HomeMy WebLinkAboutReg 2024-05-06 Item 5G - Change Order #4 - Riverton Creek Flap Gate with RL Alia Company for $72,285.08COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 05/06/24 JR ITEM INFORMATION ITEM No. 5.G. STAFF SPONSOR: JOSHUA HOPKINS ORIGINAL AGENDA DATE: 05/06/24 AGENDA ITEM TITLE Surface Water Fund - Riverton Creek Flapgate Removal Project Change Order No. 4 CATEGORY ❑ Discussion Meg Date 0 Motion Meg Date 05/06/24 ❑ Resolution Meg Date ❑ Ordinance Meg Date ❑ Bid Award Meg Date ❑ Public Hearing Meg Date ❑ Other Meg Date SPONSOR ❑Council ❑Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police IIMr' ❑Court SPONSOR'S This project restored fish access to Riverton Creek and previously inaccessible rearing SUMMARY habitat at the confluence with the Duwamish River. Change order No. 4 pays for costs associated with Change Order No. 3 punchlist items identified by WSDOT and their altered infrastructure. Council is being asked to approve Change Order No. 4 to Contract No. 20- 052 with R.L. Alia in the amount of $72,285.08 REVIEWED BY Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev. ❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 04/22/24 COMMITTEE CHAIR: ARMEN PAPYAN RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda Meeting COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $517,611.79 $0.00 Fund Source: Comments: 2023-2028 CIP Pg. 93 MTG. DATE RECORD OF COUNCIL ACTION 05/06/24 MTG. DATE ATTACHMENTS 05/06/24 Informational Memorandum dated 04/19/24 2023-2028 CIP Pg. 93 Change Order No. 4. Minutes from Transportation and Infrastructure Committee meeting of 04/22/24 107 108 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2021 to 2026 PROJECT: Riverton Creek Flap Gate Removal Project No. 99830103 Remove two culverts and flap gates that confluence with the Duwamish River; daylight creek, install trail bridge DESCRIPTION: over creek, habitat improvements and planting for 1,200 lineal feet of creek, inc 1/4 acre backwater wetland habitat and 400 ft of river; associated structural improvements for TIB roadway and adjacent commercial property. JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve fish access to Riverton Creek and enhance salmon rearing and resting area. STATUS: Project construction began in 2020. MAINT. IMPACT: Expected to increase maintenance. Construction funding from the State RCO Salmon Recovery Funding Board, King County Cooperative Watershed COMMENT: Management, King County Opportunity Funds, the WRIA 9 Re -green the Green Program and City Surface Water Funds. FINANCIAL Through Estimated (in $000's) 2019 2020 2021 2022 2023 2024 2025 2026 BEYOND TOTAL EXPENSES Design 391 391 Land (R/W) 0 Monitoring 25 25 Const. Mgmt. 200 5 205 Construction 1,654 25 1,679 TOTAL EXPENSES 391 1,854 55 0 0 0 0 0 0 2,300 FUND SOURCES Awarded Grant RCO 116 781 897 King County Grant 240 50 290 People for Puget S 30 30 Mitigation Expected 0 Utility Revenue 245 833 5 0 0 0 0 0 0 1,083 TOTAL SOURCES 391 1,854 55 0 0 0 0 0 0 2,300 Project Location `� g N �� Ili , • t. tr. "alio 2 Fir ter t6 s 3T8t r� 2021 - 2026 Capital Improvement Program 90 109 110 TO: FROM: BY: DATE: SUBJECT: City of Tukwila Pith k Works Deportment - Hari Ponnekanti, Director/City Engineer Thomas McLeod, Mayor INFORMATIONAL MEMORANDUM Mayor Thomas McLeod Hari Ponnekanti, Public Works Director Joshua Hopkins, Surface Water Project Manager April 19, 2024 Surface Water Fund - Riverton Creek Flapgate Removal Project Project Number 99830103, Contract No. 20-052 Change Order No. 4 ISSUE Approve Change Order No. 4 to Contract No. 20-052 with R.L. Alia Company BACKGROUND This project restored fish access to Riverton Creek and previously inaccessible rearing habitat at the confluence with the Duwamish River. DISCUSSION This change order accounts for overruns ($34,339.83) incurred in association with CO #3 Tasks 3.1 & 3.2; mark-ups ($25,292.03) on labor, equipment, materials, and sub -contractors not included in CO#3 Estimate; and sales tax ($6,621.96) for the overruns and mark-ups. Tasks 3.1 and 3.2 cost overruns were due to unforeseen complications with production rates associated with site conditions and the complexity of fabricating and fitting custom replacement cover plates. Mark-ups were inadvertently omitted from CO #3 Estimate. CO#4 includes 10% contingency ($6,631.06). The total cost of CO#4 is $72,285.08. FISCAL IMPACT Change order No. 4 includes compensation estimated at $72,285.08, raising the tax -inclusive contract from $1,653,593.86 to $1,884,286.37. This project cost (72,285.08) over contingency, in addition to CO#3 costs over contingency ($8,080.71), will be funded through the Utility Revenue ($80,365.79). Bid Amount Contingency (10%) Change Orders #1-3 Change Order #4 Utility Revenue Funding from 205 Levee Certification Grants (CWM, Opp, RCO) Total Encumbered $1,503,267.15 $150,326.71 $158,407.42 $72,285.08 Budget $517,611.79 $344,780.57 $1, 021, 894.00 $1,884,286.36 $1,884,268.36 RECOMMENDATION The Mayor, as signatory of the original contract, is being asked to approve and sign Change Order No. 4 with an estimated increase of $72,285.08 and 18 working days. Attachments: • CIP pg 93.pdf • Change Order No. 4. W:1PW Eng1PROJECTSIA- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)1Construction\Change Orders\CO#4 111 112 Sheet 1 of 1 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 4 DATE: April 11, 2024 BUDGET NO.: 412.98.594.382.65.00 PROJECT NO.: 99830103 CONTRACT NO.: 20-052 PROJECT NAME: Riverton Creek Flapgate Removal Project TO: R.L. Alia Company You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: See Attached Exhibit "A" We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACCEPTED: Date Contractor By Title Original Contract (with tax) $ 1,503,267.15 APPROVED BY THE CITY OF TUKWILA Previous Change Orders & Contingency $ 308,734.13 Date This Change Order (with tax) $ 72,285.08 By Mayor REV. CONTRACT AMOUNT $ 1,884,286.36 Original Contract Time: 115 Working Days Additional Contract Time for previous Change Orders: 63 Days City Engineer Additional Contract Time for this Change Order: 18 Days Updated Contract Time: 196 Working Days ORIGINAL: City Clerk (1 of 2) cc: Finance Department (w/encumbrance) Contractor (2 of 2) Project Management File Page 1 of 4 113 PROJECT NO.: 99830103 PROJECT NAME: Riverton Creek Flapgate Removal Project DESCRIPTION OF WORK CONTRACT NO.: 20-052 This change order accounts for overruns incurred in association with CO #3 Tasks 3.1 and 3.2; mark-ups on labor, equipment, materials, and subcontractors for Tasks 3.1, 3.2, and 3.3 (not included in CO#3 Estimate); and sales tax for the overruns and mark- ups. • 3.1 Replacement Cover Plates for Tie -Back Penetrations by Force Account • 3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment by Force Account • 3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates by Lump Sum 3.1 Replacement Cover Plates for Tie -Back Penetrations This work consists of mobilization, temporary pedestrian traffic control, site preparation and site restoration, temporary scaffolding, removing existing cover plates, welding, and grout tubes, preparing sheet pile wall surface to bare metal, prime coat application, and installing new cover plates per provided Cover Plate Details (Sheet 19A, File No. S1.3A). 3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge Southwest Bridge Abutment This work consists of removing existing joint sealer and dirt from the joint and installing new joint sealer. 3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates This work consists of mobilization, containment of abrasives, collecting, testing and disposal of containment waste, preparing the sheet pile wall to bare metal, and application of coating system. This work shall comply with WSDOT 2020 Standard Specifications in Section 6-07. MATERIALS All materials shall be in accordance with the provided Cover Plate detail, current contract specifications or as approved by the Engineer. CONSTRUCTION REQUIREMENTS The Contractor shall perform the work in accordance with the provided Cover Plate detail, current contract plans and specifications or as approved by the Engineer. MEASUREMENT AND PAYMENT 3.1 "Replacement Cover Plates for Tie -Back Penetrations" will be paid in accordance with WSDOT 2020 Standard Specification Section 1-09.6 CONTRACT TIME Contract time shall be extended by (18) working days as a result of this change order. 114 The total cost of Change Order #4 is $72,285.08. Change Order #4 Summary: CO#3 Tasks 3.1 and 3.2 overruns amount to $34,339.83, an 80.8% increase in direct costs over estimated costs, and accounts for 52% percent of CO#4. Mark-ups in the amount of $25,292.03 and sales tax in the amount of $6,022.76 account for 39% and 9% of CO#4, respectively. Tasks 3.1 and 3.2 cost overruns were due to unforeseen complications with production rates associated with site conditions and the complexity of fabricating and fitting custom replacement cover plates. Mark-ups were inadvertently omitted from CO #3 Estimate. CO#4 Estimate includes 10% contingency ($6,631.06). Table 1. CO#4 Summary — Three Invoice from RL Alia for Time and Materials # Invoice Date Total 1 RL Alia Time & Materials 11/28/23 to 12/22/23 $39,072.85 2 RL Alia Time & Materials 01/03/24 to 02/26/24 $28,360.05 3 RL Alia Time & Materials 03/14/24 to 03/29/24 $4,057.39 Sub -Total: $71,490.29 Sales Tax 10.1 % $7,220.52 Sub -Total: $78,710.81 CO#3 Credit Balance: -($13,056.79) Sub -Total: $65,654.02 CO#4 Contingency: $6,631.06 CO#4 Total: $72,285.08 Table 2. Change Order #3 Summary of Quantities (in grey), Payments, and Balance Item Item Description Qty Unit Unit Price Item Cost 3.1 Replacement Cover Plates for Tie -Back Penetrations 1 EST. $41,500.00 $41,500.00 3.2 Repair Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment 1 EST. $1,000.00 $1,000.00 3.3 Surface Preparation and Coating for Previously Buried Portion of Wall #1 and Replacement Cover Plates 1 LS $37,553.60 $37,553.60 - $9,508.80 (RL Alia's Share) = $28,044.20 Est. Total Coast: $70,544.20 CO#3 Sales Tax: $7,125.82 CO#3 Total: $77,669.82 CO#3 1st Payment (PE#16): $64,613.03 CO#3 Balance: $13,056.79 115 Table 3. CO #3 Summary of Quantities (in grey) and CO#4 Overruns Mark-ups, and Sales Tax Item # Item Description Qty Unit Unit Price Item Cost Overruns Mark -Up (Original + Overrun) Sales Tax (Original + Overrun) Grand Totals: 3.1 Replacement 1 EST. $41,500.00 $41,500.00 Cover Plates for Tie -Back Penetrations $34,339.83 $21,926.72 $9,975.42 $108,741.97 3.2 Repair 1 EST. $1,000.00 $1,000.00 Expansion Joint between Existing Retaining Wall and Tukwila Intl. Bridge SW Bridge Abutment 3.3 Surface 1 LS $37,553.60 $37,553.60 Preparation and - $0.00 $3,365.30 $3,172.36 $34,581.86 Coating for $9,508.80 Previously (RL Alia's Buried Portion Share) = of Wall #1 and $28,044.20 Replacement Cover Plates Est. Total Coast: $70,544.80 $34,339.83 $25,292.03 $13,147.78 $143,323.84 CO#3 Sales Tax: $7,125.02 $-7125.02 CO#3 Total: $77,669,82 -$77,669.82 CO#4 Sub -Totals: $34,339.83 $25,292.03 $6,022.76 $65,654.62 CO#4 Total: Verification: $65,654.02* *_ $0.60 difference not found. 116 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Riverton Creek Flapgate Removal Project Project No. 9980103 PE # 17 3/4/2024 Pay Pd. Item 8/1/2023 Description of item to 1 1 /3/2023 Qty Unit Price Contract Amount Quantity this Estimate Previous Quantity Quantity to Date ORIGINAL CONTRACT AMOUNT CHANGE ORDERS OR ADJUSTMENTS: ADJUSTED CONTRACT AMOUNT: NOTICE TO PROCEED: CONTRACT (CALENDAR) DAYS: CHANGE ORDER / WEATHER DAYS SCHEDULED COMPLETION DATE: Percent Complete Amount Due This Estimate $1,503,267.15 $78,159.78 $1,581,426.93 7/10/2020 115 0 12/23/2020 Previous Amount Total Amount to Date Schedule A Bridge 1 Mobilization 1 LS $82,000.00 $82,000.00 0.00 1.00 1.00 100.00% $0.00 $82,000.00 $82,000.00 2 Contractor Surveying 1 LS $18,000.00 $18,000.00 0.00 1.00 1.00 100.00% $0.00 $18,000.00 $18,000.00 3 Unexpected Site Changes 1 FA $15,000.00 $15,000.00 0.00 1.09 1.09 109.34% $0.00 $16,400.46 $16,400.46 4 Temp Traffic Control 1 LS $15,000.00 $15,000.00 0.00 1.00 1.00 100.00% $0.00 $15,000.00 $15,000.00 5 Temp TrafContr Private Prop 1 LS $10,000.00 $10,000.00 0.00 0.95 0.95 95.00% $0.00 $9,500.00 $9,500.00 6 SPCC 1 LS $500.00 $500.00 0.00 1.00 1.00 100.00% $0.00 $500.00 $500.00 7 Riverton Creek Bridge 1 LS $140,000.00 $140,000.00 0.00 1.00 1.00 100.00% $0.00 $140,000.00 $140,000.00 8 Clean/Weld Piles to WalICap 10 LF $250.00 $2,500.00 0.00 10.00 10.00 100.00% $0.00 $2,500.00 $2,500.00 9 Structural Carbon Steel 1 LS $60,000.00 $60,000.00 0.00 1.00 1.00 100.00% $0.00 $60,000.00 $60,000.00 10 Furn&Drive Test Steel Pile 1 EA $7,000.00 $7,000.00 0.00 1.00 1.00 100.00% $0.00 $7,000.00 $7,000.00 11 Furnishing St. Piling 306 LF $50.00 $15,300.00 0.00 282.50 282.50 92.32% $0.00 $14,125.00 $14,125.00 12 Driving St. Piling 11 EA $2,000.00 $22,000.00 0.00 11.00 11.00 100.00% $0.00 $22,000.00 $22,000.00 13 Bridge Railing ChnLinkFence 108 LF $100.00 $10,800.00 0.00 144.00 144.00 133.33% $0.00 $14,400.00 $14,400.00 14 Clean&Paint Wall 1 1 LS $30,000.00 $30,000.00 0.00 1.00 1.00 100.00% $0.00 $30,000.00 $30,000.00 15 Remo SoldierPile Shft Obstrc 1 FA $8,000.00 $8,000.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 16 Shaft-24 inch Diameter 530 LF $212.55 $112,651.50 0.00 532.75 532.75 100.52% $0.00 $113,236.01 $113,236.01 17 Furn Soldier Pile HP 12X84 710 LF $123.00 $87,330.00 0.00 731.00 731.00 102.96% $0.00 $89,913.00 $89,913.00 18 Conrete Lagging 1,020 SF $70.00 $71,400.00 0.00 1,020.00 1,020.00 100.00% $0.00 $71,400.00 $71,400.00 19 Permanent Ground Anchor 18 EA $6,500.00 $117,000.00 0.00 18.00 18.00 100.00% $0.00 $117,000.00 $117,000.00 20 Perm GrndAnch Pert Test 3 EA $1,250.00 $3,750.00 0.00 3.00 3.00 100.00% $0.00 $3,750.00 $3,750.00 21 Perm GrndAnch Verify Test 2 LS $3,000.00 $6,000.00 0.00 2.00 2.00 100.00% $0.00 $6,000.00 $6,000.00 CO - 1 Wall 1 and Work Suspensiion Equitable Adjustment 1 LS $47,808.17 $47,808.17 0.00 1.00 1.00 100.00% $0.00 $47,808.17 $47,808.17 CO - 3 Wall 1 Replacment Cover Plates, Cleaning and Painting and Void Rep 1 LS $70,544.20 $70,544.20 0.5109 0.00 0.51 51.09% $36,044.05 $58,685.77 $94,729.82 Roadway 22 Clearing and Grubbng 1 LS $10,000.00 $10,000.00 0.00 1.00 1.00 100.00% $0.00 $10,000.00 $10,000.00 23 Removal Structure&Obstruct 1 LS $2,500.00 $2,500.00 0.00 1.00 1.00 100.00% $0.00 $2,500.00 $2,500.00 24 Remove Existing RetainWall 1 LS $10,000.00 $10,000.00 0.00 1.00 1.00 100.00% $0.00 $10,000.00 $10,000.00 25 Channel Excavation&Haul 1,570 CY $125.00 $196,250.00 0.00 1,345.00 1,345.00 85.67% $0.00 $168,125.00 $168,125.00 26 Select Grading (by FA) 1 FA $4,000.00 $4,000.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 27 Gravel Borrow 30 TN $75.00 $2,250.00 0.00 37.50 37.50 125.00% $0.00 $2,812.50 $2,812.50 271Q Gravel Borrow- increased quantities (above 125%) 0 TN $70.00 $0.00 0.00 257.22 257.22 NA $0.00 $18,005.40 $18,005.40 28 Unsuitable Foundation Excav 25 CY $100.00 $2,500.00 0.00 8.60 8.60 34.40% $0.00 $860.00 $860.00 29 Dewatering 1 LS $3,000.00 $3,000.00 0.00 1.00 1.00 100.00% $0.00 $3,000.00 $3,000.00 30 Structure Excavation Class A 110 CY $75.00 $8,250.00 0.00 110.00 110.00 100.00% $0.00 $8,250.00 $8,250.00 31 Shoring or Extra Exc Class A 1 LS $3,000.00 $3,000.00 0.00 1.00 1.00 100.00% $0.00 $3,000.00 $3,000.00 32 Trimming and Cleanup 1 LS $7,500.00 $7,500.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 33 Crushed Surf Base Course 54 TN $100.00 $5,400.00 0.00 46.17 46.17 85.50% $0.00 $4,617.00 $4,617.00 34 Commercial HMA 41 TN $250.00 $10,250.00 0.00 23.25 23.25 56.71% $0.00 $5,812.50 $5,812.50 CO - # Change Order Holding Slot CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS CO Riverton Creek Flapgate Removal Project Project No. 9980103 PE # 17 3/4/2024 Pay Pd. 8/1/2023 to 1 1 /3/2023 ORIGINAL CONTRACT AMOUNT CHANGE ORDERS OR ADJUSTMENTS: ADJUSTED CONTRACT AMOUNT: NOTICE TO PROCEED: CONTRACT (CALENDAR) DAYS: CHANGE ORDER / WEATHER DAYS SCHEDULED COMPLETION DATE: $1,503,267.15 $78,159.78 $1,581,426.93 7/10/2020 115 0 12/23/2020 Item Description of item Qty Unit Price Contract Amount Quantity this Estimate Previous Quantity Quantity to Date Percent Complete Amount Due This Estimate Previous Amount Total Amount to Date Roadside Development $90,000.00 0.00 1.00 1.00 100.00% $0.00 $90,000.00 $90,000.00 35 Temp Stream Diversion 1 LS $90,000.00 36 Erosion/Water Poll Prevent 1 LS $7,500.00 $7,500.00 0.00 0.50 0.50 50.00% $0.00 $3,750.00 $3,750.00 37 High Visibility Fence 135 LF $4.00 $540.00 0.00 150.00 150.00 111.11% $0.00 $600.00 $600.00 38 Coir Log 360 LF $6.00 $2,160.00 0.00 360.00 360.00 100.00% $0.00 $2,160.00 $2,160.00 39 Erosion Control Blanket 180 SY $2.50 $450.00 0.00 447.50 447.50 248.61% $0.00 $1,118.75 $1,118.75 40 PSIPE Acer Circinatum #5 - All PSIPE at 100% 1/26/2: 2 EA $60.00 $120.00 0.00 3.00 3.00 150.00% $0.00 $198.00 $234.00 41 PSIPE Argentina egedii 10" 10 EA $25.00 $250.00 0.00 10.00 10.00 100.00% $0.00 $275.00 $325.00 42 PSIPE Aruncus dioicus #1 12 EA $25.00 $300.00 0.00 16.00 16.00 133.33% $0.00 $440.00 $520.00 43 PSIPE Carex lyngbei ( & 4" fragaria chiloensis) 10 EA $20.00 $200.00 0.00 130.00 130.00 1300.00% $0.00 $2,860.00 $3,380.00 44 PSIPE Comus stoloniferaBdl 15 EA $25.00 $375.00 0.00 15.00 15.00 100.00% $0.00 $412.50 $487.50 45 PSIPE Cornus stolonifera#1 4 EA $25.00 $100.00 0.00 9.00 9.00 225.00% $0.00 $247.50 $292.50 46 PSIPE Eleocharis paulstrus 10 EA $20.00 $200.00 0.00 10.00 10.00 100.00% $0.00 $220.00 $260.00 47 PSIPE Fraxinus latifolia #2 5 EA $25.00 $125.00 0.00 5.00 5.00 100.00% $0.00 $137.50 $162.50 48 PSIPE Gualtheria shallon #1 20 EA $20.00 $400.00 0.00 49.00 49.00 245.00% $0.00 $1,078.00 $1,274.00 49 PSIPE Holodiscus discolor#1 5 EA $20.00 $100.00 0.00 5.00 5.00 100.00% $0.00 $110.00 $130.00 50 PSIPE Lonicera involucratel 15 EA $20.00 $300.00 0.00 15.00 15.00 100.00% $0.00 $330.00 $390.00 51 PSIPE Malus fusca #2 5 EA $20.00 $100.00 0.00 7.00 7.00 140.00% $0.00 $154.00 $182.00 52 PSIPE Physocarpus capitats 8.00 EA $20.00 $160.00 0.00 11.00 11.00 137.50% $0.00 $242.00 $286.00 53 PSIPE Picea sitchensis 13.00 EA $175.00 $2,275.00 0.00 13.00 13.00 100.00% $0.00 $2,502.50 $2,957.50 54 PSIPE Polystichum munitum 20.00 EA $20.00 $400.00 0.00 50.00 50.00 250.00% $0.00 $1,100.00 $1,300.00 55 PSIPE Pseudotsuga menzisi 3 EA $175.00 $525.00 0.00 6.00 6.00 200.00% $0.00 $1,155.00 $1,365.00 56 PSIPE Ribies sanguineum#1 8 EA $20.00 $160.00 0.00 10.00 10.00 125.00% $0.00 $220.00 $260.00 57 PSIPE Roa Pisocarpa #1 13 EA $20.00 $260.00 0.00 19.00 19.00 146.15% $0.00 $418.00 $494.00 58 PSIPE Rubus spectabilis #1 17 EA $20.00 $340.00 0.00 17.00 17.00 100.00% $0.00 $374.00 $442.00 59 PSIPE Salix hookeriana Live 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $650.00 60 PSIPE Salix hookeriana Bndl 20 EA $50.00 $1,000.00 0.00 20.00 20.00 100.00% $0.00 $1,100.00 $1,100.00 61 PSIPE Salix lucida #2 5 EA $25.00 $125.00 0.00 5.00 5.00 100.00% $0.00 $137.50 $162.50 62 PSIPE Salix scouleriana Live 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $650.00 63 PSIPE Salix scouleriana Bnd 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $550.00 64 PSIPE Salix sitchensis Live 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $650.00 65 PSIPE Salix sitchensis Bndle 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $550.00 66 PSIPE Sambucus racemosa 6 EA $20.00 $120.00 0.00 6.00 6.00 100.00% $0.00 $132.00 $156.00 67 PSIPE Symphoricarpos alba 20 EA $25.00 $500.00 0.00 20.00 20.00 100.00% $0.00 $550.00 $650.00 68 PSIPE SymphoricarposAlbl 20 EA $25.00 $500.00 0.00 47.00 47.00 235.00% $0.00 $1,292.50 $1,527.50 69 PSIPE Thuja plicata 2 EA $200.00 $400.00 0.00 2.00 2.00 100.00% $0.00 $440.00 $520.00 70 PSIPE Tsuga heterophylla 4 EA $200.00 $800.00 0.00 4.00 4.00 100.00% $0.00 $880.00 $1,040.00 71 Topsoil Type A 7 CY $70.00 $490.00 0.00 5.00 5.00 71.43% $0.00 $350.00 $350.00 72 Compost (Amended Soil) 13 CY $70.00 $910.00 0.00 17.00 17.00 130.77% $0.00 $1,190.00 $1,190.00 73 Bark&Wood Chip Mulch 13 CY $70.00 $910.00 0.00 24.00 24.00 184.62% $0.00 $1,680.00 $1,680.00 74 Extruded Curb 240 LF $30.00 $7,200.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 75 Light Loose Riprap 400 TN $80.00 $32,000.00 0.00 506.98 506.98 126.75% $0.00 $40,558.40 $40,558.40 76 Paint Line 350 LF $10.00 $3,500.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 77 Woody Debr Strct Over Rip Rap 4 EA $1,400.00 $5,600.00 0.00 4.00 4.00 100.00% $0.00 $5,600.00 $5,600.00 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Riverton Creek Flapgate Removal Project Project No. 9980103 PE # 17 3/4/2024 ORIGINAL CONTRACT AMOUNT CHANGE ORDERS OR ADJUSTMENTS: ADJUSTED CONTRACT AMOUNT: NOTICE TO PROCEED: CONTRACT (CALENDAR) DAYS: CHANGE ORDER / WEATHER DAYS $1,503,267.15 $78,159.78 $1,581,426.93 7/10/2020 115 0 Pay Pd. 8/1/2023 to 11/3/2023 SCHEDULED COMPLETION DATE: 12/23/2020 Item Description of item Qty Unit Price Contract Amount Quantity this Estimate Previous Quantity Quantity to Date Percent Complete P Amount Due This Estimate Previous Amount Total Amount to Date 78 SingleLog Wetland Outlet 2 EA $1,400.00 $2,800.00 0.00 2.00 2.00 100.00% $0.00 $2,800.00 $2,800.00 79 SingleLogWetlandWoodDebr 10 EA $1,400.00 $14,000.00 0.00 10.00 10.00 100.00% $0.00 $14,000.00 $14,000.00 80 DoubleLogWetlandWoodDeb 2 EA $3,000.00 $6,000.00 0.00 2.00 2.00 100.00% $0.00 $6,000.00 $6,000.00 81 Floating Silt Curtain 1 LS $6,000.00 $6,000.00 0.00 1.00 1.00 100.00% $0.00 $6,000.00 $6,000.00 82 Streambed Gravel 241 TN $60.00 $14,460.00 0.00 272.55 272.55 113.09% $0.00 $16,353.00 $16,353.00 83 Streambed Cobbles 6 In. 54 TN $80.00 $4,320.00 0.00 58.21 58.21 107.80% $0.00 $4,656.80 $4,656.80 84 Streambed Boulder Two Man 16 EA $200.00 $3,200.00 0.00 32.00 32.00 200.00% $0.00 $6,400.00 $6,400.00 85 Streambed Boulder 3 Man 130 EA $300.00 $39,000.00 0.00 160.00 160.00 123.08% $0.00 $48,000.00 $48,000.00 86 Filter Bag 4 EA $200.00 $800.00 0.00 0.00 0.00 0.00% $0.00 $0.00 $0.00 87 Habitat Snag 3 EA $2,000.00 $6,000.00 0.00 3.00 3.00 100.00% $0.00 $6,000.00 $6,000.00 88 Art Installation 1 LS $2,000.00 $2,000.00 0.00 1.00 1.00 100.00% $0.00 $2,000.00 $2,000.00 89 Propery Restoration (by FA) 1 FA $5,000.00 $5,000.00 0.00 1.97 1.97 196.76% $0.00 $9,837.96 $9,837.96 CO - 2 Viewpoint and Geotextile 1 LS $25,522.98 $25,522.98 0.00 1.00 1.00 100.00% $0.00 $25,522.98 $25,522.98 SUBTOTAL BRIDGE $834,231.50 $36,044.05 $939,218.41 $975,262.46 SALES TAX BRIDGE ITEMS (10.1%) $3,640.45 $22,369.48 $26,009.93 SALES TAX BRIDGE ITEMS 2020 (10.0%) $0.00 $72,491.58 $72,491.58 SALES TAX TOTAL $3,640.45 $94,861.06 $98,501.51 5% RETAINAGE $1,802.20 $46,960.92 $48,763.12 NET PAYMENT BRIDGE ITEMS $37,882.29 $987,118.55 $1,025,000.84 SUBTOTAL ROADWAY $264,900.00 $0.00 $236,982.40 $236,982.40 SALES TAX STORM ROADWAY ITEMS (10.1%) $0.00 $23,698.24 $23,698.24 SALES TAX STORM ROADWAY ITEMS 2020 (10.0%) $0.00 $12,241.70 $12,241.70 SALES TAX TOTAL $0.00 $35,939.94 $35,939.94 5% RETAINAGE $0.00 $11,849.12 $11,849.12 NET PAYMENT ROADWAY ITEMS $0.00 $261,073.22 $261,073.22 SUBTOTAL ROADSIDE DEVELOPMENT $267,475.00 $0.00 $317,525.89 $317,525.89 SALES TAX STORM ROADWAY ITEMS (10.1%) $0.00 $31,752.59 $31,752.59 SALES TAX STORM ROADWAY ITEMS 2020 (10%) $0.00 $3,415.00 $3,415.00 SALES TAX TOTAL $0.00 $35,167.59 $35,167.59 5% RETAINAGE $0.00 $15,876.29 $15,876.29 NET PAYMENT ROADSIDE DEVELOPMENT ITEMS $0.00 $336,817.18 $336,817.18 1,366,606.50 136,660.65 1,503,267.15 Subtotal Amount $36,044.05 $1,493,726.70 $1,529,770.75 Sales Tax (10.1 %) $3,640.45 $165,968.59 $169,609.04 Total 5% Retainage $1,802.20 $74,686.34 $76,488.54 Total Net Payment $37,882.29 $1,585,008.95 $1,622,891.25 N O CITY OF TUKWILA Date. 04-14.-24 Item Description 1 Mobilization Estimate Quantity unds LS Quantity This Estimate WEEKENDS/HOLIDAYS KIDDEN UNLESS WORK PERFORMED 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 18-Aug 11-Aug 12-Aug 3-Aug 14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Mg 21-Aug 22-Aug 123-Aug 124-Aug 25-Aug 26-Aug 27-Au9 28-Aug 29-Aug 30-Aug 31-Aug Adjustment Total IS Complete Total to Date 2 Contractor Surveying 3 Unexpected Site Changes 4 Temp Traffic Control amp TretContr Private Prop SPCC FA LS ] Riverton Creek Bridge ClearvWeld Hesb WallCap Structural Cation Steel 10 LS LF 1D Fur.Drive Test Sfeel Pile EA 11 Furnishing St. Piling 12 Driving St Piling 13 Bridge Railing CmunkFence 14 Clea.Painl Weill 306 LF EA LF LS 15 Remo SoldierPlle Shtt Mat. FA 16 shan-24 inch Diameter 530 i] Fum Soldier Pile HP 12X84 ne LF 18 Conrete Lapp. 19 Permanent Ground Anchor 1020 18 SF EA 2D Perm Gr.Anch Pert Test EA 21 Perm GrndAnch Verity Test CO- Wa111 and Suspension Equitable Adjustment Roadway 22 Clearing ant Grubbng 23 Removal SlrucWreSrObstruct LS LS LS LS 24 Remove Sting Retainwall 25 Channel Exwvatlo.Haul 15]0 LS CY 26 Select Grading My FA) 27 Gravel Borrow FA TN 2710 Gravel Borrow TN 2B Unsuitable Foundation Exwv 25 CY 29 ring 3D Structure Excavation Clms A LS CY 31 Shoring or Extra Esc Class 32 Tr... ant Cleanup 33 crushed Surf Base Course 54 LS LS TN 34 Commercial HMA 41 TN CO-Y Change Order Holding Slot Roadside Development 35 amp Stream Diversion 36 Erosion/Water Poll Prevent LS LS 37 High Visibility Fence 135 38 Cod Log 39 Erosion Control Blanket 180 SY 40 PSIPE Acer Ciminatum l& EA 41 PSIPE Argentina egedii 10" 42 PSIPE Armours dioicia Xl 1D 12 EA EA 43 PSIPE Carex Nngbei(8 Frageria chiloens. 4') 10 EA 44 PSIPE Corns stolondersBdl 15 EA 45 PSIPE Cornus stolcnderaM EA 46 PSIPE Eleocharis paulstrus 47 PSIPE Fraxinus latifolia N2 EA EA 48 PSIPE Gualtheria sMllon Nl 20 EA 49 PSIPE Holodiscus dscoloNl EA 50 PSIPE Lonicera involucratel 15 EA 51 PSIPE Malus fusee k2 EA 52 PSIPE Physocarpus capita. 53 PSIPE Picea sitchems 13 EA EA 54 PSIPE Pohystichum munitum 55 PSIPE Pseudo... menasi 56 PSIPE Ribies sanguineurnal 57 PSIPE Roe Fa.carla al 5B PSIPE Rubus spectabilis lh PSIPE Sala hookenana Live 20 13 20 EA EA EA EA EA EA BO PSIPE Sala hookeriana 13.1 20 EA 61 PSIPE Sala lucida lV2 EA 62 PSIPE Sala scouleriana Live 20 EA 53 PSIPE Sala Scoulenana B. 20 EA fi4 PSIPE Salk sitchensw Lwe 20 EA 65 PSIPE Sala sitchens. Bridle 2D EA 56 PSIPE Sambucw racemosa EA 87 PSIPE SympMncerpos alba 6B PSIPE SymphoricarposAlbl 20 20 EA EA 69 PSIPE Thuta phis. 71) PSIPE TSrga he.ropmlla 71 Topsoil Type A EA EA CY 72 Compost (Amended Soil) Chip Mulch 74 Extruded Curb 13 13 CY CY LF 75 Light Lowe Rlprap 40D TN 76 Paint Line 350 LF 77 Woody De.Strot Over Rip Rap EA CITY OF TUKWILA ouneraa 78 SingleLog Wetland Outlet ingleLogvvetlandWootlOebr BD OoubleLogWellard Wo8UOeb 81 Flwting Silt Curtain 82 streamb. Gravel 241 EA EA EA LS TN 83 Strearnbee Cobble. In. 54 TN 84 Strew.. Boulder Two Man 16 EA 85 Stead). Boulder Man 130 EA Filter Bap Habitat Snag AP Installation EA EA 89 Propery Restoration (y FA) CO t12 Geatedile FabrioNiewpoint CO. Wall 1 Reptaoment Cover Plates, Cleaning an. Painting an. Void Repairs FA LS LS 0.51 0.51094 122 Transportation & Infrastructure Services Committee Minutes April22, 2024 F. Change Order: Riverton Creek Flapgate Removal Project Staff is seeking approval of Change Order No. 4 to Contract No. 20-052 with R.L. Alia Company in the amount of $72,285.08. Item(s) for follow-up: Determine if Washington State Recreation and Conservation Office can contribute to cost. Committee Recommendation Unanimous approval. Forward to May 6, 2024 Regular Consent Agenda. G. Supplemental Agreement: Neighborhood Traffic Calming Program Staff is seeking approval of a supplemental agreement with KPG Psomas, Inc. in the amount of $155,000 for on -call engineering and design services for the Program. Committee Recommendation Unanimous approval. Forward to May 6, 2024 Regular Consent Agenda. H. Grant Application: 2024 Annual Overlay - 50th Place Overlay Staff is seeking approval to apply to the Transportation Improvement Board Complete Streets program in the amount of $400,000 to fund a portion of the 2024 Annual Overlay Program. Committee Recommendation Unanimous approval. I. Surface Water Comprehensive Plan Staff provided an introduction to the 2024 Draft Surface Water Comprehensive Plan and associated capital projects. Committee Recommendation Discussion only. J. Future Water Reservoir Update Staff presented an update on the project. Item(s) for follow-up: Provide information on historically significant buildings in the city. Committee Recommendation Discussion only. The meeting adjourned at 6:45 p.m. Committee Chair Approval Minutes by LH 123