Loading...
HomeMy WebLinkAboutPermit EL19-1023 - HOLDEN AT SOUTHCENTER - ELECTRICAL FOR NEW BUILDINGHOLDEN AT SOUTHCENTER 112 ANDOVER PARK E Apn: 0223000045 FINALED 05/24/2021 ELI 9-1023 Parcel No: Address: City of Tukwila " ��nx���na t of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206'431'3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL PERMIT 0223000045 Permit Number: 112 ANDOVER PARK E Project Name: HOLDEN AT SOUTHCENTER Issue Date: Permit Expires On: EL19-1023 2/26/2020 8/24/2020 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BETA TUKWILA LLC 18OZ7BOTMELLWAY NE#1lO' BOTHELL, WA, 98011 PAT WILIKE 3BlSSECENTER ST'SN0VUAUm|E' WA, 98065 STATESIDE POWER INC 10636 NE 1Z3RDST,NRKLAND'WA, 98034 STATEP|O26PVV ''' Phone: (425) 466-4162 Phone: Expiration Date: 10/22/2020 DESCRIPTION OF WORK: NEW ELECTRICAL FOR NEW CONSTRUCTION BUILDING, Valuation of sngIe family: $0.00 Valuation of mf/comm: $I640,000.00 Type ufWork: NEW Fees Collected: $24,645.74 Electrical Service Provided by: PUGET SOUND ENERGY Water Distric: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International FueI Gas Code: 2015 2015 2015 2015 2015 National Electricai Code: WA Cities Electrical Code: WAC 296-46B: 2017WA State Energy Code: 2017 2017 2015 Permit Center Authorized Signature: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: r Date: 2 /ZE/2 o Print Name: Da This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***ELECTRICAL PERMIT CONDITIONS*** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NEPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC and the Washington Cities Electrical Code. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 httn://www.Tukwi I aW A. gov Electrical Permit No. OA- /6 2. 3 Project No. Date Application Accepted: 1 1 O—( 9 Date Application Expires: () (1D 2-0 (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: /12 4A/DeiGe Z9i0e/t. 1:1S7- Suite Number: L'/42 Floor: Tenant Name: Veg./)L1 gourhi cr.:A.767R New Tenant: PROPERTY OWNER Name: / tyre- P Company Name:?...47../c, Name: 4z4.14,f,cf-- ,e4si:o 6-4,-t - 4 e, Address: / / 2 Ziy" c ,c City:7-1//rw nil State: 1,‘ Zip:99/ go CONTACT PERSON — person receiving all project communication Name: / tyre- P Company Name:?...47../c, Address:3 6.- 3 / 0 se 03 ... $ r Citysiva4 4 4 ii i.p. State:,, g Ziy" c Phone:92 . '6 . n 2 Fax: Phones,..., 8 2o_ kfx Fax: Email: PA-7-6,),S5,1(i4. COM Contr Reg No.: Exp Date: STATE,P/0 241°41 Yes DNo ELECTRICAL CONTRACTOR INFORMATION Company Name:?...47../c, Address: /0 6 3e , / 2 3 pm/ 4 vE City:irigirliam State Zip/ Phones,..., 8 2o_ kfx Fax: Contr Reg No.: Exp Date: STATE,P/0 241°41 Tukwila Business License No.; 6o/ g q 73 2 7 Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): E(4) gliXCD)7A, 6 STe7()C Will service be altered? "rYes Adding more than 50 amps? Yes El No Type of Use: Type of work: New 0 Addition 0 Service Change 0 Remodel 0 Tenant Improvement 0 Low Voltage 0 Generator 0 Fire Alarm 0 Telecommunication 0 Temporary Service Property Served by: pit Puget Sound Energy 0 Seattle City Light WAPermit Center1Applictioas-HndoutWermit Apptications1PDFAElecirical Permit Application Revised 1-17-19.docx Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE O New single family dwellings $180.00 (including an attached garage) 0 Garages, pools, spas and outbuildings $120.00 ea Ei Low voltage systems (alarm) $60.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES O Service change or alteration $120.00 (no added/altered circuits) El Service change with added/altered circuits number of added circuits $10.00 ea El Circuits added/altered without service change $60.00 (up to 5 circuits) O Circuits added/altered without service change $60.00 (6 or more circuits) $10 00 ea O Meter/mast repair $80.00 O Low voltage systems $60.00 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES O Temporary service (residential) $60.00 O Temporary service (generator) $90.00 O Manufactured/mobile home service $100.00 (excluding garage or outbuilding) O Carnivals $100.00 Number of concessions $11.00 ea Each ride and generator truck $11.00 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: PA -76" W PZ -i717.% Day Telephone: 25 V Mailing Address: Address: 53/ 5 C AME siv,4-4-/1EE. 9g491 5 - City State Zip Date: 2 'Jo- 20/7 WAPermit CentertApplications-HandoutsTemit Applications \PDFAElectrical Permit Application Revised 1-17-19.clocx Page 2 of 2 January 13, 2020 0 City of Tukwila Department of Community Development PAT WILIKE 35316 SE CENTER ST SNOQUALMIE, WA 98065 RE: Correction Letter # 1 ELECTRICAL Permit Application Number EL19-1023 HOLDEN AT SOUTHCENTER - 112 ANDOVER PARK E Dear PAT WILIKE, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - E DEPARTMENT: Jim Benner at 206-431-3679 if you have questions regarding these comments. • CORRECTION/ #1 1). SHEET E402 PANEL EMI CIRCUIT 32,34,36 INDICATES 200 AMP OCPD FOR 400 AMP FEEDER TO PANEL EM7. REVISE. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. Sincerely, met Bill Rambo Permit Technician File No. EL19-1023 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK 19,791.99 EL19-1023 Address: 112 ANDOVER PARK E Apn: 0223000045 191 791• 99 ELECTRICAL $18249.51 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 18,849.51 TECHNOLOGY FEE TECHNOLOGY FEE R000.322.900.04.00 $942.48 $942.48 TOTAL FEES PAID BY RECEIPT: R20270 $19,791.99 Date Paid: Wednesday, February 26, 2020 Paid By: STATESIDE POWER INC Pay Method: CHECK 4691 Printed: Wednesday, February 26, 2020 4:24 PM 1 of 1 CRWS YS 'ISMS Cash Register Receipt City of Tukwila . . DESCRIPTIONS PermitTRAK ACCOUNT 1 QUANTITY I PAID $4,925.46 EL19-1023 Address: 112 ANDOVER PARK E Apn: 0223000045 $4,853.75 Credit Card Fee $141.37 Credit Card Fee R000.369.908.00.00 0.00 $141.37 ELECTRICAL $4,712.38 PLAN CHECK FEE R000.345.832.00.00 0.00 $4,712.38 EL19-1024 Address: 112 ANDOVER PARK E Apn: 0223000045 $71.71 Credit Card Fee $2.09 Credit Card Fee R000.369.908.00.00 0.00 $2.09 ELECTRICAL $66.30 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $66.30 TECHNOLOGY FEE $3.32 TECHNOLOGY FEE TOTAL! FEES PAID BY RECEIPT: R19253 R000.322.900.04.00 0.00 ' $3.32 S40925.46 Date Paid: Tuesday, December 10, 2019 Paid By: BILL WHITE Pay Method: CREDIT CARD 010200 Printpri• Tiiperlav 1.)PrPmher 10 7019 10:07 AM 1 of 1 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206'433'1870 CITY OF TUKWILA 0017]40000802}74464500 Date: I2/10/2019 10:06:40 AM CREDIT CARD SALE VISA CARD NUMBER: *****~****0536 K TRAN AMOUNT: $4,925.46 APPROVAL CD: 018200 RECORD #: 000 CLERK ID: frankip X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT {MERCHANT AGREEMENT IF CREDIT VOUCHER} Thank you! Merchant Copy Permit Number: EL19-1023 Permit Inspections City of Tukwila Applied: 12/10/2019 Approved: 2/18/2020 Issued: 2/26/2020 Finaied: 5/24/2021 Status: FINALED Parent Permit: Parent Project: Details: NEW ELECTRICAL FOR NEW CONSTRUCTION BUILDING. Description: HOLDEN AT SOUTHCENTER Site Address: 112 ANDOVER PARK E City, State Zip Code:TUKWILA, WA98188 Applicant: HOLDEN AT SOUTHCENTER Owner: BETA TUKWILA LLC Contractor: STATESIDE POWER INC CPiN P SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS UNDERGROUND SLAB Jim Benner 2533509778 Notes: ROUGH IN ELECTRICAL Jim Benner 2533509778 Notes: 3/17/2020 3/17/2020 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL Notes: PARTIAL APPROVAL/#1 O.K. -SLAB CONDUITS 13 B 3/17/2020 AM 3/17/2020 ROUGH -IN ELECTRICAL Jim Benner CANCELLED 155581 Notes: CANCELLED -SLAB WANTED CANCELLED -SLAB WANTED 5/28/2020 AM 5/28/2020 ROUGH -IN ELECTRICAL Jim Benner CANCELLED 144723 Notes: CANCELLED -UG WANTED CANCELLED -UG WANTED Printed: Thursday, 14 October, 2021 1 of 8 I i1 SUPERION Permit Inspections City of Tukwila 5/28/2020 5/28/2020 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL Notes: PARTIAL APPROVAL/#2 O.K. -2 x 4" TEL. SERVICE CONDUITS WEST PARTIAL APPROVAL/ #20.K. -2 x 4" TEL. SERVICE CONDUITS WEST 6/9/2020 AM 6/9/2020 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL 453871 Notes: PARTIAL APPROVAL/#3 O.K. -L2 COURTYARD PLANTERS -11 x 4" SERVICE LAT CONDUITS 6/25/2020 AM 6/25/2020 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL 433977 Notes: PARTIAL APPROVAL/#4 O.K. -SLAB CONDUITS AT GEN. PAD N.E. -TEMP. POWER CONDUITS EAST2" & 4" PARTIAL APPROVAL/#4 O.K. -SLAB CONDUITS AT GEN. PAD N.E. -TEMP. POWER CONDUITS EAST2" & 4" 7/10/2020 AM 7/10/2020 ROUGH -IN ELECTRICAL Jim Benner PARTIAL i APPROVAL 282169 Notes: PARTIAL APPROVAL/#5 O.K. -1.1 EXT. MASON BOXES FOR LTG. IN BRICK PARTIAL APPROVAL/#5 O.K. -11 EXT. MASON BOXES FOR LTG. IN BRICK 7/24/2020 AM 7/24/2020 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL 215757 Notes: PARTIAL APPROVAL/#6 O.K. -L7 UNITS WALLS AND LIDS EXCEPT 705 PARTIAL APPROVAL/#6 O.K. -L7 UNITS WALLS AND LIDS EXCEPT 705 7/30/2020 AM 7/30/2020 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL 322913 Notes: PARTIAL APPROVAL/#7 O.K. -LV SERVICE CONDUIT PARTIAL APPROVAL/#7 O.K. -LV SERVICE CONDUIT 8/5/2020 AM 8/5/2020 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL 183189 Notes: PARTIAL APPROVAL/#7 O.K. -L6 UNITS -UNIT 705 Printed: Thursday, 14 October, 2021 2 of 8 rk SUPERION 8/12/2020 AM 8/12/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 262118 Notes: PARTIAL APPROVAL/#8 O.K. -WALLS AND LIDS ROOFTOP MACHINE ROOMS AND BOILER ROOM -L7 CORRIDOR HARDLIDS PARTIAL APPROVAL/#8 O.K. -WALLS AND LIDS ROOFTOP MACHINE ROOMS AND BOILER ROOM -L7 CORRIDOR HARDLIDS 8/14/2020 AM 8/14/2020 ROUGH IN Jim Benner PARTIAL 461424 ELECTRICAL APPROVAL Notes: PARTIAL APPROVAL/#9 O.K. -L5 RESI UNITS PARTIAL APPROVAL/#9 O.K. -L5 RESI UNITS 8/18/2020 AM 8/18/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 26161 Notes: PARTIAL APPROVAL/#10 O.K. -L6 CORRIDOR HARD LIDS PARTIAL APPROVAL/#10 O.K. -L6 CORRIDOR HARD LIDS 9/9/2020 AM 9/9/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 151769 Notes: PARTIAL APPROVAL/#11 O.K. -L7 DROP LIDS IN UNITS 9/18/2020 PM 9/18/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 253-350-9778 Notes: PARTIAL APPROVAL/#12 O.K. -L4 UNITS -L5 CORRIDOR HARD UD -L7 CORRIDOR DROP LIDS 9/29/2020 AM 9/29/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 253 Notes: PARTIAL APPROVAL/#13 O.K. -L3 UNITS -WALLS AND LIDS BOTH STAIRWELLS -L6 UNIT SOFFITS -SMOKE SHAFT L3 -L7 BY ELEVATOR Printed: Thursday, 14 October, 2021 3 of 8 SUPERION Permit Inspections City of Tukwila 10/8/2020 AM 10/8/2020 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL 253-350-9778 Notes: PARTIAL APPROVAL/#14 O.K. -11 NORTH WALL AT FACP -L2 EXTERIOR SOFFIT EAST -L4 CORRIDOR HARD LID -L6 CORRIDOR SOFFITS ROUGH -IN PARTIAL 10/21/2020 AM 10/21/2020 ELECTRICAL Jim Benner APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#15 O.K. -L3 CORRIDOR HARD LID UNDERGROUND PARTIAL 10/21/2020 AM 10/21/2020 SLAB Jim Benner APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#15 O.K. -2 x 3/4" EAST FOR LTG. & CAMERA -GEN. PAD ROUGH -IN PARTIAL 10/27/2020 AM 10/27/2020 Jim Benner 2533509778 ELECTRICAL APPROVAL Notes: PARTIAL APPROVAL/#16 O.K. -SOFFITS 15 UNITS AND CORRIDOR 11/4/2020 11/4/2020 ROUGH -IN Jim Benner PARTIAL 2533509778 ELECTRICAL APPROVAL Notes: PARTIAL APPROVAL/#17 O.K. -COVER SMOKE CONTROL SHAFT L2 & 3 UNDERGROUND PARTIAL 11/4/2020 11/4/2020 SLAB Jim Benner APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#17 O.K. -UG LTG. CONDUITS EAST ROUGH -IN PARTIAL 11/20/2020 AM 11/20/2020 ELECTRICAL Jim Benner APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#18 O.K. -L2 WALLS AND HARDLIDS EXCEPT AT COURTYARD ENTRANCES 11/20/2020 11/20/2020 UNDERGROUND Jim Benner PARTIAL 2533509778 SLAB APPROVAL Notes: PARTIAL APPROVAL/#18 O.K. -UG CONDUITS FOR STREET LTG. EAST Printed: Thursday, 14 October, 2021 4 of 8 rk SUPERION Permit Inspections City of Tukwila 11/25/2020 AM 11/25/2020 SERVICE Jirn Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#19 O.K. -PANELS H7RS, EM7, H5S, MCDBN, MCDBS 11/25/2020 AM I 11/25/2020 ROUGH IN ELECTRICAL Jirn Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#19 O.K. -L4 SOFFITS 12/3/2020 PM 12/3/2020 ROUGH -IN ELECTRICAL Jirn Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#20 O.K. -COVER SMOKE CONTROL SHAFTS N & S 12/16/2020 AM 12/16/2020 ROUGH IN ELECTRICAL Jirn Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#21 O.K. -L4 CORRIDOR HARD LID 12/22/2020 PM 12/22/2020 SERVICE Jim Benner APPROVED 2533509778 Notes: APPROVED/ #22 O.K. -SERVICE TERMS AND UFER 12/22/2020 PM 12/22/2020 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#22 O.K. -EXTERIOR WALL AT WALKIN LI -ELEVATOR1 FIRE PHONE STUBS INTO SHAFT ALL LEVELS 12/29/2020 AM 12/29/2020 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#23 O.K. -WALLS L1 KITCHEN 1/5/2021 AM 1/5/2021 ROUGH -IN ELECTRICAL Jinn Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#24 Q.K. -ELEVATOR SOUTH DISCO FOR TEMP. 1/5/2021 1/5/2021 UNDES�B UND Jim Benner NOT APPROVED 2533509778 Notes: CORRECTION/ #24 -REPAIR EXISTING INFRASTRUCURE CONDUIT(S) WEST ALONG ANDOVER PK. E. Printed: Thursday, 14 October, 2021 5 of 8 ii SUPERION Permit Inspections City of Tukwila 1/7/2021 AM 1/7/2021 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#25 O.K. -POLE BASE UFERs WEST 1/8/2021 AM 1/8/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#26 O.K. -L3 UNITS DROP LIDS -415 DROP LIDS 1/13/2021 AM 1/13/2021 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#27 O.K. -COVER PLUMBER'S SHAFT N.W. (TRASH ROOM) 11 TO ROOF 1/13/2021 1/13/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL Notes: PARTIAL APPROVAL/#27 O.K. -ENERGIZE ATS 1 & 2 AND MTS 1/27/2021 AM 1/27/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#28 O.K. -HARDLID L5S AMENITY BATH 1/29/2021 AM 1/29/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#29 O.K. -L7 UNITS FINAL -PANEL H2N & H2S 1/29/2021 AM 1/29/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#29 O.K. -COVER SOFFITS L3 CORRIDOR 2/9/2021 AM 2/9/2021 UNDERGROUND SLAB Jim Benner PARTIAL ' APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#30 CORRECTION MADE O.K. -UG CONDUITS AND POLE BASES WEST 2/11/2021 AM 2/11/2021 ROUGH -IN ELECTRICAL Jim Benner PARTIAL APPROVAL RS 2533509778 Notes: Rescheduled from 2/10. PARTIAL APPROVAL/#31 Printed: Thursday, 14 October, 2021 6 of 8 i1 SUPERION Permit Inspections City of Tukwila O.K. -L2 HARDLIDS AT COURTYARD ENTRYWAYS 2/17/2021 PM 2/17/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#32 O.K. -WALLS & HARDLIDS L1 2/18/2021 AM 2/18/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#33 O.K. -L1 DRIVE-THRU SOFFIT 3/12/2021 AM 3/12/2021 UNDERGROUND SLAB Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#34 O.K. -3 x POLE BASES IN PARKING LOT W/ UFER 3/18/2021 AM 3/18/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#35 O.K. -L6 UNITS 4/8/2021 PM 4/8/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#35 O.K. -L5 UNITS EXCEPT 501 & 506 4/16/2021 AM 4/16/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#36 O.K. -ALL UNITS L4 EXCEPT 404 & 411 -501 & 506 4/27/2021 PM 4/27/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#37 O.K. -L6 & 7 COMPLETE NOTE: -PANEL SCHED. & FACP LABELS/BREAKER HANDLE CLAMP EM 1, 12 5/4/2021 PM 5/4/2021 ROUGH IN ELECTRICAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#38 O.K. -L1 GRID CEILINGS EXCEPT LAUNDRY AREA -L2 GRID CEILINGS Printed: Thursday, 14 October, 2021 7 of 8 i1 SUPERION Permit Inspections City of Tukwila 5/5/2021 5/5/2021 ELECTRICAL FINAL Jim Benner PARTIAL APPROVAL 2533509778 Notes: PARTIAL APPROVAL/#39 O.K. -L3 & 4 COMPLETE PARTIAL 5/6/2021 5/6/2021 ELECTRICAL FINAL Jim Benner 2533509778 APPROVAL Notes: PARTIAL APPROVAL/#40 O.K. -ROOFTOP EQUIPMENT NOTES: -BOND HOT TO COLD TO PRESSURE RELIEF COPPER -GREY DIAGONAL FOR PRESSURE AND YELLOW FOR SMOKE EXHAUST -ENGRAVED PHENOLICS -FED FROM LABELS 5/6/2021 5/6/2021 SERVICE Jim Benner APPROVED Notes: APPROVED/ #40 O.K. -ELEVATOR DISCOS1, 2, & 3 PARTIAL 5/7/2021 5/7/2021 ELECTRICAL FINAL Jim Benner 2533509778 APPROVAL Notes: PARTIAL APPROVAL/#41 O.K. -L2 UNITS ROUGH -IN PARTIAL 5/11/2021 5/11/2021 Jim Benner 2533509778 ELECTRICAL APPROVAL Notes: PARTIAL APPROVAL/#42 O.K. -CEILINGS IN KITCHEN AND LAUNDRY 5/14/2021 5/14/2021 ELECTRICAL FINAL Jim Benner PARTIAL 2533509778 APPROVAL Notes: PARTIAL APPROVAL/#43 O.K. -L2 EXCEPT COMMON AREAS -L1 EXCEPT KITCHENS, BARS, TRASH, AND EXTERIOR 5/24/2021 AM 5/24/2021 ELECTRICAL FINAL Harry Hinton APPROVED 2533509778 Notes: Printed: Thursday, 14 October, 2021 8 of 8 SUPERION PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL19-1023 PROJECT NAME: HOLDEN AT SOUTHCENTER SITE ADDRESS: 112 ANDOVER PARK E Original Plan Submittal 7C. Response to Correction Letter Revision # Revision # after Permit Issued DATE: 0074020 before Permit Issued DEPART ENTS: Buildin Division Public Works Fire Prevention Structural Planning Division Permit Coordirator PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: DATE: 01/21/20 Structural Review Required DATE: Approved Corrections Required (corrections entered in Reviews) DUE DATE: Approved with Conditions Denied (le: Zoning Issues) 03103/20 Fire Fees Apply Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire Ping LJ PW El Staff Initials: 12/18/2013 prp_C_O wumPY 0 0 PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL19-1023 DATE: 12/11/2019 PROJECT NAME: HOLDEN AT SOUTHCENTER SITE ADDRESS: 112 ANDOVER PARK E X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: a Building Division tr?) til Public Works Fire Prevention Structural PRELIMINARY REVIEW: Not Applicable Fi (no approval/review required) Planning Division Permit Coordinator DATE: 12/12/19 ri Structural Review Required REVIEWER'S NIT ALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DA IL: 1/9/2020 Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) P Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 010 Uff. Departments issued corrections: Bldg Fire 0 Ping 0 PW 0 Staff Initials: 12/18/2013 Date: 0 City of Tukwila (13— REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. 1-15-19 Plan Check/Permit Number: EL19-1023 • Response to Incomplete Letter # Response to Correction Letter # 1 LI Revision # after Permit is Issued • Revision requested by a City Building Inspector or Plans Examiner - Deferred Submittal # Project Name: Holden at Southcenter Project Address: 112 Andover Park E Contact Person: Patrick Wilkie Phone Number 425.466.4162 Summary of Revision: Revised breaker in EM1 from 200Ao 400A for the feeder to EM7 Sheet Number(s): E 402 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Pe 't Center by: Ef"."---Entered in TRAKiT on 5P/14 RECEIVED CITY OF TUKWILA JAN 17 2020 PERMIT CENTER S:\bwhile\Holdcn South Center\CAD \ To cityN3 response to Jan 13 comment \pdf \Revision Submittal Form.doc wd.nrteg, nt %) Labor & Industries (https://lni.wa.gov) Contractors STATESIDE POWER INC Owner or tradesperson Principals CHAMBERS, RONALD H White, William, PRESIDENT Wilkie, Patrick, VICE PRESIDENT White, Bill, AGENT MARKS HOLMES FOLEY ETAL, AGENT (End: 06/12/2013) Doing business as STATESIDE POWER INC WA UBI No. 601 897 327 10636 NE 123RD ST KIRKLAND, WA 98034 425-820-6516 KING County Business type Corporation Governing persons BILL WHITE RONALD H CHAMBERS; Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active Meets current requirements. License specialties GENERAL License no. STATEPI026PW Effective — expiration 10/16/1998— 10/22/2020 Designated administrator WHITE, WILLIAM E Active Meets current requirements. License type License no. Master Electrician WHITEWE968KE Bond Hartford Fire Ins Co Bond account no. 52BSBGQ4543 $4,000.00 Received by L&I Effective date 02/18/2014 02/20/2014 Expiration date Until Canceled Bond history vings No savings accounts during the previous 6 year period. License Violations Infraction no. EDORN00586 Issue date 12/05/2017 Satisfied RCW/WAC 19.28.271 RCW