Loading...
HomeMy WebLinkAboutSpec 2025-03-03 Item 5D - Contract - S Boeing Access Rd Overlay Design with Psomas Inc for $563,983.14COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 03/03/25 JR ITEM INFORMATION ITEM No. S.D. STAFF SPONSOR: ADAM COX ORIGINAL AGENDA DATE: 03/03/25 AGENDA ITEM TITLE Consultant Selection for Major Pavement Overlay and Repairs on South Boeing Access Road CATEGORY ❑ Discussion Mtg Date a Motion Date ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date Mtg 3/.3/2025 SPONSOR ❑Council ❑Mayor HR DCD ❑Finance ❑Fire ❑TS ❑PAR ❑Police DPW ❑Court SPONSOR'S The project will replace the wearing course on the portion of S Boeing Access Rd that SUMMARY crosses over Interstate 5 (I-5) and BNSF tracks, which is deteriorating. City staff advertised engineering services for the project in November 2024 and received one Statement of Qualification from Psomas. Staff interviewed Psomas who met the project requirements and the City's objectives. Council is being asked to approve a consultant agreement with Psomas, in the amount of $563,983.14 REVIEWED BY a Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Arts Comm. 02/24/2025 Finance ❑ Parks Comm. ❑ Planning/Economic Dev. Comm. ❑ Planning Comm. CHAIR: JOVITA MCCONNELL LTAC DATE: COMMITTEE RECOMMENDATIONS: SPONSOR/ADMIN. COMMII°IEE Public Works Department Unanimous Approval; Forward to the Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $563,983.14 $574,000.00 $0.00 Fund Source: GRANT AND NO LOCAL MATCH Comments: 2025 CIP — Boeing Access Road Over/ay MTG. DATE RECORD OF COUNCIL ACTION 03/03/25 MTG. DATE ATTACHMENTS 03/03/25 Informational Memorandum dated 02/21/25 2025 CIP — Boeing Access Road Overlay Preliminary Engineering Fund Authorization S Boeing Access Rd Preservation Area Map Minutes from Transportation and Infrastructure Committee meeting of 02/24/25 7 City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Peter Mayer, Interim Public Works Director BY: Adam Cox P.E, Interim Traffic Engineer CC: Mayor Thomas McLeod DATE: February 21, 2025 SUBJECT: Consultant Selection for Major Pavement Overlay and Repairs on South Boeing Access Road ISSUE Approve a contract with Psomas to provide preliminary and final design services for the South Boeing Access Road Overlay Project in the amount of $ 563,983.14 BACKGROUND The project will replace the wearing course on the portion of S Boeing Access Rd that crosses over Interstate 5 (1-5) and BNSF tracks, which is deteriorating because of its age, heavy vehicle traffic, and high traffic volumes. Project work may also include replacing traffic sensing loops, ADA ramps, and pedestrian push buttons that do not meet current ADA requirements. The project limits extend from the signalized intersection at East Marginal Way (not including the intersection) to the west side of the signalized intersection at Martin Luther King Jr Way S (not including the intersection) and is approximately 0.56 roadway miles long. In addition to design services, project scope will include survey and base mapping, stormwater analysis and management, support during initial construction administration, and public outreach support. DISCUSSION City staff advertised engineering services for the project in November 2024 and received one Statement of Qualification from Psomas. City staff interviewed Psomas in December and determined that Psomas staff meet project requirements and the City's objectives. FINANCIAL IMPACT The City has been awarded a WSDOT National Highway System Asset Management Grant in the amount of $564,000 for the Preliminary Engineering Phase. The grant does not require a local City match. Contract NHS Asset Mgmt. Grant Budgeted CIP (104) Psomas Design Contract $563,983.14 $564,000 $10,000 RECOMMENDATION Council is being asked to approve a consultant agreement with Psomas, in the amount of $563,983.14 to provide preliminary and final design services for the South Boeing Access Overlay Project, and to consider this item on the Consent Agenda at the March 3, 2025 Regular Meeting. Attachment: CIP Page Preliminary Engineering Fund Authorization Map of roadway 8 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 PROJECT: Boeing Access Road Overlay Project # 82510402 Project Manager David Baus Department Arterial Streets DESCRIPTION: Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF railway JUSTIFICATION: Existing bridge deck concrete is breaking off making an uneven surface with the potential to cause flying debris. STATUS: Project was awarded full funding by National Highway Performance Program January of 2024 MAINTENANCE IMPACT: N/A COMMENT: Construction must be completed as a single contract and authorized by August 31, 2026. FINANCIAL (in thousands) 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) $ 10 $ 15 $ - $ - $ - $ - $ - $ 25 Design $ 564 $ - $ - $ - $ - $ - $ - $ 564 Construction Mgmt. $ - $ 400 $ - $ - $ - $ - $ - $ 400 Construction $ - $ 2,750 $ - $ - $ - $ - $ - $ 2,750 Contingency $ - $ 274 $ - $ - $ - $ - $ - $ 274 Total Project Costs $ 574 $ 3,439 $ - $ - $ - $ - $ - $ 4,013 Project Funding Awarded Grant $ 564 $ 3,426 $ - $ - $ - $ - $ - $ 3,990 Fund Balance $ 10 $ 13 $ - $ - $ - $ - $ - $ 23 Total Project Funding $ 574 $ 3,439 $ - $ - $ - $ - $ - $ 4,013 9 Washington State W, Department of Transportation September 19, 2024 Mr. Pete Mayer Deputy City Administrator/Interim Public Works Director City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, Washington 98188 City of Tukwila Boeing Access Road NHPP-1380(005) FUND AUTHORIZATION Transportation Building 310 Maple Park Avenue S.E. P.O. Box 47300 Olympia, WA 98504-7300 360-705-7000 TTY: 1-800-833-6388 www.wsdot.wa.gov Dear Mr. Mayer: We have received FHWA fund authorization, effective September 16, 2024, for this project as follows: PHASE Preliminary Engineering TOTAL $564,000 FEDERAL SHARE $564,000 As a condition of authorization, you must show continuous project progress through monthly billings, until your project is complete. Failure to show continuous progress may result in your project becoming inactive per 23 CFR 630.106(a) (5) and subject to de -obligation of all federal funds and agreement closure. Enclosed for your information and file is a fully executed copy of Local Agency Agreement LA11027 between WSDOT and your agency. All costs exceeding those shown on this agreement are the sole responsibility of your agency. Any costs incurred after the Project Agreement End Date shown on the agreement are not eligible for federal reimbursement. In addition, all eligible costs incurred prior to the End Date must be billed within sixty (60) days of the End Date or they are ineligible for federal reimbursement. FHWA requires projects utilizing federal funds for preliminary engineering or right of way to advance to construction. If this project is unable to proceed to construction, any expended federal funds must be repaid. WSDOT authorization to proceed with right of way and/or construction is contingent upon receipt and approval of your environmental documents. You may proceed with the administration of this project in accordance with your WSDOT approved Certification Acceptance agreement. Sincerely, st ue- rapc Stephanie Tax Manager, Program Management Local Programs ST:jg:ml Enclosure cc: Seong Kim, Deputy City Engineer, Public Works Department Mehrdad Moini, PE, Northwest Region Local Programs Engineer 10 Transportation & Infrastructure Services Committee Minutes February24, 2025 F. Design Contract: South Boeing Access Road Overlay and Repairs *Staff is seeking approval of a contract with Psomas, Inc. in the amount of $563,983.14 for design services. Committee Recommendation: Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda. G. Consultant Contract: Interurban Avenue South Overlay and Repairs Staff is seeking approval of a contract with Psomas, Inc. in the amount of $649,418.88 for design services. Committee Recommendation: Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda. H. Consultant Contract: Orillia Road South Overlay and Repairs Staff is seeking approval of a contract with SCJ Alliance in the amount of $125,935.27 for design services. Committee Recommendation: Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda. I. Supplemental Agreement: 42' Avenue South Bridge Replacement Project Staff is seeking approval of Supplemental Agreement No. 5, Contract No. 20-116 with David Evans and Associates, Inc. in the amount of $1,386,694 for the remaining design/permitting work associated with unexpected conditions on the project. Committee Recommendation: Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda. The meeting adjourned at 6:21 p.m. SIT Committee Chair Approval Minutes by LH 12