Loading...
HomeMy WebLinkAboutTIS 2024-08-26 Item 2A - Bid Award - 2023 CBD Sanitary Sewer Rehabilitation Phase 4B: Cured-In-Place Pipe Sewer Mains Lining with Iron Horse LLC INFORMATIONAL MEMORANDUM TO:Transportation and Infrastructure Services Committee FROM:Adib Altallal,UtilitiesEngineer CC:Mayor Thomas McLeod DATE:August23, 2024 SUBJECT:2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B Project No. 80040201 ConstructionBid Award ISSUE Approve construction bid award with Iron Horse LLC for 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B Project. BACKGROUND The City of Tukwila has thousands of feet of aging sewer mains throughout, but especially in the Central Business District (CBD). The City has been conducting regular inspections and assessments of mains at the CBD for the last 15 years. A typical repair includes digging up the road to create a deep trench where the new sewer main will go. It is costly and typically inconvenient to the public. In certain scenarios, an aging sewer main loses some of its structural integrity, but has not started cracking, sagging, or crumbling. In such cases, we are able to utilize a minimally-disruptive technology where a lining is inserted through a manhole and into the existing sewer main to strengthen it and increase its useful life. The aforementioned trenchless technology minimizes disruptions to the public and greatly reduces the damage to the road. The technology is utilized when possible, but it is not applicable in all scenarios. DISCUSSION A call for bids was advertised for the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B Project on June 26, and July 3, 2024. two bids were opened on July 18, 2024, and the confirmed lowest bidder was Iron Horse LLC with a bid of $1,339,083.18. T was $1,307,633.22. FINANCIAL IMPACT Construction costs associated with the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B are within the approved budget and will be funded by the sewer enterprise fund. Cost Estimate Fund Source 2023-24 Construction Budget Contract $1,339,083.18 Contingency 15% 200,862.48 Total $1,539,945.66 Sewer Fund $1,500,000 RECOMMENDATION Council is being asked to approve the construction award with Iron Horse LLC in the amount of $1,339,083.18 for the 2023 Central Business District Sanitary Sewer Rehabilitation Phase 4B Project and consider this item on the Consent Agenda at the September 16, 2024 Regular Meeting. Attachments: 2023 CIP, Page 65 Iron Horse LLC Construction Contract Bid Tabulation 11 22 33 44 55 66 77 88 99 1010 1111 1212 1313 1414 1515 1616 1717 1818 1919 2020 2121 Iron Horse LLC SAK Construction, LLC Un1Price # Total Amount Quanti Una Unit Price Total Amount Quanti Unit Unit Price Total Amount $ 75,000 $ 2,500 $ 27,158 $ 145,000 $ 35,000 $ 45,000 $ 1,500 $ 125,500 $ 388,880 $ 342,550 $ 75,780 $ 31,050 $ 32,400 $ 1,000 $ 25,000 $ 1,353,318.00 Washington State Sales Tax 10.2% I $ 121,034.22 I Washington State Sales Tax 10.2% I $ 123,944.18 I Washington State Sales Tax 10.2% I $ 138,038.44 Total $ 1,307,644.22 Total $ 1,339,083.18 Total $ 1,491,356.44 $ 75,000 $ 2,500 $ 27,158 $ 145,000 $ 35,000 $ 45,000 $ 1,500 $ 125,500 $ 80 $ 130 $ 180 $ 690 $ 1,200 $ 500 $ 25,000 Subtotal {\g „ $ 25,000 $ 25,000 Subtotal $ 1,215,139.00 MOO $ 36,000 $ 90,000 $ 35,000 $ 42,000 $ 32,000 $ 65,000 $ 335,409 $ 268,770 $ 109,460 $ 45,000 $ 40,500 $ 9,000 °NM Apparent Low Bidder $ 36,000 $ 90,000 $ 35,000 $ 42,000 $ 32,000 $ 65,000 $ 69 $ 102 $ 260 $ 1,000 $ 1,500 $ 4,500 LS LS LS LS LS LS LS LS EA LS LF LF 0 $ 25,000 $ 1,186,610.00 $ 107,900 $ 5,800 $ 24,900 $ 72,000 $ 18,400 $ 27,500 $ 18,400 $ 74,800 $ 437,490 $ 263,500 $ 54,730 $ 23,400 $ 31,050 $ 1,740 $ 107,900 $ 5,800 $ 24,900 $ 72,000 $ 18,400 $ 27,500 $ 18,400 $ 74,800 $ 130 $ 520 $ 1,150 $ 870 15 'Force Account - Minor Changes 1 1 I EA $ 25,00 Subtotal \}/gg&:� \ City of Tukwila 2023 Central Business District Sanitary Sewer Rehabilitation - Phase 4B Item No. I Item Description Mobilization Type B Progress Schedule Traffic Control - Off -Duty Uniformed Police Officer Traffic Control - Temporary Traffic Control and Flagger Labor Pre -Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8-inch Main Line CIPP 12-inch Main Line CIPP 20-inch Main Line CIPP 24-inch Main Line CIPP Trenchless Lateral Connection Reinstatement and Packer Injection Grouting Trenchless Outside Manhole Drop Connection Reinstatement