Update February 24, 2025
City of Tukwila
PUBLIC SAFETY PLAN
Replace Fire Station 51
Replace Fire Station 52
Build Justice Center
Consolidate Public Works
Minkler Shops
screen capture from 2017 public outreach materials
2
City Facilities
FLEET & EAST
FACILITIES CAMPUS
BUILDING'3ROJECT+
JUSTICE
CENTER •
COMMUNITY%
CENTER
• roRkE
GEO
LONG
SHOPS
.
MINKLER
SHOPS
Proposed Project Site and
Fleet and Facilities Building
George Long Shops (former)
6300 (PW Engineering)
Long Acres
Minkler Shops
3
Current and Former Public Works Facilities
George Long (former site)
Fleet and Facilities Departments
relocated to the new renovated
F&F Building
Minkler Shops
Street, Traffic Signals, Sewer,
Water, Surface Water
13,000 sf interior spaces
3,500 sf exterior covered space
Long Acres Storage and
Laydown Yard (shown 3x smaller to fit page)
Minkler Site
1
1
1
1
1
1
1
1
1
1
1
4'.ger� Frrr-wv
.► 1 TierProject: LG-35
128
P-17 Pond Connection Reconnection
PROIECT FACTS
Subwatershed:
Lower Green (LG)
River mile:
AM 13.7.13.9/
left bank
eankside
jurisdiction:
City of Tukwila
Project sponsor:
City of Tukwila
Budget:
$37,000,000
PROJECT TYPE:
10111
Acquisition Restoration
1110
Manning/ Scvpingl
Design Reconnaissance
KEY HABITAT:
Floodplain Riparian
Side channel
PROIECT DESCRIPTION:
Relocate the City of Tukwila's starrnwater pond;
clean and connect the existing pond to the river,
setback the levee to create up to 7 acres of off
channel habitat.
Primary strategy
Protect, restore and enhance floodplain connectivity.
Benefits:
• Flood risk reduction
• Increased habitat connectivity
• Increased rearing habitat
Contribution to goals metrics:
- LG - Off -channel habitat
Projtct Area Map Onf020191PCNAT s4ial Moo Srte phd6 G60pk Earlh
KCIT-OCE lily 26110202t LFME GIS 0 Q\200091WRIA9 erol.tMaps wad KLINKAT
Green-buwamrsh and Central Puget Sound Watershed Salmon ;lathier 2d21 [tpdare
Minkler Site
I I 11
104. ir
• At. dap Aciaari- •1 I
Cr
Minkler Site
. ' .
SHORELINE
JURISDICTION
•,1,1 .....
NIIIFI - I
P*111-111 I=L. IZ V LI
...
• .LL ..... • r. • J. ..
.. • .
.1.
r -
- - - •
- - • .1.0. - - - • - - .1 • -.0.1.• •
1-•-•. •-r. .
.. .
- . r • ... irj-117e • •••-d-•-• ,
.. ..... :
• ....... I . . .
.... .
tit
I
.•
•
.Ws
IJILL • ...... ......
.....
. • .
_ —
...
J."
. • J
..... •L LE. L.,1 M. W. NJJJEJ.
M. • LE... M.M.1
- - - - - • .- - - - ..... r '
• • . ... .... e
......... • .1 ...VI J..: .1,1..1,1j • J. • •• •
• .. .•:.
0-4-•-•-•-•-• • 01. • LI, r-r . .
...
. _
I." • 1. • M.M.1
• • r. • • •-••-•L 1.,
J .
. •
.. .... . .....
.......
...
11"
7
...
Current Minkler Shops Overview
Salt, Sand, & Gravel Storage
limited truck access for delivery
reduces efficiency in snow event
current storage capacity: 120 tons
(need up to 240 tons for a big snow storm)
8
Current Minkler Shops Overview
Shared yard with fleet
and large trucks adjacent
to personal vehicles
9
Current Minkler Shops Overview
Inadequate space for
gear and storage of
personal belongings.
10
Current Minkler Shops Overview
Office environments in
converted shop space.
Ventilation, lighting,
occupant spaces are
substandard.
11
ID i
Long Acres Storage and Laydown Yard
12
Site Context
Duwamish Gardens Park
(City Owned) -
Duwamish River
Reduction to Project Scope
Chinook Wind Mitigation Project
(King County)
S 112th St
ant access)
MI
�.rtct
-.1 I
Reduced
scope of work at.
p
East Campus
Decant
Facility
Deferred
Duwamish Gardens Park
Separate (City Owned)
Project at
Shoreline I
Duwamish River
Reduction to Project Scope
•
/
•
•
•
•
•
Project elements carried forward:
•
•
Salt, Sand, Gravel Storage
Spoils Storage
Tool and Equipment Storage
Covered Loading
Included in 1-story building:
Offices for Crews
Break Room
Locker Rooms & Gear Rooms
Laundry Room
Driveway connection between east
and west sites
Decant: linked to grant funding
S.
•
,
/
/
/
•
•
,
•
•
•
. S.
What changed?
Eliminated:
3-story Building (35,000 sf)
Structural upgrade to essential facility
Public meeting room
Training room (for city-wide use)
Offices for Engineering Department
Flex Offices for future growth
Recovery Rooms (for 24/7 events)
Fitness Rm & Employee Resource R
Outdoor covered gathering space
Covered Parking
Truck Wash
Driveway improvement at TIB
S.
•
•
•
•
m
/
/
/
/
/
/
15
Compare Minkler Shops to Proposed Project
00
/
/
/
/
Current Minkler Shops
Does not have backup power
Does not have Spoils Storage
Does not have Decant Facility
Does not have Covered Loading
1,260 sf Salt/Sand/Gravel Storage
3,610 sf Covered Storage
1,089 sf Warehouse (distributed)
1,090 sf Tool Room (distributed)
1,000 sf Parts Storage Rooms
860 sf Signal Shop + Storage
No Gear Room or Decon Space
473 sf Locker Rooms
vs
Proposed Improvement
New Backup Generator
New 4,400 sf Spoils Storage
New 5,800 sf Decant (pending grant $)
New 3,000 sf Covered Loading
New 4,400 sf Salt/Sand/Gravel Storage
New 5,000 sf Covered Storage
New 2,175 sf Warehouse (central)
New 1,460 sf Tool Room (central)
New 1,965 sf Parts Storage Rooms
New 1,300 sf Signal Shop + Storage
New 570 sf Gear Room + 175 sf Decon
New 1,920 sf Locker Rooms
•
•
•
•
•
16
Option 1 — Maintenance and Operations Building
b
i
07'N56 1
a-50.85.
SALT
STORAGE
1•-
SAND/
GRAVEL
STORAGE
[_]
SHORELINE RESTORATION
(SEPARATE PROJECT)
STAFF PARKING
MAINTENANCE AND
OPERATIONS BUILDING
AD
VAN
DA EV EV EV EV EV
D•I'D• EV EV EV
EV
FLEET PARKING
PLANTING AREA
WATER EASPNIETING AREA
REC. NO. 7303010139 - -
—pp— .
1 II II
,SOUNDTRANS
EASEMEN
REC.410. 2005080100201
DECANT
PHASED
IEI
LI-1-.1
TRANSFORI
}
rl1l'Jl/mil
/. i!I,
IJ
Estimated
Construction Cost
$23, 330, 000
Estimated Project
Related Costs
$11,670,000
Estimated
Project Cost
Option 1
$35,000,000
17
Option 2 - Tool Storage Building with separate Modular Building
11 I
II�
�
II
II
SALT
STORAGE
SAND/
- GRAVEL
STORAGE
STAFF PARKING
SLIDING VEHICLE GATE
MODULAR
BUILDING
OFFICES,
LOCKERS,
SUPPORT
SPACES
SHORELINE RESTORATION
(SEPARATE PROJECT)
EMPLOYEE GATE
TOOLS, PARTS,
MATERIALS
& SIGNAL SHOP
DA EV EV EV EV EV
AD EV EV EV
EV
FLEET PARKING
,. �4.•�i�i���i��+i����+����i�i�i�����i�i�i+i���i�i�i�i�i�l�i�i�i�i�i�i�.V.*
PLANTING ARE
0
,-WATER EASEPr. TING AREA
REC. NO. 7303010134
SPOILS
LIND TRANS'
/ EASEMEN
REC.NO. 20050801002014
DECANT
PHASED
I
PLANTING AREA
GENERATOR
TTL
TRANSFOI
Estimated
Construction Cost
$20, 950, 000
Estimated Project
Related Costs
$10, 050, 000
Estimated
Project Cost
Option 2
$31,000,000
18
Option 1 — Maintenance and Operations Building — FLOOR PLAN
1
q a R�9
BREAK ROOM
Lag AI R
Fn
MECH
CUST(QDI
i
H r----r ----r
OPEN OFFICE
nie i
r r-r
LAUNDRY
STORAGE
r r
1
OFFICE
ADMEN
MDF & TRAFFIC
SERVERS
MEETING RQ
,11
4
OM
J
MEN'S LOCKERS ° fl
}
J
TF-1
HALLWAY
GEAR ROOM
COPY
L
W
WC
WOMEN'S
LOCKERS
DECON
11 H11,!_}
ELEC
MACHINE SHOP
V TL
COMPRESSOR
SIGNAL SHOP
TOOL ROOM
WAREHOUSE
—I
1 /
I
PAINT STORAGE
PESTICIDE
STORAGE
in
Lill
PARTS STORAGE
- SEINER I
SURFACE WATER
•
PARTS
STORAGE
- WATER
■
HT
O
H
1
Street Department I Signal Shop I Water Department I Sewer / Surface Water Department
17,450 sf interior conditioned space + 5,000 sf exterior covered storage + 3,000 sf covered loading
19
Opportunity to Preserve Future Expansion Capabilities
wi
•
I
II
II
I
II
II
II
if
SALT
STORAGE
SAND/
GRAVEL
STORAGE
SURFACE PARKING
OVER
UNDERGROUND
STORMWATER
SHORELINE RESTORATION
(SEPARATE PROJECT)
-
SLIDING VEHICLE GATE
1
EMPLOYEE GATE
TON
STAFF PARKING
REC
DUMPSTERS
8,000 SF
COVERED
_ _
1 FUTURE BUILDING '
AREA '
18,000 SF FOOTPRINT 1
1
0
PLANTING AREA
SPOILS
,SOUND TRANS
EASEMEN
REC.f1O. 2005050100201
rw,
Iu
I
ICI
�.1
---19
PLANTING AREA
t
I L__J'
PHASED
PLANTIN
G AREA
-
DECANT
-•
=�
EAT CI
TRANSFORI
J ,' „III,
Project Schedule
JAN JAN JAN JAN JAN
2023 2024 2025 2026 2027
GCCM
Procurement
REPORT
TO COUNCIL
March 2023
•
Nov 2023
City ownership
❑f UPS parcel
CONSTRUCTION
DOCUMENTS
ENVIRONMENTAL REVIEW AND PERMITTING
T
* * *
REPORT REPORT REPORT
TO COUNCIL TO COUNCIL TO COUNCIL
April 2024 October 2024 Target:
March 2025
• RECEIVED SEPA DETERMINATION OF NON -SIGNIFICANCE (DNS) ISSUED ON 9/25/2024
• SEPA AMENDMENT: TARGETAPRIL 2025
• BUILDING PERMIT: TARGET MAY 2025
• CONSTRUCTION START: FEBRUARY2026 COMPLETION: APRIL 2027
April 2025
. UPS Lease
Expires
BID
CONSTRUCTION
REPORT
TO COUNCIL
Target:
❑ecember 2025
13 months
21
April
2027