HomeMy WebLinkAboutTIS 2024-04-22 Item 2F - Change Order #4 - Riverton Creek Flapgate Removal with RL Alia CompanyTO:
FROM:
BY:
DATE:
SUBJECT:
City of Tukwila
Pith k Works Deportment - Hari Ponnekanti, Director/City Engineer
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
Mayor Thomas McLeod
Hari Ponnekanti, Public Works Director
Joshua Hopkins, Surface Water Project Manager
April 19, 2024
Surface Water Fund - Riverton Creek Flapgate Removal Project
Project Number 99830103, Contract No. 20-052
Change Order No. 4
ISSUE
Approve Change Order No. 4 to Contract No. 20-052 with R.L. Alia Company
BACKGROUND
This project restored fish access to Riverton Creek and previously inaccessible rearing habitat at the
confluence with the Duwamish River.
DISCUSSION
This change order accounts for overruns ($34,339.83) incurred in association with CO #3 Tasks 3.1 & 3.2;
mark-ups ($25,292.03) on labor, equipment, materials, and sub -contractors not included in CO#3
Estimate; and sales tax ($6,621.96) for the overruns and mark-ups. Tasks 3.1 and 3.2 cost overruns were
due to unforeseen complications with production rates associated with site conditions and the complexity
of fabricating and fitting custom replacement cover plates. Mark-ups were inadvertently omitted from CO
#3 Estimate. CO#4 includes 10% contingency ($6,631.06). The total cost of CO#4 is $72,285.08.
FISCAL IMPACT
Change order No. 4 includes compensation estimated at $72,285.08, raising the tax -inclusive contract from
$1,653,593.86 to $1,884,286.37. This project cost (72,285.08) over contingency, in addition to CO#3 costs over
contingency ($8,080.71), will be funded through the Utility Revenue ($80,365.79).
Bid Amount
Contingency (10%)
Change Orders #1-3
Change Order #4
Utility Revenue
Funding from 205 Levee Certification
Grants (CWM, Opp, RCO)
Total
Encumbered
$1,503,267.15
$150,326.71
$158,407.42
$72,285.08
Budget
$517,611.79
$344,780.57
$1, 021, 894.00
$1,884,286.36 $1,884,268.36
RECOMMENDATION
The Mayor, as signatory of the original contract, is being asked to approve and sign Change Order No. 4
with an estimated increase of $72,285.08 and 18 working days.
Attachments:
• CIP pg 93.pdf
• Change Order No. 4.
125
W:1PW Eng1PROJECTSIA- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)1Construction\Change Orders\CO#4
Sheet 1 of 1
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 4
DATE: April 11, 2024 BUDGET NO.: 412.98.594.382.65.00
PROJECT NO.: 99830103 CONTRACT NO.: 20-052
PROJECT NAME: Riverton Creek Flapgate Removal Project
TO: R.L. Alia Company
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not
included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions:
A. The following change, and work affected thereby, are subject to all contract stipulations and covenants;
B. The rights of the "Owner" are not prejudiced;
C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and
D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change
orders.
CHANGE: See Attached Exhibit "A"
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefore the prices shown above and below.
ACCEPTED: Date Contractor
By Title
Original Contract (with tax) $ 1,503,267.15 APPROVED BY THE CITY OF TUKWILA
Previous Change Orders & Contingency $ 308,734.13 Date
This Change Order (with tax) $ 72,285.08 By
Mayor
REV. CONTRACT AMOUNT $ 1,884,286.36
Original Contract Time: 115 Working Days
Additional Contract Time for previous Change Orders: 63 Days City Engineer
Additional Contract Time for this Change Order: 18 Days
Updated Contract Time: 196 Working Days
ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w/encumbrance)
Contractor (2 of 2) Project Management File
1?2ge 1 of 4
PROJECT NO.: 99830103
PROJECT NAME: Riverton Creek Flapgate Removal Project
DESCRIPTION OF WORK
CONTRACT NO.: 20-052
This change order accounts for overruns incurred in association with CO #3 Tasks 3.1 and 3.2; mark-ups on labor, equipment,
materials, and subcontractors for Tasks 3.1, 3.2, and 3.3 (not included in CO#3 Estimate); and sales tax for the overruns and mark-
ups.
• 3.1 Replacement Cover Plates for Tie -Back Penetrations by Force Account
• 3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment by Force Account
• 3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates by Lump Sum
3.1 Replacement Cover Plates for Tie -Back Penetrations
This work consists of mobilization, temporary pedestrian traffic control, site preparation and site restoration, temporary scaffolding,
removing existing cover plates, welding, and grout tubes, preparing sheet pile wall surface to bare metal, prime coat application, and
installing new cover plates per provided Cover Plate Details (Sheet 19A, File No. S1.3A).
3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge Southwest Bridge Abutment
This work consists of removing existing joint sealer and dirt from the joint and installing new joint sealer.
3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates
This work consists of mobilization, containment of abrasives, collecting, testing and disposal of containment waste,
preparing the sheet pile wall to bare metal, and application of coating system. This work shall comply with WSDOT 2020
Standard Specifications in Section 6-07.
MATERIALS
All materials shall be in accordance with the provided Cover Plate detail, current contract specifications or as approved by the
Engineer.
CONSTRUCTION REQUIREMENTS
The Contractor shall perform the work in accordance with the provided Cover Plate detail, current contract plans and specifications or
as approved by the Engineer.
MEASUREMENT AND PAYMENT
3.1 "Replacement Cover Plates for Tie -Back Penetrations" will be paid in accordance with WSDOT 2020 Standard Specification
Section 1-09.6
CONTRACT TIME
Contract time shall be extended by (18) working days as a result of this change order.
127
The total cost of Change Order #4 is $72,285.08.
Change Order #4 Summary: CO#3 Tasks 3.1 and 3.2 overruns amount to $34,339.83, an 80.8% increase in direct costs over
estimated costs, and accounts for 52% percent of CO#4. Mark-ups in the amount of $25,292.03 and sales tax in the amount of
$6,022.76 account for 39% and 9% of CO#4, respectively. Tasks 3.1 and 3.2 cost overruns were due to unforeseen complications with
production rates associated with site conditions and the complexity of fabricating and fitting custom replacement cover plates. Mark-ups
were inadvertently omitted from CO #3 Estimate. CO#4 Estimate includes 10% contingency ($6,631.06).
Table 1. CO#4 Summary — Three Invoice from RL Alia for Time and Materials
#
Invoice
Date
Total
1
RL Alia Time & Materials
11/28/23 to 12/22/23
$39,072.85
2
RL Alia Time & Materials
01/03/24 to 02/26/24
$28,360.05
3
RL Alia Time & Materials
03/14/24 to 03/29/24
$4,057.39
Sub -Total:
$71,490.29
Sales Tax 10.1 %
$7,220.52
Sub -Total:
$78,710.81
CO#3 Credit Balance:
-($13,056.79)
Sub -Total:
$65,654.02
CO#4 Contingency:
$6,631.06
CO#4 Total:
$72,285.08
Table 2. Change Order #3 Summary of Quantities (in grey), Payments, and Balance
Item
Item Description
Qty
Unit
Unit Price
Item Cost
3.1
Replacement Cover Plates for Tie -Back
Penetrations
1
EST.
$41,500.00
$41,500.00
3.2
Repair Expansion Joint between Existing Retaining
Wall and Tukwila Intl. Bridge SW Bridge Abutment
1
EST.
$1,000.00
$1,000.00
3.3
Surface Preparation and Coating for Previously
Buried Portion of Wall #1 and Replacement Cover
Plates
1
LS
$37,553.60
$37,553.60 - $9,508.80
(RL Alia's Share) =
$28,044.20
Est. Total Coast:
$70,544.20
CO#3 Sales Tax:
$7,125.82
CO#3 Total:
$77,669.82
CO#3 1st Payment (PE#16):
$64,613.03
CO#3 Balance:
$13,056.79
128
Table 3. CO #3 Summary of Quantities (in grey) and CO#4 Overruns Mark-ups, and Sales Tax
Item
#
Item
Description
Qty
Unit
Unit Price
Item Cost
Overruns
Mark -Up
(Original +
Overrun)
Sales Tax
(Original +
Overrun)
Grand
Totals:
3.1
Replacement
1
EST.
$41,500.00
$41,500.00
Cover Plates for
Tie -Back
Penetrations
$34,339.83
$21,926.72
$9,975.42
$108,741.97
3.2
Repair
1
EST.
$1,000.00
$1,000.00
Expansion Joint
between
Existing
Retaining Wall
and Tukwila Intl.
Bridge SW
Bridge
Abutment
3.3
Surface
1
LS
$37,553.60
$37,553.60
Preparation and
-
$0.00
$3,365.30
$3,172.36
$34,581.86
Coating for
$9,508.80
Previously
(RL Alia's
Buried Portion
Share) =
of Wall #1 and
$28,044.20
Replacement
Cover Plates
Est. Total Coast:
$70,544.80
$34,339.83
$25,292.03
$13,147.78
$143,323.84
CO#3 Sales Tax:
$7,125.02
$-7125.02
CO#3 Total:
$77,669,82
-$77,669.82
CO#4 Sub -Totals:
$34,339.83
$25,292.03
$6,022.76
$65,654.62
CO#4 Total:
Verification:
$65,654.02*
*_ $0.60 difference not found.
129
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
Riverton Creek Flapgate Removal Project
Project No. 9980103
PE # 17
3/4/2024
Pay Pd.
Item
8/1/2023
Description of item
to
1 1 /3/2023
Qty
Unit
Price
Contract Amount
Quantity
this
Estimate
Previous
Quantity
ORIGINAL CONTRACT AMOUNT
CHANGE ORDERS OR ADJUSTMENTS:
ADJUSTED CONTRACT AMOUNT:
NOTICE TO PROCEED:
CONTRACT (CALENDAR) DAYS:
CHANGE ORDER / WEATHER DAYS
SCHEDULED COMPLETION DATE:
Quantity
to Date
Percent
Complete
Amount Due This
Estimate
Previous
Amount
$1,503,267.15
$78,159.78
$1,581,426.93
7/10/2020
115
0
12/23/2020
Total Amount to
Date
Schedule A
Bridge
1
Mobilization
1
LS
$82,000.00
$82,000.00
0.00
1.00
1.00
100.00%
$0.00
$82,000.00
$82,000.00
2
Contractor Surveying
1
LS
$18,000.00
$18,000.00
0.00
1.00
1.00
100.00%
$0.00
$18,000.00
$18,000.00
3
Unexpected Site Changes
1
FA
$15,000.00
$15,000.00
0.00
1.09
1.09
109.34%
$0.00
$16,400.46
$16,400.46
4
Temp Traffic Control
1
LS
$15,000.00
$15,000.00
0.00
1.00
1.00
100.00%
$0.00
$15,000.00
$15,000.00
5
Temp TrafContr Private Prop
1
LS
$10,000.00
$10,000.00
0.00
0.95
0.95
95.00%
$0.00
$9,500.00
$9,500.00
6
SPCC
1
LS
$500.00
$500.00
0.00
1.00
1.00
100.00%
$0.00
$500.00
$500.00
7
Riverton Creek Bridge
1
LS
$140,000.00
$140,000.00
0.00
1.00
1.00
100.00%
$0.00
$140,000.00
$140,000.00
8
Clean/Weld Piles to WalICap
10
LF
$250.00
$2,500.00
0.00
10.00
10.00
100.00%
$0.00
$2,500.00
$2,500.00
9
Structural Carbon Steel
1
LS
$60,000.00
$60,000.00
0.00
1.00
1.00
100.00%
$0.00
$60,000.00
$60,000.00
10
Fum&Drive Test Steel Pile
1
EA
$7,000.00
$7,000.00
0.00
1.00
1.00
100.00%
$0.00
$7,000.00
$7,000.00
11
Furnishing St. Piling
306
LF
$50.00
$15,300.00
0.00
282.50
282.50
92.32%
$0.00
$14,125.00
$14,125.00
12
Driving St. Piling
11
EA
$2,000.00
$22,000.00
0.00
11.00
11.00
100.00%
$0.00
$22,000.00
$22,000.00
13
Bridge Railing ChnLinkFence
108
LF
$100.00
$10,800.00
0.00
144.00
144.00
133.33%
$0.00
$14,400.00
$14,400.00
14
Clean&Paint Wall 1
1
LS
$30,000.00
$30,000.00
0.00
1.00
1.00
100.00%
$0.00
$30,000.00
$30,000.00
15
Remo SoldierPile Shft Obstrc
1
FA
$8,000.00
$8,000.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
16
Shaft-24 inch Diameter
530
LF
$212.55
$112,651.50
0.00
532.75
532.75
100.52%
$0.00
$113,236.01
$113,236.01
17
Fum Soldier Pile HP 12X84
710
LF
$123.00
$87,330.00
0.00
731.00
731.00
102.96%
$0.00
$89,913.00
$89,913.00
18
Conrete Lagging
1,020
SF
$70.00
$71,400.00
0.00
1,020.00
1,020.00
100.00%
$0.00
$71,400.00
$71,400.00
19
Permanent Ground Anchor
18
EA
$6,500.00
$117,000.00
0.00
18.00
18.00
100.00%
$0.00
$117,000.00
$117,000.00
20
Perm GrndAnch Pert Test
3
EA
$1,250.00
$3,750.00
0.00
3.00
3.00
100.00%
$0.00
$3,750.00
$3,750.00
21
Perm GrndAnch Verify Test
2
LS
$3,000.00
$6,000.00
0.00
2.00
2.00
100.00%
$0.00
$6,000.00
$6,000.00
CO - 1
Wall 1 and Work Suspensiion Equitable Adjustment
1
LS
$47,808.17
$47,808.17
0.00
1.00
1.00
100.00%
$0.00
$47,808.17
$47,808.17
CO - 3
Wall 1 Replacment Cover Plates, Cleaning and Painting and Void Rep
1
LS
$70,544.20
$70,544.20
0.5109
0.00
0.51
51.09%
$36,044.05
$58,685.77
$94,729.82
Roadway
22
Clearing and Grubbng
1
LS
$10,000.00
$10,000.00
0.00
1.00
1.00
100.00%
$0.00
$10,000.00
$10,000.00
23
Removal Structure&Obstruct
1
LS
$2,500.00
$2,500.00
0.00
1.00
1.00
100.00%
$0.00
$2,500.00
$2,500.00
24
Remove Existing RetainWall
1
LS
$10,000.00
$10,000.00
0.00
1.00
1.00
100.00%
$0.00
$10,000.00
$10,000.00
25
Channel Excavation&Haul
1,570
CY
$125.00
$196,250.00
0.00
1,345.00
1,345.00
85.67%
$0.00
$168,125.00
$168,125.00
26
Select Grading (by FA)
1
FA
$4,000.00
$4,000.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
27
Gravel Borrow
30
TN
$75.00
$2,250.00
0.00
37.50
37.50
125.00%
$0.00
$2,812.50
$2,812.50
271Q
Gravel Borrow- increased quantities (above 125%)
0
TN
$70.00
$0.00
0.00
257.22
257.22
NA
$0.00
$18,005.40
$18,005.40
28
Unsuitable Foundation Excav
25
CY
$100.00
$2,500.00
0.00
8.60
8.60
34.40%
$0.00
$860.00
$860.00
29
Dewatering
1
LS
$3,000.00
$3,000.00
0.00
1.00
1.00
100.00%
$0.00
$3,000.00
$3,000.00
30
Structure Excavation Class A
110
CY
$75.00
$8,250.00
0.00
110.00
110.00
100.00%
$0.00
$8,250.00
$8,250.00
31
Shoring or Extra Exc Class A
1
LS
$3,000.00
$3,000.00
0.00
1.00
1.00
100.00%
$0.00
$3,000.00
$3,000.00
32
Trimming and Cleanup
1
LS
$7,500.00
$7,500.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
33
Crushed Surf Base Course
54
TN
$100.00
$5,400.00
0.00
46.17
46.17
85.50%
$0.00
$4,617.00
$4,617.00
34
Commercial HMA
41
TN
$250.00
$10,250.00
0.00
23.25
23.25
56.71%
$0.00
$5,812.50
$5,812.50
CO - #
Change Order Holding Slot
130
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
Riverton Creek Flapgate Removal Project
Project No. 9980103
PE # 17
3/4/2024
Pay Pd.
8/1/2023
to
1 1 /3/2023
ORIGINAL CONTRACT AMOUNT
CHANGE ORDERS OR ADJUSTMENTS:
ADJUSTED CONTRACT AMOUNT:
NOTICE TO PROCEED:
CONTRACT (CALENDAR) DAYS:
CHANGE ORDER / WEATHER DAYS
SCHEDULED COMPLETION DATE:
$1,503,267.15
$78,159.78
$1,581,426.93
7/10/2020
115
0
12/23/2020
Item
Description of item
Qty
Unit
Price
Contract Amount
Quantity
this
Estimate
Previous
Quantity
Quantity
to Date
Percent
Complete
Amount Due This
Estimate
Previous
Amount
Total Amount to
Date
Roadside Development
$90,000.00
0.00
1.00
1.00
100.00%
$0.00
$90,000.00
$90,000.00
35
Temp Stream Diversion
1
LS
$90,000.00
36
Erosion/Water Poll Prevent
1
LS
$7,500.00
$7,500.00
0.00
0.50
0.50
50.00%
$0.00
$3,750.00
$3,750.00
37
High Visibility Fence
135
LF
$4.00
$540.00
0.00
150.00
150.00
111.11%
$0.00
$600.00
$600.00
38
Coir Log
360
LF
$6.00
$2,160.00
0.00
360.00
360.00
100.00%
$0.00
$2,160.00
$2,160.00
39
Erosion Control Blanket
180
SY
$2.50
$450.00
0.00
447.50
447.50
248.61%
$0.00
$1,118.75
$1,118.75
40
PSIPE Acer Circinatum #5 - All PSIPE at 100% 1/26/2:
2
EA
$60.00
$120.00
0.00
3.00
3.00
150.00%
$0.00
$198.00
$234.00
41
PSIPE Argentina egedii 10"
10
EA
$25.00
$250.00
0.00
10.00
10.00
100.00%
$0.00
$275.00
$325.00
42
PSIPE Aruncus dioicus #1
12
EA
$25.00
$300.00
0.00
16.00
16.00
133.33%
$0.00
$440.00
$520.00
43
PSIPE Carex lyngbei (& 4" fragaria chiloensis)
10
EA
$20.00
$200.00
0.00
130.00
130.00
1300.00%
$0.00
$2,860.00
$3,380.00
44
PSIPE Comus stoloniferaBdl
15
EA
$25.00
$375.00
0.00
15.00
15.00
100.00%
$0.00
$412.50
$487.50
45
PSIPE Comus stolonifera#1
4
EA
$25.00
$100.00
0.00
9.00
9.00
225.00%
$0.00
$247.50
$292.50
46
PSIPE Eleocharis paulstrus
10
EA
$20.00
$200.00
0.00
10.00
10.00
100.00%
$0.00
$220.00
$260.00
47
PSIPE Fraxinus latifolia #2
5
EA
$25.00
$125.00
0.00
5.00
5.00
100.00%
$0.00
$137.50
$162.50
48
PSIPE Gualtheria shallon #1
20
EA
$20.00
$400.00
0.00
49.00
49.00
245.00%
$0.00
$1,078.00
$1,274.00
49
PSIPE Holodiscus discolor#1
5
EA
$20.00
$100.00
0.00
5.00
5.00
100.00%
$0.00
$110.00
$130.00
50
PSIPE Lonicera involucratel
15
EA
$20.00
$300.00
0.00
15.00
15.00
100.00%
$0.00
$330.00
$390.00
51
PSIPE Malus fusca #2
5
EA
$20.00
$100.00
0.00
7.00
7.00
140.00%
$0.00
$154.00
$182.00
52
PSIPE Physocarpus capitats
8.00
EA
$20.00
$160.00
0.00
11.00
11.00
137.50%
$0.00
$242.00
$286.00
53
PSIPE Picea sitchensis
13.00
EA
$175.00
$2,275.00
0.00
13.00
13.00
100.00%
$0.00
$2,502.50
$2,957.50
54
PSIPE Polystichum munitum
20.00
EA
$20.00
$400.00
0.00
50.00
50.00
250.00%
$0.00
$1,100.00
$1,300.00
55
PSIPE Pseudotsuga menzisi
3
EA
$175.00
$525.00
0.00
6.00
6.00
200.00%
$0.00
$1,155.00
$1,365.00
56
PSIPE Ribies sanguineum#1
8
EA
$20.00
$160.00
0.00
10.00
10.00
125.00%
$0.00
$220.00
$260.00
57
PSIPE Roa Pisocarpa #1
13
EA
$20.00
$260.00
0.00
19.00
19.00
146.15%
$0.00
$418.00
$494.00
58
PSIPE Rubus spectabilis #1
17
EA
$20.00
$340.00
0.00
17.00
17.00
100.00%
$0.00
$374.00
$442.00
59
PSIPE Salix hookeriana Live
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$650.00
60
PSIPE Salix hookeriana Bndl
20
EA
$50.00
$1,000.00
0.00
20.00
20.00
100.00%
$0.00
$1,100.00
$1,100.00
61
PSIPE Salix lucida #2
5
EA
$25.00
$125.00
0.00
5.00
5.00
100.00%
$0.00
$137.50
$162.50
62
PSIPE Salix scouleriana Live
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$650.00
63
PSIPE Salix scouleriana Bnd
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$550.00
64
PSIPE Salix sitchensis Live
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$650.00
65
PSIPE Salix sitchensis Bndle
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$550.00
66
PSIPE Sambucus racemosa
6
EA
$20.00
$120.00
0.00
6.00
6.00
100.00%
$0.00
$132.00
$156.00
67
PSIPE Symphoricarpos alba
20
EA
$25.00
$500.00
0.00
20.00
20.00
100.00%
$0.00
$550.00
$650.00
68
PSIPE SymphoricarposAlbl
20
EA
$25.00
$500.00
0.00
47.00
47.00
235.00%
$0.00
$1,292.50
$1,527.50
69
PSIPE Thuja plicata
2
EA
$200.00
$400.00
0.00
2.00
2.00
100.00%
$0.00
$440.00
$520.00
70
PSIPE Tsuga heterophylla
4
EA
$200.00
$800.00
0.00
4.00
4.00
100.00%
$0.00
$880.00
$1,040.00
71
Topsoil Type A
7
CY
$70.00
$490.00
0.00
5.00
5.00
71.43%
$0.00
$350.00
$350.00
72
Compost (Amended Soil)
13
CY
$70.00
$910.00
0.00
17.00
17.00
130.77%
$0.00
$1,190.00
$1,190.00
73
Bark&Wood Chip Mulch
13
CY
$70.00
$910.00
0.00
24.00
24.00
184.62%
$0.00
$1,680.00
$1,680.00
74
Extruded Curb
240
LF
$30.00
$7,200.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
75
Light Loose Riprap
400
TN
$80.00
$32,000.00
0.00
506.98
506.98
126.75%
$0.00
$40,558.40
$40,558.40
76
Paint Line
350
LF
$10.00
$3,500.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
77
Woody Debr Strct Over Rip Rap
4
EA
$1,400.00
$5,600.00
0.00
4.00
4.00
100.00%
$0.00
$5,600.00
$5,600.00
131
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
Riverton Creek Flapgate Removal Project
Project No. 9980103
PE # 17
3/4/2024
ORIGINAL CONTRACT AMOUNT
CHANGE ORDERS OR ADJUSTMENTS:
ADJUSTED CONTRACT AMOUNT:
NOTICE TO PROCEED:
CONTRACT (CALENDAR) DAYS:
CHANGE ORDER / WEATHER DAYS
$1,503,267.15
$78,159.78
$1,581,426.93
7/10/2020
115
0
Pay Pd. 8/1/2023 to 11/3/2023 SCHEDULED COMPLETION DATE: 12/23/2020
Item
Description of item
Qty
Unit
Price
Contract Amount
Quantity
this
Estimate
Previous
Quantity
Quantity
to Date
Percent
Complete
Amount Due This
Estimate
Previous
Amount
Total Amount to
Date
78
SingleLog Wetland Outlet
2
EA
$1,400.00
$2,800.00
0.00
2.00
2.00
100.00%
$0.00
$2,800.00
$2,800.00
79
SingleLogWetlandWoodDebr
10
EA
$1,400.00
$14,000.00
0.00
10.00
10.00
100.00%
$0.00
$14,000.00
$14,000.00
80
DoubleLogWetlandWoodDeb
2
EA
$3,000.00
$6,000.00
0.00
2.00
2.00
100.00%
$0.00
$6,000.00
$6,000.00
81
Floating Silt Curtain
1
LS
$6,000.00
$6,000.00
0.00
1.00
1.00
100.00%
$0.00
$6,000.00
$6,000.00
82
Streambed Gravel
241
TN
$60.00
$14,460.00
0.00
272.55
272.55
113.09%
$0.00
$16,353.00
$16,353.00
83
Streambed Cobbles 6 In.
54
TN
$80.00
$4,320.00
0.00
58.21
58.21
107.80%
$0.00
$4,656.80
$4,656.80
84
Streambed Boulder Two Man
16
EA
$200.00
$3,200.00
0.00
32.00
32.00
200.00%
$0.00
$6,400.00
$6,400.00
85
Streambed Boulder 3 Man
130
EA
$300.00
$39,000.00
0.00
160.00
160.00
123.08%
$0.00
$48,000.00
$48,000.00
86
Filter Bag
4
EA
$200.00
$800.00
0.00
0.00
0.00
0.00%
$0.00
$0.00
$0.00
87
Habitat Snag
3
EA
$2,000.00
$6,000.00
0.00
3.00
3.00
100.00%
$0.00
$6,000.00
$6,000.00
88
Art Installation
1
LS
$2,000.00
$2,000.00
0.00
1.00
1.00
100.00%
$0.00
$2,000.00
$2,000.00
89
Propery Restoration (by FA)
1
FA
$5,000.00
$5,000.00
0.00
1.97
1.97
196.76%
$0.00
$9,837.96
$9,837.96
CO - 2
Viewpoint and Geotextile
I
LS
$25,522.98
$25,522.98
0.00
1.00
1.00
100.00%
$0.00
$25,522.98
$25,522.98
SUBTOTAL BRIDGE
$834,231.50
$36,044.05
$939,218.41
$975,262.46
SALES TAX BRIDGE ITEMS (10.1%)
$3,640.45
$22,369.48
$26,009.93
SALES TAX BRIDGE ITEMS 2020 (10.0%)
$0.00
$72,491.58
$72,491.58
SALES TAX TOTAL
$3,640.45
$94,861.06
$98,501.51
5% RETAINAGE
$1,802.20
$46,960.92
$48,763.12
NET PAYMENT BRIDGE ITEMS
$37,882.29
$987,118.55
$1,025,000.84
SUBTOTAL ROADWAY
$264,900.00
$0.00
$236,982.40
$236,982.40
SALES TAX STORM ROADWAY ITEMS (10.1%)
$0.00
$23,698.24
$23,698.24
SALES TAX STORM ROADWAY ITEMS 2020 (10.0%)
$0.00
$12,241.70
$12,241.70
SALES TAX TOTAL
$0.00
$35,939.94
$35,939.94
5% RETAINAGE
$0.00
$11,849.12
$11,849.12
NET PAYMENT ROADWAY ITEMS
$0.00
$261,073.22
$261,073.22
SUBTOTAL ROADSIDE DEVELOPMENT
$267,475.00
$0.00
$317,525.89
$317,525.89
SALES TAX STORM ROADWAY ITEMS (10.1%)
$0.00
$31,752.59
$31,752.59
SALES TAX STORM ROADWAY ITEMS 2020 (10%)
$0.00
$3,415.00
$3,415.00
SALES TAX TOTAL
$0.00
$35,167.59
$35,167.59
5% RETAINAGE
$0.00
$15,876.29
$15,876.29
NET PAYMENT ROADSIDE DEVELOPMENT ITEMS
$0.00
$336,817.18
$336,817.18
1,366,606.50
136,660.65
1,503,267.15
Subtotal Amount
$36,044.05
$1,493,726.70
$1,529,770.75
Sales Tax (10.1%)
$3,640.45
$165,968.59
$169,609.04
Total 5% Retainage
$1,802.20
$74,686.34
$76,488.54
Total Net Payment
$37,882.29
$1,585,008.95
$1,622,891.25
132
CITY OF TUKWILA
Date,
Item
U4fdaw7.4
Oescrip[ion
Cuantite
ry
Unds
CEsnnmateis
WEEKENDSMOLIDAYS KIDDEN UNLESS WORK
PERFORMED
1 g 2-Aug 3-Aug 4-Aug
5-Aug 6-Aug ]-Aug
8-Aug 9-Aug 10-Aug 11-Aug 12-Aug
13-Aug 14-Aug 15-Aug
16-Aug 17g S-Aug
19-Aug 20-Aug 21-Aug 22-Aug 23-Aug 24-Aug 25-Aug 26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug
A'$IMOH
Adjustment
Total
%complete
Total to Date
Bridge
Mobilization
1
1
LS
2
Contractor Survey.
3
Unexpected Site Changes
1
FA
4
Temp Traffic Control
1
LS
emp TrafCOMr PrNate Prop
]
Riverton Creek Bridge
1
LS
6
aOaMNeId Ries to WallCap
10
LF
Structural Carton SMel
10
Fum&orlve Test Steel Pile
1
EA
11
Fumishos St. Piling
306
LF
12
vIng St Piling
EA
13
Bridge Raft. ChnEnkFence
1
14
Clea.Painl Wall
1
LS
13
Remo SoltlierPlle SIM Cbsrrc
FA
17
FumSolder Plle HP 12.4
710
LF
1B
GenMe LagRog
1020
SF
Anchor. Permanent Ground
13
EA
20
Perm GmdAnch Port Test
3
EA
21
CO-
Perm GrndAnch Verity Test
Wall and Equitable
2
LS
LS
Roadway
j
1
22
Clearing and Grubbng
23
Removal ShucWne80bshuot
1
LS
24
Remove Existing RBtainWell
LS
25
Chanel ExcavationBHaul
1570
CY
26
Select Grading (by FA)
1
FA
G27 ravel Borrow
30
TN
MO
Greed Borrow
3D
TN
26
Unsuitable Foundation Exwv
25
CY
29
Dew...
LS
30
Structure Excavation Glass
11
31
Shoring or Extra En Class A
1
LS
32
Trimmirta and Cleanup
1
LS33
crush. Surf Coume
54
TN
34
elHMA
41
TN
CO-f
Change Order Holding Slot
Roadside Development
35
mp Strearn Dworman
.
35
37
EerosioMNater Poll Prevent
High sibilM Fence
1
133
LF33
Cos Log
360
LP
39
Erosion Control Blanket
180
SY
40
PSIPE Acer Cremator 95
2
EA
41
PSIPE Argentina egedii 10"
10
EA
42
PSIPE Arenas mama¢ 41
12
EAP43
SIPE Carex Nn9bei (A Frageria chdoeeis 4')
10
EA
44
PSIPE Carnes ctolongereStll
15
EA
45
PSIPE Cannes stolongereM
4
EA
46
PSIPE EIemM1arisPaulshus
1
EA
47
PSIPE Fraxinus lat.. M2
5
EA
48
PSIPE GuaXberia shallop Nl
20
EA
49
PSIPE Holotliscus discolor.
5
EA
PSIPELonmereimOlucratel
15
EA
51
PSIPE Males fuse 32
5
EA
AO
PSIPE 752929arpus capitate
B
EA-
53
PSIPE Picea aitchaeis
13
EA
54
PSIPE Polyztichum munitum
20
EA
-
55
PSIPE Pseudotswa mennsi
3
EA
56
PSIPE Ribies sanguieumtlll
8
EA
32
PSIPE Roe Rs0carpadl
13
EA
56
PSIPE Rebus spectabilis Oft
1]
EA
PSIPE SaM hookeriana Live
20
EA
60
PSIPE Salm hooMnana Bntll
20
EA
61
PSIPE Salk lucida In
5
EA
62
PSIPE Safe scouleriana Eve
20
EA
63
PSIPE Selix scouleriana BM
20
EA
64
PSIPE Salk sitchensis Live
20
EA
65
PSIPE Salk sitcheeis Bndle
20
EA
66
PSIPE Sambuo s racemosa
6
EAP67
SIPE 6ymphortcarpos alba
-
66
PSIPE SymphormarposAlbl
20
EA-
69
PSIPE Thula pfraM
2
EA
70
PSIPE TI]Oa M1atemprnlla
4
EA-
]i
Topsoil Type A
]
CY
72
Comps. (Amended Soil)
Chip Mulch
13
13
CY-
CY-
0
74
Extruded Curb
240
LF
75
Light Loose Rlprap
400
TN
76
Pant Line
35
77
Woody Debt Slmt Over RIP Rap
4
EA
-
133
CITY OF TUKWILA
osmar-u
78 SingleLog Wetland Outlet
79 InpleLoprletlaMWoodDebr
80 DoubleLo9Wetland WoodDeb
81 Floating Silt Curtain
82 streamberi Gravel
10
241
EA
EA
EA
LS
TN
83 streamberi Cobbles 6 In.
54
TN
84 Streambed Boulder Two Man
16
EA
85 Streambed Boulder 3 Man
130
EA
BB Fleer Bap
87 Habitat Snag
88 Ad Installation
EA
EA
LS
89 Propery Restoration Ow FA)
CO k2 GeoMxtile PatincAlewpoint
co 93 Wall 1 Replacment Cover Plates, Cleaning and Painting and Void Repairs
FA
LS
1 LS
0.51
0.51094
134
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2021 to 2026
PROJECT: Riverton Creek Flap Gate Removal Project No. 99830103
Remove two culverts and flap gates that confluence with the Duwamish River; daylight creek, install trail bridge
DESCRIPTION: over creek, habitat improvements and planting for 1,200 lineal feet of creek, inc 1/4 acre backwater wetland
habitat and 400 ft of river; associated structural improvements for TIB roadway and adjacent commercial
property.
JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River.
Improve fish access to Riverton Creek and enhance salmon rearing and resting area.
STATUS: Project construction began in 2020.
MAINT. IMPACT: Expected to increase maintenance.
Construction funding from the State RCO Salmon Recovery Funding Board, King County Cooperative Watershed
COMMENT: Management, King County Opportunity Funds, the WRIA 9 Re -green the Green Program and City Surface Water
Funds.
FINANCIAL Through Estimated
(in $000's)
2019 2020 2021
2022 2023 2024 2025 2026 BEYOND TOTAL
EXPENSES
Design
391
391
Land (R/W)
0
Monitoring
25
25
Const. Mgmt.
200
5
205
Construction
1,654
25
1,679
TOTAL EXPENSES
391
1,854
55
0
0
0
0
0
0
2,300
FUND SOURCES
Awarded Grant RCO
116
781
897
King County Grant
240
50
290
People for Puget S
30
30
Mitigation Expected
0
Utility Revenue
245
833
5
0
0
0
0
0
0
1,083
TOTAL SOURCES
391
1,854
55
0
0
0
0
0
0
2,300
Project Location
`� g N
i
II
��
Ili ,
•
t.
tr.
"alio
2 Fir ter
t6
s 3T8t r�
2021 - 2026 Capital Improvement Program
90
135