HomeMy WebLinkAboutCOW 2024-11-25 Item 4A - Resolution - 2025-2026 Consolidated Fee ScheduleCOUNCIL AGENDA SYNOPSIS
Meeting Date
Prepared by
Mayor's review
Council review
11/18/24
NG
11/25/24
NG
ITEM INFORMATION
ITEM NO.
4.A.
Spec 2.A.
STAFF SPONSOR: NORA GIERLOFF
ORIGINAL AGENDA DATE: 11/18/24
AGENDA ITEM Ti 2025-2026 Consolidated Fee Schedule
CATEGORY ❑ Discussion
Mt Date
® Motion
Mt Date
11/25/24
Z Resolution
Mt Date 11/18/24
❑ Ordinance
Mig Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mig Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ Admin Svcs ® DCD ❑ Finance ❑ Fire ❑ Pe'r t ❑ Police ❑ PW
SPONSOR'S
SUMMARY
DCD and Public Works have evaluated permit and fee structures and recommend modest
inflation adjusted changes for land use, infrastructure and development related services in
2025 and 2026. These fees will be consolidated with other rates and charges administered
by Public Works and presented in a single 2025-26 consolidated fee schedule and
resolution for Council consideration and approval.
REVIEWED BY
❑ Trans&Tnfrastiucture Svcs ❑ Community Svcs/Safety ❑ Finance & Governance ❑ Planning & Community Dev.
❑ LTAC
DATE:
❑ Arts Comm.
❑ Parks Comm. ❑ Planning Comm.
COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR/ADMIN. Department of Community Development
COMMITTEE None
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
$0
AMOUNT BUDGETED APPROPRIATION REQUIRED
$ $
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
11/18/24
Forwarded to next Regular Meeting
11/25/24
MTG. DATE
11/18/24
ATTACHMENTS
Informational Memorandum dated 11/18/24
Draft Resolution
11/25/24
Informational Memorandum dated 11/18/24
Draft Resolution
1
2
City of Tukwila
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
FROM: Nora Gierloff, DCD Director
Pete Mayer, Public Works Interim Director
BY:
Rachelle Sagen, Permit Supervisor
Max Baker, Development Supervisor
Nick Waggood, Building Official
CC: Mayor McLeod
DATE: November 18, 2024
SUBJECT: Consolidated Permit Fee Resolution for 2025-2026
ISSUE
The City of Tukwila's Department of Community Development (DCD) has evaluated its permit
and fee structure and recommends modest inflation adjusted changes for land use,
infrastructure and development related services in 2025 and 2026. These fees will be
consolidated with other rates and charges administered by Public Works and presented in a
single 2025-26 consolidated fee schedule and resolution for consideration by the City Council.
BACKGROUND
The City has previously updated permit fees on a two-year cycle to align with the budget
biennium and reflect the cost of service. A 5% technology fee to provide for online permitting
software upgrades/maintenance, archiving paper records to digital form, and other permit
related technology upgrades is added onto most permit fees. Some permits have additional
fees such as hearing examiner services for review of Type 3 permits. This fee is collected with
the land use application and passed through to the applicant.
Some permits incur additional costs for Fire Department review. Resolution 1967 adopted fees
charged by the Puget Sound Regional Fire Authority which are in addition to the fees listed in
Attachment A. Public Works staff previously came forward with fee recommendations around
the Utilities that will be incorporated into this consolidated resolution.
DISCUSSION
Overall
Staff is suggesting that most permit fees increase at 3.6% in 2025 and 4.2% in 2026 to reflect
the City's increased labor and benefit costs due to a rapid rise in inflation. The CPI-W was 3.6%
for the June 2024 period and additional cost increases are anticipated to affect costs for
equipment, vehicles, supplies, etc. Additionally, staff is suggesting that hourly inspection fees
and after-hours inspections should be increased to $120 and $125 per hour in order to recover
staff costs associated with inspections.
Development Permits Building/Electrical/Plumbing/Mechanical
3
INFORMATIONAL MEMO
Page 2
Permits in this category are based on the value of the construction covered by the permit. This
permit value is developed by the International Code Council and updated twice a year. High
cost areas, such as the Puget Sound Region, apply a modifier to this nationwide index.
DCD has introduced two additional line items in the "Other Inspections and Fees" table to cover
the costs of extending issued and expired permits. These requests are common when projects
have been inactive for extended periods and demand considerable research and processing
time from the Development Center team. The proposed flat fees reflect the average time
needed to manage these requests accurately and efficiently.
OTHER INSPECTIONS AND FEES
Permit extension for issued permit- when allowed by code
$120
Permit extension for expired permit- when allowed by code
$240
Tukwila has a reduced permit fee of $100 for minor residential remodels/repairs up to a value
of $25,000. The intent is to remove a barrier to permitting for homeowners making modest
improvements to their houses or repairing storm damage. This can help to ensure that
construction is done safely and in accordance with building codes.
Utility Fees
Utility fees are being added to the combined fee resolution for ease of reference. Consultant
recommendations were provided to Council on June 3, September 16, and October 28, 2024.
Land Use Permits
As part of Resolution 2103 effective October 26, 2024, new permit types were created in
alignment with state bill 5290, and fees were set for each permit type. This proposed resolution
adjusts those fees for 2025-2026 to account for inflation and also introduces a fee for public
noticing. This new fee will offset the cost of staff to create and install smaller public notice signs
for Type 2 permits (permits which require public notice but not a public hearing), allowing for a
quicker turnaround and more efficient communication with impacted communities and
stakeholders.
FINANCIAL IMPACT
The proposed fee increases will keep pace with the City's costs to provide these necessary
services.
RECOMMENDATION
The Council is being asked to consider this fee resolution at the November 18, 2024 meeting
and adopt it at the subsequent November 25, 2024 Special Meeting.
ATTACHMENT
A. Draft Consolidated Permit Fee Resolution for 2025-2026
4
https://tukwilawa.sharepoint.com/sites/mayorsoffice/cc/CC Docs/Final agendas/11-18-24 Council/Fee Resolution Info Memo.docx
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING A
CITYWIDE CONSOLIDATED PERMIT FEE
SCHEDULE FOR 2025 AND 2026; REPEALING
RESOLUTION NOS. 2056, 2058, 2079, AND 2103.
WHEREAS, the City is authorized to impose fees to recoup the costs of services
rendered and intends to update permit fees on an annual basis, with any increases tied
to growth in City expenses for providing permit services; and
N.
WHEREAS, each year the City analy
funds, which are water, sewer and surfa
expenses, to update the traffic
continued compliance with
Comprehensive Plan; and
tdel for the three utility enterprise
er, . ensure revenues keep pace with
alyze the transportation network to ensure
agement Act and the City's adopted
WHEREAS, updated feessary to support rising costs of service; and
WHEREAS, on . ober 2 2022, the City Council adopted Resolution No. 2056
setting the Public Work -e ' edule for 2023 and 2024; and
WHEREAS, on November 28, 2022, the City Council adopted Resolution No. 2058
establishing a Consolidated Permit Fee Schedule; and
WHEREAS, on October 9, 2023, the City Council adopted Resolution No. 2079
updating the City Sewer Rates and King County Sewage Treatment Rates for 2024; and
WHEREAS, on October 21, 2024, the City Council adopted Resolution No. 2103
updating the City's Land Use Fee Schedule to align with changes being made to the
Tukwila Municipal Code in compliance with Senate Bill 5290 ("SB 5290"); and
WHEREAS, the Departments of Community Development and Public Works
currently maintain separate fee schedules and the City desires to clarify and streamline
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 1 of 16
5
those fees and utility rates in a Citywide Consolidated Permit Fee Schedule for 2025 and
2026; and
WHEREAS, the City will be updating and modernizing its Surface Water fee structure
in 2026 to the Equivalent Resident Unit (ERU) method, where a commercial parcel will
be charged one ERU per every 4,000 impervious square feet and residential parcels will
be charged a flat fee of one ERU; and
WHEREAS, permit fees for encampments are being implemented pursuant to
Ordinance No. 2745 adopting reasonable occupancy, spacing, and intensity of use
requirements for temporary encampments to protect public health and safety;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution Nos. 2056, 2058, 2079, and 2103 are hereby
repealed, effective January 1, 2025.
Section 2. For 2025 and 2026, the Technology Fee shall be set at 5% of the
applicable permit fee and is included in the fees shown below.
Section 3. Where indicated hearing examiner fees are charged in addition to the
City permit fee listed below.
Section 4. Public Works fees will be charged according to the following schedule
and take effect as of January 1, 2025:
PUBLIC WORKS FEE SCHEDULE
WATER RATES
FEE
Water Meter Installation
.75 inch
1 inch
1.5 inch
2 inch
3 inch
4 inch
6 inch
$ 600.00
$ 1,100.00
$ 2,400.00
$ 2,800.00
$ 4,400.00
$ 7,800.00
$12,500.00
Water Meter Deduct
S25.00
Water Base Charge (Monthly)
Single Family (one dwelling unit)
Multi -Family (more than one dwelling unit, each
dwelling is charged the base charge)
Commercial/Industrial Customers:
In addition to the monthly water base charge, each
100 cubic feet of water used will be charged as
shown in "Water Rates (Monthly)."
2024 2025 2026
$ 21.50 $23.25 $25.50
$ 21.50 $23.25 $25.50
2024 2025 2026
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 2 of 16
6
3/4 inch Service
1 inch Service
1-1/2 inch Service
2 inch Service
3 inch Service
4 inch Service
6 inch Service
8 inch Service
10 inch Service
12 inch Service
$ 60.00 $65.00 $71.00
$ 72.00 $78.00 $86.00
$104.00 $113.00 $124.00
$135.00 $147.00 $160.00
$194.00 $211.00 $230.00
$259.00 $282.00 $308.00
$391.00 $426.00 $465.00
$520.00 $567.00 $618.00
$650.00 $709.00 $772.00
$770.00 $839.00 $915.00
Water Rates (Monthly)
Single Family Residence (Oct -May)
Single Family Residence (Jun -Sept)
Multi -Family (Oct -May)
Multi -Family (Jun -Sept)
Commercial/Industrial (Oct -May)
Commercial/Industrial (Jun -Sept)
In addition to the monthly water base charge listed
above, each 100 cubic feet of water will be charged at
the following rates:
2024 2025 2026
$3.83 $4.17 $4.55
$4.18 $4.56 $4.97
$4.56 $4.97 $5.42
$5.02 $5.47 $5.96
$6.95 $7.58 $8.26
$7.38 $8.04 $8.77
Fire Protection Service Charges (Monthly)
2 inch Service
3 inch Service
4 inch Service
6 inch Service
8 inch Service
10 inch Service
12 inch Service
Per month based on size of service.
2024 2025 2026
$ 11.25 $12.25 $13.25
$ 25.00 $27.25 $29.75
$ 44.00 $48.00 $52.25
$100.00 $109.00 $119.00
$149.00 $162.50 $177.00
$249.00 $271.50 $296.00
$325.00 $354.25 $386.00
WATER SERVICES
FEE
Water Turn On
$ 50.00
After -Hour Water Turn On - additional fee for
customer requested after-hours water turn on
$ 100.00
Unauthorized Water Usage - after shut-off for
non-payment
$ 100.00
Special Meter Read - customer requested
meter read outside normal read schedule
$ 30.00
Shut-off notice
$ 30.00
Change in owner, tenant, and/or thir-el-paftythird-
$ 20.00
party paying agent
Emergency Conservation Sanction
$ 100.00
Temporary Water Meter Deposit
.75" and 1" water meter
2.5" water meter
$ 300.00
$1 5002.500.00
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 3 of 16
7
Temporary Water Meter Rental per minimum
60 days expiration
.75" and 1" water meter
2.5" water meter
$ 75.00
$ 150.00
WATER INTEREST CHARGE
RATE
On all water accounts 30 days in arrears from
the date of delinquency until paid
8% per annum computed on a monthly basis
SEWER RATES
FEES
Residential Sewer Service
(single dwelling unit)
Flat rate of $3233.00 per month
[TMC 14.16.030 (1)]
Residential Sewer Service (multiple dwelling
unit, permanent type)
Flat rate of $3233.00 per month for each dwelling unit
[TMC 14.16.030 (2)].
Commercial and Industrial Sewage Service
Flat rate of $57.0260.63 per month and, in addition,
any usage over 750 cubic feet of water per month
shall be at the rate of $5-7.0260.63 per 750 cubic feet
(TMC 14.16.030 (4)].
SEWER INTEREST CHARGE
RATE
On all sewer accounts 30 days in arrears from
the date of delinquency until paid
8% per annum computed on a monthly basis
•KiNc COUNTY SEWAGE TREATMENT RATES
f
(Consumption x 7.348) (55.11 / 7.5)
See Section 5
SURFACE WATER RATES
FEE PER YEAR
Surface Water Utility Rates Per Year
Service Charge
Per Acre
Category:
2024
2025 2026
1. Natural
$ 271.01
$ 279.82 $ N/A
2. 0 - 20% Developed Surface
$ 589.40
$ 608.56 $ N/A
3. 21 - 50% Developed Surface
$1,080.27
$1,115.38 $ N/A
4. 51 - 70% Developed Surface
$1,611.96
$1,664.35 $ N/A
5. 71 - 85% Developed Surface
$1,941.94
$2,005.05 $ N/A
6. 86 - 100% Developed Surface
$2,265.30
$2,338.92 $ N/A
7. Single -Family Residential Parcels
(flat rate per residential parcel)
$ 226.00
$ 234.00 $ N/A
8. Per Equivalent Residential Unit (ERU)
$278.53
SURFACE WATER INTEREST CHARGE
RATE
On all surface water accounts 30 days in arrears
from the date of delinquency until paid
8% per annum computed on a monthly basis
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 4 of 16
8
TRANSPORTATION CONCURRENCY TEST FEE SCHEDULE
Fees for Residential and Lodging Use
UNIT ALL TYPES OF
RESIDENTIAL'
ROOMS2 HOTEL/MOTEL
Between 1 and 3 $400
40 and under $3,000
Between 4 and 5 $500
Between 41 and 60 $4,800
Between 6 and 10 $900
Between 61 and 80 $6,800
Between 11 and 15 $1,500
Between 81 and 100 $8,500
Between 16 and 20 $2,100
Between 101 and 120 $10,500
Between 21 and 25 $2,600
Between 121 and 150 $12,800
Between 26 and 30 $3,200
Between 151 and 180 $24,800
Between 31 and 40 $4,000
Between 181 and 220 $30,000
Between 41 and 60 $5,700
Between 221 and 260 $36,000
Greater than 60 $6,800
Between 261 and 300 $46,000
Greater than 300 $49,800
1 All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200-299, including single family,
multi -family, mobile home parks, and shared housing
2 All lodging uses defined by the ITE Trip Generation Manual Land Use Codes 300-399, including all hotels and
motels.
Fees for Non -Residential Use
GROSS FLOOR AREA
INDUSTRIALS
OFFICE4
RETAILS
EATERY6
INSTITU-
TIONAL &
PORT
Less than 5,000
$800
$800
S4,500
$3,500
$300
Between 5,001 and 10,000
$1,500
S2,200
$10,000
$10,500
$800
Between 10,001 and 20,000
$2,500
S4,300
$16,700
$20,900
$1,600
Between 20,001 and 30,000
$3,500
S6,900
$24,400
$21,000
$2,600
Between 30,001 and 40,000
$8,300
S9,500
$31,300
$21,000
$3,600
Between 40,001 and 50,000
$7,000
$12,000
$37,700
$21,000
$4,700
Between 50,001 and 70,000
$9,500
$15,800
$46,600
$21,000
$6,200
Between 70,001 and 90,000
$12,500
$20,800
$57,600
$21,000
$8,200
Between 90,001 and 150,000
$19,000
$32,900
$77.800
$21,000
$13,400
Between 150,001 and 200,000
$27,500
$43,600
$85,000
$21,000
$18,000
Greater than 200,000
$31,500
$49,500
$95,000
$21,000
$20,500
All other uses are charged a $250 per PM peak hour trip.
3 All industrial/agricultural uses defined by the ITE Trip Generation Manual Land Use Codes 100-199, including
light and heavy industrial, manufacturing, and warehousing
4 All office, medical, and service -related uses defined by the ITE Trip Generation Manual Land Use Codes
600-699, 700-799, and 900-999, including general office, medical facilities, and banks
5 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400-499, 800-830
and 837-899, including retail sales, rental sales, athletic clubs, and theaters
6 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 930-940, excluding accessory
(stand-alone) drive -through espresso stands (or similar) under 250 sq. ft., which are assessed $400
7 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes 000-099 and
500-599, including schools, places of worship. day care. terminals, and transit
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 5 of 16
9
POLE ATTACHMENT FEES
FEE PER YEAR
Pole Attachment (per pole) Natural
Pole revisions to allow for attachments
Conduit Rental
City Dark Fiber Rental
Installation fees
$100.00 per year
Actual costs (engineering, labor, inspections, etc.)
$1.00 per foot per year
$200.00 per strand per mile per year
Actual costs (engineering, labor, inspections, etc.)
Section 5. City Sewage Treatment Charges as required by the Agreement for
Sewage Disposal between the King County Metropolitan Services and the City of Tukwila
for single family dwellings, multiple and family and commercial/industrial accounts shall
be set annually per King County and passed through to the customer.
Section 6. Right -of -Way Use and Franchise Permit fees will be charged according
to the following schedule and take effect as of January 1, 2025:
RIGHT-OF-WAY USE PERMITS FEE SCHEDULE
Permit Description
2024 Fee
2025 Fee
2026 Fee
Right -of -Way Use Permit
(ROWUP). Required for
(Franchise and Non-
Franchise Holders).
$295.00 application
base fee, Technology
Fee and, as applicable,
four additional fees
based on construction
value:
1) Plan Review
2) Construction
Inspection
3) Pavement Mitigation
4) Grading Plan
Review
See Public Works
Bulletin Al for fee
schedule.
S305 application base
S319 application base
fee. Technology Fee
fee, Technology Fee
and, as applicable, four
and, as applicable,
additional fees based on
four additional fees
construction value:
based on construction
1) Plan Review
value:
2) Construction
1) Plan Review
Inspection
2) Construction
3) Pavement Mitigation
Inspection
4) Grading Plan
3) Pavement
Review
Mitigation
See ROW Fee Estimate
4) Grading Plan
Worksheet for fee
Review
schedule.
See ROW Fee
Estimate Worksheet
for fee schedule.
Annual Activities Blanket
Permit (AABP). Issued to
Existing Franchise
Holders.
$295.00 application
base fee, Technology
Fee and, as applicable,
two additional fees
based on construction
value:
1) Plan Review
2) Construction
Inspection
See Public Works
Bulletin Al for fee
schedule.
$305 application base
$319 application base
fee, Technology Fee
fee, Technology Fee
and, as applicable, two
and, as applicable,
additional fees based on
two additional fees
construction value:
based on construction
1) Plan Review
value:
2) Construction
1) Plan Review
Inspection
2) Construction
See ROW Fee Estimate
Inspection
Worksheet for fee
See ROW Fee
schedule.
Estimate Worksheet
for fee schedule.
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 6 of 16
10
Franchise application
deposit for all franchise
applications except cable
franchises.'
$5,891.00 deposit
$6,100 deposit
$6,360 deposit
1 Requires a deposit with franchise application. The deposit is intended to cover all administrative
expenses incurred by the City (including staff/consultant related time) associated with the review of each
franchise application and associated franchise negotiations. Additional fees may apply if additional
staff/consultant related time is necessary. Any application fee deposit monies not used for administrative
expenses associated with the review of each franchise application and franchise negotiation shall be
returned to the applicant following the approval or denial of the franchise by the City Council. This
administrative fee excludes normal permit fees required for work within the City rights -of -way.
Permit Description
2024 Fee
2025 Fee
2026 Fee
Franchise Application
Fee— Cable
$5,891.00 plus 5% of
total revenue
$6,100 plus 5% of total
$6,360 plus 5% of
revenue
total revenue
Street Vacation
$1,415.00
$1,466
$1,527
Latecomer's Agreements
$587.00 processing fee,
plus
17% administrative fee,
plus $587.00
segregation fee
$608 processing fee,
$634 processing fee,
plus
plus
17% administrative fee,
17% administrative
plus $608 segregation
fee, plus $634
fee
segregation fees
Flood Zone Control Permit
$59.00 + Technology
Fee
S64
67
Infrastructure Inspector
Safety, Investigation or
Re -inspection Fee
$83.00 per hour
S120
$125
Infrastructure Inspection
Outside of Normal
Business Hours (four-hour
minimum charge)
$124.00 per hour
S124
S130
Section 7. Land Use permit and processing fees will be charged according to the
following schedule and take effect as of January 1, 2025:
LAND USE FEE SCHEDULE
Permit Type and
Subtypes
2024 FEES
Hearing
Examiner
Fee
Tech -Fee
(5%)
2025
FEES
2026
Fees
Permit
Type
ADMINISTRATIVE
Code Interpretation
$473.00
4,1444
$514.53
$536.14
2
Development
Agreement
$5,350.00
$267.50
$5,819.73
$6,064.16
5
Preapplication
Meeting
$651.00
$708.16
$737.90
Resolve uncertain
zoning district
boundary
$753.00
+HE
$37.65
$819.11,
$853.51,
3
Temporary
$514.53
$536.14
2
Encampment Permit
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 7 of 16
11
Zoning Verification
Letter (Up to two
contiguous parcels;
$50 for each
additional parcel)
$473.00
2:_:-2 .
$514.53
1
APPEALS
Appeal of Type 1, 2
Decisions
S795.00
WA
$823.62
$858.21
SEPA MDNS Appeal
$795.00
WA
$823.62,
$858.21
Appeal of Sign Code
Decision
$795.00
ild,44
$823.62
$858.21
Appeal of Fire
Impact Fees
$795.00
NA
$823.62,
$858.21,
Appeal of Parks
Impact Fees
$795.00
NA
$823.62
$858.21
Appeal of
Transportation Fees
$795.00
WA
$823.62,
$858.21
Appeal of a Notice of
$823.62
$85821
Violation and Order
COMPREHENSIVE PLAN CHANGES
Site Specific
Rezones - Separate
Comprehensive Plan
amendment fees
also apply
$8,560.00
'22.C,._
S9.311.57
$9,702.65
5
Comprehensive Plan
Amendment
$5,388.00
cC.
35,861.07
$6,107.23
5
-
Development
Regulations
Amendment
$6,130.00
$306,50
S6,668.21
$6,948.28
5
Administrative
$3,020.00
$151.00
$3,285.16
$3,423.13
2
Minor Modification
S843.00
$12.15
$917.02
$955.53
1
ENVIRONMENTAL REVIEW
State Environmental Policy Act (SEPA)
SEPA Checklist
$2,308.00
0
32,510.64
$2,616.09
SEPA - EIS
$4,042.00
$40248
S4.396.89
$4,581.56
SEPA Planned
Action
$795.00
$864.80,
$901.12
SEPA - Addendum
S795.00
$03945
$864.80
$901.12
SEPA Exemption
Letter
$473.00
$514.53
$536.14
Environmentally Critical Areas
Critical Areas
Deviation, Buffer
Reduction
$2,021.00
$101.05
62,198.44
$2,290.78
2
• Reduced fee for
$795.00
$39.75
$864.80
$901.12
2
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 8 of 16
12
owner occupied
properties, no
associated short
plat
Critical Areas
Reasonable Use
Exception
$4,042.00
+HE
$202.10
S4,396.89
$4,581.56
3
Environmentally
Critical Area Master
Plan Overlay
$6,739.00
+HE
$336.95
S7.330.68
$7,638.57
3
SHORELINE PERMITS
Exemption from
Shoreline Permit
Letter
$329.00
$16.45
$357.89
$372.92
1
Shoreline Permit
Revision
$825.00
$44-45
$897.44
$935.13
1
Conditional Use
Permit - Shoreline*
$5,244.00
+HE
$262.20
S5,704.42
$5,944.01
3
Shoreline Substantial Development Permit'
Project value: $8,504
- $15,0001
$1,596.00
$79.30
S1,736.13
$1,809.05
$15,001 - $50,0004-
$3,737.00
$186.85
34,065.11
$4,235.84
$50,001 -�
$500,000
$5,956.00
56,478.94
$6,751.05
More than
$500,0001-
$7,553.00
$g77.65
S8,216.15
$8.561.23
SIGNS (ALSO PUBLISHED IN BUILDING FEES)
Permanent Sign
$328.00
$16.40
35b.8u
3 i i .78
1
Temporary/Special
Events Permit Sign
$54.00
$2.70
$58.74
$61.21
1
Pole/Banner Initial
Application
$328.00
$4644
$356.80
$371.78
1
Pole/Banner Annual
Renewal
$72.00
60
$78.32,
$81.61,
1
New Billboard
$795.00
$3 .75
$864.80
$901.12
1
Master Sign Program
$2,936.00
$146.80
S3,193.78
$3.327.92
2
SUBDIVISIONS AND BOUNDARY LINE ADJUSTMENTS
Legal Lot Verification
$753.00
$37.65
$819.11
$853.52
1
Binding Site
Improvement Plan
$5,160.00
$45,3,00
$5,613.05
$5,848.80
2
Boundary Line Adjustment & Lot Consolidation
Boundary Line
Adjustment - Lot
Consolidation Only
$1,070.00
$53.50
$1,163.95
$1,212.83
1
Boundary Line
Adjustment- No Lot
Consolidation
$2,247.00
$122.35
$2,444.29
$2,546.95
1
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 9 of 16
13
Minor Modification of
a Boundary Line
Adjustment or
Lot Consolidation
Preliminary Approval
$795.00
$39.75
$864.80
S901.'11
1
Subdivision - Short
Short Plat (2-4 lots)
$6,420.00
42444X4
S6.983.68
$7,276.99
2
Short Plat (5-9 lots)
$8,560.00
442.244
$9,311.57
$9,702.65
2
Minor Modification to
Preliminary Short
Subdivision
$2,247.00
$122.35
$2,444.29
$2,546.95
2
Subdivision - Long
Subdivision
Preliminary Plat (10+
lots)
$9,095.00
+HE
$221.010
$9,893.54
S10,309.07
3
Subdivision Final Plat
(10+ lots)
$5,350.00
$128.00
S5,819.73
$6,064.16
2
Minor Modification to
Preliminary Long
Subdivision
$5,350.00
$122.35
S5.819.73
$6,064.16
2
Planned Residential Development (PRD)
Administrative
$2,936.00
0
$3,193.78
$3,327.92
2
Public Hearing
$6,739.00
+HE
444844
S7,330.68
$7,638.57
3
Minor Modification to
PRD
$795.00
$122.35
$864.80
$901.12
1
Major Modification to
PRD
$3,277.00
+HE
0
$3,564.72
$3,714.44,
3
TREE PERMITS
Not Within Critical Area, Shoreline
Tree Permit for
owner occupied
properties
$144.00
0
$156.64
$163.22
1
Request for
Landscape
Modification
$795.00
5
$864.80
$901.12
1
Within Critical Area, Shoreline
Critical Area Tree &
Vegetation Clearing
Permit
$595.00
4244.5.
$647.24
$674.43
2
Shoreline Tree
Permit
$795.00
$864.80
$901.12
2
In -Lieu Tree
Replacement Fee
$490.00
$533.02
$555.41,
USE PERMITS
Conditional Use
Permit
$5,244.00
+HE
$262.20
$5,704.42
$5,944.01
3
TSO Special
Permission Use
$1,310.00
+HE
0
$1,425.02
$1,484.87
3
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 10 of 16
14
Unclassified Use
Permit
$6,739.00
$336.95
S7,330.68
$7,638.57
4
VARIANCES AND MODIFICATIONS
Variances from
Zoning Code
$3,821.00
+HE
$191.05
S4.156.48
$4,331.06
3
Noise
Type I - 30 days or
less
$651.00
$32.55
$708.16,
$737.90,
1
Type Ill - More than
30 days
$1,968.00
+HE
g
$2,140.79
$2,230.70
3
Parking
Modifications to
Certain Parking
Standards
$795.00
$39.75
$864.80
$901.12
2
Parking Lot
Restriping
$795.00
$39.75
$864.80
$901.12,
2
Parking standard for
use not specified
$783.00
$39.15
$851.75
$887.52
2
Parking Variance -
Under 10% reduction
$795.00
$39.75
$864.80
$901.12
2
Parking Variance-
Over 10% reduction
$1,310.00
+HE
$65.50
S1,425.02
$1.484.87,
3
Shared, Covenant,
and/or
Complementary
Parking Reduction
$795.00
$39.75
$864.80
$901.12
Tukwila South Overlay (TSO) Modifications
Modification to TSO
Development
Standards
$795.00
$39.75
$864.80
$901.12
Tukwila Urban Center (TUC) Modifications
Modification to TUC
Corridor Standards
$795.00
$39.75
$864.80
$901.12
2
Modification to TUC
Open Space
Regulations
$795.00
$3145
$864.80
$901.12
2
Transit Reduction to
Parking
Requirements
$795.00
$39.75
$864.80
$901.12
2
Special Permission
Exception from
Single -Family Design
Standard
$795.00
$02446.
$864.80
$901.12
2
Cargo Container
Placement
$795.00
$.A.75
$864.80
$901.12
2
WIRELESS COMMUNICATION FACILITIES
Eligible Facilities
Modification
S795.00
==-. =
$864.80
$901.12
1
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 11 of 16
15
Macro Facility — No
New Tower
$2,266.00
$113.20
$2,464.95
$2,568.48
2
Macro Facility — New
Tower
$4,534.00
+HE
$226.70.
$4,932.09
$5,139.23,
3
Noticing
Fees
$637.14
$663.90
Database Fee (to
Generate Labels, per
project)
$615.00
Notice Fee (Per
address for each
physical mailing
piece -not emails)
$1.00
$1.00
$1.00
Public Notice Skin
S120 per
$125 per
2
hour
hour
Section 8. Building permit fees will be charged according to the following schedule
and take effect as of January 1, 2025:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$73.0175.64 + Technology Fee
$501 to $2,000
$73.0175.64 for the first $500, plus $4.835.00 for each additional $100, or
fraction thereof, to and including $2,000, + Technology Fee
$2,001 to $25,000
$145.17 150.71for the first $2,000, plus $22.0122.80 for each additional
$1,000,
or fraction thereof, to and including $25,000, + Technology Fee
$25,001 to $50,000
$674.44698.72 for the first $25,000, plus $17.1917.81 for each additional
$1,000,
or fraction thereof, to and including $50,000, + Technology Fee
$50,001 to $100,000
$1,104.491,144.25 for the first $50,000, plus $11.90 12.33for each
additional $1,000,
or fraction thereof, to and including $100,000, + Technology Fee
$100,001 to $500,000
$1,697.97 1,759.10for the first $100,000, plus $9,559.89 for each
additional $1,000,
or fraction thereof, to and including $500,000, + Technology Fee
$500,001 to $1,000,000
$5,511.255,709.66 for the first $500,000, plus $7.868.14 for each
additional $1,000,
or fraction thereof, to and including $1,000,000, + Technology Fee
$1,000,001 to $5,000,000
$9,481.319,825.75 for the first $1,000,000, plus $5,2-75.46 for each
additional $1,000, or fraction thereof, to and including $5,000,000, +
Technology Fee
$5,000,001 and up
$30,602.3631,704.04 for the first $5,000.000, plus $5.05 for each $1,000
or fraction thereof, + Technology Fee
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 12 of 16
16
A. Non -Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of
submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the
calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified
herein is a separate fee from the permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan
review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural
plan review fee.
C. Total Value of All Construction Work. The latest Building Data Valuation that is updated twice a
year by the International Code Council shall be used for the purposes of calculating value of the construction
work.
Section 9. Mechanical permit fees will be charged according to the following
schedule and take effect as of January 1, 2025:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
Work (Total
Contract Amount)
Mechanical Permit Fee
$36.5037.81 for issuance of each permit (base fee) + Technology Fee
$250 or less
$73.01 75.64+ Technology Fee
$251 to $500
$73.01 75.64 for first $250, plus $9.11 for each $100 or fraction
thereof,
to and including $500, + Technology Fee
$501 to $1,000
$95 0298.44 for the first $500, plus $9 10.12 for each $100 or
fraction thereof,
to and including $1,000, + Technology Fee
$1,001 to $5,000
$443,88149.06 for the first $1,000, plus $10.8311.22 for each $1,000 or
fraction thereof, to and including $5,000, + Technology Fee
$5,001 to $50,000
$187.25193.99 for the first $5,000, plus $11.2811.69 for each $1,000 or
fraction thereof, to and including $50,000, + Technology Fee
$50,001 to $250,000
$718.00743.85 for the first $50,000, plus $9, 39.77 for each $1,000 or
fraction thereof, to and including $250,000, + Technology Fee
$250,001 to $1,000,000
$2,605.152,698.94 for the first $250,000, plus $8.31-8.61 for each
$1,000 or fraction thereof, to and including $1,000,000, + Technology
Fee
$1,000,001 and up
$8,839.169.157.68 for the first $1,000,000, plus $7-527.79 for each
$1,000 or fraction thereof, + Technology Fee
Section 10. Plumbing permit fees will be charged according to the following schedule
and take effect as of January 1, 2025:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance —Issuance of each permit (base fee)
$36-5037.81 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$73.0175.64 + Technology Fee
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 13 of 16
17
For each additional fixture
$16.5117.10 + Technology Fee
For each building sewer and each trailer park sewer
$27.5328.52 + Technology Fee
Rain water system — per drain (inside building)
$16.5117.10 + Technology Fee
For each water heater and/or vent
$16.5117.10 + Technology Fee
For each industrial waste pretreatment interceptor, including its trap
and vent, except for kitchen type grease interceptors
$33.01 34.2 +Technology Fee
For each grease interceptor for commercial kitchens
$33.04 34.23+ Technology Fee
For each repair or alteration of water piping and/or water treating
equipment, each occurrence
$16.5117.10 + Technology Fee
For each repair or alteration of drainage or vent piping, each fixture
$16.5117.10 + Technology Fee
For each medical gas piping system serving one to five inlets/outlets
for a specific gas
1
$ 93.60 96.97+ Technology Fee
j
For each additional medical gas inlets/outlets
$48,6319.35 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
backflow protection devices therefor.
$33.0134.23 + Technology Fee
For atmospheric -type vacuum breakers not included in lawn sprinkler
backflow protection:
1 to 5 $16.5117.10 + Technology Fee
Over 5 $16.5117.10 for first 5 plus $3.57 for each
additional + Technology Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2-inch diameter and smaller $33.011_ + Technology Fee
Over 2-inch diameter: $36.311 + Technology Fee
_
Section 11. Fuel Gas Piping permit fees will be charged according to the following
schedule and take effect as of January 1, 2025:
FUEL GAS PIPING PERMIT FEE SCHEDULE
Permit Issuance
For issuing each permit (base fee): ($0 if permit is in conjunction with a
plumbing permit for an appliance with both plumbing and gas connection.)
$36-5037.81 + Technology Fee
Unit Fee Schedule
For each gas piping system of one to five outlets
$73.0175.64 + Technology Fee
For each additional gas piping system outlet, per outlet
$.16.5117.10 + Technology Fee
Section 12. Electrical permit fees will be charged according to the following schedule
and take effect as of January 1, 2025:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW 1 OR 2 UNIT SINGLE FAMILY DWELLINGS
New single family dwellings (including a garage)
$196.06203.12 + Technology Fee
Garages, pools, spas and outbuildings
$132.15136.91 + Technology Fee
Low voltage systems
$66 0368.46 + Technology Fee
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 14 of 16
18
2. 1 OR 2 UNITSINGL E-FDMIL V REMODEL AND SERVICE CHANGES
Service change or alteration —no added/altered circuits
$132.15136.91 + Technology Fee
Service change $40944112.97 with added/altered circuits,
$1490,l 112.97 + Technology Fee
plus
$11.0111.41 for fee $176.20182.54)
each added circuit (maximum permit
Circuits added/altered without service change (includes up to
5 circuits)
$664868.46 + Technology Fee
Circuits $46,0868.46 added/altered without service change (more than 5
$66.0868.46 + Technology Fee
circuits); $41.0111.41 for each added circuit (maximum permit fee
$409494112.97 + Technology Fee)
Meter/mast repair
$88.10 + Technology Fee
Low voltage systems
$66-0868.46 + Technology Fee
3. MULTI -FAMILY AND COMMERCIAL (including low voltage)
Valuation of
Work (Total
Contract Amount)
Permit Fee
$250 or less
$73.0175.64 + Technology Fee
$251 - $1,000
$73.0175.64 for the first $250 plus $4.835.00 for each $100 or fraction thereof,
to and including $1,000, + Technology Fee
$1,001 - $5,000
$47112.89 for the first $1,000 plus $24.2625.13 for each $1,000 or fraction
thereof,
to and including $5,000, + Technology Fee
$5,001 - $50,000
$205.90213.31 for the first $5,000 plus $4-9.8820.60 for each $1,000 or fraction
thereof,
to and including $50,000, + Technology Fee
$50,001 - $250,000
$4;099:881,139.48 for the first $50,000 plus $14.4815.00 for each $1,000 or
fraction thereof, to and including $250,000, + Technology Fee
$250,001 - $1,000,000
$4,007.024.151.27 for the first $250,000 plus $10.2610.63 for each $1,000 or
fraction thereof, to and including $1,000,000, + Technology Fee
Over $1,000,000
$11,728.0412,150.25 plus 0.5% of cost over $1,000,000, + Technology Fee
4. MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential)
$113.93120+ Technology Fee
Temporary service/generators
$-a 13.93120+ Technology Fee
Manufactured/mobile home parks and RV park sites, each service and
feeder
$443.933120+ Technology Fee
Carnivals:
Base fee
$413.93120+ Technology Fee
Each concession fee
$12.1112.55 + Technology Fee
Each ride and generator truck
$12.1112.55 + Technology Fee
Inspections or plan review not specified elsewhere (one hour minimum).
$113.93120 hour
per
Safety inspections, plan revisions
$113.93120 hour
per
Adult family home inspection (paid at the time of scheduling the
inspection)
$113.93120 for each inspection
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner
Page 15 of 16
19
Residential structure remodel or repair (up to $20,000 construction value}
$47-5,00
Section 13. Other inspections and fees will be charged according to the following
schedule and take effect as of January 1, 2025:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (four hour minimum charge)
$115.63124 hour
per
Re -inspection fee (minimum charge one hour)
$115.63120 hour
per
Inspection for which no fee is specifically indicated —investigations or safety
inspections
$115.63120 per hour
Additional plan review required by changes, additions, or revisions to approved plans
$115.63' "" hour
per
Work commencing before permit issuance shall be subject to an investigation fee
equal to 100% of the permit fee.
100% of the permit fee
Plan review fee —Mechanical, Plumbing, Fuel Gas Piping and Electric he fee for
review shall be 25% of the total calculated permit fee. The plan rev e is a
separate fee from the permit fee and is required when plans are r it order to
document compliance with the code.
Work covered prior to inspection or work not ready at the ti f inspection be
charged a re -inspection fee of $115.63120.
Expired permit final — includes two inspections
$151.18160
Expired permit final — each additional inspection
$77.0980
Minor residential remodel plan review and permit o - _ ue to
$20,00025.000 including building, mechanical, ele• al bing within 1
$45100
• year)
Certificate of Occupancy replacement
$113.93120
Permit extension for issued permit- en all. •d by c,
$120
Permit extension for expired permit- owe• .. oc'
$240
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this - day of , 2024.
ATTEST/AUTHENTICATED:
Andy Youn, CMC, City Clerk Mohamed Abdi, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
2024 Legislation: Citywide Consolidated Fee Schedule
Version: 11/12/24
Staff: M. Baker & G. Lerner Page 16 of 16
20