKen! 2241" ems/ ac Ppj. • r .�. 0° N� tgkr 4/7Cilr,tr%1Jf fefk^c^ 0 lOf, rh•_. 7, -5 10.4X 10.3X 10.2X TO TACOMA, WA RT2 SOUTH Q 0 Q i EXISTING SPRINT ERGROUND FIBER OPTIC (PITDTE T IN PLACE) EXISTING Pu ZUND ENERGY 4" GAS U'IELO VEFY) -EXISTING CITY OF RENTON 12' WATER (PROTECT IN PLACE) (t EXISTING MAIN TRACK 2 AEI EXISTING MAIN TRACK' 1 V r •,....a, .... 9 a-.r.... EXISTING AT&T C.)W� r BURIED TELEPHONE I — (w r omen c i E 0 n 0 0 0 G C 0 0 > � O J < , V � c M EXISTING CITY OF-TUKWILA i.S" AND 2" WATER (NO LONGER USED) (PROTECT IN PLACE) ndnroonr -RELOCATED BNSF/SOUND TRANSIT FIBER LINES EXISTING ELECTRIC LIGHTWAVE, INC. OH FIBER OPTIC COMMUMCATION LINE (PROTECT IN PLACE) NOTES: 1. RIGHT-OF-WAY BOUNDARIES PRE BASED SOLELY ON STATION AND RIGHT-OF-WAY MAPS AND THEREFORE ARE APPROXIMATIONS. REQUIRES VERIFICATION. 2. UTILI1 Y LOCATIONS SHOWN ARE TAKEN FROM AS-BUILTS AND BNSF CONTRACT INFORMATION. POTHOLING HAS NOT BEEN ACCOMPLISHED. 41% SUBMITTAL OR BID OR CONS i RUCTION EXISTING OVERHEAD PSE POWER LINE (PROTECT IN PLACE) • EXISTING MCI TELECOMMUNICATIONS CORPDRATION UG FIBER OPTIC CABLE 'IN 4' CASING PIPE COACT) I A-15A -EXISTING PUGET SOUND POWER d LIGHT COMPANY 230kV S-YIRE TRANSMISSION LINE WITH 2 STEEL TOWERS (PROTECT IN PLACE) +r�1 . A-15A TO SEATTLE, LJA CNI - -Agggt pp a p -- A 1 A-15 A-13 WETLAND - >� MAIN TRACK 3 I1r0031 .AREA 36' RIGHT MT2 A-14A A-13A , PLAN LEGEND, L WETLAND AREA A-11C A -NA A-7A = W EXISTING KING COUNTY (METRO) / U (1) W 120" SEWER J (PROTECT, 1N PLACE)- ( NSF FLAN Sh 7 1 50- 0 50' 100' t Q GRAPHIC SCALE HORIZ 1" = SC' EXHIBIT 2 Ini.arimt,m c-f7a.ent a, cations._-e:nps. f¢�ec.i.- rs tno yo tne SMS: a c c corn, be usedli �c a c Teen oar. even., e avUna+m e Santa me Fa' I.cy DESIGNED BY J5 DRAWN BY J5 CHECKED BY NO RAIL IYAY APPROVED BY MAC nti MTIEi15ptJ 725 TOCTI i COUNTRY RD Hu a RSSp9JTEs, DIG SUTE 300 (Seers rA 09n R BNSF RAILWAY CO. ST2 TRACK IMPROVEMENT PROJECT — EASEMENT 3 SEATTLE SUBDIVISION — MP 10.05X TO MP 15.75X UTILITY PLAN — SHEET 20 OF 21 MT03 1060+00 TO MT03 1075.00 CONTRACT NO DRAWING NO. UA-320 REVISION SHEET NO 7 3 SCALE 10.1x lox - 5 f2\Drawings\Easement 3\17055UA321.sht 0 0 0 lL co Z 0' c c w 0 01 0 +C CI > — f. .98 TO TACOMA, A, WA P4 Cf UTO O CD + CD In cV t\ M EXISTING MAIN TRACK 2 CD DI I Z •- rl -3- Z <1: J STNG. CITY OF TUKWILA SEWER 4" t FORCE MAN EXTEND tUCASTVG3 • i NOTES: 1. RIGHT-OF-WAY BOUND " ES ARE BASED SOLELY ON STATION AND RIGHT-OF-WAY MAPS AND THEREFORE ARE _' •PROXIMATIONS. REOUIRES VERIFICATION. rj MAIN -TRACK 3 (MT03) 2. UTILITY LOCATIONS HOWN ARE TAKEN FROM AS-SUILTS AND BNSF CONTRACT INFORM .< ION. POTHOLING HAS NOT BEEN ACCOMPLISHED. EXIST)11/4., G 0 1 'T''v Off' N Z4 l 4._.A ,SFI,.ica 1=a,(:e tR,N F t -EXISTING MUNICIPALITY 01g, METROPOLITAN SEATTLE 2,24' UDG RAW SEWAGE D.I. PIPE IN 36' STEEL CASING (PROTECT IN PLACE) II EXISTING UINICIPA ITY OF METROPOLITAN SEATTLE 16" UDG REUSE WATER DI PIPE IN 24' STEEL CASING (PROTECT IN PLACE) Jib o, --. - ir3' -- —.... EXISTING ELECTRIC LIGHTWAVE 41' O:D. UG FIBER OPTIC (PROTECT IN PLACE) EXISTING CENTRAL PUGET•SOUND REGIONAL TRANSIT AUTNOIPoTY 1.5" WATER LIE jLv j co 4. A I� z PL AN 1— 1- T_ .16 , ��i EXISTING CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY UDG ELECTRIC WIRE LINE LEGEND: ER I WETLAND AREA EXISTING BNSF/SOUND TRANSIT FIBER LIES C EXISTING MAIN TRACK 1 50' 0 TO F{=ATTLL, WM, ?J1 sr.TW 50' 100' GRAPHIC SCALE H01-: 1" = 50' 100% SUBMITTAL NOT FOR BID OR CONSTRUCTION REV I DATE DESCRIPTION A?P zr;a,tol: ra not . Rosa fo- cry re GC °or e 9l'rpa� f.., Sonr� . Ro; IFr DESIGNED BY J5 DRAWN BY JS CHECKED BY NO /i'A/L WAY APPROVED BY MAC DATE _. TEMAE.R 5.2014 LeaP1AssToTCc2uSrert mi TOGT7 L COUNTRY RD ma. ORM [MCA 92888 BNSF RAILWAY CO. ST2 TRACK IMPROVEMENT PROJECT - EASEMENT 3 SEATTLE SUBDIVISION - MP 10.05X TO MP 15.75X UTILITY PLAN - SHEET 21 OF 21 MT03 1075+00 TO MT03 1090+00 MP 10.19X TO MP 9.91X CONTRACT NO DRA'N!NG NO U A- 3 21 REV!SiON SHEET NO ^ SCALE AS SHOWN 43 A I o FL"' ..4.' I TUNNtl, TQ TRENCH TRENCH TRANSITION. .; SEE 21 I-, 5 `...,.............,:....,,,., .. •'--------- '- ..,.. „....„ ...-,, ----____ -'-'-....--Z..,..---.....,v.rx:_•_.7::,-,:.---,--...,,,•^-1 _ ___ ::-.-,,,,` ---,,a1----- ----- -... -,... `,... ',.._ ',-,.., ,...__. ,...s._ -p, -____ I z !!!!"---z,z--,...--,. -...._ --- ', ".. "......, ." ..-. J.°."',,, F31% ' --,,,..7 - '•- ' 146 ''S, ''',.. '.....,.'", • -..‘,::',1 ''''''.., 44,••••,.. ....."',,Milj cP4,c, -co" -\\\ s?.), 0' t4„ • • A ',.. N. -------, ---",,, !---t, / \ \ : \ ',... •••••••••-••• ... .""•-• 60? 61 - --• \ • +NI -- - • - -- t.2a '--...„...... !•••...,.... - .- -...:1-..3-,. s•-••,...,_• •• -•::,._ .-,,,,, `-,....,,.....,, ,.. ._ ' '''-:‘ •., I, n ? -40 ,.,-e' ......,. ",,. ', .`, ,. li • ..--. '. ''''"'s... -:..,... '''S 117Q5')..-1;471:22F,... .--- -•::,-:., ..,..., ',,,, • ,....,,,,......„..„......A ---..„..„ '--„.. ...., ......, , 1 . .......,. ,,, ,,. 701 FEET ' 96 OS ..e.ogsmucTo 624 05 91.1B •"' BNRR EA St.U00E. Fki -DJ __...--..._ ......_ \--..--::::-:-,:„. "KING COUNTY DEPARTMECANIIVOP-8Ff°4R2E4':(5'v5565YL7: --'---,,,, 614c. di' NATURAL RESOURCES AND PARKS Pv •siA- AcTERtiAllVEB DOES NOT WARRANT OR GUARANTEE 3G- cm,,,,,G INV EL 117 OD ILI Ki:J. MI )11 ii THE ACCURACY OR COMPI,E.TENESS OF ... 2 140 0 . 4'; PIPE ,TO vnt.w ; : \;)--, '•'-' i : .... . : , . • VAULT' 'FROM RWR. ; . • : \ ,!4 - A 'Ili) : ,cg FENCE; ! . . . .. ; . : . : : 2,-.247 FM INV EL"1 10.10- !.. 1 . 7 21" cAspqn INV EL 117.77 1 - I 0" RWR INV EL 118 10 : TUNNE.1. 10 TRENCH TRg.4tiTiON, •StE 21..;: ': ' THE DATA SHOWN HEREIO! ' ' : . : EL 1 21.80 - TRACK$ : : : . ; -+ti '‘A : • : : ti^ Plug io vAL vc: N. , 1 . • . • - . . . : '1 .. 150 0 !. vKLILT FROM EACEI FM.'. r-' - ' ... : ! ,-,,--"-----.7 : : '.-7•r1--:'''jl-----LL -9'-',,__•_, : ' . ' . 777 i : q El_ 1?1•110 ^:--,.-. -.-.,, ! \ v',/ -.1 • • ' " • : :(3.2. -: :: : 1 : - --T.- . : .`"4. 0 • 8. 8 : I :L RECEIVING PIT : : • 1,--16,.. RNArR • . 1-Th .....:":" i : ': : S 4 -066 0-Al -- .:: i• • — 2 ' - 12OLLUS'°. F ' tri --- . V) ‘,02,11117.1.4•C•1391.1,1 9 •: : PR 0 \A b E. c q 06 i. 1;16 G. NOTE:. UTIUTY LOCATIONS ARE APPROY.NATE. LOCATIONS AND ELEVATIONS SHALL BE VERIFIED BEFORE CONSTRUCTION. tjJ. • .. ; - • 96 Z.; ; . i • • . TRENCH. TRANSITION • so < _7+00 A A . Apr, REiS S I "/,.1 I 11- RN NF A" ‘i()M S 5‘. 7.) 00 T. 0 20 . . - . . _ 2 24" SEWER FORCFMAINS & I - 16" REUSE WA TER ; • LS. . t4 24! CASING! (AL 1ERN AT1VE ; • ; PRESSURE QR0(.11 C(‘SiN. -.; roi.t.o0N9 CON S1RUCTfOt4 PRO \IOC CR OU T PLUGS . .... • • • • • . • 160 LE CASING • • 58+00 59+00 r 1A.I 11 i 6 /.9 (-;,;1;1_ • ALTERNATIVE B • • ! 1 -1 6.r REUSE WATER : . 2-24 rO,RC.E.1.V44$ ; • • $ D.OD..FT/FT ...... • r. . . . ," . . .. TRENCH; TRANSITION 60+00 -.ALL S 'A -iONIN C IS C OF Air:WENT FOR NE PPELINES PER 13 S11. .1,1 • .2, . • )$` N . • . . 1-- IV Raise WATER : 2-24" FORC,EMAINS . S 0.0028 FT/FT, . . 61+00 ALL Lai I .)L0 140 • " 0 . 77-7— • 130 EXHIBIT 3 TRENCH"C" SEE DETAIL C DW .C215. 62+00 NuriPlpdity 11arrrpolllo1 11.I, 110 63 134502 ALKI TRA:SFER/CSO ;V<CJECT SO:,THERN. 1RANS4E13/1%-.1.:RURBAS1 PR0.11.3 INTERURBAN FORCEMAINS PLAN & PROFILE OCTOSER 1992 40A C211 58 3442 • A tt 0 A A st: i4o 0 citkeire ,04oy CO el„....10 fiXiS SS.1311 RT 12" DIP FL-1g EICNOL rf:DTtta %INA." Gel-+ 4.• c4 1 2 O ,-/--vitaw. v.- •-•-.:st,...„ -4 -•ALFL:i -' 4.4. -2's-4-- •-• •"*"` „ REICN •••••-•••• REGIONAL. WAsTEWAIE,R TRE,-A-rW,1\t-r pLANY A-rEN R-roil 4"8> ar‘), 74" ----- DUCT (WO CAW...R:110W t EI1,4 e v, 11.s3 _.-----..\,c ..11." •.-- 5 '-'.- .......-4.-.4),--,,....,s-, ----.-----"=:= '4)-0-=---------:;----::.-_-,..-r_••=--.=_. ...... _..„---.-......._,..7--'-'- 1:- '''-',-,--• . ,,..15....°._3-.=-9,...1'....--,,,,..-: ...,-,. - 0 1 32=-Verfijk-4:,-.... .LOCATiON/ , •-•••..„ 4••"•-' • •• •••. , -7; • ---- / ch 7.. (-) : ' it'Ariiis.Tci aorin • : 130 r---- ; --.": : ' -.---',-,•;',I.-.:: : ' i ; ; 1;.)0 PO 11 0 • a0 `..1. (.) N - - • J.:Art-1,1.YR 120J--"R-7-;v1 4 krs 4,1111• EXIST 12" oalzflik _„. tto.d r.mis [ coKRE-A. _rouRE. sucul / OkASS 3g' FA STRUD SE -4.1 SD 120 5' NOTE: "KING COUNTY DEPARTMEI4T OF NATURAL RESOURCES AND PARKS DOES NOT WARRANT OR GUARANTEE FEET (1" = 20') UTILITY LOCATIONS ARE APPROXIMATE LODAT1ON5 AND ELEVATIONS SHALL BE VERIFIED BEFORE CONSTRUCTION, - THE: ACCURACY OR COMPLETENESS OF. THE DATA SHOWN HEREIN".: . • ....... . ....• • . • : • • : I : .. . • . : : I : • • • • - • • : : , . : . ' : ; : • . : . . . . . : • : : ' : . : . : .. ' . ' ..... • • : : • : •.< I -- ion (r) : & 0 eti ,.-.+F•i•i- i.Ni• - TtPc A . I • z . : BACKFILI, • 90 I. hy DE.TAIL C. DWG C215 ..._1— TRENCH "C" SEE • (_) 1-100 /N— • • . . . • • - E t LC F : : ___ • . ; : ; so . ;; ... E)(ST 2-241. ;F$RCEMAINS . .. • • . --,, • : ; : ; Duct, OA • : : ; . • :: • . • :: . : • : ; : .EIST .171 . 2 : REPS"-• IV?: : ' : :: • :. ' : I : :: : : : : : . - • . : : : : . I : . • St? : : . . . . . . .. ... . ....... - . .......... . ; .. , ... • " ' • ' : .... ... , . ; .... . . , . .. . . , . .. .... .. . • . : ... , ... - , .. .. . . :: •:•:'. • : : : . : ; :' . . . . . .. .... • . .. . , . .. ' . :: : :: : . : . : : : .. : : .... : .. : .. . . •-• ..... .... • • I : • • 171 DIRT LTO. P 4,•• AUST1‘; !1:! CALL BEFORE YOU DIG: 1-800-424-5555 ...... ... . • .1 ...... , ....... : .. . 64-1-00 A', NI-EC:Mit 0 REVISION - AFIL) F3AL.',14.11 I u 10. 1"(1` I F Si,, ?V I() 5 /O I A A J v : • • • • . .. .• . 65+00 66+00 stAii.oviNa IS C or ALICNVF.NT FOR T,IE PPELINES PER ... ... • . • - • • : • • :: ; : • • • • ..... . • 67+00- ).4 0 la .3- P 00 z I-- 0 ...... . .. . : • „ . . • . . , . • • . ; : .. : : : .. : .... • • • ........... ..• ....... 40 DI1-1ARGE s-rutiuR• DWG S'2 .... ..... . . . • . . . RESTRAINED JOINT PIPE . ..... . . • • . . . ...... : • : .... . : . . EXHIBIT 3 ALL MET Ft 0 wet? Ti• .r,F1 nicipt UV of Ile:x(11[011(in 5NO.1.0 69+0 134503 OCTOSER 1292 44.4 0.73: 404 C212 _ 1*••70•14,1".10),P >.:-=7.-•47,::. W/F30- 92 ALKI TRANSEENCSO PROJEC.-T SOUTHERN TRNFER/INTERIPSAN P4OjEcT INTERURBAN FORCEMAINS PLAN & PROFILE 41 130 120 110 Sewer Force Main) \CADD\Design \TSM—XXX—CV.dwg Plot date Oct 10, 2016-10:47:52am CAD User tome. Path: Z:\115000-115400\115077 (Tuk CITY OF TUKWILA, WASHINGTON FORT DENT PARK BNSF SEWER RELOCATION PROJECT NO. 915 301 01 PROJECT LOCATION MAP NOT TO SCALE MAYOR ALLAN EKBERG CITY ADMINISTRATOR DAVID CLINE CITY COUNCIL PRESIDENT DIRECTOR OF PUBLIC WORKS JOE DUFFIE BOB GIBERSON, PE CITY COUNCIL CITY ENGINEER KATE KRULLER ROBIN TISCHMAK, PE DENNIS ROBERTSON VERNA SEAL PROJECT MANAGER KATHY HOUGARDY MICHAEL CUSICK, PE DE'SEAN QUINN THOMAS MCLEOD City of Tukwila: "City of Opportunity - Community of Choice" DEPARTMENT OF PUBLIC WORKS 6200 SOUTHCENTER BLVD., SUITE 100 TUKWILA, WA 98188 (206) 433-0179 EXHIBIT 4 DRAWING INDEX SHEET NO DWG 'NO SHEET TITLE 1 CV.01 COVER SHEET & INDEX 2 SP.01 SITE PLAN 3 SP.02 SITE PLAN 4 PF.01 SEWER PROFILE 5 DT.01 DETAILS 6 DT.02 DETAILS 7 OT.03 DETAILS P LJBLIC WORKS DEPT_ *ENGINEERING *STREETS *WATER* SEWER* BUILDING * designed drawn checked Prot eng pml dir field bk no by MJS TLC CJP MJS date 08/01/16 08/01/16 08/01/16 08/01/16 kpff 16015th Avenue, 5u1t01600 Seattle. WA98101 µ 06..66us822 kpfl.com FORT DENT PARK BNSF SEWER RELOCATION COVER SHEET & INDEX of file n CV.0 no date revisions date 10/11/2016 E E kvila Sewer Force Main) \CADD\Design \ISM Path Z: \115000-115400\115077 go‘ 9001 CM?' OIL VRA CONSTRUCTION ACCESS. ALONG STABIUZED EXISTING MAINTENANCE ROAD PROPERTY UNE 9030 TEMPORARY CHAIN LINK FENCE APPROXIMATE DIRECTIONAL DRILL END POINT CONSTRUCTION LIMITS TOP OF BANK THE TEMP CONSTRUCTION HIGH VISIBIUTY SILT FENCE TO EXISTING STARFIRE FENCE \` • �\• • SILT FENCE PER SWPPP TREE "13"_T0 '\ BE REMOVED 't PROVIDE $ RTILIZING OF OtSTURBED AREAS PER WSDOT, i' STD SPEC SECOON-8-01.3(210- �— PROPERTY LINE (APPROXIMATE LOCATION) AIR RELEASE VALVE ASSY VAULT, SEE DETAIL 1/DT.01 4' PLUG SHUTOFF VALVE, MJ SEE NOTES 2 & 3 4' INSULATING COUPUNG ---1 SEE NOTE 4 4' 11 )'• RJ DI VERT BEND 4' X 6" RJ DI ECC REDUCER 6" 11,1' RJ DI VERT BEND 6' DI TO HOPE COUPUNG /PROTECT EXIST SEWER '✓ ,FORCE MAIN UNTIL SERVICE CUTOVER TO NEW, THEN PLUG AND PROTECT EXIST KING D0N COUNTY STRUCTURE REMOVE EXIST POST. 9` 9s- • END 12" STL \' CASING ELECTROLYSIS 3-WIRE TEST STATION, SEE DETAIL 2/DT.02 DETAIL 1- = 10' P USLIC WORKS DEPT_ • ENGINEERING *STREETS *WATER* SE WER* BUILDING * designed drawn checked Prol eng prof dir field bk no by MJS TLC GIs MJS date 08/01/16 08/01 /16 08/01 /16 08/01/I6 GREEN RIVER kpff 160151h Avenue, Suite 1600 Semi= WA 98101 206..6223822 w.kpff.mm 4Ti .NOTE: RIGHTS OF ENTRY TO BNSF PROPERTY HAVCNOT BEEN ACQUIRED, CONTRACTOR TO ACQUIRE TREES TO BE REMOVED SIZE (INCHES AT DBH) TREE A 31 TREE B 24 TREE C 23 CIT? 3&' lR7GNITCM o .ape q44, t,G\'T'F r r'nr - PROPERTY LINE�� 0 10 20 40 1 in8t . 20 feet NOTE: 1. PROVIDE STABIUZED CONSTRUCTION ENTRANCE IN ACCORDANCE WITH DETAIL 1/DT.02 STARTING AT THE SIDEWALK ALONG STARFIRE WAY AND EXTENDING NW ALONG THE EXISTING GRAVEL ROAD. 2. CONSTRUCT HDPE INFLOW CONTAINMENT 015H FOR VALVE BOX AND CAP, CRETEX OR APPROVED EQUAL. 3. PROVIDE LOCKING CAP FOR VALVE BOX. 4. THE CONTRACTOR SHALL HAVE THE VACTOR TRUCK ON SITE WHEN THE PIPE IS CUT DURING THE CONNECTION TO THE EXISTING SEWER. LEGEND 9027 FORT DENT PARK BNSF SEWER RELOCATION SITE PLAN TAX LOT NUMBER J z 2 file o SP.O no date revisions date 10/11/2018 / 48:20om CAD Use —SP.dwg Plot dote: Oct 10, Polh Z: \115000-115400\115077 (Tukwila Sewer Force Mom) \CADD\Design \TSAI TRUCK TARPING ZONE CONSTRUCTION LIMITS rr R=1200' PROPERTY LINE INSTALL INLET CB PROTECTION PER SWPPP, SEE DETAIL 1/DT.03 0 • • MK ONO MOO WO CLASS B SIGN MUTCD.. W21-7 36" X 36" 'UTILITY WORK AHEAD' ..r 6" HDPE SS IN -12"- SR CASING rr .FORr ed: CLASS B SIGN MUTCO W21-5 36' X 36" ` . .. "SHOULDER WORK*--,_444. 1EMPORARY CONCRETE.. -- BARRIER -ECOLOGY BLOCK ss- pER WSDOT SPECS SEE DETAIL BELOW ENTRANT TO M-.UF MAINT-. AC*' ALL TIMES �CLASS 8 MUTCD -W24-SA 36' x 6� ^f ~. FENCE PER SEE/DETAIL TY. SILT..... 2/DT.03 ALS, APPROXIMATE DIRECTIONAL DRILL START POINT ® ... posh' o F CO Nit/cm "rLr)(ys G ELECTROLYSIS 3-1NRE TEST STATION, SEE DETAIL 2/DT.02 6' HOPE START 12" STL-CASING.. 6" DI TO HDPE COUPLING 6' ltY' RJ DI VERT BEND PROTECT EXIST SEWER FORCE IN UNTIL SERVICE CUTOVER TO NEW, THEN PLUG ABANDON ABANDON EXIST MH. 1 FILL NTH BACKFILL FOR SAND DRAINS IN AC ;;DANCE WITH WSDOT STD SPEC 9-03.13 DETAIL 48' SSMH, SEE NOTE 3 90' 'RJ DI BEND 6' PLUG SHUTOFF VALVE ASSY, NJ SEE NOTES 1 & 2 1' = 10' P U.BL.IC WORKS DEP T_ +ENGINEERING * STREETS *WATER* SEWER* BUILDING * designed drawn checked Prol en6 Pros dir field bk no by MJS TLC CJP MJS date 08/01/16 08/01/16 08/01/16 08/01/16 CONSTRUCTION UNITS $ewEiZ 5' sT7'Y` % kpff 16015th Avenue, Suite 1600 Seattle, WA98101 206,622-5622 w.kpa.com EXIST POWER POLE 0 TO20 40 t ineh = 20 feet NOTES: 1. CONSTRUCT HOPE INFLOW CONTAINMENT DISH FOR VALVE BOX AND CAP, CRETEX 0R APPROVED EQUAL 2. PROMDE LOCKING CAP FOR VALVE BOX. 3. MANHOLE COVER SHALL BE PER COT STD PLAN SS-11. MANHOLE STEPS SHALL BE PER P-14938 0R APPROVED EQUAL NOT FOR CONSTRUCTION FORT DENT PARK BNSF SEWER RELOCATION SITE PLAN no date revisions 3 o file n 5P.022 date 10/11/2016_,/ ce Han) \ CAN \Desgn\TSIA Path. Z:\115000-115400\115077 45 40 35 30 25 20 15 10 0+00 45 40 35 0 30 o 25 20 0 15 10 TREE A' APPROXIMATE DIRECTIONAL DRILL -END POINT - _ 0+50 TREE B TREE C EXIST 4" SS DI (FM) ROW z .' ¢ Im ,NI 11 y23 2 N�N N< s k, =1> w w _ _ ;- 1 4" PLUG SHUTOFF VALVE. MJ 2" AIR RELEASE VALVE - ASSY CONNECTION POINT F EXIST BI4SF-Fl13ERjOPTIC EXIST BNSF RR TRACKS EXIST GRADE • EXIST BNSF. z RR TRACKS d 'in ROW 6 HDPE SS (FM) 'IN 12" STEEL CASING EXIST RR TRACKS EXIST GRAVEL PILE, TIP TO 8E REMOVED BY OTHERS 45 40 i 35 EXIST 4" SS (FM) - CUT AND COVER WORK 6" DI X HDPE COUPLING DIRECTIONAL DRILL WORK EXIST 96" PCCP SS FORCE MAIN 1+00 1+50 2+00 2+50 3+00 4 AND 6" HDPE SS (FM) IN 12" STEEL CASING PROFILE 3+50 4+00 4+50 m a o _ "2 'z • z --- - - - - ;� EXIST GRADE- ��: \\ /{ iI EXIST 4" SS 01 (FM) 6" HOPE SS (FM) IN-12",STEEL CASING 5 5+00 5+50 6" 01 X HDPE COUPLING . 6" PLUG SHUTOFF VALVE, MJ — • DIRECTIONAL CUT AND DRILL WDRK COVER WORK 48'-SSMH •- RIM=32.95 EXIST 8' DI IE=23.71 6" 01 (FM) IE=24.00 EXIST BNSF RR TRACKS EXIST SSMH RIM=32.38 • - -- , - EIXST 8" 01 IE= 19.38 W, SE • EXIST 8" UNKNOWN IE=19 58 NW EXIST 10" CAPPED.IE=24.83 NW EXIST 6" UNKNOWN IE=19.58 N APPROXIMATE DIRECTIONAL DRILL START POINT - 45 - 40 35 30 25 20 15 NOT FOR CONSTRUCTION 10 6+00 6+50 7+00 7+40 7+60 7+80 8+00 8+20 8+40 8+60 4" AND 6" HDPE SS (FM) IN 12" STEEL CASING PROFILE P U_BLIC WORKS _D_EP T_ * ENGINEERING *STREETS *WATER* SEWER* BUILDING * by date desiened drawn checked Prol eon PToj dv field bk no MJS TLC CJP MJS 08/01/16 08/01/16 08/01/16 08/01/16 kpff 16015th Avenue. suite 1600 Seattle, WA 98101 206.622.5822 www.kpff .co m FORT DENT PARK BNSF SEWER RELOCATION SEWER PROFILE 3 o 30 W 41 N 1 z 25 Q z 4 20 „ 0 -15 . 10 If 5+0053 OM CI III 1- O in 20 40 li Mi 1 02 1 1 rock = 20 n. HOR2 O 25 5 10 1 inch = 5 R VERT 51en PF.0 no date revisions date 10/11/20 6 E 0 Force Moe)\CADD\Design\T 1. THE SIZE OF THE AIR RELEASE VALVE SHALL BE SPECIFIED IN THE CONTRACT. THE PIPING AND VALVES SHALL BE THE SAME SIZE AS THE AIR/VACUUM VALVE. 2. LOCATE AT THE HIGH POINT OF THE MAIN, TAP TOP OF MAIN. 3. PROTECT ADJACENT KING COUNTY BUILDING. sC MATCH EXISTING GRADE TYPE K COPPER PIPE TYPE 3 HANDHOLE W/ EXTENSIONS • NOTES: 2" OPEN PATTERN, RETURN BEND 2" BRASS PIPE H2O TRAFFIC LOAD COVER INSULATING UNION 1" MIN BRASS7 PIPE {/ ELBOW NIPPLE INSULATING UNION BRASS PIPE Z AND FITTING HOPE TO COPPER TRANSITION COUPUINC 4' X 1" ELECTROFUSION/PIPE SADDLE SEWER FORCE MAIN AIR RELEASE VALVE AIR RELEASE VALVE STAINLESS STEEL BALL VALVE GRAVEL BACKF1LL FOR DRAINS IN ACCORDANCE WITH WSDOT STD SPEC 9-03.12(4) NTS PUBLIC WORKS DEPT_ * ENGINEERING* STREETS *WATER* SEWER* BUELDING * designed drawn checked 900) eng Pfoi dir Betd bk no by MJS TLC CJP MJS 2' BEE HIVE STRAINER 2-2" 90' ELBOWS, GALVANIZED WITH Y,' HOLD IN ONE (DRILLED) & CLOSE NIPPLE BETWEEN 2' X 1' MIN REDUCER NON —SHRINK GROUT date 08/01/16 08/01/16 08/01/16 08/01/16 MORTAR FILLET EXISTING 8' SEWER MAIN, PLUG AND ABANDON kpff 16015th Avenue, Suite 1600 Seattle, WA98101 W06..61Z.5822 w.kpff.com - \-- CONSTRUCT CRETEX OR APPROVED EQUAL HDPE INFLOW CONTAINMENT DISH APPLY RAVEN OR APPROVED EQUAL PCLYURETHANE LINER TO ALL INTERIOR CONCRETE SURFACES UNDISTURBED EARTH OR GRAVEL BACKFILL IN ACCORDANCE WITH 9-03.12(1), 4' MIN THICKNESS REINFORCING STEEL MIN 0.21 SO IN/FT TOP FACE, EACH DIRECTION PRECAST 48' MANHOLE IN ACCORDANCE W/ CITY OF TUKWILA. SEE DETAIL MH—I WATERTIGHT FLEXIBLE PIPE CONNECTION STUB 3'-5' 8' SEWER MAIN OR AS FIELD CONDITIONS PERMIT CAST —IN —PLACE BASE CUT -IN MANHOLE ON EXIST LINE (1 NTS — NOT FOR CONSTRUCTION FORT DENT PARK BNSF SEWER RELOCATION DETAILS 8" ROMAC OR FERNCO STRONG BACK COUPUNG 0 no date revisions date 10/11/20 6 % 0 er Force Mmn)\CADD\Design\TS Z: \115000-115400\115077 NOTES: 1. STABILIZED ACCESS SHALL BE USED IN ALL AREAS OF THE SITE WITH VEHICLE TRAFFIC AND PARKING. 2. SEE ',MOT STD SPEC SECTION 9-33.2 (TABLE 3) FOR GEOTEXT1LE REQUIREMENTS. GEOTEXTILE MODIFICATIONS BASED ON SPECIFIC PROJECT SITE CONDITIONS. 3. REMOVE STABILIZED CONSTRUCTION ENTRANCE AND RE —GRADE GRAVEL ROAD AFTER SUBSTANTIAL COMPLETION. R=25' MIN 4"-8" QUARRY SPALLS CEO —TEXTILE FABRIC STABILIZED CONSTRUCTION ENTRANCE NTS — NUMBER OF TERMINALS EQUALS NUMBER OF TEST WIRES PLUS 1 Yi MOUNTING BOX HOLES MANUFACTURER, DETERMINED BY TEST BOX SIZE &MANUFACTURER, MTyP IN 1(4"-20 NICKEL —PLATED BRASS NUT NICKEL —PLATED BRASS CUT WASHER NICKEL —PLATED BRASS LOCK WASHER Y'-20 NICKEL —PLATED BRASS BOLT 1 CRIMP TYPE SPACE CONNECTOR MIN 0 6.75" X 4.88" X Y," PHENOLIC PANEL TEST WIRE, TYP WIRE IOENTIFlCA110N WHEN SPECIFIED IN CONTRACT DOCUMENTS TERMINAL BOARD DETAIL NTS 0—RING CABLE ENTRY SYSTEM TERMINAL BOARD, SEE DETAIL 3/DT.02 NEMA TYPE 4X ENCLOSURE W/ HINGED COVER, HOFFMAN BRAND OR APPROVED EQUAL TEST BOX SECTION NTS PUBLIC WORKS _DEP Y. *ENGINEERING * STREETS *WATER* SEWER*BGILDING* designed drawn checked Or01 eng pool drz field bk no by MJS TLC CJP MJS date 08/01/16 08/01/16 08/01/16 08/01/16 CONSTRUCT CRETEX OR APPROVED EOUAL HDPE INFLOW CONTAINMENT DISH 1 Yi C SCHEDULE 40 ELECTRICAL GRADE PVC CONDUIT TO PIPE AND REFERENCE CELL, SEE DETAIL 6/DT.02 ELEVATION MINERAL AGGREGATE TYPE 9, 6" MIN DEPTH ELECTROLYSIS TEST STATION TRAFFIC AREA FINISH GRADE FRAME & COVER MIN 3 COURSES CONC BLOCK & MORTAR TEST BOX. SEE DETAIL 4/DT.02 TEST STATION WIRES (NUMBER VARIES) PROVIDE 3'-0" MIN OF SLACK BETWEEN TEST BOX AND CONDUIT COMPACTED SUBGRADE (95%) CONNECTION SEQUENCE: 1. REMOVE CASING COATING TO BRIGHT & CLEAN METAL 2. STRIP INSULATION FROM TEST STATION WE, INSTALL ADAPTER SLEEVE 3 HOLD MOLD FIRMLY WITH OPENING AWAY FROM OPERATOR TO IGNITE 4. REMOVE SLAG AND ALLOW TO COOL 5. 16 OUNCE HAMMER TEST PER CONTRACT DOCUMENTS 6. FINAL CONNECTION TO BE MADE WATERTIGHT WITH MASTIC COATING OR PREFORMED THERMITE WELD CAP THERMITE WELD CONNECTION 16015c6 Avenue, Suite 1600 Seattle, WA 98101 206.6225822 www.kpH.cnm NTS NTS THERMITE WELD CONNECTION SEE DETAIL 5/DT.02 HDPE CARRIER PIPE CASING END SEAL ZINC REFERENCE CELL PLACE AT SPRING UNE OR BELOW, 4"±2" FROM CASING /6 AWG, BLACK TEST STATION WIRE 110 AWG, BLACK TEST STATION WIRE 110 AWG, YELLOW 1 Yi 0 CONDUIT TO TEST STATION, SEE DETAIL 2/DT.02 TERMINATE END OF CONDUIT AS CLOSE TO CASING AS POSSIBLE STEEL CASING STANDARD 3-WIRE TEST STATION NTS NOT FOR CONSTRUCTION FORT DENT PARK BNSF SEWER RELOCATION DETAILS n0 date revisions date 10/11/20 6 / 0tn 0 Path Z:\115000-115400\115077 (Tu GEOTEXTILE FABRIC RETRIEVAL STRAP ADAPTOR SKIRT TRIM TO WITHIN 3" - 5" OF GRATE OVERFLOW (TO BYPASS PEAK STORM VOLUMES) SEDIMENT ACCUMULATION CATCH BASIN INSERT NTS NOTES: 1. CATCH BASIN INSERTS NEED TO BE REMOVED AT THE END OF THE JOB. 2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN DRAINAGE DEVICES PER THE MANUFACTURER'S RECOMMENDATIONS. CATCH BASIN INLET INSERTS ARE NOT TO BE INSTALLED IN CURB INLETS. 3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO CLEARING AND GRADING ACTIVITY, OR UPON PLACEMENT OF A NEW CATCH BASIN. 4. SEDIMENT SHALL BE REMOVED FROM THE UNIT WHEN IT BECOMES ONE THIRD FULL OR IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 5. SEDIMENT REMOVAL SHALL DE ACCOMPLISHED BY REMOVING THE INLET INSERTS, EMPTYING, AND RE-INSERTING IT INTO THE CATCH BASIN. D0 NOT WASH SEDIMENT INTO STORM DRAINS WHILE CLEANING. PUBLIC WORKS DEPT. * ENGINEERING * STREETS * WATER* SEWER*BUILDING * n SP.02 desinned drawn checked prof e0R prosdr field bk no by MJS TLC CJP MJS date 08/01 /16 08/01/16 08/01/16 08/01/16 16015th Avenue, Suite 1600 Seattle, WA90101 206.602.582Z www.kpff.com HIGH DENSITY POLYETHYLENE OR POLYPROPYLENE MESH, AND SHALL BE UV RESISTANT, ORANGE COLOR 6'-0" MAX FENCING MATERIAL SELF-LOCKING 11E - NYLON 6/6 (MIN GRADE), 501 MIN TENSILE STRENGTH, UV STABILIZED (DESIRABLE) \1 STEEL T-BAR POST V ELEVATION 1'-� MIN (DEEPER FOR V UNSTABLE SOIL) SECTION STEEL T-BAR POST HIGH VISIBILITY FENCE DETAIL i2- NTS SP.01, SP.02 NOT FOR CONSTRUCTION FORT DENT PARK BNSF SEWER RELOCATION DETAILS J file no DT.0 no date revisions date 10/11/20 6 orce Moin)\CADD\Design \TS Path Z.\115000-115400\115077 (Tuk FORT DENT PARK BNSF SEWER RELOCATION PROJECT NO. 915 301 01 SHORELINE EXEMPTION REQUEST & SHORELINE TREE REMOVAL &VEGETATION CLEARING PERMIT APPLICATION PROJECT LOCATION MAP NOT TO SCALE PUBLIC WORKS _DEPT_ *ENGINEERING *STREETS *WATER* SEWER*BUILDING * 1 16015th Avenue, Suite 1600 Seattle, WA98101 206.6225622 W k5H.wm MAYOR ALLAN EKBERG CITY ADMINISTRATOR DAVID CLINE CITY COUNCIL PRESIDENT DIRECTOR OF PUBLIC WORKS JOE DUFFIE BOB GIBERSON, PE CITY COUNCIL CITY ENGINEER KATE KRULLER ROBIN TISCHMAK, PE DENNIS ROBERTSON VERNA SEAL PROJECT MANAGER KATHY HOUGARDY MICHAEL CUSICK, PE DE'SEAN QUINN THOMAS MCLEOD City of Tukwila: "City of Opportunity - Community of Choice" DEPARTMENT OF PUBLIC WORKS 6200 SOUTHCENTER BLVD., SUITE 100 TU KW I LA, WA 98188 (206) 433-0179 EXHIBIT 5 DRAWING INDEX SHEET NO DWG NO SHEET TITLE 1 CV.01 COVER SHEET & INDEX 2 SP.01 SITE PLAN 3 PF.01 SERER PROFILE FORT DENT PARK BNSF SEWER RELOCATION COVER SHEET & INDEX of 3 file n CV.0 00 dale revisions dote 08/26/2016 • Sep 23. 2016-1257 33pm CAD User: Terence) cn Sewer Force Main)\CADD\Design\TSM— Z. \115000-115,100\115077 (Tuk 9001 COnf CP YREN70aa i CONSTRUCTION ACCESS ALONG STABILIZED EXISTING ` MAINTENANCE ROAD 8��• CaII 811 two business days ��1r% before you dig PROPERTY LINE 9030 TEMPORARY CHAIN LINK FENCE APPROXIMATE DIRECTIONAL DRILL END POINT CONSTRUCTION UNITS ♦ SILT FENCE PER SWPPP TOP OF BANK —\ THE TEMP CONSTRUCTION HIGH VISIBILITY SILT FENCE TO EXISTING STARFIRE FENCE 0H a - _ TREE "B" TO BE-REA10VE11� NOTE: RIGHTS OF ENTRY TO BNSF . `♦ ♦ PROPERTY HAVE'NOT BEEN ACOUIREQ, CONTRACTOR TO ACQUIRE PROVDE SEEDING - AND FERTILIZING OF DISTURBED AREAS PER WSDOT . •STD S•PEC SECTIONB•=• PROPERTY UNE (APPROXIMATE LOCATION) AIR RELEASE VALVE ASSY VAULT, SEE DETAIL 1/01".01 4" PLUG SHUTOFF VALVE, MJ SEE NOTES 2 & 3 4" INSULATING COUPUNG 4" 11 Ya" RJ DI VERT BEND ♦ �- /PROTECT EXIST SEWER ♦ ,FORCE MAIN UNTIL ♦ SERVICE CUTOVER TO NEW, THEN PLUG AND TI\— PROTECT EXIST KING‘ABANDON_ COUNTY STRUCTURE ♦REMOVE EXIST POST. 4" X 6" RJ DI ECC REDUCER 6' 11Y; RJ DI VERT BEND 6" DI TO HDPE COUPLING END 12' SE CASING ELECTROLYSIS 3—WIRE TEST STATION, SEE DETAIL 2/0T.02 DETAIL = 10' GREEN RIVER TREES TO BE REMOVED SPECIES SIZE (INCHES AT DOH) NUMBER OF REPLACEMENT TREES * TREE A ACER MACROPHYLLUM 31 / 8 TREE 8 ACER MACROPHYLLUM 24 I 8 TREE C ACER MACROPHYLLUM 23 8 TOTAL REPLACEMENT TREES 24 10 GDTn 1/ 2C1WCGJ 10220 1 inch = 20 feel 0 7 40 * NOTE: 1. THE CITY OF TUKVILA INTERURBAN IMPROVEMENTS PROJECT WILL PROVIDE AND PLANT THE REQUIRED REPLACEMENT TREES FOR THIS PROJECT LEGEND 9027 TAX LOT NUMBER PUBLIC WORKS DEPT. *ENGINEERING *STREETS *WATER* SEWER*BUILDING * designed drawn checked proj etg prof dir field bk no by MJS TLC CJP MJS date 08/01/I6 08/01/16 08/01/16 08/01/16 krif 1601 SU. Avenue, Suite 1600 Seattle, WA91101 206.672.542 www.lpft.c*m FORT DENT PARK BNSF SEWER RELOCATION SITE PLAN 2 of 3 file n SP.O 00 date revisions date 08/26/2016 / 45 40 35 30 25 20 15 10 TREE B TREE. A . • • • APPROXIMATE .D1RECTIONAL -DRILL—END POINT • • • • - • E : :I: • - • i • PLUG'SHUTOFF VALVE. MJ TREE C EXIST 4" SS DI (FM) 5 0+00 45 40 35 30 1.6.1 g 25 a • • • 20 0 15 10 - • -1; SrVArVrT '• : ; : A55iCONNCnC0 PONT 1'7 • ' ',.„,•••:: :...H1,1":„ . • : .1" : : ROW ... ; EXIST BNSF • • RR TRAMS: ! : • .B : , f‘t"; :1: • n4 \;`‘," • " !•-?, a : I ''• ''3• 57-:FTn‘l-' : L'XIST GRADE EXIST;BNSF; z • < aNI 0 17, It< RR TRACKS ___ L6' DI X 'HoPEI COUPLING • . • • • . . : : I EXIST 96" PCCP SS Fora MAIN . • . . • ctir AN6 DIRECTIONAL • COVF_R WORK I ORILL WORK . . . : • .... . . . . . • • • . • . • • . • t . . .. . 6 HD E FM),IN 2 STEE EXIST RR TRACKS : • .. . ... EXIST GRAVEL ;PILE TYP ; • . TO BEREMOVED 61 OTHERS ... ./)'L . I 45 40 . 35 - 3 'et EXIST 4" SS (FM) -A 25-0 i?-2 00 00 20 0 0+50 15 — 10 1+00 1+50 2+00 2+50 3+00 EXIST GRADE • : • T • • LI - : 4" 5 01.(TIA) 4 AND 6" HDPE SS (FM) IN 12" STEEL CASING PROFILE • . 48 :SSMH 6" HOPE 55 FM) N l2STEa ASING RIA32.95 EXIST 8 DI 1E=23.71 6" 01 (FM) 1E=24.00 EXIST BNSF RR 11RACKS 3+50 4+00 4+50 . . , . • • i • .. : • • : • • . ... •• DI X HDPE COUPLING • 6" PLUG SHUTOFF VALVE M3 : . . EXIST SSMH RIM 32.38 —f EIXST 13 DI lEr- 1930.W, SE EXIST 8" UNKbIOWN /0=1938 MX !HST 10 CAPPED lE=24.83. NW EXIST 6" UNKNOWN lE=19.68 N .. • APPROXIMATE DIRECTIONAL Okla: START POINT .. . XIST GRADE . ' . : .. . .. . . ! • : ' : .1' • • .1: : •• . . • DIRECIIONAL CUT AND • DRILL WORK I COVER WORK • 5 5+00 5+50 NOT FOR CONSTRUC TION 6+00 6+50 7+00 7+40 7+60 7+80 4" AND 6" HOPE SS (FM) IN 12" STEEL CASING PROFILE 1'LIE3LIC WORKS DEPT. *ENGINEERING*STREETS*WATER*SEWER*BUILDING* designed drawn checked proj eng Proi dir field bk no by MJS TIC CJP MJS date 08/01/16 oval /16 o8/01/16 ovoips kpff 1601 50 Moue, Suite 1600 Seethe, WA 911101 Z06.6225122 www.kpff.com 8+00 8+20 8+40 FORT DENT PARK BNSF SEWER RELOCATION SEWER PROFILE 45 40 35 30 25 20 5 5+00 15 0 10 20 10 8+60 1 inch = 20 fL 110R2 0 2.5 5 10 1 inch = 5 fL VERT 3 of 3 file no PF.0 no date revisions date 08/26/2016 } City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE SUBSTANTIAL DEVELOPMENT File Number: L14-0022 Applied: April 10, 2014 Approved: June 23, 2014 Expiration: June 23, 2016 A permit is hereby granted to: City of Tukwila, Public Works Department to: Repair and improve approximately 4,100 linear feet (0.78 mile) of Interurban Avenue from Fort Dent Way to South 143`d Street. Approximately 1,200 feet (0.23 mile) of the project is within the 200 foot shoreline jurisdiction of the Green River. The project involves installation of sidewalks, curb, gutter, a new water main, storm drains, stormwater facilities, removal of an existing gabion wall and construction of a new soldier pile wall in the same location; resurfacing the road, channelization, street lighting and landscaping. Upon the following property: Address: Interurban Avenue Public Right of Way from Fort Dent Way to South 143rd Street. Parcel #: N/A Section/Township/Range: NE and SE Quarters of 23/23/04 Development under this permit shall comply with the following conditions: 1. In the planting area just north of Ft. Dent Way, substitute 10 Western Red Cedars, five in each planting area on either side of the driveway for either Red Osier Dogwood or snowberry. 2. Prior to starting construction, an ISA certified arborist shall examine, and trim if necessary any tree branches in the area where the soldier pile wall is to be placed to avoid damage by construction equipment. 3. A clean source of fill must be used for any fill placed in the shoreline jurisdiction. 4. Prior to final inspection of planted restoration trees and shrubs, submit a maintenance and monitoring plan including performance standards. 5. As soon as possible, provide a detailed construction schedule to the Muckleshoot Indian Tribe to ensure that any night time work does not interfere with tribal fishing in the area. This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other Federal, State or local statues, ordinances or CL: Page 1 of 2 H:W I4-0022 Interurban Ave. Improvements\Shoreline Substantial Development Permit 6300 Southcenter Boulevard, Suite #100 • Tuk-41- 06/23/201410:53 AM EXHIBIT 6313665 Interurban Avenue Road Improvement L14-0022 Shoreline Substantial Development Permit regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the pern ittee fails to comply with the project as approved and any conditions thereof. CONSTRUCTION PURSUANT TO THIS PERMIT MAY NOT BEGIN AND IS NOT AUTHORIZED UNTIL TWENTY-ONE (21) DAYS FROM THE DATE OF RECEIPT WITH THE DEPARTMENT OF ECOLOGY AS DEFINED IN RCW 90.58.140(6) AND WAC 173-14-090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY-ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c). Pursuant to RCW 90.58.180 the decision by the City of Tukwila to issue this Shoreline Substantial Development Permit may only be appealed to the Shoreline Hearings Board. Appeals must be filed with the Shoreline Hearings Board within 21-days from the filing of this permit with D.O.E as defined in RCW 90.58.140. For more detailed information on appeals, refer to RCW 90.58 and WAC 461.08. Date 0Jack Pace, Director of Department of Community Development Construction must begin within 2 years from the effective date of the permit and be substantially completed within 5 years of the effective date of the permit. The effective date of a substantial development permit shall be the date of receipt as provided in RCW 90.58.140(6). H:1\E13-015 Duwamish Gardens\NOD Page 2 of 2 06/23/2014 10:53 AM aa 64 00 56 52 46 44 40 35 32 m 24 20 16 12 a -so 1. •. wn�cC a ..6 i m. _ ',x,`vsuiw` i 4,4.036 o Wit-_ r w ra- _ram.__________________________._ -- _.- N, outfall pipe qTe B cross section, see —�a> civil plans pdf pg 11 .3 m e. 17 / sheet 23 IM'ERURBANpYE$ +- .�-�`�'7- eTr'- �•� `i..� •i•a g '. i ri .. i �..� ... `+' .a..i.r ,i131". NF.1 70 BE 1'1E/2¢D IGATERVAM OF Mt _s •Q" + '�, 5 _ N__ �r!d �'� Ji4M�Y - oisvc 6ABN11 wa _ r 4111'mT TW_ vnl0f- _ F PACK OF �EWX O.OI •�!'.- 4 •�� ozia _ SOILER PEE 4NLL - Oflelf �1 o-� b J G _ idS._: c—" < OF Ponwoll cautaucEITZMI f / p�pb4.r wa ^^ Y6 q4 a.. 24.0 �•'�21011' / / / J 18�50.00 1I/ / 1r -40 -2 STA 14+25 & 16+50 PLAN & PROFILE INE'SRURBAN AVER TIIKWILA, WA suer OP I 14+25, 00 Es r69w WAIL IDdE.ROKTED 20 40 co 0 10 2b 40 CO SCALE M FEET 64 60 56 52 40 44 40 56 32 26 24 20 12 a fro 60 56 52 48 44 40 50 32 20 24 $1 18 12 4 -00 0 3 l0 20 30 SCALE N FEEL' -40 Site Plan & Section within Shoreline Proposed soldier [pile wall 16+50.00 Bottom invert of outfail e1v=27.3 i'This will be tac MTN- cleanng limits 100 yr flood elv-24.5 lnrsncml lsE N 0 20 LM 40 b NOVRMR2RT01S 60 56 52 48 44 40 56 32 26 24 12 4 Project Area Ir..1P4Ca .... AM* Mears .../.+0 October 2012 Allyson Brooks Ph.D., Director State Historic Preservation Officer July 8, 2016 Mr. Mike Cusick PE City of Tukwila 6200 Southcenter Blvd. Tukwila, WA98188 In future correspondence please refer to: Project Tracking Code: 2016-07-04849 Property: City of Tukwila EZ-1 for Tsewerhe Project HDD Boring, 45KI267 Re: Archaeology -Professional Archaeological Monitor and Archaeological Monitoring Plan Requested Dear Mr. Cusick: Thank you for contacting the Department of Archaeology and Historic Preservation (DAHP) regarding your project. We have reviewed the information contained in the EZ-1 form provided to our office for the above referenced project. The project area is either within or near precontct archaeological site 45K1 267. Please be aware that archaeological sites are protected from knowing disturbance on both public and private lands in Washington States. Both RCW 27.44 and RCW 27.53.060 require that a person obtain a permit from our Department before excavating, removing, or altering Native American human remains or archaeological resources in Washington. Failure to obtain a permit is punishable by civil fines and other penalties under RCW 27.53.095, and by criminal prosecution under RCW 27.53.090. Chapter 27.53.095 RCW allows the Department of Archaeology and Historic Preservation to issue civil penalties for the violation of this statute in an amount up to five thousand dollars, in addition to site restoration costs and investigative costs. Also, these remedies do not prevent concerned tribes from undertaking civil action in state or federal court, or law enforcement agencies from undertaking criminal investigation or prosecution. Chapter 27.44.050 RCW allows the affected Indian Tribe to undertake civil action apart from any criminal prosecution if burials are disturbed. We request a professional archaeological be onsite to monitor the excavation of the boring pits under an archaeological monitoring plan reviewed by DAHP and the Tribes. EXHIBIT 7 State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov D Thank you for the opportunity to review. Should you have any questions, please contact me. Sincerely, Gretchen Kaehler Assistant State Archaeologist, Local Governments (360) 586-3088 zretchen.kaehlera,dahp.wa.gov cc. Richard Young, Cultural Resources Director, Tulalip Tribes Dennis Lewarch, THPO, Suquamish Tribe Laura Murphy, Archaeologist, Muckleshoot Tribe Cecile Hansen, Chair, Duwamish Tribe Steven Mullen Moses, Cultural Resources, Suquamish Tribe 2 PROJECT REVIEW SHEET - EZ1 HISTORIC & CULTURAL RESOURCES REVIEW PROPERTY / CLIENT NAME: City of Tukwila FUNDING AGENCY: CitvofTukwila Project Applicant: City of Tukwila Contact Person: Michael Cusick Address: 6300 Southcenter Blvd. City, State: Tukwila. WA Zip: 98188 Phone/ FAX: 206 431 2441 E-Mail: Michael.cusickfttukwilawa.Gov County: King Funding Agency: Organization: Address: City, State: Phone: City of Tukwila 6300 Southcenter Blvd. Tukwila, WA Zip: 98188 206 431 2441 PLEASE DESCRIBE THE TYPE OF WORK TO BE COMPLETED (Be as detailed as possible to avoid having to provide additional information) ❑ Provide a detailed description of the proposed project: . Tsewerhe project will be the excavation of 3 boring pits for directional drilling for the installational of 600 feet +/- of 6" sewer forcemain from the southeast corner of Fort Dent Park, under the BNSF Railroad tracks, to the west edge of Monster Road. ❑ Describe the existing project site conditions: The work zone on the west side of Monster Road is near the gravel entrance to Manufactors Minerals, a gravel processing company. The work zone on the west side of the project is 40 +/- north of the Green River in a depressed area at the southeast corner of Fort Dent Park, west of the BNSF tracks, and adjacent to the King County Metro sewer forcemain. The ground in this work area was disturbed by construction of Fort Dent Park, Metro sewer force main, and the railroad tracks over 100 years ago. The area between the 2 zones is used for gravel storage and railroad spur tracks that go to the Manufactors Minerals and King County Renton sewage treatment plant. There will no ground disturbance between the 2 work zones. ❑ Describe the proposed ground disturbing activities: There 3 temporary bore pits will be excavated, 2 at end and 1 at the other end of the project. The bore pits will be about 30' +/- by 20' +/- by 10' +/- feet in depth. ❑ Check if building(s) will be altered or demolished. If so please complete a DAHP Determination of Eligibility "EZ2 form" using our on-line Historic Property Inventory Database for each building, 45 years or older, effected by the proposed project. PLEASE ATTACH A COPY OF THE RELEVANT PORTION OF A 7.5 SERIES USGS QUAD MAP AND OUTLINE THE PROJECT INPACT AREA. USGS Quad maps are available on-line at http://maptech.mytopo.com/onlinemaps/index.cfm Project Location Township: 23N Range: 4 E Section: 23&24 Address: Monster Road City: Tukwila &Renton County: King Mail this form to: Robert Whitlam, PhD. State Archaeologist, DAHP (360) 586-3080 rob.whitlam@daho.wa.gov (Within 30 days DAHP will email their opinion back to you.) Please be aware that this form may only initiate consultation. For some projects, DAHP may require additional information to complete our review such as plans, specifications, and photographs. An historic property inventory form may need to be completed by a qualified preservation professional. 11/30/2016 \ RE: Dent Park Tree Removal Permit - MaxweII,P \er RE: Dent Park Tree Removal Permit Michael Cusick Wed 11/30/2016 6:16 AM To: Maxwell Baker <Max.Baker@TukwilaWA.gov>; Hi Max, The 3 trees to be removed at Fort Dent Park for sewer repair at railroad tracks are sugar maple. The diameter of the west tree is 32", the middle tree is 28" and the east tree is 18". 6 Thanks Mike Cusick, P.E. Senior Program Manager — Sewer/Water 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188-2544 (206)-431-2441 (work) (206) 571-6318 (cell) MichaeLCusick@Tukwilawa.gov The City of opportunity, the community of choice. From: Maxwell Baker Sent: Tuesday, November 22, 2016 9:32 AM To: Michael Cusick <Michael.Cusick@TukwilaWA.gov> Cc: Andrea Cummins <Andrea.Cummins@TukwilaWA.gov>; Mike Ronda <Mike.Ronda@TukwilaWA.gov> Subject: Dent Park Tree Removal Permit Hi Michael, After speaking with Andrea and reviewing the tree permit for the BNSF/Fort Dent Park project, it appears we will need more specific information regarding the number, siting, and species of trees to be planted within the shoreline along Interurban (L14-0022) in replacement of those being removed. This will likely require getting in touch with Mike Ronda, who I believe has been coordinating the Interurban project. I have cc'ed him in this email. If this sounds incorrect or you have any questions, please feel free to email me back. Maxwell Baker I Assistant Planner Department of Community Development 1 City of Tukwila 6300 Southcenter Blvd, Suite 100 1 Tukwila, WA 98188 Max.Baker Tukwilawa.gov 1 206.431.3683 Tukwila: The City of opportunity, the community of choice. https://outlook.office365.com/owa/?viewmodel=ReadMessageltem&Item ID=AAM kAGFhN DMxNzU5LTgwNTEtNDk4Ni 1 iMzY1 LW FiZGN IYY3N2N hOABGA.. 1/1 Minnie Dhaliwal From: Kaehler, Gretchen (DAHP) <Gretchen.Kaehler@DAHP.wa.gov> Sent: Friday, July 08, 2016 10:47 AM To: Michael Cusick Cc: Carol Pennie (carol.pennie@kpff.com); Andrea Cummins; Minnie Dhaliwal; Steven Mullen -Moses; 'laura.murphy@muckleshoot.nsn.us' (laura.murphy@muckleshoot.nsn.us); dlewarch@suquamish.nsn.us; Richard Young; DTS@qwestoffice.net Subject: RE: EZ1 form for Fort Dent sewer relocation Attachments: 2016-07-04849_City of Tukwila EZ-1 for Tsewerhe Project HDD Boring, 45KI267.pdf; D00015.pdf Hi Michael, Please see attached for this project. Please feel free to contact me if you have any question. Best, Gretchen Gretchen Kaehler Assistant State Archaeologist, Local Governments Department of Archaeology and Historic Preservation (DAHP) Office: 360-586-3088 CeII: 360-628-2755 Gretchen.Kaehler@dahp.wa.gov From: Michael Cusick [mailto:Michael.Cusick@TukwilaWA.gov] Sent: Friday, June 24, 2016 8:01 AM To: Kaehler, Gretchen (DAHP) Cc: Carol Pennie (carol.pennie@kpff.com); Andrea Cummins; Minnie Dhaliwal Subject: EZ1 form for Fort Dent sewer relocation Hi Gretchen, Attached for your review is a completed EZ1 for the Fort Dent Park BNSF sewer relocation Project located in Tukwila and Renton. Please contact me if you have any questions. Sincerely, Mike Cusick, P.E. Senior Program Manager — Sewer/Water 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188-2544 (206)-431-2441 (work) (206) 571-6318 (cell) 1 Michael. CusickPTukwil awa.gov The City of opportunity, the community of choice. ached for your review is the City of Tukwila 2 � 1 P.teC1 try@ po!, q q{le °:`e 1Apy, Allyson Brooks Ph.D., Director State Historic Preservation Officer July 8, 2016 Mr. Mike Cusick PE City of Tukwila 6200 Southcenter Blvd. Tukwila, WA98188 In future correspondence please refer to: Project Tracking Code: 2016-07-04849 Property: City of Tukwila EZ-1 for Tsewerhe Project HDD Boring, 45KI267 Re: Archaeology -Professional Archaeological Monitor and Archaeological Monitoring Plan Requested Dear Mr. Cusick: Thank you for contacting the Department of Archaeology and Historic Preservation (DAHP) regarding your project. We have reviewed the information contained in the EZ-1 form provided to our office for the above referenced project. The project area is either within or near precontct archaeological site 45KI 267. Please be aware that archaeological sites are protected from knowing disturbance on both public and private lands in Washington States. Both RCW 27.44 and RCW 27.53.060 require that a person obtain a permit from our Department before excavating, removing, or altering Native American human remains or archaeological resources in Washington. Failure to obtain a permit is punishable by civil fines and other penalties under RCW 27.53.095, and by criminal prosecution under RCW 27.53.090. Chapter 27.53.095 RCW allows the Department of Archaeology and Historic Preservation to issue civil penalties for the violation of this statute in an amount up to five thousand dollars, in addition to site restoration costs and investigative costs. Also, these remedies do not prevent concerned tribes from undertaking civil action in state or federal court, or law enforcement agencies from undertaking criminal investigation or prosecution. Chapter 27.44.050 RCW allows the affected Indian Tribe to undertake civil action apart from any criminal prosecution if burials are disturbed. We request a professional archaeological be onsite to monitor the excavation of the boring pits under an archaeological monitoring plan reviewed by DAHP and the Tribes. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Thank you for the opportunity to review. Should you have any questions, please contact me. Sincerely, Gretchen Kaehler Assistant State Archaeologist, Local Governments (360) 586-3088 gretchen.kaehler a,dahp.wa.gov cc. Richard Young, Cultural Resources Director, Tulalip Tribes Dennis Lewarch, THPO, Suquamish Tribe Laura Murphy, Archaeologist, Muckleshoot Tribe Cecile Hansen, Chair, Duwamish Tribe Steven Mullen Moses, Cultural Resources, Suquamish Tribe 2 l PROJECT REVIEW; SHEET EZ1 HISTORIC & CULTURAL RESOURCES REVIEW PROPERTY / CLIENT NAME: City ofTukwila FUNDING AGENCY: GtvofTukwila Project Applicant: City of Tukwila Contact Person: Michael Cusick Address: 6300 Southcenter Blvd. City, State: Tukwila, WA Zip: 9alaa County: King Phone/ FAX: 206 431 2441 E-Mail: Michael.cusickAtukwilawa.Gov Funding Agency: Organization: Address: City, State: Phone: City of Tukwila 6300 Southcenter Blvd, Tukwila, WA Zip: 98166 206 4312441 PLEASE DESCRIBE THE TYPE OF (WORK TO BE COMPLETED (Be as detailed as possible to avoid having to provide additional nformation) ❑ Provide a detailed description of the proposed project: . Tsewerhe project will be the excavation of 3 boring pits for directional drilling for the installational of 600 feet +/- of 6" sewer forcemain from the southeast corner of Fort Dent Park, under the BNSF Railroad tracks, to the west edge of Monster Road. ❑ Describe the existing project site conditions: The work zone on the west side of Monster Road is near the gravel entrance to Manufactors Minerals, a gravel processing company. The work zone on the west side of the project is 40 +/- north of the Green River in a depressed area at the southeast corner of Fort Dent Park, west of the BNSF tracks, and adjacent to the King County Metro sewer forcemain. The ground in this work area was disturbed by construction of Fort Dent Park, Metro sewer force main, and the railroad tracks over 100 years ago. The area between the 2 zones is used for gravel storage and railroad spur tracks that go to the Manufactors Minerals and King County Renton sewage treatment plant. There will no ground disturbance between the 2 work zones. ❑ Describe the proposed ground disturbing activities: There 3 temporary bore pits will be excavated, 2 at end and 1 at the other end of the project. The bore pits will be about 30' +/- by 20' +/- by 10' +/- feet in depth. ❑ Check if building(s) will be altered or demolished. If so please complete a DAHP Determination of Eligibility "EZ2 form" using our on-line Historic Property Inventory Database for each building, 45 years or older, effected by the proposed project. r\ PLEASE ATTACH A COPY OF THE RELEVANT PORTION OF A 7.5 SERIES USGS QUAD MAP AND OUTLINE THE PROJECT INPACT AREA. USGS Quad maps are available on-line at http://maptech.mytopo.com/on:inemaps/index.cfm Project Location Township: 23N Range: 4 E Section: 23&24 Address: Monster Road City: Tukwila &Renton County: King Mail this form to: Robert Whitlam, Ph.D. State Archaeologist, DAHP (360) 586-3080 rob.whitlam@dahe.wa.gov (Within 30 days DAHP will email their opinion back to you.) Please be aware that this form may only initiate consultation. For some projects, DAHP may require additional information to complete our review such as plans, specifications, and photographs. An historic property inventory form may need to be completed by a qualified preservation professional. Page 1 of 3 ofraA Minnie and Chad, I have started filling out the form for DAHP for this project. Thanks, Mike Cusick From: Minnie Dhaliwal Sent: Tuesday, June 21, 2016 9:16 AM To: Andrea Cummins; 'Chad Durand' Cc: Michael Cusick; Carol Lumb Subject: RE: Ft Dent - Star fire sewer project Chad, It is best if you check directly with Department of Archaeology. They should have information about the general area and then can make recommendations on what is needed for the proposed project. Mike, Did you say you are already doing this? Minnie From: Andrea Cummins Sent: Tuesday, June 21, 2016 8:44 AM To: 'Chad Durand' Cc: Minnie Dhaliwal; Michael Cusick; Carol Lumb Subject: RE: Ft Dent - Star fire sewer project Hi Chad, I think they have generally asked for a pre -con survey, although I am not totally sure. I don't think they would ask for construction monitoring unless something is found during survey. Minnie, is that correct? Andrea Andrea Cummins Urban ! ;vironnun tal Spe:clu.list, Catty of Tuk ila 6 300 Southcentcr B1vd., Suite 100 7ukv,ila. WA Q 188 undrea.curnmins('Prukwvilawa.2o 206.4-31.30(6 Tukwila: The City of opportunity, the community of choice. From: Chad Durand[mailto:chaddurand@clearwavenv.coml Sent: Monday, June 20, 2016 9:32 AM hay ://192.168.0.5/emails/list/search/bfuDfFwix 1 Lx0UUalsAErdzcWwXnbctnOdfJOCJi85... 12/2/2016 Page 2 of 3 To: Andrea Cummins Cc: Minnie Dhaliwal; Michael Cusick; Carol Lumb Subject: [BULK] Re: Ft Dent - Star fire sewer project Importance: Low Thanks for all the information Andrea. I'll work with Michael and Carol Pennie (project manager) to address archaeological requirements. Do you know what the Muckleshoot Indian Tribe has asked for before? Unanticipated discovery plan in advance? Site investigation in advance of construction? Monitoring during construction? Rob Fritz (the biologist with my firm) worked for the Muckleshoots for six years and still has good contacts there but I would prefer to know what they have requested in the past before contacting them. Our firm does not have an archaeologist, so if that is required, we can assist in finding additional help. For some low-level construction monitoring, Rob has been trained to provide this and I believe he has done so for several stream projects - I'll check. From: Andrea Cummins <Andrea.Cummins@TukwilaWA.gov> Sent: Thursday, June 16, 2016 3:58 PM To: Chad Durand Cc: Minnie Dhaliwal; Michael Cusick; Carol Lumb Subject: Ft Dent - Star fire sewer project Hi Chad, I have spoken with Minnlie, and we agree that a pre-app meeting is not necessary. Just go ahead and start the permitting work and we will go from there. Again, please submit a Shoreline Tree Removal permit that shows trees to be removed, replacement ratios, and justification for why this alignment (which leads to the tree removal) is necessary. The current in lieu fee for tree replacement is $124/tree. Ideally the trees would be planted on site, so please address why this isn't possible. We will need a written letter, containing a basic project description, requesting a Shoreline Exemption as this project is determined to be maintenance per WAC 173-27-040 (2)(b). A written determination of exemption will be made by the City to submit to Ecology. Also, another item, that I am not sure if is part of your scope of not...has an archeology survey been done? Do you plan to have an archeologist on site during construction? This area is of concern for the tribe as it has the possibility of a cultural site. The Muckleshoot have asked for this on prior projects so I think this needs to be addressed if it has not already. Please let me know if you have any additional questions, I'm happy to help out. Cheers! andrect(:14mmi s Urban Env! * mmcntctl Spc:ctcili.st, City o It}(ISoutltcenttrBlue.'., Surto 100 [ ttktwila, lk A q8188 r .w-ila http://192.168.0.5/emails/list/search/bfgDfFwj x 1 LxODUg1sAErdzcWwXnbctnOdfJQCJi85... 12/2/2016 Page 3 of 3 undretr.e umminsOtu.l.wi lavvat.,guv 2L06.431. ie)63 Tukwila: The City of opportunity, the community of choice. httn://192.168.0.5/emails/list/search/bfaDfFwix 1 Lx0UUa1sAErdzcWwXnbctnOdffJJOCJi85... 12/2/2016 Minnie Dhaliwal From: Michael Cusick Sent: Friday, June 17, 2016 7:14 AM To: Minnie Dhaliwal Cc: Carol Pennie (carol.pennie@kpff.com) Subject: FW: BNSF rail sewer upgrades and tree removal Minnie, I have not received a formal letter from DCD, but in an email on May 3, Andrea is requiring my project to be substantively compliant with the SMP. Additionally, tree removal will require a Shoreline Tree Removal and Vegetation Clearing Permit which my consultant will obtain. Thanks MPC From: Carol Pennie [mailto:Carol.Pennie@kpff.com] Sent: Wednesday, May 04, 2016 2:38 PM To: Michael Cusick Cc: Chad Durand; Mac Smith Subject: FW: BNSF rail sewer upgrades and tree removal Hi Mike, Excellent news about the exemption. I am forwarding an email from Chad; I think he was part of that conversation perhaps? After your site visit with Minnie, it would be good to get it in writing that we're exempt if possible. Chad has some budget that we set aside if we did not get an exemption. He can use that time to reach an agreement with the City that a Tree Removal Permit is appropriate. Then we'll need to prepare the permit application and then pursue the Renton Exemption. I do not think he'll have enough hours to support us with the applications. KPFF will prepare supporting exhibits for this effort. I have a couple of questions about the specifications. • Are you going to bid this using bid items verses lump sum? • I propose we use as many standard bid items (2016 WSDOT) as possible. I think the actual drilling should be a special provision (includes pipe, casing, drill pit etc). • Do you happen to have any past Specials previous Tukwila jobs crossing BNSF that we can look at? I am copying Chad and Mac on this. I am out of town the next two days. I am picking up my son from WSU and bringing him home to the Nest! Carol J. Pennie Associate KPFF Consulting Engineers O 206.622.5822 D 206.926.0536 Caro[.Pennie Dkpff.com 1 From: Chad Durand [mailto:chaddurand@clearwayenv.com] Sent: Wednesday, May 04, 2016 11:06 AM To: Carol Pennie Subject: Re: BNSF rail sewer upgrades and tree removal Hi Carol - When I finally reached Minnie at Tukwila yesterday, Mike Cusick was already in her office, which worked out great. It sounded like they were open to the shoreline exemption based on WAC 173-27-040 (2)(b) at that time, but they still planned to do a site visit before finalizing their decision. I agree we should receive something more formal, like a letter or e-mail from the planning department stating that the project is exempt from the requirement to obtain a shoreline substantial development permit. But they may want to work out issues for the Shoreline Tree Removal and Vegetation Clearing (Tree Removal) Permit first, since they are related. For example, if the City decides we're not eligible for the Tree Removal Permit, it could push them to either refuse to allow the trees to be removed or require a shoreline substantial development permit to remove them. So we should focus on eligibility for the Tree Removal permit for now. Regarding Mike's question about whether the Tree Removal permit is in our scope, it currently is not, but we are able to provide the services. You did tell me in a previous e-mail that I can use the budget set aside for Task 4 - Obtain Shoreline Exemption. I can use some of that time to obtain City agreement on whether a Tree Removal Permit will work for the project. Then, we can work out the details on support for the actual permit application. If you are OK with that, I'll work with you to develop answers to the City's questions/concerns below, and hopefully convince them that the project is eligible for coverage under the Tree Removal permit. From: Carol Pennie <Carol.Pennie@kpff.com> Sent: Wednesday, May 4, 2016 8:21 AM To: Chad Durand Subject: FW: BNSF rail sewer upgrades and tree removal Good morning Chad, Please see the discussion below about the Shoreline permit. It seems like there should be something more formal documenting the exemption... Carol J. Pennie Associate KPFF Consulting Engineers 0 206.622.5822 D 206.926.0536 Carol.Peenie kpff.com From: Michael Cusick [mailto:Michael.Cusick@TukwilaWA.gov] Sent: Wednesday, May 04, 2016 8:06 AM To: Carol Pennie Cc: Andrea Cummins; Minnie Dhaliwal Subject: FW: BNSF rail sewer upgrades and tree removal Carol, It looks like we don't have to do a Shoreline Management Plan for the project, but we still need to do a Shoreline Tree Removal and Vegetation Clearing permit. Is this permit included in Chads, scope? I hope we get as lucky in Renton. 2 Thanks MPC From: Andrea Cummins Sent: Tuesday, May 03, 2016 3:19 PM To: Michael Cusick Cc: Minnie Dhaliwal; Carol Lumb Subject: BNSF rail sewer upgrades and tree removal Hi Mike, After a brief discussion with Minnie, I think we need a bit more documentation from you regarding the proposed tree removal. Even though I understand you will not be getting a shoreline permit as you are determining this to be maintenance, you still need to be substantively compliant with the SMP. Additionally, tree removal will require a Shoreline Tree Removal and Vegetation Clearing Permit, http://tukwilawa.gov/wp-content/uploads/DCD-Apps- ShorelineTreeVegClearingPermit.pdf. Tree retention is prioritized in the Shoreline so you will need to explain and defend the need for the removal and detail the proposed mitigation. For instance, why can't the pipe be moved to avoid the trees? That kind of explanation will be required. On -site mitigation is preferred so you will also need to detail the need for off -site or in -lieu fee mitigation. All this is written in 18.44.080. You will also see the table with the tree replacement ratios that we talked about this afternoon. I'm happy to help out if you need it, just let me know. If you need someone in PW to help out with drafting the permit application, Mike Perfetti might be a good choice. Thank you! A/kir1. i ( id11lrinns Urban ITrlvi, nnic,ituf S!x lLt(ist, ovif1(1 ri3O('' ,iiIi&(Titer-fib'( . ,.Suit(: IEJ('I Ukli%ii(1. 1V, 4 oc`188 (iS1.fir a.itnnntirl.s{ultuktv'iI Iva oov 2('6:4 31. in-) Tukwila: The City of opportunity, the community of choice. 3 Minnie Dhaliwal From: Minnie Dhaliwal Sent: Thursday, June 16, 2016 4:12 PM To: Michael Cusick Subject: Starfire sewer project Mike, I don't see that we ever issued a shoreline exemption letter for the sewer upgrade project. Are you planning on submitting one? Here is the language from WAC 173-27-040(2)(b) Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. We will need a written description and plans of the project including an analysis how it meets the normal maintenance definition noted above. We will then prepare a written letter approving it as an exemption and send it to Department of Ecology. Also, I am not sure if you followed up on the archaeological concerns at the site. Are you planning on doing an archaeological survey and/or have an archaeologist on site during construction? This was required for past projects in the area based on comments from the Muckleshoot Tribe and Department of Archaeology. Minnie 1 7 \ , Public Works Department ncUmbrancelotice • •,:enti-tra.etNd: 15-054 Vendor KPFF ..." Project No. 91530101 Project Title Fort Dent Park BNSF Sewer Relocation Contract Title Fort Dent Park BNSF Sewer Relocation - Design Expires Date 03131/2016 Contract Original Amount $156,877.00 This Encumbrance: $156,877.00 BARs This Change/Supplement applies to Amount 301.98.594.760.41.00 $156,877.00 9/S301D tvo • or4i. History of Contract Including Change Orders and Supplements • pate DateToFinance Original 03/20/2015 • Revised 'Description Amount Complete Date/ 0 03/31/2016 Original Amt Checked by: 1114 MIKE CUSI K Approved by: Am< jcost j L $156,877.00] Total: $156,877.00 Public Works Director Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID $5.35 L16-0071 Address: Apn:2423049030 $5.35 TECHNOLOGY FEE TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R9868 R000.322.900.04.00 0.00 • $5.35 $5.35 $5.35 Date Paid: Thursday, November 17, 2016 Paid By: TREE & LANDSCAPE MOD Pay Method: CITY ACCOUNT 301.98.594.760.41.00 Printed: Thursday, November 17, 2016 10:17 AM 1 of 1 SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ProjectTRAK L16-0071 Address: TREE AND LANDSCAPE MOD SHORELINE TOTAL FEES PAID BY RECEIPT: R9861 ACCOUNT R000.322.100.00.00 QUANTITY 1 PAID 0.00 $107.00 $107.00 $107.00 Date Paid: Wednesday, November 16, 2016 Paid By: TUKWILA CITY OF Pay Method: CITY ACCOUNT 301.98.594.760.41.00 Printed: Wednesday, November 16, 2016 9:04 AM 1 of 1 CRWSYSTEMS CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-3670 FAX (206) 431-3665 SHORELINE TREE REMOVAL AND VEGETATION CLEARING PERMIT APPLICATION FOR STAFF USE ONLY Permits Plus Type: P-TREE Planner: File Number: I I(i —001 I Application Complete Date: Project File Number: P L Ilk - 0054 Application Incomplete Date: Other File Numbers: NAME OF PROJECT/DEVELOPMENT: Fort Dent Park BNSF Sewer Relocation BRIEF DESCRIPTION OF WORK TO BE DONE: The replacement of the existing sewer forcemain under the BNSF railroad tracks LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. 14800 Starfire Way Tukwila LIST ALL TAX LOT NUMBERS (this information may be found on your tax statement). City Parcel # 242 304 9030 BNSF Parcel # 242 304 9027 DEVELOPMENT COORDINATOR : The individual who: • has decision making authority on behalf of the owner/applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City to whom all notices and reports will be sent. Name: Mike Cusick Address: 6300 Southcenter Blvd. Suite 100 Phone: 206 431 2441 E-mail: Michael.Cusick Tukwilawa.gov FAX: Signature: '11 ///, Date: j/// 6 /f C RECEIVED CITY OF TUKWILA NOV 16 2016 \ \ dtystore\ City Common\ Teri - DCD\ Kirby\ 2016 A pplications\ 8rorelineTree and Veg Clearing Permit -March 2016.docx PERMIT CENTER The scope of work for the Fort Dent Park BNSF Sewer Relocation is the replacement of the existing sanitary sewer force main under the BNSF railroad track. The BNSF is constructing a third set tracks and is requiring the City of Tukwila, to upgrade the sewer force main under their tracks to meet their current engineering specifications. The installation of the proposed force main will require the removal of 3 maple trees in Fort Dent Park, near the Green River. Site constrains prevent the replacement of the tree in the area near the force main construction. The trees will be replaced in an area near the Green River, on the west side of Fort Dent Park, under the Shoreline Substantial Development Permit L14-0022. Attached the is a plan showing the 3 trees that must removed Please contact me if you have any questions. Mike Cusick, P.E. Senior Program Manager — Sewer/Water 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188-2544 (206)-431-2441 (work) (206) 571-6318 (cell) Michael.Cusick@Tukwilawa.gov The City of opportunity, the community of choice. City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE SUBSTANTIAL DEVELOPMENT File Number: L14-0022 Applied: April 10, 2014 Approved: June 23, 2014 Expiration: June 23, 2016 A permit is hereby granted to: City of Tukwila, Public Works Department to: Repair and improve approximately 4,100 linear feet (0.78 mile) of Interurban Avenue from Fort Dent Way to South 143th Street. Approximately 1,200 feet (0.23 mile) of the project is within the 200 foot shoreline jurisdiction of the Green River. The project involves installation of sidewalks, curb, gutter, a new water main, storm drains, stormwater facilities, removal of an existing gabion wall and construction of a new soldier pile wall in the same location; resurfacing the road, channelization, street lighting and landscaping. Upon the following property: Address: Interurban Avenue Public Right of Way from Fort Dent Way to South 143`d Street. Parcel #: N/A Section/Township/Range: NE and SE Quarters of 23/23/04 Development under this permit shall comply with the following conditions: 1. In the planting area just north of Ft. Dent Way, substitute 10 Western Red Cedars, five in each planting area on either side of the driveway for either Red Osier Dogwood or snowberry. 2. Prior to starting construction, an ISA certified arborist shall examine, and trim if necessary any tree branches in the area where the soldier pile wall is to be placed to avoid damage by construction equipment. 3. A clean source of fill must be used for any fill placed in the shoreline jurisdiction. 4. Prior to final inspection of planted restoration trees and shrubs, submit a maintenance and monitoring plan including performance standards. 5. As soon as possible, provide a detailed construction schedule to the Muckleshoot Indian Tribe to ensure that any night time work does not interfere with tribal fishing in the area. This permit is granted pursuant to the Shoreline Management Act of 1971 and nothing in this permit shall excuse the applicant from compliance with any other Federal, State or local statues, ordinances or CL: Page 1 of 2 H:AL14-0022 lntenuban Ave. Improvements\Shoreline Substantial Development Permit 06/23/2014 10:53 AM 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Interurban Avenue Road Improvement L14-0022 Shoreline Substantial Development Permit regulations applicable to this project, but not inconsistent with the Shoreline Management Act (Chapter 90.58 RCW). This permit may be rescinded pursuant to RCW 90.58.140(8) in the event the permittee fails to comply with the project as approved and any conditions thereof. CONSTRUCTION PURSUANT TO THIS PERMIT MAY NOT BEGIN AND IS NOT AUTHORIZED UNTIL TWENTY-ONE (21) DAYS FROM THE DATE OF RECEIPT WITH THE DEPARTMENT OF ECOLOGY AS DEFINED IN RCW 90.58.140(6) AND WAC 173-14-090, OR UNTIL ALL REVIEW PROCEEDINGS INITIATED WITHIN TWENTY-ONE (21) DAYS FROM THE DATE OF SUCH FILING HAVE TERMINATED; EXCEPT AS PROVIDED IN RCW 90.58.140(5)(a)(b)(c). Pursuant to RCW 90.58.180 the decision by the City of Tukwila to issue this Shoreline Substantial Development Permit may only be appealed to the Shoreline Hearings Board. Appeals must be filed with the Shoreline Hearings Board within 21-days from the filing of this permit with D.O.E as defined in RCW 90.58.140. For more detailed information on appeals, refer to RCW 90.58 and WAC 461.08. 6 -a'3-1 Date csJack Pace, Director of Demen p t of Community Development Construction must begin within 2 years from the effective date of the permit and be substantially completed within 5 years of the effective date of the permit. The effective date of a substantial development permit shall be the date of receipt as provided in RCW 90.58.140(6). CL: H:\\E13-015 Duwamish Gardens\NOD Page 2 of 2 06/23/2014 10:53 AM ea 64 80 53 52 Ae u 40 36 52 21 2. 20 le 12 1 -E0 . 0 _40 to 1 t�ib G ye .r �tlra iacEau !A,�s I11E13 TOW REYOIER (0) -2n STA 14+25 & 16+50 PLAN & PROFILE IW��iIY _ y C . „wrYlr,rRj{s s :Sr silD)6 / / /� 14+25.00 1µ a fJRRRI WALL TD.02-68633E0 1E1' s0LOIR 'PIE 20 a a 13. f;u�,..p., 1 a••••-ORRtI tR14l 1 p: . �INI��RN .. •1 t - — MFA 70 6E CLENiED 1 f v _ RAIEA**AR(1 Cr THE �J RLT FDIC- "P.=PG CANON I.YL _r WFAROq Ur oo EOM OF WORMY 061UNAMfE CC M' NRIRUCTION ls,10 L. PM .W..4 ]ON 0 10 20 40 90 SCALE 04 FEET 68 so u 44 a x 32 21 24 20 O1 12 1 w 60 53 b 44 a 3 22 20 2A 20 11 12 + -60 0 3 10 20 30 SCALE PI FEET IE+S0.00 a For outfall pipe cross section. see civil plans pdf pg 17/sheet 23 6401 ff SCOWL( WOt SOIEER PILE WL - ORU6 PERILYUI11PACT ILA CF A[ 025124C CASON WAIL Proposed soldier pile wall 16+50.00 Bottom invert of outfall eIv=27.3 "This will be clearing limits 100 yr flood e1v=24.5 SORQR PIE 20 INTRRURRAN AVB, 11fRWILA, WA SHEET I OF Site Plan & Section within Shoreline Existing gabion wall ea as 22 e 44 40 x 32 21 24 m q 12 1 + 40 60 NOVEMBER2013 ACC r Project Area MI G 13111.kaLYJib asa1.*sa s�w1.m (IyiM PRIV. October 2012 Force Maio)\CADD\Design\TSM Path' Z:\115000-115400\115077 (T FORT DENT PARK BNSF SEWER RELOCATION PROJECT NO. 915 301 01 SHORELINE EXEMPTION REQUEST & SHORELINE TREE REMOVAL & VEGETATION CLEARING PERMIT APPLICATION PROJECT LOCATION MAP NOT TO SCALE PUBLIC WORKS Z7EPT_ ENGINEERING *STREETS *WATER* SEWER*BUThDING * by date des... ed ® 08 01 16 drawn m 08 01 16 checked j 08 01 16 pro' en MI 08 01 I6 odr EMI — kp 160151h Avenue, Suite 1600 Seattle, WA 98101 Z06.6225822 www.kprf.com MAYOR ALLAN EKBERG CITY COUNCIL PRESIDENT JOE DUFFIE CITY COUNCIL KATE KRULLER DENNIS ROBERTSON VERNA SEAL KATHY HOUGARDY DE'SEAN QUINN THOMAS MCLEOD CITY ADMINISTRATOR DAVID CLINE DIRECTOR OF PUBLIC WORKS BOB GIBERSON, PE CITY ENGINEER ROBIN TISCHMAK, PE PROJECT MANAGER MICHAEL CUSICK, PE City of Tukwila: "City of Opportunity - Community of Choice" DEPARTMENT OF PUBLIC WORKS 6200 SOUTHCENTER BLVD., SUITE 100 TUKWILA, WA 98188 (206) 433-0179 DRAWING INDEX SHEET N0 DWG N0 SHEET TITLE 1 CV.01 COVER SHEET & INDEX 2 SP.01 SITE PLAN 3 PF.01 SEWER PROFILE FORT DENT PARK BNSF SEWER RELOCATION COVER SHEET & INDEX of 3 file no CV.o 00 date revisions RECEIVED date 06/26/2016 J CITY OF TUKWILA NOV 16 2016 PERMIT CENTER Main)\CADD\Desgn\TS Polh. Z \II5000-115400\115077 (T • SY,% - 9001 COY7 Or7 7003701a Cali 811 • two business days before you dig PROPERTY LINE SE0pCN. � TEMPORARY CHAIN LINK FENCE APPROXIMATE DIRECTIONAL DRILL END POINT THE TEMP CONSTRUCTION HIGH VISIBILITY SILT FENCE TO EXISTING STARFIRE FENCE CONSTRUCTION ACCESS. ALONG STABILIZED EXISTING MAINTENANCE ROAD • ♦ ♦ 9030 CONSTRUCTION OMITS • • • SILT FENCE PER SWPPP TOP OF BANK —� OH • • rZY ♦ • ♦ • \♦ - '" • 6• HDP ' SS IN 1. ' ♦ \ - \2• STL CASING ♦ - ei s� •a: oa ® 6m ®®me diet oa : epase,ctao_sa _�--A A A A ETA A-��A - . - GS A• cia noel as. am atm - 9117 1- COVY OF NEN700 RV,S, SNP ` Oy\ • TREE 'C• TO BE REMOVED'., -- PROVIDE SEEDING AND FERTIUZING OF DISTURBED AREAS PER WSDOT STD- SPEC SECTIONS-01:3(2)8-..:. PROPERTY UNE (APPROXIMATE LOCATION) ♦ ♦ AIR RELEASE VALVE ASSY VAULT, SEE DETAIL 1/DT.01 4" PLUG SHUTOFF VALVE, MJ SEE NOTES 2 & 3 4• INSULATING COUPLING 4. 11 )0" RJ DI VERT BEND PROTECT EXIST SEWER - , . ;{ .FORCE MAIN UNTIL SERVICE CUTOVER TO NEW,, THEN PLUG AND i1 PROTECT EXIST KING ANDQN COUNTY STRUCTURE ♦ REMOVE EXIST N.POST_ 4• X 6" RJ DI ECC REDUCER 6- I11:" RJ DI VERT BEND 6" DI TO HDPE COUPLING • • END 12• SE_ • CASING ELECTROLYSIS 3-1YRE TEST STATION, SEE DETAIL 2/DT.02 DETAIL 1•= 10' PUBLIC WORKS DEFT_ *ENGINEERING *STREETS «WATER* SEWER*BUII,DING « designed drawn checked Prof eng Pro' ddr field bk na by MIS TLC CJP MJS date 08/01/16 D8/01/16 08/01/16 08/01/16 GREEN RIVER • NOTE: RIGHTS OF ENTRY TO BNSE PROPERTY HAVE-NOT BEEN ♦ ACQUIRED, CONTRACTOR TO ACQUIRE 9027 \ TREES TO BE REMOVED SPECIES SIZE (INCHES AT DBH) NUMBER OF REPLACEMENT TREES * TREE A ACER MACROPHYLLUM 31 8 TREE 8 ACER MACROPHYLLUM 24 8 TREE C ACER MACROPHYLLUM 23 8 TOTAL REPLACEMENT TREES 24 kp 160151h Avenue, Suite 1600 Seattle, WA 99101 206.62L5e22 www.kpff.c*m azt f— PROPERTY LINE- N. ♦ N 10 20 1 inch 20 feet *NOTE: 1. THE CITY OF TUKWILA INTERURBAN IMPROVEMENTS PROJECT PALL PROVIDE AND PLANT THE REQUIRED REPLACEMENT TREES FOR THIS PROJECT LEGEND 9027 FORT DENT PARK BNSF SEWER RELOCATION SITE PLAN TAX LOT NUMBER 2 of 3 Elen SP.0 00 date revisions date 08/26/2016 / Force Man)\CADO\Design\T5M Path: Z \11500D-115400\115077 Call 811 two business days before you dig 45 40 35 30 25 20 15 10 5 0+00 45 40 35 O a 30 W 0 25 cu 20 0 10 5 TREE A 0+50 TREE C TREE B — EXIST 4' SS DI (FM) ROW w m m 4 CCO VI O • 4' PLUG SHUTOFF VALVE, MJ a 6' DI X HDPE COUPLING : -27-AIR -RELEASE VALVE " ASSY CONNECTION POINT CUT AND: DIRECTIONAL COVER WORK DRILL WORK EXIST' GRADE EXIST 4" 1+00 SS DI (FM) 6 HDPE SS (FAT) IN 12' STEEL CASING 1+50 0 z x�i m z _ N... S, z'` k / \\ 3 / 1 -- -1.. EXIST •BNSF z: RR TRACKS, UU2 • t V ry ROW 6' HDPE SS (FM),IN 12' STEEL CASING • EXIST BNSF. RR TRACKS EXIST 96' PCCF SS FORCE MAN .I: 2+00 2+50 3+00 4 AND 6" HDPE SS (FM) IN 12" STEEL CASING PROFILE 6' 01 11 iioPE COUPLING . 6' PLUG SHUTOFF VALVE MJ — DIRECTIONAL . CUT AND . DRILL: WORK • .I -:. COVER WORK: 5+00 5+50 6+00 6+50 PUBLIC WORKS DEFT *ENGINEERING * STREETS *WATER* SEWER*BUILDING by designed MJS drawn TLC checked CJP proj MJS prof dir - daft 08/01/16 08/01/16 08/01/16 08/01 /16 46 SSMH RIM=32.95.1' EXIST 8' 01,1E=23.71 16" DI_ (FM) YE=24:00' _ EXIST. BNSF RR TRACKS EXIST SSMH RIM732 38 PXST 8' DI I 1938 W, SE EXIST 8' UNKNOWN IE=1958 NW' FAST 10' CAPPED 1E44.83 NW : EXIST 6" UNKNOWN IF=19,58 N 7+00 7+40 7+60 7+80 4" AND 6" HDPE SS (FM) IN 12" STEEL CASING PROFILE field bk no pff 16015th Avenue, Sake 1600 Seattle, WA9910I 206.62251122 www.lvfl.mm 3+50 8+00 RR'1RAc6S EXIST GRAVEI'PILE, TYP ' _ \ TO BE REMOVED BY OTHERS 4+00 APPROXIMATE. DIRECTIONAL DRILL START POINT EXIST GRADE 8+20 8+40 FORT DENT PARK BNSF SEWER RELOCATION 4+50 SEWER PROFILE 45 40 35 30 25 20 15 10 5 8+60 45 40 1 35 0 30 m tJ N Z 25 20 .. z 0 4,r 0 La.- 15 If 10 5 5+00 3 F IL ID 0 10 20 1 inch = 20 N. HORZ 0 25 5 10 1,sN= 5 ft. V4t7 } F Ole DO PF.0 DO date re661on5 dale 08/26/2016 / Fort Dent Park 0.17 acres (7400 sq ft) 0.03 acres (1300 sq ft) N 0 20 40 60 80 ■ Feet • Proposed Plantings Trees composed of a mixture of western red cedar, Douglas fir, and willows. Proposed Mitigation Planting Area Interurban Avenue Improvements 0 20 40 60 80 ■ Feet • Proposed Plantings Trees composed of a mixture of western red cedar, Douglas fir, and willows. Proposed Mitigation Planting Area Interurban Avenue Improvements "1„...fk 41421,' :of — 4-; *yiaf/� . IC..047' • 1 • I •,, 744 1: • • -