ITEM INFORMATION
ITEM No.
5.D.
STAFF SPONSOR: CATRIEN DE BOER
ORIGINAL AGENDA DATE: 02/03/25
AGENDA ITEM TITLE Surface Water Fund — S 131st St Drainage Improvements
Department of Ecology Streamflow Restoration Grant Award
CATEGORY ❑ Discussion
Mtg Date
0
Motion
Dale
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg
2/3/2025
SPONSOR ❑Council ❑Mayor ❑FIR DCD ❑Finance Fire ❑11_S' ❑PeR ❑Police IIPr ❑Court
SPONSOR'S City staff applied to the DOE Streamflow Restoration grant to fund design, permitting, and
SUMMARY acquisition expenses. In October 2024, the City was notified that we received the full grant
award. The project aims to improve instream and stream buffer habitats, enhance water
quality treatment, and mitigate flooding while reducing routine maintenance and the need
for dredging. Council is being asked to accept a DOE Streamflow Restoration Grant Award,
pending legal review, in the amount of $1,729,600.
REVIEWED BY
A Trans&Infrastructure
CommunitySvs/Safety
❑ Arts Comm.
01/27/2025
Finance
Parks
Comm. ❑ Planning/Economic Dcv.
Comm. ❑ Planning Comm.
CHAIR: JOVITA MCCONNELL
❑ LTAC
DATE:
COMMITTEE
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMIT
Public Works Department
IEE Majority Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,729,600 $0.00 $0.00
Fund Source: GRANT; No CITY MATCH
Comments: CIP 2025 2030 S 131st PI Drainage Improvements
MTG. DATE
RECORD OF COUNCIL ACTION
02/03/25
MTG. DATE
ATTACHMENTS
02/03/25
Informational Memorandum dated 01/24/25
2025-2030 CIP
Vicinity Map
Minutes from Transportation and Infrastructure Committee meeting of 01/27/25
27
28
City of Tukwila
Thomas McLeod, Mayor
Public Works ❑eportment - Pete Moyer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Deputy City Administrator/ Interim Public Works Director
BY: Catrien de Boer, Public Works Analyst
CC: Mayor McLeod
DATE: January 24, 2025
SUBJECT: Surface Water Fund — S 131st St Drainage Improvements
Project No. 91641204
Department of Ecology Streamflow Restoration Grant Award
ISSUE
Accept a Washington State Department of Ecology (DOE) Streamflow Restoration grant for the S 131st
St Drainage Improvements project in the amount of $1,729,600.
BACKGROUND
The S 131st Drainage Improvement Project goal is to address flooding of roadway and adjacent private
properties along Southgate Creek, and to address issues that contribute to flooding, water quality,
barriers to fish migration and habitat degradation. The original contract's preliminary design and
hydraulic modeling indicated a broader approach would be necessary to resolve flooding.
DISCUSSION
In February 2024, City staff applied to the DOE Streamflow Restoration grant to fund design, permitting,
and acquisition expenses related to Phase II of the S 131st St Drainage Improvements project. Phase II
work will refine the 30% conceptual designs under Phase I and expand the site footprint to determine
useable/developable areas at adjacent parcels. While details will be determined through the design
process, the project goals are to enhance instream and stream buffer habitat, reduce flooding, reduce
routine maintenance, eliminate the need for dredging, reduce the amount of water bypassed through
the underground system, and increase water quality treatment. Grant funding will be used to complete
design, prepare bid documents, develop permit applications and construction documents.
In October 2024, the City was notified that we received the full grant award. The City is currently
completing preliminary design for the S 131st St Drainage Improvements Project and this funding will
be used to support the next phase.
FISCAL IMPACT
The City was awarded a $1,729,600 grant from the DOE for the S 131st Drainage Improvements
project. There is no local city match.
Project Budget
DOE Grant Award $1,729,600.00
Total $1,729,600.00
29
S 131st St Drainage Improvements
January 24, 2025
Page 2
RECOMMENDATION
Council is being asked to accept a DOE Streamflow Restoration Grant Award, pending legal review, in
the amount of $1,729,600 and consider this item on the Consent Agenda at the February 3, 2025
Regular Council Meeting.
Attachments: 2025-2030 CIP Page
Vicinity Map
Https://Tukwilawa.Sharepoint.Com/Sites/Publicworks/Engineering/PW Drop Box/01 TIC Agenda/2025 Agenda Items/TIC 01-27-25/1. Accept Ecology
Streamflow Restoration Grant For S 131st Drainage Improvements/Info Memo DOE Streamflow Acceptance For S 131st .Docx
30
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2025 to 2030
PROJECT: S 131st Pl Drainage Improvements
Project # 91641204
Project Manager Joshua Hopkins Department Surface Water
DESCRIPTION:
Developing alternate horizontal alignment for Southgate Creek in conjunction with replacing a fish barrier culvert.
Scope expanded in 2024 to increase hydraulic analysis limits to address persistent flooding not addressed with the
preliminary hydraulic design.
JUSTIFICATION:
Southgate Creek overtops its bank several times per year during storm events and runs through private property.
Debris is deposited within a private driveway and storm system.
STATUS:
HPA permitted dredging is performed annually on the creek to remove excess sedimentation to reduce the likelihood
of flooding.
Project will include 1-year contract maintenance and typically 2-to-4 years of plant establishment. Project
MAINTENANCE IMPACT:
improvements will be turned over to surface water division for routine maintenance.
Project applied for Department of Ecology design development funding and Conservation Futures property acquisition
COMMENT:
grant to support the expanded hydraulic analysis. Assumes estimated 2028 construction.
FINANCIAL (in thousands)
2025
2026
2027
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
$ 25
$ 25
$ -
$ 25
$ -
$ -
$ -
$ 75
Planning
$ 780
$ 600
$ -
$ -
$ -
$ -
$ -
$ 1,380
Land (R/W)
$ 1,000
$ 1,000
$ -
$ -
$ -
$ -
$ -
$ 2,000
Construction Mgmt.
$ -
$ -
$ -
$ 400
$ -
$ -
$ -
$ 400
Construction
$ -
$ -
$ -
$ 2,000
$ -
$ -
$ -
$ 2,000
Total Project Costs
$ 1,805
$ 1,625
$ -
$ 2,425
$ -
$ -
$ -
$ 5,855
Project Funding
Awarded Grant
$ 706
$ -
$ -
$ -
$ -
$ -
$ -
$ 706
Proposed Grant
$ 1,105
$ 1,625
$ -
$ 1,600
$ -
$ -
$ -
$ 4,330
Utility Revenues
$ 205
$ -
$ -
$ 825
$ -
$ -
$ -
$ 1,030
'Total Project Funding
$ 2,016
$ 1,625
$ -
$ 2,425
$ -
$ -
$ -
$ 6,066
31
32
V!
CI—
c
CD
a)
0
(6
a)
CD
CO
a)
U
a)
c0
0)
r0
V
a Pa or
rr _�
rrj
S ar'V 41S
S any 7' S
S a^ti ]s
E
co
CO
LO
00N_
O
O
O
Duwamish River
City of Tukwila, King County, King County
City of Tukwila
33
34
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
January 27, 2025, 5:30 p.m. - Hybrid Meeting; Duwamish Conference Room & MS Teams
Councilmembers Present: Jovita McConnell, Chair; Hannah Hedrick
Staff Present: Pete Mayer, Griffin Lerner, Catrien de Boer, Mike Perfetti, Bryan Still, Adib
Altallal
I. BUSINESS AGENDA
A. Grant Award: S. 131st St Drainage Improvements
*Staff is seeking approval to accept a Washington State Department of Ecology Streamflow
Restoration grant in the amount of $1,729,600 for the project.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agend.a
B. Grant Award: S. 124th St and 50th Place Reconfiguration
Staff is seeking approval to accept a Transportation Improvement Board Urban Arterial
Program grant in the amount of $900,404 for design and construction of the project.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
C. Design Contract: Duwamish Hill Preserve Phase 3 & S. 1046 St Shoreline Restoration
Staff is seeking approval of a contract with Anchor QEA in the amount of $453,201.00 for both
projects.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
D. Design Contract: Tukwila Urban Center Conveyance Inspections
Staff is seeking approval of a contract with PACE in the amount of $71,808.00 for design of the
Tukwila Urban Center Conveyance Inspections.
Committee Recommendation
Majority approval. Forward to February 3, 2025 Regular Consent Agenda.
E. Southcenter Boulevard/65th Avenue South Signal Project Update
Staff provided an update on the status of right-of-way acquisition for minor portions of the
sidewalks on 65th Avenue South.
Committee Recommendation
Discussion only.
The meeting adjourned at 5:54 p.m.