Loading...
HomeMy WebLinkAboutRes 2105 - 2025-2026 Consolidated Permit Fee ScheduleCity of Tukwila Washington Cover page to Resolution 2105 The full text of the resolution follows this cover page. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A CITYWIDE CONSOLIDATED PERMIT FEE SCHEDULE FOR 2025 AND 2026; REPEALING RESOLUTION NOS, 2056, 2058, 2079, AND 2103. Resolution 2105 was amended or repealed by the following resolutions. AMENDED Section(s) Amended Amended by Res # 7, 13 2124 2149 REPEALED Section(s) Repealed Repealed by Res # City of Tukwila Washington Resolution No. II r A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A CITYWIDE CONSOLIDATED PERMIT FEE SCHEDULE FOR 2025 AND 2026; REPEALING RESOLUTION NOS. 2056, 2058, 2079, AND 2103. WHEREAS, the City is authorized to impose fees to recoup the costs of services rendered and intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, each year the City analyzes the rate model for the three utility enterprise funds, which are water, sewer and surface water, to ensure revenues keep pace with expenses, to update the traffic model, and to analyze the transportation network to ensure continued compliance with the Growth Management Act and the City's adopted Comprehensive Plan; and WHEREAS, updated fees are necessary to support rising costs of service; and WHEREAS, on October 24, 2022, the City Council adopted Resolution No. 2056 setting the Public Works Fee Schedule for 2023 and 2024; and WHEREAS, on November 28, 2022, the City Council adopted Resolution No. 2058 establishing a Consolidated Permit Fee Schedule; and WHEREAS, on October 9, 2023, the City Council adopted Resolution No. 2079 updating the City Sewer Rates and King County Sewage Treatment Rates for 2024; and WHEREAS, on October 21, 2024, the City Council adopted Resolution No. 2103 updating the City's Land Use Fee Schedule to align with changes being made to the Tukwila Municipal Code in compliance with Senate Bill 5290 ("SB 5290"); and WHEREAS, the Departments of Community Development and Public Works currently maintain separate fee schedules and the City desires to clarify and streamline 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 1 of 15 those fees and utility rates in a Citywide Consolidated Permit Fee Schedule for 2025 and 2026; and WHEREAS, the City will be updating and modernizing its Surface Water fee structure in 2026 to the Equivalent Resident Unit (ERU) method, where a commercial parcel will be charged one ERU per every 4,000 impervious square feet and residential parcels will be charged a flat fee of one ERU; and WHEREAS, permit fees for encampments are being implemented pursuant to Ordinance No. 2745 adopting reasonable occupancy, spacing, and intensity of use requirements for temporary encampments to protect public health and safety; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Repealer. Resolution Nos. 2056, 2058, 2079, and 2103 are hereby repealed, effective January 1, 2025. Section 2. For 2025 and 2026, the Technology Fee shall be set at 5% of the applicable permit fee and is included in the fees shown below. Section 3. Where indicated hearing examiner fees are charged in addition to the City permit fee listed below. Section 4. Public Works fees will be charged according to the following schedule and take effect as of January 1, 2025: PUBLIC WORKS FEE SCHEDULE WATER RATES FEES Water Meter Installation .75 inch 1 inch 1.5 inch 2 inch 3 inch 4 inch 6 inch $ 600.00 $ 1,100.00 $ 2,400.00 $ 2,800.00 $ 4,400.00 $ 7,800.00 $12,500.00 Water Meter Deduct $25.00 Water Base Charge (Monthly) Single Family (one dwelling unit) Multi -Family (more than one dwelling unit, each dwelling is charged the base charge) In addition to the monthly water base charge, each 100 cubic feet of water used will be charged as shown in "Water Rates (Monthly)." 2025 2026 $23.25 $25.50 $23.25 $25.50 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff. M. Baker & G. Lerner Page 2 of 14 Commercialllndustrial Customers: 3/4 inch Service 1 inch Service 1-112 inch Service 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service 2025 2026 $65.00 $71.00 $78.00 $86.00 $113.00 $124.00 $147.00 $160.00 $211.00 $230.00 $282.00 $308.00 $426.00 $465.00 $567.00 $618.00 $709.00 $772.00 $839.00 $915.00 Water Rates (Monthly) Single Family Residence (Oct -May) Single Family Residence (Jun -Sept) Mufti -Family (Oct -May) Mufti -Family (Jun -Sept) Commercial/Industrial (Oct -May) Commercial/Industrial (Jun -Sept) In addition to the monthly water base charge listed above, each 100 cubic feet of water will be charged at the following rates: 2025 2026 $4.17 $4.55 $4.56 $4.97 $4.97 $5.42 $5.47 $5.96 $7.58 $8.26 $8.04 $8.77 Fire Protection Service Charges (Monthly) 2 inch Service 3 inch Service 4 inch Service 6 inch Service 8 inch Service 10 inch Service 12 inch Service Per month based on size of service. 2025 2026 $12.25 $13.25 $27.25 $29.75 $48 00 $52 25 $109.00 $119.00 $162.50 $177.00 $271.50 $296.00 $354.25 $386.00 WATER SERVICES FEES Water Turn On $50.00 After -Hour Water Turn On - additional fee for customer requested after-hours water turn on $100.00 Unauthorized Water Usage - after shut-off for non-payment $100.00 Special Meter Read - customer requested meter read outside normal read schedule $30 00 Shut-off notice $30.00 Change in owner, tenant, and/or third -party paying agent $20.00 Emergency Conservation Sanction $100.00 Temporary Water Meter Deposit .75" and 1" water meter 2.5" water meter $300.00 $2,500.00 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 3 of 14 Temporary Water Meter Rental per minimum 60 days expiration .75" and 1" water meter 2.5" water meter $ 75.00 $ 150.00 WATER INTEREST CHARGE RATE On all water accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis SEWER RATES FEES Residential Sewer Service (single dwelling unit) Flat rate of $33.00 per month [TMC 14.16.030 (1)] Residential Sewer Service (multiple dwelling unit, permanent type) Flat rate of $33.00 per month for each dwelling unit [TMC 14.16.030 (2)]. Commercial and Industrial Sewage Service Flat rate of $60.63 per month and, in addition, any usage over 750 cubic feet of water per month shall be at the rate of $60.63 per 750 cubic feet [TMC 14.16.030 (4)]. SEWER INTEREST CHARGE RATE On all sewer accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis SEWAGE TREATMENT RATES See Section 5 SURFACE WATER RATES FEE PER YEAR Surface Water Utility Rates Per Year Category: Service Charge Per Acre 2025 2026 1. Natural 2. 0 - 20% Developed Surface 3. 21 - 50% Developed Surface 4. 51 - 70% Developed Surface 5. 71 - 85% Developed Surface 6. 86 - 100% Developed Surface 7. Single -Family Residential Parcels (flat rate per residential parcel) 8. Per Equivalent Residential Unit (ERU) $ 279.82 $ N/A $ 608.56 $ N/A $1,115.38 $ N/A $1,664.35 $ N/A $2,005.05 $ N/A $2,338.92 $ N/A $ 234.00 $ N/A $278.53 SURFACE WATER INTEREST CHARGE RATE On all surface water accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 4 of 14 TRANSPORTATION CONCURRENCY TEST FEE SCHEDULE Fees for Residential and Lodging Use UNIT ALL TYPES OF RESIDENTIAL' ROOMS2 HOTEL/MOTEL Between 1 and 3 $400 40 and under $3,000 Between 4 and 5 $500 Between 41 and 60 $4,800 Between 6 and 10 $900 Between 61 and 80 $6,800 Between 11 and 15 $1,500 Between 81 and 100 $8,500 Between 16 and 20 $2,100 Between 101 and 120 $10,500 Between 21 and 25 $2,600 Between 121 and 150 $12,800 Between 26 and 30 $3,200 Between 151 and 180 $24,800 Between 31 and 40 $4,000 Between 181 and 220 $30,000 Between 41 and 60 $5,700 Between 221 and 260 $36,000 Greater than 60 $6,800 Between 261 and 300 $46,000 Greater than 300 $49,800 1 All residential uses defined by the ITE Trip Generation Manual Land Use Codes 200-299, including single family, multi -family, mobile home parks, and shared housing 2 All lodging uses defined by the ITE Trip Generation Manual Land Use Codes 300-399, including all hotels and motels. Fees for Non -Residential Use GROSS FLOOR AREA INDUSTRIALS OFFICE4 RETAIL EATERY6 INSTITU- TIONAL & PORT Less than 5,000 $800 $800 $4,500 $3,500 $300 Between 5,001 and 10,000 $1,500 $2,200 $10,000 $10,500 $800 Between 10,001 and 20,000 $2,500 $4,300 $16,700 $20,900 $1,600 Between 20,001 and 30,000 $3,500 $6,900 $24,400 $21,000 $2,600 Between 30,001 and 40,000 $8,300 $9,500 $31,300 $21,000 $3,600 Between 40,001 and 50,000 $7,000 $12,000 $37,700 $21,000 $4,700 Between 50,001 and 70,000 $9,500 $15,800 $46,600 $21,000 $6,200 Between 70,001 and 90,000 $12,500 $20,800 $57,600 $21,000 $8,200 Between 90,001 and 150,000 $19,000 $32,900 $77.800 $21,000 $13,400 Between 150,001 and 200,000 $27,500 $43,600 $85,000 $21,000 $18,000 Greater than 200,000 $31,500 $49,500 $95,000 $21,000 $20,500 All other uses are charged a $250 per PM peak hour trip. 3 All industrial/agricultural uses defined by the ITE Trip Generation Manual Land Use Codes 100-199, including light and heavy industrial, manufacturing, and warehousing All office, medical, and service -related uses defined by the ITE Trip Generation Manual Land Use Codes 600-699, 700-799, and 900-999, including general office, medical facilities, and banks 5 All retail and recreation uses defined by the ITE Trip Generation Manual Land Use Codes 400-499, 800-830 and 837-899, including retail sales, rental safes, athletic clubs, and theaters 6 All food service uses defined by the ITE Trip Generation Manual Land Use Codes 930-940, excluding accessory (stand-alone) drive -through espresso stands (or similar) under 250 sq. ft., which are assessed $400 All institutional and transportation uses defined by the ITE Trip Generation Manual Land Use Codes 000-099 and 500-599, including schools, places of worship, day care, terminals, and transit 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 5 of 14 POLE ATTACHMENT FEES FEE PER YEAR Pole Attachment (per pole) Natural Pole revisions to allow for attachments Conduit Rental City Dark Fiber Rental Installation fees $100.00 per year Actual costs (engineering, labor, inspections, etc.) $1 M0 per foot per year $200.00 per strand per mile per year Actual costs (engineering, labor, inspections, etc.) Section 5. City Sewage Treatment Charges as required by the Agreement for Sewage Disposal between the King County Metropolitan Services and the City of Tukwila for single family dwellings, multiple and family and commercial/industrial accounts shall be set annually per King County and passed through to the customer. Section 6. Right -of -Way Use and Franchise Permit fees will be charged according to the following schedule and take effect as of January 1, 2025: RIGHT-OF-WAY USE PERMITS FEE SCHEDULE Permit Description 2025 Fee 2026 Fee Right -of -Way Use Permit (ROWUP). Required for (Franchise and Non- Franchise Holders). $305 application base fee, Technology Fee and, as applicable, four additional fees based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See ROW Fee Estimate Worksheet for fee schedule. $319 application base fee, Technology Fee and, as applicable, four additional fees based on construction value: 1) Plan Review 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See ROW Fee Estimate Worksheet for fee schedule. Annual Activities Blanket Permit (AABP). Issued to Existing Franchise Holders. $305 application base fee, Technology Fee and, as applicable, two additional fees based on construction value: 1) Plan Review 2) Construction Inspection See ROW Fee Estimate Worksheet for fee schedule. $319 application base fee, Technology Fee and, as applicable, two additional fees based on construction value: 1) Plan Review 2) Construction Inspection See ROW Fee Estimate Worksheet for fee schedule. Franchise application deposit for all franchise applications except cable franchises.' $6,100 deposit $6,360 deposit 1 Requires a deposit with franchise application. The deposit is intended to cover all administrative expenses incurred by the City (including staff/consultant related time) associated with the review of each franchise application and associated franchise negotiations. Additional fees may apply if additional staff/consultant related time is necessary. Any application fee deposit monies not used for administrative expenses associated with the review of each franchise application and franchise negotiation shall be returned to the applicant following the approval or denial of the franchise by the City Council. This administrative fee excludes normal permit fees required for work within the City rights -of -way. 2024 Legislation. Citywide Consolidated Fee Schedule Version. 11/12/24 Staff: M. Baker & G. Lerner Page 6 of 14 Permit Description 2025 Fee 2026 Fee Franchise Application Fee— Cable $6,100 plus 5% of total revenue $6,360 plus 5% of total revenue Street Vacation $1,466 $1,527 Latecomer's Agreements $608 processing fee, plus 17% administrative fee, plus $608 segregation fee $634 processing fee, plus 17% administrative fee, plus $634 segregation fee Flood Zone Control Permit $64 $67 Infrastructure Inspector Safety, Investigation or Re -inspection Fee $120 $125 Infrastructure Inspection Outside of Normal Business Hours (four-hour minimum charge) $124 $130 Section 7. Land Use permit and processing fees will be charged according to the following schedule and take effect as of January 1, 2025: LAND USE FEE SCHEDULE Permit Type and Subtypes Hearing Examiner Fee 2025 FEES 2026 Fees Permit Type ADMINISTRATIVE 4 Code Interpretation $514.53 5536.14 2 Development Agreement $5,819.73 $6,064.16 5 Preapplication Meeting $708.16 $737.90 Resolve uncertain zoning district boundary +HE $819.11 $853.51 3 Temporary Encampment Permit $514.53 $536.14 2 Zoning Verification Letter (Up to two contiguous parcels; $50 for each additional parcel) $514.53 $536.14 1 APPEALS Appeal of Type 1, 2 Decisions $823.62 $858.21 SEPA MDNS Appeal $823.62 $858.21 Appeal of Sign Code Decision $823.62 $858.21 Appeal of Fire Impact Fees $823.62 $858.21 Appeal of Parks Impact Fees $823.62 $858.21 Appeal of Transportation Fees $823.62 $858.21 Appeal of a Notice of Violation and Order J $823.62 $858.21 NKr-- — ‘--------- COMPREHENSIVE PLAN CHANGES Site Specific Rezones - Separate Comprehensive Plan amendment fees also apply $9,311.57 $9,702.65 5 Comprehensive Plan Amendment $5,861.07 $6,107.23 5 Development Regulations Amendment $6,668.21 $6,948.28 5 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 7 of 14 F DESIGN REVIEW . - . 4 Administrative $3,285.16 $3,423.13 2 Minor Modification $917.02 $955.53 State Environmental Policy Act (SEPA) SEPA Checklist $2,510.64 $2,616.09 SEPA - EIS $4,396.89 $4,581.56 SEPA - Planned Action $864.80 $901.12 SEPA - Addendum $864.80 $901.12 SEPA Exemption Letter $514.53 $536.14 Environmentally Critical Areas Critical Areas Deviation, Buffer Reduction $2,198.44 $2,290.78 2 • Reduced fee for owner occupied properties, no associated short plat $864.80 $901.12 2 Critical Areas Reasonable Use Exception +HE $4,396.89 $4,581.56 3 Environmentally Critical Area Master Plan Overlay +HE $7,330.6$ $7,638.57 3 Exemption from Shoreline Permit Letter $357.89 $372.92 1 Shoreline Permit Revision $897.44 $935.13 1 Conditional Use Permit - Shoreline* +HE $5,704.42 $5,944.01 3 Shoreline Substantial Development Permit Project value: $8,504 - $15,000 $1,736.13 $1,809.05 $15,001 - $50,000 $4,065.11 $4,235.84 $50,001 - $500,000 $6,478.94 $6,751.05 More than $500,000 $8,216.15 $8,561.23 SIGNS (ALSO PUBLISHED IN BUILDING FEES) Permanent Sign $356.80 $371.78 1 Temporary/Special Events Permit Sign $58.74 $61.21 1 Pole/Banner Initial Application $356.80 $371.78 1 Pole/Banner Annual Renewal $78.32 $81.61 1 New Billboard $864.80 $901.12 1 Master Sign Program $3,193.78 $3,327.92 2 Legal Lot Verification $819.11 $853.52 1 Binding Site Improvement Plan $5,613.05 $5,848.80 2 Boundary Line Adjustment & Lot Consolidation Boundary Line Adjustment - Lot Consolidation Only $1,163.95 $1,212.83 1 1 2024 Legislation: Citywide Consolidated Fee Schedule Version: 1 1112/24 Staff' M. Baker & G. Lerner Page 8 of 14 Boundary Line Adjustment - No Lot Consolidation $2,444.29 $2,546.95 1 Minor Modification of a Boundary Line Adjustment or Lot Consolidation Preliminary Approval $864.80 $901.12 1 Subdivision - Short Short Plat (2-4 lots) $6,983.68 $7,276.99 2 Short Plat (5-9 lots) $9,311.57 $9,702.65 2 Minor Modification to Preliminary Short Subdivision $2,444.29 $2,546.95 2 Subdivision - Long Subdivision Preliminary Plat (10+ lots) +HE $9,893.54 $10,309.07 3 Subdivision Final Plat (10+ lots) $5,819.73 $6,064.16 2 Minor Modification to Preliminary Long Subdivision $5,819.73 $6,064.16 2 Planned Residential Development (PRD) Administrative $3,193.78 $3,327.92 2 Public Hearing +HE $7,330.68 $7,638.57 3 Minor Modification to PRD $864.80 $901.12 1 Major Modification to PRD +HE $3,564.72 IIIMIP $3,714.44 3 Not Within Critical Area, Shoreline Tree Permit for owner occupied properties $156.64 $163.22 1 Request for Landscape Modification $864.80 $901.12 1 Within Critical Area, Shoreline Critical Area Tree & Vegetation Clearing Permit $647-24 $674.43 2 Shoreline Tree Permit $864.80 $901.12 2 In -Lieu Tree Replacement Fee $533.02 $555.41 Conditional Use Permit +HE $5,704.42 $5,944.01 3 TSD Special Permission Use +HE $1,425.02 $1,484.87 3 Unclassified Use Permit $7,330.68 $7,638.57 4 VARIANCES AND MODIFICATIONS Variances from zoning Code +HE $4.156.48 I $4,331.06 3 Noise Type I - 30 days or less $708.16 $737.90 1 Type Ill - More than 30 days +HE $2,140.79 $2,230.70 3 Parking Modifications to Certain Parking Standards $864.80 $901.12 2 Parking Lot Restriping $864.80 $901.12 2 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11 /12/24 Staff: M. Baker & G. Lerner Page 9 of 14 Parking standard for use not specified $851.75 $887.52 2 Parking Variance - Under 10% reduction $864.80 $901.12 2 Parking Variance Over 10% reduction +HE $1,425.02 $1,484.87 3 Shared, Covenant, and/or Complementary Parking Reduction $864.80 $901.12 2 Tukwila South Overlay (TSO) Modifications Modification to TSO Development Standards $864.80 $901.12 2 Tukwila Urban Center (TUC) Modifications Modification to TUC Corridor Standards $864.80 $901.12 2 Modification to TUC Open Space Regulations $864.80 $901.12 2 Transit Reduction to Parking Requirements $864.80 $901.12 2 Special Permission Exception from Single -Family Design Standard $864.80 $901.12 2 Cargo Container Placement $864.80 $901.12 2 WIRELESS COMMUNICATION FACILITIES Eligible Facilities Modification $864.80 $901.12 1 Macro Facility - No New Tower $2,464.95 $2,568.48 2 Macro Facility - New Tower +HE $4,932.09 $5,139.23 3 Database Fee (to Generate Labels, per project) $637.14 $663.90 Notice Fee (Per address for each physical mailing piece -not emails) $1.00 $1.00 Public Notice Sign $120 per hour $125 per hour 2 Section 8. Building permit fees will be charged according to the following schedule and take effect as of January 1, 2025: BUILDING PERMIT FEE SCHEDULE Total Valuation Building Permit Fees $1 to $500 $501 to $2,000 $75.64 + Technology Fee $75.64 for the first $500, plus $5.00 for each additional $100, or fraction thereof, to and including $2,000, + Technology Fee $2,001 to $25,000 $150.71for the first $2,000, plus $22.80 for each additional $1,000, or fraction thereof, to and including $25,000, + Technology Fee $25,001 to $50,000 $698.72 for the first $25,000, plus $17.81 for each additional $1,000, or fraction thereof, to and including $50,000, + Technology Fee 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 10 of 14 $50,001 to $100,000 $1,144.25 for the first $50,000, plus $12.33for each additional $1,000, or fraction thereof, to and including $100,000, + Technology Fee $100,001 to $500,000 $1,759.10for the first $100,000, plus $9.89 for each additional $1,000, or fraction thereof, to and including $500,000, + Technology Fee $500,001 to $1,000,000 $5,709.66 for the first $500,000, plus $8.14 for each additional $1,000, or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 to $5,000,000 $9,825.75 for the first $1,000,000, plus $5.46 for each additional $1,000, or fraction thereof, to and including $5,000,000, + Technology Fee $5,000,001 and up $31,704.04 for the first $5,000.000, plus $5.05 for each $1,000 or fraction thereof, + Technology Fee A. Non -Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural plan review fee. C. Total Value of All Construction Work. The latest Building Data Valuation that is updated twice a year by the International Code Council shall be used for the purposes of calculating value of the construction work. Section 9. Mechanical permit fees will be charged according to the following schedule and take effect as of January 1, 2025: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Contract Amount) $250 or less Mechanical Permit Fee $37.81 for issuance of each permit (base fee) + Technology Fee $75.64+ Technology Fee $251 to $500 $501 to $1,000 $1,001 to $5,000 $75.64 for first $250, plus $9.11 for each $100 or fraction thereof, to and including $500, + Technology Fee $98.44 for the first $500, plus $10.12 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $149.06 for the first $1,000, plus $11.22 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 to $50,000 $193.99 for the first $5,000, plus $11.69 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $250,000 $743.85 for the first $50,000, plus $9.77 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 to $1,000,000 $2,698.94 for the first $250,000, plus $8.61 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 and up $9,157.68 for the first $1,000,000, plus $7.79 for each $1,000 or fraction thereof, + Technology Fee 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner Page 11 of 14 Section 10. Plumbing permit fees will be charged according to the following schedule and take effect as of January 1, 2025: PLUMBING PERMIT FEE SCHEDULE Permit Issuance —Issuance of each permit (base fee) $37.81 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) $75.64 + Technology Fee For each additional fixture $17.10 + Technology Fee For each building sewer and each trailer park sewer $28.52 + Technology Fee Rain water system — per drain (inside building) $17.10 + Technology Fee For each water heater and/or vent $17.10 + Technology Fee For each industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors $34.23+ Technology Fee For each grease interceptor for commercial kitchens $34.23+ Technology Fee For each repair or alteration of water piping and/or water treating equipment, each occurrence $17.10 + Technology Fee For each repair or alteration of drainage or vent piping, each fixture $17.10 + Technology Fee For each medical gas piping system serving one to five inlets/outlets for a specific gas $96 g7+ Technology Fee For each additional medical gas inlets/outlets $19.35 + Technology Fee For each lawn sprinkler system on any one (1) meter including backflow protection devices therefor. $34.23 +Technology Fee For atmospheric -type vacuum breakers not included in lawn sprinkler backflow protection: 1 to 5 $17.10 + Technology Fee Over 5 $17.10 for first 5 plus $3.70for each additional + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inch diameter and smaller $34.23 + Technology Fee Over 2-inch diameter: $37.65 + Technology Fee Section 11. Fuel Gas Piping permit fees will be charged according to the following schedule and take effect as of January 1, 2025: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appliance with both plumbing and gas connection.) Unit Fee Schedule For each gas piping system of one to five outlets For each additional gas piping system outlet, per outlet $37.81 + Technology Fee $75.64 + Technology Fee $17.10 + Technology Fee Section 12. Electrical permit fees will be charged according to the following schedule and take effect as of January 1, 2025: 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11 /12124 Staff: M. Baker & G. Lerner Page 12 of 14 ELECTRICAL PERMIT FEE SCHEDULE 1. NEW 1 OR 2 UNIT DWELLINGS New dwellings (including a garage) $203.12 + Technology Fee Garages, pools, spas and outbuildings $136.91 + Technology Fee Low voltage systems $68.46 + Technology Fee 2. 1 OR 2 UNIT REMODEL AND SERVICE CHANGES Service change or alteration —no added/altered circuits $136.91 + Technology Fee Service change $112.97 with added/altered circuits, plus $11.41 for each added circuit (maximum permit fee $182.54) $112.97 + Technology Fee Circuits addedlaltered without service change (includes up to 5 circuits) $68.46 + Technology Fee Circuits $68.46 added/altered without service change (more than 5 circuits); $11.41 for each added circuit (maximum permit fee $112.97 + Technology Fee) $68.46 +Technology Fee Meter/mast repair $88.10 + Technology Fee Low voltage systems $68.46 + Technology Fee 3. MULTI -FAMILY AND COMMERCIAL (including low voltage) Valuation of Work (Total Contract Amount) Permit Fee $250 or less $75.64 + Technology Fee $251 - $1,000 $75.64 for the first $250 plus $5.00 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 - $5,000 $112.89 for the first $1,000 plus $25.13 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 - $50,000 $213.31 for the first $5,000 plus $20.60 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 - $250,000 $1,139.48 for the first $50,000 plus $15.00 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 - $1,000,000 $4,151.27 for the first $250,000 plus $10.63 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee Over $1,000,000 $12,150.25 plus 0.5% of cost over $1,000,000, + Technology Fee 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) Temporary service/generators $120+ Technology Fee $120+ Technology Fee Manufactured/mobile home parks and RV park sites, each service and feeder Carnivals: $120+ Technology Fee Base fee Each concession fee $120+ Technology Fee $12.55 + Technology Fee Each ride and generator truck $12.55 + Technology Fee 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff. M. Baker & G. Lerner Page 13 of 14 Inspections or plan review not specified elsewhere (one hour minimum). Safety inspections, plan revisions $120 per hour $120 per hour Adult family home inspection (paid at the time of scheduling the inspection) $120 for each inspection Section 13. Other inspections and fees will be charged according to the following schedule and take effect as of January 1, 2025: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (four hour minimum charge) $124 per hour Re -inspection fee (minimum charge one hour) $120 per hour $120 per hour Inspection for which no fee is specifically indicated —investigations or safety inspections Additional plan review required by changes, additions, or revisions to approved plans $120 per hour Work commencing before permit issuance shall be subject to an investigation fee equal to 100% of the permit fee. 100% of the permit fee Plan review fee —Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered prior to inspection or work not ready at the time of inspection may be charged a re -inspection fee of $120. Expired permit final — includes two inspections $160 Expired permit final — each additional inspection $80 Minor residential remodel plan review and permit (projects valued up to $25,000 including building, mechanical, electrical, and plumbing within 1 year) $100 Certificate of Occupancy replacement $120 Permit extension for issued permit- when allowed by code $120 Permit extension for expired permit- when allowed by code $240 PASSED BY THE CITY COUNC L OF THE CITY OF TU WILA, WASHINGTON, at a Special Meeting thereof this day of )f 0\ G v1n\JCA f , 2024. ATTEST/AUTHENTICATED: Andy Youn,LP IIC, City Clerk APPROVED AS TO FORM BY: Office of the City Attorney 2024 Legislation: Citywide Consolidated Fee Schedule Version: 11/12/24 Staff: M. Baker & G. Lerner &,„,c( ,460 Mohamed Abdi, Council President Filed with the City Clerk: l' Passed by the City Council: Resolution Number: Page 14 of 14 From: Kari Sand To: Jennifer Marshall Cc: Andy Youn Subject: Re: Scriveners Error - Resolution 2105 Date: Wednesday, December 4, 2024 12:38:08 PM Attachments: image001.pnq image003.pnq Hi, Jennifer -- Yes, please do accept (correct) the changes for the final version as scrivener's errors - thank you! Hope you're having a good day (and week)! Best, Kari Kari L. Sand I Attorney Ogden Murphy Wallace, PLLC 701 Fifth Avenue, Suite 5600 I Seattle, WA 98164 Direct: 206.447.2250 I Fax: 206.447.0215 ksand@omwlaw.com I www.omwlaw.com Notice: Emails and attachments may be subject to disclosure pursuant to the Public Records Act (chapter 42.56 RCW). From: Jennifer Marshall <Jennifer.Marshall@TukwilaWA.gov> Sent: Wednesday, December 4, 2024 9:47 AM To: Kari Sand <Kari.Sand@TukwilaWA.gov> Cc: Andy Youn <Andy.Youn@TukwilaWA.gov> Subject: Scrivener's Error - Resolution 2105 Good morning Kari, We were notified by staff that while track changes were accepted in the final version of Resolution 2105 one column header was not removed and two column headers were not shifted. Please let me know if we can proceed correcting this as a Scrivener's Error. Track changes as approved by Council (this is the version from their packet): SURFACE WATER RATES FEE PER YEAR Surface Water Utility Rates Per Year Service Charge Per Acre Category: 2024 2025 2026 1, Natural $ 271.01 $ 279.82 $ N/A 2. 0- 20% Developed Surface $ 589.40 $ 608.56 $ N/A 3. 21 - 50% Developed Surface $1,080.27 $1,115.38 $ N/A 4. 51 - 70% Developed Surface $1,611.96 $1.664.35 $N/AN/A 5. 71 - 85% Developed Surface $1,941,94 $2,005.05 $ N/A 6. 86 - 100% Developed Surface $2,265.30 $2,338.92 $ N/A 7. Single -Family Residential Parcels (flat rate per residential parcel) $ 226.00 $ 234.00 $ N/A 8. Per Egairalent ReSi;ertial unit i-7Ur $278.53 SURFACE WATER INTEREST CHARGE RATE On all surface water accounts 30 days in arrears from the date of delinquency until paid 8% per annum computed on a monthly basis The proposed correction is identified below: SURFACE WATER RATES FEE PER YEAR Surface Water Utility Rates Per Year Category_ 1_ Natural 2. 0 - 20% Developed Surface 3. 21 - 50% Developed Surface 4. 51 - 70% Developed Surface 5. 71 - 85% Developed Surface 6. 86 - 100% Developed Surface 7. Single -Family Residential Parcels (flat rate per residential parcel) 8. Per Equivalent Residential Unit (ERU) Service Charge Per Acre 2025 2026 ) $ 279.82 $ N/A $ 608.56 $1,115.38 $1,664.35 $2,005.05 $2,338.92 $ 234.00 $ NIA $ N/A $ N/A $ NIA $ N/A $ N/A $278.53 SURFACE WATER INTEREST CHARGE RATE flea nit! curfhre u..nfer .ntc 2fS An uc :ea errnearc Thank you, Jennifer Marshall Deputy City Clerk — Public Disclosure City of Tukwila I Office of the City Clerk