Loading...
HomeMy WebLinkAbout2024-03-14 Bid Tabulations - Stormwater Outfalls Water Quality RetrofitCITY OF TUKWILA - I Storm Water Outfalls Quality Retrofit Project 3/18/2024 BID TAB [Project No. 91241202] f Total APPARENT LOW BIDDER ENGINEER'S ESTIMATE ROAD CONSTRUCTION NORTHWEST INC. LASER UNDERGROUND & EARTHWORKS INC. TITAN EARTHWORK LLC NORTHWEST CASCADE INC. No. Section Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost ROADWAY 1 1-04 Unexpected Site Changes 1 EST $20,000 $ 20,000.00 $20,0001 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 2 1-05 Roadway Surveying 1 LS $25,000 $ 25,000.00 $ 6,050.00 $ 6,050.00 $ 6,500.00 $ 6,500.00 $ 4,950.00 $ 4,950.00 $ 5,200.00 $ 5,200.00 3 1-05 Record Drawings (Minimum Bid $1,500) 1 LS $2,000 $ 2,000.00 $ 1,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 4 1-07 SPCC Plan 1 LS $10,000 $ 10,000.00 $ 600.00 $ 600.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 500.00 $ 500.00 5 1-09 Mobilization 1 LS $75,000 $ 75,000.00 $ 47,500.00 $ 47,500.00 $ 90,000.00 $ 90,000.00 $ 100,000.00 $ 100,000.00 $ 109,000.00 $ 109,000.00 6 1-10 Project Temporary Traffic Control 1 LS $72,000 $ 72,000.00 $ 64,000.00 $ 64,000.00 $ 55,000.00 $ 55,000.00 $ 95,991.00 $ 95,991.00 $ 115,000.00 $ 115,000.00 7 1-10 Portable Changeable Message Sign 820 HR $5 $ 4,100.00 $ 10.00 $ 8,200.00 $ 10.00 $ 8,200.00 $ 11.00 $ 9,020.00 $ 4.00 $ 3,280.00 8 1-10 Contractor Provided Uniformed Police Officer 150 HR $160 $ 24,000.00 $ 152.00 $ 22,800.00 $ 140.00 $ 21,000.00 $ 150.00 $ 22,500.00 $ 145.00 $ 21,750.00 9 2-01 Clearing and Grubbing 1 LS $8,500 $ 8,500.00 $ 4,750.00 $ 4,750.00 $ 25,000.00 $ 25,000.00 $ 7,084.00 $ 7,084.00 $ 4,800.00 $ 4,800.00 10 2-02 Removal of Structure and Obstruction 1 LS $24,000 $ 24,000.00 $ 12,000.00 $ 12,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 $ 17,000.00 $ 17,000.00 11 2-02 Pavement Removal Incl. Haul 350 SY $35 $ 12,250.00 $ 18.00 $ 6,300.00 $ 35.00 $ 12,250.00 $ 90.00 $ 31,500.00 $ 30.00 $ 10,500.00 12 2-03 Unsuitable Foundation Excavation Incl. Haul 25 CY $100 $ 2,500.00 $ 49.00 $ 1,225.00 $ 90.00 $ 2,250.00 $ 100.00 $ 2,500.00 $ 150.00 $ 3,750.00 13 2-09 Shoring or Extra Excavation Class B 3,230 SF $5 $ 16,150.00 $ 0.25 $ 807.50 $ 2.50 $ 8,075.00 $ 1.00 $ 3,230.00 $ 0.50 $ 1,615.00 14 4-04 Crushed Surfacing Top Course 80 TN $55 $ 4,400.00 $ 61.00 $ 4,880.00 $ 65.00 $ 5,200.00 $ 80.00 $ 6,400.00 $ 87.00 $ 6,960.00 15 4-04 Crushed Surfacing Base Course 30 TN $55 $ 1,650.00 $ 61.00 $ 1,830.00 $ 65.00 $ 1,950.00 $ 80.00 $ 2,400.00 $ 87.00 $ 2,610.00 16 5-04 HMA Cl. 1/2" PG 58H-22 290 TN $140 $ 40,600.00 $ 249.00 $ 72,210.00 $ 300.00 $ 87,000.00 $ 330.00 $ 95,700.00 $ 273.00 $ 79,170.00 17 5-04 Planing Bituminous Pavement 100 SY $25 $ 2,500.00 $ 115.00 $ 11,500.00 $ 35.00 $ 3,500.00 $ 100.00 $ 10,000.00 $ 63.00 $ 6,300.00 18 7-12 Adjust Water Valve to Grade 1 EA $1,000 $ 1,000.00 $ 665.00 $ 665.00 $ 5,000.00 $ 5,000.00 $ 375.00 $ 375.00 $ 625.00 $ 625.00 19 8-01 Erosion Control and Water Pollution Prevention 1 LS $16,000 $ 16,000.00 $ 3,100.00 $ 3,100.00 $ 11,000.00 $ 11,000.00 $ 24,000.00 $ 24,000.00 $ 11,000.00 $ 11,000.00 20 8-04 Extruded Curb 120 LF $40 $ 4,800.00 $ 32.00 $ 3,840.00 $ 50.00 $ 6,000.00 $ 50.00 $ 6,000.00 $ 51.00 $ 6,120.00 21 8-04 Cement Conc. Traffic Curb and Gutter 70 LF $75 $ 5,250.00 $ 123.00 $ 8,610.00 $ 135.00 $ 9,450.00 $ 110.00 $ 7,700.00 $ 114.00 $ 7,980.00 22 8-14 Cement Conc. Sidewalk 30 SY $180 $ 5,400.00 $ 123.00 $ 3,690.00 $ 150.00 $ 4,500.00 $ 110.00 $ 3,300.00 $ 114.00 $ 3,420.00 TRAFFIC CONTROL DEVICES 23 8-09 Restore Raised Pavement Markers 1 LS $2,500 $ 2,500.00 $ 3,150.00 $ 3,150.00 $ 4,000.00 $ 4,000.00 $ 3,500.00 $ 3,500.00 $ 1,700.00 $ 1,700.00 24 8-22 Plastic Line 130 LF $10 $ 1,300.00 $ 4.00 $ 520.00 $ 10.00 $ 1,300.00 $ 25.00 $ 3,250.00 $ 5.75 $ 747.50 25 8-22 Plastic Wide Line 90 LF $15 $ 1,350.00 $ 6.00 $ 540.00 $ 10.00 $ 900.00 $ 25.00 $ 2,250.00 $ 6.75 $ 607.50 26 8-22 Plastic Crosswalk Line 180 SF $15 $ 2,700.00 $ 21.50 $ 3,870.00 $ 10.00 $ 1,800.00 $ 25.00 $ 4,500.00 $ 9.00 $ 1,620.00 27 8-22 Plastic Stop Line 40 LF $25 $ 1,000.00 $ 28.00 $ 1,120.00 $ 20.00 $ 800.00 $ 60.00 $ 2,400.00 $ 16.00 $ 640.00 ROADSIDE DEVELOPMENT 28 8-02 Fine Compost 60 CY $105 $ 6,300.00 $ 64.50 $ 3,870.00 $ 100.00 $ 6,000.00 $ 85.00 $ 5,100.00 $ 102.00 $ 6,120.00 29 8-02 Seeding, Fertilizing and Mulching 200 SY $50 $ 10,000.00 $ 8.50 $ 1,700.00 $ 50.00 $ 10,000.00 $ 20.00 $ 4,000.00 $ 6.00 $ 1,200.00 30 8-02 Property Restoration 1 EST $5,000 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 31 8-11 Removing and Resetting Guardrail 80 LF $80 $ 6,400.00 $ 120.00 $ 9,600.00 $ 110.00 $ 8,800.00 $ 100.00 $ 8,000.00 $ 141.00 $ 11,280.00 32 8-15 Quarry Spalls 5 TON $200 $ 1,000.00 $ 125.00 $ 625.00 $ 65.00 $ 325.00 $ 110.00 $ 550.00 $ 217.00 $ 1,085.00 33 8-15 Remove and Restore Rockery 1 LS $8,000 $ 8,000.00 $ 3,115.00 $ 3,115.00 $ 15,000.00 $ 15,000.00 $ 4,000.00 $ 4,000.00 $ 6,400.00 $ 6,400.00 STORM DRAINAGE 34 4-04 Crushed Surfacing Top Course for Trench Backfill 390 CY $ 75.00 $ 29,250.00 $ 121.00 $ 47,190.00 $ 90.00 $ 35,100.00 $ 100.00 $ 39,000.00 $ 123.00 $ 47,970.00 35 7-04 Storm Sewer Pipe 8 In. Diam. 24 LF $ 135.00 $ 3,240.00 $ 101.00 $ 2,424.00 $ 90.00 $ 2,160.00 $ 300.00 $ 7,200.00 $ 156.00 $ 3,744.00 36 7-04 Storm Sewer Pipe 12 In. Diam. 270 LF $ 165.00 $ 44,550.00 $ 103.00 $ 27,810.00 $ 100.00 $ 27,000.00 $ 350.00 $ 94,500.00 $ 143.00 $ 38,610.00 37 7-04 Storm Sewer Pipe 24 In. Diam. 87 LF $ 220.00 $ 19,140.00 $ 211.00 $ 18,357.00 $ 170.00 $ 14,790.00 $ 400.00 $ 34,800.00 $ 191.00 $ 16,617.00 38 7-05 Concrete Inlet 2 EA $ 2,500.00 $ 5,000.00 $ 1,945.00 $ 3,890.00 $ 3,500.00 $ 7,000.00 $ 2,250.00 $ 4,500.00 $ 1,575.00 $ 3,150.00 39 7-05 Catch Basin Type 2 48 In. Diam. 3 EA $ 2,500.00 $ 7,500.00 $ 2,300.00 $ 6,900.00 $ 6,000.00 $ 18,000.00 $ 4,000.00 $ 12,000.00 $ 2,575.00 $ 7,725.00 40 7-05 Catch Basin, Type 1L 5 EA $ 4,500.00 $ 22,500.00 $ 6,300.00 $ 31,500.00 $ 10,000.00 $ 50,000.00 $ 10,000.00 $ 50,000.00 $ 5,300.00 $ 26,500.00 41 7-05 Catch Basin Type 2 54 In. Diam. w/ Flow Splitter w/ Overflow Riser 1 EA $ 12,000.00 $ 12,000.00 $ 8,650.00 $ 8,650.00 $ 14,000.00 $ 14,000.00 $ 20,000.00 $ 20,000.00 $ 13,100.00 $ 13,100.00 42 7-05 Catch Basin Type 2 60 In. Diam. w/ Flow Splitter w/ Weir Wall 1 EA $ 14,000.00 $ 14,000.00 $ 16,000.00 $ 16,000.00 $ 18,500.00 $ 18,500.00 $ 25,000.00 $ 25,000.00 $ 10,300.00 $ 10,300.00 43 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ 12,000.00 $ 12,000.00 $ 20,000.00 $ 20,000.00 $ 13,000.00 $ 13,000.00 $ 20,000.00 $ 20,000.00 $ 6,800.00 $ 6,800.00 44 7-06 8' x 12' Modular Wetland Unit 1 EA $ 105,000.00 $ 105,000.00 $ 150,500.00 $ 150,500.00 $ 130,000.00 $ 130,000.00 $ 95,000.00 $ 95,000.00 $ 191,500.00 $ 191,500.00 45 7-09 4' x 21' Modular Wetland Unit 1 EA $ 100,000.00 $ 100,000.00 $ 177,500.00 $ 177,500.00 $ 140,000.00 $ 140,000.00 $ 105,000.00 $ 105,000.00 $ 181,750.00 $ 181,750.00 46 8-32 Pothole Utility 2 EA $ 1,000.00 $ 2,000.00 $ 1,700.00 $ 3,400.00 $ 670.00 $ 1,340.00 $ 1,650.00 $ 3,300.00 $ 850.00 $ 1,700.00 47 8-32 Resolution of Utility Conflicts 1 EST $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 TRAFFIC SIGNALS 48 8-20 Illumination Modifications (Tukwila International Blvd), Complete 1 LS $ 12,000.00 $ 12,000.00 $ 22,000.00 $ 22,000.00 $ 28,000.00 $ 28,000.00 $ 10,000.00 $ 10,000.00 $ 15,300.00 $ 15,300.00 49 8-20 Traffic Signal Modifications (Interurban and 58th Ave S), Complete 1 LS $ 24,000.00 $ 24,000.00 $ 38,000.00 $ 38,000.00 $ 40,000.00 $ 40,000.00 $ 22,500.00 $ 22,500.00 $ 33,800.00 $ 33,800.00 GRAND TOTAL $ 849,830.00 $ 928,288.50 $ 1,019,690.00 $ 1,077,000.00 $ 1,088,046.00 The City of Tukwila intends to award the bid to the apparent low bidder, Road Construction Northwest Inc. Certified by c�,`�Gza. y' r l� Date: March, 18, 2024 shua Hopkins, Surface Water Project Manager