HomeMy WebLinkAboutSpec 2025-03-03 Item 5J - Final Acceptance - 2024 Annual Overlay & Repair Program with ICON Materials for $867,537.54COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.J.
STAFF SPONSOR: DAVID BAUS
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE 2024 Overlay and Repair Project — Proj. #82410401, Contract No. 24-055
Project Completion and Acceptance
CATEGORY ❑ Discussion
Mtg Date
Motion
Date
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
lltg
3/3/2025
SPONSOR Council ❑Mayor ❑HR EIDCD Finance Fire ❑TS EIP&R ❑Police ®PIS ECourt
SPoNsoR's The Notice to Proceed with ICON Materials was issued on July 8, 2024, for the 2024
SUMMARY Overlay Project with physical completion on December 10, 2024. Council is being asked to
formally accept the project as complete and authorize the release of the insurance, and
performance bonds, subject to standard claim and lien release procedures, for the 2024
Overlay and Repair Project with ICON Materials in the final amount of $867,537.54.
REVIEWED BY ® Trans&Infrastructure C CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
I"IEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/24/25
2024 Annual Overlay Project Sites Map
Post construction pictures
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
157
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Pete Mayer, Interim Public Works Director
BY: David Baus, Project Manager
CC: Mayor Tom McLeod
DATE: February 24, 2025
SUBJECT: 2024 Overlay and Repair Project — Proj. #82410401, Contract No. 24-055
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of insurance, and performance bond.
BACKGROUND
The Notice to Proceed for Contract No. 24-055 with ICON Materials, of Pacific, Washington was issued
on July 8, 2024, for the 2024 Overlay Project. The project included pavement overlay and repair of
seven sites within the City of Tukwila. Approximately combined total of 6,300 centerline feet of paving.
The attached maps show the areas of work.
ANALYSIS
Construction was Physically Complete on December 10, 2024. The budget for the 2024 Overlay &
Repair was $1,144,013.20 including a contingency of 10%. No formal Change Orders were executed
for the work since all changes fit within existing bid items or were performed under allowable Force
Account items. Under -runs were primarily due to reduced quantities of Asphalt Roadway Planning and
Reuse, Crushed Surfacing Base Course and various Force Account items not used.
Construction Contract Amount
Total Amount to be Paid
$1,144,013.20
$ 867,537.54
RECOMMENDATION
Council is being asked to formally accept the project as complete and authorize the release of the
insurance, and performance bonds, subject to standard claim and lien release procedures, for the 2024
Overlay and Repair Project construction contract with ICON Materials in the final amount of $867,537.54
and consider this item on the Consent Agenda at the March 3, 2025 Regular Meeting.
ATTACHMENT
- 2024 Project Sites Map
- Post construction pictures
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
158
City of Tukwila
Public Works Department - Pete Mayer, Interim Director
RAINIER
GOLF &
COUNTRY
GIUB
3IENT
RIVERTON $1T45T
NEIGHBORHOOD
S
S136ST
2024 Annual Overlay project sites
Thomas McLeod, Mayor
S 114TH ST
50TH PL S
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
159
City of Tukwila
Public Works Department - Pete Mayer, Interim Director
S 128th St from E Marginal Way S to Macadam Rd S
Thomas McLeod, Mayor
Intersection of S 130th St and 35th Ave S
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
160
City of Tukwila
Public Works Department - Pete Mayer, Interim Director
40th Ave S from S 130th St to S 132nd PI
Thomas McLeod, Mayor
Allentown: 40th Ave S from S 115th St to dead end
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
161
City of Tukwila
Public Works Department - Pete Mayer, Interim Director
50th PI S from S 125th St to Railroad Ave
Thomas McLeod, Mayor
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
162
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
February 24, 2025, 5:30 p.m. - Hybrid Meeting; City Council Conference Room & MS Teams
Councilmembers Present Jovita McConnell, Chair; Hannah Hedrick, Mohamed Abdi
Staff Present Pete Mayer, Griffin Lerner, Catrien de Boer, Shawn Christie, Laurel
Humphrey, Brandon Miles, Adib Altallal, David Baus
Guests Laura Maman, Justine Kim, John Palewicz, Ryan Duckworth, Mike Herzog
1. BUSINESS AGENDA
A. Tukwila Maintenance and Operations East Campus Project Update
Staff and consultants presented an update on the project's revised scope.
Committee Recommendation
Discussion only. Forward to March 10, 2025 Committee of the Whole.
B. Bid Award: S. 149th St & S. 150th Watermain Replacement
Staff is seeking approval of a construction contract with Pape & Sons Construction, Inc. in the
amount of $1,214,012.98.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
C. Design Contract: Ryan Hill Water System Connection
Staff is seeking approval of a contract with Carollo Engineers in the amount of $601,505.00
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
D. Project Completion: 2024 Overlay and Repair
*Staff is seeking approval of contract completion and release of retainage with ICON Materials,
Inc. in the final amount of $867,537.54.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
E. Consultant Contract: 2025 Annual Overlay Program
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $487,198.99 for
design and construction management services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
163