HomeMy WebLinkAboutTIS 2024-04-22 Item 2B - Final Acceptance - 2023 Overlay and Repair with Lakeside IndustriesCity of Tukwila
Public Works Department - Hari Ponnekanti, Director/City Engineer
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Hari Ponnekanti, Public Works Director
BY: Michael Ronda, Project Manager
CC: Mayor Tom McLeod
DATE: April 19, 2024
SUBJECT: 2023 Overlay and Repair Project - Proj #82310401 & 92210301, Contract No. 23-112
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of insurance, retainage and performance bond.
BACKGROUND
The Notice to Proceed for Contract No. 23-112 with Lakeside Industries Inc, of Issaquah, Washington
was issued on July 10. 2023 for the 2023 Overlay and Repair Project and S 119th St. Bridge Raised
Crosswalk Project. The project included pavement overlay and repair of ten sites within the City of
Tukwila. For the 2023 Overlay, the Raised Crosswalk and RRFB installation in Allentown was included
under a separate schedule to take advantage of economies of scale for this Neighborhood Traffic
Calming, ADA and Complete Streets work. The attached maps show the areas of work.
ANALYSIS
Construction was Physically Complete on March 6, 2024, after an extended delay for RRFB equipment
(specifically the poles). The budget for the 2023 Overlay & Repair was $1,296,481.50. There was no
explicit contingency dedicated to this project. No formal Change Orders were executed for the work
since all changes fit within existing bid items or were performed under allowable Force Account items.
Under -runs were primarily due to reduced quantities of Asphalt Roadway Planing and Reuse, Crushed
Surfacing Base Course and various Force Account Items not used. Major Overrun items included
Asphalt Pavement Removals Including Haul and Planing Bituminous Pavement.
Construction Contract Amount $1,296,481.50
Over -runs 61,712.11
Under -runs (260,155.02)
Total Amount to be Paid $ 1,098,038.59
RECOMMENDATION
Council is being asked to formally accept the project as complete and authorize the release of the
insurance, retainage and performance bonds, subject to standard claim and lien release procedures, for
the 2023 Overlay and Repair Project construction contract with Lakeside Industries, Inc. in the final
amount of $1,098,038.59 and consider this item on the Consent Agenda at the May 6, 2024 Regular
Meeting.
ATTACHMENT - Project Site Maps, Project Under/Over Sheet
45
2023 Tukwila Overlay Proo,am\CADD\Sheet=lles\
K: APROJECTS\TUKWILA\9TU
2023 ANNUAL OVERLAY & REPAIR PROGRAM
PROJECT NO. 82310401
MAY 2023
MAYOR
ALLAN EKBERG
DIRECTOR OF PUBLIC WORKS/ CITY ENGINEER
HARI PONNEKANTI, P.E.
SCHEDULE OF DRAWINGS
SHEET NO. SHEET TITLE
SCHEDULE A
1
2 -4
5-6
7
8
9 - 10
11
12 - 13
14
15 -16
17 - 18
19
SCHEDULE B
20 - 26
COVER
DETAILS
51ST AVE S
S 139TH ST
S 137TH ST
32ND AVE S
33RD PL S
S 140TH ST
35TH AVE S
S 142ND ST
37TH AVE S
S 144TH ST
S 119TH ST BRIDGE/ 42ND AVE
S RAISED CROSSWALK AND RRFB
LEGEND
EXISTING:
-9-
0
O
0
e
0
EB
CITY COUNCIL
CYNTHIA DELOSTRINOS JOHNSON, COUNCIL PRESIDENT ,,,,n
KATHY HOUGARDY
DE'SEAN QUINN
KATE KRULLER
THOMAS MCLEOD
MOHAMED ABDI
TOSH SHARP
WATER VALVE
GAS VALVE
FIRE HYDRANT
TELEPHONE MANHOLE
FIBER OPTIC MANHOLE
POWER POLE
MONUMENT
SANITARY SEWER MANHOLE
WATER METER
CATCH BASIN
JUNCTION BOX TYPE 1,2
SIGNAL CONTROLLER CABINET
TREE
CRUSHED GRAVEL
CEMENT CONC. PAVEMENT
VEGETATION
FENCELINE
ROW LIMITS (SURVEY)
ROW LIMITS (GIS)
PROPOSED:
NNNNNNNNNNNN
32ND AVE S &
33RD PL S
140TH ST & 35TH
AVE S & S 142ND
ST & 37TH AVE S
THICKENED EDGE
PAVEMENT REPAIR
HMA OVERLAY
HMA PAVEMENT SECTION
CRUSHED SURFACING TOP COURSE
CEMENT CONC. PAVEMENT
GRINDING AND PAVING LIMITS
SAWCUT
INLET PROTECTION PER WSDOT STD
LANDSCAPE AREA
SUFACE FLOW DIRECTION
PLAN 1-40.20
S 137TH ST &
S 139TH ST &
51ST AVE S
S 144TH ST &
PUBLIC' WORKS DEFT_
*ENGINEERING * STREETS *WATER* SEWER*
designed
drawn
checked
proj eng
proj dir
field bk no
by
MKE
EH
BMC
date
03/23
03/23
03/23
KPG
PS OMAS
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
Tacoma 1 Wenatchee I KPG.com
BID
DOCUMENTS
2023 ANNUAL OVERLAY &
REPAIR PROGRAM
COVER
no date
revisions
1
26
s.
file no 9TUK0ID400 COV.DWG
scale
04/2023 /
K:APROJECTS\TUKWILA\9TUK010400-2023 Tukwila Overlay Program \CADD\119th CAD files\9—UK000
SCHEDULE B- S 119TH ST BRIDGE/ 42ND
AVE S RAISED CROSSWALK AND RRFB
PROJECT NO. 92210301
APRIL 2023
MAYOR
ALLAN EKBERG
DIRECTOR OF PUBLIC WORKS
HARI PONNEKANTI, P.E.
CITY ENGINEER
HARI PONNEKANTI, P.E.
SCHEDULE OF DRAWINGS
SHEET NO. SHEET TITLE
SCHEDULE B
20 COVER
21 DETAILS
22 RRFD DETAILS
24 EXISTING CONDITIONS & SITE PREPARATION
25 42ND AVE S - ROADWAY PLAN
26 42ND AVE S - RAMP DETAIL
LEGEND
EXISTING:
4
O
O
0
e
O
0
CITY COUNCIL
TCYNTHIA DELOSTRINOS JOHNSON, PRESIDENT
KATHY HOUGARDY
DE'SEAN QUINN
KATE KRULLER
THOMAS MCLEOD
MOHAMED ABDI
TOSH SHARP
WATER VALVE
GAS VALVE
FIRE HYDRANT
TELEPHONE MANHOLE
FIBER OPTIC MANHOLE
POWER POLE
MONUMENT
SANITARY SEWER MANHOLE
WATER METER
CATCH BASIN
JUNCTION BOX TYPE 1,2
SIGNAL CONTROLLER CABINET
TREE
CRUSHED GRAVEL
CEMENT CONC. PAVEMENT
VEGETATION
FENCELINE
ROW LIMITS (SURVEY)
ROW LIMITS (GIS)
PROPOSED:
SD
CEMENT CONCRETE PAVEMENT
GRAVEL/ CSTC
FULL DEPTH HMA PAVEMENT
DETECTABLE WARNING SURFACE
SAWCUT LINE
DRAINAGE STRUCTURE
STORM SEWER PIPE
STORM DRAINAGE STRUCTURE LABEL
INLET PROTECTION PER WSDOT STD PLAN 1-40.20
S 119TH ST
CROSSING
PUBLIC' WORKS DEFT_
*ENGINEERING *STREETS *WATER* SEWER*
designed
drawn
checked
proj eng
proj dir
field bk no
by
MKE
MKE
BMC
date
04/23
04/23
04/23
KPG
PS OMAS
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
Tacoma 1 Wenatchee I KPG.com
BID
DOCUMENTS
SCHEDULE B- S 119TH ST BRIDGE/ 42ND
AVE S RAISED CROSSWALK AND RRFB
COVER
20
26
file no 9TUK000-COV.DWG
scale
no date
revisions
2/17/23 /
y11LAk
oJ�4 Nr„MONTHLY CONSTRUCTION
1 °ram••=
,90t.
ESTIMATE
KPG
PSOMAS
Project:
Contractor:
Address:
Owner:
Pay Period:
2023 Overlay Program
Lakeside Industries, Inc.
6505 226th PI SE STE 200
Issaquah, WA, 98027-9805
City of Tukwila
1-Dec-23 to
Date:
Estimate No:
City Project No.:
City Contract No.:
Original Contract Amount:
30-Mar-24 Current Authorized Amount:
3/8/2024
6 - Final
82310401, 92210301
23-112
$ 1,296,481.50
$ 1,296,481.50
City Budget Nos.:
PREVIOUS
AMOUNT
TOTAL DUE
THIS ESTIMATE
TOTAL AMOUNT
TO DATE
A. Schedule A Items (see attached)
$923,818.03
$1,050.00
$924,868.03
B. Schedule B Items (see attached)
$145,408.72
$27,761.84
$173,170.56
C. Total Contract Amount Due
$1,069,226.75
$28,811.84
$1,098,038.59
D. Retainage (None - Bond #107847235)
$0.00
$0.00
$0.00
E. Amount Due Contractor (C - D)
$1,069,226.75
$28,811.84
$1,098,038.59
I HEREBY CERTIFY THAT THIS IS A TRUE AND
CORRECT ESTIMATE; THAT THE WORK WAS
ACTUALLY PERFORMED AND MATERIAL
FURNISHED; AND THAT THE AMOUNT IS JUST
AND DUE ME.
I HAVE REVIEWED THIS ESTIMATE, APPROVED:
BELIEVE IT TO BE TRUE AND
CORRECT AND RECOMMEND
PAYMENT OF THE AMOUNT SHOWN.
A
Lakeside Industries, Inc.
Date KPG Psomas City of Tukwila
48
File: 2023 Overlay PE_#6-Final.xlsx - Tab: Signature Summary
CONTRACT INFORMATION ESTIMATE INFORMATION SCHEDULE INFORMATION
2023 Overlay Program PAY APPLICATION START DATE 12/1/2023 INITIAL CONTRACT TIME 60
��
�Jr'YlIIA
PAY APPLICATION END DATE 3/30/2024
ESTIMATE No. 6 - Final CHANGE ORDER DAYS 0
p
Contractor: Lakeside Industries, Inc. ORIGINAL CONTRACT AMOUNT ($): $1,296,481.50 AUTHORIZED CONTRACT TIME 60
COT Proj No.: 82310401, 92210301 CHANGE ORDER ADJUSTMENT ($): $0.00
P M
4 ~
� r
KPG Proj No.: 9TUK101400 TOTAL UNCUMBERED AMOUNT ($): $1,296,481.50 :':
Total Previous
Pay Estimate 06
Item No.
Description
Plan
Quantity
Units
Unit Price
Contract Total
Previous
Qty
Previous Cost
Qty
Cost
Qty to Date
Cost to Date
Percent Complete
to Date
SCHEDULE A - 2023 ANNUAL OVERLAY & REPAIR PROGRAM
ROADWAY IMPROVEMENTS
(Yellow Shading - Common Costs)
Al
UNEXPECTED SITE CHANGES
1
FA
$ 55,500.00
$55,500.00
0.12
6,643.77
$0.00
0.12
$6,643.77
11.97%
A3
RESOLUTION OF UTILITY CONFLICTS
1
FA
$ 6,000.00
$6,000.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
A4
SPCC PLAN
1
LS
$ 550.00
$550.00
1.00
550.00
$0.00
1.00
$550.00
100.00%
A5
MOBILIZATION
1
LS
$ 94,000.00
$94,000.00
1.00
94,000.00
$0.00
1.00
$94,000.00
100.00%
A6
PROJECT TEMPORARY TRAFFIC CONTROL
1
LS
$ 140,500.00
$140,500.00
1.00
140,500.00
$0.00
1.00
$140,500.00
100.00%
A24
EROSION & WATER POLLUTION CONTROL
1
FA
$ 10,750.00
$10,750.00
0.00
0.00_
$0.00
0.00
$0.00
0.00%
A7
ASPHALT PAVEMENT REMOVAL INC. HAUL
220
SY
$ 65.00
$14,300.00
482.66
31,372.90
$0.00
482.66
$31,372.90
219.39%
Al
REMOVAL OF STRUCTURES & OBSTRUCTION
1
LS
$ 7,500.00
$7,500.00
1.00
7,500.00
$0.00
1.00
$7,500.00
100.00%
All
ASPHALT PAVEMENT PLANING & REUSE
4090
SY
$ 6.00
$24,540.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
Al2
ROADWAY EXCAVATION INCL. HAUL
90
CY
$ 125.00
$11,250.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
A13
CRUSHED SURFACING TOP COURSE
640
TN
$ 100.00
$64,000.00
258.89
25,889.00
$0.00
258.89
$25,889.00
40.45%
A14
PAVEMENT REPAIR EXCAVATION INCL. HAUL
50
CY
$ 150.00
$7,500.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
A15
HMA CL. 1/2" PG 58H-22
2340
TN
$ 125.00
$292,500.00
2369.52
296,190.00
$0.00
2369.52
$296,190.00
101.26%
A16
HMA FOR PAVEMENT REPAIR CL 1/2" PG 58H-22
100
TN
$ 150.00
$15,000.00
113.79
17,068.50
$0.00
113.79
$17,068.50
113.79%
A17
TEMPORARY PAVEMENT
180
TN
$ 100.00
$18,000.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
A18
THICKENED EDGE
2630
LF
$ 1.50
$3,945.00
3130.70
4,696.05
$0.00
3130.70
$4,696.0500
119.04%
A19
PLANING BITUMINOUS PAVEMENT
14630
SY
$ 5.50
$80,465.00
17793.15
97,862.33
$0.00
17793.15
$97,862.33
121.62%
A20
ADJUST MANHOLE
14
EA
$ 670.00
$9,380.00
14.00
9,380.00
$0.00
14.00
$9,380.00
100.00%
A21
ADJUST CATCH BASIN
41
EA
$ 670.00
$27,470.00
13.00
8,710.00
$0.00
13.00
$8,710.00
31.71%
A22
ADJUST WATER VALVE
11
EA
$ 495.00
$5,445.00
9.00
4,455.00
$0.00
9.00
$4,455.00
81.82%
A23
ADJUST WATER METER BOX
6
EA
$ 670.00
$4,020.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
A25
INLET PROTECTION
57
EA
$ 85.00
$4,845.00
57.00
4,845.00
$0.00
57.00
$4,845.00
100.00%
A29
WHEEL STOP
21
EA
$ 220.00
$4,620.00
21.00
4,620.00
$0.00
21.00
$4,620.00
100.00%
A30
ADJUST MONUMENT CASE & COVER
1
EA
$ 495.00
$495.00
1.00
495.00
$0.00
1.00
$495.00
100.00%
A35
ADJUST JUNCTION BOX
1
EA
$ 555.00
$555.00
0.00
0.00
$0.00
0.00
$0.00
0.00%
CO - XX Place Holder
$ 0.00
$0.00
0.00
0.00
$0.00
0.00
$0.00
;RANGE TOTAL
$0.00
$0.00
Subtotal Roadway Improvements
$903,130.00
$754,777.55
$0.00
Sales Tax Roadway Improvements (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Roadway Improvements
$903,130.00
$754,777.55
$0.00
SIDEWALKS
A2
ADA FEATURES SURVEYING
1
LS
$ 4,400.00
$4,400.00
1.00
$4400.00
$0.00
1.00
$4,400.00
100.00%
A8
CEMENT CONC. CURB REMOVAL INCL. HAUL
580
LF
$ 29.00
$16,820.00
408.20
$11837.80
$0.00
408.20
$11,837.80
70.38%
A9
CEMENT CONC. SIDEWALK REMOVAL INCL. HAUL
340
SY
$ 57.00
$19,380.00
350.46
$19976.22
$0.00
350.46
$19,976.22
103.08%
A26
CEMENT CONC. CURB & GUTTER
480
LF
$ 46.00
$22,080.00
570.00
$26220.00
$0.00
570.00
$26,220.00
118.75%
A27
CEMENT CONC. DRIVEWAY
100
SY
$ 94.00
$9,400.00
44.26
$4160.44
$0.00
44.26
$4,160.44
44.26%
49
.6
Item No.
Description
Plan.
Quantty
Units
Unit Price
Contract Total
Previous
Qty
Previous Cost Qty
Cost
Qty to Date
Cost to Date
Percent Complete
to Date
A28
CEMENT CONC. DRIVEWAY ENTRANCE
30
SY
$ 110.00
$3,300.00
11.66
$1282.60
$0.00
11.66
$1,282.60
38.87%
A31
CEMENT CONC. SIDEWALK
310
SY
$ 83.00
$25,730.00
313.23
$25998.09
$0.00
313.23
$25,998.09
101.04%
A32
CEMENT CONC. CURB RAMP TYPE PARALLEL
4
EA
$ 3,300.00
$13,200.00
4.00
$13200.00
$0.00
4.00
$13,200.00
100.00%
A33
CEMENT CONC. CURB RAMP TYPE PERPENDICULAR A
1
EA
$ 3,300.00
$3,300.00
1.00
$3300.00
$0.00
1.00
$3,300.00
100.00%
A34
CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION A
1
EA
$ 3,300.00
$3,300.00
II 1.00
$3300.00
$0.00
1.00
$3,300.00
100.00%
CO - XX Place Holder
$ 0.00
$0.00_ 0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00
$0.00
Subtotal
Sidewalks
$120,910.00
$113,675.15
$0.00
Sales Tax Sidewalks
(N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment
Sidewalks
$120,910.00
$113,675.15
$0.00
TRAFFIC CONTROL DEVICES
A36
SPEED CUSHION
3
EA
$ 3,800.00
$11,400.00
3.00
$11400.00
$0.00
3.00
$11,400.00
100.00%
A37
RAISED PAVEMENT MARKER TYPE 1
102
EA
$ 4.25
$433.50
106.00
$450.50
$0.00
106.00
$450.50
103.92%
A38
RAISED PAVEMENT MARKER TYPE 2
14
EA
$ 8.25
$115.50
16.00
$132.00
$0.00
16.00
$132.00
114.29%
A39
PERMANENT SIGNING
1
LS
$ 19,600.00
$19,600.00,
1.00
$19600.00
$0.00
1.00
$19,600.00
100.00%
A40
PLASTIC SHARED LANE SYMBOL
6
EA
$ 357.00
$2,142.00
6.00
$2142.00
$0.00
6.00
$2,142.00
100.00%
A41
PLASTIC STOP LINE
106
LF
$ 10.50
$1,113.00,
144.00
$1512.00
$0.00
144.00
$1,512.00
135.85%
A42
PLASTIC CROSSWALK LINE
210
SF
$ 6.50
$1,365.00
906.00
$5889.00
$0.00
906.00
$5,889.00
431.43%
A43
A43 PLASTIC LINE, 41N
1010
LF
$ 2.35
$2,373.50
0.00
$0.00
$0.00
0.00
$0.00
0.00%
A44
A44 PAINT LINE, 41N
3680
LF
$ 0.85
$3,128.00
4471.00
$3800.35
$0.00
4471.00
$3,800.35
121.49%
A45
A45 PAINTED ACCESS PARKING SYMBOL SPACE
1
EA
$ 110.00
$110.00
1 2.00
$220.00
$0.00
2.00
$220.00
200.00%
A46
A46 TEMPORARY PAVEMENT MARKINGS
2680
LF
$ 0.90
$2,412.00
2577.20
$2319.48
$0.00
2577.20
$2,319.48
96.16%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
CHANGE
TOTAI
$0.00
$0.00
$0.00
Subtotal Traffic
Control Devices
$44,192.50
$47465.33
$0.00
Sales Tax Traffic Control Devices
(N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Traffic
Control Devices
$44,192.50
$47465.33
$0.00
PROPERTY RESTORATION
A47
PROPERTY RESTORATION
1
FA
$ 13,500.00
$13,500.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
A48
BLACK VINYL COATED CHAIN LINK FENCE
20
LF
$ 395.00
$7,900.00
20.00
$7900.00
$0.00
20.00
$7,900.00
100.00%
CO - XX Place Holder
$ 0.00
$0.00[
0.00
$0.00
$0.00
0.00
$0.00
CHANGE TOTAL
$0.00
$0.00
$0.00
Subtotal Property Restoration
$21,400.00
$7900.00
$0.00
Sales Tax Roadside Development (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Property Restoration
$21,400.00
$7900.00
$0.00
FRANCHISE UTILITY ITEMS
A49
ADJUST GAS VALVE 2
EA
$ 495.00
$990.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
'MANGE T $0.00
$0.00 $0.00
Subtotal Franchise Utility Items
$990.00
$0.00
$0.00
Sales Tax Franchise Utility Items(N/A Rule 171)
$0.00
S0.00
50.00
Net Payment Franchise Utility Items
$990.00
$0.00
$0.00
Totals (Schedule A - Rule 171 - All Taxes Included) $1,090,622.50 $923,818.03 $0.00 $923,818.03
50
Item No.
Description
Plan
Quantity
Units
Unit Price
Contract Total
Previous Previous Cost
Qty
Qty Cost
Qty to Date
Cost to Date
Percent Complete
to Date
SCHEDULE B- S 119TH ST BRIDGE/42ND AVE S RAISED CROSSWALK AND RRFB
ROADWAY IMPROVEMENTS
B6
REMOVAL OF STRUCTURES & OBSTRUCTION
1
LS
$ 16,000.00
$16,000.00
1.00
$16000.00
$0.00
1.00
$16,000.00
100.00%
B7
ROADWAY EXCAVATION INCL. HAUL
70
CY
$ 125.00
$8,750.00
35.81
$4476.25
$0.00
35.81
$4,476.25
51.16%
B8
CRUSHED SURFACING TOP COURSE
45
TN
$ 115.00
$5,175.00
38.74
$4455.10
$0.00
38.74
$4,455.10
86.09%
B9
HMA CL. 1/2" PG 58H-22
33
TN
$ 175.00
$5,775.00
64.45
$11278.75
$0.00
64.45
$11,278.75
195.30%
B10
CEMENT CONCRETE PAVEMENT
20
CY
$ 825.00
$16,500.00
13.44
$11088.00
$0.00
13.44
$11,088.00
67.20%
B11
MODIFY EXISTING STORM DRAINAGE SYSTEM
1
LS
$ 12,750.00
$12,750.00
0.42
$5350.00
$0.00
0.42
$5,350.00
41.96%
B27
RESOLUTION OF UTILITY CONFLICTS
1
LS
$ 2,750.00
$2,750.00 1.00
$2750.00
$0.00
1.00
$2,750.00
100.00%
CO - XX Place Holder
$ 0.00
$0.001 0.00
$0.00
$0.00
0.00
$0.00
„HANGt
W U I /
$0.00
$0.00
$0.00
Subtotal Roadway
Improvements
$67,700.00
$55,398.10
$0.00
Sales Tax Roadway Improvements
(N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Roadway
Improvements
$67,700.00
$55,398.10
$0.00
SIDEWALKS (Yellow Shading - Common Costs)
B1
UNEXPECTED SITE CHANGES
1
FA
$ 5,000.00
$5,000.00
0.01
$67.20
$0.00
0.01
$67.20
1.34%
B2
CONSTRUCTION SURVEYING
1
LS
$ 2,200.00
$2,200.00
1.00
$2200.00
$0.00
1.00
$2,200.00
100.00%
B3
SPCC PLAN
1
LS
$ 550.00
$550.00
1.00
$550.00
$0.00
1.00
$550.00
100.00%
B4
MOBILIZATION
1
LS
$ 20,000.00
$20,000.00
1.00
$20000.00
$0.00
1.00
$20,000.00
100.00%
B5
PROJECT TEMPORARY TRAFFIC CONTROL
1
LS
$ 32,500.00
$32,500.00
1.00
$32500.00
$0.00
1.00
$32,500.00
100.00%
B12
EROSION CONTROL & WATER POLLUTION PREVENTION
1
FA
$ 7,500.00
$7,500.00
0.00
$0.00
$0.00
0.00
$0.00
0.00%
B13
INLET PROTECTION
2
EA
$ 85.00
$170.00
2.00
$170.00
$0.00
2.00
$170.00
100.00%
B15
CEMENT CONC. TRAFFIC CURB & GUTTER
60
LF
$ 72.00
$4,320.00
96.00
$6912.00
$0.00
96.00
$6,912.00
160.00%
B16
CEMENT CONC. TRAFFIC CURB
50
LF
$ 72.00
$3,600.00
1 44.00
$3168.00
$0.00
44.00
$3,168.00
88.00%
B17
CEMENT CONC. DRIVEWAY ENTRANCE
20
SY
$ 138.00
$2,760.00
25.55'
$3525.90
$0.00
25.55
$3,525.90
127.75%
B20
CEMENT CONC. SIDEWALK
50
SY
$ 83.00
$4,150.00
62.69
$5203.27
$0.00
62.69
$5,203.27
125.38%
B25
BOLLARDS
2
EA
$ 1,650.00
$3,300.001
0.00
$0.00
$0.00
0.00
$0.00
0.00%
B26
METAL SAFTEY RAILING
50
LF
$ 315.00
$15,750.00
40.00
$12600.00
$0.00
40.00
$12,600.00
80.00%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
'CHANGE TOTAL
$0.00
$0.00
$0.00
Subtotal Sidewalks
$101,800.00
$86,896.37
$0.00
Sales Tax Sidewalks (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Sidewalks
$101,800.00
$86,896.37
$0.00
TRAFFIC CONTROL DEVICES
B18
RPM,TYPE 1
32
EA
$ 4.25
$136.00
24.00
$102.00
$0.00
24.00
$102.00
75.00%
B19
RPM,TYPE 2
4
EA
$ 8.25
$33.00
13.00
$107.25
$0.00
13.00
$107.25
325.00%
B22
PERMANENT SIGNING
1
LS
$ 1,900.00
$1,900.00
1.00
$1900.00
$0.00
1.00
$1,900.00
100.00%
B23
PLASTIC CROSSWALK LINE
80
SF
$ 6.50
$520.00
70.00
$455.00
$0.00
70.00
$455.00
87.50%
B24
PLASTIC YIELD LINE SYMBOL
14
EA
$ 55.00
$770.00
10.00
$550.00
$0.00
10.00
$550.00
71.43%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
$0.0t,
$0.00 $0.00
Subtotal Traffic Control Devices
$3,359.00
$3,114.25
$0.00
Sales Tax Traffic Control Devices (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Traffic Control Devices
$3,359.00
$3,114.25
$0.00
51
Item No.
Description
Plan
Quantity
Units
Unit Price
Contract Total
Previous Previous Cost
Qty
Qty Cost
Qty to Date
Cost to Date
Percent Complete
to Date
TRAFFIC SIGNALS
B21
SOLAR POWERED RRFB SYSTEM, COMPLETE
1
LS
$ 27,500.00
$27,500.00[
0.00
$0.00 1.00
$27500.00
1.00
$27,500.00
100.00%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00
$0.00
Subtotal Traffic Signals
$27,500.00
$0.00
$27,500.00
Sales Tax Traffic Signals (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Traffic Signals
$27,500.00
$0.00
$27,500.00
PROPERTY RESTORATION
B14
PROPERTY RESTORATION
1
FA
$ 5,500.00
$5,500.00
I 0.00
$0.00 ' 0.05
$261.84
0.05
$261.84
4.76%
CO - XX Place Holder
$ 0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00 $0.00
Subtotal Property Restoration
$5,500.00
$0.00
$261.84
$0.00
Sales Tax Property Restoration (N/A Rule 171)
$0.00
$0.00
$0.00
Net Payment Property Restoration
$5,500.00
$0.00
$261.84
Totals (Schedule B - Rule 171 - All Taxes Included) $205,859.00 $145,408.72 $27,761.84 $173,170.56
Totals (Schedule A&B) $1,296,481.50 $1,069,226.75 $27,761.84 $1,096,988.59
52