HomeMy WebLinkAboutTIS 2025-01-27 Item 2B - Grant Acceptance - Transportation Improvement Board Grant for S 124th St / 50th Pl ReconfigurationCity of Tukwila Thomas McLeod, Mayor Pub[rc Works Department - Pete Mayer, Interim Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Pete Mayer, Deputy City Administrator/ Interim Public Works Director BY: Catrien de Boer, Public Works Analyst CC: Mayor McLeod DATE: January 24, 2025 SUBJECT: Arterial Streets Fund — S 124th St and 50th PI Reconfiguration Project No. 92510402 Transportation Improvement Board Urban Arterial Program ISSUE Accept a Transportation Improvement Board (TIB) Urban Arterial Program (UAP) grant for the design and construction of S 124th and 50th PI reconfiguration in the amount of $900,404. BACKGROUND In 2022, a traffic calming study identified intersection improvements to control speeds, improve safety, and address pedestrian access throughout the Allentown neighborhood. This intersection was prioritized to mitigate traffic concerns in the neighborhood. The intersection is a 3-way controlled stop except for the east -bound right turn slip lane from S 124th St onto 50th PI. The speed limit is 25 mph with known speeding on both roads. DISCUSSION In August 2024, City staff applied to the TIB UAP to fund design, construction management, and construction expenses related to the S 124th St and 50th Pl. road reconfiguration. In November 2024, the City was notified that we received the full grant award. The identified solutions include removing the east -bound right turn slip lane, requiring all vehicles to come to a complete stop, adding a highly visible marked pedestrian crossing, and constructing protected pedestrian walkways. The specific site elements will be further explored during the design process. The City currently has a conceptual design (Exhibit A) and this funding will be used to support project implementation. FISCAL IMPACT The City was awarded a $900,404 grant from the TIB. There is a 21.8% local city match which is budgeted in the recently adopted CIP, using 104 (Arterial Streets) Funds. Project Budget TIB Funds $900,404 Local Funds $251,083 Total $1,151,487 Match Source 2025-2027 CIP Budgeted 104 Funds RECOMMENDATION Council is being asked to accept a Transportation Improvement Board grant in the amount of $900,404 and consider this item on the Consent Agenda at the February 3, 2025 Regular Council Meeting. Attachments: 2025-2030 CIP Conceptual Design 5 EXHIBIT A S 124TH ST / 50TH PL S INTERSECTION IMPROVEMENTS SIDEWALK, OVERLAY, CHANNELIZATION IMPROVEMENTS MEMNTTTTT 7 10 20 40 60 SCALE IN FEET 8/8/2024 I PQ 1j/ PS• MAS CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 PROJECT: S 124th St/50th Pl S Reconfiguration Project # 92510402 Project Manager Cyndy Knighton Department Arterial Streets DESCRIPTION: Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to 51 st, new paved shoulder walkway on south side of 124th connecting to existing walkway on west side of 50th Pl, new stormwater treatment/rain garden in old slip lane ROW. Project can be done in phases, with phase 1 including just the intersection reconfiguration and phase 2 including the sidewalk on S 124th but cost would be greater. JUSTIFICATION: Removing the free -flow right turn movement will improve safety at the S 125th St/50th Pl S intersection and generally on S 124th St and 50th Pl S. Narrowing pedestrian crossing distance at the intersection and improving pedestrian facilities will improve safety and livability for the neighborhood. Identified in the Allentown Neighborhood Transportation Study in 2022. STATUS: New project for 2025 MAINTENANCE IMPACT: ' water treatment facilities. If project is done in phases, the stand-alone sidewalk project could be double the cost of including them in a single project. Approximate estimate in 2024 dollars is $600k for construction and design and COMMENT: construction management costs approaching $250k. Phasing the project may be necessary due to funding constraints. FINANCIAL (in thousands) 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) $ - $ - $ - $ - $ - $ - $ - $ - Construction Mgmt. $ - $ - $ 300 $ - $ - $ - $ - $ 300 Construction $ - $ - $ 1,350 $ - $ - $ - $ - $ 1,350 Contingency $ - $ - $ 180 $ - $ - $ - $ - $ 180 Total Project Costs $ - $ 275 $ 1,830 $ - $ - $ - $ - $ 2,105 Project Funding Awarded Grant $ - $ - $ - $ - $ - $ - $ - $ - Fund Balance $ - $ 275 $ - $ - $ - $ - $ - $ 275 Total Project Funding $ - $ 275 $ 1,830 $ - $ - $ - $ - $ 2,105 Adopted by the Tukwila City Council on November25, 2024 7