Loading...
HomeMy WebLinkAboutTIS 2024-09-23 Item 2A - Grant Acceptance - Department of Ecology Water Quality Combined Funding for Stormwater Outfall Water Quality RetrofitCity of Tukwila Thomas McLeod, Mayor Public Works ❑eportment - Pete Moyer, Interim Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Pete Mayer, Deputy City Administrator/ Interim Public Works Director BY: Catrien de Boer, Public Works Analyst CC: Mayor McLeod DATE: September 20, 2024 SUBJECT: Surface Water Fund - Stormwater Outfall Water Quality Retrofit Project Project No. 91241202 Department of Ecology Water Quality Combined Funding Grant Award ISSUE Accept a Washington State Department of Ecology (DOE) Water Quality Combined Grant to fund water quality improvements in the amount of $1,805,745. BACKGROUND In 2017, Council authorized staff to accept DOE grant funding for the design of four stormwater outfall sites through 90% design. In 2022, Council authorized staff to accept a DOE grant funding the final design and construction of two of the sites — Tukwila International Boulevard and Interurban Avenue. DISCUSSION In September 2023, Council authorized staff to submit an application to the DOE Water Quality Combined Funding Program to fund the final design and construction for the third and fourth outfalls at Starfire Way/Fort Dent Way and E Marginal Way. In July 2024, the City was notified that we received the full grant award to fund the construction of two stormwater outfall retrofits. FISCAL IMPACT The City was awarded a $1,805,745 grant from the DOE for the construction of two stormwater outfalls. The grant requires a 15% local city match, which is $270,861. The Project CIP, which comes from Surface Water Fees, is sufficient to cover the match. Project Budget DOE Grant Award $1,534,883.00 City Match $ 270,861.00 Total $1,805,745.00 Fund Source CIP Budget (412 Funds) RECOMMENDATION Council is being asked to accept a DOE Water Quality Grant Award in the amount of $1,805,745 and consider this item on the Consent Agenda at the October 7th, 2024 Regular Council Meeting. Attachments: 2023-28 CIP Pg. 77 Vicinity Maps 1 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2023 to 2028 PROJECT: Storm Water Quality Retrofit Program Project No. 91241202 DESCRIPTION: Provide, design, and install water quality testing and improvements at selected drainage locations. JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated. STATUS: Water quality retrofit has been added to CIP projects since 2015 (Interurban and 53rd Ave S). MAINT. IMPACT: Expected to increase maintenance. COMMENT: Combine with other CIP projects for design and construction, where feasible. For 2021, funding for added improvements to the West Valley Highway project. A proposed State DOE grant is listed in 2022. FINANCIAL Through Estimated (in $000's) 2021 2022 2023 2024 2025 2026 2027 2028 BEYOND TOTAL EXPENSES Design 41 100 20 100 100 100 100 20 581 Land (R/W) 5 5 Const. Mgmt. 300 400 15 715 Construction 1,300 1,800 80 3,180 TOTAL EXPENSES 41 105 1,620 100 100 2,200 100 100 115 4,481 FUND SOURCES Awarded Grant 22 1,365 1,387 Proposed Grant 100 1,530 100 1,730 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 19 105 255 100 0 670 100 0 115 1,364 TOTAL SOURCES 41 105 1,620 100 100 2,200 100 100 115 4,481 2023 - 2028 Capital Improvement Program 803-14 72 Site 7:East Marginal Way City ofTukwila Stormwater Outfall Water Quality Retrofit Project Figure 1 —Vicinity Map Design Report Site 4: Starfire/Fort Dent Way October 2020 KPG 3 \ PROJECTS \TUKWILA\19057—Storm WO Retrofit \ DESIGN \ Drawings \ Working \ Drainage \Figure-2-5_Site Areas. dwg 1\21 — AREA TREATED FOR `44.STORMWATER RETROFIT ♦ % % SEE DESIGN PLANS • ♦44ti ♦♦ • • • • • • ,••,4s �• ••ei �• ♦i� FIGURE 2. SITE 4: STARFIRE WAY CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT KPGr Interdisciplinary Design 3131 Ellioff Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206) 286-1640 ylw i.kpg.com CO 0 E — AREA TREATED FOR STORMWATER RETROFIT SEE DESIGN PLANS DUWAMISH RIVER FIGURE 4. SITE 7: EAST MARGINAL WAY S CITY OF TUKWILA STORMWATER QUALITY OUTFALL RETROFIT PROJECT —OUTFALL TO GREEN—DUWAMISH RIVER 0 50 100 200 SCALE IN FEET 300 MPG. Interdisciplinary Design 3131 Elliott Ave 2502 Jefferson Ave Suite 400 Tacoma, WA 98402 Seattle, WA 98121 (253) 627.0720 (206)286-1640 www.kpg.com