HomeMy WebLinkAboutCOW 2024-03-25 COMPLETE AGENDA PACKET�I O LA w Tukwila City Council Agenda
J
4s
.• COMMITTEE
OF
THE
WHOLE
.•
10
1905
Thomas McLeod, Mayor Councilmembers: ❖ De'Sean Quinn ❖ Tosh Sharp
MartyWine, Interim City Administrator ❖ Armen Papyan ❖ Jovita McConnell
Mohamed Abdi, Council President ❖ Dennis Martinez ❖ Hannah Hedrick
ON -SITE PRESENCE:
TUKWILA CITY HALL
COUNCIL CHAMBERS
REMOTE PARTICIPATION FOR THE PUBLIC:
1-253-292-9750, AccEss CODE: 670077847#
Click here to: Join Microsoft Teams Meeting
6200 SOUTHCENTER BOULEVARD
For Technical Support: 1-206-433-7155
Monday, March 25, 2024; 7:00 PM • Ord #2728 • Res #2092
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE
2. LAND
ACKNOWLEDGEMENT
The City of Tukwila is located on the ancestral lands of the Coast Salish people.
We acknowledge their continuing connections to land, waters and culture.
We pay our respects to their elders past, present and emerging.
3. PUBLIC COMMENTS
including comment
on items both on and
not on the meeting agenda
Those wishing to provide public comments may verbally address the City Council both
on -site at Tukwila City Hall or via phone or Microsoft Teams for up to
5 minutes for items both on and not on the meeting agenda.
To provide comment via phone or Microsoft Teams, please email
citycouncil@tukwilawa.gov with your name and topic by 5:00 PM on the meeting date.
Please clearly indicate that your message is for public comment during the meeting,
and you will receive further instructions.
4. SPECIAL ISSUES
a. A resolution authorizing South King Housing and Homelessness
Partners (SKHHP) Housing Projects using funds contributed by
the City to the Housing Capital Fund.
b. Public Records Request mitigation and staffing request.
> Rescheduled from 3/11/24 Committee of the Whole 4
c. 2025 — 2026 Biennial Budget Development kick-off.
Pg.1
Pg,37
Pg.45
5. REPORTS
a. Mayor
b. City Council
c. Staff
6. MISCELLANEOUS
7. EXECUTIVE SESSION
Pending Litigation — Pursuant to RCW 42.30.110.(1)(i) (30 minutes)
NO Action will follow in the open meeting.
8. ADJOURNMENT
❖ CLOSED SESSION ❖
Collective Bargaining — Pursuant to RCW 42.30.140(4)(b)
Location: Hazelnut Conference Room (CR #3)
This agenda is available at www.tukwilawa.gov, and in alternate formats with advance notice for those with disabilities.
RemoteTukwila Council meetings are audio taped (and video taped as of 9/14/20). Available at www.tukwilawa.gov)
raw- If you are in need of translation or interpretation services at a Council meeting,
Milli please contact us at 206-433-1800 by 12:00 p.m. on the meeting date.
WELCOME TO THE TUKWILA CITY COUNCIL MEETING
The Tukwila City Council encourages community participation in the local government process and
welcomes attendance and public comment at its meetings.
MEETING SCHEDULE
Regular Meetings are held at 7:00 p.m. on the 1st and 3rd Mondays of each month. The City Council takes
formal action in the form of motions, resolutions and ordinances at Regular Meetings.
Committee of the Whole Meetings are held at 7:00 p.m. on the 2nd and 4th Mondays of each month. The
City Council considers current issues, discusses policy matters in detail, and coordinates the work of
the Council at Committee of the Whole meetings.
PUBLIC COMMENTS
Members of the public are given the opportunity to address the Council for up to 5 minutes on items both on
and not on the meeting agenda during Public Comments. The City Council will also accept comments on an
agenda item when the item is presented in the agenda, but speakers are limited to commenting once per
item each meeting.
When recognized by the Presiding Officer, please go to the podium if on -site or turn on your microphone if
attending virtually and state your name clearly for the record. The City Council appreciates hearing from you
but may not respond or answer questions during the meeting. Members of the City Council or City staff may
follow up with you following the meeting.
PUBLIC HEARINGS
Public Hearings are required by law before the Council can take action on matters affecting the public
interest such as land -use laws, annexations, rezone requests, public safety issues, etc. The City Council
Rules of Procedure provide the following guidelines for Public Hearings:
1. City staff will provide a report summarizing and providing context to the issue at hand.
2. City staff shall speak first and be allowed 15 minutes to make a presentation.
3. The applicant is then allowed 15 minutes to make a presentation.
4. Each side is then allowed 5 minutes for rebuttal.
5. After City staff and the applicant have used their speaking time, the Council may ask further
clarifying questions of the speakers.
6. Members of the public who wish to address the Council on the hearing topic may speak for 5
minutes each.
7. Speakers are asked to sign in on forms provided by the City Clerk.
8. The Council may ask clarifying questions of speakers and the speakers may respond.
9. Speakers should address their comments to the City Council.
10. If a large number of people wish to speak to the issue, the Council may limit the total amount of
comment time dedicated to the Public Hearing.
11. Once the Presiding Officer closes the public hearing, no further comments will be accepted, and the
issue is open for Councilmember discussion.
12. Any hearing being held or ordered to be held by the City Council may be continued in the manner as
set forth by RCW 42.30.100.
For more information about the City Council, including its complete Rules of
Procedure, please visit: https://www.tukwilawa.gov/departments/city-council/
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's review
Council review
3/25/24
LH
ITEM INFORMATION
ITEM No.
4.A.
STAFF SPONSOR: LAUREL HUMPHREY
ORIGINAI. AGENDA DATE: 3/25/24
AGENDA ITEM TITLE Resolution authorizing allocation from SKHHP Housing Capital Fund.
CATEGORY ❑ Discussion
Mtg Date
❑ Motion
Mtg Date
® Resolution
Mtg Date 3/25/24
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ® Council ❑ Mayor ❑ Admin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Police ❑ PIF
SPONSOR'S
SUMMARY
The proposed resolution authorizes the allocation of $15,402.00 from the city's existing
contributions to the South King Housing & Homelessness Partners (SKHHP) Housing
Capital Fund.
REVIEWED BY 0 Trans&Infrastructure Svcs 0 Community Svcs/Safety 0 Finance & Governance ❑ Planning & Community Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm.
DATE: COMMITTEE CHAIR:
❑ Planning Comm.
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMIT ILE
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
$15,402
Fund Source: HB 1406 REVENUE
Comments:
AMOUNT BUDGETED
$15,402
APPROPRIATION REQUIRED
$
MTG. DATE
RECORD OF COUNCIL ACTION
3/25/24
4/1/24
MTG. DATE
ATTACHMENTS
3/25/24
Information Memo
Presentation
Draft resolution
4/1/24
1
2
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Committee of the Whole
FROM: Claire Goodwin, Executive Manager, SKHHP
Laurel Humphrey, Legislative Analyst
DATE: March 19, 2024
SUBJECT: Resolution authorizing allocation from SKHHP Housing Capital Fund
ISSUE
The proposed resolution authorizes the allocation of $15,402.00 from the City's existing
contributions to the South King Housing and Homelessness Partners (SKHHP) Housing
Capital Fund to finance affordable housing projects.
SUMMARY
SKHHP was created in 2019 through an interlocal agreement of several cities and King County
to address housing needs in South King County. There are currently 11 member jurisdictions:
Auburn, Burien, Covington, Des Moines, Federal Way, Kent, Maple Valley, Normandy Park,
Renton, Tukwila, and King County. Mayor McLeod serves as Tukwila's representative on the
SKHHP Executive Board, with Councilmember Martinez serving as alternate.
Housing Capital Fund
In 2019, RCW 82.14.540 (SHB 1406) became law allowing jurisdictions to enact a local sales
and use tax for the purpose of supporting affordable housing. In 2021, eight of the nine
SKHHP member cities entered into a second interlocal agreement for purposes of pooling
sales tax receipts authorized by RCW 82.14.540 with SKHHP to create the Housing Capital
Fund (Pooling ILA - SHB 1406). In 2022, SKHHP awarded two projects in South King County
almost $1.4 million during the first annual funding round.
In 2023, two of the four SKHHP member cities who are able to collect RCW 82.14.530 (HB
1590) revenues desired to pool a portion of those funds with SKHHP for the 2023 funding
round of the Housing Capital Fund to add to existing SHB 1406 pooled revenue and entered
into an additional interlocal agreement (Pooling ILA - HB 1590).
The Establishing ILA and Pooling ILAs established the SKHHP Housing Capital Fund, set
parameters for the process for the selection of awards involving pooled funds, and
determined the approval process. Pursuant to the ILAs, the SKHHP Executive Board
recommends allocations for funding affordable housing projects to the participating City
Councils. Even though the Council has already contributed funds to the 2023 Housing Capital
Fund funding round, Council approval is needed to authorize the allocation of funds to
specific projects.
Funding Recommendations
The SKHHP Executive Board adopts annual funding guidelines and priorities for each funding
round. The SKHHP Advisory Board subsequently reviewed applications and provided a
3
INFORMATIONAL MEMO
Page 2
funding recommendation based on adopted priorities to the SKHHP Executive Board. The
SKHHP Executive Board concurred with the majority of the SKHHP Advisory Board's
recommendation and recommends funding four projects totaling $5,747,306 as described in
the 2023 SKHHP Housing Capital Fund Recommendation memo dated January 17, 2024
(attached).
The SKHHP Executive Board requests approval to use $15,402 of the total $17,233
contributed funds from 2023 from the City of Tukwila for the following recommended
projects:
Project Sponsor
and Project
Name
Location
# of
Units
Total
Development
Cost
Total SKHHP
Contribution
Total City
Contribution
Mercy Housing
NW - Kent
Multicultural
Village
Kent
199
$134,323,456
$1,000,000
$0
LIHI - Skway
Affordable
Housing and
Early Learning
Center
Skyway
55
$36,295,892
$2,800,000
$0
TWG - Pandion
at Star Lake
Kent
168
$87,149,708
$1,170,000
$0
Multi -Service
Center-
Victorian Place II
Des
Moines
20
$785,125
$777,306
$15,402
Sales and use tax receipts from Tukwila have already been contributed to SKHHP's 2023
Housing Capital Fund, and with this Council approval of $15,402 those funds may be
allocated to the projects recommended by the SKHHP Executive Board. Detailed descriptions
of the projects, funding requests, rationale, and recommended conditions of funding for
projects by the SKHHP Executive Board are included in the attached memo.
RECOMMENDATION
Staff is seeking Council approval of the proposed resolution with possible final action on April
1, 2024.
ATTACHMENTS
1. Draft Resolution
4
South King Housing and
Homelessness Partners (SKHHP)
Housing Capital Fund
Recommendations
Claire V. Goodwin, SKHHP Executive Manager
City of Tukwila Committee of the Whole
March 25, 2024
SK:15P
South King Housing and Homelessness Partners
w� Establishing SKHHP and the Housing Capital Fund
• 2019: SKHHP was formed via an Interlocal Agreement
• Eleven member jurisdictions include:
= Auburn = Federal Way = Renton
= Burien = Kent = Tukwila
= Covington = Maple Valley = King County
= Des Moines = Normandy Park
• 2019: SHB 1406 (RCW 82.14.540) became law allowing jurisdictions to enact a local sales tax
for the purpose of affordable housing; sales tax is a recapture of a portion of existing sales tax
• 2020: HB 1590 (RCW 82.14.530) became law allowing jurisdictions to impose a 0.1 % local sales
and use tax to support affordable housing; limited window to act before County collected revenue
• 2021 and 2023: Interlocal Agreements for the Purpose of Pooling Sales Tax Receipts with
SKHHP
• 2022: Launched first funding round of the Housing Capital Fund
2
SKr1:.?
South King Housing and Homelessness Partners
itt 2023 Housing Capital Fund
• The second annual SKHHP Housing Capital Fund application opened in 2023.
• Six applications were received with broad geographic diversity throughout South King County.
• The SKHHP Advisory Board reviewed and made recommendations to the SKHHP Executive
Board to fund four of the six projects.
• The SKHHP Executive Board agreed with most of the recommendation and is seeking
concurrence from each jurisdiction.
• The recommendation totals $5,747,306
• $777,306 from SHB 1406
• $4,970,000 from HB 1590
SK:IP
3
South King Housing and Homelessness Partners
Ast
Recommended Projects
1. Mercy Housing NW — Kent Multicultural Village: Kent
• 199-unit multifamily rental development adjacent to the future Kent Des Moines Link light rail station
• 30%-80% of area median income (AMI); 20% set -aside for households with an I/DD and 30% set -aside for families
• $1,000,000
2. LIHI — Skyway Affordable Housing and Early Learning Center: Unincorporated South King County
• 55-unit multifamily rental development with on -site support services
• 30%-50% AMI; 75% set -aside for households transitioning out of homelessness
• $2,800,000
3. TWG — Pandion at Star Lake: Kent
• 168-unit multifacility rental development adjacent to the future Kent/Star Lake Link light rail station
• 30%-60% AMI; set -asides for families and families transitioning out of homelessness or are at -risk of homelessness
• $1,170,000
4. Multi -Service Center— Victorian Place II: Des Moines
• 20-unit rehabilitation and preservation project
• 5 units up to 35% AMI; 10 units up to 40%AMI; 5 units up to 50%AMI
• $777,306
SKr1:.?
4
South King Housing and Homelessness Partners
AtiProposed Funding Sources for Recommended Projects
o - HB 1590
Jurisdiction
1. Mercy
Housing-KMV
2. LIHI-Skyway
3. TWG-
Pandion
Total Contributed
in 2023
Unallocated
Covington
Kent
$ 88,126 $ 246,752 $ 103,107 $ 438,028 $ 43
$ 911,874 $ 2,553,248 $ 1,066,893 $ 4,532,457 $ 442
$ 1,000,000 $ 2,800,000 $ 1,170,000 $ 4,970,485 $ 485
SKr:J:0
5
South King Housing and Homelessness Partners
o�Proposed Funding Sources for Recommended Projects
- SHB 1406
Jurisdiction
4. MSC -Victorian
Place II
Total
Contributed in
2023
Carry -Over from
2022
Unallocated
Federal Way
Kent
Normandy Park
Renton
Tukwila
$ 137,595
$ 152,865 $ 11,548
$ 26,819
$ 63,128 $ 69,897 $ 5,535
$ 12,304
$ 30,261 $ 34,301 $ 1,858
$ 5,898
$ 119,468 $ 133,558 $ 9,196
$ 23,286
$ 188,422 $ 212,655 $ 12,493
$ 36,726
$ 5,942 $ 6,992
$ 108 $ 1,158
$ 217,088 $ 246,643 $ 12,758
$ 42,313
$ 15,402 $ 17,233 $ 1,171
$ 3,002
777,306 $ 874,145 $ 54,667
$ 151,506
SIP
South King Housing antl Homr. Partners
Thank you
Claire V. Goodwin, SKHHP Executive Manager
cvgoodwin@skhhp.org
SK:15P
South King Housing and Homelessness Partners
12
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, AUTHORIZING
THE DULY -APPOINTED ADMINISTERING AGENCY
FOR SOUTH KING HOUSING AND HOMELESSNESS
PARTNERS (SKHHP) TO EXECUTE ALL
DOCUMENTS NECESSARY TO ENTER INTO
AGREEMENTS FOR THE FUNDING OF
AFFORDABLE HOUSING PROJECTS, AS
RECOMMENDED BY THE SKHHP EXECUTIVE
BOARD, UTILIZING FUNDS CONTRIBUTED BY THE
CITY OF TUKWILA TO THE SKHHP HOUSING
CAPITAL FUND.
WHEREAS, on February 21, 2019, the City of Tukwila entered into an Interlocal
Agreement to form South King Housing and Homelessness Partners (SKHHP) to help
coordinate the efforts of South King County cities to provide affordable housing; and
WHEREAS, on May 17, 2021, the City of Tukwila entered into an Interlocal
Agreement for the purposes of pooling sales tax receipts with SKHHP to administer funds
through the SKHHP Housing Capital Fund; and
WHEREAS, the SKHHP Executive Board has recommended that the City of Tukwila
participate in the funding of certain affordable housing projects and programs hereinafter
described; and
WHEREAS, the SKHHP Executive Board has developed recommended conditions
to ensure the City's affordable housing funds are used for their intended purpose and that
projects maintain their affordability over time; and
WHEREAS, pursuant to the SKHHP formation Interlocal Agreement, each legislative
body participating in funding a project or program through SKHHP's Housing Capital Fund
must authorize the application of a specific amount of the City's funds contributed to the
SKHHP Housing Capital Fund to a specific project or program; and
2024 Legislation: SKHHP Allocation
Version: 02/15/2024
Staff: L. Humphrey
Page 1 of 2
13
WHEREAS, the City Council desires to use $15,402.00 from funds contributed to the
SKHHP Housing Capital Fund as designated below to finance the projects recommended
by the SKHHP Executive Board;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Pursuant to the Interlocal Agreement, the City Council authorizes the
duly -appointed administering agency of SKHHP to execute all documents and take all
necessary actions to enter into agreements on behalf of the City to fund the rehabilitation
of the Multi -Service Center's Victorian Place II, and to use $15,402.00 from the City's
SHB 1406 contribution.
Section 2. The agreements entered into pursuant to Section 1 of this resolution, shall
include terms and conditions to ensure that the City's funds are used for their intended
purpose and that the projects maintain affordability over time. In determining what
conditions should be included in the agreements, the duly -appointed administering
agency of SKHHP shall be guided by the recommendations set forth in the SKHHP
Executive Board's memorandum dated January 17, 2024, a copy of which is attached
hereto as Exhibit A.
Section 3. This resolution will take effect and be in full force immediately upon
passage and signatures.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2024.
ATTEST/AUTHENTICATED:
Andy Youn, CMC, City Clerk Mohamed Abdi, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
Attachment: Exhibit A — SKHHP Executive Board memorandum dated January 17, 2024
14
2024 Legislation: SKHHP Allocation
Version: 02/15/2024
Staff: L. Humphrey
Page 2of2
SKIIP
South King Housing and Homelessness Partners
TO:
FROM:
DATE:
RE:
City of Auburn City Council
City of Burien City Council
City of Covington City Council
City of Des Moines City Council
City of Federal Way City Council
Memorandum
City of Kent City Council
City of Normandy Park City Council
City of Renton City Council
City of Tukwila City Council
SKHHP Executive Board
January 17, 2024
2023 SKHHP Housing Capital Fund Recommendation
OVERVIEW
The 2023 SKHHP Housing Capital Fund was the second funding round made possible by pooling
resources among SKHHP member jurisdictions. 2023 was the first year members pooled funds sourced
from HB 1590, which led to quadrupling the amount of funding available over the previous year totaling
$5,899,297. SKHHP received six applications for funding representing over $8.6 million in requests to
develop or preserve 493 units of housing. The SKHHP Executive Board concurred with the majority of
the SKHHP Advisory Board's recommendation and recommends funding four projects totaling
$5,747,306 (see Table 1). Of this total, the Executive Board recommends using $777,306 of the total
$928,812 sourced from SHB 1406 revenue contributions for one preservation project; and $4,970,000
sourced from HB 1590 revenue contributions for three new construction projects. This
recommendation leaves a balance of $151,506 in SHB 1406 funds and $485 in HB 1590 funds in the
Housing Capital Fund that will rollover into the next funding round in 2024 (see Tables 2 and 3). A
summary of the recommended projects, funding rationale, and the conditions for funding are described
in this memo. Included as an attachment are the economic summaries of the recommended projects.
Table 1: Recommended Projects and Recommended Funding Level
Project
Sponsor
Location # of Project type Amount
Units requested
Recommended Recommended
Funding — HB 1590 Funding — SHB 1406
Mercy Kent 199 New Construction $1,000,000
Housing NW Rental
$1,000,000
LIHI
Skyway 55 New Construction $2,800,000
Rental
$2,800,000
TWG
Kent 168 New Construction $2,856,000
Rental
$1,170,000
Multi -Service Des
Center Moines
20 Preservation
Rental
$500,000 -- $777,306
TOTAL 442
$4,970,000
$777,306
Page 1 of 22
15
Table 2: Proposed HB 1590 Allocations by Jurisdiction for Recommended Projects
Jurisdiction
1. Mercy
Housing-KMV
2. LIHI-Skyway
3. TWG-
Pandion
Total Contributed
in 2023
Unallocated
Covington
$ 88,126
$ 246,752
$ 103,107
$ 438,028
$ 43
Kent
$ 911,874
$ 2,553,248
$ 1,066,893
$ 4,532,457
$ 442
Total
$ 1,000,000
$ 2,800,000
$ 1,170,000
$ 4,970,485
$ 485
Table 3: Proposed SHB 1406 Allocations by Jurisdiction for Recommended Projects
Jurisdiction
4. MSC-
Victorian Place
II
Total
Contributed in
2023
Carry -Over from
2022
Unallocated
Auburn
$ 137,595
$ 152,865
$ 11,548
$ 26,819
Burien
$ 63,128
$ 69,897
$ 5,535
$ 12,304
Des Moines
$ 30,261
$ 34,301
$ 1,858
$ 5,898
Federal Way
$ 119,468
$ 133,558
$ 9,196
$ 23,286
Kent
$ 188,422
$ 212,655
$ 12,493
$ 36,726
Normandy Park
$ 5,942
$ 6,992
$ 108
$ 1,158
Renton
$ 217,088
$ 246,643
$ 12,758
$ 42,313
Tukwila
$ 15,402
$ 17,233
$ 1,171
$ 3,002
Total
$ 777,306
$ 874,145
$ 54,667
$ 151,506
BACKGROUND
The SKHHP Advisory Board met on October 5, 2023 and November 2, 2023 to review project
applications and develop a funding recommendation for the SKHHP Executive Board's consideration.
The SKHHP Executive Board met on October 20, 2023 and November 17, 2023 to review each project
and consider the recommendations of the Advisory Board. The Advisory Board adopted its
recommendation on November 2, 2023 and the Executive Board took final action on November 17,
2023.
PROCESS
Advisory Board
recommendation
(November 2, 2023)
•
ATTACHMENTS
Executive Board finalized
recommendation
(November 17, 2023
1. Economic summaires for recommended projects
Member Councils to approve
funding recommendation
(February -April 2024)
16
Page 2 of 22
1. Mercy Housing NW - Kent Multicultural Village
Funding request: $1,000,000
Executive Board recommendation: $1,000,000 (forgivable loan)
Address: 23446 Pacific Highway South, Kent, WA 98032
PROJECT SUMMARY
Kent Multicultural Village is a 199-unit multifamily rental project in Kent adjacent to the future Kent Des
Moines Link light rail station. The light rail station is scheduled to open in 2026. The project will support
households earning 30% area median income (AMI) to 80% AMI with a 20% set -aside (39 units) for
households with an intellectual and/or developmental disability (I/DD). The I/DD units will benefit from
on -site supportive services. A 30% set -aside (61 units) will be for families with children. The project
includes studios, 1-bedrooms, 2-bedrooms, and three -bedroom units. The site is comprised of eight
stories and will include a community center, a family resource center, and a licensed early learning
facility with six classrooms to accommodate 96 infants and children with a focus on serving children with
I/DD. The project was awarded the RFP by Sound Transit to be located on surplus land, but the terms of
development are forthcoming, and the final project may be slightly different than described. 39 units
are eligible for SKHHP funds sourced from HB 1590 revenue.
The project is a partnership between Mercy Housing NW and Open Doors for Multicultural Families,
who will provide support to the I/DD households and will relocate their headquarters to the property.
Open Doors for Multicultural Families will also operate the Community Center which will include space
for recreational activities and community -focused programming. Open Doors for Multicultural Families
is a non-profit organization dedicated to meeting the needs of persons of color living with I/DD,
especially immigrants and refugees.
PROJECT SCHEDULE
Activity
Date
Site Control
2024
— to be coordinated in Sound Transit negotiations
Building Permits Issued
4/2025
Begin Construction
6/2025
Begin Lease Up
2/2027
Certificate of Occupancy Issued
6/2027
First LIHTC Year Start
6/2027
100% Lease Up
2/2028
FUNDING RATIONALE
The Executive Board supports the intent of this application for the following reasons:
• The project has a 20% set -aside for households with an I/DD.
• The project serves a diverse range of incomes from 30% AMI to 80% AMI.
• The project proposal is thorough, well planned, and has funding commitments already
established.
Page 3 of 22
17
• The project is located adjacent to the future Kent Des Moines Link light rail station and has
convenient access to transit, schools, medical clinics, grocery stores, and services.
• The project strongly aligns with SKHHP Housing Capital Fund adopted priorities including: being
a transit -oriented development (TOD) project, collaboration with local community -based
organizations, addressing the needs of populations most disproportionately impacted by
housing costs, advancing economic opportunity due to its proximity to the future Link light rail
station and other amenities, advancing geographic equity of the Housing Capital Fund, and the
leverage of private and public investment.
• Mercy Housing NW is a well -established nonprofit developer in the region.
• A third -party construction report found the proposed budget to be appropriate.
PROPOSED CONDITIONS
Standard Conditions
1. Contractor shall provide SKHHP with development and operating budgets based upon
actual funding commitments for approval by SKHHP staff. Contractor must notify
SKHHP staff immediately if it is unable to adhere to these budgets, and must submit
new budget(s) to SKHHP staff for approval. SKHHP staff shall not unreasonably withhold
its approval of these budget(s), so long as they do not materially or adversely change
the Project. This shall be a continuing obligation of the Contractor. Contractor's failure
to adhere to budgets (either original or new/amended) may result in SKHHP's
withdrawal of its funding commitment. Contractor must prepare and submit final
budgets to SKHHP at the time it starts project construction and at the project's
completion.
2. Contractor shall submit to SKHHP evidence of funding commitments from all proposed
public and private funding sources. If Contractor cannot secure an identified
commitment within an application's time frame, Contractor shall immediately notify
SKHHP staff and describe its anticipated actions and time frame for securing alternative
funding.
3. Contractor shall use SKHHP provided funds toward specific project costs as included in
the funding agreement and consistent with RCW 82.14.530. Contractor may not use
SKHHP funds for any other purpose unless SKHHP staff authorizes such alternate use in
writing. If budget line items with unexpended balances exist after completion of the
project, SKHHP and other public funders shall approve adjustments to the project
capital sources (including potential reductions in public fund loan balances).
4. Contractor shall evaluate and consider maximizing sustainability features for the Project
(such as an efficient building envelope and heat pumps) and shall propose a plan to
maximize the Project's sustainability.
5. If Contractor uses federal funds toward the Project, it must meet applicable federal
guidelines, including but not limited to: contractor solicitation; bidding and selection;
wage rates; and federal laws and regulations.
Page 4 of 22
18
6. Contractor shall maintain documentation of any necessary land use approvals, permits,
and licenses required by the jurisdiction in which the project is located.
7. Quarterly Status Reports. Contractor is required to provide SKHHP with quarterly status
reports for projects funded through SKHHP's Housing Capital Fund during the project's
development stage (from the time funds are awarded until the project's completion and
occupancy). These quarterly reports must include at a minimum the status of funds
expended and progress to date. SKHHP will rely on these quarterly reports to determine
whether Contractor is making satisfactory progress on the project. Contractor shall
submit a final budget to SKHHP upon project completion. If applicable, Contractor shall
submit initial tenant information as required by SKHHP.
8. SKHHP will inspect the project site at least once during the project's construction.
9. Ongoing Monitoring. After occupancy, Contractor will submit annual reports to SKHHP
summarizing the number of project beneficiaries, housing expenses for the target
population, and the proportion of those beneficiaries that are low- and/or moderate -
income and that meet other eligibility criteria established in the Contract. In addition,
for projects with loan payments, Contractor must annually report financial information
to SKHHP that it will use to assess contingent loan payments and project health. These
annual reports will be required for the full duration of affordability. SKHHP will also
periodically evaluate all projects for long term sustainability.
10. For rental projects, Contractor shall maintain the project in good and habitable
condition for the duration of its affordability term.
11. SKHHP shall reimburse the Contractor for satisfactory completion of the requirements
specified in the Contract and upon Contractor's submission to SKHHP of invoices and
supporting documentation of eligible expenses.
12. A covenant is recorded ensuring affordability for at least 50 years, with unit size,
number of units, and affordability distribution established prior to executing Contract.
Special Conditions
1. SKHHP will provide project funds to the Contractor in the form of a deferred,
contingent, forgivable loan. Loan terms will account for various factors, including loan
terms from other fund sources and available cash flow. Final loan terms shall be
determined prior to release of funds and must be approved by SKHHP staff. The loan
will be secured by a deed of trust recorded against the development property to ensure
that Contractor maintains the project's affordability and target population. Contractor
shall not be required to repay the loan so long as it maintains these project
requirements.
2. Timeframe for funding commitment. The funding commitment continues for thirty-six
(36) months from the date of Council approval and shall expire thereafter if all
conditions are not satisfied. An extension may be requested to SKHHP staff no later
than sixty (60) days prior to the expiration date. At that time, the Agency will provide a
Page 5 of 22
19
status report on progress to date and expected schedule for start of construction and
project completion. The SKHHP Executive Board will consider a twelve-month extension
only on the basis of documented, meaningful progress in bringing the project to
readiness or completion. At a minimum, the Contractor will demonstrate that all capital
funding has been secured or is likely to be secured within a reasonable period of time.
3. At least 39 of the housing units shall be set -aside for households with an I/DD who earn
no more than 60% AMI. Use of funds and population eligibility must be in -alignment
with RCW 82.14.530.
4. SKHHP funds shall be used solely for new construction, unless otherwise approved by
SKHHP staff.
5. Receipt of the documentation of remediation results and Department of Ecology
approval of remediation efforts shall be submitted to SKHHP prior to proceeding with
construction.
Page 6 of 22
20
2. Low Income Housing Institute (LIHI) - Skyway Affordable Housing and Early Learning Center
Funding request: $2,800,000
Executive Board recommendation: $2,800,000 (forgivable loan)
Address: 12712-12724 & 12742 Renton Ave. South, Seattle, WA 98178
PROJECT SUMMARY
Skyway Affordable Housing and Early Learning Center is a multifamily rental project in Unincorporated
King County. The project will provide 55 housing units for individuals and families, including 12 studios,
19 one -bedroom, 13 two -bedroom, and 11 three -bedroom units for households earning between 30%
and 50% AMI with a 75% set -aside (42 units) for households transitioning out of homelessness. An early
learning center will be located on the ground floor of the building, featuring four classrooms to
accommodate up to 80 children, a parent resource room, and offices. The surrounding community will
be prioritized in the early learning center activities. Additional amenities include a community room,
case manager offices, and a roof deck for resident use. LIHI will provide on -site case management. This
project has been previously awarded predevelopment and acquisition funds from King County.
The project will serve individuals (25 units) and families (17 units) exiting homelessness earning 30%
AMI (42 total units) and will support general population households earning up to 50% AMI (12 units). A
common room will support all residents (1 unit). 42 units are eligible for SKHHP funds sourced from HB
1590 revenue.
Childhaven, a nonprofit dedicated to strengthening families and preventing childhood trauma, plans to
lease the early learning center and relocate their program to the site and will assist in applying for local
funding for this portion of the project. The early learning center will be financed separately from the
residential space, without using tax credits on the commercial space.
PROJECT SCHEDULE
Activity
Date
Site Control
1/30/2023
Building Permits Issued
1/23/2025
Begin Construction
6/1/2025
Begin Lease Up
9/15/2026
Certificate of Occupancy Issued
10/15/2026
FUNDING RATIONALE
The Executive Board supports the intent of this application for the following reasons:
• The project has a 75% set -aside for households transitioning out of homelessness.
• The project brings quality, affordable housing to a historically underserved neighborhood.
• The project will house Childhaven on -site to run an early learning center.
• The project is located near schools, a library, and a future community center.
• The project strongly aligns with SKHHP Housing Capital Fund adopted priorities including:
collaboration with local community -based organizations, addressing the needs of populations
Page 7 of 22
21
most disproportionately impacted by housing costs, advancing geographic equity of the Housing
Capital Fund, leverage of private and public investment, and promoting racial equity by
prioritizing residents with a connection to the neighborhood.
• The project will prioritize residents with a connection to the neighborhood.
• LIHI is an established developer in the region.
• A third -party construction report found the proposed budget to be appropriate.
PROPOSED CONDITIONS
Standard Conditions
1. Contractor shall provide SKHHP with development and operating budgets based upon
actual funding commitments for approval by SKHHP staff. Contractor must notify
SKHHP staff immediately if it is unable to adhere to these budgets, and must submit
new budget(s) to SKHHP staff for approval. SKHHP staff shall not unreasonably withhold
its approval of these budget(s), so long as they do not materially or adversely change
the Project. This shall be a continuing obligation of the Contractor. Contractor's failure
to adhere to budgets (either original or new/amended) may result in SKHHP's
withdrawal of its funding commitment. Contractor must prepare and submit final
budgets to SKHHP at the time it starts project construction and at the project's
completion.
2. Contractor shall submit to SKHHP evidence of funding commitments from all proposed
public and private funding sources. If Contractor cannot secure an identified
commitment within an application's time frame, Contractor shall immediately notify
SKHHP staff and describe its anticipated actions and time frame for securing alternative
funding.
3. Contractor shall use SKHHP provided funds toward specific project costs as included in
the funding agreement and consistent with RCW 82.14.530. Contractor may not use
SKHHP funds for any other purpose unless SKHHP staff authorizes such alternate use in
writing. If budget line items with unexpended balances exist after completion of the
project, SKHHP and other public funders shall approve adjustments to the project
capital sources (including potential reductions in public fund loan balances).
4. Contractor shall evaluate and consider maximizing sustainability features for the Project
(such as an efficient building envelope and heat pumps) and shall propose a plan to
maximize the Project's sustainability.
5. If Contractor uses federal funds toward the Project, it must meet applicable federal
guidelines, including but not limited to: contractor solicitation; bidding and selection;
wage rates; and federal laws and regulations.
6. Contractor shall maintain documentation of any necessary land use approvals, permits,
and licenses required by the jurisdiction in which the project is located.
7. Quarterly Status Reports. Contractor is required to provide SKHHP with quarterly status
reports for projects funded through SKHHP's Housing Capital Fund during the project's
Page 8 of 22
22
development stage (from the time funds are awarded until the project's completion and
occupancy). These quarterly reports must include at a minimum the status of funds
expended and progress to date. SKHHP will rely on these quarterly reports to determine
whether Contractor is making satisfactory progress on the project. Contractor shall
submit a final budget to SKHHP upon project completion. If applicable, Contractor shall
submit initial tenant information as required by SKHHP.
8. SKHHP will inspect the project site at least once during the project's construction.
9. Ongoing Monitoring. After occupancy, Contractor will submit annual reports to SKHHP
summarizing the number of project beneficiaries, housing expenses for the target
population, and the proportion of those beneficiaries that are low- and/or moderate -
income and that meet other eligibility criteria established in the Contract. In addition,
for projects with loan payments, Contractor must annually report financial information
to SKHHP that it will use to assess contingent loan payments and project health. These
annual reports will be required for the full duration of affordability. SKHHP will also
periodically evaluate all projects for long term sustainability.
10. For rental projects, Contractor shall maintain the project in good and habitable
condition for the duration of its affordability term.
11. SKHHP shall reimburse the Contractor for satisfactory completion of the requirements
specified in the Contract and upon Contractor's submission to SKHHP of invoices and
supporting documentation of eligible expenses.
12. A covenant is recorded ensuring affordability for at least 50 years, with unit size,
number of units, and affordability distribution established prior to executing Contract.
Special Conditions
1. SKHHP will provide project funds to the Contractor in the form of a deferred,
contingent, forgivable loan. Loan terms will account for various factors, including loan
terms from other fund sources and available cash flow. Final loan terms shall be
determined prior to release of funds and must be approved by SKHHP staff. The loan
will be secured by a deed of trust recorded against the development property to ensure
that Contractor maintains the project's affordability and target population. Contractor
shall not be required to repay the loan so long as it maintains these project
requirements.
2. Timeframe for funding commitment. The funding commitment continues for thirty-six
(36) months from the date of Council approval and shall expire thereafter if all
conditions are not satisfied. An extension may be requested to SKHHP staff no later
than sixty (60) days prior to the expiration date. At that time, the Agency will provide a
status report on progress to date and expected schedule for start of construction and
project completion. The SKHHP Executive Board will consider a twelve-month extension
only on the basis of documented, meaningful progress in bringing the project to
readiness or completion. At a minimum, the Contractor will demonstrate that all capital
funding has been secured or is likely to be secured within a reasonable period of time.
Page 9 of 22
23
3. At least 75% of the housing units shall be set -aside for households transitioning out of
homelessness and be for an eligible population defined in RCW 82.14.530 and who earn
no more than 60% AMI.
4. SKHHP funds shall be used solely for new construction, unless otherwise approved by
SKHHP staff.
5. LIHI shall reexamine the guest policy allowing only one guest at a time to determine if it
is necessary.
Page 10 of 22
24
3. TWG — Pandion at Star Lake
Funding request: $2,856,000
Executive Board recommendation: $1,170,000 (loan)
Address: 2526 S 272nd Street, Kent, WA 98059
PROJECT SUMMARY
The South Building (building one of two) of Pandion at Star Lake is a multifamily rental, mixed use
project consisting of 168 affordable housing units for households earning between 30% and 60% AMI in
Kent. The project is located adjacent to the Kent/Star Lake Link light rail station. This transit -oriented
development (TOD) project will provide a mix of studio, one, two and three -bedroom units. The project
will include ground floor commercial space consisting of an early learning center for low-income children
and other non-profit tenants. The property was purchased by the developer in December 2022. The
project is a seven -story building with six stories of affordable housing over one story of commercial
space, plus basement level parking.
The 168 units includes 109 units for the general population, 30 units for families with children, 25 units
for families with children that require permanent supportive services and who are transitioning out of
homelessness or are at -risk of homelessness, and 4 units supporting households with an intellectual
and/or developmental disability (I/DD) requiring supportive services.
Pandion at Star Lake is a partnership between TWG Development and Vision House, with Vision House
providing on -site supportive serves for 140 units or those receiving 4% LIHTC support. In collaboration
with the City of Kent, an additional service provider will be selected to serve residents of the remaining
28 units or those receiving 9% LIHTC support.
29 units of the project are eligible for HB 1590 funds which includes 25 units for families with children
transitioning out of homelessness or are at -risk of homelessness and require permanent supportive
services and the four units set -aside for I/DD households.
PROJECT SCHEDULE
Activity
Date
Site Control
12/6/2022
Building Permits Issued
10/1/2025
Begin Construction
12/31/2025
Certificate of Occupancy Issued
12/31/2027
Placed in service
1/1/2028
First LIHTC Year
2028
FUNDING RATIONALE
The Executive Board supports the intent of this application for the following reasons:
• The project is located adjacent to the future Kent/Star Lake Link light rail station and has
convenient access to transit, schools, grocery stores, and services.
Page 11 of 22
25
• The project strongly aligns with SKHHP Housing Capital Fund adopted priorities including: being
a transit -oriented development (TOD) project, collaboration with local community -based
organizations, addressing the needs of populations most disproportionately impacted by
housing costs, advancing economic opportunity due to its proximity to the future Link light rail
station and other amenities, advancing geographic equity of the Housing Capital Fund, and the
leverage of private and public investment.
• The project construction start date is anticipated by early 2026, six months later than other
recommended projects. The sponsor may have more time to secure the additional funds than
other projects prior to beginning construction.
• The project has a strong partnership with Vision House who will provide on -site supportive
services for 140 households.
• A second building supporting 173 units for seniors earning 80% to 100% AMI is part of the
overall project, but is not part of the application to public funders. The overall project supports
mixed -income housing from 30% AMI-100% AMI.
• The project sponsor has been in close communication with the City of Kent on project feasibility
and zoning requirements since the property was purchased in December 2022.
• The project sponsor has agreed to voluntarily meet the design standards for properties zoned as
'Midway Transit Community,' which is a higher degree of development than what is required
under general mixed -use commercial standards for the City of Kent.
• A third -party construction report found the proposed budget to be appropriate.
PROPOSED CONDITIONS
Standard Conditions
1. Contractor shall provide SKHHP with development and operating budgets based upon
actual funding commitments for approval by SKHHP staff. Contractor must notify
SKHHP staff immediately if it is unable to adhere to these budgets, and must submit
new budget(s) to SKHHP staff for approval. SKHHP staff shall not unreasonably withhold
its approval of these budget(s), so long as they do not materially or adversely change
the Project. This shall be a continuing obligation of the Contractor. Contractor's failure
to adhere to budgets (either original or new/amended) may result in SKHHP's
withdrawal of its funding commitment. Contractor must prepare and submit final
budgets to SKHHP at the time it starts project construction and at the project's
completion.
2. Contractor shall submit to SKHHP evidence of funding commitments from all proposed
public and private funding sources. If Contractor cannot secure an identified
commitment within an application's time frame, Contractor shall immediately notify
SKHHP staff and describe its anticipated actions and time frame for securing alternative
funding.
3. Contractor shall use SKHHP provided funds toward specific project costs as included in
the funding agreement and consistent with RCW 82.14.530. Contractor may not use
SKHHP funds for any other purpose unless SKHHP staff authorizes such alternate use in
writing. If budget line items with unexpended balances exist after completion of the
Page 12 of 22
26
project, SKHHP and other public funders shall approve adjustments to the project
capital sources (including potential reductions in public fund loan balances).
4. Contractor shall evaluate and consider maximizing sustainability features for the Project
(such as an efficient building envelope and heat pumps) and shall propose a plan to
maximize the Project's sustainability.
5. If Contractor uses federal funds toward the Project, it must meet applicable federal
guidelines, including but not limited to: contractor solicitation; bidding and selection;
wage rates; and federal laws and regulations.
6. Contractor shall maintain documentation of any necessary land use approvals, permits,
and licenses required by the jurisdiction in which the project is located.
7. Quarterly Status Reports. Contractor is required to provide SKHHP with quarterly status
reports for projects funded through SKHHP's Housing Capital Fund during the project's
development stage (from the time funds are awarded until the project's completion and
occupancy). These quarterly reports must include at a minimum the status of funds
expended and progress to date. SKHHP will rely on these quarterly reports to determine
whether Contractor is making satisfactory progress on the project. Contractor shall
submit a final budget to SKHHP upon project completion. If applicable, Contractor shall
submit initial tenant information as required by SKHHP.
8. SKHHP will inspect the project site at least once during the project's construction.
9. Ongoing Monitoring. After occupancy, Contractor will submit annual reports to SKHHP
summarizing the number of project beneficiaries, housing expenses for the target
population, and the proportion of those beneficiaries that are low- and/or moderate -
income and that meet other eligibility criteria established in the Contract. In addition,
for projects with loan payments, Contractor must annually report financial information
to SKHHP that it will use to assess contingent loan payments and project health. These
annual reports will be required for the full duration of affordability. SKHHP will also
periodically evaluate all projects for long term sustainability.
10. For rental projects, Contractor shall maintain the project in good and habitable
condition for the duration of its affordability term.
11. SKHHP shall reimburse the Contractor for satisfactory completion of the requirements
specified in the Contract and upon Contractor's submission to SKHHP of invoices and
supporting documentation of eligible expenses.
12. A covenant is recorded ensuring affordability for at least 50 years, with unit size,
number of units, and affordability distribution established prior to executing Contract.
Special Conditions
1. SKHHP will provide project funds to the Contractor in the form of a deferred, 1%
interest, non -forgivable loan to the LIHTC partnership. The form of the funds are
subject to change, but shall be agreed upon prior to contract execution. Loan terms will
Page 13 of 22
27
account for various factors, including loan terms from other fund sources and available
cash flow. Final loan terms shall be determined prior to release of funds and must be
approved by SKHHP staff. The loan will be secured by a deed of trust recorded against
the development property to ensure that Contractor maintains the project's
affordability and target population.
2. Timeframe for funding commitment. The funding commitment continues for thirty-six
(36) months from the date of Council approval and shall expire thereafter if all
conditions are not satisfied. An extension may be requested to SKHHP staff no later
than sixty (60) days prior to the expiration date. At that time, the Agency will provide a
status report on progress to date and expected schedule for start of construction and
project completion. The SKHHP Executive Board will consider a twelve-month extension
only on the basis of documented, meaningful progress in bringing the project to
readiness or completion. At a minimum, the Contractor will demonstrate that all capital
funding has been secured or is likely to be secured within a reasonable period of time.
3. At least 29 housing units of the total shall be for an eligible population defined in RCW
82.14.530 including households transitioning out of homelessness or are at -risk of
homelessness or households with an I/DD and who also earn no more than 60% AMI.
4. SKHHP funds shall be used solely for new construction of the South Building, unless
otherwise approved by SKHHP staff.
Page 14 of 22
28
4. Multi -Service Center - Victorian Place II
Funding request: $500,000
Executive Board recommendation: $777,306 (grant)
Address: 24517 26th Place South, Des Moines, WA 98198
PROJECT SUMMARY
Victorian Place II is a multifamily, preservation 20-unit rental project in Des Moines. Since 1996, the
nonprofit Multi -Service Center has owned the two adjacent buildings that comprise the project which
includes five units for households earning up to 35% AMI, ten units for households up to 40% AMI, and
five units for households up to 50% AMI. The 20 three bedroom/two bath affordable rental units are in
active use and the target population is families with children.
The original request was for $500,000 in the form of a grant. Initial estimates were based on a 2018
construction estimate. An updated cost estimate of the project received on October 25, 2023 totaled
$675,918. The Advisory Board recommended fully funding the project at the revised amount, however,
after the recommendation was made, it was discovered that the revised estimate did not include
contingency funding. The Executive Board recommend funding the project with a 15% contingency
which totals $777,306.
SKHHP funds are requested to support the rehabilitation of the two buildings including: landscape
improvements, staircase repairs, installation of new railings, seal coating the parking lot, upgrading
external lighting, recoating tenant decks, installation of new siding, replacing gutters and downspouts,
replacing windows, replacing sliding glass doors, replacing unit entry doors, and replacing baseboard
heating with energy -efficient heating systems.
PROJECT SCHEDULE
Activity
Date
Site Control
1/1/2000
Building Permit Issued
Mid-2024
Begin Rehabilitation and Renovation
Mid -late 2024
End Rehabilitation and Renovation
Mid -late 2025
FUNDING RATIONALE
The Advisory Board supports the intent of this application for the following reasons:
• There are limited funding sources available for preservation and rehabilitation. The focus for
larger public funders has historically been on creating new units of affordable housing. Smaller
preservation projects like this one are not as competitive against larger preservation projects
competing for the same funds.
• The property is in need of rehabilitation to support the health and safety of residents which are
families with children.
• Preservation of affordable housing is a high -priority for SKHHP.
• 75% of the households earn no more than 40% AMI.
Page 15 of 22
29
• The project's proximity to the future Kent Des Moines Link light rail station an asset (1.3 miles).
• Multi -Service Center is a well -established South King County -based nonprofit that owns and
operates over 650 units of affordable housing.
• Multi -Service Center's housing programs have a history of serving BIPOC community members
with 72% of clients self -identifying as BIPOC.
• The project strongly aligns with SKHHP Housing Capital Fund adopted priorities including: the
project sponsor's community connection and engagement with the populations they intend to
serve, advancing racial equity, addressing the needs of populations most disproportionately
impacted by housing costs, advancing geographic equity of the Housing Capital Fund, and
preservation.
• Of the two applications submitted by the project sponsor, this project is the higher of the two
priorities as the larger housing units are more difficult for families in need to access, and the
current safety concerns at the project site are more immediate.
PROPOSED CONDITIONS
Standard Conditions
1. Contractor shall provide SKHHP with development and operating budgets based upon
actual funding commitments for approval by SKHHP staff. Contractor must notify
SKHHP staff immediately if it is unable to adhere to these budgets, and must submit
new budget(s) to SKHHP staff for approval. SKHHP staff shall not unreasonably withhold
its approval of these budget(s), so long as they do not materially or adversely change
the Project. This shall be a continuing obligation of the Contractor. Contractor's failure
to adhere to budgets (either original or new/amended) may result in SKHHP's
withdrawal of its funding commitment. Contractor must prepare and submit final
budgets to SKHHP at the time it starts project rehabilitation and at the project's
completion.
2. Contractor shall submit to SKHHP evidence of funding commitments from all proposed
public and private funding sources. If Contractor cannot secure an identified
commitment within an application's time frame, Contractor shall immediately notify
SKHHP staff and describe its anticipated actions and time frame for securing alternative
funding.
3. Contractor shall use SKHHP provided funds toward specific project costs as included in
the funding agreement and consistent with RCW 82.14.540. Contractor may not use
SKHHP funds for any other purpose unless SKHHP staff authorizes such alternate use in
writing. If budget line items with unexpended balances exist after completion of the
project, SKHHP shall approve adjustments to the project capital sources (including
potential reductions in public fund loan balances).
4. Contractor shall evaluate and consider maximizing sustainability features for the Project
(such as an efficient building envelope and heat pumps) and shall propose a plan to
maximize the Project's sustainability.
Page 16 of 22
30
5. If Contractor uses federal funds toward the Project, it must meet applicable federal
guidelines, including but not limited to: contractor solicitation; bidding and selection;
wage rates; and federal laws and regulations.
6. Contractor shall maintain documentation of any necessary land use approvals, permits,
and licenses required by the jurisdiction in which the project is located.
7. Quarterly Status Reports. Contractor is required to provide SKHHP with quarterly status
reports for projects funded through SKHHP's Housing Capital Fund during the project's
development stage (from the time funds are awarded until the project's completion).
These quarterly reports must include at a minimum the status of funds expended and
progress to date. SKHHP will rely on these quarterly reports to determine whether
Contractor is making satisfactory progress on the project. Contractor shall submit a final
budget to SKHHP upon project completion. If applicable, Contractor shall submit initial
tenant information as required by SKHHP.
8. SKHHP will inspect the project site at least once during the project's rehabilitation.
9. Ongoing Monitoring. After occupancy, Contractor will submit annual reports to SKHHP
summarizing the number of project beneficiaries, housing expenses for the target
population, and the proportion of those beneficiaries that are low- and/or moderate -
income and that meet other eligibility criteria established in the Contract. In addition,
for projects with loan payments, Contractor must annually report financial information
to SKHHP that it will use to assess contingent loan payments and project health. These
annual reports will be required for the full duration of affordability. SKHHP will also
periodically evaluate all projects for long term sustainability.
10. For rental projects, Contractor shall maintain the project in good and habitable
condition for the duration of its affordability term.
11. SKHHP shall reimburse the Contractor for satisfactory completion of the requirements
specified in the Contract and upon Contractor's submission to SKHHP of invoices and
supporting documentation of eligible expenses.
12. A covenant is recorded ensuring affordability for at least 50 years, with unit size,
number of units, and affordability distribution established prior to executing Contract.
Special Conditions
1. SKHHP will provide project funds to the Contractor in the form of a secured grant with
no repayment. Final Contract terms shall be determined prior to release of funds and
must be approved by SKHHP staff. The grant will be secured by a deed of trust recorded
against the property to ensure that Contractor maintains the project's affordability and
target population. Contractor shall not be required to repay the grant so long as it
maintains these project requirements.
2. Timeframe for funding commitment. The funding commitment continues for thirty-six
(36) months from the date of Council approval and shall expire thereafter if all
Page 17 of 22
31
conditions are not satisfied. An extension may be requested to SKHHP staff no later
than sixty (60) days prior to the expiration date. At that time, the Agency will provide a
status report on progress to date and expected schedule for start of construction and
project completion. The SKHHP Executive Board will consider a twelve-month extension
only on the basis of documented, meaningful progress in bringing the project to
readiness or completion. At a minimum, the Contractor will demonstrate that all capital
funding has been secured or is likely to be secured within a reasonable period of time.
3. SKHHP funds shall be used solely for the rehabilitation of the property to include, but
not be limited to, the following, unless otherwise approved by SKHHP staff:
a. landscape improvements
b. staircase repairs
c. installation of new railings
d. seal coating the parking lot
e. upgrading external lighting
f. recoating tenant decks
g. installation of new siding
h. applying exterior paint
i. replacing gutters and downspouts
j. replacing windows
k. replacing sliding glass doors
I. replacing unit entry doors
m. replacing baseboard heating with energy -efficient heating systems
4. SKHHP and Contractor shall agree to the specifics on what will be funded prior to
executing a contract to ensure eligibility of expenses in alignment with RCW 82.14.540
and to mitigate cost -overruns.
5. Five housing units shall serve households earning up to 35% AMI, ten units for
households up to 40% AMI, and five units for households up to 50% AMI for the
duration of the term of affordability.
6. Should cost overruns occur that require funds above SKHHP's contribution, sponsor will
work towards filling the funding need through their capital budget process or seeking
funds through other sources.
Page 18 of 22
32
ATTACHMENT 1: Economic Summaries of Recommended Projects
Project: Mercy Housing NW — Kent Multicultural Village
Proposed Funding Sources by Amounts and Status
Funding source
Proposed Amount
Status
SKHHP
$1,000,000
Applied
4% LIHTC Equity
$48,849,278
Applied
King County (2022)
$5,000,000
Committed
GP Equity
$1,000
Self -funded
Permanent Loan
$23,500,000
Applied
State HTF
$8,000,000
Awarded
Deferred Fee
$4,850,000
Self -funded
Amazon Grant
$2,000,000
Applied
Amazon Loan
$11,369,574
Applied
Private: Non -Residential
$7,841,869
Will Apply
State: Non -Residential
$10,735,000
Will Apply
Federal: Non -Residential
$2,552,000
Will Apply
County: Non -Residential
$3,150,000
Will Apply
Debt: Non -Residential
$5,474,735
Will Apply
TOTAL
$134,323,456
Proposed Use of Funds and Total Residential Cost Per Unit
Proposed use
Amount
Per Unit
Land acquisition
$384,504
--
Construction costs
$98,698,553
--
Soft costs
$12,761,870
--
Development costs
$8,372,636
--
Other development costs
$4,002,261
--
Community facility
$9,402,356
--
4% bond issuance
$701,276
--
TOTAL
$134,323,456
--
TOTAL NON-RESIDENTIAL
$29,753,604
--
TOTAL RESIDENTIAL (Includes common areas)
$104,569,852
$525,476
Residential Cost Per Square Foot
Item
Amount
Residential square footage
246,019
Residential development cost
$104,569,852
Cost per square foot
$425.05
Residential Cost Per Unit Based on Unit Size
Unit Size
Number of Units
Unit Square Footage
Cost per Unit
Average Studio
54
392
$166,619
Average 1-bedroom
40
484
$205,724
Average 2-bedroom
65
710
$301,785
Average 3-bedroom
40
982
$417,399
Common area and other residential
spaces, including parking
--
85,700
$36,426,785
Page 19 of 22
33
Project: LIHI — Skyway Affordable Housing and Early Learning Center
Proposed Funding Sources by Amounts and Status
Funding source
Proposed Amount
Status
SKHHP
$2,800,000
Applied
State HTF
$7,465,748
Will apply in fall 2024
King County 2023
$2,500,000
Awarded $2.1M
9% LIHTC 1
$13,080,144
Will apply in fall 2024
King County 2022 (pre -development funds)
$2,500,000
Received
Direct Appropriations -Federal 1
$700,000
Received
Direct Appropriations -State
$3,000,000
Received
Wyncote Foundation
$1,000,000
Received
PSTAA
$300,000
Received
TOTAL
$36,295,892
Proposed Use of Funds and Total Residential Cost Per Unit
Proposed use
Amount
Cost per Unit
Land acquisition
$2,041,000
--
Construction costs
$26,761,254
--
Soft costs
$4,624,073
--
Development costs
$1,737,565
--
Other development costs
$1,132,000
--
TOTAL
$36,295,892
--
TOTAL NON-RESIDENTIAL
$3,250,000
--
TOTAL RESIDENTIAL (Includes common areas)
$33,045,892
$600,834
Residential Cost Per Square Foot
Item
Amount
Residential square footage
50,608
Residential development cost
$33,045,892
Cost per square foot
$652.97
Residential Cost Per Unit Based on Unit Size
Unit Size
Number of Units
Unit Square
Footage
Cost per Unit
Average studio square footage
12
400
$261,188
Average 1-bedroom square footage
19
516
$336,932
Average 2-bedroom square footage
13
816
$532,823
Average 3-bedroom square footage
11
900
1 587,673
Common area and other residential spaces,
including parking
--
12,121
$7,914,649
Page 20 of 22
34
Project: TWG — Pandion at Star Lake
Proposed Funding Sources by Amounts and Status
Funding source
Proposed Amount
Status •
SKHHP
$2,856,000
Applied
LIHTC & Energy Credits
$31,023,163
Applied
Amazon
$22,000,000
Applied
Permanent Loan
$15,340,000
Applied
State HTF
$4,218,915
Applied -Not
awarded in 2023
King County
$4,500,000
Applied -Not
awarded in 2023
Deferred Development Fee
$2,355,370
Self -funded
Non -Residential Commercial
$4,856,260
--
TOTAL
$87,149,708
Proposed Use of Funds and Total Residential Cost Per Unit
Proposed use
Amount
Per Unit
Land acquisition
$3,435,523
--
Construction costs
$63,626,629
--
Soft costs
$9,689,519
--
Development costs
$6,902,268
--
Other Development costs
$3,154,594
--
4% Bond Issuance
$341,175
--
TOTAL
$87,149,708
--
TOTAL NON-RESIDENTIAL
$4,856,260
--
TOTAL RESIDENTIAL (Includes common areas)
$82,293,448
$489,841
Residential Cost Per Square Foot
Item
Amount
Residential square footage
180,197
Residential development cost
$82,293,448
Cost per square foot
$456.68
Residential Cost Per Unit Based on Unit Size
Unit Size
Number of Units
Unit Square
Footage
Cost per Unit
Average Studio
30
381
$173,995
Average 1-bedroom
78
615
$280,858
Average 2-bedroom
24
950
$433,846
Average 3-bedroom
36
1,095
$500,064
Common area and other residential spaces,
including parking
--
59,772
$27,296,676
Page 21 of 22
35
Project: Multi -Service Center - Victorian Place II
Proposed Funding Sources by Amounts and Status
Funding source
Proposed Amount
Status
SKHHP
$777,306
Applied
Multi -Service Center
$7,819
Self -Funded
TOTAL
$785,125
Proposed Use of Funds and Total Residential Cost Per Unit
Proposed use
Amount
Per Unit
Title document recording fees
$5,000
$250
Rehabilitation costs
$780,125
$39,006
TOTAL
$785,125
$39,256
Page 22 of 22
36
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's review
Council review
3/11/24
AY
3/25/24
AY
4/1/24
AY
ITEM INFORMATION
ITEM NO.
4.B.
STAFF SPONSOR: ANDY YOUN
ORIGINAL AGENDA DATE: 3/11/24
AGENDA ITEM TITLE City Clerk's Office request to increase 0.5 FTE to 1.0 FTE to mitigate the impacts of
Public Records Requests
CATEGORY ® Discussion
Mtg Date 3/11/24
® Motion
Mtg Date 3/18/24
❑ Resolution
Mtg Date
❑ Ordinance
Mfg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ® Admin Svcs ❑ DCD
Finance ❑ Fire ❑ P&R ❑ Police ❑ PW
SPONSOR'S
SUMMARY
Public agencies are required to comply with the Public Records Act or face heavy sanctions
and fines for failures to comply. The City Clerk's Office is requesting to increase an existing
budgeted 0.5 FTE to 1.0 FTE that will be absorbed in the department's budget to provide
the necessary support to handle public records requests.
REVIEWED BY
❑ Trans&Infrastructure Svcs ❑ Community Svcs/Safety ® Finance & Governance ❑ Planning & Community Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 2/26/24 COMMITTEE CHAIR: QUINN
RECOMMENDATIONS:
SPONSOR/ADMIN. Administrative Services/City Clerk's Office
COMMITTEE Majority Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
AMOUNT BUDGETED
APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
3/11/24
Committee of the Whole cancelled
3/25/24
4/1/24
MTG. DATE
ATTACHMENTS
3/25/24
Informational Memorandum dated 2/20/24
Staffing Levels Chart (added after Committee)
Minutes from the 2/26 Finance and Governance Committee meeting
4/1/24
37
38
City of Tukwila
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
TO: Finance & Governance Committee
BY: Andy Youn, Deputy City Clerk
CC:
Mayor McLeod
Marty Wine, Interim City Administrator
Christy O'Flaherty, Records Governance Manager/ City Clerk
DATE: February 20, 2024
SUBJECT: Public records requests mitigation and
request to increase current 0.5 FTE to 1.0 FTE
ISSUE
Public agencies are required to comply with the Public Records Act or face substantial sanctions
for failures to respond to or provide records. The City Clerk's Office is requesting Council approval
for additional staffing to support the heavy workload associated with public records requests.
BACKGROUND
In 2006, the Public Disclosure Statutes were recodified as the Public Records Act (identified in
RCW 42.56), changing the landscape of government transparency by requiring public agencies
to make public records (physical or electronic) available upon request. The Public Records Act
requires that the City respond within 5 business days to all requests for public records either by
making the record available, providing a reasonable estimate of availability, requesting
clarification, or denying the request if there is a statutory exemption.
The City Clerk's Office coordinates complex, multi -departmental records requests as the
department responsible for administering the City's Records Management Program, and for
managing governmental transparency to the public. These requests are often in concurrence with
pending litigation against the City and require close coordination with the Attorney's Office to
mitigate legal and financial risk to the City. The City Clerk's Office also reports annually to the
State Legislature's Joint Legislative Audit and Review Committee (JLARC) on required
performance metrics related to public records retention, management, and disclosure.
The City Clerk is currently the Public Records Officer for the City and oversees Citywide
compliance with the Public Records Act. This includes:
• Interpreting and distributing the request to staff
• Corresponding with requestors
• Managing the Citywide search for, review of, and delivery of responsive records
• Managing the redaction of exempt and sensitive information
• Database tracking
• Records retention and destruction
• Providing guidance to departmental liaisons on handling departmental requests
• Coordinating with the City Attorney's Office on redactions, exemptions,
third -party notices, and Nissen Affidavits.
39
INFORMATIONAL MEMO
Page 2
DISCUSSION
Since staff began tracking public records data in
2010, the total number of requests (Figure 1)
received annually by the Clerk's Office has
steadily increased, with a record number of
requests received in 2019 (161 total). The total
number of requests received does not
sufficiently describe the scope of work involved
in responding, which may range from providing
a simple link to an existing document, to
providing thousands of email records with
attachments that first need to be reviewed by
Clerk's Office staff for responsiveness and to
ensure exempt information is not released.
Figure 2 shows an approximation of the number
of electronic records reviewed by staff and
provided to requestors over the past few years.
The number of files is considerable but does not
fully capture other components such as
metadata, multiple tabs in an excel document,
and files that contain hyperlinks. In other words,
this is an undercount of the true scope of work.
Staff Time on Public Records Requests Annually
(Clerk's Office)
1689
1463
Hours (annual)
1800
1600
1400
1200
1000
800
600
400
200
0
O
Figure 3
years and have "commercialized" the process
records on behalf of their business clients.
requestor of municipal records with an average
individuals (30%), and other requestors (7%).
0
N
0
O
N
0
0
00 0,
0 0 a -I
0
N N N
ON N N
O O 0
N N N
1628
0
N
180
160
140
120
100
80
60
40
90
93
Number of Requests Annually
(Clerk's Office)
161
.•74 7
65
O
0
N
0
N
N
0
N
CO
0
0
N
147
131
ii.1213
131 130
18
Lf1
0
N
0
N
N.
0
N
11
CO
0
N
0
N
0
N
O
N
N
0
N
N
N
0
N
M
N
0
N 1
Figure 1
Total Files Reviewed
2017
12,214
2018
131,508
2019
40,638
2020
11,688
2021
19,444
2022
61,058
2023
43,867
Figure 2
Requests can often take weeks or months to
fulfill due to the litigious nature and
complexity, and available staff capacity. As
shown in Figure 3, the growing scope of
requests over the years has resulted in a
steady increase in the total staff time spent on
Public Records Requests. Two major factors
have contributed to the sharp increase in time
spent on requests: 1) The growing reliance on
technology and software systems over the
years has resulted in more digital records that
become part of the public record and therefore
must be provided in response to requests; and
2) Requestors have grown savvier over the
of public records requests by seeking municipal
Business organizations are the most frequent
of 43% of requests, compared to law firms (20%),
While the goal is to complete requests within the legal 5-day timeframe upon receipt, as shown in
Figure 4, less than half of requests were closed within 5 business days. Requests took an average
of 18 days to fulfill in 2023. In 2023, the longest request took 182 days for City Clerk staff to
complete and would have taken longer had the requestor not cancelled the request due to the
resolution of their pending litigation against the City.
2017
2018
2019
2020
2021
2022
2023
% Requests closed in 5 days
77%
68%
73%
50%
56%
57%
57%
Average days to close
11
18
16
23
19
20
18
40 Figure 4
INFORMATIONAL MEMO
Page 3
Responding to Public Records Requests can be labor intensive, but noncompliance can result in
hefty sanctions, fines, and legal fees imposed against the City as well as the loss of public trust.
Courts often fine public agencies for failure to recognize requests, interpreting requests too
narrowly, performing inadequate searches, and failure to provide records in a timely manner.
Some examples of the heavy cost of failure to comply with the Public Records Act include:
• A $575,000 settlement in 2014 by Snohomish County to resolve a lawsuit brought by a
non-profit group that submitted more than 275 requests. The County failed to respond
timely to 4 of the requests.
• A 2019 Pierce County settlement of $950,000 with former employee Nissen, after an 8-
year case to disclose then -County Prosecutor's text messages. This landmark case
found that work -related text messages from the private phone were required to be
disclosed, resulting in the implementation of "Nissen affidavits" as records.
• The Port of Quincy paid $350,000 in 2022 to a requestor as a result of missing one of
four emails requesting public records that had landed in the spam folder.
Continued media coverage on the Public Records Act, an influx of new technologies, the growing
demand for access to government records, and ever -evolving records requirements by the State
all translate to increased workload impacts when it comes to public records requests. There are
also immediate impacts based on current events and activities: Requests are often submitted in
conjunction with pending or potential litigation, in response to issues happening locally or
nationally, actions taken (or not taken) by the City, and many other scenarios.
Over the years, the urgent need for high-level staffing dedicated to public records request has
become very apparent. As a service that is both legally mandated and high -risk, the escalating
impact of public records requests on public agencies cannot be overstated, especially given the
fluctuating and unpredictable nature of this workload. While the Clerk's Office has sought to
absorb public records request workload on top of existing core functions, this approach is
becoming unsustainable and presents legal and financial risk for the City.
FINANCIAL IMPACT
Prior to budget cuts, the Clerk's Office used available departmental funds towards public records
request support. However, due to the minimal available hours and high level of responsibility
required in this support role, maintaining staffing has proven difficult. As part of the 2023-2024
Biennial Budget, the Council approved funding for a 0.5 FTE (full time equivalent) Public Records
Request Assistant. The City Clerk's Office is requesting this existing position be increased to 1.0
FTE to provide the necessary support to handle the workload associated with public records
requests at a high level, given the legal and financial risks, evolving mandates, complexity of
reporting requirements, and sensitive information handled in this position. The costs associated
with this position are estimated to be $94,000 (salary and benefits) and will be absorbed in the
current City Clerk's budget using available salary savings.
RECOMMENDATION
The Committee is being asked to approve an increase from 0.5 FTE to 1.0 FTE for the City
Clerk's Office for staffing of Public Records Requests, to be included in the year-end budget
amendment, and forward this item for consideration to the March 11 Committee of the Whole
and March 18 Regular Meeting Consent Agenda.
ATTACHMENTS
None.
41
Current Staffing Levels - City Clerk's Office (5.5 FTEs)
The City Clerk's Office is a small team of 5.5 FTEs responsible for day-to-day administration of
essential public services and governmental transparency to the public. This office oversees the
key Citywide functions of Public Access, Public Meetings, and Public Records.
Each member of the team oversees and/or executes core Citywide programs that require
coordination with all departments, from Contract Processing, Records Management, Legislative
Development, Policy Development, Public Records Requests, Council Agendas, and Public
Meetings. In addition, the City Clerk's Office is considered the central information center for the
City and handles essential public services such as acceptance of claims and litigation,
distribution of Citywide mail, recording of documents to the County, noticing of bids, legal
notices, publications for all City departments, and more.
Position
Core duties (LEAN)
City Clerk
(1.0 FTE)
Management/Supervision of Dept; Focus on oversight of
PRRs, Agendas, Council meetings, DRC, Records
Management Program, Legal Notices, Essential public
services, Budgeting, Risk Management
Deputy City Clerk*
(1.0 FTE)
Same as above with focus on execution of assigned core
programs/services; Legislative development, TMC codification
Records Program
Coordinator
(1.0 FTE)
Management of Citywide Records Program (retention,
destruction, archiving); back-up of other departmental core
functions
Electronic Content Mgmt.
Coordinator
(1.0 FTE)
Management of Digital Records Center; Complex digitization
projects (as-builts, permits); agenda compilation; Importing
contracts
Administrative Support
Coordinator*
(1.0 FTE)
Front desk services; mail/postage; staffing of Council
meetings; agenda production; contract processing;
Acceptance of claims/litigation/appeals
Public Records Request
Assistant
(0.5 FTE)
Public records request support
*As of March 2024, these positions will be vacant due to internal promotions, bringing staffing
levels down to 3.5 FTEs.
Proposed Staffing Levels - City Clerk's Office (6 FTEs)
City Clerk/
Records Governance Manager
Deputy City Clerk/
Legislative Manager
Deputy City Clerk/
Public Records Request Manager
Records Program Coordinator
Electronic Content
Management Coordinator
Administrative Support
Coordinator
42
City of Tukwila
City Council Finance & Governance Committee
Meeting Minutes
February26, 2024 - 5:30 p.m. - Hybrid Meeting; Hazelnut Conference Room & MS Teams
Councilmembers Present:
Staff Present:
I. BUSINESS AGENDA
De'Sean Quinn, Chair; Tosh Sharp, Jovita McConnell
Vicky Carlsen, Tony Cullerton, Laurel Humphrey, Marty Wine, Pete
Mayer, Christy O'Flaherty, Andy Youn
A. City Clerk Staffing Request - Public Records Response
Staff is seeking Council approval of additional .5 FTE to handle the workload associated with
public records requests.
Committee Recommendation
Divided recommendation with Councilmembers Quinn and McConnell in favor of the proposal
and Councilmember Sharp opposed. Forward to March 11, 2024 Committee of the Whole.
B. Financial Policies
Committee members discussed the current Financial Policies as adopted by Resolution 2014.
Staff plans to return in March with a modification to Section 5(b) with regard to grant
applications.
Committee Recommendation
Return to Committee.
C. December 2023 and January 2024 General Fund Expenditure Update
Staff presented the report.
Committee Recommendation
Discussion only.
MISCELLANEOUS
The meeting adjourned at 6:32 p.m.
Committee Chair Approval
43
44
COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's review
Council review
3/25/24
VC
ITEM INFORMATION
ITEM NO.
4.C.
STAFF SPONSOR: VICKY CARLSEN
ORIGINAL AGENDA DATE: 3/25/24
AGENDA ITEM TITLE 2025-2026 Budget Development Kick Off
CATEGORY ® Discussion
Mtg Date 3/25/24
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ Admin Svcs ❑ DCD ® Finance ❑ Fire ❑ P&R ❑ Police ❑ PW
SPONSOR'S
SUMMARY
2025-2026 Budget Development Kick Off and Discussion
REVIEWED BY
❑ Trans&Infrastructure Svcs ❑ Community Svcs/Safety ❑ Finance & Governance ❑ Planning & Community Dev.
❑ LTAC
DATE:
❑ Arts Comm.
❑ Parks Comm. ❑ Planning Comm.
COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR/ADMIN. Finance
COMMITTEE
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
AMOUNT BUDGETED
APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
3/25/24
MTG. DATE
ATTACHMENTS
3/25/24
Info Memo dated 3/25/24
Proposed Budget Calendar
Power Point Presentation
45
46
City of Tukwila
Thomas McLeod, Mayor
Finance Department - Vicky Carlsen, Director
INFORMATIONAL MEMORANDUM
TO: Committee of the Whole
CC: Mayor McLeod
FROM: Vicky Carlsen, Finance Director
BY: Tony Cullerton, Deputy Finance Director
DATE: March 25, 2024
SUBJECT: 2025 — 2026 Budget Kickoff Meeting
SUMMARY
This presentation aims to apprise the council of the commencement of the 2024-2025 biennial
budget preparation process. Finance will provide regular updates on budget information from
now until budget adoption.
Tonight's presentation marks the beginning of the 2025-2026 budget process. It will cover
various aspects including the Budget Process, Roles, Council Touchpoints, Community
Engagement Overview, and details on Priority Based Budgeting (PBB).
ATTACHMENTS
Proposed 2025-2026 Biennial Budget Calendar
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
47
48
City of Tukwila Proposed 2025-2026 Biennial Budget Calendar
*Note* To make the best use of Council time, Workshops may take place during COW, Regular Meeting,
or Special Work Sessions, depending on schedules and other legislative items.
February
March
Budget Steering Committee convenes- Program list reviewed and refined.
Programs rescored as necessary. Drafting of 2025-26 City Work Plan
Launch Phase 1 Community Engagement Process- Balancing Act sorting
budget buckets, priorities, trade-offs, etc.
Council workshop: Budget Kick -Off, overview of Budget Process, critical
path, community engagement plan, budget drivers/assumptions, Mayor's
Goals/Priorities
April
Budget Call / Kick -Off w/ City Staff- budget worksheets sent to Departments
Budget Steering Committee convenes
Budget Liaison Group convenes- begins supporting Department budget
development
Council Workshop- Program Budgeting 101; Capital Budgeting 101
April 1-30
Launch Phase 2 Community Engagement Process- ETC statistically valid
community survey and Boards/Commissions outreach
Financial Sustainability Plan Recommendations Presentation:
• Council guidance regarding Financial Sustainability Committee
recommendations
• Preliminary Council guidance/assumptions
Budget Steering Committee convenes
April 15— May 15
Launch Phase 3 Community Engagement Process- Balancing Act testing
Financial Sustainability Committee recommendations
Department Narratives Due to Finance
May
Draft budgets due for Finance, Debt, Fund 611 Firemen's Pension, Fund 302
Urban Renewal, Fund 303 General Improvements, Fund 304 Fire
Improvements, Fund 305 Public Safety Plan, Fund 109 Drug Seizure Fund)
Council Workshop
• Results and recommendations from Community Engagement Process;
• Utility Cost of Service Analysis
•
Department Goals and Objectives due
Budget Steering Committee convenes
Page I 1
49
May - July
Department heads prepare budget estimates (on/before the 4th Monday in
September)
• Departments incorporate City Work Plan items into Department Work
Plans
June
Department Head meetings w/City Administrator & Finance Director to
review budget proposals & work plans
Department Accomplishments Due
Department Year -End Projections Due
Draft budgets due for:
Finance- Fund 502- Employee Healthcare, Finance- Fund 503- LEOFF 2 Healthcare,
Fund 301- Parks, Trails & Open Space, Fund 103- Residential Streets, Fund 104-
Bridges & Arterial Streets, Fund 401- Water, Fund 402- Sewer, Fund 412- Surface
Water
July
Department Head meetings w/City Administrator & Finance Director to
review budget proposals
CPI-W released by DOR
Council Workshop
• Overview of Capital Improvement Program (CIP) including: capital
(Residential Street, Bridges & Arterial Streets, Parks, Trails & Open Space, City
Facilities)project funds, utility funds (Water, Sewer, Surface Water), and golf course
Finance provides Departments salary/benefits information
Draft budgets due for:
City Council, Mayor's Office, Mayor's Office- Economic Development, Mayor's
Office- Lodging Tax, Administrative Services- Human Resources, Administrative
Services- Information Technology, Administrative Services- City Clerk,
Administrative Services- Human Services, Administrative Services -
Communications, Finance, Parks and Recreation- Parks, Rec and Golf, DCD, Court,
Police, Public Works, Public Works -Streets
August
2023-24 Budget Amendments due to Finance
2025-26 Work Plan Draft finalized
Finance reconciles and builds 2025-26 Preliminary Draft Operating and
Capital Budget
Finance presents 2025-26 Preliminary Draft Operating and Capital Budget
(no later than first Monday in October per RCW)
Council Workshop- Overview of Funds
Special Revenue (Drug Seizure, Lodging Tax), General (Contingency), Debt Service (LTGO,
UTGO, LID #33, Guaranty), Internal Service (ER&R, Self -Insured Healthcare, LEOFF 1
Retiree, Firemen's Pension)
September
Council Workshop- Presentation of Preliminary 2025-26 Budget
Page 12
50
Council Workshops- Program Presentations- Aligned & Innovative Services,
Strategic & Responsive Engagement, Connected & Vital Infrastructure,
Accessible Mobile Networks
October
Council Workshops- Program Presentations (Healthy & Sustainable
Community, Integrated Operations, Safe & Resilient and Capital
Improvement Program
Council Workshop & Public Hearing
Council Workshops- guidance, deliberations, and direction on finalizing
budget proposal
Revised 2025-26 Proposed Operating and Capital Budget Released
November
Council Workshop(s) & Public Hearings
• Tax Levy Legislation (property tax legislation must be sent to the County by
November 30)
• Budget Legislation- 2023-24: Ordinance amending 2023-24 Budget
• Budget Legislation -2025-26: Ordinance adopting 2025-26 Budget
• Fire and Park Impact Fees
• Consolidated Fee Schedule
Council Meeting
• Adoption of 2025-25 Biennial Operating and Capital Budget (must be
adopted by December 31, 2024
December
Final 2025-26 Adopted Operating and Capital Budget + Budget Brief
Released
Page 13
51
52
CITY OF TUKWILA 2025-26
1
11110141.1.1b DEVELOPMENT PROCESS
March 25, 2024- City Council Meeting The City of opportunity, the community of choice.
Budget Kick -Off Presentation
01
01
Marty Wine
Interim City Administrator
Vicky Carlsen
Finance Director
Tony Cullerton
Deputy Finance Director
Today's Briefing
• Budget Process, Roles & Council Touch Points
• Community Engagement Overview
• About Priority Based Budgeting
ICity of Tukwila 2025-26 Budget Development 2 I
Budget Process per State Law
The City of Tukwila's budget procedures are mandated by RCW 35A.33
• October 2-Mayor submits a proposed budget to the City Council
• November- City Council conducts public hearings on the proposed budget
• By December 31- Council makes any adjustments and adopts by ordinance
• January- Final adopted budget published & distributed
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 18.
City of Tukwila 2025-26 Budget Development 3
01
07
Tukwila Budget Process
• The City Council, Mayor, City Administrator, Department Directors, City staff
and residents all participate in the budget process
• Budget planning includes reviews of
• City Strategic Plan
• Policy Priorities for the next biennium
• City Financial Policies
• Final estimates of revenues, expenditures and capital improvement investments
• The six -year capital improvement program is developed in conjunction with the
biennial budget.
• The preliminary budget is presented to the Council and the final budget is
adopted in late November or early December.
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 18.
City of Tukwila 2025-26 Budget Development 4
Tukwila Budget Process- cont'd
• The adopted biennial budget takes effect on January 1st of odd numbered years.
• Biennial budgeting vs. annual budgeting
• Mid -Biennium Reviews
• Occurs in both budget years.
• The City Council authorizes transfers within funds and must approve by ordinance any
amendments that increase the total for the fund.
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 18 - "
City of Tukwila 2025-26 Budget Development 5
U7
v
01
00
Financial Structure of the City Budget
GOVERNMENTAL FUND TYPES
General Fund: Supports general operations of the City. Taxes are
the principal source. Accounts for all City resources except those
required to be accounted for in a different fund.
Special Revenue Funds: Revenues which are legally or
administratively restricted for special purposes.
Debt Service Funds: Account for resources necessary to pay
principal and interest on general long-term debt.
Capital Projects Funds: Accounts for financial resources to be
used for the acquisition or construction of capital items, facilities,
or infrastructure. Not to be used for maintenance or repairs.
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 25.
PROPRIETARY FUND TYPES
Enterprise Funds: Accounts for operations that are
financed and operated in a manner similar to business
enterprises.
Internal Service Funds: Used to account for
operations or services to other departments on a cost
reimbursement basis.
FIDUCIARY FUNDS
Account for assets held by the City in a trustee capacity and
cannot be used to support the City's own programs.
City of Tukwila 2025-26 Budget Development 6
Budget Inputs
System
Plans
Transportation;
Parks; Water;
Sewer;
Stormwater
Utility Rate
Stu +ie� Council &
Community
Engagement
Facilities
Studies &
Recommendations
Mayor's
Priorities
City
Strategic
Plan
City Comp
Plan Update
City Work
Plan 6-Year
Financial
Forecast
Statistically
Valid Polling
Results
Business &
Strategic
Plans
Financial
Sustainability
Committee
,commPrictlions
Operating and Capital Budget
Proposal
City of Tukwila 2025-26 Budget Development 7
U1
Q)
O
Strategic Foundation
City Strategic Plan Goals
• Acommunityof
inviting Neighborhoods and
Vibrant Business Districts
• A solid foundation for all
Tukwila residents
• A diverse & regionally competitive
economy
• A high performing &
effective organization
• A positive community identify
& image
City Comprehensive Plan
Land Use
• Housing Element
• Economic Development
• Natural Environment
• Parks, Recreation & Open Space
• Regional Centers
• Utilities
• Capital Facilities
City of Tukwila 2025-26 Budget Development 8
Critical Milestones
MARCH
BUDGET
KICK-OFF
JULY
Dep't Budget
Submittals
6 Year Financial
Forecast & Town
Hall
NOVEMBER
Public Hearings
& Final Budget
Adoption
APRIL-MAY
Community
Engagement &
Feedback
AUGUST
Budget
Document
Prep
DECEMBER
Final Adopted
Budget
Distributed
APRIL-MAY
Policy Review &
Council
Guidance
SEPTEMBER
Preliminary
Budget
Proposal
Program
Presentations
JUNE
Capital&
Transportation
Plans
OCTOBER
Program
Presentations
Revised
Proposed
Budget
City of Tukwila 2025-26 Budget Development 9
0)
0)
N
Budget
Development
Roles
Mayor
• Sets Priorities and Goals
Council
• Establishes strategic goals & priorities to provide
framework for budget
• Sets policy and adopts the final budget
Staff
• Informs and develops the budget
Community
• Financial Sustainability Committee
• Boards/Commissions
• Community Members
ICity of Tukwila 2025-26 Budget Development 10 I
Budget Outreach & Engagement
Seeking community priorities:
• uommunity Survey (ETC Institute - statistically valid sample)
• Balancing Act tool
• Board/Commissions outreach
• Council Town Hall
City of Tukwila 2025-26 Budget Development 11
a)
W
Q)
Budget Outreach & Engagement
Phase 1- Community Feedback
• Program Based Budgeting
• Budget Priorities & Trade-offs
Phase 3- Boards & Commissions
• Program Based Budgeting
• Budget Priorities & Trade-offs
Phase 2- Statistically Valid Survey
• Needs and Priorities
Phase 4- City Staff & Council
• Program Based Budgeting
• Budget Priorities & Trade-offs
City of Tukwila 2025-26 Budget Development 12
Foundations
of Priority
Based
Budgeting
•
• Prioritize services
• Do the important things
well
• Question past patterns of
spending
• Know the true cost of
doing business
• Provide transparency of
community priorities
• Provide transparency of
service impact:
• Demand accountability for
results
• Evaluating programs based
on their influence in
achieving the Strategic Goals
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 30
City of Tukwila 2025-26 Budget Development 13
6)
01
Priority Based Budgeting (PBB)
A priority -driven budgeting process that demonstrates how resources are
allocated to the programs and services that provide the greatest value to
our residents.
PBB
• Drives alignment between the City Strategic Plan and community
priorities
• Encourages strategic decision -making regarding funding, adding
and/or eliminating programs and services
Source: City of Tukwila, WA 2023-2024 Biennial Budget, P. 30.
City of Tukwila 2025-26 Budget Development 14
Program
Alignment &
Categorization
Aligned & Innovative Strategic & Responsive
Services
Accessible
Mobile Networks
Engagement
Healthy & Sustainable
Community
y
Connected & Vital
Infrastructure
Integrated
Operations
Safe &
Resilient
"W-
City of Tukwila 2025-26 Budget Development 15
6)
Q)
00
Program Alignment and Categorization
Aligned & Innovative
Services
E4
Strategic & Responsive
Engagement
Prioritizes timely and reliable solutions efficiently and effectively across internal
programs and services
Endeavors to foster an inclusive community characterized by open communication,
transparency and equitable access to municipal services for all residents
g g Strategically allocates resources to enhance assets and infrastructure and ensures the
88� provision of safe and sustainable utilities for both residential and commercial
Connected&Vital communities
Infrastructure
Accessible
Mobile Networks
Prioritizes investments in mobility and well -maintained transportation routes
throughout the city, encompassing streets, sidewalks, and trails, to facilitate safe,
accessible and efficient travel for both residents and visitors
City of Tukwila 2025-26 Budget Development 16
Program Alignment and Categorization
Healthy & Sustainable
Community
Integrated
Operations
Naha
owe
..
Safe &
Resilient
Values a healthy environment and exemplifies a well planned and structurally sound
city, offering a diverse array of cultural and recreational amenities that supports an
active community.
Offers comprehensive support in financial management, technology integration, and
policy development to various program areas within the city.
Committed to fostering a structurally sound community, ensuring both residents and
visitors feel safe and secure.
City of Tukwila 2025-26 Budget Development 17
0)
CO
v
O
Next Steps
• Program list refined and programs re -scored as needed
• Public outreach to gather budget input & feedback
• Department heads prepare budget estimates
• Council Budget Workshop — Overview of capital projects
• City Council Town Hall
• Finance & Administration review department budgets;
community feedback evaluated
• Mayor presents draft budget to Council
ICity of Tukwila 2025-26 Budget Development 18
CITY OF TUKWILA 2025-26
x 1
1 BUDGE
DEVELOPMENT PROCESS
te41
Ana
it
The City of opportunity, the community of choice.
72
UPCOMING MEETINGS AND EVENTS
MARCH — APRIL 2024
City Council meetings and Council Committee meetings will be conducted in a hybrid model, with in -person and virtual attendance available.
MAR 25 MON
MAR 26 TUE
MAR27 WED
MAR 28 THU
MAR 29 FRI
MAR 30 SAT
➢ Finance and
Governance
5:30 PM
City Hall — Hazelnut
Conference Room
Hybrid Meeting
➢Transportation and
Infrastructure Services
5:30 PM
6300 Building —
Duwamish Conference
Room
Hybrid Meeting
➢ City Council
Committee of the Whole
Meeting
7:00 PM
City Hall Council
Chambers
Hybrid Meeting
FREE TAX HELP
IN -PERSON / ONLINE OR
FILE YOUR OWN TAXES
Onsite locations are open
through April 21!
See below for Westfield
Southcenter Mall information.
Click here for information.
APR1 MON
APR 2 TUE
➢ Work Session
5:30 PM
City Hall Council
Chambers
Hybrid Meeting
➢ City Council
Regular Meeting
7:00 PM
City Hall Council
Chambers
Hybrid Meeting
➢ Library Advisory Board
6:00 PM
Hybrid Meeting
➢ Arts Commission
6:00 PM
Hybrid Meeting
APR 3 WED
King County
Library System
FREE EMPLOYMENT
SERVICES AND SKILLS
TRAINING PROGRAMS
Reasonable accommodation
for people with disabilities
is available by request.
Email access@kcls.org at
least 7 days before the
event.
1:00 PM - 3:00 PM
Tukwila Library
14380 Tukwila Intl Blvd
Click here for information.
➢ Planning -Commission
Cancelled
Give Blood = Save 3 Lives
DONATE AND
ENTER TO WIN A
SCHWINN ADULT
ELECTRIC BIKE!
It takes 1,000 donors a day
to sustain a blood supply
for patients in our
community.
Click here to schedule an
appointment.
Or call 1-800-398-7888.
APR4 THU
➢ Equity and Social
Justice Commission
5:30 PM
Hybrid Meeting
R
Recology
RE -THINK WASTE: EARTH
DAY ART, PHOTO AND
VIDEO CONTEST
Students can submit video
clips, photos, drawings or art
with a waste reduction theme
for the chance to win prizes
up to $350!
Submissions due today!
Click here for information.
Or, email
ajarvis@recology.com.
APR 5 FRI
United
Way
FREE TAX HELP
IN -PERSON / ONLINE OR
FILE YOUR OWN TAXES
Onsite locations are open
through April 21!
See below for Westfield
Southcenter Mall information.
Click here for information.
THE MUSEUM OF FLIGHT
FREE SENSORY DAY
EVENT
For adults and families of
children, teenagers and young
adults with disabilities. Guests
will get access to the Museum
during off -hours.
Pre -registration required.
8:00 AM — 10:00 AM
Click here for information.
TUKWILA CITY OF
OPPORTUNITY
SCHOLARSHIP
Scholarships will be awarded to
individuals enrolled for
undergraduate study in
community colleges, colleges,
trade schools and universities.
Applications due today!
Click here for information.
APR 6 SAT
BM Explore
- Seattle
11=0 Southside
FREE SAVINGS PASS
Sign up now and get the
mobile pass delivered
instantly. You will get savings
at attractions, restaurants,
retailers and more. Both one-
time and repeating offers allow
you to save all
year long!
Click here for information.
CITY HALL & 6300 BUILDINGS ARE OPEN TO THE PUBLIC MONDAYS, WEDNESDAYS & THURSDAYS 8:30 AM — 4:00 PM
SUMMER CAMP REGISTRATION OPENS APR 1
Join us at Camp Tukwilly and make some memories that will last a lifetime! Camp is for children entering grades K-5 at the beginning of 2024-2025 school
year. Click here for information.
CALL FOR UTILITY BOX ARTISTS APPLICATIONS DUE APR 26
We are seeking artists to create artwork for this year's Utility Box Art Program. Artists will receive a budget of up to $1,000. Click here for information.
RE -THINK WASTE: EARTH DAY ART, PHOTO & VIDEO CONTEST FOR STUDENTS SUBMISSIONS DUE MAR 29
Submit your creative work to win prizes up to $350. Click here for information. Or, email ajarvis@recology.com.
TUKWILA CITY OF OPPORTUNITY SCHOLARSHIP APPLICATIONS DUE MAR 31
Scholarships will be awarded to individuals enrolled for undergraduate study in community colleges, colleges, trade schools and universities. Click here for information.
NEIGHBORHOOD WATCH GROUP HELP
Police Community Engagement Coordinator can help to create a neighborhood watch group in your neighborhood and apartments. Click here to email Brooke Lamothe.
FREE CRIME PREVENTION SURVEY FOR BUSINESSES TO ENHANCE SECURITY
Police Community Engagement Coordinator will visit your business to conduct a security assessment and recommend making your business more secure. Allow up to 2 weeks for
an appointment date confirmation. Click here to make an appointment.
FOOD BANK OPENS: TUESDAYS, THURSDAYS AND SATURDAYS 10:00 AM — 2:30 PM 3118 S 140TH ST, TUKWILA
T� ire. VOLUNTEERS — In need of volunteers for food packaging or food distributions. To volunteer, click here to sign up.
DONORS — Please donate at tukwilapantry.org/please-donate/. Donations can be dropped off on Tuesday -Saturday from 8 AM —11 AM or by appointment.
Click here for a current list of items in need.
STILL WATERS SNACK PACK NEEDS YOUR DONATIONS AND VOLUNTEER HELP!
SnackPack distributes food bags on Fridays to Tukwila students in need. Click here for the Snack Pack list.
VOLUNTEERS NEEDED ON WEDNESDAYS. Pack snacks every Wednesday at 9:30 AM.
To volunteer, email Stillwatersfamilyservices@gmail.com. To deliver food, click here to register with Tukwila School District.
Please donate to feed our Tukwila kids. Click here to donate online or mail checks to Still Waters, PO Box 88984, Tukwila WA 98138.
United
Way
GET FREE TAX HELP IN -PERSON / ONLINE OR FILE YOUR OWN TAXES
Free tax filing assistance if you make less than $80,000 a year (or $96,000 for non -single filers). In -person locations will run through Apr 21.
Please arrive no later than 45 minutes BEFORE closing time. First come, first serve. Click here for information.
SOUTHCENTER MALL (NEAR SEARS) 11:00 AM -7:00 PM THURSDAYS, FRIDAYS, SATURDAYS AND SUNDAYS
K ! N G
COUNTY
LIBRARY
SYSTEM
FREE ONLINE TUTORING AND HOMEWORK HELP FOR GRADES K THRU 12
Use a computer, tablet, smartphone or home phone to connect with tutors by phone or on Zoom. Click here for information.
FUN ACTIVITIES AND OTHER EVENTS AT TUKWILA LIBRARY
Tukwila Library offers many resources and services. Click here for information.
FREE EMPLOYMENT SERVICES AND SKILLS TRAINING PROGRAMS
This is a monthly event hosted by Puget Sound Training Center. Reasonable accommodation for people with disabilities is available by request. Click here for information.
73
Tentative Agenda Schedule
MEETING 1 —
REGULAR
MEETING 2 — MEETING 3 —
C.O.W. REGULAR
MEETING 4 —
C.O.W.
MARCH 4
See below links for the
agenda packets to view
the agenda items:
March 4, 2024
Work Session
March 4, 2024
Regular Meeting
MARCH 11
See below links for the
agenda packets to view
the agenda items:
March 11, 2024
Committee of the Whole
Meeting
MARCH 18
See below links for the
agenda packets to view
the agenda items:
March 18, 2024
Work Session
March 18, 2024
Regular Meeting
MARCH 25
See below links for the
agenda packets to view
the agenda items:
March 25, 2024
Committee of the Whole
Meeting
MEETING 1—
REGULAR
MEETING 2 —
C.O.W.
MEETING 3 —
REGULAR
MEETING 4 —
C.O.W.
APRIL 1
APRIL 8
SPECIAL ISSUES
- An ordinance updating the
City's Tax Codes.
- Resolution revising the City
Council rules of procedure.
APRIL 15
WORK SESSION
- Update on Annual Overlay Program.
- Update on Neighborhood Traffic
Calming Program.
- Introduction to Transportation
Improvement Program.
REGULAR MEETING
PRESENTATION
- Tourism presentation.
- State of the City Address.
UNFINISHED BUSINESS
- An ordinance updating the City's Tax
Codes.
- Resolution revising the City Council
rules of procedure.
NEW BUSINESS
Authorize the Mayor to sign a
settlement participation form through
the One Washington Memorandum of
Understanding between Washington
municipalities to accept allocation for
Opioid Funds received from entities
within the pharmaceutical supply plan.
APRIL 22
PUBLIC HEARING
An ordinance amending rezone
regulations and appeal body.
SPECIAL ISSUES
An ordinance amending rezone
regulations and appeal body.
Special Meeting to follow
Committee of the Whole
Meeting.
WORK SESSION
Robert's Rules Training.
REGULAR MEETING
APPOINTMENTS / REAPPOINTMENTS
Appointments and reappointments to Boards
and Commissions.
CONSENT AGENDA
- Authorize the Mayor to sign a grant agreement
with the Washington State Department of
Transportation (WSDOT) through the National
Highway System Asset Management Program for
Orillia Road South pavement repairs and overlay,
in the amount of $1,309,000.00.
- Authorize the Mayor to sign a grant agreement
with the Washington State Department of
Transportation (WSDOT) through the National
Highway System Asset Management Program for
Interurban Avenue South pavement repairs and
overlay, in the amount of $4,958,000.00.
- Authorize the Mayor to sign a grant agreement
with the Washington State Department of
Transportation (WSDOT) through the National
Highway System Asset Management Program for
Boeing Access Road pavement repairs and
overlay, in the amount of $3,990,000.00.
- Authorize the Mayor to sign a grant agreement for
waste reduction and recycling education, in the
amount of $50,000.00.
- Authorize the Mayor to sign a contract for a
commercial organics collection and diversion
outreach project, in the amount of $100,000.00.
- Authorize the purchase of LED King Lumineers,
in the amount of $104,176.62.
- Authorize the Mayor to sign a grant agreement
with the Washington State Department of
Commerce for the Washington Electric Vehicle
Charging Program (WAEVCP), in the amount of
$46,000.00.
- Award a bid and authorize the Mayor to sign a
contract for the Stormwater Outfalls WQ Retrofit
project, in the amount of $850,000.00.
UNFINISHED BUSINESS
- Authorize the Mayor to sign an Interlocal
Agreement with the Cities of Burien and Maple
Valley for an organics project.
- Resolution authorizing South King Housing and
Homelessness Partners' Housing Projects using
funds contributed by the City to the Housing
Capital Fund.
- Public Works Operations Facility, Phase 2 Update.
- Approve 1.0 FTE (full-time employee) for the City
Clerk's Office for staffing of Public Records
Requests, to be included in the year-end budget
amendment.
74