HomeMy WebLinkAboutTrans 2012-04-16 Item 2C - Grant Application - Boeing Access Road Over BNRR BridgeCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Robin Tischmak, City Engineer DATE: April 13, 2012 SUBJECT: Boeina Access Road Over BNRR Bridqe Realacement Proiect Project No. 99410408 Grant Application ISSUE Authorize the submittal of a grant application for funding from the Federal Highway Bridge Program to rehabilitate the Boeing Access Road (BAR) Bridge over BNSF Burlington Northern Railroad (BNRR). BACKGROUND The Washington State Department of Transportation has issued a Call for Projects to compete for an estimated $40 $70 million of Federal Highway Bridge Program funds. Tukwila currently has only one bridge that qualifies for funding. The Boeing Access Road Bridge over BNRR is structurally deficient and is programmed in the City's 6 -year Transportation Improvement Program (TIP) and the Capital Improvement Program (CIP) for replacement beginning in 2013 (contingent upon available funding). Project applications were submitted in 2008 and 2010 and both were unsuccessful in receiving funds to replace the bridge. Feedback from the funding agency indicated a desire to fund this project, but that the estimated costs were too high to compete in the program. The City hired Jacobs Engineering to provide an analysis and estimated costs to rehabilitate the bridge instead of total replacement. The estimated cost to rehabilitate the bridge is $12,182,000 as opposed to the $30 million for full replacement of the BAR Bridge. DISCUSSION Grant applications are due by May 4, 2012. A preliminary grant application totaling $12,182,000 has been prepared to rehabilitate the bridge. The Call for Projects indicates that 20% in matching funds should be assumed, which would require $2,436,400 in local matching funds. FINANCIAL IMPACT The revised project scope would require an estimated local match in the amount of $2,436,400. RECOMMENDATION Discuss with the Transportation Committee the decision to authorize the submittal of a grant application for the rehabilitation of the Boeing Access Road Bridge over BNRR. Attachments: Project Application 2012 CIP Page 9 W TW Eng \PROJECTS \A RW RS Projects \BAR Bridge Repl (99410408)\BRAC Application \2012 Application \InfoMemo 4- 10- 12.doc 27 Federal Highway Bridge Program Project Application Please send copies of the latest inventory and inspection reports, load ratings summary, accident data, any other pertinent information, and electronic photos (640 x 480 pixels minumum Jpg) with this questionnaire by the due date specified in the cover letter. Agency Name: City of Tukwila Bridge Name: Boeing Access Road Br Bridge Number: 0 0 0 0 TUK -12 Contact Person: Robin Tischmak Phone: (206 )431 -2455 Sufficiency Rating: Structure ID: 08002500 Pick one of the following: OReplacement Candidate *Rehabilitation Candidate OScour Mitigation OSeismic Retrofit OPainting Brief Project Description (includng bridge replacement type) Rehabilitate the Boeing Access Road Bridge over railroads (both BNSF UPRR) by strengthening both substructure and superstructure and widening for sidewalk. Proposed Length: 337 Width (Curb to Curb) 83 Rehabilitation /Replacement /Seismic /Paint /Scour Projects: PE Costs (approx 25% total) $1, 163,000 (Soils, Environmental, Design Documents, Plans Preparation, etc.) Right of Way Costs 0 (Purchases, Relocations and Construction Easement) Construction Costs $7,050,000 (Environmental mitigation, approach costs (15 structure costs, etc.) Construction Engineering (18 $1,396, 000 Contingency (15 $1,163, 000 Mobilization (10 $705,000 Inflation Factor (5% per year, based on projected Ad date below) $705,000 Total Rehabilitation /Replacement/Preventative Maintenance Project Costs:* $12,182,000 If a Rehabilitation, what would be the Replacement cost for that same structure (including PE, Right of Way, and Construction)? $32,500,000 Realistic Start Dates (Month, Year): Preliminary Engineering Right of Way Purchases Construction (March 2013 I IMay 2014 Projected Advertising Date (Year): 2014 Provide comments below Project cost estimates may be updated on this form until August 30, 2012. 28 Comments This project was submitted in 2010 for a replacement candidate but was not accepted. After more discussion with the HELP engineering staff and further evaluation of the existing bridge conditions, this project is resubmitted for a rehabilitation candidate. With this rehabilitation, the bridge will also be brought up to the current seismic codes. Approximately 40,000 vehicles per day (ADT) travel through this bridge, serving King County International Airport and manufacturing /industrial center of the area. Truck volumes are approximately 10% of the ADT. The nearest access to I -5 are approximately 3.5 miles to,the north and 1.5 miles to the south. A detail project cost estimate has been prepared by a consultant and attached as backup information. 29 CITY OF TUKWILA CAPITAL PROJECT SUMMARY Project Location 2012 2017 Capital Improvement Program 9 30 2012 to 2017 PROJECT: Boeing Access Rd over BNRR Bridge Replacement Project No. 99410408 Replace the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to DESCRIPTION: curb and have sidewalks on both sides. The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet standards. Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant STATUS: applications were submitted in 2008 and 2010. City will continue to submit application for funding as federal bridge funds are made available. MAINT. IMPACT: Maintenance will be reduced. New bridge will be constructed in phases to allow continued traffic use. Construction of projects over COMMENT: $10 million are only funded at 80% for federal funding. A Bond issue will be required for the City match. FINANCIAL Through Estimated (in $000's) 2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL EXPENSES Design 53 1,750 1,750 3,553 Land (R=) 0 Const. Mgmt. 1,602 1,602 3,204 Construction 12,015 12,015 24,030 TOTAL EXPENSES 53 0 0 1,750 1,750 13,617 13,617 0 0 30,787 FUND SOURCES Awarded Grant 0 Proposed Grant 1,400 1,400 10,894 10,894 24,588 Bond 350 350 2,723 2,723 6,146 Mitigation Expected 0 City Oper. Revenue 53 0 0 0 0 0 0 0 0 53 TOTAL SOURCES 53 0 0 1,750 1,750 13,617 13,617 0 0 30,787 Project Location 2012 2017 Capital Improvement Program 9 30