ITEM No.
5.C.
STAFF SPONSOR: CATRIEN DE BOER
ORIGINAL AGENDA DATE: 02/03/25
AGENDA ITEM TITLE S 124th St and 50th PI Reconfiguration
Transportation Improvement Board Urban Arterial Program
CATEGORY ❑ Discussion
Mtg Date
® Motion
Mtg Date
2/3/2025
1- Resolution
Mtg Date
E Ordinance
Mtg Date
1- Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
1- Other
Mtg Date
SPONSOR Council I—Mayor❑HR DCD ❑Finance I— Fire ❑IS ❑P&R ❑Police IIPIW ❑Court
SPoNSoR's In order to address safety concern related to S. 124th and 50th PI, In August 2024, City staff
SUMMARY applied to the TIB UAP to fund design, construction management, and construction
expenses related road reconfiguration. In November 2024, the City was notified that we
received the full grant award. The funding will be used to support project implementation.
Council is being asked to accept a Transportation Improvement Board grant in the amount
of $900,404.
REVIEWED BY
Trans&Infrastructure
E CommunitySvs/Safety P Finance Comm. 17 Planning/Economic Dev.
E Arts Comm. P Parks Comm. n Planning Comm.
01/27/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
1— LTAC
DATE:
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm'
Public Works Department
I°IEE Majority Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$900,404 $0.00 $0.00
Fund Source: GRANT; ARTERIAL STREETS FUND (21.8%)
Comments: CIP 2025 2030 S 124th St/50th PI S Reconfiguration
MTG. DATE
RECORD OF COUNCIL ACTION
02/03/25
MTG. DATE
ATTACHMENTS
02/03/25
Informational Memorandum dated 01/24/25
2025-2030 CIP
Conceptual design
Minutes from Transportation and Infrastructure Committee meeting of 01/27/25
17
18
Public WorksDepartment Pete
Thornas McLeod, Mayor
n e "in Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Deputy City Administrator/ Interim Public Works Director
BY: Catrien de Boer, Public Works Analyst
CC: Mayor McLeod
DATE: January 24, 2025
SUBJECT: Arterial Streets Fund — S 124th St and 50th PI Reconfiguration
Project No. 92510402
Transportation Improvement Board Urban Arterial Program
ISSUE
Accept a Transportation Improvement Board (TIB) Urban Arterial Program (UAP) grant for the design
and construction of S 124th and 50th PI reconfiguration in the amount of $900,404.
BACKGROUND
In 2022, a traffic calming study identified intersection improvements to control speeds, improve safety,
and address pedestrian access throughout the Allentown neighborhood. This intersection was
prioritized to mitigate traffic concerns in the neighborhood. The intersection is a 3-way controlled stop
except for the east -bound right turn slip lane from S 124th St onto 50th Pl. The speed limit is 25 mph with
known speeding on both roads.
DISCUSSION
In August 2024, City staff applied to the TIB UAP to fund design, construction management, and
construction expenses related to the S 124th St and 50th Pl. road reconfiguration. In November 2024,
the City was notified that we received the full grant award. The identified solutions include removing the
east -bound right turn slip lane, requiring all vehicles to come to a complete stop, adding a highly visible
marked pedestrian crossing, and constructing protected pedestrian walkways. The specific site
elements will be further explored during the design process. The City currently has a conceptual design
(Exhibit A) and this funding will be used to support project implementation.
FISCAL IMPACT
The City was awarded a $900,404 grant from the TIB. There is a 21.8% local city match which is
budgeted in the recently adopted CIP, using 104 (Arterial Streets) Funds.
Project Budget
TIB Funds $900,404
Local Funds $251,083
Total $1,151,487
Match Source
2025-2027 CIP Budgeted 104 Funds
RECOMMENDATION
Council is being asked to accept a Transportation Improvement Board grant in the amount of $900,404
and consider this item on the Consent Agenda at the February 3, 2025 Regular Council Meeting.
Attachments: 2025-2030 CIP
Conceptual Design
19
20
CITY OF TUCAPITAL PROJECT SUM ARY
2025 to 2030
PROJECT: S 124th St/50th Pt S Reconfiguration
Project Manager
DESCRIPTION:
JUS11EiC 4TION:
1STATUS
Cyndy Knighton
Project # 92510402
Depart ment Arterial Streets
Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to 51 st, new paved
shoulder walkway on south side of 124th connecting to existing walkway on west side of 50th Pl, new
stormwater treatment/rain garden in old slip Lane ROW. Project can be done in phases, with phase 1
including just the intersection reconfiguration and phase 2 including the sidewalk on S 124th but cost
would be greater.
Removing the free -flow right turn movement will improve safety at the 125th St/50th PC S intersection
generally on S 124th St and 50th Pt S. Narrowing pedestrian crossing distance at the intersection and
improving pedestrian facilities will improve safety andlivability for the neighborhood. Identified in the
Allentown Neighborhood Transportation Study in 2022.
New project for 2025
MAINTENANCE IMPACT: Minor impacts to Streets for additional sidewalk. Increases to Surface Water with maintenance of storm
water treatment facilities.
COMMENT:
FINANCIAL (in thousands
nd
If project is done in phases, the stand-alone sidewalk project could be double the cost of including them L
a single project. Approximate estimate in 2024 dollars is $600k for construction and design and
construct on management costs approaching $250k. Phasing the project may be necessary due to funding
constraints.
2025 2026 2027 2028
2029
2030 Beyond
TOTAL
n
Project Costs
Project Mgmt (Staff Time/Cost)
Construction Mgmt.
Construction
Contingency
$ -
$ 300
$ 1,350
$ 180
300
1,350
180
Total Project Costs
$ 275
$ 1,830
$ 2,105
Project Funding
Awarded Grant
Fund Balance
$ -
$ 275
$ 275
Total Project Funding
$ 275
$ 1,830
2,105
Adopted by the Tukwila City Council on November25, 2024
21
22
23
24
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
January 27, 2025, 5:30 p.m. - Hybrid Meeting; Duwamish Conference Room & MS Teams
Councilmembers Present: Jovita McConnell, Chair; Hannah Hedrick
Staff Present: Pete Mayer, Griffin Lerner, Catrien de Boer, Mike Perfetti, Bryan Still, Adib
Attalla(
1. BUSINESS AGENDA
A. Grant Award: S. 131sY St Drainage Improvements
Staff is seeking approval to accept a Washington State Department of Ecology Streamflow
Restoration grant in the amount of $1,729,600 for the project.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agend.a
B. Grant Award: S. 124th St and 50th Place Reconfiguration
*Staff is seeking approval to accept a Transportation Improvement Board Urban Arterial
Program grant in the amount of $900,404 for design and construction of the project.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
C. Design Contract: Duwamish Hill Preserve Phase 3 & S. 104th St Shoreline Restoration
Staff is seeking approval of a contract with Anchor QEA in the amount of $453,201.00 for both
projects.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
D. Design Contract: Tukwila Urban Center Conveyance Inspections
Staff is seeking approval of a contract with PACE in the amount of $71,808.00 for design of the
Tukwila Urban Center Conveyance Inspections.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
E. Southcenter Boulevard/65th Avenue South Signal Project Update
Staff provided an update on the status of right-of-way acquisition for minor portions of the
sidewalks on 65th Avenue South.
Committee Recommendation
Discussion only.
The meeting adjourned at 5:54 p.m.
JM
Committee Chair Approval
Minutes by LH