HomeMy WebLinkAboutPermit EL19-0995 - MUTUAL MATERIALS / IT ROOM - DOOR KANTECH HOSTED SYSTEM AND TURNKEY HP IP VIDEO SOLUTION WITH CAMERASMUTUAL MATERIALS
4302 S 104TH PL
0323049213
EXPIRED
E L19-0995
Parcel No:
Address:
��* �� Tukwila
of n ��o����oa
x�
Department -° Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206'431-367¢
Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html
Fire Inspection Request Line: 206'575'4407
Web site: http://www.TukwilaWA.Rov
0323049213
4302 S 104TH PL
Project Name: MUTUAL MATERIALS
ELECTRICAL OTC PERMIT
Permit Number: EL19'0995
Issue Date: 1I/2/2019
Permit Expires On: 6/31/2821
Owner:
Name:
Address:
Contact Person:
Name:
Address:
MUTUAL MATERIALS COMPANY
605 119TH AVE NE , BELLEVUE, WA,
98005
BRIANNA BOWLING Phone: (253) 796-7247
19625 62ND AVE S, KENT, WA, 98032
Contractor:
Name: JOHNSON CONTROLS SEC SOL LLC
Address: POBOX 3U43'B0CAR4T0N'FL, 3J43l
License No: JOHNSCS837N4
Lender:
Name:
Address:
Phone: (561) 226-8220
Expiration Date: 8/23/2021
DESCRIPTION OF WORK:
INSTALL (1) DOOR KANTECH HOSTED SYSTEM FOR THE IT ROOM AND PROVIDE A NEW TURNKEY HP IP VIDEO
SOULTION WITH A TOTAL OF (4) EXTERIOR VANDAL RATEDE CAMERAS.
Valuation of single family: $0.0
Valuation of mf/comm: $4,932.00
Type of Work: LOW VOLTAGE
Fees Collected: $196.41
Electrical Service Provided by: Seattle City Light
Water District: Tukwila
Sewer District: Tukwila
Current Codes adopted by the City of Tukwila:
International Fire Code Edition:
International Buliding Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International FueI Gas Code:
2018
20182018
2018
2018
2018
National Electrical Code
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2020
2020
2020
2018
All provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work.
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDtTIONSu
1: ***ELECTRICAL PERMIT CONDITIONS***
2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical
Inspector at each work site.
3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical
Inspector.
4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations,
Chapter 296-46B WAC and the Washington Cities Electrical Code.
5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts
of the building, such equipment shall not be concealed until it has been inspected and approved by the
Electrical Inspector.
6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any
violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related
documentation that presumes to grant this authority are therefore not valid.
7: Any change in the scope of work described by the electrical work permit shall require additional work
permits. Where approved plans have been issued, revisions to the plans and additional review may be
required.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Scheduling: https://tukw-egov.aspgov.com/BP/index.html
Fire Inspection Request Line: 206-575-4407
2100 ELECTRICAL FINAL
7003 ROUGH -IN ELECTRICAL
7002 SERVICE
UNDERGROUND SLAB
,.iilL4-4,
,,s4---- --,
at Cash Register Recept
Receipt Nuniber.
-...„ City of T kvvil
--1960.
, e
DESCRIPTION ACCOUNT QTY COMMENTS
PAID
PermitTRAK
$196.41
EL19-0995 Address: 4302 S 104TH PL APN: 0323049213
$19641
ELECTRICAL
$187 06
PERMIT FEE MULTTFAM/COMM
R000 322.101 00.00
0
$187 06
TECHNOLOGY FEE
$935
TECHNOLOGY FEE
R000.322 900 04 00
0
$9 35
TOTAL FEES PAID BY RECEIPT:R19180
Date Paid: Monday, December 02, 2019
Paid By: TYCO INTEGRATED SECURITY
Cashier: BR2
Pay Method: CHECK 015146
$196.41
Printed: Thursday, July 15, 2021 11:48 AM 1 of 1
King County iMap
T,olu obylesr hto.
The intonation included on this rrep has been compiled by King County staff from a variety of sources and h
subject to change without notice. King County makes no representations or warranties, express or impfed,
re, to accuracy, completeness, t rnelkress, or rights to the use of suchintomsatiai. Ths document is rot intended
br use asa survey product, Kng County shall not be liable fcr any general, special, ndired, inddental, or
consequential damages indudng, but net limted to, lost revenues or lost profits resulting from the use or misuse
d the informatbn crntained on this map. My sale of the map orinformaticn on this map is prohildted except by
wriken permission of King County.
Date: 7/15/2021 Notes:
King County
��
NL �
��
Tukwila
^U
a
��"~ Department Community Deveentlopm
,^'��
, 6300 Southcenter Boulevard, Suite #100
)
Tukwila, Washington 98188
Parcel No:
Address:
Phone: 206^431-3670
Inspection Request Line: 206-438'9350
Web site: http://www.TukwilaWA.gov
ELECTRICAL OTC PERMIT
0323049213 Permit Number: EL19-0995
4302SI04THPL
Project Name: MUTUAL MATERIALS
Issue Date: 12/2/20I9
Permit Expires On: 5/30/2020
Owner:
Name:
Address:
Contact Person
Name:
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
MUTUAL MATERIALS COMPANY
605 119TH AVE NE , BELLEVUE, WA,
98005
BRIANNA BOWLING
l96ZI6ZNDAVE S,KENT, WA, 98O32
JOHNSON CONTROLS SEC SOL LLC
POBOX 384Z,BOCARAT0N,FL,
33431
'''
Phone: (253) 796-7247
Phone: (561) 226-8220
Expiration Date: 8/23/2021
DESCRIPTION OF WORK:
INSTALL (1) DOOR KANTECH HOSTED SYSTEM FOR THE IT ROOM AND PROVIDE A NEW TURNKEY HP IP VIDEO
SOULTION WITH A TOTAL OF (4) EXTERIOR VANDAL RATEDE CAMERAS.
Valuation of singie family: $0.00
Valuation of mf/comm: $4,932.00
Type of Work: LOW VOLTAGE
Fees Collected: $196.41
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: TUKWILA
Sewer District: TUKWILA
Curren
Codes adopted by the City of Tukwila:
International Building Code Edition:
Internationat Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
lnternational Fuel Gas Code:
Permit Center Authorized Signature:
2015
2015
2015
2015
2015
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2017
2017
2017
2015
Dale:
I hearby certify that I have read and examined this permit and know the same to be true and correct, All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. 1 am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
—may%� e� e �l
Print Name:,/
Date: /2. 2 - 2o'
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***ELECTRICAL PERMIT CONDITIONS***
2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical
Inspector at each work site.
3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical
Inspector.
4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations,
Chapter 296-46B WAC and the Washington Cities Electrical Code.
5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts
of the building, such equipment shall not be concealed until it has been inspected and approved by the
Electrical Inspector.
6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any
violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related
documentation that presumes to grant this authority are therefore not valid.
7: Any change in the scope of work described by the electrical work permit shall require additional work
permits. Where approved plans have been issued, revisions to the plans and additional review may be
required.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
2100 ELECTRICAL FINAL
7003 ROUGH -IN ELECTRICAL
7002 SERVICE
7001 UNDERGROUND/SLAB
Pit
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 981138
http://www.TukwilaWA.gov
o -
Electrical Permit No. EL 9 s -
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION
4710
Site Address:*40'44
W a!%210 .136
King Co Assessor's Tax No.:
uite Number:
New Tenant:
Tenant Name:
PROPERTY OWNER
Name:
_1.dVa
Address: (005 ow\ Ave_
City: ,z6\ev State:
CONTACT PERSON - person receiving all project
communication
Na e:
I I
Address: ligi (0 26 (o2yc. Ave siA5u)
City: V.....NIA_ State: W J Zip: OtSe
Phone: . lal (v rater:
Email:y)v Avv.1 a i. . v.\ \ cc.
Floor:
0 Yes 0 ..No
ELECTRICAL CONTRACTOR INFORMATION
Company Name: oIr\ vyr\ (4,0-y-hr015
Address: 1c1 1,0 25 6,2,20ct. /149S 5iii‘e
City: v_e4A._ State: Ik.) ).__ Zip: cito
Phone: 2,6; , 1(v14 Fax:
Contr Reg No.:3014 1\15:cisa;-7 Kflp Date: S)20
Tukwila Business License No.; ‘30, _ 00101 sii R
C112_
Valuation of Project (contractor's bid price): $ /-4°)'2J/1--
Scope of Work (please provide detailed inforrnation): \ttl A-3‘ \
Sy -W\ \T
c •A
Will service be altered?
Type of Use:
ED Yes
0 PYO)SO1 W
No Adding more than 50 amps?
E: Yes Wo
Type of work:
0 New 0 Addition
pcLow Voltage 0 Generator
Property Served by:
pcPuget Sound Energy 0 Seattle City Light
0 Service Change
0 Fire Alarm
WAPermit cern e Mpplicat io og-liandoutsTermit Applications PD E leaf ical Permit Application Revised 1- 17- 19.docx
0 Remodel
0 Telecommunication
Tenant Improvement
0 Temporary Service
Page 1 of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
❑ New single family dwellings 5180.00
(including an attached garage)
❑ Garages, pools, spas and outbuildings $120.00 ea
❑ Low voltage systems
(alarm) $60.00 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑ Service change or alteration $120.00
(no added/altered circuits)
❑ Service change with added/altered circuits $100.00
number of added circuits S10.00 ea
❑ Circuits added/altered without service change $60.00
(up to 5 circuits)
❑ Circuits added/altered without service change$60.00
(6 or more circuits).. $10.00 ea
❑ Meter/mast repair $80.00
❑ Low voltage systems $60.00
(alarm, furnace thermostat)
MULTI -FAMILY AND COMMERCIAL
Fees arc based on the valuation of the electrical contract,
MISCELLANEOUS FEES
0 Temporary service (residential)............. .............. $60.00
❑ Temporary service (generator) $90.00
0 Manufactured/mobile home service S100.00
(excluding garage or outbuilding)
❑ Carnivals $100.00
Number of concessions $11.00 ea
Each ride and generator truck $ 11.00 ea
***EFFECTIVE JANUARY 1, 2014 EACH
PERMIT WILL BE ASSESSED A 5%
TECHNOLOGY FEE***
PERMIT APPLICATION NOTES
Value of Construction — In all casts, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation,
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY 13Y THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
,� �2•
Signator-. Date: q
Print Name:
Mailing Address: `C21 tD ►�
W;CPemtit Center 1Applicationa-riandouta\Pelmit Applitations\PDFa\Electrieal Permit Application Revised 1-17-194nen
Day Telephone:
2s.'laito 12,0
C t\2 w r W fir a1 0j'2
City Stare tap
Page 2 of 2
Receipt Number
DESCRIPTIONS 1
PermitTRAK
I QUANTITY
PAID
$196.41
EL19-0995 Address: 4302 S 104THPL
Apn: 0323049213
$196.41
ELECTRICAL
$187.06
PERMIT FEE MULTI-FAM/COMM
R000.322.101.00.00
0.00
$187.06
TECHNOLOGY FEE
$9,35
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R19180
R000.322.900.04.00
0.00
$9.35
$196.41
Date Paid: Monday, December 02, 2019
Paid By: TYCO INTEGRATED SECURITY
Pay Method: CHECK 015146
Printed: Monday, December 02, 2019 9:24 AM 1 of 1