HomeMy WebLinkAboutRes 2099 - 2025-2030 Transportation Improvement Program"
Washington
Resolution No. 2.0)())
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2025-
2030), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2025-2030); and
WHEREAS, on June 10, 2024, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2025 to 2030, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
2024 Legislation: 2025-2030 TIP
Version: 05/6/2024
Staff: C. Knighton
Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this 124 day of , 2024.
ATTEST/AUTHENTICATED:
DocuSigned by:
B90BE6B75624458..
Andy Youn, CMC, City Clerk Mohamed Abdi, Council President
APPROVED AS TO FORM BY:
te (14-14
,-DocuSigned by: Filed with the City Clerk:
Passed by the City Council: 6 -17-2-14
Resolution Number: 21)0)9
5E499CA4165E452...
Office of the City Attorney
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2025 to 2030
2024 Legislation: 2025-2030 TIP
Version: 05/6/2024
Staff: C. Knighton
Page 2 of 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
/ 1037(004) TUK-62
42nd Ave S Bridge Replacement
06/10/24
06/17/24
2099
11
0.100
DCE
No
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement will require
preliminary engineer design, right-of-way, and construction phases. The new
structure will meet current road and bridge design standards. The replacement
structure configuration will be two through -lanes, possibly a turn pocket, and include
sidewalks.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
STBG
1,500,000
0
1,000,000
2,500,000
P
RW
2026
0
MAW
1,400,000
0
1,400,000
S
CN
2027
BR
12,000,000
MAW
17,000,000
0
29,000,000
Totals
13,500,000
18,400,000
1,000,000
32,900,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
200,000
400,000
0
0
0
RW
0
1,400,000
0
0
0
CN
0
0
19,000,000
10,000,000
0
Totals
200,000
1,800,000
19,000,000
10,000,000
0
Report Date: June 20, 2024
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-15812
42nd Avenue S Bikeway
42nd Avenue S
Southcenter Blvd to S 150th Street
Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and
Southcenter Blvd. On the west side of the street, add striped southbound bike lane
between Southcenter Blvd and S 150th St. On the east side of the street, add striped
bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to
widen the sidewalk on the east side of the street between S 151st St and S 150th St,
creating a shared path; add shared lane markings to the roadway
06/10/24
06/17/24
2099
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
55,000
55,000
S
CN
2026
0
0
295,000
295,000
Totals
0
0
350,000
350,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
55,000
0
0
0
0
CN
0
295,000
0
0
0
Totals
55,000
295,000
0
0
0
Report Date: June 20, 2024
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/10/24
06/17/24
2099
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
SRTS
170,000
80,000
250,000
P
RW
2026
0
SRTS
65,000
10,000
75,000
P
CN
2028
0
SRTS
1,660,000
410,000
2,070,000
Totals
0
1,895,000
500,000
2,395,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
250,000
0
0
0
RW
0
0
75,000
0
0
CN
0
0
0
2,070,000
0
Totals
0
250,000
75,000
2,070,000
0
Report Date: June 20, 2024
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA05409
Allentown Truck Reroute Project
to
Study alternatives for truck access to reroute outside of residential neighborhood.
06/10/24
06/17/24
2099
18
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2025
0
0
600,000
600,000
Totals
0
0
600,000
600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
10,000
0
0
0
0
Totals
10,000
0
0
0
0
Report Date: June 20, 2024
Page 4
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/10/24
06/17/24
2099
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
600,000
600,000
Totals
0
0
600,000
600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
100,000
100,000
100,000
100,000
200,000
Totals
100,000
100,000
100,000
100,000
200,000
Report Date: June 20, 2024
Page 5
Agency: Tukwila
County: King
��~�� ����� ^��������������~���� Improvement U���������
`~^ Year ^^-~^~~~o�-~^~-~~^`~^^ ~^~^�~~`~~-~^^~~~^^~ Program
From 2025 t 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. o.nnp|o
c.Project Title
o.Road Name n,Number
s.Begin uEnd Termini
p.Project Description o.Structure |o
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
10
vvA-07740
Andover Park BminmerBlvd Intersection
Andover Park E
mmmerBlvd m
Construct left turn lanes on Andover Park East and reconstruct traffic signal
00/10/24
00/17/24
2098
03
CGOpS
Tw
No
Funding
Status
pxuoe
Phase Start Yoa,(yrrr)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Lvcm punuo
Total Funds
s
PE
2025
0
0
200.000
200.000
G
nW
2025
0
0
20.000
20.000
P
Cw
2020
0
T|e
1.440.000
300.000
1.800.000
Expenditure Schedule
Phase
1st
2nu
um
*m
5mu6tm
PE
200.000
o
o
o
o
RVY
20.000
o
o
o
o
CN
o
1.800.000
o
o
o
Totals
220.000
1.800.000
o
o
o
Report Date: June 20.2024
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15107
Andover Park East/Industry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park East left turn lanes and
crosswalks.
06/10/24
06/17/24
2099
03
P
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
0
150,000
150,000
P
RW
2026
0
0
20,000
20,000
P
CN
2027
0
TIB
1,530,000
220,000
1,750,000
Totals
0
1,530,000
390,000
1,920,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
150,000
0
0
0
RW
0
20,000
0
0
0
CN
0
0
1,750,000
0
0
Totals
0
170,000
1,750,000
0
0
Report Date: June 20, 2024
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/10/24
06/17/24
2099
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
1,380,000
1,380,000
Totals
0
0
1,380,000
1,380,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
215,000
220,000
230,000
235,000
480,000
Totals
215,000
220,000
230,000
235,000
480,000
Report Date: June 20, 2024
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/10/24
06/17/24
2099
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
15,000,000
15,000,000
Totals
0
0
15,000,000
15,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
2,500,000
2,500,000
2,500,000
2,500,000
5,000,000
Totals
2,500,000
2,500,000
2,500,000
2,500,000
5,000,000
Report Date: June 20, 2024
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-15104
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repairs of signals that exceed
routine maintenance work;loop replacement, head replacement, and controllers.
Replace direct bury cable for existing lighting system.
06/10/24
06/17/24
2099
44
P
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
0
860,000
860,000
Totals
0
0
860,000
860,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
130,000
130,000
150,000
150,000
320,000
Totals
130,000
130,000
150,000
150,000
320,000
Report Date: June 20, 2024
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
TUK-68
Boeing Access Road Overlay
Boeing Access Road
East Marginal Way S to Martin Luther King Jr Way S
Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF
railway.
06/10/24
06/17/24
2099
05
0.560
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
NHPP
564,000
0
0
564,000
S
CN
2026
NHPP
3,426,000
0
0
3,426,000
Totals
3,990,000
0
0
3,990,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
564,000
0
0
0
0
ALL
0
3,426,000
0
0
0
Totals
564,000
3,426,000
0
0
0
Report Date: June 20, 2024
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15109
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control.
06/10/24
06/17/24
2099
03
C G O P S
TW
0.270
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
0
350,000
350,000
P
RW
2028
0
TIB
500,000
300,000
800,000
P
CN
2029
0
TIB
1,800,000
1,200,000
3,000,000
Totals
0
2,300,000
1,850,000
4,150,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
250,000
100,000
0
RW
0
0
0
800,000
0
CN
0
0
0
0
3,000,000
Totals
0
0
250,000
900,000
3,000,000
Report Date: June 20, 2024
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
TUK-66
Interurban Avenue S Overlay
Interurban Avenue S
E Marginal Way S to S 143rd Street
Complete pavement repairs, overlay, and curb and gutter repair.
06/10/24
06/17/24
2099
05
2.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
397,000
0
0
397,000
S
CN
2027
NHPP
4,561,000
0
0
4,561,000
Totals
4,958,000
0
0
4,958,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
397,000
0
0
0
ALL
0
0
4,561,000
0
0
Totals
0
397,000
4,561,000
0
0
Report Date: June 20, 2024
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-63
Keeping South King County Moving with TDM
South King County
Various to Various
This project will help people access sustainable transportation options that reduce
drive -alone travel and traffic congestion in South King County. TDM programming
and services will be provided to residents, workers, visitors, employers, property
managers, and students in Tukwila and the partnering jurisdictions of Burien, Des
Moines, Kent, Renton, and SeaTac. The program will target those willing and able to
try sustainable modes of transportation at activity centers (community hubs,
commercial areas, business parks, multifamily housing complexes, and educational
institutions). Examples of activity centers include the Tukwila International Boulevard
District, Southcenter, and Sea-Tac Airport. The TDM Program will work in
partnership with transit agencies, nonprofits, employers, and community
organizations to reach priority populations through trusted channels. The project
aims to reduce 542,997 vehicle trips and 8,093,549 vehicle miles traveled.
06/10/24
06/17/24
2099
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
WSDOT
672,000
0
672,000
S
ALL
2025
0
OTHER
168,000
0
168,000
P
ALL
2025
0
WSDOT
832,000
0
832,000
P
ALL
2025
0
OTHER
208,000
0
208,000
Totals
0
1,880,000
0
1,880,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
235,000
260,000
260,000
260,000
130,000
Totals
235,000
260,000
260,000
260,000
130,000
Report Date: June 20, 2024
Page 14
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/10/24
06/17/24
2099
04
0.350
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
Ped/Bike Program
350,000
50,000
400,000
P
RW
2028
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2029
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,240,000
360,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
300,000
100,000
0
RW
0
0
0
100,000
0
CN
0
0
0
0
3,100,000
Totals
0
0
300,000
200,000
3,100,000
Report Date: June 20, 2024
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
TUK-67
Orillia Road South Overlay
Orillia Road S
S 188th Street to S 204th Street
Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail
repair.
06/10/24
06/17/24
2099
05
0.750
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
105,000
0
0
105,000
S
CN
2027
NHPP
1,204,000
0
0
1,204,000
Totals
1,309,000
0
0
1,309,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
105,000
0
0
0
ALL
0
0
1,204,000
0
0
Totals
0
105,000
1,204,000
0
0
Report Date: June 20, 2024
Page 16
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA13494
S 119th St Pedestrian Bridge Painting
S 119th Street Bridge
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
06/10/24
06/17/24
2099
06
0.040
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2026
0
0
200,000
200,000
Totals
0
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
200,000
0
0
0
Totals
0
200,000
0
0
0
Report Date: June 20, 2024
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-15108
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, which could include a new traffic
signal or a roundabout,
lighting, pedestrian facilities, and drainage.
06/10/24
06/17/24
2099
03
C G O P S
TW
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2028
0
0
400,000
400,000
P
RW
2028
0
0
150,000
150,000
P
CN
2029
0
TIB
1,620,000
1,080,000
2,700,000
Totals
0
1,620,000
1,630,000
3,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
400,000
0
RW
0
0
0
150,000
0
CN
0
0
0
0
2,700,000
Totals
0
0
0
550,000
2,700,000
Report Date: June 20, 2024
Page 18
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/10/24
06/17/24
2099
05
0.300
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2025
0
0
250,000
250,000
S
RW
2025
0
0
100,000
100,000
P
CN
2026
0
Ped/Bike Program
2,140,000
2,085,000
4,225,000
Totals
0
2,140,000
2,435,000
4,575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
250,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
4,225,000
0
0
0
Totals
350,000
4,225,000
0
0
0
Report Date: June 20, 2024
Page 19
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15829
S Ryan Way
SR 900 to 51 st Ave S
Resurface and rechannel S Ryan Way to improve failing pavement and improve
safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection
with 47th Avenue S to accommodate future growth and improve safety.
06/10/24
06/17/24
2099
06
C G P S T
W
0.500
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2025
0
TIB
780,000
520,000
1,300,000
P
CN
2027
0
TIB
7,300,000
1,900,000
9,200,000
Totals
0
8,080,000
2,420,000
10,500,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
400,000
900,000
0
0
0
CN
0
0
9,200,000
0
0
Totals
400,000
900,000
9,200,000
0
0
Report Date: June 20, 2024
Page 20
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
TUK-65
South 144th Street Bridge Sidewalks
S 144th Street Bridge
51st Ave S to 53rd Ave S
The project entails replacing approximately 320 feet of raised bridge deck on the S
144th street bridge with 6-foot-wide sidewalks, which will be separated from the
traffic lanes by a crash tested barrier and a pedestrian railing. Sharrows will also be
added to the traffic lanes for bicycle traffic.
06/10/24
06/17/24
2099
28
0.060
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
STBG(UL)
500,000
0
78,035
578,035
P
CN
2027
0
SRTS
2,302,000
388,000
2,690,000
Totals
500,000
2,302,000
466,035
3,268,035
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
578,035
0
0
0
CN
0
0
2,690,000
0
0
Totals
0
578,035
2,690,000
0
0
Report Date: June 20, 2024
Page 21
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-64
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and
community organizations.
06/10/24
06/17/24
2099
24
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2025
CMAQ
449,567
OTHER
20,164
50,000
519,731
P
PL
2027
CMAQ
550,000
OTHER
85,838
0
635,838
Totals
999,567
106,002
50,000
1,155,569
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
129,933
129,933
158,960
158,960
317,909
Totals
129,933
129,933
158,960
158,960
317,909
Report Date: June 20, 2024
Page 22
Agency: Tukwila
County: King
��~�� ����� ^��������������~���� Improvement U���������
`~^ Year ^^-~^~~~o�-~^~-~~^`~^^ ~^~^�~~`~~-~^^~~~^^~ Program
From 2025 t 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. o.nnp|o
c.Project Title
o.Road Name n,Number
s.Begin uEnd Termini
p.Project Description o.Structure |o
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
vvA'15813
SvumoenverBlvd Bikeway and Pedestrian Crossing Upgrades
Svmxoenverevu|evam
International Boulevard m4cnuAvenue S
Improve the existing bike lanes and crosswalks onsoumnemorBlvd within ahalf-
mile orTuxwi|amwmaunna|Bvu|ovard Station <T|BG>.n°'c»annonovm11u
general purpose lanes ooaccommodate separated (tuff curb and post) bike lanes.
Tighten intersection with 40mAve Smshorten crossing distance. Add bike
ohannenzauunand upgrade tohigh-visibility omxowa|kmarmnguatSvumcenter
a|vd/T|aGstation entrance and Guvmovnto,o|vd/4undAve Gintersections.
00/10/24
00/17/24
2098.
28
CGPGT
W
No
Funding
Status
phase
Phase Start Year (Yr/Y)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
L000 punus
Total Funds
s
ps
oous
n
n
65,000
65,000
G
cm
oous
n
n
325,000
325.000
Totals
n
n
390,000
390,000
Expenditure Schedule
Phase
1st
2nu
a,u
*m
mmuam
PE
65.000
O
O
O
O
CN
O
325.000
O
O
O
Totals
65,000
325,000
u
u
u
Report Date: June 20.2024
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-13495
Southcenter Blvd/65th Avenue S Signal
Southcenter Boulevard
65th Avenue S to
Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue
S intersection to improve level of service and safety.
06/10/24
06/17/24
2099
21
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2025
0
TIB
782,090
400,000
1,182,090
Totals
0
782,090
400,000
1,182,090
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,182,000
0
0
0
0
Totals
1,182,000
0
0
0
0
Report Date: June 20, 2024
Page 24
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2025 to 2030
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-13491
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
06/10/24
06/17/24
2099
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2025
0
WSDOT
93,300
0
93,300
P
ALL
2027
0
WSDOT
186,600
0
186,600
Totals
0
279,900
0
279,900
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
46,650
46,650
46,650
46,650
93,300
Totals
46,650
46,650
46,650
46,650
93,300
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
25,256,567
45,994,992
31,461,035
102,712,594
Report Date: June 20, 2024
Page 25
Andy Youn
From: Andy Youn
Sent: Friday, June 21, 2024 4:05 PM
To: millarr@wsdot.wa.gov
Cc: Cyndy Knighton
Subject: Tukwila - Transportation Improvement Program 2025-2030
June 21, 2024
TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
RE: CITY OF TUKWILA 2025-2030 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2099, passed June 17, 2024, adopting the Transportation
Improvement Program for 2025-2030.
es 2099 - 2 25 2 30 "Tr nsoor iflo
Regards,
overlent Pro
ANDY YOUN
CITY CLERK I OFFICE OF THE CITY CLERK
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
206.433.1830 I andy.youn@tukwilawa.gov
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public Records Act (Chapter
42.56 RCW).
1
Andy Youn
From: Andy Youn
Sent: Friday, June 21, 2024 4:05 PM
To: amarkley@psrc.org
Cc: Cyndy Knighton
Subject: Tukwila - Transportation Improvement Program 2025-2030
June 21, 2024
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2025-2030 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2099, passed June 17, 2024, adopting the Transportation
Improvement Program for 2025-2030.
es 2099 - 2 25 2 30 "Tr nsoor iflo
Regards,
venlent Pro
ANDY YOUN
CITY CLERK I OFFICE OF THE CITY CLERK
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
206.433.1830 I andy.youn@tukwilawa.gov
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public Records Act (Chapter
42.56 RCW).
1
Andy Youn
From: Andy Youn
Sent: Friday, June 21, 2024 4:05 PM
To: GregA@TIB.wa.gov
Cc: Cyndy Knighton
Subject: Tukwila - Transportation Improvement Program 2025-2030
June 21, 2024
TO: TRANSPORTATION IMPROVEMENT BOARD
RE: CITY OF TUKWILA 2025-2030 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2099, passed June 17, 2024, adopting the Transportation
Improvement Program for 2025-2030.
es 2099. 2025-2 30 Thai ssp rtation I r e er:t rogra
Regards,
ANDY YOUN
CITY CLERK I OFFICE OF THE CITY CLERK
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
206.433.1830 I andy.youn@tukwilawa.gov
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public Records Act (Chapter
42.56 RCW).
1