ORDINANCE NO. 436 4;
AN ORDINANCE adopted pursuant to RCW 35.77 adopting a
comprehensive street program for the City of Tukwila for the
ensuing six years.
WHEREAS the City of Tukwila previously adopted a compre-
hensive street program by Ordinance No. 347, and
WHEREAS the City of Tukwila has reviewed the work accomp-
lished under the program and determined current needs,and
WHEREAS the City of Tukwila has now revised and extended
the comprehensive street program for the ensuing six years,
and
WHEREAS a public hearing was held on said revisions and
extensions on August 16, 1965 at the City Hall in the City of
Tukwila, NOW, THEREFORE
The City Council of the City of Tukwila do ordain as
follows:
Section 1: The maps and lists attached hereto entitled Com-
prehensive Tukwila Street Program is hereby adopted as the
comprehensive street program for the ensuing six years.
Section 2: This comprehensive street program shall be filed
by the City Clerk with the Washington State Director of Highways
not more than thirty (30) days after its adoption. lh
PAS SED by the City Council of the City of Tukwila this h
day of -t, 1965. r
ryk MAYOR
ATTEST-
)13-et,(4-
ler
ARTERIAL STREET PROGRAM
REVISED TO AUGUST 1965
A. Primary Arterials
1. 58th. Avenue South Interurban Avenue to South 149th.
Street. widening, sidewalks, curbs, gutters, storm
sewers and grading. Also paving with Asphalt and
street lighting, $117,600.00
2. 58th. Avenue South- South 149th to Three Tree Point
Road- procurement of right -of -way, clearing, grading,
storm sewers, curbs, gutters, asphalt paving, street n
lighting and sidewalks, 94,225.00
3, South 144th. street- 53rd. Avenue South to 58th. Avenue
South- widening, grading, storm sewers, curbs, gutters
asphalt paving, street lighting and sidewalks. 73,600,00
4. 53rd. Avenue South and Macadam Road- South 139th Street
to South 151st. Street- widing, grading,storm sewers,
curbs, gutters, asphalt paving, street lighting and side-
walks. 175,350.00
5, South 180th.- Christianson Road to South
widening, grading, storm sewers, curbs,gutters asphalt
paving, street lighting and sidewalks.
Resurfaced Prospectus approved December 1963. 215,250.00
6, South 180th, Street- 57th. Avenue South to West boundary
of City procurment of right -of -way, clearing, grading,
storm sewers, curbs, gutters, asphalt paving, street
lighting and sidewalks. 121,800.00
7, Tukwila Parkway west and extension of 57th. Avenue
South to South 190th.- grading storm sewers,curbs,gutters,
asphalt paving, street lighting and sidewalks.
Resurfaced on 57th. Avenue South from 180th. to 188th.
Prospectus Approved May 1963. 621,600 00
TOTAL COST PRIMARY ARTERIALS:
$1,424,420,00
B. Secondary Arterials
1. South 151st, Street- Macadam Road to 57th, Avenue
South. widening, grading, storm sewers,curbs, gutters,
Asphalt paving, street lighting and sidewalks. 42,000.00
2, South 151st. Street- 57th. Avenue South to 62nd. Ave,
South- procurement of right-of-way, clearing, grading,
storm sewers, curbs, gutters, Asphalt paving, street
lighting and sidewalks. 56,700,00
-2-
tTERIAL STREET PROGRAM (cont.)
3. South 151st. Street- 62nd. Avenue South to 65th. Avenue
South, to South 154th. widening, grading storm sewers,
curbs, gutters, Asphalt paving, street lighting and side-
walks. 107,100.00
4. Tukwila Parkway,- Andover Park West to Tukwila Parkway
West- grading, storm sewers, curbs, gutters, Asphalt
paving, street lighting and sidewalks. 208,950.00
5. Andover Park East- Tukwila Parkway to South 180th.
Street- grading, storm sewers, curbs, gutters, Asphalt
paving, street lighting. 412,650.00
TOTAL SECONDARY ARTERIALS 827, 400.00
TOTAL PRIMARY AND SECONDARY ARTERIALS $2,251,820.00
Ordnance #436
Six Year Comprehensive Street Program
(Blueprint on file in vault)