Loading...
HomeMy WebLinkAboutTIS 2025-02-24 Item 2D - Final Acceptance - 2024 Overlay and Repair with ICON MaterialsCity of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Pete Mayer, Interim Public Works Director BY: David Baus, Project Manager CC: Mayor Tom McLeod DATE: February 24, 2025 SUBJECT: 2024 Overlay and Repair Project — Proj. #82410401, Contract No. 24-055 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of insurance, and performance bond. BACKGROUND The Notice to Proceed for Contract No. 24-055 with ICON Materials, of Pacific, Washington was issued on July 8, 2024, for the 2024 Overlay Project. The project included pavement overlay and repair of seven sites within the City of Tukwila. Approximately combined total of 6,300 centerline feet of paving. The attached maps show the areas of work. ANALYSIS Construction was Physically Complete on December 10, 2024. The budget for the 2024 Overlay & Repair was $1,144,013.20 including a contingency of 10%. No formal Change Orders were executed for the work since all changes fit within existing bid items or were performed under allowable Force Account items. Under -runs were primarily due to reduced quantities of Asphalt Roadway Planning and Reuse, Crushed Surfacing Base Course and various Force Account items not used. Construction Contract Amount Total Amount to be Paid $1,144,013.20 $ 867,537.54 RECOMMENDATION Council is being asked to formally accept the project as complete and authorize the release of the insurance, and performance bonds, subject to standard claim and lien release procedures, for the 2024 Overlay and Repair Project construction contract with ICON Materials in the final amount of $867,537.54 and consider this item on the Consent Agenda at the March 3, 2025 Regular Meeting. ATTACHMENT - 2024 Project Sites Map - Post construction pictures Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 95 City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 96 City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 97 City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 98 City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 99