Loading...
HomeMy WebLinkAboutPermit EL19-0995 - MUTUAL MATERIALS / IT ROOM - DOOR KANTECH HOSTED SYSTEM AND TURNKEY HP IP VIDEO SOLUTION WITH CAMERASMUTUAL MATERIALS 4302 S 104TH PL 0323049213 EXPIRED E L19-0995 Parcel No: Address: ��* �� Tukwila of n ��o����oa x� Department -° Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206'431-367¢ Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html Fire Inspection Request Line: 206'575'4407 Web site: http://www.TukwilaWA.Rov 0323049213 4302 S 104TH PL Project Name: MUTUAL MATERIALS ELECTRICAL OTC PERMIT Permit Number: EL19'0995 Issue Date: 1I/2/2019 Permit Expires On: 6/31/2821 Owner: Name: Address: Contact Person: Name: Address: MUTUAL MATERIALS COMPANY 605 119TH AVE NE , BELLEVUE, WA, 98005 BRIANNA BOWLING Phone: (253) 796-7247 19625 62ND AVE S, KENT, WA, 98032 Contractor: Name: JOHNSON CONTROLS SEC SOL LLC Address: POBOX 3U43'B0CAR4T0N'FL, 3J43l License No: JOHNSCS837N4 Lender: Name: Address: Phone: (561) 226-8220 Expiration Date: 8/23/2021 DESCRIPTION OF WORK: INSTALL (1) DOOR KANTECH HOSTED SYSTEM FOR THE IT ROOM AND PROVIDE A NEW TURNKEY HP IP VIDEO SOULTION WITH A TOTAL OF (4) EXTERIOR VANDAL RATEDE CAMERAS. Valuation of single family: $0.0 Valuation of mf/comm: $4,932.00 Type of Work: LOW VOLTAGE Fees Collected: $196.41 Electrical Service Provided by: Seattle City Light Water District: Tukwila Sewer District: Tukwila Current Codes adopted by the City of Tukwila: International Fire Code Edition: International Buliding Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International FueI Gas Code: 2018 20182018 2018 2018 2018 National Electrical Code WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2020 2020 2020 2018 All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDtTIONSu 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html Fire Inspection Request Line: 206-575-4407 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE UNDERGROUND SLAB ,.iilL4-4, ,,s4---- --, at Cash Register Recept Receipt Nuniber. -...„ City of T kvvil --1960. , e DESCRIPTION ACCOUNT QTY COMMENTS PAID PermitTRAK $196.41 EL19-0995 Address: 4302 S 104TH PL APN: 0323049213 $19641 ELECTRICAL $187 06 PERMIT FEE MULTTFAM/COMM R000 322.101 00.00 0 $187 06 TECHNOLOGY FEE $935 TECHNOLOGY FEE R000.322 900 04 00 0 $9 35 TOTAL FEES PAID BY RECEIPT:R19180 Date Paid: Monday, December 02, 2019 Paid By: TYCO INTEGRATED SECURITY Cashier: BR2 Pay Method: CHECK 015146 $196.41 Printed: Thursday, July 15, 2021 11:48 AM 1 of 1 King County iMap T,olu obylesr hto. The intonation included on this rrep has been compiled by King County staff from a variety of sources and h subject to change without notice. King County makes no representations or warranties, express or impfed, re, to accuracy, completeness, t rnelkress, or rights to the use of suchintomsatiai. Ths document is rot intended br use asa survey product, Kng County shall not be liable fcr any general, special, ndired, inddental, or consequential damages indudng, but net limted to, lost revenues or lost profits resulting from the use or misuse d the informatbn crntained on this map. My sale of the map orinformaticn on this map is prohildted except by wriken permission of King County. Date: 7/15/2021 Notes: King County �� NL � �� Tukwila ^U a ��"~ Department Community Deveentlopm ,^'�� , 6300 Southcenter Boulevard, Suite #100 ) Tukwila, Washington 98188 Parcel No: Address: Phone: 206^431-3670 Inspection Request Line: 206-438'9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT 0323049213 Permit Number: EL19-0995 4302SI04THPL Project Name: MUTUAL MATERIALS Issue Date: 12/2/20I9 Permit Expires On: 5/30/2020 Owner: Name: Address: Contact Person Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: MUTUAL MATERIALS COMPANY 605 119TH AVE NE , BELLEVUE, WA, 98005 BRIANNA BOWLING l96ZI6ZNDAVE S,KENT, WA, 98O32 JOHNSON CONTROLS SEC SOL LLC POBOX 384Z,BOCARAT0N,FL, 33431 ''' Phone: (253) 796-7247 Phone: (561) 226-8220 Expiration Date: 8/23/2021 DESCRIPTION OF WORK: INSTALL (1) DOOR KANTECH HOSTED SYSTEM FOR THE IT ROOM AND PROVIDE A NEW TURNKEY HP IP VIDEO SOULTION WITH A TOTAL OF (4) EXTERIOR VANDAL RATEDE CAMERAS. Valuation of singie family: $0.00 Valuation of mf/comm: $4,932.00 Type of Work: LOW VOLTAGE Fees Collected: $196.41 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA Curren Codes adopted by the City of Tukwila: International Building Code Edition: Internationat Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: lnternational Fuel Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 Dale: I hearby certify that I have read and examined this permit and know the same to be true and correct, All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: —may%� e� e �l Print Name:,/ Date: /2. 2 - 2o' This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB Pit CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 981138 http://www.TukwilaWA.gov o - Electrical Permit No. EL 9 s - Project No. Date Application Accepted: Date Application Expires: (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION 4710 Site Address:*40'44 W a!%210 .136 King Co Assessor's Tax No.: uite Number: New Tenant: Tenant Name: PROPERTY OWNER Name: _1.dVa Address: (005 ow\ Ave_ City: ,z6\ev State: CONTACT PERSON - person receiving all project communication Na e: I I Address: ligi (0 26 (o2yc. Ave siA5u) City: V.....NIA_ State: W J Zip: OtSe Phone: . lal (v rater: Email:y)v Avv.1 a i. . v.\ \ cc. Floor: 0 Yes 0 ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: oIr\ vyr\ (4,0-y-hr015 Address: 1c1 1,0 25 6,2,20ct. /149S 5iii‘e City: v_e4A._ State: Ik.) ).__ Zip: cito Phone: 2,6; , 1(v14 Fax: Contr Reg No.:3014 1\15:cisa;-7 Kflp Date: S)20 Tukwila Business License No.; ‘30, _ 00101 sii R C112_ Valuation of Project (contractor's bid price): $ /-4°)'2J/1-- Scope of Work (please provide detailed inforrnation): \ttl A-3‘ \ Sy -W\ \T c •A Will service be altered? Type of Use: ED Yes 0 PYO)SO1 W No Adding more than 50 amps? E: Yes Wo Type of work: 0 New 0 Addition pcLow Voltage 0 Generator Property Served by: pcPuget Sound Energy 0 Seattle City Light 0 Service Change 0 Fire Alarm WAPermit cern e Mpplicat io og-liandoutsTermit Applications PD E leaf ical Permit Application Revised 1- 17- 19.docx 0 Remodel 0 Telecommunication Tenant Improvement 0 Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings 5180.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings $120.00 ea ❑ Low voltage systems (alarm) $60.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $120.00 (no added/altered circuits) ❑ Service change with added/altered circuits $100.00 number of added circuits S10.00 ea ❑ Circuits added/altered without service change $60.00 (up to 5 circuits) ❑ Circuits added/altered without service change$60.00 (6 or more circuits).. $10.00 ea ❑ Meter/mast repair $80.00 ❑ Low voltage systems $60.00 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees arc based on the valuation of the electrical contract, MISCELLANEOUS FEES 0 Temporary service (residential)............. .............. $60.00 ❑ Temporary service (generator) $90.00 0 Manufactured/mobile home service S100.00 (excluding garage or outbuilding) ❑ Carnivals $100.00 Number of concessions $11.00 ea Each ride and generator truck $ 11.00 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES Value of Construction — In all casts, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY 13Y THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING ,� �2• Signator-. Date: q Print Name: Mailing Address: `C21 tD ►� W;CPemtit Center 1Applicationa-riandouta\Pelmit Applitations\PDFa\Electrieal Permit Application Revised 1-17-194nen Day Telephone: 2s.'laito 12,0 C t\2 w r W fir a1 0j'2 City Stare tap Page 2 of 2 Receipt Number DESCRIPTIONS 1 PermitTRAK I QUANTITY PAID $196.41 EL19-0995 Address: 4302 S 104THPL Apn: 0323049213 $196.41 ELECTRICAL $187.06 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $187.06 TECHNOLOGY FEE $9,35 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R19180 R000.322.900.04.00 0.00 $9.35 $196.41 Date Paid: Monday, December 02, 2019 Paid By: TYCO INTEGRATED SECURITY Pay Method: CHECK 015146 Printed: Monday, December 02, 2019 9:24 AM 1 of 1