Loading...
HomeMy WebLinkAboutOrd 0436 - 1966-1969 Comprehensive Street Program J HILA 41W /D06 CITY OF TUK WASHINGTON ORDINANCE NO. 436 4; AN ORDINANCE adopted pursuant to RCW 35.77 adopting a comprehensive street program for the City of Tukwila for the ensuing six years. WHEREAS the City of Tukwila previously adopted a compre- hensive street program by Ordinance No. 347, and WHEREAS the City of Tukwila has reviewed the work accomp- lished under the program and determined current needs,and WHEREAS the City of Tukwila has now revised and extended the comprehensive street program for the ensuing six years, and WHEREAS a public hearing was held on said revisions and extensions on August 16, 1965 at the City Hall in the City of Tukwila, NOW, THEREFORE The City Council of the City of Tukwila do ordain as follows: Section 1: The maps and lists attached hereto entitled Com- prehensive Tukwila Street Program is hereby adopted as the comprehensive street program for the ensuing six years. Section 2: This comprehensive street program shall be filed by the City Clerk with the Washington State Director of Highways not more than thirty (30) days after its adoption. lh PAS SED by the City Council of the City of Tukwila this h day of -t, 1965. r ryk MAYOR ATTEST- )13-et,(4- ler ARTERIAL STREET PROGRAM REVISED TO AUGUST 1965 A. Primary Arterials 1. 58th. Avenue South Interurban Avenue to South 149th. Street. widening, sidewalks, curbs, gutters, storm sewers and grading. Also paving with Asphalt and street lighting, $117,600.00 2. 58th. Avenue South- South 149th to Three Tree Point Road- procurement of right -of -way, clearing, grading, storm sewers, curbs, gutters, asphalt paving, street n lighting and sidewalks, 94,225.00 3, South 144th. street- 53rd. Avenue South to 58th. Avenue South- widening, grading, storm sewers, curbs, gutters asphalt paving, street lighting and sidewalks. 73,600,00 4. 53rd. Avenue South and Macadam Road- South 139th Street to South 151st. Street- widing, grading,storm sewers, curbs, gutters, asphalt paving, street lighting and side- walks. 175,350.00 5, South 180th.- Christianson Road to South widening, grading, storm sewers, curbs,gutters asphalt paving, street lighting and sidewalks. Resurfaced Prospectus approved December 1963. 215,250.00 6, South 180th, Street- 57th. Avenue South to West boundary of City procurment of right -of -way, clearing, grading, storm sewers, curbs, gutters, asphalt paving, street lighting and sidewalks. 121,800.00 7, Tukwila Parkway west and extension of 57th. Avenue South to South 190th.- grading storm sewers,curbs,gutters, asphalt paving, street lighting and sidewalks. Resurfaced on 57th. Avenue South from 180th. to 188th. Prospectus Approved May 1963. 621,600 00 TOTAL COST PRIMARY ARTERIALS: $1,424,420,00 B. Secondary Arterials 1. South 151st, Street- Macadam Road to 57th, Avenue South. widening, grading, storm sewers,curbs, gutters, Asphalt paving, street lighting and sidewalks. 42,000.00 2, South 151st. Street- 57th. Avenue South to 62nd. Ave, South- procurement of right-of-way, clearing, grading, storm sewers, curbs, gutters, Asphalt paving, street lighting and sidewalks. 56,700,00 -2- tTERIAL STREET PROGRAM (cont.) 3. South 151st. Street- 62nd. Avenue South to 65th. Avenue South, to South 154th. widening, grading storm sewers, curbs, gutters, Asphalt paving, street lighting and side- walks. 107,100.00 4. Tukwila Parkway,- Andover Park West to Tukwila Parkway West- grading, storm sewers, curbs, gutters, Asphalt paving, street lighting and sidewalks. 208,950.00 5. Andover Park East- Tukwila Parkway to South 180th. Street- grading, storm sewers, curbs, gutters, Asphalt paving, street lighting. 412,650.00 TOTAL SECONDARY ARTERIALS 827, 400.00 TOTAL PRIMARY AND SECONDARY ARTERIALS $2,251,820.00 Ordnance #436 Six Year Comprehensive Street Program (Blueprint on file in vault)