INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director
BY: Robin Tischmak, City Engineer
DATE: April 13, 2012
SUBJECT: Boeina Access Road Over BNRR Bridqe Realacement Proiect
Project No. 99410408
Grant Application
ISSUE
Authorize the submittal of a grant application for funding from the Federal Highway Bridge Program to
rehabilitate the Boeing Access Road (BAR) Bridge over BNSF Burlington Northern Railroad (BNRR).
BACKGROUND
The Washington State Department of Transportation has issued a Call for Projects to compete for an
estimated $40 $70 million of Federal Highway Bridge Program funds. Tukwila currently has only one
bridge that qualifies for funding. The Boeing Access Road Bridge over BNRR is structurally deficient and
is programmed in the City's 6 -year Transportation Improvement Program (TIP) and the Capital
Improvement Program (CIP) for replacement beginning in 2013 (contingent upon available funding).
Project applications were submitted in 2008 and 2010 and both were unsuccessful in receiving funds to
replace the bridge.
Feedback from the funding agency indicated a desire to fund this project, but that the estimated costs
were too high to compete in the program. The City hired Jacobs Engineering to provide an analysis and
estimated costs to rehabilitate the bridge instead of total replacement. The estimated cost to rehabilitate
the bridge is $12,182,000 as opposed to the $30 million for full replacement of the BAR Bridge.
DISCUSSION
Grant applications are due by May 4, 2012. A preliminary grant application totaling $12,182,000 has
been prepared to rehabilitate the bridge. The Call for Projects indicates that 20% in matching funds
should be assumed, which would require $2,436,400 in local matching funds.
FINANCIAL IMPACT
The revised project scope would require an estimated local match in the amount of $2,436,400.
RECOMMENDATION
Discuss with the Transportation Committee the decision to authorize the submittal of a grant application
for the rehabilitation of the Boeing Access Road Bridge over BNRR.
Attachments: Project Application
2012 CIP Page 9
W TW Eng \PROJECTS \A RW RS Projects \BAR Bridge Repl (99410408)\BRAC Application \2012 Application \InfoMemo 4- 10- 12.doc
27
Federal Highway
Bridge Program
Project Application
Please send copies of the latest inventory and inspection reports, load
ratings summary, accident data, any other pertinent information, and
electronic photos (640 x 480 pixels minumum Jpg) with this
questionnaire by the due date specified in the cover letter.
Agency Name: City of Tukwila
Bridge Name: Boeing Access Road Br
Bridge Number: 0 0 0 0 TUK -12
Contact Person: Robin Tischmak
Phone: (206 )431 -2455
Sufficiency Rating:
Structure ID: 08002500
Pick one of the following:
OReplacement Candidate
*Rehabilitation Candidate
OScour Mitigation
OSeismic Retrofit
OPainting
Brief Project Description (includng bridge replacement type)
Rehabilitate the Boeing Access Road Bridge over railroads
(both BNSF UPRR) by strengthening both substructure and
superstructure and widening for sidewalk.
Proposed Length: 337 Width (Curb to Curb) 83
Rehabilitation /Replacement /Seismic /Paint /Scour Projects:
PE Costs (approx 25% total) $1, 163,000
(Soils, Environmental, Design Documents, Plans Preparation, etc.)
Right of Way Costs 0
(Purchases, Relocations and Construction Easement)
Construction Costs $7,050,000
(Environmental mitigation, approach costs (15 structure costs, etc.)
Construction Engineering (18 $1,396, 000
Contingency (15 $1,163, 000
Mobilization (10 $705,000
Inflation Factor (5% per year, based on projected Ad date below) $705,000
Total Rehabilitation /Replacement/Preventative Maintenance Project Costs:*
$12,182,000
If a Rehabilitation, what would be the Replacement cost for that same structure
(including PE, Right of Way, and Construction)? $32,500,000
Realistic Start Dates (Month, Year):
Preliminary Engineering Right of Way Purchases Construction
(March 2013 I IMay 2014
Projected Advertising Date (Year): 2014
Provide comments below
Project cost estimates may be updated on this form until August 30, 2012.
28
Comments
This project was submitted in 2010 for a replacement
candidate but was not accepted. After more discussion
with the HELP engineering staff and further evaluation of
the existing bridge conditions, this project is
resubmitted for a rehabilitation candidate. With this
rehabilitation, the bridge will also be brought up to the
current seismic codes.
Approximately 40,000 vehicles per day (ADT) travel through
this bridge, serving King County International Airport and
manufacturing /industrial center of the area. Truck
volumes are approximately 10% of the ADT. The nearest
access to I -5 are approximately 3.5 miles to,the north and
1.5 miles to the south.
A detail project cost estimate has been prepared by a
consultant and attached as backup information.
29
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
Project Location
2012 2017 Capital Improvement Program 9
30
2012 to 2017
PROJECT:
Boeing Access Rd over BNRR Bridge Replacement Project No. 99410408
Replace the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to
DESCRIPTION:
curb and have sidewalks on both sides.
The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete
JUSTIFICATION:
spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet
standards.
Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant
STATUS:
applications were submitted in 2008 and 2010. City will continue to submit application for funding as federal
bridge funds are made available.
MAINT. IMPACT:
Maintenance will be reduced.
New bridge will be constructed in phases to allow continued traffic use. Construction of projects over
COMMENT:
$10 million are only funded at 80% for federal funding. A Bond issue will be required for the City match.
FINANCIAL
Through Estimated
(in $000's)
2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL
EXPENSES
Design
53 1,750 1,750
3,553
Land (R=)
0
Const. Mgmt.
1,602 1,602
3,204
Construction
12,015 12,015
24,030
TOTAL EXPENSES
53 0 0 1,750 1,750 13,617 13,617 0 0
30,787
FUND SOURCES
Awarded Grant
0
Proposed Grant
1,400 1,400 10,894 10,894
24,588
Bond
350 350 2,723 2,723
6,146
Mitigation Expected
0
City Oper. Revenue
53 0 0 0 0 0 0 0 0
53
TOTAL SOURCES
53 0 0 1,750 1,750 13,617 13,617 0 0
30,787
Project Location
2012 2017 Capital Improvement Program 9
30