HomeMy WebLinkAboutReg 2024-12-02 Item 5C - Grant Acceptance - 3 Sound Transit Grants: 152nd St & TIB Station Pedestrian Connection for $510,000 / 52nd Ave Traffic-Calming for $350,000 / Southcenter Blvd & TIB Station Improvements for $390,000COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's review
Council review
12/02/24
JR
ITEM INFORMATION
ITEM No.
5.C.
STAFF SPONSOR: CATRIEN DE BOER
ORIGINAL AGENDA DATE: 12/02/24
AGENDA ITEM TITLE Accept Three Sound Transit System Access Fund Grants S 152nd Ped Connection,
42nd Ave Bikeway, and SCB Ped/Bike Upgrades.
CATEGORY ❑ Discussion
Mtg Date
0
Motion
Date 12/02/24
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg
SPONSOR ❑Council ❑Mayor HR ❑DCD Finance ❑Fire ❑TS ❑P&R Police 11PTV Court
SPONSOR'S
SUMMARY
In February 2024, Sound Transit approached the City with a list of projects aimed at
improving connectivity and access to the TIB Light Rail Station. Each project will improve
station access and public safety. Council is being asked to accept three Sound Transit
System Access Fund grant awards totaling 1,250,000.
Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm.
DATE: 11/25/24 COMMITTEE CHAIR: ARMEN
❑ Planning/Economic
Dev.
REVIEWED BY
❑ Planning Comm.
PAPYAN
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
Public Works Department
Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,250,000 $0.00 $0.00
Fund Source: GRANT
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
12/02/24
MTG. DATE
ATTACHMENTS
12/02/24
Informational Memorandum dated 11/22/24
Conceptual Designs and Maps
Minutes from Transportation and Infrastructure Committee meeting of 11/25/24
(distributed separately)
17
18
City of Tukwila
Thomas McLeod, Mayor
Public Works ❑epartment - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Deputy City Administrator/ Interim Public Works Director
BY: Catrien de Boer, Public Works Analyst
CC: Mayor McLeod
DATE: November 22, 2024
SUBJECT: Accept Three Sound Transit System Access Fund Grants
S 152nd Ped Connection, 42nd Ave Bikeway, and SCB Ped/Bike Upgrades.
Project No. 91710303, 92510401, and 92510405
ISSUE
Accept three Sound Transit System Access Fund (SAF) Grant Awards to improve access to the TIB
Light Rail Station. First, Tukwila was awarded $510,000 for the design and construction of a pedestrian
connection between 152nd St and the TIB Station overflow parking lot. Second, Tukwila was awarded
$350,000 to add a traffic -calmed bikeway along 42nd Ave S. Third, Tukwila was awarded $390,000 to
improve the Southcenter Blvd intersection near the TIB Station. These grants total to $1,250,000.
BACKGROUND
In February 2024, Sound Transit approached the City with a list of projects aimed at improving
connectivity and access to the TIB Light Rail Station. The City and Sound Transit Teams ranked the
projects and selected three to move forward with. These are direct investments in the City that were
approved by the Sound Transit board on March 28, 2024. City staff believe these are meaningful
additions to improve station access and public safety.
DISCUSSION
The first project will develop a pathway connection between the TIB Station overflow parking lot to the
existing multi -use path dead-end on S 152nd St. This will include a pathway, marked crossing, lighting,
and a retaining wall to allow for this direct connection. The second project will develop a traffic -calmed
bikeway along 42nd Ave S between S 150th St and Southcenter Blvd. The third project will improve the
existing bike lanes and crosswalks on Southcenter Blvd within a half -mile of TIB Light Rail Station; re-
channelize to 11 ft general purpose lanes and add separated bike lanes; and upgrade high -visibility
crosswalk markings at the station entrance/intersection.
FISCAL IMPACT
The City has been awarded grants for three different projects. There is no city match associated with
these grant awards.
Award Amount
S 152nd Ped Connection $510,000
42nd Ave S Bikeway $350,000
Southcenter Blvd Intersection Improvements $390,000
TOTAL $1,250,000
19
RECOMMENDATION
Council is being asked to accept three Sound Transit System Access Fund grant awards and consider
this item on the consent agenda on the December 2, 2024 Meeting.
Attachments: Conceptual Designs and Maps
20
< 1S GNZSI S 01
Y Q ( )
Q � Z
C O
Q
CD
cV O J
LiJ W »
> CC
O La'
U p
Qz
CQ
EXISTING PATH.
O
LEI
NEW PED SCALE LUMINAIRE.
?fp-
Z
0
0)
Z
L,J
xm
L.J W
Illhhomm
0 N
Z CD
O Z
CDm
Q N X
Z
Lu
5 O W
O CL ct
O Z cl-
CD Li
O
CC
CL Q CC
wj z
O
CC CL
Q Z Z
JOLiJ
Q
Ct
CL
aG
Air
w=z
cD CD
J (n
L.U
c_) M A W
0
SOUND TRANSIT PATH CONNECTION
CITY OF TUKWILA- TIB LIGHT RAIL STATION
Tacoma I Wenatchee I KPG.com
Wd 0:c ZZOZ/9Z/Ol 6mPH1Vd 1S d21dOZllZA6ui)I-oM\s6uimoJQ\u6isaQ\100yaS 01 sa}n0H aPS 1S PuZSL S— OZLL6 VIIMH I\S103P021dVA
21
22
Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo
Project 10-N 13b:
High -cost 42nd Ave S Bikeway
STRIDE ACCESS PROJECTS
Project 10-N13b
Tukwila International
Boulevard Station
Project Title: High -cost 42nd Ave S Bikeway
Total Cost Estimate: $350,000
Bike Lane
Wide Sidev,alk (8')
Shared Lane Markings
AStudy Location for Ped Crossing
SOUNDTRANSIT NNLSON
N EG A A R D
Project Description
Jurisdiction: City of Tukwila
Develop a traffic calmed bikeway along 42nd Ave S between S 150th St and Southcenter
Blvd (approx. 950ft). Emulate the character of the bike facility on 42nd Ave S south of
Southcenter Blvd. Add striped bike lanes on both sides of the roadway between South
Center Blvd and S 151 st St. Continue the southbound bike lane on the west side of the street
to S 150th St. Between S 151' St and S 150th St widen the sidewalk on the east side of the
street to create a shared, widened sidewalk as a low traffic stress option, with an in -lane
shared lane marking for more confident bicyclists to remain in the roadway. This intervention
requires the removal of on -street parking for one block on the west side of the roadway. At
the intersection of S 152nd St study the crossing for a marked crosswalk to connect the new
Sound Transit funded sidewalk project to the adjacent bus stop and/or as a school crossing
opportunity. The segment of roadway is recommended as a bicycle friendly route with a
30mph speed limit in the City of Tukwila's Non -motorized Plan. The City of Tukwila supports
a multi -use path or bikeway investment on 42nd Ave S.
Cost Estimate
Table 56 Preliminary Cost Estimate for Project 10-N13b High -cost Option
Preliminary Cost Estimate (2023$)
Construction Subtotal $239,244
Professional Services Subtotal
$113,163
Grand Total $352,407
Rounded Grant Total $350,000
Detailed cost estimate can be found in Appendix A
Page 5-14 1 Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo
DRAFT — For internal discussion only. Not reviewed or approved on behalf of any party.
November 2023
23
Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo
Figure 59 Further developed conceptual Design for Project 10-N13b
Page 5-15 I Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo November 2023
NET — For internal discussion only. Not reviewed or approved on behalf of any party.
Project Name 10-N13b High -cost 42nd Ave 5 Bikeway
Develop a traffic calmed bikeway along 42nd Ave 5 between 5 150th St and Southcenter Blvd (approx. 950ft). Emulate the character of the bike facility on 42nd Ave 5 south of Southcenter Blvd.
Add striped bike lanes on both sides of the roadway between South Center Blvd and S 151st St. Continue the southbound bike lane on the west side of the street to 5150th St. Between S 151st St
Project Description and S 150th St widen the sidewalk on the east side of the street to create a shared, widened sidewalk as a low traffic stress option, with an in -lane shared lane marking for more confident
bicyclists to remain in the roadway. This intervention requires the removal of on -street parking for one block on the west side of the roadway. At the intersection of S 152nd St study the crossing
for a marked crosswalk to connect the new Sound Transit funded sidewalk project to the adjacent bus stop and/or as a school crossing opportunity. The segment of roadway is recommended as a
bicycle friendly route with a 30mph speed limit in the City of Tukwila's Non -motorized Plan. The City of Tukwila supports a multi -use path or bikeway investment on 42nd Ave 5.
Corridor I-405, 51 Line
Station Tukwila International Blvd Station
Jurisdiction Tukwila
Assuming connection
Notes and Assumptions
to existing storm
drainage network
Prepared by NN,MAB
Date 10/10/2023
Checked by CEH
Date 10/19/2023
ProJect 10-N13b
Tukwila International
Boulevard Station
elpslorinik4Nip ®l Ord Arm S IYYwmp
Told Go•11•1 : SIMON
Bin LIrm
Y.YY Stlwrt fi)
841./ L4arwh. i
Alf LKramlr rod Glpawg
DN
Sg{r$Idl1! .0 1l lr . NCr LxS6BLs
Description
Unit
Quantity
Unit Cost (2023)
Total Cost
Notes and Assumptions
Percentage Based Allocations
Demolition
LS
$126,920
5%
$8,346
Site Utilities/Utility Relocation
LS
$126,920
5%
$8,346
2 grate inlets converted to curb inlets
Traffic control
LS
$126,920
10%
$12,692
Mobilization
LS
$126,920
10%
$12,692
Pedestrian, Bike Access, and Accommodation, Landscaping
Concrete Sidewalk
SY
301
$80
$24,060
Curb Ramps
EA
3
$3,000
$9,000
Street Trees
EA
0
$1,200
$0
Asphalt Paving (31
SY
44
$200
$8,600
Concrete Curb and Gutter
LF
250
$75
$18,750
Roadway drainage, linear curb
EA
2
$25,000
$50,000
Roadway drainage, curb comer
EA
0
$35,000
$0
Roadway drainage, reset existing structure
EA
0
$7,500
$0
Paint, White line, 4"
LF
4000
$2
$8,000
Allowance to rechannelize exiting roadway
Paint, Yellow line, 4"
LF
2000
$2
$4,000
Allowance to rechannelize exiting roadway
Paint, High Visibility Crosswalk, Per Lane
LN
7
$120
$840
Allowance to rechannelize exiting roadway
Paint, Stop Bar, 24"
LN
6
$75
$450
Allowance to rechannelize exiting roadway
Yield pavement symbols
LN
0
$500
$0
Pavement symbols
EA
10
$300
$3,000
Allowance to rechannelize exiting roadway
Bike Intersection Channelization
EA
0
$4,000
$0
Tuff Curb and Post
LF
0
$50
$0
Speed hump
EA
0
$4,500
$0
Traffic Signals and Crossing Protection
Rectangular Rapid Flashing Beacon (RRFB), hard wired
EA
0
$30,000
$0
Traffic signal
EA
0
$750,000
$0
Electrical service connection
EA
0
$20,000
$0
Subtotal
$164,996
Contingency
45%
$74,248
Construction Subtotal
$239,244
Professional Services
Development/Design Consultant
LS
12%
$28,709
Agency Staff Administration
LS
14%
$33,494
Construction Management
LS
4%
$9,570
Legal, Permits, Fees
LS
10%
$23,924
Start-up
LS
3%
$7,177
Subtotal
$102,875
Contingency
10%
$10,288
Professional Services Subtotal
$113,163
Grand Total
$352,407
Rounded Grand Total
$350,000
25
Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo
Project 10-N6: Southcenter Blvd Bikeway
and Pedestrian Crossing Upgrades
Figure 5-5 Conceptual Design for Project 10-N6
Project 10-N6 - Tukwila International Boulevard Station
Project Title: Southcenter Blvd Bikeway and Pedestrian
Total Cost Estimate: $390,000
Agl Tuff Curb and Post (1,000 LF per side)
Stripe 11' general purpose lanes (1,500 LF)
kLN
SOUNDTRANSIT 'v N EG AOR D
Crossing Upgrades
•
•
High Visibility Pedestrian
Crossing (2 EA)
C Intersection bike
OO channelization (4 EA)
Project Description
Jurisdiction: City of Tukwila
Description: Improve the existing bike lanes and crosswalks on Southcenter Blvd within 0.5
mile of Tukwila International Boulevard Station. Rechannelize roadway to accommodate
separated bike lanes: 11' general purpose lanes, tuff curb and post. Tighten the intersection
at both legs of 40th Ave S to shorten the crossing distance for people biking and walking.
Add bike channelization such as crossbikes at the intersection of Southcenter Blvd and TIBS
station entrance. Upgrade crosswalk markings to high visibility at Southcenter Blvd/TIBS
station entrance and Southcenter Blvd/42nd Ave S.
Cost Estimate
Table 5-3 Preliminary Cost Estimate for Project 10-N6
Preliminary Cost Estimate (2023$)
Construction Subtotal
Professional Services Subtotal
Grand Total
Rounded Grant Total
$261,497
$123,688
$385,185
$390,000
Detailed cost estimate can be found in Appendix A
Page 5-10 I Stride Bus Rapid Transit Access Allowance Support: Additional Projects Identification Memo
NFT — For internal discussion only. Not reviewed or approved on behalf of any party.
November 2023
Project Description
Project Name 10-N6 Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades
Improve the existing bike lanes and crosswalks on Southcenter Blvd within 0.5 mile of Tukwila International Boulevard Station. Rechannelize roadway to accommodate separated bike lanes: 11'
general purpose lanes, tuff curb and post. Tighten the intersection at both legs of 40th Ave 5 to shorten the crossing distance for people biking and walking. Add bike channelization such as
crossbikes at the intersection of Southcenter Blvd and TIBS station entrance. Upgrade crosswalk markings to high visibility at Southcenter Blvd/TIBS station entrance and Southcenter Blvd/42nd
Ave S.
Corridor 1-405, S1 Line
Station Tukwila International Blvd Station
Jurisdiction Tukwila
Notes and Assumptions
Prepared by
Date
Checked by
Date
Corridor distance is
1,500' LF from TIBS
access to 100' east of
42nd Ave 5
NN, MAP
10/10/2023
CEP
10/19/2023
Project 10-N6 -'Tukwila International Boulevard Station
Turr Cu h and Porn t1,D00SF pan tidal
91.ip* 11. y.;r. uI R'rp4YJ 6TI r1,51 tFi
Vsow•ATr 10i44 x
" " CrosamEp{2 EAI
A Intarsenkrn hike
0 '16 chanrwlirarinn {4 EAi
Description
Percentage Based Allocations
Unit
Quantity
Unit Cost (2023)
Total Cost
Notes and Assumptions
Demotion
LS
$138,725
5%
$6,936
Site Utilities/Utility Relocation
LS
$138,725
5%
$6,936
Traffic control
LS
$138,725
10%
$13,873
Mobilization
LS
$138,725
10%
$13,873
Pedestrian, Bike Access, and Accommodation, Landscaping
Concrete Sidewalk
SY
0
$80
$0
Curb Ramps
EA
0
$3,000
$0
Street Trees
EA
0
$1,200
$0
Asphalt Paving (3")
SY
0
$200
$0
Concrete Curb and Gutter
LF
0
$75
$0
Roadway drainage, linear curb
EA
0
$25,000
$0
Roadway drainage, curb comer
EA
0
$35,000
$0
Roadway drainage, reset existing structure
EA
0
$7,500
$0
Paint, White line, 4"
LF
3000
$2
$6,000
Allowance to rechannelize exiting roadway
Paint, Yellow line, 4"
LF
3000
$2
$6,000
Allowance to rechannelize exiting roadway
Paint, High Visibility Crosswalk, PerLane
LN
10
$120
$1,200
Paint, Stop Bar, 24"
LN
7
$75
$525
Yield pavement symbols
LN
0
$500
$0
Pavement symbols
EA
30
$300
$9,000
Bike symbols, turn arrows
Bike Intersection Channelization
EA
4
$4,000
$16,000
Includes paint and post square -up treatments at 40th Ave S
Tuff Curb and Post
LF
2000
$50
$100,000
1000 LF per side assuming reduction for driveways
Speedhump
EA
0
$4,500
$0
Traffic Signals and Crossing Protection
Rectangular Rapid Flashing Beacon (RRFB), hard wired
EA
0
$30,000
$0
Traffic signal
EA
0
$750,000
$0
Electrical service connection
EA
0
$20,000
$0
Subtotal
$180,343
Contingency
45%
$81,154
Construction Subtotal
$261,497
Professional Services
Development/Design Consultant
LS
12%
$31,380
Agency SlafAdminishation
LS
14%
$36,610
Construction Management
LS
4%
$10,460
Legal, Permits, Fees
LS
10%
$16,150
Start-up
LS
3%
$7,845
Subtotal
$112,444
Contingency
10%
$11,244
Professional Services Subtotal
$123,588
Grand Total
$385,185
Rounded Grand Total
$390,000
27