HomeMy WebLinkAboutSpec 2025-03-03 COMPLETE AGENDA PACKETIJ
Monday,
Tukwila City Council Agenda
❖ SPECIAL MEETING ❖
A ,
®
90S.`
Thomas McLeod, Mayor Counci/members: ❖ Mohamed Abdi •3 Armen Papyan
Marty Wine, CityAdministrator •3 Jovita McConnell •3 Dennis Martinez
Tosh Sharp, Council President ❖ Hannah Hedrick ❖ vacant
ON -SITE PRESENCE:
TUKWILA CITY HALL
COUNCIL CHAMBERS
6200 SOUTHCENTER BOULEVARD
REMOTE PARTICIPATION FOR THE PUBLIC:
1-253-292-9750, ACCESS CODE: 670077847#
Click here to: Join icrosoft Teams eetinq
For Technical Support: 1-206-433-7155
March 3, 2025; 5:30 PM
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / ROLL CALL
2. LAND
ACKNOWLEDGEMENT
The City of Tukwila is located on the ancestral lands of the Coast Salish people.
We acknowledge their continuing connections to land, waters and culture.
We pay our respects to their elders past, present and emerging.
3. PUBLIC COMMENTS
including comment on
items both on and not on
the meeting agenda
Those wishing to provide public
on -site at Tukwila City Hall or
items both on and not on the
To provide comment via phone
citycouncil@tukwilawa.gov with
comments may verbally address the City Council both
via phone or Microsoft Teams for up tominutes for
meeting agenda.
or icrosoft Tea s, please email
your name and topic by 5:00 PM on the meeting date.
message is for public comment during the meeting, and
Please clearly indicate that your
you will receive further instructions.
4. PRESENTATIONS
Council Candidate Interviews for Position #7.
Applications can be reviewed through the following link:
Applicants for City Council Position 7 - City of Tukwila
5. CONSENT AGENDA
a. Approval of Minutes: 02/24/25 (Specia/Mtg.)
b. Approval of Vouchers
c. Authorize the Mayor to sign a contract with SCJ Alliance for design
services for the Orillia Road South Overlay Project, in the amount of
$125,935.27.
[Grant-funded][Rev/ewed and forwarded to consent by the Transportation
and Infrastructure Committee on 02/24/2025]
d. Authorize the Mayor to sign a contract with Psomas Inc. for design
services for the South Boeing Access Road Overlay Project, in the
amount of $563,983.14.
[Grant -funded] [Reviewed and forwarded to consent by the Transportation
and Infrastructure Committee on 02/24/2025]
e. Authorize the Mayor to sign a contract with Psomas Inc. for design
services for the Interurban Avenue South Overlay Program, in the
amount of $649,418.88.
[Grant -funded] [Reviewed and forwarded to consent by the
Transportation and Infrastructure Committee on 02/24/2025]
(continued...)
Pg.1
Pg.7
Pg.13
SPECIAL MEETING
March 3, 2025
Page 2
5. CONSENT AGENDA
(cont.)
f. Authorize the Mayor to sign supplemental agreement No. 4 to
contract #20-116 with David Evans and Associates, Inc. (acquirer
of original contractor, TranTech, LLC), for the 42nd Avenue South
Bridge Replacement Project, in the amount of $1,386,694.00.
[Grant -funded] [Reviewed and forwarded to consent by the Transportation
and Infrastructure Committee on 02/24/2025]
g. Authorize the Mayor to sign a contract with Carollo Engineers for
design services for the Ryan Hill Water System Connection Project,
in the amount of $601,505.00.
[Reviewed and forwarded to consent by the Transportation and
Infrastructure Committee on 02/24/2025]
h. Award a bid and authorize the Mayor to sign a contract with Pape &
Sons Construction, Inc. for the South 149th Street & South 150th
Street Watermain Replacement Project, in the amount of
$1,214,012.98 (plus contingency).
[Reviewed and forwarded to consent by the Transportation and
Infrastructure Committee on 02/24/2025]
i. Authorize the Mayor to sign a contract with Psomas, Inc. for design
and construction management services for the 2025 Annual Overlay
and Repair Program, in the amount of $487,198.99.
[Reviewed and forwarded to consent by the Transportation and
Infrastructure Committee on 02/24/2025]
j. Accept as complete the 2024 Annual Overlay and Repair Program
(Contract #24-055) with ICON Materials; authorize release of
retainage, subject to the standard claim and lien procedures (final
cost of project, including retainage: $867,537.54).
[Reviewed and forwarded to consent by the Transportation and
Infrastructure Committee on 02/24/2025]
Pg.21
Pg.57
Pg.79
Pg.133
Pg.157
6. UNFINISHED
BUSINESS
A resolution repealing Resolution No. 2093; Adopting revised City
Council Rules of Procedure.
Pg.165
7. EXECUTIVE SESSION
To evaluate the qualifications of the candidates for appointment to
elective office — Pursuant to RCW 42.30.110(h). Not to exceed 30 minutes.
8. NEW BUSINESS
a. Discussion and motion to appoint a new Councilmember to Position
#7 on the Tukwila City Council.
b. Update on City's Asylum Seeker Response and Authorization to
enter into contracts. [Grant -funded]
(1) Authorize the Mayor to sign a contract with First United Church
of Tacoma in a form reviewed and approved by the City
Attorney, in an amount not to exceed $163,000.00.
(2) Authorize the Mayor to sign a contract with Access to our
Communities (ATOC) in a form reviewed and approved by the
City Attorney, in an amount not to exceed $482,000.00.
(continued...)
Pg.187
SPECIAL MEETING
March 3, 2025
Page 3
8. NEW BUSINESS
(cont.)
(3) Authorize the Mayor to sign a contract with Interurban Suites
in a form reviewed and approved by the City Attorney, in an
amount not to exceed $331,000.00.
(4) Authorize the Mayor to sign Amendment No. 1 to Contract
#25-055 with SureHouse in a form reviewed and approved by
the City Attorney, in an amount not to exceed $139,000.00.
(5) Authorize the Mayor to sign Amendment No. 1 to Contract
#25-050 with New Covenant Church in a form reviewed and
approved by the City Attorney, in an amount not to exceed
$139,000.00.
(6) Authorize the Mayor to sign a contract with House of Shalom
in a form reviewed and approved by the City Attorney, in an
amount not to exceed $80,000.00.
(7) Authorize the Mayor to sign a contract with Bryn Mawr United
Methodist Church in a form reviewed and approved by the City
Attorney, in an amount not to exceed $80,000.00.
(8) Authorize the Mayor to sign Amendment No. 4 to Contract
#23-166 with Innovative Impact (i2) Strategies in a form
reviewed and approved by the City Attorney, in an amount not
to exceed $745,423.00.
9. REPORTS
a. Mayor
b. City Council
c. Staff — City Administrator Report
Pg.205
10. MISCELLANEOUS
11. ADJOURNMENT
This agenda
(Tukwila
is available at www.tukwilawa.gov, and in alternate formats with advance notice for those with disabilities.
Council meetings are audio and video taped. Available at www.tukwilawa.qov)
"to
If you are in need of translation or interpretation services at a Council meeting,
please contact us at 206-433-1800 by 12:00 p.m. on the meeting date.
WELCOME TO THE TUKWILA CITY COUNCIL MEETING
The Tukwila City Council encourages community participation in the local government process and
welcomes attendance and public comment at its meetings.
MEETING SCHEDULE
Regular Meetings are held at 7:00 p.m. on the 1st and 3rd Mondays of each month. The City Council takes
formal action in the form of motions, resolutions and ordinances at Regular Meetings.
Committee of the Whole Meetings are held at 7:00 p.m. on the 2nd and 4th Mondays of each month. The
City Council considers current issues, discusses policy matters in detail, and coordinates the work of
the Council at Committee of the Whole meetings.
PUBLIC COMMENTS
Members of the public are given the opportunity to address the Council for up to 5 minutes on items both on
and not on the meeting agenda during Public Comments. The City Council will also accept comments on an
agenda item when the item is presented in the agenda, but speakers are limited to commenting once per
item each meeting.
When recognized by the Presiding Officer, please go to the podium if on -site or turn on your microphone if
attending virtually and state your name clearly for the record. The City Council appreciates hearing from you
but may not respond or answer questions during the meeting. Members of the City Council or City staff may
follow up with you following the meeting.
PUBLIC HEARINGS
Public Hearings are required by law before the Council can take action on matters affecting the public
interest such as land -use laws, annexations, rezone requests, public safety issues, etc. The City Council
Rules of Procedure provide the following guidelines for Public Hearings:
1. City staff will provide a report summarizing and providing context to the issue at hand.
2. City staff shall speak first and be allowed 15 minutes to make a presentation.
3. The applicant is then allowed 15 minutes to make a presentation.
4. Each side is then allowed 5 minutes for rebuttal.
5. After City staff and the applicant have used their speaking time, the Council may ask further
clarifying questions of the speakers.
6. Members of the public who wish to address the Council on the hearing topic may speak for 5
minutes each.
7. Speakers are asked to sign in on forms provided by the City Clerk.
8. The Council may ask clarifying questions of speakers and the speakers may respond.
9. Speakers should address their comments to the City Council.
10. If a large number of people wish to speak to the issue, the Council may limit the total amount of
comment time dedicated to the Public Hearing.
11. Once the Presiding Officer closes the public hearing, no further comments will be accepted, and the
issue is open for Councilmember discussion.
12. Any hearing being held or ordered to be held by the City Council may be continued in the manner as
set forth by RCW 42.30.100.
For more information about the City Council, including its complete Rules of
Procedure, please visit: tt s:// .tu ila aov/e a ents/city-council/
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEMNO.
5.C.
STAFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE Consultant Selection for Major Pavement Overlay and Repairs on Orillia Road South
CATEGORY ❑ Discussion
Mtg Date
Motion
Date
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
lltg
3/3/2025
SPONSOR Council ❑Mayor ❑HR EIDCD Finance Fire ❑T5 ❑P&R ❑Police ®PIS ECourt
SPoNsoR's This project aims to replace the worn course on Orillia Rd S, upgrade pedestrian crossings,
SUMMARY and replace ADA ramps, while also involving engineering design, surveying, and
environmental permitting. Staff advertised engineering services and received statements of
qualification from several engineering consulting firms. All firms were evaluated, and SCJ
Alliance was selected as the firm that best met project requirementsCouncil is being asked
to approve a consultant agreement with SCJ Alliance, in the amount of $125,935.27.
REVIEWED BY ® Trans&Infrastructure C CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
I"IEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$125,935.27 $0.00 $0.00
Fund Source: GRANT AND NO LOCAL MATCH
Comments: 2025 CIP — Orillia Road South Overlay
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
2025 CIP — Orillia Road South Overlay
WSDOT Asset Management Preliminary Engineering Fund Authorization
Orillia Rd S Preservation Area Map
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
1
SCJ Design Contract $125,935.27
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Peter Mayer, Interim Public Works Director
BY: Adam Cox P.E, Interim Traffic Engineer
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: Consultant Selection for Major Pavement Overlay and Repairs on Orillia
Road South
ISSUE
Approve a contract with SCJ Alliance to provide preliminary and final design services for the Orillia Road South
Overlay Project in the amount of $125,935.27.
BACKGROUND
The project will replace the wearing course on the portion of Orillia Rd S between S 188th St and S 204th St, a
.75-mile arterial that connects to several major roadways including 1-5 and S 212th St. The project will also
upgrade pedestrian crossings and replace ADA ramps that do not meet current ADA requirements. In addition to
engineering design services, tasks included in the project scope include surveying the location and condition of
existing facilities, utility locate, environmental permitting required by the National Environmental Policy Act,
preparing a cultural resources assessment, and project management.
DISCUSSION
City staff received statements of qualification from several engineering consulting firms who responded to
the City's Request for consultant qualifications. The statement of qualifications of each of these firms was
evaluated, and SCJ Alliance was selected as the firm that best meets project requirements and City
objectives.
FINANCIAL IMPACT
The City has been awarded a WSDOT National Highway System Asset Management Grant in the amount of
$125,935.27 for the Preliminary Engineering Phase of the Project. The grant does not require a local City match.
Contract NHS Asset Mgmt Grant CIP Budget (104 Fund)
$105,000 $20,000
RECOMMENDATION
Council is being asked to approve a consultant agreement with SCJ Alliance, in the amount of $125,935.27 to
provide preliminary and final design services for the Orillia Road South Overlay Project, and to consider this item
on the Consent Agenda at the March 3, 2025 Regular Meeting.
Attachment:
CIP Page
WSDOT Asset Management Preliminary Engineering Fund Authorization
Map of roadways
2
CITY OF TU V1/ILA CAPITAL PRO JE T SUMMARY
2025 to 2030
PROJECT: Orillia Road South Overlay
Project Manager David Baus
Project #
82510404
Department Arterial Streets
DESCRIPTION: Complete pavement repairs, overlay, and curb and gutter, sidewalk, and guardrail repair
JUSTIFICATION:`
STATUS:;;
Preserve and maintain the street structure Ina safe and useable state by resurfacing before failure which also
minimizes CoSts,
full. funding by National Highway Performance Prograrr
MAINTENANCE IMPACT: -520 Man Hours for pothole repair/crack sealing
nuary of2024'
onstruction must be completed as a single contract and authorized by August 1, 2026
FINANCIAL (in thousands)
2025
2026
2027
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
$ 20
$ 20
$ -
$ -
$ -
$ -
$ -
$ 40 1
Design
$ 105
$ -
$ -
$ -
$ -
$ -
$ -
$ 105
Construction Mgmt.
$ -
$ 170
$ -
$ -
$ -
$ -
$ -
$ 170
Construction
$ -
$ 939
$ -
$ -
$ -
$ -
$ -
$ 939
Contingency
$ -
$ 95
$ -
$ -
$ -
$ -
$ -
$ 95
Total Project Costs
$ 125
$ 1,224
$ -
$ -
$ -
$ -
$ -
$ 1,349
Project Funding
Awarded Grant
$ 105
$ 1,204
$ -
$ -
$ -
$ -
$ -
$ 1,309
Fund Balance
$ 20
$ 20
$ -
$ -
$ -
$ -
$ -
$ 40
Total Project Funding
$ 125
$ 1,224
$ -
$ -
$ -
$ -
$ -
$ 1,349
3
Mr. Pete Mayer
Deputy City Administrator/Interim
City of Tukwila
6300 Southcenter Blvd., Suite 100
Tukwila, Washington 98188
Dear Mr. Mayer:
September 19, 2024
Public Works Director
City of Tukwila
Orillia Rd South
NHPP-1230(007)
FUND AUTHORIZATION
Transportation Building
310 Maple Park Avenue S.E.
P.O. Box 47300
Olympia, WA 98504-T300
360-705-7000
TTti': 1-800-833-6388
www.wsdot.wa.gov
We have received FHWA fund authorization, effective September 16, 2024, for this project as follows:
PHASE
Preliminary Engineering
TOTAL
$105,000
FEDERAL SHARE
$105,000
As a condition of authorization, you must show continuous project progress through monthly billings, until
your project is complete. Failure to show continuous progress may result in your project becoming inactive
per 23 CFR 630.106(a) (5) and subject to de -obligation of all federal funds and agreement closure.
Enclosed for your information and file is a fully executed copy of Local Agency Agreement LA11024
between WSDOT and your agency. All costs exceeding those shown on this agreement are the sole
responsibility of your agency. Any costs incurred after the Project Agreement End Date shown on the
agreement are not eligible for federal reimbursement. In addition, all eligible costs incurred prior to the
End Date must be billed within sixty (60) days of the End Date or they are ineligible for federal
reimbursement.
FHWA requires projects utilizing federal funds for preliminary engineering or right of way to advance to
construction. If this project is unable to proceed to construction, any expended federal funds must be repaid.
WSDOT authorization to proceed with right of way and/or construction is contingent upon receipt and
approval of your environmental documents.
You may proceed with the administration of this project in accordance with your WSDOT approved
Certification Acceptance agreement.
Sincerely,
arc
Stephanie Tax
Manager, Program Management
Local Programs
ST:jg:ml
Enclosure
cc: Seong Kim, Deputy City Engineer, Public Works Department
Mehrdad Moini, PE, Northwest Region Local Programs Engineer
4
Transportation & Infrastructure Services Committee Minutes February24, 2025
F. Design Contract: South Boeing Access Road Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $563,983.14 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
G. Consultant Contract: Interurban Avenue South Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $649,418.88 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
H. Consultant Contract: Orillia Road South Overlay and Repairs
Staff is seeking approval of a contract with SCJ Alliance in the amount of $125,935.27 for
*
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
I. Supplemental Agreement: 42nd Avenue South Bridge Replacement Project
Staff is seeking approval of Supplemental Agreement No. 5, Contract No. 20-116 with David
Evans and Associates, Inc. in the amount of $1,386,694 for the remaining design/permitting
work associated with unexpected conditions on the project.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
The meeting adjourned at 6:21 p.m.
SIT
Committee Chair Approval
Minutes by LH
6
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.D.
STAFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE Consultant Selection for Major Pavement Overlay and Repairs on South Boeing
Access Road
CATEGORY ❑ Discussion
Mtg Date
11
Motion
Date
[ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg
3/3/2025
SPONSOR Council QMayor ❑HR EIDCD Finance EFire On EIP&R ❑Police ®PJV Court
SPONSOR'S The project will replace the wearing course on the portion of S Boeing Access Rd that
SUMMARY crosses over Interstate 5 (I-5) and BNSF tracks, which is deteriorating. City staff
advertised engineering services for the project in November 2024 and received one
Statement of Qualification from Psomas. Staff interviewed Psomas who met the project
requirements and the City's objectives. Council is being asked to approve a consultant
agreement with Psomas, in the amount of $563,983.14
REVIEWED BY ® Trans&Infrastructure E CommunitySvs/Safety ❑ Finance Comm. LI Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMA"IEE
Public Works Department
Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$563,983.14 $574,000.00 $0.00
Fund Source: GRANT AND NO LOCAL MATCH
Comments: 2025 CIP — Boeing Access Road Overlay
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
2025 CIP — Boeing Access Road Overlay
Preliminary Engineering Fund Authorization
S Boeing Access Rd Preservation Area Map
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Peter Mayer, Interim Public Works Director
BY: Adam Cox P.E, Interim Traffic Engineer
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: Consultant Selection for Major Pavement Overlay and Repairs on South
Boeing Access Road
ISSUE
Approve a contract with Psomas to provide preliminary and final design services for the South Boeing Access Road
Overlay Project in the amount of $ 563,983.14
BACKGROUND
The project will replace the wearing course on the portion of S Boeing Access Rd that crosses over Interstate 5 (1-5)
and BNSF tracks, which is deteriorating because of its age, heavy vehicle traffic, and high traffic volumes. Project
work may also include replacing traffic sensing loops, ADA ramps, and pedestrian push buttons that do not meet
current ADA requirements. The project limits extend from the signalized intersection at East Marginal Way (not
including the intersection) to the west side of the signalized intersection at Martin Luther King Jr Way S (not including
the intersection) and is approximately 0.56 roadway miles long. In addition to design services, project scope will
include survey and base mapping, stormwater analysis and management, support during initial construction
administration, and public outreach support.
DISCUSSION
City staff advertised engineering services for the project in November 2024 and received one Statement of
Qualification from Psomas. City staff interviewed Psomas in December and determined that Psomas staff meet
project requirements and the City's objectives.
FINANCIAL IMPACT
The City has been awarded a WSDOT National Highway System Asset Management Grant in the amount of $564,000
for the Preliminary Engineering Phase. The grant does not require a local City match.
Contract NHS Asset Mgmt. Grant Budgeted CIP (104)
Psomas Design Contract $563,983.14 $564,000 $10,000
RECOMMENDATION
Council is being asked to approve a consultant agreement with Psomas, in the amount of $563,983.14 to provide
preliminary and final design services for the South Boeing Access Overlay Project, and to consider this item on the
Consent Agenda at the March 3, 2025 Regular Meeting.
Attachment:
CIP Page
Preliminary Engineering Fund Authorization
Map of roadway
8
CITY OF TU V1/ILA CAPITAL PRO JE T SUMMARY
2025 to 2030
PROJECT: Boeing Access Road Overlay
Project Manager David Baus
Project #
82510402
Department Arterial Stree
DESCRIPTION: Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF railway
JUSTIFICATION:`
STATUS:
Existing bridge deck concrete is breaking off making an uneven surface with the potential to cause flying debris.
Project was awarded
MAINTENANCE IMPACT: N/A
FINANCIAL (in thousands
ult. funding by N
ionat Highway Perf
nce Program fanu
of 2024
Construction must be completed as a single contract and authorized by August 31, 2026.
2025
2026
2027
2028
2029
2030
Beyond TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
Design
Construction Mgmt.
Construction
Contingency
$ 15
$ -
$ 400
$ 2,750
$ 274
Total Project Costs
574
$ 3,439
$ 25
$ 564
$ 400
$ 2,750
$ 274
$ 4,013
Project Funding
Awarded Grant
Fund Balance
$ 564
$ 10
$ 3,426
$ 13
$ 3,990
$ 23
Total Project Funding
574 $ 3,439 $
4,013
9
Mr. Pete Mayer
Deputy City Administrator/Interim
City of Tukwila
6300 Southcenter Blvd., Suite 100
Tukwila, Washington 98188
Dear Mr. Mayer:
September 19, 2024
Public Works Director
City of Tukwila
Boeing Access Road
NHPP-1380(005)
FUND AUTHORIZATION
Transportation Building
310 Maple Park Avenue S.E.
P.O. Box 47300
Olympia, WA 98504-T300
360-705-7000
TTti': 1-800-833-6388
www.wsdot.wa.gov
We have received FHWA fund authorization, effective September 16, 2024, for this project as follows:
PHASE
Preliminary Engineering
TOTAL
$564,000
FEDERAL SHARE
$564,000
As a condition of authorization, you must show continuous project progress through monthly billings, until
your project is complete. Failure to show continuous progress may result in your project becoming inactive
per 23 CFR 630.106(a) (5) and subject to de -obligation of all federal funds and agreement closure.
Enclosed for your information and file is a fully executed copy of Local Agency Agreement LA11027
between WSDOT and your agency. All costs exceeding those shown on this agreement are the sole
responsibility of your agency. Any costs incurred after the Project Agreement End Date shown on the
agreement are not eligible for federal reimbursement. In addition, all eligible costs incurred prior to the
End Date must be billed within sixty (60) days of the End Date or they are ineligible for federal
reimbursement.
FHWA requires projects utilizing federal funds for preliminary engineering or right of way to advance to
construction. If this project is unable to proceed to construction, any expended federal funds must be repaid.
WSDOT authorization to proceed with right of way and/or construction is contingent upon receipt and
approval of your environmental documents.
You may proceed with the administration of this project in accordance with your WSDOT approved
Certification Acceptance agreement.
Sincerely,
s
Stephanie Tax
Manager, Program Management
Local Programs
ST:jg:ml
Enclosure
cc: Seong Kim, Deputy City Engineer, Public Works Department
Mehrdad Moini, PE, Northwest Region Local Programs Engineer
10
Transportation & Infrastructure Services Committee Minutes February24, 2025
F. Design Contract: South Boeing Access Road Overlay and Repairs
*Staff is seeking approval of a contract with Psomas, Inc. in the amount of $563,983.14 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
G. Consultant Contract: Interurban Avenue South Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $649,418.88 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
H. Consultant Contract: Orillia Road South Overlay and Repairs
Staff is seeking approval of a contract with SCJ Alliance in the amount of $125,935.27 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
I. Supplemental Agreement: 42nd Avenue South Bridge Replacement Project
Staff is seeking approval of Supplemental Agreement No. 5, Contract No. 20-116 with David
Evans and Associates, Inc. in the amount of $1,386,694 for the remaining design/permitting
work associated with unexpected conditions on the project.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
The meeting adjourned at 6:21 p.m.
SIT
Committee Chair Approval
Minutes by LH
12
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEMNO.
5.E.
STAFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE Consultant Selection for Major Pavement Overlay and Repairs on Interurban Avenue
South
CATEGORY ❑ Discussion
Mtg Date
11
Motion
Date
I- Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg
3/3/2025
SPONSOR Council QMayor ❑HR ❑DCD Finance EFire On ❑P&R ❑Police ®PJV Court
SPONSOR'S The project aims to rehabilitate asphalt pavement on Interurban Ave S, replace traffic
SUMMARY sensing loops, upgrade video detection equipment, and replace ADA ramps and push
buttons. City staff advertised engineering services and received statements of qualification
from several engineering consulting firms. All firms were evaluated, and Psomas was
selected as the firm that best met project requirements. Council is being asked to approve
a consultant agreement with Psomas in the amount of $649,418.88.
REVIEWED BY ® Trans&Infrastructure E CommunitySvs/Safety ❑ Finance Comm. LI Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMA"IEE
Public Works Department
Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$649,418.88 $661,386 $0.00
Fund Source: GRANT AND NO LOCAL MATCH
Comments: 2025 CIP — Boeing Access Road Over/ay
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
2025 CIP — Boeing Access Road Overlay
WSDOT Asset Management Award Letters
Interurban Ave S Preservation Area Map
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
13
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Peter Mayer, Interim Public Works Director
BY: Adam Cox P.E, Interim Traffic Engineer
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: Consultant Selection for Major Pavement Overlay and Repairs on
Interurban Avenue South
ISSUE
Approve a contract with Psomas to provide preliminary and final design services for the Interurban Avenue
South Overlay Project in the amount of $649,418.88
BACKGROUND
The project will rehabilitate asphalt pavement on Interurban Ave S, required because of heavy vehicle traffic and
high traffic volumes. Project work will also replace traffic sensing loops, upgrade video detection equipment, and
replace ADA ramps and pedestrian push buttons that do not meet current ADA requirements. The project limits
extend from approximately 100' south of East Marginal way S to 100' north of S 143rd St. and include
approximately 2.25 miles of roadway, including 9 signalized intersections, 10 unsignalized intersections and
numerous driveway approaches. In addition to design services, project effort will include survey and base
mapping, stormwater analysis and management, support during initial construction administration, and public
outreach support.
DISCUSSION
City staff received statements of qualification from several engineering consulting firms who responded to
the City's Request for Qualifications. The qualifications of each of these firms were evaluated, and
Psomas was selected as the firm that best meets project requirements and City objectives.
FINANCIAL IMPACT
The City has been awarded a WSDOT National Highway System Asset Management Grant in the amount of
$661,386 for the Preliminary Engineering Phase. The grant does not require a local City match.
Psomas Design Contract
Contract NHS Asset Mgmt Grant
$649,418.88 $661,386
RECOMMENDATION
Council is being asked to approve a consultant agreement with Psomas in the amount of $649,418.88 to provide
preliminary and final design services for the Interurban Avenue South Overlay Project, and to consider this item
on the Consent Agenda at the March 3, 2025 Regular Meeting.
Attachment:
CIP Page
WSDOT Asset Management Award Letters
Map of roadway
14
CITY OF TU V1/ILA CAPITAL PRO JE T SUMMARY
2025 to 2030
PROJECT: Interurban Avenue S Overlay
Project Manager David Baus
DESCRIPTION: Complete pavement repairs, overlay, and curb and gutter repair
JUSTIFICATION:`
STATUS:
Project #
82510403
Department Arterial Streets
Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs.
full. funding by National Highway Perforr
MAINTENANCE IMPACT: -1,300 Man Hours not needed to fill in potholes/crack sealing
rice Prf gran
nua
2024
Construction must be completed as a single contract and authorized by August 31, 2026'
FINANCIAL (in thousands)
2025
2026
2027
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
$ -
$ 50
$ 50
$ -
$ -
$ -
$ -
$ 100
Design
$ -
$ 397
$ -
$ -
$ -
$ -
$ -
$ 397
Construction Mgmt.
$ -
$ -
$ 545
$ -
$ -
$ -
$ -
$ 545
Construction
$ -
$ -
$ 3,650
$ -
$ -
$ -
$ -
$ 3,650
Contingency
$ -
$ -
$ 365
$ -
$ -
$ -
$ -
$ 365
Total Project Costs
$ -
$ 447
$ 4,610
$ -
$ -
$ -
$ -
$ 5,057
Project Funding
Awarded Grant
$ -
$ 397
$ 4,561
$ -
$ -
$ -
$ -
$ 4,958
Fund Balance
$ -
$ 50
$ 49
$ -
$ -
$ -
$ -
$ 99
Total Project Funding
$ -
$ 447
$ 4,610
$ -
$ -
$ -
$ -
$ 5,057
15
Transportation Building
310 Maple Park Avenue S.E.
P.O. Box 47300
Olympia, WA 98504-7300
360-705-7000
TTY: 1-800-833-6388
www.wsdat.wa:yov
January 10, 2024
Mr. Hari Ponnekanti, P.E.
Public Works Director
City of Tukwila
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
RE: Interurban Ave S.
2023 National Highway System (NHS) Asset Management Program
Federal Funding
Dear Mr. Ponnekanti:
WSDOT is pleased to advise you that the above -mentioned project was selected to receive funding
through the 2023 NHS Asset Management program. The federal funding is limited as shown below:
Interurban Ave S. $4,958,000
Scope: Pavement repairs, overlay, and curb and gutter repair.
NOTE: Funding provided requires the local match as detailed in your project application. If no
local match was identified, federal funds are available at 100%, for all eligible federal expenditures.
Construction must be completed as a single contract and authorized by August 31, 2026, or funds
may be reprogrammed to other projects. Scope changes are not allowed.
To meet state and federal requirements, the following are required:
• Project expenditures incurred before receiving notice from Local Programs of federal fund
authorization are not eligible for reimbursement.
• Please refer to the Local Programs webpage for detailed information, including:
(http://www.wsdot.wa.gov/localprograms)
s( Local Agency Guidelines (LAG) manual for the requirements regarding
programming, authorization, reimbursement, etc.;
✓ Projects utilizing federal funds must be included in your current Transportation
Improvement Program (TIP) as a complete programmed project. Once your TIP
amendment is approved, WSDOT will amend the Statewide Transportation
Improvement Program (STIP);
✓ Funding and billing forms;
16
Mr. Hari Ponnekanti, P.E.
City of Tukwila
January 10, 2024
V Local Project Report is required to be completed by the end of June and December
each year. To access the database you will need an account name and password.
Your account name is Tukwila and your password is Tukwi785. The password is
case sensitive.
• If the project is not actively pursued, or becomes inactive (23 CFR 630), the project is at
risk of being cancelled, funds repaid and reprogrammed.
• FHWA requires that all projects are ADA compliant upon completion or the federal funds
must be repaid.
As a reminder, Local Programs requires all agencies to submit monthly progress billings to ensure
timely reimbursement of eligible federal expenditures.
For assistance, please contact your Region Local Programs Engineer, Mehrdad Moini at 206.440.4734
or Mehrdad.Moini@wsdot.wa.gov.
Sincerely,
/
L,
Jay Drye, PE
Director
Local Programs
JD:st:cdm
cc: Kelly McGourty, Transportation Director, PSRC
Mehrdad Moini, Northwest Region Local Programs Engineer
17
H.
q' 1
HI
11"' ,,,„uumu.1111 momoHw
1-
a
w
I-
w
19
Transportation & Infrastructure Services Committee Minutes February24, 2025
F. Design Contract: South Boeing Access Road Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $563,983.14 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
G. Consultant Contract: Interurban Avenue South Overlay and Repairs
*Staff is seeking approval of a contract with Psomas, Inc. in the amount of $649,418.88 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
H. Consultant Contract: Orillia Road South Overlay and Repairs
Staff is seeking approval of a contract with SCJ Alliance in the amount of $125,935.27 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
I. Supplemental Agreement: 42nd Avenue South Bridge Replacement Project
Staff is seeking approval of Supplemental Agreement No. 5, Contract No. 20-116 with David
Evans and Associates, Inc. in the amount of $1,386,694 for the remaining design/permitting
work associated with unexpected conditions on the project.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
The meeting adjourned at 6:21 p.m.
SIT
Committee Chair Approval
Minutes by LH
20
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared Iy
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.F.
STAFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE 42nd Ave South Bridge Replacement Project- Supplement Agreement No. 4
Contract No. 20-116, Supplement No. 4
CATEGORY ❑ Discussion
Mtg Date
11
Motion
Date
P Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
Mtg
3/3/2025
SPONSOR Council QMayor ❑HR ❑DCD Finance EFire On ❑P&R ❑Police ®PIF Court
SPONSOR'S This supplement will cover the remaining design and permitting work. Demolition of the
SUMMARY existing bridge is scheduled to begin in Spring 2027, and the new bridge to be open to the
public in late 2029. Council is being asked to approve supplemental agreement No. 4 for
design services with David Evans and Associates, Inc. in the amount of $1,386,694 for the
42nd Ave S Bridge Replacement Project.
REVIEWED BY ® Trans&Infrastructure E CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMM
Public Works Department
ll'1EE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,386,694 $2,606,661 $0.00
Fund Source: GRANT AND CITY FUNDING
Comments: 2025 CIP — 42nd Ave 5 Bridge Replacement
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
2/21/25 Info Memo - Updated on 2/27/25 after Committee meeting
2025 CIP — 42nd Ave S Bridge Replacement
Supplemental Scope of Work and Budget
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Interim Public Works Director
BY: Adam Cox, Transportation Program Manager
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: 42nd Ave South Bridge Replacement Project- Supplement Agreement o® 4 o. 5
Project No. 91810404
Contract No. 20-116, Supplement o. 4 o. 5
ISSUE
Approve Supplemental Agreement No. 4 No. 5 Contract No. 20-116 with David Evans and Associates,
Inc. (DEA) for the 42nd Avenue South Bridge Replacement Project.
BACKGROUND
In September 2024, Tukwila's consultant informed the City that a supplement would be needed to
account for the remaining design/permitting work in the amount of $1,386,694.00. The project has
faced several unexpected hurdles including permitting delays, navigating culturally sensitive areas,
utility coordination, and accounting for complex site conditions. These hurdles have resulted in
additional coordination, consultation, and costs.
In August 2024, TranTech, LLC., the designer of record for the 42nd Ave S Bridge, announced they
were being acquired by David Evans & Associates, Inc. Project staff were informed the indirect cost
recovery (ICR) rate would increase once the merger occurred, and the City is now processing the
supplement to include this change. Since there is still a balance in the budget for the existing contract,
work has continued to date.
ANALYSIS
This supplement will cover the remaining design and permitting work. Demolition of the existing bridge
is scheduled to begin in Spring 2027, and we expect the new bridge to be open to the public in late
2029. Final design and permitting of the 42nd Ave S Bridge have been delayed, resulting in delayed
construction. Some of the delays are a result of design timeline extensions, unexpected geological
conditions, complex environmental, historical, and cultural requirements, 2-D hydrology analysis
requirement, customized architectural components, the discovery of different utility conditions and
associated coordination, navigating challenging constructability conditions, in -water work window
constraints, and more associated civil/ stormwater and structural design, including additional walls and
utility bridge requirements. In sum, this project has faced many hurdles, primarily related to permitting
delays and culturally sensitive areas, requiring additional coordination with the Washington State
Department of Transportation, the Department of Archeological and Historic Preservation, the
Washington Department of Fish and Wildlife, the Washington Department of Natural Resources, and
Tribes, among others. The 42nd Ave S Bridge replacement project is currently at 90% Plans and
Estimate.
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
22
42nd Ave S Bridge Replacement Project — Supplement Agreement Noe 4 No, 5
February 21, 2025
Page 2
FISCAL IMPACT
The contract for Supplement Agreement No, 4 No, 5 is to bring the 90% Plan and Estimate (P&E) to
100% Plans Specs & Estimate design in the amount of $1,386,694. The City is using funding from our
Move Ahead Washington (MAWA) grant to cover the Supplement Number 4 5 costs. Supplement 1
expanded the scope of work from 30% plans and estimate to 100% bid -ready plan set, Supplement 2
provided a time extension, Supplement Number 3 accounted for a change in subconsultant, and
Supplement Number 4 accounts for the merge of TranTech, LLC to David Evans and Associates (DEA)
and adds additional $1,386,694 to the contract. DEA's scope of work and cost estimate for Supplement
4 Supplement 5-are attached.
Contract Estimate
Original Contract
Supplement No. 1
$1,078,487
$1,528,174
Supplement No. 2 $0
Supplement No. 3 $0
Su pp em&nt n o n
Supplement No. 5- 4
$1,386,694
City Funding
Puget Sound Regional
Council (PSRC) Grant
Move Ahead WA Grant
Funding Sources
$1,106,661
$1,500,000
$1,386,694
Total
$3,993,355 Total $3,993,355
RECOMMENDATION
Council is being asked to approve supplemental agreement NoA No. 5 for design services with David
Evans and Associates, Inc. in the amount of $1,386,694 for the 42nd Ave S Bridge Replacement Project
and consider this item on the Consent Agenda at the March 03, 2025 Regular Meeting.
Attachments: 42"d Ave S CIP Page
Supplemental Scope of Work and Budget
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
23
CITY OF TU V1/ILA CAPITAL PRO JE T SUMMARY
2025 to 2030
PROJECT: 42nd Ave S Bridge Replacement
Project Manager Adam Cox
DESCRIPTION:
JUSTIFICATION:
STATUS:;;
Project #
91810404
Department Arterial Stree
Design and construct a replacement structure for the existing 42nd Ave S Bridge adjacent to the Tukwila Community
Center.
The current bridge has been restricted to one lane for southbound traffic due to the bridge being struck by an over
height truck. The current through truss bridge is fracture critical, structural defioient, and has tasted longer than its
deign life.
The project is currently in the design phase,
early 2027 and be complete by end of 2028.
th 0% design complete: Project cons
anticipated to begin in
MAINTENANCE IMPACT: Streets crews will be responsible to sweep the bridge and maintain any vegetation that is planted.
The City has secured project costs through multiple grants-
match), $12M in Local Bridge Programs funding (no match), and
ace.Transportation Program funding (13.5°lc+'
Move Ahead Washington funding (no match).
FINANCIAL (in thousands)
2025
2026
2027
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
$ 100
$ 100
$ 100
$ 50
$ -
$ -
$ -
$ 350
Design
$ 200
$ 500
$ 50
$ 50
$ -
$ -
$ -
$ 800
Land (R/W)
$ -
$ -
$ 100
$ -
$ -
$ -
$ -
$ 100
Construction Mgmt.
$ -
$ -
$ 1,500
$ 1,500
$ -
$ -
$ -
$ 3,000
Construction
$ -
$ -
$ 15,000
$ 15,000
$ -
$ -
$ -
$ 30,000
Contingency
$ -
$ -
$ 1,000
$ 1,000
$ -
$ -
$ -
$ 2,000
Total Project Costs
$ 300
$ 600
$ 17,750
$ 17,600
$ -
$ -
$ -
$ 36,250
Project Funding
Awarded Grant
$ 200
$ 500
$ 16,500
$ 14,650
$ -
$ -
$ -
$ 31,850
Proposed Grant
$ -
$ -
$ 1,150
$ 2,950
$ -
$ -
$ -
$ 4,100
Fund Balance
$ 100
$ 100
$ 100
$ -
$ -
$ -
$ -
$ 300
Total Project Funding
$ 300
$ 600
$ 17,750
$ 17,600
$ -
$ -
$ -
$ 36,250
24
Supplement No. 5 - Prime Consultant Cost Computations Summary
City of Tukwila 42nd Ave S Bridge Replacement
DEA TEAM BUDGET BREAKDOWN
TranTech $ 803,573
1 Alliance $ 13,785
Facet $ 90,871
HWA Geosciences $ 79,922
Landau $ 104,062
Ott -Sakai $ 59,680
Transpo $ 53,084
Natural Waters $ 55,654
TOTAL PROJECT BUDGET $ 1,260,631
MANAGEMENT RESERVE (MR) @ 10% $ 126,063
TOTAL PROJECT BUDGET + MR $ 1,386,694
25
City of Tukwila 42nd Ave S Bridge Replacement
t
CITY OF TUKWILA 42ND AVE S BRIDGE REPLACEMENT
INTRODUCTION
Under the 42nd Ave S Bridge Replacement project, the City of Tukwila (City) has
requested that David Evans & Associates' team (Consultant) prepare a supplement to
provide professional services to perform work not included within the original Scope
of Services and Construction Phase Engineering and Construction Management
Services.
Additional design phase services are provided by Consultant and Consultant's team
members, [geotechnical, environmental, hydraulics, bridge aesthetics and landscape
architecture, traffic engineering, and constructability], under Work Elements 1, 2, 3,
4, 5, 6, 7, 8,10 and 12 of Supplement 4 of the contract. Work elements consisted of
additional project management, additional survey, geotechnical, environmental,
aesthetics, utility coordination, traffic signal, civil and structural design services.
These additional services are necessary as the result of design timeline extensions,
more challenging than expected geological conditions, complex environmental,
historical, and community requirements, 2-D hydrology analysis requirement,
customized architectural components, the discovery of different utility conditions and
associated coordination, challenging constructability conditions, and more associated
civil/ storm and structural design, including additional walls and utility bridge
requirements. These design revisions require additional coordination and preparation
of 90%, 100%, and Bid -Ready plans, estimates, and specifications for an additional
submittal, additional plan, estimate, and specifications.
In the following, the additional scope of work is described in further detail.
ADDITIONAL DESIGN PHASE SCOPE OF SERVICES
The additional Scope of Services described below are the work elements to be
accomplished by the Consultant as summarized under each Task. This scope consists
of the following elements:
(The task numbers below correspond to the original Scope of Services.)
26
Page
1
City of Tukwila 42nd Ave S Bridge Replacement
Work Element 1 —
Work Element 2 —
Work Element 3 —
Work Element 4 —
Work Element 5 —
Work Element 6 —
Work Element 7 —
(Supplemented)
Work Element 8 —
Work Element 10
Work Element 12
Project Management (Supplemented)
Surveying and Right -Of -Way (Supplemented)
Geotechnical Engineering (Supplemented)
Environmental Pei hutting (Supplemented)
Bridge Aesthetics and Landscape Architecture (Supplemented)
Utility Coordination (Supplemented)
Constructability Review, Construction Schedule & Estimation
Traffic Control and Traffic Signal (Supplemented)
— Hydraulics and Hydrology (Supplemented)
— PS&E (Supplemented)
The extra services are identified in the detailed Scope of Services below.
SCOPE OF SERVICES DEFINED
Task 1 — Project Management (Supplemented)
This task includes project administration, meeting coordination, and design team management.
Work Elements:
• Consultant Team Meetings — approximately ninety-six (96) additional team meetings are
assumed for the additional design services.
• Monthly Progress Reports and Invoicing — approximately forty-eight (48) progress
reports containing a narrative that identifies and describes significant activities performed
in the previous month.
• Design Team Management — below is a list of continued tasks to be provided for the
duration of the additional design:
o Schedule and coordinate with the design team.
o Prepare sub -consultant agreements, coordinate, budget, and review the project
progress and submittals.
o Monitor project budget.
o Maintain regular informal contact telephone discussions and electronic mail.
Deliverables:
• Progress reports
• Monthly invoices
• Project schedule
Page
2
27
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELEMENT 2 SURVEYING AND RIGHT-OF-WAY (Supplemented)
This Work Element is performed by 1 Alliance to provide survey control for bathymetry, done by
others, for the purpose of updating the existing basemap to include the Duwamish River for design
purposes.
Please see Exhibit A, Surveying Limits.
Surveying
2.1 Survey PM, Admin, QA/QC
This task includes the survey project management, administrative duties, and quality control required
for a project of this complexity and magnitude.
2.2 Survey Control
This task includes the establishment of survey control, or the recovery of existing survey control, as
required for the project. Survey control will be set, found, or referenced utilizing Real Time
Kinematic (RTK) GPS (GNSS) and the Washington State Reference Network (WSRN) in
conformance with industry standards. This survey control is then propagated, as required, utilizing
standard terrestrial total station measurements.
2.2.1. Geodetic Survey Control
• Survey work shall reference the Washington State Plane Coordinate System of 1983 as
established in accordance with Chapter 58.20 Revised Code of Washington.
• Vertical Datum shall reference the North American Vertical Datum of 1988.(NAVD88).
2.3 Field Mapping
This task includes the field surveying and mapping required for this specific effort. 1 Alliance will
survey using traditional Total Station and GPS technologies to collect the data for use in the creation
of a basemap. All found features will be located withing the mapping limits. Trees greater than 6"
DBH and/or landscaped trees will be located and will be identified as either evergreen or deciduous.
Mapping will extend across the full width of the existing Right -of -Way. Please see Exhibit A,
Surveying Limits, for specific mapping limits
2.4 Utility Surveying
Surface Observable utilities will be located as found within the surveying limits. Measure Downs for
sewer manholes, catch basins and storm drain manholes with pipe size, material, direction, and invert
elevations will be obtained, if possible, at each structure. Nearest drainage structure outside the
mapping limits will also be collected. The lowest line of overhead utilities to be located on the pole
face and, if possible, a point in or near the middle.
Underground Conductible Utility Locates will be mapped.
2.5 Office Processing
This task includes the office processing of the collected survey data, data extraction, field book note
reductions, CADD drafting, and other duties required for the generation of the deliverable(s).
Page
28
3
City of Tukwila 42nd Ave S Bridge Replacement
Assumptions:
• Rights -of -Entry will be provided by the AGENCY.
• Traffic control, if required, will be a uniformed officer and billed as an invoiced ODC.
• Tree Tags, driplines/canopies are not a part of the scope services.
• Setting of property corners is not a part of the scope of services.
• A record of Survey is not a part of the scope of services.
• Right -of -Way and boundary resolution is not a part of the scope of services.
• A private utility locating firm will be utilized by 1 Alliance. This will include Ground
Penetrating Radar (GPR).
Deliverables:
• Updated topographic Survey with 1-foot contour intervals (electronic copy).
• Updated AutoCAD Surfaces (DTM Files) (electronic copy).
• ASCII file of control points, if requested.
Page
4
29
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELEMENT 3 GEOTECHNICAL ENGINEERING (Supplemented)
This Work Element, performed by HWA Geosciences Inc. (HWA) is supplemented
to provide geotechnical engineering services.
Supplemental Geotechnical Investigation
HWA will conduct a supplemental geotechnical field investigation program. The
following tasks will be included in the program:
• Develop a Geotechnical Subsurface Exploration Plan that identifies the type,
location, and extent of proposed field explorations. This plan will also be used to
assist in development of traffic control plans.
• Prior to beginning the field exploration program, HWA will mark the proposed
exploration locations and arrange for public utility locates using the Washington
State Utility Notification Center.
• Because explorations will be located within the travel lanes or shoulders of
publicly owned streets, HWA will coordinate with the City of Tukwila to obtain
right-of-way/traffic control permits. HWA will coordinate a traffic control
subcontractor to provide appropriate traffic control personnel and devices when
working within public right-of-way.
• HWA will complete four exploratory cone penetrometer test (CPT) soundings to
provide supplemental information for use in evaluating lateral loads and design
of ground improvement (by contractor). Two CPT soundings will be located near
the north bridge approach and two CPT soundings will be located near the south
bridge approach. CPT soundings will be completed by a CPT contractor under
subcontract to HWA. HWA's subcontractor will provide a report summarizing
the results of the CPT soundings.
• Upon completion, CPT soundings will be backfilled in accordance with
Department of Ecology requirements and pavement surfaces will be patched with
fast -setting concrete.
Supplemental Geotechnical Engineering Analyses and Reporting
Information from HWA's field investigations, and those previously completed by
Landau will be analyzed by a geotechnical engineer from HWA to develop
geotechnical engineering conclusions, recommendations, and specifications for
design and construction of the proposed improvements. HWA will also discuss the
potential need for DSM near Piers 1 and 2 after attempting to refine the lateral earth
pressures near the south bridge abutment. HWA's field explorations, engineering
analyses, and geotechnical conclusions and recommendations will be summarized in
a draft geotechnical report. The draft geotechnical report will include the following:
Page
30
5
City of Tukwila 42nd Ave S Bridge Replacement
A site vicinity map and site plans identifying the approximate locations of the
explorations completed by HWA and Landau.
The report, prepared by HWA's subcontractor, documenting the results of the CPT
soundings.
Logs of explorations and laboratory testing previously completed by Landau.
A cross section along the bridge alignment that shows the anticipated geologic
conditions under and along the banks of the river.
A discussion of near surface soil and groundwater conditions observed along the
project alignment.
An evaluation of the liquefaction and lateral spreading hazards along the project
alignment.
Seismic design criteria in accordance with the American Association of State
Highway and Transportation Officials (AASHTO) LRFD Bridge Design
Specifications.
Geotechnical recommendations for the design of deep foundations for the proposed
replacement bridge as well as temporary foundation support for the existing bridge,
which will be used as a temporary bridge during construction of the replacement
bridge. The recommendations will include estimates of the following: tip elevation,
axial resistance, downdrag loads and loss of side resistance during seismic loading,
uplift resistance, lateral shaft analysis, and construction considerations.
Lateral earth pressure criteria for design of proposed bridge abutment walls and
permanent retaining walls, including equivalent fluid densities for the active, at -rest,
and passive states of stress.
Updated recommendations related to earth pressures acting on retaining walls and
bridge piers that will retain DSM-improved soil.
Updated lateral spreading loads acting on Pier 1, developed using limit equilibrium
analyses.
If needed, recommendations related to the potential for ground improvement near the
location of Pier 1, should the limit equilibrium analysis indicate that further reduction
of lateral loads are required.
Recommendations related to mechanically stabilized earth (MSE) walls along the
Green River Trail, which crosses beneath the southernmost bridge span.
Recommendations related to stormwater infiltration along the project alignment.
Recommendations related to design of flexible pavements.
Recommendations for design and construction of signal standard foundations at the
intersection of S 115th St and E Marginal Way S.
Recommendations for shallow foundation support, including subgrade preparation,
allowable soil bearing pressures, estimates of settlement, and soil parameters for
lateral load resistance (for use during design of proposed gateway structure).
Page
6
31
City of Tukwila 42nd Ave S Bridge Replacement
Recommendations for monitoring and testing during construction.
An appendix containing recommended specifications for construction of DSM ground
improvement at the north bridge approach.
After receipt and review of consolidated review comments from the design team, a
stamped final geotechnical report will be prepared.
ASSUMPTIONS
HWA made the following assumptions when preparing this scope of services and cost estimate:
All field tasks will be performed within or adjacent to City right-of-way. The City
will issue HWA a no cost right-of-way permit.
If it is necessary to perform field tasks outside of City right-of-way, access
permission will be obtained by others at no cost to HWA.
Due to the significance of 42nd Avenue S for freight traffic, it has been assumed that
the proposed CPT soundings will need to be completed as night work on weekdays.
HWA has assumed at least 8 hours per night will be available for on -street work.
The geotechnical field investigation will be completed under one mobilization.
The project area is assumed to be free of contamination.
Traffic control and flagging, in the form of a temporary 1-lane closure, will be
required for the proposed CPT soundings. HWA will be responsible for preparing
Traffic Control Plans (TCP). TCPs will be developed in accordance with WSDOT
standard TCPs. TCPs will be submitted to the City of Tukwila for approval and
permitting.
Traffic control will require closing the 42nd Avenue South bridge for one night.
Due to proximity to the signalized intersection of 42nd Avenue South and Interurban
Avenue S, a uniformed police officer will be required during explorations in the
vicinity of the south bridge approach.
Utility locates, completed via the Washington Utility Locate Center, will be
comprehensive and accurate enough to allow for reliable and safe location of CPT
soundings.
The City of Tukwila will allow the pavement at the CPT sounding locations to be
patched with fast -setting concrete.
Portland cement concrete pavement is not present below the asphalt concrete
pavement at the proposed CPT sounding locations (i.e., no concrete coring will be
required).
Groundwater levels at the time of the CPT soundings will be estimated based on the
CPT information that is collected.
Page
32
7
City of Tukwila 42nd Ave S Bridge Replacement
Upon completion of each CPT sounding, the soundings will be decommissioned in
accordance with the requirements of WAC 173-160.
Seismic design of the MSE wall proposed along the Green River Trail might not be
practical because it will likely be subject to liquefaction and relatively large lateral
spreading loads during the design seismic event. As such, it is assumed that seismic
design of the proposed MSE wall will not be required. If seismic design is required,
an alternative wall type will need to be considered. A budget amendment will be
required for evaluation of alternative wall types.
If the results of the additional geotechnical analyses proposed herein do not
sufficiently reduce the estimated lateral loads on Pier 1, more advanced analysis
techniques (e.g., Newmark's sliding block analysis, site response analysis, etc.) could
be performed to further refine the estimate of lateral loads. If more advanced analysis
techniques are determined to be needed, a budget amendment will be required. It will
be feasible to utilize existing geotechnical information contained in HWA's library in
developing recommendations for the proposed signal standard foundations.
Up to 16 hours has been budgeted for a Senior Geotechnical Engineer to attend
virtual meetings with the design team.
Page
8
33
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELEMENT 4 ENVIRONMENTAL PERMITTING (Supplemented)
This Work Element, performed by LAI Associates, Inc., (LAI) is supplemented to
provide environmental permitting documentation support for the National
Environmental Policy Act (NEPA), the State Environmental Policy Act (SEPA), and
local permits/approvals. Federal funding is anticipated to be administered through
WSDOT Local Programs. LAI therefore assumes that the WSDOT will be the lead
coordinator for NEPA. For the purposes of this Scope of Services, LAI assumes that
this project can be authorized under a NEPA Categorical Exclusion (CE). The
necessary work elements associated with Environmental Permitting are assumed to
be:
4.3 Team and Agency Meetings
LAI will assist in scheduling and participate in meetings, as needed, with the
AGENCY, Washington State Department of Transportation (WSDOT), US Army
Corps of Engineers (USACE), Washington Department of Natural Resources, and
Washington Department of Fish & Wildlife (WDFW) to coordinate permit conditions
for the project. This task includes bi-weekly team meetings with the City and
Consultant team.
4.6 Cultural Resources
LAI will obtain the services of a qualified cultural/historic resources subconsultant to
support historic resources mitigation in compliance with Section 106 of the National
Historic Preservation Act (NHPA). The qualified cultural/historic resources
subconsultant will assist in preparing project correspondence regarding proposed
Section 106 NHPA mitigation that will be incorporated into a Memorandum of
Agreement (MOA) between the City, WSDOT Local Programs, Washington
Department of Archaeology and Historic Preservation, and affected Tribes. Upon
execution of the MOA, the subconsultant will develop the required mitigation
documents. LAI will provide support in revising subconsultant documents for
consistency with project application materials and agency coordination..
4.7 Section 4(f) Documentation
If required, LAI will support the City in developing the WSDOT Section 4(f) matrix
that will determine the content of an Individual Section 4(f) Review report. The
matrix will present an overview of project purpose and need, Section 4(f) resources,
and a least harm analysis.
Page
34
9
City of Tukwila 42nd Ave S Bridge Replacement
Following WSDOT concurrence on the contents of the Section 4(f) matrix, Landau
will prepare a Draft Individual Section 4(f) Review report following the WSDOT
provided outline to include:
• Introduction
• Proposed Project
• Purpose and Need
• Description of 4(f) Properties
• Alternatives Analyzed (including No Build)
• Avoidance Alternatives
• Least Harm
• Measures to Minimize Harm
• Coordination
An electronic -only (MSWord) copy of the draft report will be submitted to
Consultant/DEA and the City for review. Based on Consultant/City comments, LAI
will revise the draft and prepare a pdf of the draft report for WSDOT review and
coordination. LAI will prepare a final report following receipt of comments from
WSDOT and consulting agencies. This task includes support with agency
coordination to obtain information necessary for project concurrence.
4.12 Bidding Services
This task includes effort by LAI to provide support during bidding services and is
limited to response to questions regarding peimit conditions.
Work Element 4 Assumptions:
• Team and agency meetings will occur through 2026.
• WSDOT Local Programs will prepare the Section 106 NHPA MOA.
• The deteiinination on adverse impacts to historic resources has not been
confirmed and this task includes a not to exceed fee for mitigation documentation.
A supplement may be required upon determination of mitigation required in
accordance with the Section 106 NHPA MOA.
• Consultant will provide support in providing engineering justification for
reasonable and feasible project alternatives.
• No more than two project avoidance alternatives will be evaluated.
• This task includes support in developing at least two iterations of the Section 4(f)
matrix.
• The determination on adverse impacts to all Section 4(f) resources in the project
area has not been confirmed. This task includes a not to exceed fee for
documentation in support of Individual Section 4(f) review.
• This task includes a limited not to exceed fee for bidding support. A supplement
may be required depending on the extent of support requested during bidding.
Page
10
35
City of Tukwila 42nd Ave S Bridge Replacement
Work Element 4 Deliverables:
• Meeting participation and correspondence.
• Section 106 NHPA mitigation documentation
• WSDOT Section 4(f) matrix in Excel format.
• An electronic -only (MSWord) copy of the draft Individual Section 4(f)
Evaluation Report.
• An electronic -only (Adobe Acrobat pdf) copy of the draft Individual Section 4(f)
Evaluation Report.
• An electronic -only (Adobe Acrobat pdf) copy of the final Individual Section 4(f)
Evaluation Report.
• Bidding services correspondence as requested.
Page
36
11
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELEMENT 5 BRIDGE AESTHETICS AND LANDSCAPE
ARCHITECTURE (Supplemented)
This Work Element is performed by Makers Architecture and Urban Design, LLP
(MAKERS), and a landscape architect subconsultant, (LAS) and is supplemented to
provide Bridge Aesthetics, Landscaping design, Arborist Services, and Gateway
Design. The following describes Amendment 04 for this work between
CONSULTANT and Facet (formerly DCG/Watershed,) as a landscape architect
subconsultant (hereafter referred to as LAS) to Makers Architecture and Urban
Design (SUBCONSULTANT).
Amendment 04 Scope Summary:
Amendment 04 includes services to be completed to advance Bridge Aesthetics and
Landscape Architecture, Arborist Services, and Gateway Design to 100% design. The
original project rates from 2021 are renegotiated with an anticipated completion of
scope in 2026. Scope items remaining from the agreement dated 3/13/2023, which
includes 100% plans, specifications, and estimate for Bridge Aesthetics and
Landscape Architecture, will be completed per the rates noted in this agreement.
Elements included in Amendment 04 include:
1. Updated rates for Work Element 5, Bridge Aesthetics and Landscape
Architecture
2. Arborist Services
3. 100% Gateway Design
Work Element 5. Bridge Aesthetics and Landscape Architecture
Completion of Work Element 5 scope outlined in the agreement dated 3/13/2023
using new negotiated rates.
A04.1. Tree Inventory, Impacts Assessment and Reporting
a. Inventory all significant trees (per TMC 18.06.775) located within the expanded
project (APE) area that were not inventoried as a part of Amendment 2 scope. Trees
will be tagged with a 1-1/4" aluminum tag with a unique identification number on
the trunk. Attribute information to be collected will include species, general tree
health, diameter at breast height (DBH), canopy radius (i.e. drip line) and height.
Page
12
37
City of Tukwila 42nd Ave S Bridge Replacement
All trees will be visually assessed using current Level 1 ISA standards to evaluate
current condition.
b. Trees will be identified on an annotated PDF tree sketch and attributes will be
provided on a summary table.
c. 100% site plans will be reviewed to assess anticipated impacts to individual trees
and deteiznine which trees will likely require removal.
d. The results of the additional tree inventory and impacts assessment will be included
as an update to the arborist report, or as a report addendum, provided as a part of
Amendment 2 scope.
e. Revise Arborist Report, Tree Retention and Removal Plan, and Tree Replacement
Plan per 100% site plan revisions.
Assumptions:
• Level II or Level III arborist assessment is not included.
• Access permission for the subject properties will be obtained by Consultant.
• AutoCAD file of the site survey and 100% site plan will be provided to complete
tree impacts and removal assessment and preparation of plans.
• Final Arborist Report, Tree Retention and Removal Plan, and Tree Replacement
Plan are based upon 100% site plan including any plan revisions made in response
to draft arborist report. Additional changes to the site plan affecting tree impacts
are not included and would be covered under a separate agreement.
• The budget assumes one virtual meeting with the staff/Consultant team.
Deliverables:
• Tree Inventory Map
• Tree Inventory Table
• Revised Arborist Report or Report Addendum
• Tree Retention and Removal Plan
• Tree Replacement Plan
38
Page
13
City of Tukwila 42nd Ave S Bridge Replacement
A04.3. 100% Design for Gateway Feature
a. Work up preferred alternative at 100% design level for gateway features.
Provide drawings in a format compatible with the engineering documents.
(Format provided by the engineering team.)
b. Structural design of gateway feature.
c. Coordination with electrical engineer on lighting design.
d. Attendance at 2 public meeting to present current design to the community.
e. Attendance at 1 virtual or in person meeting with the City and Duwamish Tribe
to present current design.
Assumptions:
• All lighting, electrical, or utilities work will be by Consultant.
• The budget includes presentation at 2 public meetings organized by others.
• The budget includes one virtual or in person meeting with the City and
Duwamish Tribe organized by others.
• The engineering team will provide LAS with: CAD layouts, templates and
numbering to meet the requirements of the final bid document formatting; all
background documentation stated above or that could be useful in informing
gateway feature design.
• Coordination with respective landowners and utility managers regarding
location of gateway features shall be handled by Consultant. LAS will locate
features as directed by Consultant. Relocation of features during 100% design
that results in additional coordination, redesign and/or design modification,
and/or revisions to documentation may require additional fee.
• Redesign of gateway feature elements based on city, community, landowner, or
tribal feedback during 100% design that results in additional coordination,
redesign and/or design modification, and/or revisions to documentation may
require additional fee.
Deliverables:
• 100% documents of gateway elements of the project in digital format (CAD) as
provided by the engineering team.
• Bid -ready, stamped and signed, plans, specification, and estimate in digital
format (PDF).
Page
14
39
City of Tukwila 42nd Ave S Bridge Replacement
Work Element 6 — Utility Coordination (Supplemented)
Additional Coordination with Utilities and design and analysis services include:
6.1 Utility Coordination
During initial project scoping the AGENCY believed they owned the property
between Interurban Ave and the Duwamish River. This property is owned by Seattle
City Light (SCL). This made the coordination more time consuming, will require
additional meetings beyond the original scope, and more components are included
than franchise utilities being within AGENCY owned property and being requested to
relocate. We need to follow SCL requirements on their property. With the utilities
being on a third party owned property additional coordination was needed. We have
had 11 meetings to date, the original scope was for 12, we anticipate about 28
meetings will be needed before the plans are finalized. We have had 7 utility
meetings and 4 meetings with Districts and Stakeholders relating to utilities.
Additional coordination outside of meetings is also required due to the property
ownership. To date there have been over 100 coordination emails and calls between
utilities, districts and stakeholders. It is anticipated that at least double this amount
will be needed to complete the project.
SCL process requires approval through the Seattle City Council, permanent easement
changes, temporary easements, approval of the modified Green River Trail
configuration, artwork, tree plantings, wall configurations, trail connection to 42" d
illumination, and other design elements will all need to be reviewed by the Council.
There will be additional effort required for all of these design elements to have
approval for work on SCL property. This will also include approval from various
SCL departments such as Electrical Engineering, Real Estate, Environmental
Engineering, Vegetation Management, and Technical Engineering divisions at a
minimum.
The coordination work for the temporary gas and temporary water to be hung from
the temporary bridge was assumed to not be part of the CONSULTANT scope. The
CONSULTANT will be including specifications to meet the utilities requirements as
a performance specification for the Contractor to follow.
The pressurized sewer line was not one of the 6 utilities considered in the original
scope and is an important element of the design because it is a 96" pressurized sewer
serving two entire cities and must be protected during construction. The line runs
parallel to Interurban and so it must be crossed with cranes and other construction
equipment and loads much be considered. Only the sewer line that crosses under the
Duwamish was a known utility when design began.
Page
40
15
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELEMENT 7 CONSTRUCTABILITY REVIEW, CONSTRUCTION
SCHEDULE AND ESTIMATION (Supplemented):
This work element is performed by Ott -Sakai Construction Consultants (OS), to
provide constructability review, construction schedule, and construction estimation
services, and is supplemented as follows.
The constructability had more challenges than originally envisioned like staging areas
and major utilities on the south end of the project; erection of the long girders, and
north side soil conditions.
The work element includes the following activities:
7.3 Constructability Review and Cost Estimation 90% and Pre Ad -ready
- Supplemented
OS will provide Constructability Review, Construction Schedule and Cost Estimation
of the design team's prepared Plans, Specifications & Estimate (PS&E) package at
90% and pre -Ad -ready design levels.
7.4 Project Management / Meeting Participation
This sub task includes OS's project management with CONSULTANT, various
administrative duties, and quality control. OS will participate in internal meetings
with the design team for consultation during design of the project.
Deliverables:
• Constructability Review, Construction Schedule and Cost Estimation for
supplemented 90% and pre -Ad -ready PS&E Levels
Page
16
41
City of Tukwila 42" Ave S Bridge Replacement
WORK ELEMENT 8 - T FFIC CONTROL AND TRAFFIC SIGNAL
(Supplemented):
This work element is performed by Transpo Group, Inc. (TRANSPO) to provide
traffic control, detour, and traffic signal plans for the Contractor's use in constructing
the proposed bridge and roadway improvements. The original contract is
supplemented with the following:
8.1 Traffic Analysis
No modifications and/or additions to scope.
8.2 Traffic Control
TRANSPO will prepare traffic control plans, special provisions, and engineer's
opinion of cost for constructing the proposed bridge and roadway improvements. As
noted in Supplement 02, the exact limits of the traffic control and specific plans were
unknown at the time of contracting. Supplement 02 included the following plans:
• Eight (8) short term traffic control plans
• One (1) long term traffic control plan
Since that time, the extent of traffic control needs has been further established based
on coordination with the CITY and King County, and the 90% design submittal
included the following plans:
• One (1) general notes plan
• One (1) long term traffic control overview plan
• One (1) long term traffic control plan
• One (1) long term trail plan
• One (1) detour removal plan (removing "emergency work" detour)
• Five (5) short term traffic control plans
• Four (4) traffic control detail plans
• One (5) channelization restoration plan
The plans were/will be developed to conform with MUTCD and/or WSDOT/CITY
procedures and standard plans. The Scope of Work under this Supplement 03
modifies/updates the traffic control plan deliverables.
TRANSPO will also assist the City in developing estimated travel time information
for scenarios with a temporary bridge during construction, and without a temporary
Page
42
17
City of Tukwila 42nd Ave S Bridge Replacement
bridge during construction. It is anticipated that the travel time information will be
incorporated into a PowerPoint presentation for the CITY's use.
Assumptions:
• Traffic control plans noted under Supplement 02 will not be provided.
• Traffic control plans are based on the 90% submittal package and include:
o TCP 1: General notes plan
o TCP 2: Long term plan - overview plan
o TCP 3: Long term plan - temporary staging (channelization and signing)
plans for temporary bridge bypass on 42nd Ave S between S 124th St
and Interurban Ave S.
o TCP 4: Long term plan — trail closure/diversion plan
o TCP 5: Detour removal plan
o TCP 6: Short term plan — full closure of 42nd Ave S
o TCP 7: Short term plan — full closure of Temporary 42nd Ave S
o TCP 8: Short term plan — intersection corner plan with uniformed police
officer at 42nd Ave S/Interurban Ave S
o TCP 9: Short term plan — intersection corner shoulder closure plan at
42nd Ave S/Interurban Ave S
o TCP 10: Short term plan — multiple work zone plan at 42nd Ave
S/Interurban Ave S
o TCP 11: Details — pedestrian and driveway traffic control details
o TCP 12: Details — right lane closure details
o TCP 13: Details — flagger control details
o TCP 14: Details — multi -lane closure details
o CH 1: Petuianent — channelization restoration plan for Interurban Ave S
and Macadam Road S
• Long term staging plans are not required for work at the E Marginal Way S/S
115th Street intersection.
• Short term staging plans listed above will be used for work at the E Marginal
Way S/S 115th Street intersection.
• It is assumed that others will prepare all civil -related plans for temporary traffic
control. This includes, but is not limited to, the design of temporary curbs,
sidewalks, paving, grading, utilities, drainage, structures, geotechnical design,
and related work.
• Standard traffic control plans will be used to the extent feasible.
• Traffic analysis is not included in this task.
• Virtual attendance for up to two (2) meetings with the CITY is included.
Deliverables:
• Previously submitted Traffic Control package for 90% in an electronic delivery
format (PDF)
• Responses to 90% traffic control comments
• Virtual attendance for up to two (2) meetings with the CITY
Page
18
43
City of Tukwila 42nd Ave S Bridge Replacement
• Traffic Control package for 100% in an electronic delivery format (PDF)
• Stamped and Signed Ad -ready design plans in electronic foiuiat.
• Travel time information
8.3 Traffic Signal Design (42nd Ave S/Interurban Ave S)
No modifications and/or additions to scope.
8.4 Emergency Staging Design
No modifications and/or additions to scope.
8.5 Traffic Signal Design (E Marginal Way S/S 115th St)
TRANSPO will prepare traffic signal plans, special provisions, and engineer's
opinion of cost for constructing a new traffic signal system at the E Marginal Way
S/S 115th Street intersection. TRANSPO will coordinate with Puget Sound Energy
(PSE) for new electrical service for the traffic signal system. TRANSPO will
coordinate potholing for new traffic signal poles. For estimating purposes, it is
assumed up to three (3) locations will be potholed.
Assumptions:
• Traffic analysis and/or traffic signal warrant analysis is not anticipated.
• Traffic signal poles will be mast arm style.
• Special/custom signal pole foundation design is not anticipated.
• It is assumed that others will prepare all civil -related plans. This includes, but is
not limited to, the design of curbs, sidewalks, paving, grading, utilities, drainage,
structures, geotechnical design, and related work.
• The existing E Marginal Way S bridge over the Duwamish River will not be
impacted.
• Fiber optic connection and/or interconnect design to adjacent traffic signals,
traffic operations fiber-optic network, and/or traffic management center is not
anticipated.
• Video detection will be used for vehicle detection on each intersection leg.
• Streetlights will be included on the traffic signal poles, as needed, to meet
intersection lighting requirements.
• Utility relocation design, if needed, will be prepared by others.
• Up to three (3) locations will be potholed. If additional potholes are required,
this will be provided as an additional expense. Utility potholing services will be
invoiced as a project expense. The fee for potholing provided at the time of
contracting is an estimate only. If the actual cost is higher than estimated,
TRANSPO coordinate with the CITY to discuss options. Potholing for each
location will occur under the same mobilization. Repairs for potholing will be
cold mix asphalt patch, if located within concrete sidewalk or roadway. The
CITY will not charge a permitting fee for potholing.
Page
44
19
City of Tukwila 42nd Ave S Bridge Replacement
• Virtual attendance for up to one (1) meeting with the CITY is included.
• Traffic signal plans are anticipated to include:
o TS06: Traffic Signal Plan at 1"=20' scale (1 sheet)
o TS07: Traffic Signal Field Termination Plan (1 sheet)
o TS08: Traffic Signal Pole Schedule (1 sheet)
Deliverables:
• 90%, 100%, and stamped/signed ad -ready traffic signal plans in an electronic
format (PDF).
• Responses to 90% and 100% traffic signal comments.
• Virtual attendance for up to one (1) meeting with the CITY.
• Potholing data (up to three locations, as needed).
8.6 Channelization Design (E Marginal Way S/S 115th St)
TRANSPO will prepare channelization plans, special provisions, and engineer's
opinion of cost for modifying the existing channelization at the E Marginal Way S/S
115th Street intersection to support the installation of a new traffic signal system.
Assumptions:
• Traffic analysis is not anticipated.
• The existing left turn lane storage length for southbound E Marginal Way S will
not be modified.
• Channelization improvements are anticipated to primarily include installation of
new crosswalks and stop bars, and removal of existing conflicting markings.
• Channelization plans are anticipated to include:
o CH 2: Channelization Plan (1 sheet)
Deliverables:
• 90%, 100%, and stamped/signed ad -ready channelization plans in an electronic
format (PDF).
• Responses to 90% and 100% channelization comments.
Page
20
45
City of Tukwila 42nd Ave S Bridge Replacement
WORK ELE ENT 10 HYDRAULICS & HYDROLOGY (Supplemented)
This Work Element replaces work element 10 in the original contract, is performed
by Natural Waters (NW) to provide Hydraulics & Hydrology services for the project.
The hydraulic and hydrology activities include the following subtasks:
10.01 Existing Data Review
NW will review existing available data and information that may be needed for the
hydraulic and scour evaluation. NW will request available information from the
AGENCY, such as: existing topography, aerial photos, bridge inspection records,
bridge plans, and anecdotal information on past flood events.
10.02 Site Reconnaissance
NW will conduct a site reconnaissance to examine the characteristics of the river,
bridge, and surrounding river corridor with respect to hydraulic, erosion, and scour
processes. The purpose of this reconnaissance is to understand site hydraulics and
channel conditions. It will be beneficial for NW to meet with the project surveyors
on site during the site reconnaissance to discuss where additional survey is needed to
support the hydraulic and scour analysis.
10.03 Hydrologic Review
The hydrology for the reach has been studied extensively by the US Corps of
Engineers. NW will review available information from the US Corps of Engineers, in
addition to available FEMA Flood Insurance Study (FIS) infoiination, to assess
appropriate discharges, which will serve as the basis of design for the proposed water
crossing. Anticipated flows may consist of the 2-, 10-, 50-, 100-, and 500-year flood
events.
10.04 Geomorphic Assessment
NW will conduct a rapid geomorphic assessment using newly obtained survey
information, geotechnical reports, aerial photos, and findings from the field
reconnaissance. The purpose of this assessment is to determine if there have been
significant geomorphic changes over time which will need to be accounted for in the
design of the proposed water crossing.
10.05 Hydraulics
Based on review of existing data (Task 10.1) and direction from the AGENCY on
acceptable level of risk, either an existing hydraulic model developed by the US
Page
46
21
City of Tukwila 42nd Ave S Bridge Replacement
Corps of Engineers, FEMA or another source may be used as the existing conditions
model, with minor modifications to incorporate the proposed bridge to simulate
proposed conditions. Based on the proposed crossing being located on a sharp bend,
the FHWA recommends a 2D model for assessing hydraulics at a water crossing. For
the purposes of this scope and estimate, development of a 2D model was assumed to
provide sufficient budget. All survey required for proper development of the existing
conditions hydraulic model will be performed by others and provided to NW as a
combined surface in a Land XML format in State Plane Coordinates. A proposed
combined surface, which includes the proposed bridge and grading, will be provided
by CONSULTANT in a Land XML foiuiat in State Plane Coordinates.
• Amendment 01
o The bridge design has changed since the original scope and as such
several proposed condition alternatives have been required to be
modeled to assist in the proposed project meeting FEMA no -rise
criteria. A final proposed combined surface, which includes all the
proposed project elements and grading, has been provided by
CONSULTANT in a Land XML format in State Plane Coordinates.
This final proposed combined surface will be used to finalize the 2D
hydraulic model for assessing hydraulics and scour estimates for the
final proposed design (Task 10.06).
10.06 Scour Estimates
A scour evaluation will be conducted using the hydrology and corresponding
hydraulic characteristics estimated from the hydraulic model developed in Task 10.5.
The proposed bridge is not anticipated to have any elements within the 100-yr water
surface elevation. The proposed combined surface, which includes the proposed
bridge and grading, will be provided by CONSULTANT in a Land XML format in
State Plane Coordinates. The scour estimates will be performed using this
information following the guidelines described FHWA HEC-18, 5th Edition.
10.07 Documentation
The results of the hydrologic, geomorphic, hydraulic and scour assessments will be
summarized in a brief report. The report will include a description of the physical
characteristics of the site, including photographs taken during the site reconnaissance,
along with pertinent information to support the basis of design. A draft version of the
report will be provided to CONSULTANT and the AGENCY for review and one set
of combined comments. Upon receipt of combined comments, NW will finalize the
report and submit a digital (pdf) copy, as requested by CONSULTANT and the
AGENCY.
• Amendment 01
Page
22
47
City of Tukwila 42nd Ave S Bridge Replacement
o The results from the no -rise assessment (Task 10.08) will be
summarized in the brief bridge hydraulic and scour report that includes
pertinent information to document the no -rise assessment. A separate
no -rise report is assumed to not be required.
10.08 Intentionally left blank
Amendment 01: No- Rise Assessment
The bridge design has changed since the original scope which now includes project
elements within the FEMA floodway. Since the project now includes elements within
a FEMA floodway a no -rise assessment is required. A preliminary no -rise assessment
utilizing the final proposed combined surface, which includes all the proposed project
elements and grading, provided by CONSULTANT, has been incorporated into the
2D hydraulic model developed as part of Task 10.5. The preliminary no -rise
assessment using the 2D model suggests the proposed project should meet FEMA no -
rise criteria.
The AGENCY has provided the effective FEMA 1D model to the CONSULTANT.
After review of the effective FEMA 1D model, it was recommended to the AGENCY
that the effective FEMA 1D model not be used for the no -rise assessment. The
proposed bridge is not in the best location from a hydraulics perspective due to being
on a sharp bend which does not follow the assumptions of 1D flow. This has been
verified based on the preliminary 2D hydraulic model results as the effective FEMA
1D model does not model the bridge or areas within the river bend accurately due to
flow being more 2D/3D. In addition, the cross sections that were placed in the area of
the proposed bridge by the modeler for the development of the FEMA 1D effective
model do not seem to be properly placed and there is minimal information to
determine how they were adjusted to account for the existing bridge skew. The
AGENCY corresponded with FEMA and the Department of Ecology (DOE) and
determined that the 2D hydraulic model can be used to demonstrate a no -rise for this
project. As such, this task will use the final 2D hydraulic model (Task 10.05) to
demonstrate the no -rise as it follows standard engineering practice for modeling
bridges on a skew and for rivers on sharp bends. The FEMA Effective 1D model is
inappropriate for these conditions. The 2D hydraulic model uses information from the
FEMA Effective Flood Insurance Study (FIS) dated August 19, 2020, including the
1% annual chance flood flow, floodway elevations and base flood elevations. Using
the 2D hydraulic model will also provide efficiencies by using one hydraulic model
for both the no -rise and providing hydraulic information to support the bridge design.
10.09 Permitting Assistance
NW will be available to assist with the team's preparation of peiuiit applications and
answer questions that arise during agency review.
Page
48
23
City of Tukwila 42nd Ave S Bridge Replacement
10.10 60%/90%/100% Plans Review
NW will review river related plans at the 60%, 90%, and 100% project phases.
10.11 Project Management and Meetings
Throughout the project, NW will maintain a line of communication with the
CONSULTANT team and the AGENCY through frequent meetings and e-mails.
Various team and resource agency meetings are anticipated throughout the project
delivery process. Meetings are assumed to be virtual.
• Amendment 01 — Due to a project time extension, additional hours for project
management and meetings have been added. Meetings are assumed to be
virtual. It is assumed that hydrology and hydraulics related meetings will be
end prior to June 30, 2025.
Assumptions:
• One site visit is assumed to cover all tasks.
• A no -rise assessment or no -rise certificate (if required by AGENCY) is not
assumed to be needed and therefore is not included in the scope or budget.
■ Amendment 01
• The bridge design has changed since the original scope which now
includes project elements within the FEMA floodway. A
preliminary no -rise assessment utilizing the 2D hydraulic model
developed as part of Task 10.5 has been conducted. The preliminary
no -rise assessment utilizing the final proposed combined surface,
which includes all the proposed project elements and grading,
provided by CONSULTANT, suggests the proposed project should
meet FEMA no -rise criteria. Based on coordination with the
AGENCY, the 2D hydraulic model developed as part of Task 10.5
will be used to demonstrate a no -rise.
• No CAD related services will be perfolined by NW.
• Only hydrologic and hydraulic services to support the riverine aspects of the
bridge design are assumed. No other services, such as bridge drainage and
stormwater, are assumed to be needed.
• It is assumed no scour countermeasures will be required as bridge elements,
walls, roadway prism and other transportation assets will be designed to account
for total scour without the need for a scour countermeasure. If scour
countermeasures are determined to be needed, an amendment will be required.
• No large woody material or other habitat/restoration features are anticipated for
this project. If habitat restoration features are determined to be needed, an
amendment will be required.
• No plans, specifications or estimates are assumed to be needed from NW.
• CONSULTANT team will provide required geotechnical and structural
information at scheduled time to complete hydraulics and scour related tasks.
• Only one proposed condition is scoped and budgeted to be assessed and
documented in report.
Page
24
49
City of Tukwila 42nd Ave S Bridge Replacement
■ Amendment 01
• The bridge design has changed since the original scope and as such
several proposed condition alternatives have been required to be
modeled to assist in the proposed project meeting FEMA no -rise
criteria. This amendment provides hours to model the final proposed
condition.
• Climate change is not anticipated to be accounted for in the hydrologic and
hydraulic analyses.
• Amendment 01
• AGENCY has stated climate change does not need to be accounted
for in the hydrologic and hydraulic analyses.
• It is assumed the project will have no change to the existing groundline and
therefore will meet AGENCY and FEMA no -rise criteria due to being within a
floodway. For these reasons, a CLOMR and LOMR is not within this scope or
estimate. If a CLOMR or LOMR is needed, an amendment will be required.
• Amendment 01
• The bridge design has changed since the original scope which now
includes project elements within the FEMA floodway. As such,
there are some modifications to the existing groundline which
includes but is not limited to a new trail location on the south side
of the proposed bridge, removal of existing piers and placement of
new piers and walls within the FEMA floodway. All other proposed
ground has been graded by CONSULTANT to match the existing
groundline. Based on a preliminary no -rise assessment utilizing the
final proposed combined surface provided by CONSULTANT, the
proposed project should meet FEMA no -rise criteria.
• It is assumed the AGENCY no -rise criteria and flood hazard code
requirements are equivalent to FEMA requirements.
• Based on coordination with the AGENCY, the 2D hydraulic model
developed as part of Task 10.5 will be used to demonstrate a no -rise.
For these reasons, a CLOMR and LOMR is not within this scope or
estimate. If a CLOMR or LOMR is needed, an amendment will be
required.
• A detailed lateral migration analysis will not be performed. A qualitative
assessment of lateral migration potential will be based on site observations and
surveyed ground information provided by the AGENCY.
• The US Corps of Engineers and the Effective FEMA hydraulic models will be
requested through or in collaboration with the AGENCY.
• AGENCY will pay any fees for acquiring US Corps of Engineers or FEMA
hydraulic models and any required permits.
• The number and level of detail of such tasks shall be performed by NW
commensurate with the level of effort allocated in the estimate.
• No hydraulic or scour analyses is assumed for any temporary features or work
access platforms within the 100-year WSE.
Page
50
25
City of Tukwila 42nd Ave S Bridge Replacement
Deliverables:
• Digital (pdf) copy of final bridge hydraulic and scour report.
■ Amendment 01
• The results from the no -rise assessment (Task 10.08) will be
summarized in the brief bridge hydraulic and scour report to include
pertinent infounation to document the no -rise assessment. A
separate no -rise report is assumed to not be required.
Page
26
51
City of Tukwila 42nd Ave S Bridge Replacement
Work Ele ent 12 — PS E (Supplemented)
Additional PS&E design and analysis services include:
12.3 & 12.4 100% and Bid -ready PS&E
As the project developed, new infoliiiation where available that revised the
assumptions were made in the scoping phase, which, in turn, required efforts that
were not anticipated during the scoping phase. Additional design calculations, plans,
and opinions of cost services are included in the 90% package and will be included in
future submittals. They include:
• More Challenging -than -expected geotechnical conditions
The project as scoped assumed the proposed bridge replaces the existing
structure. The geotechnical report showed a deep liquefiable at the bridge's north
end. During the foundation design, the bridge foundation would have been too
deep (approximately 130 ft deep). Structural and geotechnical engineers worked
on refining the design and reduced the pier foundation. The design requires soil
mixing ground improvement to alleviate the lateral spread risk on the bridge
piers.
• Wall 17 at the north end of the bridge
The original scope assumed the wall at the north end is a soldier wall replacing
the failed existing sheet pile wall. The new channel survey data and geotechnical
analysis showed that the slope in front of the wall (in the river stream) would be
unstable during a large seismic event; hence, the soldier pile would lose support
and fail. Any type of wall needs to be extended below the liquefied soil layer to
satisfy safety during the earthquake. The design required a complex system,
including ground improvement, a secant pile wall supporting an MSE walls at
both ends. The additional efforts are design calculations, plan preparation for the
secant pile wall and MSE wall, and corresponding moment slabs.
• Ground Improvement
Per the above design, a ground improvement by deep soil mixing is required to
support the north end of the project. The ground improvement design was not
anticipated in the original scope. The additional efforts are plan preparations and
special specifications for the ground improvement.
• Utility Coordination
Two items were changed per the new information on the utilities:
52
Page
27
City of Tukwila 42nd Ave S Bridge Replacement
a) Surveys showed another sewer line parallel to Interurban Ave and a
complex network of sewer lines at the south end of the bridge. This
required additional calculations to check construction loads on the utilities
and coordination meetings.
b) The north end of the detour bridge would have been close to the King
County Sewer Manhole. The concept of the detour bridge assumed access
of workers to the manhole, which is typical. However, during coordination
meetings, King County indicated that a crane access is required —
furthermore, they placed stringent requirement to drive pile near the sewer
line. Considering the risk of delay to the project and damage to the sewer
line, the design team has relocated the detour bridge further east of the
sewer. The new King County criteria effectively double the designed
effort of the detour bridge, which was not anticipated in the original scope.
• Complex environmental, historic, and social site
During the design phase of the project, the historic significance of the existing
bridge and the bridge site have changed. The changes required additional
construction and site studies, stakeholder meetings, and public involvement
meetings that were beyond the original scope of the project. So far, we have
studied and prepared the following reports:
a) Feasibility of rehabilitating and retrofitting the existing bridge.
b) Investigation of Impacts of Closing Traffic and Pedestrian Crossing.
c) Feasibility study of moving the existing bridge to build a new pedestrian
crossing upstream.
• Custom barrier, handrail, fence
The bridge design was scoped to have typical elements. The typical elements
have standard drawings and designs; as a result, they do not require engineering
design or full detailing. The plan preparations were also anticipated to follow the
typical drawings provided by WSDOT, where the details need to be revised to
match the project. The architectural components of the bridge have been beyond
the anticipated level. They require structural design to assure the components'
safety and performance. The custom details must be developed fully from the
start. The additional effort is in two parts:
a) The engineers need to design and stamp the barriers, rails, handrails, and
fences. The design efforts for the custom elements are beyond those
anticipated in the original scope.
b) Additional plan sheets are required to include the custom details. Plan sheets
in Section 12.4 would be revised as shown below:
Sheet Name
Original
PS&E
Revised
PS&E
Bridge Barrier details
3
3
Bridge Railing Details
1
2
Ped. Handrails on Bridge Railings Details
0
2
Page
28
53
City of Tukwila 42nd Ave S Bridge Replacement
Ped. Handrails on Bridge Barrier Details
0
2
Fall Protection Fence on Walls
0
2
Custom light pole details
0
1
• Civil 3D (C3D) modeling for no -rise calculations
It was not originally anticipated that modeling of existing or proposed conditions
above or below the road would be needed and so it was not included in the
scope. The initial scope included C3D modeling for the roadway plan and profile
design only. Since the bridge was being lengthened from its existing condition it
was assumed we would not need to create models for use by the hydraulic
engineer. Additional time required included working with the existing survey
and topography to create a "combined" EG surface, a secondary "EG" surface
which showed grades after proposed demolition in order to have a base surface
for the proposed grades to tie into, a finished grade (Fg) surface also had to be
created that had more grading than what we used for the plans as it had to extend
beyond the water surface for the hydraulic model to analyze properly. There
were also meetings and emails required to make changes to the two surfaces so
they were ready for hydraulic modeling. In addition, the no -rise condition was
not met with the initial bridge design and so the bridge was modified to a wider
span and reduced pier count to ensure a "no -rise" was obtained. This resulted in
additional meetings, emails, and effort by the civil team modeling the surfaces,
the structural team to modify the structure, and they hydraulics engineer.
• Stormwater Design Criteria Changes
Since the original scope was completed, a ruling by National Marine Fisheries
Services (NMFS) has come out regarding 6-PPDq. The original assumption was
that standard treatment and flow control measures would be required for this
project, but since the NMFS ruling it was determined that 100% infiltration is the
only option to avoid a lengthy permit review process, and additional design work
is needed to meet the updated requirements.
In addition, an updated Stormwater Management Manual for Western
Washington (SWMMWW) is anticipated in June of 2024, and the King County
Stormwater Design Manual (KCSWDM) will need to be updated in response to
the SWMMWW updates. It is unknown at this time exactly what updates will be
made to the KCSWDM, but it is anticipated that these updates will impact
treatment and flow control requirements for the federal side of permitting for this
project. These requirements are anticipated to be far more stringent that what is
currently required, and will result in additional design work.
Page
54
29
City of Tukwila 42nd Ave S Bridge Replacement
Stormwater Assumptions:
a) 100% infiltration of new and replaced PGIS will be required, or additional
(anticipated minimum 2 years) ESA review will be required.
b) Potential impacts of KCSWDM updates unknown at this time, but
anticipated to require additional design work similar to that required in
the 2024 SWMMWW, and potentially more stringent for ESA
compliance.
c) Additional modifications to the design will need to be made after 90%
based on new requirements.
• Specifications: The consultant revised all structural Contract Provisions
("Specifications") to incorporate the revised designs listed above.
• Estimate: Updated the opinion of cost to reflect new quantities from the
changes. Updated the unit cost to reflect current bidding climate.
• Internal QA/QC: An internal consultant quality assurance/quality control
review of deliverables will be conducted for each Pre -Ad Ready submittal
packages, as well as confirmation that comments received have been addressed.
A record of comments received will be maintained. Response to each comment
received will be tracked to confirm that they have been addressed.
Deliverables:
• 100% PS&E package
• Bid -ready PS&E Package
Page
30
55
Transportation & Infrastructure Services Committee Minutes February24, 2025
F. Design Contract: South Boeing Access Road Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $563,983.14 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
G. Consultant Contract: Interurban Avenue South Overlay and Repairs
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $649,418.88 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
H. Consultant Contract: Orillia Road South Overlay and Repairs
Staff is seeking approval of a contract with SCJ Alliance in the amount of $125,935.27 for
design services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
I. Supplemental Agreement: 42nd Avenue South Bridge Replacement Project
*Staff is seeking approval of Supplemental Agreement No. 5, Contract No. 20-116 with David
Evans and Associates, Inc. in the amount of $1,386,694 for the remaining design/permitting
work associated with unexpected conditions on the project.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
The meeting adjourned at 6:21 p.m.
SIT
Committee Chair Approval
Minutes by LH
56
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEMNO.
5.G.
STAFF SPONSOR: ADIB ALTALLAL
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE Water Fund — Ryan Hill Water System Connection
Project No. 92540103 — Design Contract
CATEGORY ❑ Discussion
Mtg Date
Motion
Date
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
lltg
3/3/2025
SPONSOR Council ❑Mayor ❑HR EIDCD Finance Fire ❑T5 EIP&R ❑Police ®PIS ECourt
SPoNsoR's The Ryan Hill neighborhood, which lacks access to the City's main water distribution
SUMMARY system, faces increasing water demand and vulnerability during peak events. The City
plans to construct a new water main to connect Ryan Hill to the City's system. The design
will focus on optimizing constructability while ensuring compliance with permitting
requirements. Construction is planned for 2027. The Mayor is being asked to approve the
design contract with Carollo Engineers in the amount of $601,505.00.
REVIEWED BY ® Trans&Infrastructure C CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
I"IEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$601,505.00 $1,025,000.00 $0.00
Fund Source: WATER FUND
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
CIP Sheet -Ryan Hill Water System Connection
Scope of Work & Fee Schedule
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
57
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Public Works Director
BY: Adib Altailal, Utilities Engineer
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: Water Fund — Ryan Hill Water System Connection
Project No. 92540103 — Design Contract
ISSUE
Approve a design contract with Carollo Engineers to provide design services for the Ryan Hill Water System Connection project in
the amount of $601,505.00.
BACKGROUND
The Ryan Hill neighborhood, comprising the Lower and Upper Ryan Hill Zones, is not connected to the City's main water
distribution system. It currently relies on a single water supply station with a set contractual flow rate and an emergency
intertie with Seattle Public Utilities. Future projections indicate that in the next 20 years, water demand will exceed the
available supply, and the lack of dedicated water storage leaves the area vulnerable during peak demands, fire flow events,
and emergencies. To address these challenges, the City intends to construct a new water main to connect Ryan Hill to the
rest of the City's system. This connection will enhance system reliability, improve efficiency by providing access to City water
storage, and support community growth, including housing expansion and job opportunities. The project consists of a
trenchless crossing and an open cut installation. The trenchless component will involve installing an 18-inch water main using
advanced trenchless technologies beneath Interstate 5 (1-5) and the BNSF railroad tracks. The open cut component will
extend from the eastern end of the trenchless crossing to the Ryan Hill neighborhood using traditional trenching methods.
Carollo Engineers will provide the design, permitting support, and easement acquisition assistance required for the project.
The design phase is expected to take approximately two years, with construction planned for 2027.
DISCUSSION
The design contract includes project management, alternatives analysis, preliminary (30%) design, coordination with agencies
and utilities, permitting initiation, and easement acquisition support. Carollo will evaluate multiple alignment alternatives to
determine the most feasible route. The northern alignment follows South Boeing Access Road from East Marginal Way to the
east side of 1-5. The middle alignment follows the Seattle City Light transmission corridor from East Marginal Way to Martin
Luther King Jr. Way. The southern alignment extends from 44th Avenue South and 44th Place South to the east side of Martin
Luther King Jr. Way. The design will focus on optimizing constructability while ensuring compliance with permitting
requirements.
FINANCIAL IMPACT
Carollo's design fee will be fully funded by the water fund.
Consultant Fee 2025 Design Budget
Carollo Design Contract $601,505.00 $1,025,000.00
RECOMMENDATION
The Mayor is being asked to approve the design contract with Carollo Engineers in the amount of $601,505.00 and to consider
this item on the Consent Agenda at the March 3, 2025 Regular Council Meeting
58
Attachments: CIP Sheet - Ryan Hill Water System Connection
Carollo Scope & Fee
PROJECT:
Project Manager
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINTENANCE IMPACT:
COMMENT:
FINANCIAL (in thousands
CI1
A CAPITAL PRO
2025 to 2030
Ryan Hill Water Infrastructure Upgrade:
Connect & Expand
OF TU KI
Project # 92540103
AdibAttaliat Department Water
The project will see the Ryan Hill neighborhood connected to the rest of the City's water system to create resiliency
system -wide. Boring under train tracks and a state highway will be required, as well as upgrading several critical,
undersized water mains within the neighborhood.
The Department of Health is requiring the Cityto provide storage,which Ryan Hill currently does not have access to.
Project design scheduled for2025
N/A
Improving and expanding the in
urrently sating vacant.
2025
2026
ucture in the neighborhood
2027
2028
ikely encourage the develops
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
Design
$ 25
$ 1,000
$ 25
$ 1,000
50
$ 2,000
Total Project Costs
$ 1,025
$ 1,025
$ 2,050
Project Funding
Utility Revenues
1,025
1,025
$ 2,050
Total Project Funding
$ 1,025
$ 1,025
$ 2,050
59
SCOPE OF WORK
ENGINEERING SERVICES FOR THE CITY OF TUKWILA
CONNECT RYAN HILL TO REST OF SYSTEM (TRENCHLESS)
INTRODUCTION
The City of Tukwila, referred to as"City", wants to connect the Ryan Hill neighborhood to the rest of the
City's water system. The connection will consist of two components:
• A trenchless component crossing underneath Interstate 5 (1-5) and BNSF railroad tracks.
• An open cut component from the east end of the trenchless crossings to Ryan Hill neighborhood.
The trenchless component, Connect Ryan Hill to Rest of System (Project), will include an i8-inch water
main to be installed using advanced trenchless technologies crossing underneath 1-5 and multiple BNSF
railroad tracks. The Project is expected to take approximately 2 years to complete design, permitting, and
easement acquisition activities. The construction of the project is aimed at occurring in 2027.
BACKGROUND
The Ryan Hill neighborhood, comprising the Lower and Upper Ryan Hill Zones, is not connected to the
City's main water distribution system. It relies on a single supply station (SS 169) with a contractual
flow rate of 7o gallons per minute (gpm) and an emergency intertie with Seattle. Projections show that
in zo years, water demand will exceed the contractual flow. The area also lacks water storage, making it
reliant on the supply station and emergency intertie for peak demands, fire flow requirements, and
emergencies.
Connecting Ryan Hill to the City's main water system will enhance reliability by adding a source supply and
improving efficiency through access to City storage which is vital for meeting the Washington State
Department of Health (DOH) storage requirements. This project will also have significant benefits to the
communities by supporting neighborhood growth, facilitating housing expansion and job opportunities.
The Project location is near the north end of the City in the general area of South Boeing Access Road and
Interstate 5. There are three alternatives for alignment corridors under consideration:
• The northern alignment alternative along South Boeing Access Road from East Marginal Way to
the east side of Interstate 5.
• The middle alignment alternative along the Seattle City Light power transmission corridor from
East Marginal Way to the east side of Martin Luther King Jr Way.
• The northern alignment alternative from 44th Avenue South and 44th Place South to the east side
of Martin Luther King Jr Way.
PROJECT TEAM
Carollo Engineers, Inc., (Consultant) will serve as the Prime Consultant for the Project, utilizing the following
key persons:
Key Staff
Role
Erik Waligorski
Project Manager
Wolfe Lang
Project Engineer
60
Page i of ai
Aurelie Nabonnand
Planning Liaison
Cheyenne Thompson
Permitting Lead
The following Subconsultant firms will support Consultant:
Subconsultant
Key Staff
Role
Staheli Trenchless Consultants
Kim Staheli
Agencies Coordination Lead
Jake Andresen
Trenchless Design Lead
Confluence Environmental
Company
Lisa Adolfson
Environmental Assessment/Permitting Lead
PRR, Inc.
Maria Buchanan
Community Engagement
Delve Underground
James Struthers
Geotechnical Lead
Equinox Research and
Consulting International, Inc.
Kelly Bush
Cultural Resources
KPG/Psomas
Mike Bowen
Surveying
Bryce Corrigan
Roadway Restoration/Design
CITY -PROVIDED SERVICES
• City will furnish available studies, reports, and other data pertinent to the Project.
• City will arrange for access to, and make provisions for, the Consultant to enter upon public and
private property.
• City will provide current "front-end" (Division o) documents to be used in developing the contract
documents.
• City will provide current AutoCAD standards to be used in the development of the contract plans.
• City will provide one combined set of document/plan review comments for project deliverables.
• City will locate City -owned facilities along the proposed pipeline alignments prior to survey being
completed by the Consultant.
• City will lead all right -of -entry and easement acquisition negotiations, acquire and pay for title
reports, and handle closing and payment for easements.
GENERAL ASSUMPTIONS
• Carollo Engineers and its subconsultants will be referred to as "Consultant" in this document.
• The City of Tukwila and its staff will be referred to as "City" in this document.
• Deliverables shall be provided in electronic PDF format, unless otherwise indicated. Final deliverables
will be "wet" signed and/or digitally signed in accordance with the Washington Administrative Codes
(WAC).
• Consultant shall complete the services required hereunder in accordance with the prevailing
engineering standard of care by exercising the skill and ability ordinarily required of engineers
performing the same or similar services, under the same or similar circumstances, in the State of
Washington.
• The City will furnish the Consultant available studies, reports and other data pertinent to the
Consultant's services; obtain or authorize the Consultant to obtain or provide additional reports and
data as required; furnish to the Consultant services of others required for the performance of the
Consultant's services hereunder, and the Consultant shall be entitled to use and rely upon all such
information and services provided by the City or others in performing the Consultant's services under
this Agreement.
Page 2 of as
61
• Opinions of probably costs will be based on the level of project definition and expected accuracy
range as defined by the American Association of Cost Engineers (AACE) International.
• In providing opinions of cost, financial analyses, economic feasibility projections, and schedules of
potential projects, the Consultant has no control over cost or price of labor and materials; unknown
or latent conditions of existing equipment or structures that may affect operation and maintenance
costs; competitive bidding procedures and market conditions; time or quality performance of third
parties; quality, type, management, or direction of operating personnel; and other economic and
operational factors that may materially affect the ultimate project cost or schedule. Therefore, the
Consultant makes no warranty that the City's actual project costs, financial aspects, economic
feasibility, or schedules will not vary from the Consultant's opinions, analyses, projections, or
esti mates.
• The City will arrange for access to and make all provisions for the Consultant to enter upon public and
private property as required for the Consultant to perform services hereunder.
• The project will use Consultant standard, CSI formatted specifications (6-digit, 50-division system)
for technical specifications.
• Durations for meetings, workshops, and site visits in this Scope of Services are based on estimated
time on -site. Allowances for travel time, as appropriate, are accounted for in the budget in Exhibit B.
• Meetings/workshops will be conducted at City facilities, virtually, or at a City approved location.
• The Consultant shall not be responsible for warranties, guarantees, fitness for a particular purpose,
breach of fiduciary duty, loss of anticipated profits or for economic, incidental or consequential
damages to the City or any third party arising out of breach of contract, termination, or for any other
reason whatsoever. Additionally, the Consultant shall not be responsible for acts and decisions of
third parties, including governmental agencies, other than the Consultant's subconsultants, that
impact project completion and/or success.
• The services to be performed by the Consultant are intended solely for the benefit of the City. No
person or entity not a signatory to this Agreement shall be entitled to rely on the Consultant's
performance of its services hereunder, and no right to assert a claim against the Consultant by
assignment of indemnity rights or otherwise shall accrue to a third party as a result of this Agreement
or the performance of the Consultant's services hereunder.
SCOPE OF WORK SUMMARY
The Project will be completed in three phases:
• Phase 1—Alternatives Analysis and 30% Design, Initial Permitting, Easement Acquisition Documents
• Phase 2 - Prepare 60%, go%, s00% and Bid Documents, Temporary Construction Easement
Acquisition, Permitting and Bid Services (future)
• Phase 3 — Engineering Services During Construction (future)
This Scope of Work provides for Phase 1—Alternatives analysis and 30% Design, Initial Permitting, Easement
Acquisition Documents and is divided into the following tasks:
TASK soo PROJECT MANAGEMENT
TASK 200 ALTERNATIVES ANALYSIS
TASK 30o PRELIMINARY (30%) DESIGN
TASK 40o COORDINATION w/OTHER AGENCIES and UTILITIES
TASK 50o PERMITTING INITIATION
TASK 600 EASEMENT AQUSITION INITIATION
Phase 2 — Prepare 6o%, go%, i00% and Bid Documents, Temporary Construction Easement Acquisition,
Permitting, and Bid Services will be scoped and completed when the 30% design has been completed for the
preferred alternative.
Page 3ofai
62
Phase 3 — Engineering Services During Construction will be scoped and completed when the design efforts
have been completed during Phase 2 and a Contractor has been selected.
PHASE 1 SCOPE OF WORK DETAIL
TASK 100 — PROJECT MANAGEMENT
The purpose of this task is to manage and coordinate engineering and related services required for Phase 1
Project completion in accordance with the schedule, budget, and quality expectations that are established.
Task 10o includes the following subtasks:
Subtask 110 — Project Management Plan
1. Prepare a Project Management Plan (PMP) that describes project roles and responsibilities, lists
contact information for the project team, describes communication protocols, quality management,
and includes the scope of work, schedule, and budget. Project schedule will be reviewed on a monthly
basis throughout the project to reflect current progress.
Subtask 120 - Project Monitoring and Reporting
1. Manage the Project team to track time and budget, work elements accomplished, work items
planned for the next period, level of effort, scope changes, time and budget needed to complete this
Scope of Work.
2. Prepare monthly project status reports that compare work accomplished with schedule activities and
compare expenditures with task budgets and submit reports to the City's Project Manager with
monthly invoices. Document expenditures on a task basis and show hours by project personnel and
other direct expenses related to work. Reports and invoicing will be formatted in a manner that is
acceptable to the City. With each monthly progress report, provide corrective action plans to
address schedule/budget deviations from baseline projections, if required.
3. Develop and maintain a Decision Log to record key decisions made by the City and others during
the project to document the evolution of the design.
Subtask 120 Assumptions:
1. Phase 1 duration is assumed to be six (6) months.
Subtask 130 — Project Management Meetings
1. Schedule and conduct 30-minute, bi-weekly Project Management calls throughout the duration of
the Project. Attendees will include Consultant Project Manager and Project Engineer at a
minimum. Additional staff will be invited as needed throughout the project to discuss project
status.
Subtask 13o Assumptions:
1. Bi-weekly Project Management calls will be virtual.
2. Consultant's Project Manager will lead all meetings and calls.
3. Consultant's Project Manager and Project Engineer will attend all Project Management calls. In
addition, other staff will be asked to join the calls to address the status of specific project related
tasks. For the purposes of this scope of work it is assume that three (3) Consultant's will attend the bi-
weekly calls on average.
4. No agenda or meeting minutes are anticipated for the bi-weekly project management calls. Decisions
made during the calls will be entered into the Decision Log.
Page 4of11
63
Task soo Deliverables:
z. Project Management Plan.
2. Six (6) monthly Invoices and Progress Reports.
3. Decision Log submitted at major milestones (Alternative Analysis and 30%)
TASK 200 -ALTERNATIVES ANALYSIS
The purpose of this task is to complete an alternative analysis on trenchless crossing alternatives to select the
preferred alignment, layout concepts and technologies. Alternatives will be developed for the following:
• North Alignment Alternative: Airport Way South and ramps, BNSF railroad tracks, 1-5 and
ramps.
• Middel Alignment Alternative: BNSF railroad tracks and 1-5.
• South Alignment Alternative: BNSF railroad tracks, 1-5 and Martin Luther King Jr. Way South.
Task 200 includes the following subtasks:
Subtask 210 - Kickoff Meeting and Site Visit
i. Kickoff Meeting: All key members of Consultant's team will attend this meeting. Review scope,
schedule, budget, project goals, and interim milestones. Establish City's preferred project
communications and special invoicing requests.
2. Site Visit: Attend a site visit with City's staff to review/discuss the existing water transmission system,
alignment alternative areas and associated facilities potentially impacted by this Project.
Subtask 210 Assumptions:
i. Kickoff Meeting will be held at City's office and will be attended by a minimum of one (1)
representative from each firm supporting Consultant on the project.
2. Site visit will occur immediately following the Kickoff Meeting.
Subtask 220 - Data Collection and Review
i. Data Requests: Submit data request(s) for available project documentation to support defining
existing conditions. Documentation may include but is not limited to related reports and analyses,
record drawings, geotechnical investigations, utility and franchise data, standard operating
procedures (SOPs) and other operation and maintenance records.
2. Consultant shall complete review of existing data to identify gaps in information required for the
completion of Phase i of the Project.
Subtask 230 — Preliminary Right of Way, Topography and Utility Review
s. Perform public records research of assessors maps, King County Survey Records, WSDOT Records,
and Railroad Records for the purposes of right-of-way retracement. Assess site topographic features
using published LiDAR information.
2. Conduct utility research for project area.
3. Produce preliminary base map for alternative concepts development and evaluation.
Subtask 240 — Preliminary Geotechnical Study
i. Review available geologic and geotechnical information for the project area including published
geologic soil/bedrock maps and previous geotechnical study reports for WSDOT, Seattle Public
Utility and other available information. Conduct a geologic site reconnaissance for the proposed
Page 5ofn.
64
alignment alternatives to identify site conditions and geologic features.
2. Assess the potential seismic hazards in the Project area and potential impacts for the trenchless
crossings and interties.
3. Develop a preliminary geotechnical assessment memorandum.
Subtask 25o — Preliminary Cultural Resources Risk Assessment
s. Conduct archival and background research to identify potential cultural resources impacts
that could affect the construction of the proposed improvement
2. Make recommendations for further cultural resources review and study.
3. Develop a preliminary cultural resources assessment memorandum.
Subtask 26o — Preliminary Environmental Assessments
i. Conduct a desk -top and field reconnaissance level assessment of wetlands, streams, sensitive
species, and natural resources within the project area to support the selection of preferred
alignments and to refine the study area boundary.
2. Review available government records for potential hazardous materials in soil and shallow
groundwater in the project area to determine the need for Phase I and Phase II Environmental
Site Assessments (ESA).
3. Develop a preliminary environmental assessment memorandum.
Subtask 26o Assumptions:
i. Should critical areas or their buffers be identified and potentially impacted by construction activities,
a Critical Areas report will be prepared as part of Phase 2 efforts.
Subtask 27o — Trenchless Crossing Alternative Evaluation
i. Develop a list of technically feasible alternatives to be considered, including up to three (3)
alignment alternatives (north, middle and south alignments) and up to four (4) technology
alternatives (microtunnel, auger -bore, pipe ramming and horizontal directional drilling).
2. Conduct a workshop with the City to present the proposed alternatives and to identify criteria
and weighting factors to be used as part of the alternatives analysis and selection of a
preferred alternative. City staff shall assist in development of the criteria and weighting
factors before being applied to alternatives.
3. Evaluation of alignment alternatives will be presented in a Trenchless Technical Memorandum
(TM). The evaluation will include development of construction concepts and sequences for the
considered alternatives to allow a comparative analysis between alignments and technology.
Based upon this comparison of key decision criteria (feasibility, practical application, cost, risk
profile, schedule, available contractor pool, and others determined in the course of the
evaluation). A chapter within the Basis of Design Report (BODR) will summarize the
trenchless TM conclusions, workshop results, describe design methodology, subsurface
conditions and risks, and quantitative analysis comparing impacts to existing buried and
overhead utilities, surface connections to existing header pipes, site reconstruction costs,
restrictions & permitting requirements associated with WSDOT, BNSF and other agencies,
traffic impacts, environmental and culture resources impacts, as well as construction costs
and permitting time.
4. Determine planning level costs for each alternative to be used in the selection process.
5. Complete alternatives analysis chapter within BODR and prepare a presentation of the
findings for the City.
6. Conduct an alternatives selection workshop.
Page 6 of ii
65
Subtask 27o Assumptions:
2. No alternatives beyond those identified above will be considered as part of the preliminary design.
3. No field survey works will be conducted at this stage.
4. No geotechnical field explorations will be conducted at this stage.
5. The alternatives analysis will be summarized as a chapter in in the BODR. No technical
memorandum will be generated as part of this task, only presentations which will be used for City
workshops. Notes and decisions shall be summarized following all presentations through formal
meeting minutes.
Task 200 Deliverables:
1. Meeting Materials, Agendas, and Minutes
2. Data Request (Subtask 22o)
3. Preliminary Survey Base Map (Subtask 230)
4. Preliminary Geotechnical Memorandum (Subtask 240)
5. Preliminary Cultural Resources Assessment Memorandum (Subtask 250)
6. Preliminary Environmental Assessment Memorandum (Subtask 260)
7. Trenchless Technical Memorandum (Subtask 270)
8. Alternatives Criteria Presentation (Subtask 27o)
9. Alternatives Selection Presentation (Subtask 27o)
TASK 300 — PRELIMINARY (30%) DESIGN
The purpose of this task is to establish the final project design criteria and identify the general
construction conditions for the preferred alternative identified in Task zoo. This task will develop
construction bidding documents to the 3o percent completion level. Task 30o includes the following
subtasks:
Subtask 31.o — Surveying and Utility Locating for Preferred Alignment
s. Obtain right -of -entry for accessing the Preferred Alignment for survey field works.
2. Establish a survey control network.
3. Conduct detailed utility research for project area.
4. Conduct locates of all readily available buried utilities within project area.
5. Map trees 6" diameter and larger, map wetland flagging within the proposed corridor as
identified in Task 27o.
6. Perform public records research for the purposes of right-of-way retracement.
7. Using information obtained through public records research, recover existing survey
monuments and perform right-of-way retracement and documentation of easements along
pipeline corridor.
8. Complete a topographic survey in International Foot Units for the project area. As
appropriate, for various portions of the project area, the survey may be conducted via a
combination of aerial methods, mobile laser scanning, and ground survey and will include
orthorectified photos and LiDAR data collection. Ground survey will include utility locate
paint, invert elevations of storm and sanitary structures and mapping of obscured areas to
locate critical features not visible in the aerial survey.
Page 7 of ii
66
9. Produce base map with all gathered survey data in AutoCAD CiviI3D with one foot contours.
so. In support of property/easement acquisition needs, prepare legal descriptions and exhibits.
Subtask3so Assumptions:
s. Traffic control requirements to be utilized during field investigations and data collection are included
in this task including railroad flagging in and around the BNSF railroad.
2. For the purposes of this scope of work, the survey limits are assumed to be 5o feet on either sides of
the preferred alignment.
3. Utility locating will be completed by a private locating company, except for City facilities. This work
assumes that the City will locate all City owned facilities along the proposed pipeline alignment. No
potholing will be conducted during this phase of the project.
4. Title reports cost and acquisition is not included in Tasks 30o and 600.
Subtask 32o — Basis of Design Report (3o% Design)
The purpose of this subtask is to summarize the data collected and analysis completed into a Basis of
Design Report (BODR) and to prepare the 3o% level plans and a specifications table of contents.
s. Summarize the preliminary analysis findings in a Draft BODR, including hydraulic verification,
3o% level plans, alternatives analysis, and specifications table of contents.
2. Verify hydraulic modeling and confirm sizing and hydraulic performance of the proposed
crossing.
3. Develop a list of critical facilities to be further researched during the Phase 2 Design of the
Project.
4. Develop a proposed construction schedule for the required improvements, including
permitting timelines identified in Task 500, and recommendations for construction
sequencing.
5. Identify critical utility crossings and develop a potholing plan to be executed during Phase 2 Design
of the Project.
6. Prepare an Opinion of Probable Construction Cost (OPCC) based on 3o% design documents.
7. Conduct internal QA/QC of the BODR per Task 900
8. Conduct internal QA/QC of the 3o% plans per Task goo.
9. Submit the Draft BODR/3o% Design to the City for review.
io. Conduct a BODR/3o% Design review meeting with City staff.
al. Incorporate comments and produce a Final BODR.
Subtask32o Assumptions:
i. The BODR will include a project schedule developed in conjunction with Task 500.
2. The 3o% specifications will be limited to a table of contents of required specifications.
3. Modifications to the 3o% plans and specifications table of contents will be addressed during Phase 2
Design of the project.
4. Any transportation related reporting, including but not limited WSDOT intersection control
evaluation, basis of design report, channelization plans, construction permit documentation, design
memorandums, and other associated/required documents as a result of the selected alternative will
be furnished as part of Phase 2.
5. Opinions of probable costs will be based on the level of project definition and expected accuracy
range as defined by the American Association of Cost Engineers (AACE) International.
Page 8 of ii
67
6. The OPCC generated during 30% shall be a Class 4 estimate based on AACE standards.
7. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for
potential projects, the Consultant has no control over cost or price of labor and material; unknown or
latent conditions of existing equipment or structures that may affect operation and maintenance
costs; competitive bidding procedures and market conditions; time or quality of performance of
third parties; quality, type, management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate project cost or schedule. Therefore,
the Consultant makes no warranty that the City's actual project costs, financial aspects, economic
feasibility, or schedules will not vary from the Consultant's opinions, analyses, projections, or
estimates.
Task3oo Deliverables:
i. Survey Base Map (Subtask 31.0)
2. Property/Easement acquisition document preparation and review including development of
legal descriptions and exhibits (Subtask 31.0)
3. BODR (Subtask 330)
4. 30% Plans and Specification TOC (Subtask 33o)
5. Critical Utility Crossings and Potholing Requirements
TASK 400 — INITIAL COORDINATION WITH AGENCIES AND UTILITIES
The purpose of this task is to conduct initial coordination with other agencies and utilities directly
impacted by the proposed project improvements. Task 400 includes the following:
i. Roadway/Traffic Control meetings
a. One (1) virtual design coordination meeting with WSDOT
2. Permitting Meetings
a. One (1) meeting (in -person) with WSDOT to discuss easement requirements.
b. One (1) meeting (virtual) with BNSF to discuss permitting requirements.
c. One (1) meeting (in -person) with Seattle City Light to discuss easement requirements.
d. One (1) meeting (in -person) with Seattle Public Utilities to discuss easement requirements
e. One (1) virtual meetings with Sound Transit to discuss easement requirements.
f. Two (2) meetings (virtual) with the City of Tukwila and King County to discuss land use
requirements.
Task 40o Assumptions:
z. Up to two (2) consulting team members will attend each meeting.
Task 400 Deliverables:
1. Meeting agenda, coordination materials, and minutes.
TASK 500 — PERMITTING INITIATION
The purpose of this task is to identify the permits required to complete the proposed project
improvements and initiate coordination with the corresponding agencies. Task 50o includes the
following:
1. Environmental Permitting Strategy. Consultant shall prepare an environmental permitting strategy
document to identify environmental permitting requirements for the Project. The strategy shall
incorporate the natural resource information to inform the permitting process, propose a schedule
Page 9ofil
68
for permit application submittal and approval, and identify critical path elements and risks associated
with permitting the proposed Project. Consultant shall coordinate with the project design team on
the proposed project improvements and develop a matrix of anticipated permits required for
construction. This task will include review of anticipated means of construction, environmental
impacts, and potential mitigation measures. The strategy will be based on current permitting
requirements and conversations with the relevant resource agencies to confirm permit requirements
and approach. The environmental permitting strategy shall include the following elements, as
necessary:
a. List of required permits.
b. Permitting schedule, including critical path permit tasks.
c. Anticipated information needs necessary to complete the permit application process.
d. Coordination strategy for key stakeholders.
e. Key milestones and decision points throughout the permitting process.
f. Permitting issues and requirements associated with alternative design options.
g. Anticipated permitting costs and approval timelines.
h. General mitigation requirements and opportunities.
i. Proposed permitting approach for each of the required natural resource permits.
2. Land Use Permitting Strategy. Consultant shall prepare a land use permitting strategy document to
clarify the land use permit requirements and process for the Project. The document will summarize
the major land use standards, criteria and submittal requirements for each permit and outline the
land use approval process(es), including public notice and public hearing requirements, identify the
decision makers, and describe the optimal timing of land use decisions based on construction
schedule. In addition, the land use permitting strategy will identify and describe the potential risk
and proposed approach for mitigating risks associated with land use permitting. The strategy will
outline other local government permits including, as applicable, erosion control and grading, tree
removal, and County roadway use. Consultant shall work closely with the design team to incorporate
environmental findings into the design efforts and will update the environmental and land use
strategies based on design modifications.
3. Initiate agency check -in based on alternative analysis results to refine permitting and mitigation
strategies.
Task soo Assumptions:
i. The City will take the lead role in coordinating with permitting agencies with support from the
Consultant.
2. No permit applications will be submitted as part of this Phase of the project. Applications and
associated material developed during this phase will be refined and submitted during Phase 2 of the
project.
3. Consultant shall evaluate natural resource -related considerations associated with different design
options; however, a formal environmental/permitting alternatives analysis will not be prepared for
this task.
4. An evaluation of the potential climate change impacts associated with the Project will not be
conducted.
5. Wetland and/or stream mitigation design will not be developed during this phase of the project;
however, potential mitigation needs will be identified and high-level cost estimates developed.
Task soo Deliverables:
Page io of n
69
i. Environmental and Land Use Permitting Strategy.
2. Preparation of a permitting acquisition schedule.
TASK 600 — EASEMENT ACQUISITION INITIATION
The purpose of this Task is to identify required permanent or temporary easements required for the
construction of the proposed improvements. Task 600 includes the following:
i. Research project alignment and identify potential permanent and temporary easements required
for the construction of the proposed improvements.
2. Prepare programming estimate.
Task 600 Assumptions:
1. The Project will not require any land use applications/actions.
z. City will pay for all title reports.
Task 600 Deliverables:
i. Easement and Property Acquisition Requirement Memorandum.
70
Page ii of n
City of Tukwila
Connect Ryan Hill to Rest of System
Phase 1 LOE
1/23/2025
TASK /DESCRIPTION
PM
Waligorski
QM
Avon
PE
Lang
Planning
Nabbonand
Permitting
Thompson
DP
Mettox
CAD/GIS
Varies
Staff
En g
Nasser
Total Carollo
Hours
Carollo Labor
Cost
Sub Fee
OTHER DIRECT COSTS
TOTAL COST
Sub Markup PECE
10% $15.00
Expenses
Total Labor Rate
$ 330.00
$ 360.00 $ 290.00
$ 260.00
$ 260.00
$ 150.00
$ 160.00
$ 175.00
Task 100 - Project Management
110
Project Management
12
16
8
8
44
$ 11,880
$ 3,310
$ 331 $ 660
$ 16,181
120
Project Monitoring and Reporting
24
12
12
6
54
$ 15,420
$ 4,859
$ 486 $ 810
$ 21,575
130
Project Management Meetings
6
12
3
3
24
$ 7,020
$ 10,041
$ 1,004 $ 360
$ 500
$ 18,925
.. .. .. Task 900
42
.0.
40
3""
". 23
14 "
0
..
0
.122."
$ 34,320.00
$" 10.209.87
"$ 1,020:99.$ t,830.00
"#..500.00"
$ "56,680.86
Task 200 - Alternatives Analysis
210
Kickoff Meeting and Site Visit
4
8
4
4
20
$ 5,720
$ 9,423
$ 942 $ 300
$ 500
$ 16,885
220
Data Collection and Review
2
16
8
2
8
36
$ 9,080
$ 10,315
$ 1,031 $ 540
$ 20,966
230
Preliminary ROW, Topography, & Utility Review
2
8
2
16
28
$ 6,080
$ 11,296
$ 1,130 $ 420
$ 18,926
240
Preliminary Geotechnical Study
8
2
8
18
$ 4,020
$ 17,860
$ 1,786 $ 270
$ 23,936
250
Preliminary Cultural Resources Risk Assessment
4
8
12
$ 3,240
$ 5,601
$ 560 $ 180
$ 9,581
260
Preliminary Environmental Assessments
4
8
12
$ 3,240
$ 6,770
$ 677 $ 180
$ 10,867
270
Trenchless Crossing Alternative Evaluation
24
16
40
8
24
12
80
24
228
$ 52,400
$ 29,204
$ 2,920 $ 3,420
$ 1,000
$ 88,944
" .. ' Task 200"
." 32 `.
"16
98
20. "..
44
18
80 " "
:
". 56"
3S4
$ 83.7$0.00.
$ '90,468.25.
$ 9,046.83" $" 5;310.00
S. 1.500.00
"$ 190,105.08
Task 300 - Preliminary (30%) Design
310
Surveying & Utility Locate (Preferred Alignment)
4
16
2
8
30
$ 7,660
$ 74,608
$ 7,461 $ 450
$ 90,179
320
Basis of Design Report(30% Design)
40
24
120
60
24
300
120
688
$ 144,840
$ 15,826
$ 1,583 $ 10,320
$ 1,000
$ 173,569
" "' : Task 300
44
", 24. ""
136
." "0 ::
60
26
"" 300
"
"-128 "
718 " "
$ " 152 600.00
$ 90,434.17
$ . 9043.42 $ ." 10,170,00
$" 1,000.00
$ 263,747.59
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
2
8
2
4
16
$ 3,980
$ -
$ - $ 240
$ 500
$ 4,720
Permitting Meetings
12
28
40
8
8
96
$ 25,080
$ 12,137
$ 1,214 $ 1,440
$ 39,871
" 'Task460
" 14
D "
36 "
" 0
. 40
... 10 " .
0 ..
.
12 ."
.. 112
$ " 29,060.00"
"$ 12,13712
$ .1,213.71 "$".. 1,680.00
$".. " 500.00
$ . 44,590.83
Task 500 - Permitting Initiation
Environmental Permitting Strategy
2
8
12
22
$ 6,100
$ 4,710
$ 471 $ 330
$ 11,611
Land Use Permitting Strategy
2
8
24
2
8
44
$ 10,920
$ -
$ - $ 660
$ 11,580
. . " " Task 5041
. 4 ..
...: 0 "
16 " "
1}
. 36 "
2 "
0 .,
$
66 ...
$ . 17,020.00 "
4 " 4,716.00
$ . 471,00 $ 990.00
"$ -"
$ ."23.191.00
Task 600 - Easement Acquisition Initiation
Easement Identification
2
8
8
16
34
$ 7,860
$ -
$ - $ 510
$ 8,370
Programming Estimate
4
8
40
52
$ 14,040
$ -
$ - $ 780
$ 14,820
.
.. "" Task 600"
6.
..0.. .
"i6."
.. 0
48
0
" 0
16
.- 86 ." $" .21,900.00 $ -.
.$ ":- : $ 1,290.00.
$ ` -"
$ 23,i90.00
Total
8 . 601,105
or -Ca: off
1
City of Tukwila
N Connect Ryan Hill to Rest of System
Phase 1 LOE
Staheli Trenchless Consultants
1/23/2025
TASK/ DESCRIPTION
Role Role
Role Role
Total Labor Rate
ake Andresen Kimberlie Staheli Pradip Kandel Heidi Howard
245.00 $ 325.00 $ 190.00 $ 150.00
Total Hours
Labor Cost
Expenses
TOTAL COST
Task 100 - Project Management
110 Project Management
120 Project Monitoring and Reporting
130 Project Management Meetings
Task 200 - Alternatives Analysis
210 Kickoff Meeting and Site Visit
220 Data Collection and Review
230
240
250
260
270
Preliminary ROW, Topography, & Utility Review
Preliminary Geotechnical Study
Preliminary Cultural Resources Risk Assessment
Preliminary Environmental Assessments
Trenchless Crossing Alternative Evaluation
Task 200
Task 300 - Preliminary (30%) Design
310 Surveying & Utility Locate (Preferred Alignment)
320 Basis of Design Report (30% Design)
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
Permitting Meetings
Task 500 - Permitting Initiation
Environmental Permitting Strategy
Land Use Permitting Strategy
Task 600 - Easement Acquisition Initiation
Easement Identification
Programming Estimate
Task 300
Task 400
Task
Task 600
40 22 18
10
10
0
0
0
0
0
0
0
86
94
4,560
4,560
4,560.00 $ $ 4,560.00
2,280
$ 21,270
23.550.00
8,320
4,230 $
4,230.00
80
0.00
160
60.00
2,360
21,270
23,630.00
8,320
8,320.00
City of Tukwila
Connect Ryan Hill to Rest of System
Phase 1 LOE
Confluence Environmental
1/23/2025
TASK / DESCRIPTION
Sr. Permitting Lead Sr. Biologist Planner Staff Scientist GIS Editor Accounting
Ado son McArthur Duffy Wolf Huynh Hoff Burton
Total Labor Rate
285.00 $ 205.00 $ 175.00
105.00
65.00
120.00
0.00
Total Hour
bor Cos
Expenses
TOTAL COST
Task 100 - Project Management
110
120
130
Project Management
Project Monitoring and Reporting
Project Management Meetings
Task 100
6
5
1
7
0
13
5
$ 2,760
1,425
4,185.00
$ 2,760
$ 1,425
$ 4,185.00
Task 200 - Alternatives Analysis
210 Kickoff Meeting and Site Visit
220 Data Collection and Review
230 Preliminary ROW, Topography, & Utility Review
240 Preliminary Geotechnical Study
250 Preliminary Cultural Resources Risk Assessment
260 Preliminary Environmental Assessments
270 Trenchless Crossing Alternative Evaluation
Task 200
6
2
2
6
16
2
12
8
8
20
20
1,710
3,700
6,770
1,710
890.00
$ 1,710
$ 3,700
6,770
1,710
890.00
Task 300 - Preliminary (30%) Design
10 Surveying & Utility Locate (Preferred Alignment)
20 Basis of Design Report (30% Design)
Task 300
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
Permitting Meetings
Task 500 - Permitting Initiation
Environmental Permitting Strategy
Land Use Permitting Strategy
Task 400
Task 50
980
980.00
980
980.00
Task 600 - Easement Acquisition Initiation
Easement Identification
Programming Estimate
Task 600
Total
cgr—c iiio
City of Tukwila
Connect Ryan Hill to Rest of System
Phase 1 LOE
Delve Underground
1/23/2025
TASK / DESCRIPTION
Principal Principal Associate Associate Project Role
Struthers Duvel Cordes Pinske Dayley Adniin
Total Labor Rate
284.31 $ 271.93 $ 190.34 $ 213.52 $ 143.06 $ 105.00
Total Hours
abor Cos
Expenses
TOTAL COST
Task 100 - Project Management
110
120
130
Project Management
Project Monitoring and Reporting
Project Management Meetings
Task 100
8
3
6
17
2
8
5
8
21
2,274
1,063
1,992
329.39
$ 2,274
$ 1,063
$ 1,992
$ 5.329.39
Task 200 - Alternatives Analysis
210 Kickoff Meeting and Site Visit
220 Data Collection and Review
230 Preliminary ROW, Topography, & Utility Review
240 Preliminary Geotechnical Study
250 Preliminary Cultural Resources Risk Assessment
260 Preliminary Environmental Assessments
270 Trenchless Crossing Alternative Evaluation
Task 200
4
4
13
6
27
8
21
29
4
11
4
9
12
52
4
3
4
28
0
100
0
0
12
144
1,137
5,231
17,796
3,104
27,267.81
80
64
44.00
$ 1,217
$ 5,231
$ 17,860
$ 3,104
$- _27,411.81
Task 300 - Preliminary (30%) Design
310 Surveying & Utility Locate (Preferred Alignment)
320 Basis of Design Report (30% Design)
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
Permitting Meetings
Task 500 - Permitting Initiation
Environmental Permitting Strategy
Land Use Permitting Strategy
Task 600 - Easement Acquisition Initiation
Easement Identification
Programming Estimate
0
24
24
5,127
.12
80
0.00
2,826
2,826.17
5,207
5,207.12
Total $ 40,774
Iv
City of Tukwila
Connect Ryan Hill to Rest of System
Phase 1 LOE
Equinox Research Consultants Inc (ERCI)
1/23/2025
TASK / DESCRIPTION
Role Role Role Role Role Role Role
Name Name Name Name Name Name Name
Total Labor Rate
9.87 $ 83.92 $ 74.60 $ 68.38
Total Hours
abor Cost
Expenses
TOTAL COST
Task 100 - Project Management
110 Project Management
120 Project Monitoring and Reporting
130 Project Management Meetings
Task 100
2
2
2
2
0
$ 280
$ 280
280
280
Task 200 - Alternatives Analysis
210
220
230
240
250
260
270
Kickoff Meeting and Site Visit
Data Collection and Review
Preliminary ROW, Topography, & Utility Review
Preliminary Geotechnical Study
Preliminary Cultural Resources Risk Assessment
Preliminary Environmental Assessments
Trenchless Crossing Alternative Evaluatior
Task 200
Task 300 - Preliminary (30%) Design
310 Surveying & Utility Locate (Preferred Alignment)
320 Basis of Design Report (30% Design)
Task 300
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
Permitting Meetings
Task 400
Task 500 - Permitting Initiation
Environmental Permitting Strategy
Land Use Permitting Strategy
Task 600 - Easement Acquisition Initiation
Easement Identification
Programming Estimate
4
8
12
30 8 20
0
20
0
0
559
5,601
60.
559
$ 5,601
6,160.44
6,719.92
accaroi!o-
1
City of Tukwila
Connect Ryan Hill to Rest of System
Phase 1 LOE
KPG - Psomas
1/23/2025
TASK / DESCRIPTION
Survey Manager Transpotation Engineer Project Surveyor II Surveyor III Survey Crew Il Survey Cre
Mike Bowen Bryce Corrigan Ron Reichel Chris Johnson TBD TBD
Total Labor Rate
252.00 $ 195,00 $ 173.00 $ 144.00 $ 272.00 $ 214,00
Total Hours
bor Cos
Expenses
TOTAL COST
Task 100 - Project Management
110 Project Management
120 Project Monitoring and Reporting
130 Project Management Meetings
Task 100
Task 200 - Alternatives Analysis
210 Kickoff Meeting and Site Visit
220 Data Collection and Review
230 Preliminary ROW, Topography, & Utility Review
240 Preliminary Geotechnical Study
250 Preliminary Cultural Resources Risk Assessment
260 Preliminary Environmental Assessments
270 Trenchless Crossing Alternative Evaluation
Task 200
Task 300 - Preliminary (30%) Design
310 Surveying & Utility Locate (Preferred Alignment)
320 Basis of Design Report (30% Design)
Task 300
Task 400 - Coordination w/ Agencies & Utilities
Roadway/Traffic Control Meetings
Permitting Meetings
Task 400
Task 500 - Permitting Initiation
Environmental Permitting 5trategy
Land Use Permitting Strategy
Task 500
Task 600 - Easement Acquisition Initiation
Easement identification
Programming Estimate
3
3
10
16
8
72
0
0
0
16
3
3
2
8
24
24
8
8
16
24
24
24
8
32
40
40
80 100 80
0
100
0
40
40
756
756
2,064
76.00 $
3,576
1,384
11,296
$ 3,120
9,376.00
64,608
4,680
69,288.00
$ 10,000
0,000.00
$ 756
756
2,064
576,00
3,576
1,384
11,296
3,120
9
$ 74,608
$ 4,680
$ 79,288.00
1,560
560.00
C 'ca: iiio
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
February 24, 2025, 5:30 p.m. - Hybrid Meeting; City Council Conference Room & MS Teams
Councilmembers Present Jovita McConnell, Chair; Hannah Hedrick, Mohamed Abdi
Staff Present Pete Mayer, Griffin Lerner, Catrien de Boer, Shawn Christie, Laurel
Humphrey, Brandon Miles, Adib Altallal, David Baus
Guests Laura Maman, Justine Kim, John Palewicz, Ryan Duckworth, Mike Herzog
1. BUSINESS AGENDA
A. Tukwila Maintenance and Operations East Campus Project Update
Staff and consultants presented an update on the project's revised scope.
Committee Recommendation
Discussion only. Forward to March 10, 2025 Committee of the Whole.
B. Bid Award: S. 149th St & S. 150th Watermain Replacement
Staff is seeking approval of a construction contract with Pape & Sons Construction, Inc. in the
amount of $1,214,012.98.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
C. Design Contract: Ryan Hill Water System Connection
Staff is seeking approval of a contract with Carollo Engineers in the amount of $601,505.00
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
D. Project Completion: 2024 Overlay and Repair
Staff is seeking approval of contract completion and release of retainage with ICON Materials,
Inc. in the final amount of $867,537.54.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
E. Consultant Contract: 2025 Annual Overlay Program
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $487,198.99 for
design and construction management services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
77
78
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.H.
STAFF SPONSOR: ADIB ALTALLAL
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE Water Fund — S 149th & S 150th Watermain Replacement
Construction Bid Award
CATEGORY ❑ Discussion
Mtg Date
7 Motion
Mtg Date
7 Resolution
Mtg Date
Ordinance
Mtg Date
Bid
Award
3/3/25
Public Hearing
Mtg Date
Other
Mtg Date
Mtg Date
SPONSOR ❑Council ❑Mayor ❑HR EIDCD Finance ❑Fire ❑T5 EIP&R ❑Police ®PIS ❑Court
SPoNsoR's The City received nine bids with the lowest bidder being Pape & Sons Construction, Inc in
SUMMARY the amount of $1,214,012.98. The project will involve the removal, relocation and
installation of new water mains. The Mayor is being asked to approve the construction
contract with Pape & Sons Construction, Inc. in the amount of $1,214,012.98.
REVIEWED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
FIEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,214,012.98 $2,035,000.00 $0.00
Fund Source: WATER FUND
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
CIP Sheet - S 149th & S 150th Watermain Replacement
Bid Tabulation List
Pape Construction Contract
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
79
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Services Committee
FROM: Pete Mayer, Interim Public Works Director
BY: Adib Altailal, Utilities Engineer
CC: Mayor Thomas McLeod
DATE: February 21, 2025
SUBJECT: Water Fund — S 149th & S 150th Watermain Replacement
Project No. 91640103 — Construction Bid Award
ISSUE
Approve a construction contract for the S 149th & S 150th Watermain Replacement project to the lowest responsible bidder in the
amount of $1,214,012.98.
BACKGROUND
The existing water mains in the project area are undersized and have reached the end of their useful life. One of these mains
runs between two residential properties, posing a significant risk of property damage in the event of a failure. The project will
decommission this segment to eliminate the risk of flooding to the affected homes. The new water main will be rerouted to
Macadam Road to ensure service reliability while mitigating future risks to private properties. The existing cast iron pipes are
more susceptible to failure, while the new ductile iron pipes will enhance system resilience, reliability, and reduce long-term
maintenance needs.
DISCUSSION
This project involves the removal of the outdated water mains and the installation of new, properly sized ductile iron pipes
along a safer alignment. The scope of work includes excavation, pipe installation, service reconnections, testing, and surface
restoration. By relocating the main away from private properties, the project will reduce the risk of property damage due to
pipe failure, improve water flow and pressure in the service area, and decrease the likelihood of emergency repairs and
associated costs. The lowest responsible bidder was Pape & Sons Construction, Inc. with a bid amount of $1,214,012.98,
which is within the project budget.
FINANCIAL IMPACT
The construction contract will be fully funded by the water fund. We received nine total bids for this project, which is the highest
turnout for a CIP in recent memory. The bids represented a wide range, with the engineer's estimate at $1,737,513 and bid
amounts spanning from $1,214,012.98 to $1,839,269.18, as detailed in the attached bid tabs.
Construction Fee 2025 Budget
Construction Contract $1,214,012.98
Contingency (20%) $242,802.60
Total $1,456,815.58 $2,035,000.00
RECOMMENDATION
The Mayor is being asked to approve the construction contract with Pape & Sons Construction, Inc. in the amount of
$1,214,012.98 and to consider this item on the Consent Agenda at the March 3, 2025 Regular Council Meeting.
Attachments: CIP Sheet - S 149th & S 150th Watermain Replacement, Bid Tabulation List, Pape Construction Contract
(Bid Package)
80
PROJECT:
Project Manager
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINTENANCE IMPACT:
COMMENT:
FINANCIAL (in thousands)
CI.
OF 'Mk
A CAPITAL PRO
2025 to 2030
S 149th and S 150th St Watermain Replacement Project#
Ac#ib Altallal
Design and Construct 1,400 LF of 12" DI watermain along S 149th St and S 150th St. The dead end main will also be
extended to Macadam Rd.
92340102
Department Water
The existing watermain is reaching its useful fife and does not meet Department of Health or fireflow requirements.
Design almost complete, construction 'expected in 2025. Ea
aintenance should be decreased.
The project will improve the quality and
maintenance needs.
2025
2026
2027
uisitions may be needed:
fthe water, Looping of the existing dead end main
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
Design
Land (R/W)
Construction Mgmt.
Construction
$ 25
$ 50
$ 10
$ 200
$ 1,750
Total Project Costs
Project Funding
Utility Revenues
$ 2,035
$ 2,035
Total Project Funding
$ 2,035
$ 25
$ 50
$ 10
$ 200
$ 1,750
$ 2,035
$ 2,035
$ 2,035
81
CITY OF TUKWILA
PROPOSAL
(unit price)
Contractor's Name PAPE & SONS CONSTRUCTION, INC
Contractor's State License No. PAPESI*204DE
City of Tukwila Project Nos. 923 401 02
To the Mayor and City Council
City of Tukwila, Washington
The undersigned (Bidder) hereby certifies that they personally examined the location and
construction details of Work outlined in the Contract Documents for the City of Tukwila (Owner)
project titled S 149TH AND S 150TH STREET WATERMAIN REPLACEMENT, which project
includes, but is not limited to;
Construction of approximately 1,600 linear feet o 8-inch tactile iron vvaterrnain on S 149TH
Street and S 150th Street along with hydrants, valves, services, and other appurtenances. The
work also includes replacement of one 8-inch check valve vault assembly, connections to the
existing water system, trench repair, newADA ramp and sidewalk improvements, and HMA
grind and overlay.
The undersigned further certifies that they have read and thoroughly understand these
Documents which govern all Work embraced in this improvement and the methods by which
payment will be made for said Work, and thoroughly understands the nature of said Work; and
hereby proposes to undertake and complete all Work embraced in this improvement in
accordance with these Contract Documents and at the following schedule of rates and prices.
The Bidder understands that the quantities mentioned herein are approximate only and are
subject to increase or decrease, and hereby proposes to perform all quantities ofwork as either
increased or decreased in accordance with the Contract Documents.
As evidence of good faith, (check one) 'bid bond or 0 cash, 0 cashier's check, 0 certified
check, or 0 postal money order made payable to the City of Tukwila equal to five percent (5%)
of the Total Bid Price is attached hereto. Bidder understands that, should this offer be accepted
by Owner within ninety (90) calendar days after the day of Bid Opening and the Bidder fails or
refuses to enter into an Agreement and furnish the required Payment and Performance Bond
and liability insurance within ten (10) calendar days after Notice of Award, the Contract shall be
null and void and the Bid Deposit or Bond accompanying this Proposal shall be forfeited and
become the property of Owner as liquidated damages, all as provided for in the Bid Do uments.
Bidder shall attain physical completion of all Work in all respects within 12vvorking aYa from
the date stated in the written Notice to Proceed. If the work is not completedis time
period, Bidder shall pay liquidated damages to Owner as specified in Section 1-08.9 of the
Standard Specifications for every calendar day work is not PhYsicallY Complete after the
expiration of the Contract time stated above. In addition, Bidder shall compensate Owner for
actual engineering inspection and supervision costs and any other legal fees incurred by Owner
as a result of such delay.
S 149TH AND 515(TTH
VVATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY2025
?rovi.B.2 to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF TUKWILA
S 149TH AND S 150TH STREET WATERMAIN REPLACEMENT
PROJECT NUMBER 923 401 02
Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where
conflict occurs between the unit price and the total amount specified for any item, the unit price
shall prevail, and totals shall be corrected to conform thereto.
BID SCHEDULES
SCHEDULE
ITEM
NO.
A:
tyry
'''''
ROADWAY
ITEM
DESCRIPTION
UNIT
UNIT
PRICE
TOTAL
AMOUNT
Al
1
MOBILIZATION, 10% MAX.
LS
1
$42,000.00
$42,000.00
A2
1
CLEARING AND GRUBBING
LS
1
S7,000E00
$7,000 00
A3
1
REMOVAL OF
STRUCTURES AND
OBSTRUCTIONS
LS
1
$9,000.00
$9,000.00
A4
2,827
REMOVING ASPHALT CONC.
PAVEMENT
SY
2,827
$16.00
$45,232.00
A5
267
CRUSHED SURFACING BASE
COURSE
TN
267
$40.00
$10,680.00
A6
13
CRUSHED SURFACING TOP
COURSE
TN
13
$40.00
$520.00
A7
1
STORMWATER DISPERSAL
TRENCH
LS
1
$8,500,00
$8,500.00
A8
2,683
PLANING BITUMINOUS
PAVEMENT
SY
2,683
$6.00
$16,098.00
A9
1,112
HMA CL. 1/2 IN. PG 58H-22
TN
1,112
$175.00
$194,600.00
Al0
1,027
ASPHALT CONCRETE BARRIER
CURB
LF
1,027
$4.00
$4,108,00
All
77
TOPSOIL TYPE A
TN
77
$80.00
$6,160.00
Al2
1
EROSION/WATER POLLUTION
CONTROL
FA
1
$34,154
$34,154
A13
STEEP SLOPE LANDSCAPE
RESTORATION
LS
$7,500.00
$7,500.00
A14
331
RESTORE LANDSCAPE TO
EXISTING CONDITION
SY
331
$38.00
$12,578.00
A15
192
CEMENT CONC. TRAFFIC CURB
AND GUTTER
LF192
$32.00
$6,144.00
Al6
74
CEMENT CONC. TRAFFIC CURB
LF
74
$32.00
$2,368,00
A17
53
CEMENT CONC. PEDESTRIAN
CURB
LF
53
$32,00
S1,696.00
A18
195
PLASTIC CROSSWALK LINE
SF
195
$11.00
$2,145.00
149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
83
CITY OF TUKWILA
A19
78
PLASTIC STOP LINE
LF
78
$17.00
51,326.00
A20
1,928
PLASTIC LINE
LF
1,928
$6.00
$11,568.00
A21
1
PLASTIC TRAFFIC ARROW
EA
1
$450.00
S450.00
A22
3
PLASTIC ACCESS PARKING
SPACE SYMBOL
EA
3
$450.00
$1,350.00
A23
54
RAISED PAVEMENT MARKER
TYPE 1
EA
54
$9.00
$486.00
A24
25
RAISED PAVEMENT MARKER
TYPE 2
EA
25
$14.00
$350.00
A25
1
PERMANENT SIGNING
LS
1
$1,750.00
$1,750.00
A26
1
PROJECT TEMPORARY
TRAFFIC CONTROL
LS
1
$46,000.00
$46,000.00
A27
32
SPEED BUMP
LF
32
S65.00
$2,080.00
A28
1
TYPE B PROGRESS SCHEDULE,
MIN. $10,000
LS
1
$1-0,000.00
$10,000.00
A29
11
STRUCTURE EXCAVATION
CLASS B INCL. HAUL
CY
11
$50.00
$550.00
A30
20
CONTROLLED DENSITY FILL
CY
20
$150.00
53,000.00
A31
1
ROADWAY SURVEYING
LS
1
$9,000.00
$9,000.00
A32
1
ADA FEATURES SURVEYING
LS
1
$900.00
S900.00
A33
2
MONUMENT CASE AND COVER
EA
2
$3,500.00
$7,000.00
A34
69
CEMENT CONC. SIDEWALK
SY
69
$90.00
$6,210.00
A35
1
CEMENT CONC. CURB RAMP
TYPE A SINGLE DIRECTION
EA,
1
$4,500.00
$4,500.00
A36
1
CEMENT CONC. CURB RAMP
TYPE A PARALLEL
EA
1
$4,500.00
$4,500.00
A37
1
CLEANING EXISTING DRAINAGE
STRUCTURE
LS
1
$1,000.00
$1,000.00
A38
1
HEALTH AND SAFETY PLAN
LS
1
$6,000.00
$6,000.00
A39
1
MINOR CHANGE
FA
1
$50,000
$50,000
A40
1
SPCC PLAN
LS
1
$750.00
$750.00
A41
2
CONNECTION TO DRAINAGE
STRUCTURE
EA
2
$2,000.00
$4,000.00
A42
4
ADJUST STRUCTURE
EA
4
$1,000.00
$4,000.00
A43
1
RECORD DRAWINGS, MIN.
$10,000
LS
1
$10,000.00
$10,000.00
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
84
CITY OF TuKwILA
A44
1
STORMWATER. POLLUTION
PREVENTION PLAN (SWPPP)
LS
1
$1,250.00
$1,250.00
SUBTOTAL, SCHEDULE A
$598,503.00
Washington State Sales Tax (0°I°, Per
State Sales Tax - Rule 171)
0.00
TOTAL SCHEDULE A
$598,503.00
* Denotescontingent items ofiwork per
pecial Provisions Section 1-04.4
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
85
CITY OF TUKWILA
SCHEDULE
ITEM
NO.
B:
.
QTY
WATER MAIN '
. '
ITEM
DESCRIPTIONJ
UNIT
UNIT
PRICE
TOTAL
AMOUNT
B1
1
MOBILIZATION, 10% MAX.
LS
1
$22,000.00
$22,000.00
$3,500.00
B2
50
UNSUITABLE
FOUNDATION
EXCAVATION INCL,
HAUL
CY
50
$70.00
B3
3
COMB. AIR RELEASE/AIR
VACUUM VALVE ASSEMBLY 1
IN.
EA
3
$4,800.00
$14,400.00
B4
5
HYDRANT ASSEMBLY
EA
5
$10,000.00
$50,000.00
$48,400.00
B5
22
SERVICE CONNECTION 3/4 N.
DIAM.
EA
22
$2,200.00
B6
7
SERVICE CONNECTION! 1 IN.
DIAM.
EA
7
$2,900.00
$20,300.00
B7
64
DUCTILE IRON PIPE FOR
WATER MAIN 6 IN. DIAM.
LF64
$141.00
$9,024.00
B8
1,662
DUCTILE IRON PIPE FOR
WATER MAIN 8 IN. DIAM.
LF
1,662
$141.00
S234,342.00
$27,000.00
B9
12
GATE VALVE 8 IN.
EA
12
$2,250.00
B10
4
CONNECTION TO EXISTING
WATERMAIN
EA
4
$1 ,500.00
$46,000.00
811
1
CHECK VAL\/E VAULT
EA
1
$41,000.00
S41,000EOO
$15,500.00
B12
1
REMOVAL OF EXISTING WATER
MAIN
LS
1
$15,500.00
B13
8,292
SHORING OR EXTRA
EXCAVATION TRENCH
SF
8,292
$0,25
$2,073.00
$25,000
B14
1
MINORCHANGE
FA
$25,000
SUBTOTAL, SCHEDULE B
$558,539.00
Washington State Sales Tax (10.2%)
$56,970.98
TOTAL SCHEDULE B
$615,509.98
* Denotes contingent items of work per Special Provisions Section 1-04.4
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
86
CITY OP TUKWILA
TOTAL SCHEDULE A
TOTAL SCHEDULE B
TOTAL A OUNT (SCHEDULES A AND B).
598,503.00
S615, 509.98
S1,214,012.98
Total Bid Price in
Words: One million, two hundred fourteen thousand,
twelve dollars and ninety eight cents
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
87
OW OF TUKWILA
Bids Submitted on Computer Printouts
Bidders, at their option, in lieu of handwriting in the unit prices in figures in ink on the Bid forms
above, may submit an original computer printout sheet with their bid, as long as the following
requirements are met:
1. Each sheet of the computer printout must contain the exact same information as shown on
the hard -copy bid form — Project Name, Schedule Name, column headings — in the order
shown, totals, etc.
2. The computer printout of the Bid Proposal must have the exact certification language shown
below, signed by the appropriate officer of the firm.
3. If a computer printout is used, the bidder must still execute that portion of the unit price Bid
form which acknowledges the Bid Guaranty, Time of Completion, and all addenda that may
have been issued, etc.
If any of these things are missing or out of order, the bid may be rejected by the Owner.
The unit and lump sum prices shown on acceptable printouts will be the unit prices used to
tabulate the Bid and used in the Contract if awarded by the City. In the event of conflict between
the two, unit Bid prices will prevail over the extended (Total) prices. If the Bid submitted by the
bidder contains both the form on these Bid Proposal sheets, and also a computer printout,
completed according to the instructions, the unit bid prices shown on the computer printout will
be used to determine the bid.
Put this certification on the last sheet of the Bid computer printout, and sign:
(YOUR FIRM'S NAME) certifies that the unit prices shown on this complete computer print-out for
all of the bid items contained in this Proposal are the unit and lump sum prices intended and that
its Bid will be tabulated using these unit prices and no other information from this print-out. (YOUR
FIRM'S NAME) acknowledges and agrees that the total bid amount shown will be read as its total
bid and further agrees that the official total Bid amount will be determined by multiplying the unit
Bid prices shown in this print-out by the respective estimated quantities shown on the Bid form
then totaling all of thexte9ed amounts.
Signed:
Title: PRESIDENT - JAMES PAPE - PAPE & SONS CONSTRUCTION, INC
Date: JANUARY 29, 2025
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
,rovi4943to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF TUKWILA
By signing below, Bidder acknowledges receipt and understanding of the following Addenda to
the Bid Documents:
Addendum Addendum
No. Date of Receipt No.
1 1/27/2025 3
2 1/27/2025 4
Date of Receipt
NOTE: Failure to acknowledge receipt of Addenda may be considered as an irregularity in
the Bid Proposal and Owner reserves the right to determine whether the bid will be
disqualified.
By signing below, Bidder certifies that Bidder has reviewed the insurance provisions of the Bid
Documents and will provide the required coverage.
It is understood that Owner may accept or reject all bids.
The Surety Company which will furnish the required Payment and Performance Bond is:
SWISS RE COPORATE SOLUTIONS 95 SOUTH JACKSON ST, SUITE 100
AMERICAN INSURANCE CORPORATION of SEATTLE. WA 98104
(Name) (Address)
Bidder: PAPE & SONS CONSTRUCTION, INC
Signature of Authorized Official:
Printed Name and Title: JAMES PAPE
Address:
9401 BUJACICH ROAD, STE 1A, GIG HARBOR, WA 98332
Check One: El Individual El Partriership State of Incorporation:
WA
L Joint Venture Corporation
Phone No.: 253-851-6040 Date: JANUARY 29, 2025
This address and phone number is the one to which all communications regarding this proposal
should be sent.
NOTES:
1. If the Bidder is a co -partnership, give firm name under which business is transacted;
proposal must be executed by a partner. If the Bidder is a corporation, proposal must be
executed in the corporate name by the president or vice-president (or any other corporate
officer accompanied by evidence of authority to sign).
2. A bid must be received on all items. If either a unit price or an extension is left blank (but not
both) for a bid item, the Owner will multiply or divide the available entry by the quantity, as
applicable, and enter it on the bid form. If there is no unit price or extension for one or more
bid itern(s), the proposal will be rejected.
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
,rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
8 9
CITY OF TUKWILA
BID SECURITY
Bid Deposit: The undersigned Principal hereby deposits a Bid Deposit with the City of Tukwila
in the form of a cash deposit, certified or cashier s check, or postal money order in the amount
of dollars
($
-- OR --
Bid Bond: The undersigned, Pape & Sons Construction, Inc.
(Principal), and Swiss Re Corporate Solutions America Insurance Corporation (Surety), are held and firmly
bound unto the City of Tukwila (Owner) in the penal sum of
Five Percent of the Total Amount of Bid (5%) dollars
($ 5% ), which for the payment of which Principal and Surety bind themselves,
their heirs, executors, administrators, successors and assigns, jointly and severally. The liability
of Surety under this Bid Bond shall be limited to the penal sum of this Bid Bond.
Conditions: The Bid Deposit or Bid Bond shall be an amount not less than five percent (5%) of
the total bid, including sales tax and is submitted by Principal to Owner in connection with a
Proposal for S 149TH AND S 150TH STREET WATERMAIN REPLACEMENT, Project No. 923
401 02, according to the terms of the Proposal and Bid Documents. Now therefore,
a. If the Proposal is rejected by Owner, or
b. If the Proposal is accepted and Principal shall duly make and enter into an Agreement with
Owner in accordance with the terms of the Proposal and shall furnish a bond for the
faithful performance of said Project and for the payment of all persons performing labor or
furnishing materials in connection therewith, with Surety or Sureties approved by Owner,
then this Bid Security shall be released; otherwise it shall remain in full force and effect and
Principal shall forfeit the Bid Deposit or Surety shall immediately pay and forfeit to Owner the
amount of the Bid Bond, as penalty and liquidated damages.
The obligations of Surety and its Bid Bond shall be in no way impaired or affected by any
extension of time within which Owner may accept bids; and Surety does hereby waive notice of
any such extension.
Signed and dated this 27th day of January
Pape & Sons Construction, Inc.
P ci
--Sigriature of Authorized Official
ere6 (1 (z, frier
Title
Name and address of local office of
agent and/or Surety Company:
20 25
Swiss Re Corporate Solutions America Insurance Corporation
Surety
By
Daphne Roberts Attorney in Fact
(Attach Power of Attorney)
Acrisure Northwest
1901 40th Ave VV #440
Lynwood, WA 98036
Surety companies executing bonds must appear on the current Authorized Insurance List in the State of
Washington per Section 1-02.7 of the Standard Specifications
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
rovidaPto Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
SWISS RE CORPORA I E SOLUTIONS
SWISS RE CORPORATE SOLUTIONS AMERICA INSURANCE CORPORATION ("SRCSAIC")
SWISS RE CORPORATE SOLUTIONS PREMIER INSURANCE CORPORATION ("SRCSPIC")
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, THAT SRCSAIC, a corporation duly organized and existing under laws of the State of Missouri, and
having its principal office in the City of Kansas City, Missouri, and SRCSPIC, a corporation organized and existing under the laws of the State of
Missouri and having its principal office in the City of Kansas City, Missouri, each does hereby make, constitute, and appoint:
THOMAS P. HENTSCHELL, BRADLEY A. ROBERTS, JOANNE REINKENSMEYER, KRISTIN JACKSON,
DAPHNE ROBERTS, DANIELLE BRYANT and BAILEY BEACH
JOINTLY OR SEVERALLY
Its true and lawful Attomey(s)-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies, as surety, on contracts of suretyship as are or may be required or permitted by
law, regulation, contract or otherwise, provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of:
FIFTY MILLION ($50,000,000.00) DOLLARS
This Power of Attomey is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both SRCSAIC and SRCSPIC at meetings duly called and held on the 91-h of May 2012:
"RESOLVED, that any two ofthe President, any Managing Dircctor, any Senior Vice President, any Vice President, the Secretary or any Assistant
Secretary be, and each or any of them hereby is, authorized to execute a Power of Attomey qualifying the attorney named in the given Power of
Attorney to execute on behalf of the Corporation bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to
attest to the execution of any such Power of Attorney and to attach therein the seal of the Corporation; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Corporation may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Corporation when so affixed and in the future with reaard to any bond, undertaking or contract of surety to which it is attached."
OS° OSS PREO;
Ap...b;?..P 0 R4
i=e•
s E
.7.0%
1973 By
, s o/ ••••
• ... • • • c4"s's
t%c.',Noss * *
',II/1111111111W 4,0,1,111111100
By
David Satory, Senior Vice President of SRCSAIC & Senior Vice President of SRCSPIC
Gerald Jagrowski, Vice President of SRCSAIC& Vice President of SRCSPIC
IN WITNESS WHEREOF, SRCSAIC and SRCSPIC have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized
officers this 25TH day of SEPTEMBER , 20 24
State of Illinois
County of Cook
Swiss Re Corporate Solutions America Insurance Corporation
Swiss Re Corporate Solutions Premier Insurance Corporation
On this 25TH day of SEPTEMBER , 20 24 , before me, a Notary Public personally appeared David Satory Senior Vice President of SRCSAIC
and Senior Vice President of SRCSPIC and Gerald Jagrowski , Vice President of SRCSAIC and Vice President of SPCSPIC, personally known to me, who
being by me duly sworn, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act
and deed of their respective companies.
-- -. • —61f ZIA/4Z ' - - - 4
KAREN M SAWN
AM/r., SUM yi Ilyne
CoMmimes, M) 9301
My CAMMIW. Emmy Sniverbm 111 7
Karen N .nseda, Notary
I, Jeffrey Goldberg, the duly elected Senior Vice President and Assistant Secretary of SRCSAIC and SRCSPIC, do hereby certify that the above and foregoing
is a true and correct copy of a Power of Attorney given by said SRCSAIC and SRCSPIC, which is still in full force and effect.
IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 27th day of January , 20
Jeffrey Goldberg, Senior Vice President &
Assistant Secretary of SRCSAIC and
SRCSPIC
91
CITY OF TUKW/LA
NON -COLLUSION DECLARATION
STATE OF WASHINGTON
) ss,
COUNTY OF KING
The undersigned, being first duly sworn, on oath states that the person, firm, association,
partnership, joint venture, or corporation named in the Bid Proposal has (have) not, either
directly or indirectly, entered into any agreement, participated in any collusion, or otherwise
taken any action in restraint of free competitive bidding in connection with the City of Tukwila
project named S 149TH AND S 150TH STREET WATERMAIN REPLACEMENT, Project No,
923 401 02.
PAPE & SONS CONSTRUCTION, INC
Name of Firm
ature of Authorized Official
PRESIDENT - JAMES PAPE
Title
SEAL
Signed and sworn to before me:
Dated
EN p
(Signature)
•
•c,
JANUAR
9, 2025
— n • sz NOT :
= c
= —II PUBLIC • Z
''.:•;1";%*•.°0 ,k i 0:
%.• A. .
%41,1" r.tfe CI
WAS'
11111111‘‘‘
KATH LE
N FA E IRISH
(Print Narne)
Notary Public in and for the State
of WASHINGTON
Commission
Expires: MARCH 26, 2028
S 149TH AND. S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
Drovi92to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa,com - Always Verify Scal
CITY OF TUKWILA
To report bid rigging activities call:
NOTICE TO Ail_ BIDDERS
1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll -free "hotline" Monday
through Friday, 8;00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid
rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such
activities.
The "hotline" is part of LJSDOT's continuing effort to identify and investigate highway
construction contract fraud and abuse and is operated under the direction of the USDOT
Inspector General. All information will be treated confidentially and caller anonymity will be
respected.
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
?rovided to Builders Exchange of WA, Inc, For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
93
CITY OF TUKWILA
RESPONSIBLE BIDDER DETERMINATION FORM
Attach additional sheets as necessary to fully provide the information required.
Name of Bidder: PAPE & SONS CONSTRUCTION, INC
Address of Bidder: 9401 BUJACICH ROAD, STE 1A
GIG HARBOR, WA 98332
City State Zip Code
Contractor's License No. PAPESI*204DE WA State UBI No. 600 291 966
Dept. of L8,1
License Bond Registration No, 2273368 Worker's Comp. Acct. No, 378,813-00
Bidder is a(n): L Individual E. Partnership Joint Venture
Incorporated in the state of WASHINGTON
List business names used by Bidder during the past 10 years if different than above:
N/A
Bidder has been in business continuously from 1973
Year
Bank Reference US BANK GIG HARBOR - KARA 253-858-8008
Bank Account Officer Officer's Phone Na
No. of regular full-time employees: 23
Number of projects in the past 10 years completed: 75 ahead of schedule 75 on schedule
0 behind schedule
Bidder has had experience in work comparable to that required for this Project:
As a prime contractor for 51 years.
As a subcontractor for 51 years.
List the supervisory personnel to be employed by the Bidder and available for work on this
project (Project Manager, Principal Foreman, Superintendents, and Engineers):
How Long
Name With Bidder
SEE ATTACHMENT "A"
Name the Surveyor to be used on this Project, who will directly supervise all surveying activities.
Attach a resume outlining the experience and qualifications of the Surveyor. Is the Surveyor
licensed in the State of Washington (a PLS)? Yes fl No
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
?roviiI4 to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF TUKWILA
Surveyor's Name: AMERICAN SURVEYING & ENVIRONMENTAL. LLC
List all those projects, of similar nature and size, completed by Bidder within the past 10 years.
Include a reference for each. Any attached preprinted project listing must include all this
information. Bidder must have at least 10 years' experience working on projects of similar
nature and size.
Year Contract Owner/Reference
Proiect Name Completed Amount Name and Phone
SEE ATTACHMENT "B"
List all projects undertaken in the last 10 years which have resulted in partial or final settlement
of the Contract by arbitration or litigation in the courts:
Name of Client and Project
N/A
Total Claims Amount of
Contract Arbitrated Settlement
Amount or Litigated of Claims
Bidder, or any representative or partner thereof, ever failed to complete a contract?
No I] Yes If yes, give details: N/A
Hs Bidder ever had any Payment/Performance Bonds called as a result of its work?
IV No ri Yes If yes, please state:
project Name
N/A
Contractina Party Bond Amount
S 149TH AND S 150TH
WATERMA1N REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
95
CITY OF TUKVVILA
Bidder ever been found guilty of violating any State or Federal employment laws?
No LI Yes If yes, give details: N/A
Has Bidder ever filed for protection under any provision of the federal bankruptcy laws or state
insolvency laws? No ri Yes If yes, give details: N/A
Has any adverse legal judgment been rendered against Bidder in the past 5 years?
No I— Yes If yes, give details: N/A
Has Bidder or any of its employees filed any claims with Washington State Workman's
Compensation or other insurance comps y for accidents resulting in fatal injury or
dismemberment in the past 5 years? No Yes If yes, please state:
-
Tvoe of Iniury Aaencv Receiving Claim
N/A
The undersigned warrants under penalty of Perjury that the foregoing information is true and
accurate to the best of his/her knowledge. The undersigned authorizes the City of Tukwila to
verify all information contained herein.
Signature of Bidder„ --
Title: PRESIDENT - JAMES PAPE
Date: JANUARY 29, 2025
S 149TH AND S 150TH
WATERmAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
?roviliOto Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CIT' OF TUKWILA
CERTIFICATE OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that, within the three-year period immediately preceding the bid
solicitation date, January 29, 2025, the bidder is not a "willful" violator, as defined in RCW
49.48.082, of any provision of Chapters 49.46, 49.48, or 49.52 RCW, as determined by a final
and binding citation and notice of assessment issued by the Department of Labor and
Industries or through a civil judgement entered by a court of limited or general jurisdiction.
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is
true and correct.
Bidder's Busine Name E & SONS CONSTRUCTION, INC
SignaturgPi Authorized Official*
JAMES PAPE
Printed Name
PRESIDENT
Title
JANUARY 29, 2025
Date
Check One:
Sole Proprietorship El
GIG HARBOR WA
City State
Partnership ri Joint Venture Corporation IY/
State of Incorporation, or if not a corporation, State where business entity was formed:
WASHINGTON
If a co -partnership, give firm name under which business is transacted:
N/A
*If a corporation, proposal must be executed in the corporate name by the president or vice-
president (orany other corporate officer accompanied by evidence of authority to sign). lf a co-
partnership, proposal must be executed by a partner.
S 149TH AND S 150TH
VVATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
97
ashington State
partment of Transportaton
Contractor Certification
Wage Law Compliance - Responsibility Criteria
Washington State Public Works Contracts
FAILURE TO RETURN THIS CERTIFICATION AS PART OF THE BID PROPOSAL PACKAGE WILL
MAKE THIS BID NONRESPONSIVE AND INELIGIBLE FOR AWARD
I hereby certify, under penalty of perjury under the laws of the State of Washington, on behalf of the firm
identified below that, to the best of my knowledge and belief, this firm has NOT been determined by a final
and binding citation and notice of assessment issued by the Washington State Department of Labor and
Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully
violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three
(3) years prior to the date of the Call for Bids.
Bidder Name:
PAPE & SONS CONSTRUCTION, INC
Name of Contractor/Bidder- Print full legal entity name of firm
—Signature of authorized person
Title: PRESIDENT
JAMES PAPE
Print Name of person making certifications for firm
Place: GIG HARBOR, WA
Title of person signing certificate Print city and state where signed
Date: JANUARY 29, 2025
Form 272-009
17
Provi
o Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
CITY OF TUKWILA
PROPOSED EQUIPMENT AND LABOR SCHEDULE
(Use additional sheets if required)
Equipment to be used:
DESCR1PTION/TYPE
YEAR
CONDITION
OWN/RENT
SEE ATTACHMENT "C"
Labor to be used: SEE ATTACHMENT "D"
PAPE & SONS CONSTR C310N, INC
me
nature of Authorized Official
PRESIDENT - JAMES PAPE
Title
S 149TH AND S 150TH
INATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
99
CITY OF TUKWILA
PROPOSED SUBCONTRACTORS
Name of Bidder PAPE & SONS CONSTRUCTION, INC
In accordance with RCW 39.30.060 as amended, every bid that totals $1 million or more shall
include below the names of the subcontractors with whom the Bidder, if awarded the contract, will
subcontract for performance of the work of: structural steel installation, rebar installation,
electrical, heating, ventilation, air conditioning and plumbing as described in RCW 18.106 and
electrical as described in RCW 19.28, and, or to name itself for the work. The Bidder shall not list
more than one subcontractor for each category of work identified, unless subcontractors vary with
bid alternates, in which case the Bidder must indicate which subcontractor will be used for which
alternate. Failure of the Bidder to submit as part of the bid the names of such subcontractors or to
name itself to perform such work or the naming of two or more subcontractors to perform the
same work shall render the prime contract bidder's bid nonresponsive and, therefore, void. Prime
Contractor must declare if they intend to perform any of these items.
The successful Bidder must have the written permission of the Owner to make any change to
this list.
Percent of total bid to be performed by Bidder 83 %
Schedule/Bid Item Numbers
Name Subcontractor will perform
AMERICAN SURVEYING & ENVIRONMENTAL, LLC A31, A32, A33
NW TRAFFIC, INC
BECKER BLACKTOP LLC
% of
Total Bid
1%
A18. A19. A20, A21, A22, A23, A24, A27 1%
A8, A9, A10, A27 13%
FOUR SEASONS CONCRETE CONSTRUCTION, LLC A15, A16, A17, A34, A35, A36 2%
WORK TO BE PERFORMED BY PRIME CONTRACTOR
ALL OTHER BID ITEMS NOT LISTED ABOVE 83%
S 149TH AND S 150TH
WATERMAIN REPLACEMENT
PROJECT NUMBER 916 401 03
JANUARY 2025
Provide o Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
BOARD RESOLUTION OF PAPE & SONS CONSTRUCTION, INC. FOR
SIGNING AUTHORITY
DULY PASSED ON April 2, 2021
RESOLVED, that the following shall having signing authority on behalf of the company,
subject to subsequent revocation or limitation by James Pape:
1. James Pape
2. Jeanette Pape
3. Chris Pape
4. Brad Appleman
5. Phil Sagen
It is hereby certified by the undersigned that the foregoing resolution was duly passed by
the Board of Directors of the above -named Company on the 2" day of April, 2021, in
accordance with the Memorandum or By -Laws and Articles of Incoiporation of the
Company and the laws and by-laws governing the Company and that the said resolution
has been duly recorded in the Minute Book and is in full force and effect.
--TAMES PAPE - DIRECTOR
1 0
MINUTE
SPECIAL MEET G OF S HOLDERS
OF
PAPE & SONS CONSTRUCTION, INC
A special meeting of the Shareholders has been called. A quorum was present as all
shareholders were present. The purpose of said meeting was to conduct election of officers.
The majority of votes carried as follows.
It has been addressed, ordered and agreed as follows.
1. James Pape is elected as President.
2. Jeanette Pape is elected as Secretary/Treasurer.
3. Chris Pape is elected as Vice -President.
4. Brad Appleman is elected as Assistant Vice -President.
5. Phil Sagen is elected as Assistant Secretary.
Agreed and approved this 8th day of October, 2020.
PAPE & SONS CONSTRUCTION,
By:
pe, President and Director and Majority Shareholder
102
103
BACKGROUND & EXPERIENCE OF PRINCIPAL INDIVIDUALS AVAILABLE
ATTACHMENT "A"
James Pape — President - Owner
40 yrs. With Pape & Sons Construction, inc.
Jeanette Pape —Secretary/Treasurer-
9 yrs. With Pape & Sons Construction, Inc:
Christopher Pape- Vice President
14 yrs. With Pape & Sons Construction, Inc.
Phil Sagen — Project Manager —
17 yrs. With Pape & Sons Construction, Inc.
Brad Appleman — GM/Project Manager
18 yrs. With Pape & Sons Construction, Inc
Jeff Tomasovich — Foreman Operator
29 yrs. With Pape & Sons Construction, Inc
Bryan Hughes — Foreman Operator
24 yrs. With Pape & Sons Construction, Inc
Eric Anderson — Foreman Operator
14 yrs. With Pape & Sons Construction, Inc
Bookkeeping/Admin =
Pipelayers = 3
Operators =6
41 years in underground utilities.
Superintendent for projects.
34 years assisting accounting dept. and
office personnel.
14 years in underground construction.
Laborer/Pipelayer/Operator
18 years in underground construction.
Manages projects and estimates.
19 years in underground construction.
Manages projects and estimates.
41 years in underground construction.
Foreman - Operator
25 years in underground construction.
Foreman — Operator
19 years in underground construction.
Foreman — Operator
Truck Drivers = 1
Flaggers = 1
Laborers = 3
Mechanics = 1
Updated 4/22/2024
104
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"B
Amount of
Contract
Project Manager Project Name
Completion
Date
Owner or Representative
$6,608.72
Brad Appleman SEWER SPOT REPAIRS
124-2 PRIVATE
Dec-24
WOLLOCHET HARBOR SEWER DISTRICT
PO BOX 2166
GIG HARBOR, WA 98335
253-265-0265
$15511.40
Brad Appleman DIRECTIONAL DRILL @ PIONEER WAY
865 PRIVATE
Dec-24
CITY OF ORTING
PO BOX 489
ORTING, WA 98360
360-893-9039 STEVE DASKAM
$425,532.07
Brad Appleman MCCORMICK WOODS WELL #11 SITE IMP:
861
Subcontractor to JMG
Nov-24
CITY OF PORT ORCHARD
216 PROSPECT STREET
PORT ORCHARD, WA 98366
360-876-4407
$23,820.58
Brad Appleman EMERGENCY WATERMAIN REPAIRS
124-3
Oct-24
BELFAIR WATER DISTRICT #1
PO BOX 563
BELFAIR, WA 98528
360-275-3008 JIM FREEMAN/DALE WEBB
$31,337.43
Phil Sagen WATER METER EXCHANGES
875
Sep-24
CITY OF FIRCREST
115 RAMSDELL ST
FIRCREST, WA 98466
JEFF DAVIS - 253-238-4137
$3,854,760.00
Brad Appleman NBK REPAIR & REPLACE SEWERW INFRASTRUCTURE
802 SUB TO MACNAK
CONTRACT # N4425517D4013-N4425519F4319
Sep-24
NAVFAC NW PUBLIC WORKS DEPT KITSAP
MACKNAK CONSTRUCTION, LLC
CHESTER BERGNER
253-212-2378
$68,284.20
Brad Appleman FIR MEADOWS WATERMAIN PO#13034
877 PRIVATE
Sep-24
WA WATER SERVICE COMPANY
4531 INTELCO LOOP SE, SUITE 3
LACEY, WA 98503
253-320-1631 JOHN PUCCINELLI
$8,153.20
Brad Appleman WHITE CLOUD SEWER SPOT REPAIRS
124-1 PRIVATE
Aug-24
WOLLOCHET HARBOR SEWER DISTRICT
PO BOX 2166
GIG HARBOR, WA 98335
253-265-0265
$140,495.31
Brad Appleman SOUTH ORCHARD ST WATER MAIN REPLACEMENT
876
Aug-24
CITY OF FIRCREST
-115;RAMSDELL ST
FIRCREST, WA 98466
JEFF DAVIS - 253-238-4137
$1,074,444,15
Phil Sagen WATER RENEWAL & REPLACMENT PROJ #6
864 PRIVATE
Jun-24
SPANAWAY WATER COMPANY
PO BOX 1000
SPANAWAY, WA 98387
253-531-9024 TIM WELLS
$488,904.38
Brad Appleman HERONSWOOD GARDEN WATERMIAN EXTENSION
$70
Jun-24
PORT GAMBLE S'KLALLAM TRIBE
31912 LITTLE BOSTON RD NE
KINGSTON, WA 98346
MIKE ROREM 206-930-3229
$33,305.25
Brad Appleman 108 131stSTREET FIRE LINE
873 PRIVATE
Jun-24
PARKLAND LIGHT & WATER
PO BOX 44426
TACOMA, WA 98448
253-531-5666 DALE BUDZINSKI
$748,233.66
Brad Appleman SOUTHWOOD 204TH WATERMAIN PO#12615
867 PRIVATE
Apr-24
WA WATER SERVICE COMPANY
4531 INTELCO LOOP SE, SUITE 3
LACEY, WA 98503
253-320-1631 JOHN PUCCINELLI
$4,227,126.89
Brad Appleman SANITARY SEWER PUMP STATION & SANITARY SEWER
839
Mar-24
MASON COUNTY PUBLIC WORKS
PO BOX 1850
SHELTON, WA 98584
RICHARD DICKINSON 360-427-9670
$1,568,80591
Phil Sagen PAULSON RD POTABLE & RECYCLED WATER MAIN
860
Apr-24
SILVERDALE WATER DISTRICT #16
PO BOX 493
SILVERDALE, WA 98383
MICHAEL PLEASANTS 360-447-3513
$6,75000
Brad Appleman SPSCC INFRASTRUCTURE PUMP LIFT STATION
123-12 SUB TO SOURCE ELECTRIC
Apr-24
ENTERPRISE SERVICES, WASH STATE DEPT
PO BOX 41476
OLYMPIA, WA 98504
STACY SIMPSON 360-349-2341
$1,605,190.04
Phil Sagen SCHEDULE A DISTRIBUTION REPLACMENT
862
Apr-24
WESTERN RANCHETTES INC
15914 748TH AVE CT E
PUYALLUP, WA 98375
RYAN FRANK 360-876-0958
105
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"B
Amount of
Contract
Project Manager
Project Name
Completion
Date
Owner or Representative
$262,389.46
Phil Sagen
2022 AC WATER MAIN
863 PRIVATE
Feb-24
FRUITLAND WATER DISTRICT
4001 9TH ST SW
PUYALLUP, WA 98373
253-848-5519 TED HARDIMAN
$12,152.00
Brad Appleman
HWY 300 WATER SERVICE REPLACMENT
869 PRIVATE
Feb-24
BELFAIR WATER DISTRICT#1
PO BOX 563
BELFAIR, WA 98528
360-275-3008 JIM FREEMAN/DALE'WEBB
$137,370.67
Brad Appleman
ARDMORE WHITMAN WATERMAIN #879
868
Feb-24
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499
JAMES DEAN - 253-588-4423
$442,682.70
Brad Appleman
GLEN ALDER WATERMAIN REPLACEMENT
850
Dec-23
THURSTON COUNTY PUD
1230 RUDDELL RD SE
LACEY, WA 98503
KIM GUBBE - 360-357-8783 EXT125
$486811.96
Brad Appleman
LAKE JOSEPHINE COUNTRY CLUB WATERMAIN
857
Nov-23
LAKE JOSEPHINE WATER DEPARTMENT
11016 COUNTRY CLUB DR
ANDERSON ISLAND, WA 98303
RUSS RODOCKER - 253-884-4093"
$132,412.43
Phil Sagen
EVERGREEN SHORES WATERMAIN REPLACEMENT
859 PRIVATE
Oct 23
WASHINGTON WATER COMPANY
PO BOX 336
GIG HARBOR, WA 98335
JOHN PUCCINELLI, PE 360-437-2042
$1,440,519.01
Brad Appleman
.
MANORWOOD WATER MAIN REPLAC. PHASE 2 & 3
852
Nov-23
CITY OF PUYALLUP
333 S. MERIDIAN
PUYALLUP, WA 98371
MICHELLE GEHRING 253-841-5579
$604,533.47
Phil Sagen
CANYON RD E WATERMAIN REPLACEMENT
854 PRIVATE
Sep-23
WASHINGTON WATER COMPANY
PO BOX 336
GIG HARBOR, WA 98335
JOHN PUCCINELLI, PE 360-437-2042
$81,279.07
Brad Appleman
WICKS LAKE RANCHES WATERMAIN RELOCATION
851 PRIVATE
Aug-23
WASHINGTON WATER COMPANY
PO BOX 336
GIG HARBOR, WA 98335
JOHN PUCCINELLI, PE 360-437-2042
$1,037,540.50
Phil Sagen
KPUD LUD #40 BILL POINT WATER PART 1
847
Aug-23
Kitsap PUD#1
PO Box 1989
Poulsbo, WA 98370
PETER DRESSEL 360-626-7746
$188,612.86
Phil Sagen
STORMWATER PRETREATMENT OUTFALL
844
Jun-23
CITY OF FIRCREST
115 RAMSDELL ST
FIRCREST, WA 98466
TYLER BEMIS- 253-238-4134
$41,450.90
Phil Sagen
FIRCREST ROSE ST WATERMAIN
855
Jun-23
CITY OF FIRCREST
115 RAMSDELL ST
FIRCREST, WA 98466
JEFF DAVIS - 253-564-8900
$555,193.45
Phil Sagen
KPUD LUD # 40 BILL POINT WATER PART 2
849
May-23
Kitsap PUD #1
PO Box 1989
Poulsbo, WA 98370
PETER DRESSEL 360-626-7746
$4,080.00
Phil Sagen
KPUD WATER SERVICE CONNECTIONS
123-16
Apr-23
Kitsap PUD #1
PO Box 1989
Poulsbo, WA 98370
BILL W H ITELEY- 360-779-4078
$1,056,735.07
Brad Appleman
NAOMILAWN NEWGROVE HIGHLAND WATERMAIN
843
Mar-23
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
IAN BLACK - 253-588-4423
$36,960.00
Phil Sagen
REGENTS BLVD WATERMAIN
848
Mar-23
CITY OF FIRCREST
115 RAMSDELL ST
FIRCREST, WA 98466
JEFF DAVIS - 253-564-8900
$69,289.46
Brad Appleman
ROBBINS RD STORM WATER IMPROVEMENTS
831
Mar-23
ROBBINS RD IMPROV. & MAINT. ASSOC.
PO BOX 752
GRAPEVIEW, WA 98546
ROBERT ISBELL-360-229-2079
106
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT "IT'
Amount of
Contract
Project Manager
Project Name
Completion
Date
Owner or Representative
$74,553.65
Phil Sagen
2022 ANNUAL DRAINAGE PROJECT
846
Mar-23
CITY OF BAINBRIDGE ISLAND
280 MADISON AVE N
BAINBRIDGE ISLAND, WA 98110-1812
JOEL CORLEW 206-348-2913
$`153,434.13
Brad Appleman
SOUTHWOOD PRV STATIONS
845 PRIVATE
Feb-23
WASHINGTON WATER CO.
14519 PEACOCK HILL AVE NW
GIG HARBOR, WA 98332
JOHN PUCINNELLI 253-320-1631
$890,647.56
Phil Sagen
HOLIDAY VALLEY WATER MAIN REPLACEMENT
838 PRIVATE
Dec-22
HOLIDAY VALLEY WATER DISTRICT
3403 STEAMBOAT ISLAND RD FMB 334
OLYMPIA, WA 98502
JIM LOGAN - 360-529-2947
$2,705,312.30
Phil Sagen
FRUITLAND 2021 WATER MAIN
827 PRIVATE
Dec-22
FRUITLAND MUTUAL WATER CO
PO BOX 73759
PUYALLUP, WA 98373
TED HARDIMAN - 253-848-5519
$302,391.52
Brad Appleman
55TH ST CT NW (REID DR) WATER MAIN
841
Nov-22
CITY OF GIG HARBOR
3510 GRANDVIEW STREET
GIG HARBOR, WA 98335
MANDY CHAPMAN 253-853-7561
$158,549.53
Brad Appleman
WATERMAIN EXTENSION QUISTORFF SWEDE HILL
842 PRIVATE
Oct-22
WASHINGTON WATER
PO BOX 336
GIG HARBOR, WA 98335
RYAN HASEMAN - 877-408-4060
$656,318.01
Phil Sagen
SUMMIT WATER MAIN
840
Oct-22
CITY OF FIRCREST
115 RAMSDELL ST
FIRCREST, WA 98466
JEFF DAVIS - 253-564-8900
$483,753.73
Phil Sagen
EISENHOWER WATER MAIN REPLACEMENT
837
Aug-22
WEST SOUND UTILITY DISTRICT #1
2924 SE LUND AVE
PORT ORCHARD, WA 98366
JOHN TAPIA 360-876-2545
$1,436,262.54
Brad Appleman
2020 LIFT STATION UPGRADES PROJECT
824
Jul-22
CITY OF ORTING
PO BOX 489
ORTING, WA 98360
APRIL WHITTAKER-253-604-6600
$1,042,182.11
Brad Appleman
OYSTER BAY AVE FORCE MAIN REPLACEMENT
836
Jul-22
CITY OF BREMERTON
239 4TH ST
BREMERTON, WA 98337
ROBERT ENDLSEY 360-473-2348
$1,826,469,86
Brad Appleman
MARINE DRIVE WATER MAIN REPLACEMENT
826
May-22
CITY OF BREMERTON
239 4TH 5T
BREMERTON, WA 98337
ROBERT ENDLSEY 360-473-2348
$325,933.52
Brad Appleman
6th STREET SEWER REPLACEMENT
822
May-22
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DRIVE
BREMERTON, WA 98310
BILL DAVIS 360-473-5398
$211,411.27
Brad Appleman
2022 STORMWATER REPAIR PROJECT
834
Apr-22
CITY OF LAKEWOOD
6000 MAIN STREET SW
LAKEWOOD, WA 98499
D'ANDRA BUCHANAN 253-983-7820
$36,841,91
Brad Appleman
BORGEN BLVD EMERGENCY PAVEMENT REPAIR
835
Mar-22
CITY OF GIG HARBOR
3510 GRANDVIEW STREET
GIG HARBOR, WA 98335
TRENT WARD 253-851-6170
$456,793.50
Phil Sagen
224th 12 Inch WATER MAIN REPLACEMENT
832 PRIVATE
May-22
WASHINGTON WATER CO.
14519 PEACOCK HILL AVE NW
GIG HARBOR, WA 98332
JOHN PUCINNELLI 253-320-1631
$137,019.96
Brad Appleman
SILVER CREEK BOOSTER STATION
830 PRIVATE
Apr-22
WASHINGTON WATER CO.
14519 PEACOCK HILL AVE NW
GIG HARBOR, WA 98332
JOHN PUCINNELLI 253-320-1631
$1,095,865 25
Phil Sagen
WATER MAIN RENEWAL & REPLACEMENT
829 PRIVATE
Mar-22
SPANAWAY WATER COMPANY INC
PO BOX 1000
SPANAWAY, WA 98387-1000
TIM WELLS 253-531-9024
107
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"B
Amount of
Contract
Project Manager Project Name
Completion
Date
Owner or Representative
$118,544.19
Brad Appleman MINTERBROOK 82ND AVE MAINLINE EXTENTION
828 PRIVATE
Nov-21
WASHINGTON WATER CO.
14519 PEACOCK HILL AVE NW
GIG HARBOR, WA 98332
JOHN PUCINNELLI 253-320-1631
$643,981.00
Brad Appleman McCORMICK WEST DIVISION 11 & 12
821
Subcontractor to RV Associates, Inc
Nov-21
MCCORMICK DEVELOPMENT CORP
PRIME - RV ASSOCIATES, INC
1333 LLOYD PARKWAY, PORT ORCHARD, WA
360-876-9737
$372,678.73
Phil Sagen SILVER, SPRINGS WATER SYSTEM MAINLINE
825 PRIVATE
Aug-21
WASHINGTON WATER CO.
14519 PEACOCK HILL AVE NW
GIG HARBOR, WA 98332
JOHN PUCINNELLI 253-320-1631
$978,962.40
Phil Sagen CARPENTER RD UTILITY IMPROVEMENTS
820
Jul-21
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509-3400
JUSTIN KNOX 360-491-5600
$3,310,427.98
Brad Appleman NBK REPAIR & REPLACE SEWER INFRASTRUCTURE
802
Jun-21
MACNAK CONSTRUCTION, LLC
12802 BRIDGEPORT WAY SW
LAKEWOOD, WA 98499
CHESTER BERGNER 253-212-1378
$1,017,655.86
Phil Sagen 2019 WATER MAIN IMPROVEMENTS
819
May-21
CITY OF YELM
PO BOX 479
YELM, WA 98597
DEREK M MCCOY, P.E.
$20,381.25
Brad Appleman POTHOLE BOX CULVERT EDDON BOAT PARK
823
Apr-21
CITY OF GIG HARBOR
3510 GRANDVIEW STREET
GIG HARBOR, WA 98335
GEORGE FLANIGAN 253-377-6165
$377,800.20
Brad Appleman 2020 CDBG WATERMAIN REPLACEMENT
818
Apr-21
TOWN OF BUCODA
PO BOX 10
BUCODA, WA 98530
STEVE WILLIE 360-352-9456
$24,538.94
Brad Appleman WATERMAIN & SERVICE to 2012 STATE GAME RD
817
Jan-21
TORRE
4306 27TH AVE SE
PUYALLUP, WA 98374
LOUIS TORRE 253-845-3936
$1,234,299.05
Brad Appleman 39TH AVE WATER MAIN REPLACEMENT
813
Jan 21
LAKEWOOD WATER DISTRICT
PO BOX99729
TACOMA, WA 98499
RANDALL BLACK - 253-588-4423
$79,047.10
Brad Appleman N WARNER STREET SEWER & STORM
812
Dec-20
HENDRICKSON CONSTRUCTION CO
PO BOX,64370
UNIVERSITY PLACE, WA 98464-0370
RON HENDRICKSON 253-381-7486
$1,279,235.21
Phil Sagen MAPLE AVE WATER MAIN IMPROVEMENT
811
Dec-20
CITY OF PORT ORCHARD
216 PROSPECT ST
PORT ORCHARD, WA 98366
K. CHRIS'HAMMER PE 360-876-4991
$14,416.18
Phil Sagen EMERGENCY MANHOLE REPLACEMENT
816
Nov-20
CITY OF FIRCREST
115 RAMSDELL;ST
FIRCREST, WA 98466
JEFF DAVIS - 253-564-8900
$48,351.60
Brad Appleman ILLAHEE OYEHUT HYDRANT REPLACEMENT
814
Nov-20
GRAYS HARBOR COUNTY
100W BROADWAY, STE 2
MONTESANO, WA 98563
MARK COX 360-249-4222
$396,877.89
Brad Appleman BOND GUNDERSON WATER MAIN EXTENSION
809 PRIVATE
Sep-20
ARNESS TREE FARM
22777 INDIANOLA RD NE
POULSBO, WA 98370
LARRY TODD 360-692-6867
$39,991.01
Brad Appleman 120-KCSD7 REUSE WATER PUMP & MANHOLE
815
Sep-20
KITSAP COUNTY SEWER DISTRICT #7
PO BOX 40088'
BELLEVUE, WA 98015
RAOAN BLACKER 206-669-5723
108
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT "B"
Amount of
Contract
Project Manager
Project Name
Completion
Date
Owner or Representative
$6,597.00
Brad Appleman
PHASE 3 TELEMETRY UPGRADES
120-CEDAR -SUB TO SOURCE ELECTRIC, LLC
Aug-20
CEDAR RIVER WATER/SEWER DISTRICT
18421 SE PETROVITSKY RD
RENTON, WA 98058
CHRIS ROBERTS 206-437-2878
$356,104.01
Phil Sagen
WOODS ROAD WATER MAIN REPLACEMENT
808
Aug-20
WEST SOUND UTILITY DISTRICT #1
2924 SE LUND AVE
PORT ORCHARD, WA 98366
JOHN TAPIA 360-876-2545
$9,385.99
Brad Appleman
MINDER & SR 307 BORE EXCAVATION
120- KCPUD#1
Jul-20
KITSAP COUNTY PUD #1
PO BOX1989
POULSBO, WA 98370
TODD SMITH 360-626-7751
$224,949.30
Phil Sagen
JACKSON AVE WATER MAIN RELOCATION
810
Jun-20
WEST SOUND UTILITY DISTRICT #1
2924 SE LUND AVE
PORT ORCHARD, WA 98366
JOHN TAPIA 360-876-2545
$399,899.41
Phil Sagen
CAMP SEYMOUR YMCA WATER SYSTEM
804
Jun-20
YMCA OF PIERCE & KITSAP COUNTIES
4717 S 19TH ST, STE 201
TACOMA, WA 98402
ED BRESSETTE 253-534-4738
$175,390.25
Phil Sagen
AC WATER MAIN REPLACEMENT
807
May-20
TIMBERLAKE COMMUNITY CLUB
2880 E. TIMBERLAKE WEST DRIVE
SHELTON, WA 98584
EVAN HENKE, PE 425-637-3693
$96,130.00
Phil Sagen
RANCH ACRES MAIN REPLACEMENT
805 PRIVATE
May-20
WASHINGTON WATER SERVICE CO
PO BOX 336
GIG HARBOR, WA 98335
JOHN PUCCINELLI, PE 360-437-2042
$66,923.45
Phil Sagen
WATER MAIN REPLACEMENT PROJ NO<MRP2019-34
806
Apr-20
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
TROY SAGHAFI PE 253-502-8746
$2,112,099.38
Brad Appleman
2019 SEWAGE PUMP STATION CW-4 REPLACEMENT
797
Apr-20
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DRIVE
BREMERTON, WA 98310
BILL DAVIS 360-473-2312
$4,950.00
Brad Appleman
VWD BUTTES TELEMETRY
120 - SUB TO SOURCE ELECTRIC
Mar-20
VALLEY WATER DISTRICT
14501 PIONEER WAY E
PUYALLUP, WA 98372
SEAN VANCE 253-841-9698
$829,071.74
Phil Sagen
MARINE DR STORMWATER LID RETROFIT
799
Dec-19
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DRIVE
BREMERTON, WA 98310
KATIE KETTERER 360-473-5334
$870,682.07
Phil Sagen
LIDSTROM WATER MAIN REPLACEMENT
800
Nov-19
WEST SOUND UTILITY DISTRICT #1
2924 SE LUND AVE
PORT ORCHARD, WA 98366
GLEN SCREWS 360-874-5004
$19,938.28
Phil Sagen
PARKWOOD SEWER
803
Oct-19
WEST SOUND UTILITY DISTRICT #1
2924 SE LUND AVE
PORT ORCHARD, WA 98366
JOHN TAPIA 360-876-2545
$1,031,235.05
Brad Appleman
STINSON AVE WATER MAIN REPLACEMENT
796
Oct-19
CITY OF GIG HARBOR
3510 GRANDVIEW STREET
GIG HARBOR, WA 98335
AARON HULST 253-853-7620
$105,622.66
Phil Sagen
FARALLONE SANITARY SEWER
801
Oct-19
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
JERRY WAKEFIELD 253-564-8900
$505,101.61
Phil Sagen
7TH ST IMPROVEMENTS WATERLINE REPLAC.
798
Aug-19
CITY OF ELMA
1235 MONTE ELMA RD
ELMA, WA 98541
JIM STARKS 360-482-2212
$2,559,164.54
Brad Appleman
LIFT STATION NO 2 PW 2017-07
771
Jul-19
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509
KEVEN INMAN 360-438-2682
109
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT "B"
Amount of
Contract
Project Manager Project Name
Completion
Date
Owner or Representative
$289,977.51
PhD Sagen WATER MAIN REPLACEMENT MRP 2016-24
795
Jul-19
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
GREG ARMSTRONG -253-502-8742
$1,197,859.21
Brad Appleman
ARROWHEAD WATER MAIN REPLACEMENT PH 2
791
Jun-19
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499
RANDALL BLACK - 253-588-4423
$975,493.68
Phil Sagen
WATER, MAIN REPLACEMENT MRP2017-17
788
Jun-19
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
GREG ARMSTRONG -253-502-8742
$110,896.23
Brad Appleman
LIFT STATION #9A REHABILITATION
792
Jun-19
CITY OF GIG HARBOR
3510 GRANDVIEW STREET
GIG HARBOR, WA 98335
MARCOS MCGRAW 253-853-2647
$376,921.47
PhD Sagen
WATER MAIN REPLACEMENT MRP2017-27
790
May-19
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
RYAN FLYNN "253-396-3111
$124,657.48
Brad Appleman
EMERGENCY REPAIR SEWER FORCEMAIN
794
Apr-19
CITY OF BREMERTON
239 4TH ST
BREMERTON, WA 98337
NED LEVER 360-473-2398
$654,710.00
Brad Appleman
FREDRICKSON INDUSTRIAL PARK SEWER MAIN
786
SUB TO RV ASSOCIATES, INC
Feb-19
RV ASSOCIATES, INC
1333 LLOYD PARKWAY
PORT ORCHARD, WA
360-876-9737
$415,111.05
Brad Appleman
DRAKE STREET LIFT STATION PROJECT
781
Nov-18
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
BRIAN CASEY 253-627-1520
$928,674.24
Phil Sagen
LAKE STEILACOOM DR REPLAC/REHABIL. JOB 690
783
Nov-18
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499
RANDALL BLACK - 253-588-4423
$485,322.87
Phil Sagen
WATER MAIN REPLACEMENT PROJ MRP2017-22
785
Nov-18
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
RYAN FLYNN 253-396-3111
$679,710.84
Brad Appleman
Green Mountain Acres System Reconstruction
759
Sep-18
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
$245,57363
Brad Appleman
BELA VISTA MAIN REPLACEMENT PHASE 1
787
Sep-18
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
$95,652.86
Phil Sagen
WALLER RD CROSSING WATER MAIN JOB #701
784
Jun-18
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499
RANDALL BLACK - 253-588-4423
$175,285.14
Phil Sagen
FRP 2017-18 WATER MAIN
782
Jun-18
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
GREG ARMSTRONG-253-502-8742
$188,536.00
Phil Sagen
FLORENCE STREET SEWER
780
May-18
CITY OF ENUMCLAW
1339 GRIFFIN AVE
ENUMCLAW, WA 98022
SCOTT WOODBURY 360-615-5728
$200,099.47
Phil Sagen
2018 CDBG WATERMAIN REPLACEMENT
779
Apr-18
TOWN OF BUCODA
PO BOX 10
BUCODA, WA 98530
STEVE WILLIE 360-352-9456
$412,039.11
Phil Sagen
RAMSDELL WATER MAIN PROJECT
778
Apr-18
CITY OF FIRCREST
115 RAMSDELL ST
FIRCRESET, WA 98466
KIMBERLEY SAVAGE 253-473-4494
110
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT"B"
Amount of
Contract
Project Manager
Project Name
Completion
Date
Owner or Representative
$8,500.00
Brad Appleman
PHASE 4-SCADA SYSTEM UPGRADES
118-SUB TO TSI & SOURCE ELECTRIC, LLC
Apr-18
CITY OF BONNEY LAKE
PO BOX 7380
BONNEY LAKE, WA 98390
JOHN WOODCOCK 253-447-4348
$282,142.19
Brad Appleman
LUD#19 NEW SWEDEN WATER MAIN EXTENSION
776
Mar-18
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
$541,150.62
Phil Sagen
SILCOX DRIVE SW WATER MAIN REPLACEMENT
777
Mar-18
LAKEWOOD WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499
RANDALL BLACK - 253-588-4423
$368,576.37
Brad Appleman
HISTORIC VILLAGE WATER MAIN REPLACEMENT
770
Mar-18
CITY OF DUPONT
1700 CIVIC DR
DUPONT, WA 98327
DOMINIC MILLER P.E. 360-292-7481
$1,460,927.05
Phil Sagen
ORVILLE ROAD WATER MAIN REPLACEMENT
769
Mar-18
CITY OF ORTING
PO BOX 489
ORTING, WA 98360
APRIL WHITTAKER-253-604-6600
$401,684.50
Brad Appleman
ALAMEDA LIFT STATION PROJECT
767
Feb-18
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
BRIAN CASEY 253-627-1520
$143,871.50
Brad Appleman
RIDDELL WELL SLIDE IMPROVEMENTS
775
Dec-17
NORTH PERRY AVE WATER DISTRICT
PO BOX 2183
BREMERTON, WA 98310
JIM GROSS PE - 206-357-9932
$268,536.22
Phil Sagen
MEEKER AVE STORM SEWER
772
Dec-17
CITY OF TACOMA
747 MARKET ST STE#408
TACOMA, WA 98402
JESSICA TONKA 253-502-8332
$94,992.37
Phil Sagen
WSP:ACADEMY WATER SYSTEM
773
Nov-17
ENTERPRISE SERV, DEPT OF
PO BOX 41476
OLYMPIA, WA 98504
CURTIS PATE 360-407-7913
$752,018.26
Phil Sagen
N. 6TH & G STREET STORM SEWER
768
Oct-17
CITY OF TACOMA
747 MARKET ST STE#408
TACOMA, WA 98402
JESSICA TONKA 253-502-8332
$3,834,570.26
Brad Appleman
S. TACOMA WAY SR512 TO 96TH ST ROADWAY
751
Sep-17
CITY OF LAKEWOOD
6000 MAIN STREET SW
LAKEWOOD, WA 98499
WESTON OTT 253-983-7725
$1,210,258 45
Brad Appleman
SOUTH HILL MALL LIFT STATION
766
Sep-17
CITY OF PUYALLUP
333 5 MERIDIAN
PUYALLUP, WA 98371
MARY WINTER 253-841-4321
$289,190.07
Brad Appleman
WATER SUPPLY MAIN REPLACEMENT
765
Jul-17
TOWN OF CARBONADO
PO DRAWER 91
CARBONADO, WA 98323
LANCE STEVENS 206-284-860
$850,541.88
Brad Appleman
NISQUALLY WATER IMPROVEMENTS-PW 2017-02
764
Aug-17
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509
KEVEN INMAN 360-438-2682
$377,674.67
Phil Sagen
Thorne Lane -Portland Ave to Spruce WO#21131
762
Apr-17
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
RANDALL BLACK - 253-588-4423
$848,735.66
Phil Sagen
Water Main Replacement WD16-0445F-MRP 2016-29
760
Apr-17
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
MARIE HOLM 253-502-8468
$351,937.95
Brad Appleman
Crystal Springs Water Main Replacement
758
Feb-17
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
111
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT "B"
Amount of
Contract
Project Manager Project Name
Completion
Date
Owner or Representative
$542,190.33
Brad Appleman S'Klallam Tribe -Ravenwood Pump Station
749
Mar-17
PORT GAMBLE S KLALLAM TRIBE
31912 LITTLE BOSTON RD NE
KINGSTON, WA 98346
HARVEY DOTY 206-284-0860
$34,294.85
Phil Sagen Rockaway Beach Road Fire Hydrant
761
Dec-16
CITY OF BAINBRIDGE ISLAND
280 MADISON AVE N
BAINBRIDGE ISLAND, WA 98110
AARON CLAIBORNE 206-780-3585
$190,901.11
Phil Sagen ES16-0267S - 2016A Wastewater Sewer Spot Repair
755
Nov-16
TACOMA PUBLIC UTILITIES
3628 S 35TH ST
TACOMA, WA 98409
SAMOL HEFLEY 253-502-8468
$21,700.00
Brad Appleman Pressure Reducing Valve Replacement
757
Oct-16
HARTSTENE POINTE WATER -SEWER DIST
772 E CHESAPEAKE DR
SHELTON, WA 98584
MICEAL CARNAHAN - 360-427-2413
$50,546.59
Brad Appleman Lift Station #18 Generator Replacement -PVV2016-16
756
Oct-16
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509
KEVIN INMAN 360-438-2682
$273,629.48
Brad Appleman Pioneer Street Utility Improvements Project
754
Oct-16
CITY OF TUMWATER
555 ISRAEL RD SW
TUMWATER, WA 98501
JOHN NORMAN 360-754-4140
$1,242,702.98
Phil Sagen Hostmark Mains Project #CN2016-03
752
Sep-16
CITY OF POULSBO
200 NE MOE ST
POULSBO, WA 98370
DEAN ZAVACK 360-394-9736
$157,902.71
Brad Appleman Pearson Lift Station & Sewer Line
753
Aug-16
NORTH KITSAP SCHOOL DIST #400
18360 CALDART AVE NE
POULSBO, WA 98370
MICHAEL CURRIE 360-377-0014
$78,923.22
Brad Appleman Sole Soure Control Valves Project
750
Aug-16
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509
AUBREY ARGENS 360-438-2639
$851,195.54
Brad Appleman Project NO 4514 Flow Control & Seismic Valve
742
May-16
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DRIVE
BREMERTON, WA 98310
NED LEVER -360-473-5270
$66,074.15
Phil Sagen Downtown Parking Lot Stormwater Retrofit & Overlay
748 - sub to Puget Paving & Construction, Inc
Apr-16
CITY OF BUCKLEY
PO BOX D
BUCKELY, WA 98321
DOMINIC MILLER P.E. 360-292-7481
$374,408.20
Brad Appleman Clarks Creek Targeted Outfall Retrofit
743
Apr-16
CITY OF PUYALLUP
333 S. MERIDIAN
PUYALLUP, WA 98371
VIRGINIA LORBERAU 253-864-4164
$362,663.54
Phil Sagen Water Main Replacement Project MRP 2015-37
746
Mar-16
CITY OF TACOMA
747 MARKET ST STE# 408
TACOMA, WA 98402
LISA OESTREICH 253-594-7871
$1,943,752.61
Brad Appleman 6th Ave & 9th Ave Pump Station Project
734
Mar-16
CITY OF POULSBO
200 NE MOE ST
POULSBO, WA 98370
MIKE LUND - 360-394-9741
$36,632.24
Brad Appleman 2015 Sidewalk Replacement Project
744
Jan-16
CITY OF BUCKLEY
PO BOX D
BUCKELY, WA 98321
DOMINIC MILLER P.E. 360-292-7481
$7,959.67
Brad Appleman 4TH Ave Stormwater Retrofit
115CCT - sub to CCT Construction, Inc
Oct-15
CITY OF OLYMPIA
PO BOX 1967
OLYMPIA, WA 98507
CRAIG ANDERSON 360-753-8709
$352,530.61
Brad Appleman Phase VI Water Main
740
Oct-15
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
112
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT "B"
Amount of
Contract
Project Manager
Project Name
Completion
Date
Owner or Representative
$1,169,465.84
Brad Appleman
Phase V Water Main
739
Nov-15
KITSAP COUNTY PUD NO 1
PO BOX 1989
POULSBO, WA 98370
WILLIAM WHITELEY, P.E. 360-262-7747
$421,559.48
Phil Sagen
Wastewater Sewer Replacement Proj ES15-0003F
738
Oct-15
CITY OF TACOMA
747 MARKET ST STE# 408
TACOMA, WA 98402
LISA OESTREICH 253-594-7871
$493,936.83
Phil Sagen
70th Ave Water Main Replacement Proj. MRP2013-58
737 WD15-0090F
Nov-15
CITY OF TACOMA
747 MARKET ST STE# 408
TACOMA, WA 98402
GREG ARMSTRONG -253-502-8742
$196, 32.13
Phil Sagen
Peabody Creek Water Quality Treatment Retrofit
736
Aug-15
CITY OF PORT ANGELES
PO BOX 1150
PORT ANGELES, WA 98362
LUCIO BAACK 360-417-4720
$383,794.06
Brad Appleman
Washington Ave Community Blvd
735
Subcontractor to RV Associates, Inc
Sep-15
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DRIVE
BREMERTON, WA 98310
EDUARDO ABAN 360-473-5270
$762,723.11
Brad Appleman
Steilacoom Blvd SW Replacement & Rehabilitation
733
May-15
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
RANDALL BLACK - 253-588-4423
76,353.99
Phil Sagen
Lakewood Water District AMI Project
732
Feb-15
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
IAN BLACK - 253-588-4423
$712,685.61
Brad Appleman
Central Business District
Stormwater Retrofit #CN2014-07
731
May-15
CITY OF POULSBO
200 NE MOE ST
POULSBO, WA 98370
BILL WHITELEY - 360-779-4078
$339,730.38
Brad Appleman
2014 Sound Transit Water Main Relocations
at Rail Crossings
730
Mar-15
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
RANDALL BLACK - 253-588-4423
$21,936.21
Brad Appleman
Carpenter Rd Air Release Valves/PVV2014-21
729
Jan-15
CITY OF LACEY
PO BOX 3400
LACEY, WA 98509-3400
KEVIN INMAN - 360-438-2682
$1,153,251.75
Phil Sagen
LID 8652-1, 8652-2 & 8655-1- PW14-0019F
728
Apr-15
CITY OF TACOMA
747 MARKET ST STE# 408
TACOMA, WA 98402
PHILL RINGROSE 253-502-8163
$890,714.47
Brad Appleman
300 Block Alley Farallone/Eldorado Sewer
727
Jan-15
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
TRENT LOUGHEED 253-564-8900
$228,374.36
Brad Appleman
2014 CDBG Watermain Replacement
726
Oct-14
TOWN OF BUCODA
PO BOX 10, BUCODA WA 98530
STEVE WILLIE
360-352-9456
$248,364.65
PhD Sagen
2014 Alley Sewer Replacement
725
Oct-14
CITY OF ELMA
1235 MONTE ELMA RD
ELMA, WA 98541
JIM STARKS 360-482-2212
$681,893.60
SF
SYLVAN PARK WATER MAIN REPLAC. FROG PH 1
724
Nov-14
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
RANDALL BLACK - 253-588-4423
$349,007.69
SF
Lakeholme Road SW Water Main Replacement
and Rehabilitation Proj Job # 598 WO #21009
723
Jul- 4
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
IAN BLACK - 253-588-4423
$543,078.06
Phil Sagen
Water Main Replacement MRP 2013-07
722
May-14
CITY OF TACOMA
GARY GATES
253-502-8742
113
PAPE RECENT PROJECTS COMPLETED/REFERENCES
ATTACHMENT'S"
Amount of
Contract
Project Manager Project Name
Completion
Date
Owner or Representative
$1,227,147.25
Phil Sagen LID 8654 and 8652-3
721
Oct-14
CITY OF TACOMA PUBLIC WORKS
PHILL RINGROSE
253-502-8163
$1,634,000.14
Brad Appleman Washington Ave Sewer Improvements
720
Aug=14
CITY OF BREMERTON PUBLIC WORKS
3027 OLYMPUS DR, BREMERTON, WA 98310
NED LEVER PE
360-473-2398
$238,128.47
Phil Sagen Water Main Replacement MRP 2013-14
719
Feb=14
CITY OF TACOMA
GARY GATES
253-502-8742
$787,245.23
Brad Appleman Eastown Sanitary Sewer Mains Phase 1
717
Dec-13
CITY OF BONNEY LAKE
PO BOX 7380
BONNEY LAKE, WA 98390
MARLYN CAMPBELL - 253-447-4348
$340;638.35
Phil Sagen Regents/Alameda 2013 Sewer Replacement Project
718
Nov-13
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
TRENT LOUGHEED 253-564-8900
$164,520.35
Brad Appleman Hood Canal ntertie Project - Dalby Road
716
Nov-13
MASON COUNTY PUD #1
N 21971 HWY 101
SHELTON, WA 98584
JOCELYNE GRAY 360-877-5249
$640,647.01
Phil Sagen Del Monte Sewer Main Replacement Project
715
Nov-13
CITY OF FIRCREST
115 RAMSDELL STREET
FIRCREST, WA 98466
TRENT LOUGHEED 253-564-8900
$542,608.89
Brad Appleman Water System Improvements Project
714
Oct-13
CITY OF YELM
PO BOX 479
YELM, WA 98597
STEPHANIE RAY 360-458-3244
$506,026.08
Phil Sagen Water Main Replacement Project MRP 2011-01
713
Aug-13
CITY OF TACOMA
GARY GATES
253-502-8742
$746,246.86
Brad Appleman Big Valley Transmission Main Replacement Project
712
Aug-13
CITY OF POULSBO
200 NE MOE ST
POULSBO, WA-98370
MIKE LU N D - 360-394-9741
$240,309.52
SF Town of Belfair Sanitary Sewer Improvements
Pressure Sewer Extension Project
700
Aug-13
MASON COUNTY
PO BOX 578
SHELTON, WA 98584
TOM MOORE- 360-427-9670
$1,598,941.91
Brad Appleman Ponderosa Estates Waterline Replacement
709
Aug-13
CITY OF BONNEY LAKE
PO BOX 7380
BONNEY LAKE, WA 98390
MARLYN CAMPBELL - 253-447-4348
$452,471.26
Brad Appleman Veteran's Drive SW Water Main Replacement Project
phase 3
710
Jun-13
CITY OF LAKEWOOD - WATER DISTRICT
PO BOX 99729
TACOMA, WA 98499-0729
IAN BLACK - 253-588-4423
$2,002,557.80
Phil Sagen Dayton -Airport Road Watermain Expansion Project
706
Jun-13
CITY OF SHELTON
PO BOX 1277
SHELTON, WA 98584
DONI KOTAS-TURNER-360-432-5104
$679,357.51
SF/CP 2011 Wastewater Sewer Main Replacement Extensions
695
Jun-13
TACOMA PUBLIC WORKS
KATHY KATTERHAGEN-253-502-8468
$553,185.46
Brad Appleman Cedarwood Assoc Water System DWSRF/CDBG
2012 Water System Improvements
701
Jun-13
THURSTON CO. PUD NO 1
921 LAKERIDGE WAY SW, STE 301
OLYMPIA, WA 98502
JULIE PARKER - 360 357-8783
$117,968.95
Brad Appleman 184th Avenue Water Main Replacement Project
708
Feb-13
CITY OF BONNEY LAKE
8720 MAIN STREET E
BONNEY LAKE, WA 98391
MARLYN CAMPBELL 253-447-4348
$22,902.06
Brad Appleman Valley System 2-inch Domestic Water Service
707
Nov-12
VALLEY WATER DISTRICT
14501 PIONEER WAY E
PUYALLUP, WA 98372
BRIAN THOMPSON 253-841-9698
114
EQUIPMENT OWNED/TO BE USED 202E
ATTACHMENT"C`
TRUCKS
SERVICE TRUCKA±OOLSx
DUMP TRUCK?UR & TILT TRL x2
WA ER TRUCK x2
EXCAVATORS
PC12 UU (KOMATSU) x2 (E12)
DOOSAN DS140 x3 77, E8, E14)
eT cm35 x2 (E4)
JOHN DEER 35G (E6)
JOHN DEERE 50 (E15)
KOMATSU 228 xl (Ell)
KOMATSU 238@ (E16)
TRENCHER (TR1)
VIBRATORY COMPACTORS
BACKHOES
420D BACKHOE (BHo)
420E BACKHOE (BH15,16,17)
420Ej2)ACKHOE (BH01 & BH18)
420EXBACKHOE (BH49)
420E BACKHOE (BH02, 03)
420E T BACKHOE $HD)
HOE ACS
LOADERS
250 KOMATSU %\
240 SKID STEER (SS1)
725 SKID STEER (SS2)
DOZERS & GRADERS
5 0JD GRADER ( 3)
D4H DOZER (D4)
COMPACTION
JUMPING JACK
SAKAI SINGLE DRUM (CHI )
SAKAI DBL DRUM ROLLER(CR89 10)
S&KAtag3500 (CR7)
MISC
ASPHALT ZIPPERS
DUMP TRAILERS 7X14
MESSAGE BOARDS
CONCRETE SAW
BROOMS
LAYTON(SFHALT) BOX
TRENCH BOXES x13
TRAFFIC CONTROL DEVICES x 000
SPILL REFSONSE KITS x3
HDPE WELDING MACHINES x3
PIPE LASERS x 3
COMPRESSOR, JACKHAMMER, ACCESS. X5
GENERATORS x9
115
ANPO ER SCHEDULE
ATTACHMENT "D"
Total
Total Minority
Job Categories Employees Employees Black
Off icer/Manager
General Managers
Mechanic
Project Managers
Office/Clerical
Job Categories
Superintendent
Flaggers
Foreman/operator
Pipelayer
Operators
Laborers
Truck brivers
M F M F
M F
Asian
M F
American
Indian Hispanic
M F M F
2
1
1
1
2
Total Total
Employees Minority
M F M F
Black
M F
American
Asian Indian Hispanic
M F M F M F
1
2
1
3
2
2
1
3
1
3
2
1
1
19 6
5
1
2
1
0
0
2
0
0
116
American Surveying & nvironmental, LLC
Land Surveyors & Consultants
Land Surveying
Construction Layout
Water Quality Testing
Boundary Line Alteration
FEMA Elevation Certificates
Legal Description Preparation
4056 148th Ave NE Redmond, WA 98052 • Tel (425) 881-7430 • Fax (425) 881-7731
vvww.american-engineering.net
117
Z\m8T'--n Surveying &
Environmental, L| F8t 8
Glance
Consulting- Land Surveying & Related .Services
Founded- September, 201formerly known 'American
Engineering Corporation
Ownership- Privately held 3'Corporatioo
Off ice- Redmond, WA
Annual Sales- $1.3N1l||inn+
General Liability |nsorance
$1rniU|on/$2nnUKonpo|icy
Professional Liability mcurance'
$2,OO[\OOOpo|icy
Employees- 4hourly staff
About American SurveyingB~
Environmental, LLC
American Surveying Q Environmental, Uz is a
full- service consulting company offering land
surveying and construction surveying & layout
services. We have a highly experienced and
motivated staff who will work closely with you
to serve your project needa.
Our office is equipped with a comprehensive network
ofcomputer stations and software including the most
current version ofAuto[AD Civil 3D. Our field crews
are 'equipped with the latest electronic surveying
instruments 'and GPSequipment and are backed bya
time -efficient survey ou|cp|utinn and mapping
program. Our field survey equipment includes
Topcun GPS receivers, Topcon Robotic and Nikon
Total Stations, Leica Digital Level and TnS & Spectra
Ranger Data Collectors.
Areas of Expertise
= Boundary and Topographic Surveying
° Legal Description Composition
° Construction Surveying &Layout
• Certified Federal Surveyor
• Water Quality Testing/Monitoring
'
° Settlement Monitoring
American Surveying & Environmental, LLC
_
Services Provided
Land Surveying:
• Boundary Surveys
w Topographic Surveys and Site Mapping
= Horizontal and Vertical Control Surveys
w AOA/A[8M Surveys
° Construction Layout Surveying
" Survey Monume"tPerpetuation/Restoradon
° Easement Exhibits and Legal Descriptions
° Parcel [Naps
w Condominium Surveys &Plans
w Longp|at/SubdimsionSurveys
• Boundary/Lot Line Adjustment Surveys
m Record of Survey
^ Aerial Maps
• HydmgraphicSumeys
• Settlement Monitoring
w FEKxAElevation Certificate
• AsBuilt Surveys & Record Drawings
° Title report and Property Encumbrance Reviews
° Land Description Reviews (LDR)—{FedI
w Cert. ofInspection f\Possession ([|P)-[FedJ
° Boundary Assurance Certificates (BA[)-[FedJ
Contact Information
Phone: (425)8O1'743OFax:p42S 88I-7731
Michae|SjoUn, Principal
Registered Professional Land Surveyor —(WA)No. 45174
Certified Federal Surveyor— No. 1578(CFedS)
msio|in(@annerican'ennineednn.^et
Brett Garr, Principal
Land Surveyor inTraining— (W4) wo11as
Rory Allen, Principal
Certified Erosion and Sediment Control Lead
14y5NVVGilman Blvd, Ste 14 VVAy80379Tel. (425)881-743O*
118
American Surveying & Environmental, LLC
'Land Surveyo°mConsu^=u
D�|hJ(~I�/\| ���U���C
PRINCIPAL '`�.`^—.^^^.,.�~~
Michael Sjo|in,Director ofSurveys, Principal
Registered NQ.45174k��)
- '
Certified Federal Surveyor No. 1570
Michael has more than years' of experience inthe land surveying profession. During
this time hehas conducted and supervised cadaS1ra surveys, topographic surveys and
construction layout surveys and been involved as project manager of many different types and
sizes of projects. He has vast experience drafting numerous types of survey maps, including
boundary surveys, topographic, ALTA, condominium, wetland delineation, long and short plats,
B|Smapping, and boundary line adjustments. |naddition, heiswell-versed 8tpreparing various
types of legal descriptions and easement documents including exhibit maps using Autodesk Civil
3O.Michael also has ample experience conducting and supervising FEk4/\Elevation Certificate
surveys used for flood insurance. Michael has a very methodic and systematic approach to
insure a high level of quality control. His attention to detail and careful projectapproachmakes
him avaluable member nfASE'sprofessional team.
Michael's experience also includes performing complex boundary computations and construction
staking pre -calculations for a variety ofdifferent projects 1nboth the private and public sector.
His project experiencerange includes small residential lots, large site developmentprojects; both
private and public, airports, county roads and state highways. He|shighly capable and has the
experience needed tosimultaneously ^manage multiple projects frornbeBnnjngtocomp|etk)n
with accuracy and attention t0detail and the ability tomaintain required project budgets and
time constraints.
In June of 2012Michael received Certified Federal (CFedS) status from the United
States Department of the Interior Bureau of Land Management.The CFedS program, which has
been approved bythe U.S.SeCretaryof the Interior, was designed specif|ca|lytoenhancethe
level ofknowledge and expertise in the professional land surveying communityfor surveywork
performed nnfederal lands and especially on Indian trust lands. To earn the CFedS designation,
professional land surveyors must complete approximately 120 hours of course materials
prepared bythe BLM'sNational Training Center, in'Phoenix, .Arizona, and pass the certification
examination. To maintain the certification, a CFedS must complete 10 hours of continuing
education annually. This certification has provided Michael the additional knowledge and skill to
offer superior boundary 'survey practice.
1495 VVGilman Blvd Ste 14 Issaquah, \&A08027eTel. (4Z5)881-743O0
Fax (4%5)8Q1-7731www`amehcan'eng|ne8ring.net
P��5A
1/� 1 U
.." �
�
Brett Garr, Project Manager, Principal
Land Surveyor in Training No. 1139
Brett Garr, LS[T has more than twenty years' experience iDthe field starting his career asa
chainman and working his way up to Project Manager at American Surveying and
Emdnnnmental,LL[. Brett's surveying experience includes many years of field staking of plats,
roads, water, sewer and infrastructure. Brett understands exactly what is required tOproduce
the finished products and communicates well with contractors and applies that knowledge in
gathering field data. Hewill oversee the work ofthe survey crew onsite toensure that .all
necessary data 'obtained jsconsistent and correct, Brett now oversees all projects fromstartto
finish, Brett isA5E'sestimator/contract administrator oM all Public Works projects and plays
vital role on all projects.
Rory Allen, Project Manager, Principal
Certified Erosion & Sediment Control Lead
Rory Allen has more than fourteen years' experience in the field starting his career as a rodman/
instrument operator at American Engineering Corporation and working his way up to survey
party chief. Rory understands exac±lyvvhatisnequiredtonroducethe finished products of
mapping and site development and applies that knowledge ingathering field data. Rory isa
major player inthe mapping and the collection offield data for all projects. Rory has always
pushed himself t0keep upwith equipment technology and isconstantly working onways to
keep projects within budget while obtaining all the data that is required for the finished product.
In December of 2012 Rory obtained his Certified Erosion & Sediment Control Lead certification.
Rory iscurrently working towards obtaining his 'Land Surveyor inTraining' status here h1
Washington State.
14y5NVVGilman Blvd Ste 14Issaquah, \NA98OZ7wTel. /425\081~743OvFax (425)
page5B
American Surveying 8 Environmonbd.LCC
Land 5—eyors & Consultants
�������T(���y�U�|��|
^//r�/ �—.,.�—." . ��/ QUALIFICATIONS
American Surveying & Environmental, LLC(ASE) isasmall sized firm with a20+ year history in
the Seattle and Puget Sound area offering professional surveying, construction staking, and
planning semices. Formerly known as American Engineering Corporation (AEC), A5Ewas formed
in 2012 when the employees purchased the business from the principal of AEC, Einar
Gundersen. Our staff members have worked together on a variety ofsurvey projects involving
boundary surveys, topographic surveys and site mapping for design, roadway and right
of way surveys, constructions layout services for building construction and civil site
development, ALT7\ surveys for commercial 8i residential properties, parking lots and
underground utilities, new housing projects for residential and multifamily, condominium
surveys, FEKHA Elevation 'Certificate surveys and settlement monitoring.
American Surveying & Environmental, LL[ hasa proven record of providing high quality land
surveying services to our clients. We are pleased to introduce you to Our company and the
professional services vveare able tOprovide.
Our land surveying servicesindudehoundorysurveysfromsinglefani|y1otstoconnrnercalsites
having multiple lots and entire blocks, site mapping for planning and design, land use permitting,
ALTA surveys long plats and short plats, site and roadway mapping for storm water
management, erosion control, sanitary sewer and water distribution design.
Our staff is also experienced in the field and is able to provide coordination and observation
during the entire development process from feasibility toconstruction with the city, engineering
consultants, contractors, orarchitects,
American Surveying & Environmental, ULC'sdrafting department |3equipped with the latest
version of AutoCA[) Civil 5D as we are on the subscription program with Autodesk and we
automatically are upgraded with the latest versions ofCADD programs asthey are introduced.
Our drafters attend continuing education classes as well as online vVebinacstV maintain a high
level ofproficient use ofthe software.
The following pages are select pr0jectsA5E has taken on and successfully completed since our
formation inSeptember, 2012.
14g5NVVGilman Blvd Ste 14Issaquah, VVAQ8DZ7wTel. (425)D81-743OwFax (4Z5)
121
American Surveying & Environmental, LCC
=
�����|��0�UAV�V|����E�V|D�0K��NT�| |h~
..~-^..--..'~~.`'_...'~___'~.'._''—._,.._'__~
SURVEY PROJECTS
Drearnlifter Operations Center
Location: Snohomish County Airport (Paine Re|d)Everett, WA:
Project Owner: Snohomish County Airport
Prime Contractor: Strider Construction, Bellingham, WA
Contract Value: $73,000
Project Description: The site was developed toprovide the Boeing Company with amaintenance
facility for the Boeing 747Dreann||fLer.
This project consisted primarily of construction layout services; however, ASE provided services
for the composition of legal descriptions so K4UkUteo Water 8' Wastewater District and the
Snohomish County PUD owU|d obtain the proper |8Dd use license agreements from the
Snohomish County airport for the underground gas, water and electrical utilities servicing the
property. ASE was also requested to replace an kladVer8Ot|V destroyed survey monument
controlling the right-of-way position for a portion of SR525 (Paine Field Blvd) that directly abuts
the project site. ASE conducted the necessary document research to determine original
monument position for replacement. ASE filed the necessary permit with the Washington State
Depart of Natural Resources and the required Land Corner Record with the Snohomish County
Auditor post installation ofmonument.
ASE provided horizontal position and grade control for site development for the duration of the
project for roadway (asphalt and concrete), curbing, site lighting, underground utility vaults and
duct banking, water, underground 'et fuel pipeline, storm -water facilities, . sanitary sewer
facilities, airplane noise walls, concrete airfield ramp paving and chaDne|ioation. The project
required a fast paced schedule for on -time completion which ASE was able to maintain through
the life ofthe project.
Upon completion of construction, ASE provided the project engineer, [H2KHHi||vvith a complete
as -built survey which included the concrete airfield ramp.
1495NWGilman Blvd Ste 14Issaquah, WAy8027 * Tel. (42B881-7430 eRax (425)
881-7731www.american'eng1necring.nat
122
American Surveying & Environmental, LCC
_*and SuNeyors &Consultants
Redmond Central Connector
Location: Redmond, WA:
Project Owner: City oƒRedmond
Prime Contractor: Road Construction Northwest, Renton, WA
Contract Value: $20000
Project Description: The city of Redmond was utilizing an abandoned railroad grade to construct
apedestrian trail tOinterconnect the Bear Creek Trail and the SernrnanlishRiver Trail.
ASE provided horizontal position and grade control for the trail surface, which was concrete,
asphalt and gravel depending on location, storm drain facilities, roadway intersection
improvements, parking lot position and grading, retaining walls, concrete stairway, water
structures and various architectural features. This project required ASE to provide the contractor
with a creative approach for the survey layout of the concrete banding design at the trail p|aza's
in order to minimize the amount of survey stakes on the ground, but still enable the construction
crew tO build the features as designed.
SR9 212*hStreet SE to 176th Street SE Stage 3 Widening
Location: Snohomish County, \@A:
Project Owner: Washington State Department otTransportation
Prime Contractor: Northwest Construction, Bellevue, \NA
Contract Value: $I5[iO0O
Project Description: The Washington Department ofTransportation (VVSDOT) was widening the
existing two-lane State Route into a four -lane (with center median) improved highway with
intersection safety enhancements.
ASE provided horizontal position and grade control for construction layout of the following:
demolition and clearing limits, three storm water retention ponds, a storm water drainage
system that comprised of Over two hundred drainage structures, intersection improvements,
curbing, slope staking, drainage ditches, intelligent traffic signals, highway illumination,
driveways and road approaches, subgrade and top of asphalt finished grade of highway
(b|uetops), and channe|izetion and signage. This project required night work for certain task to
be completed due to heavy daytime traffic volumes though this travel qzrridor. This project was
constructed on e demanding and rigorous schedule which required absolute scheduling
commitments along with tight completion deadlines.
149SNVVGilman Blvd Ste 14Issaquah, WA98OZ7wTel, (425)D81'743OeFax (425)
123
American Surveying & Environmental, LOC
~�Land Sumey=aComUltants
Anderson Concrete Recycling Topographic
& Grading Plans
Location: King County, Vy4(TukwUa)(
Project Owner: Anderson Concrete Recycling Plant
Contract Value: $45000+
Project Description: King County Land Use required the property owner to apply for a site
grading permit in order to close operations. The planned timeline at the beginning of the project
for complete closure was two years. The project site is a concrete recycling plant with a.
substantial volume of both raw and recycled concrete products on the property. /\ critical factor
for this project is a steep slope which is greater than 409A and comprises the majority ofthe
property area.
This project required ASE to conduct adetailed topography and mapping survey of the property
to locate all improvements and in addition, make an accurate measurement of the volumes of
both the raw unprocessed concrete rubble and the recycled concrete stockpile. This projectwas
unusually challenging for the field survey crew due to the continuous activity of heavy machinery
on site for the operations of the plant. ASE subcontracted with a professional engineer to
manage the grading permit process with King County.
14g5NVVGilman Blvd Ste 14Issaquah, VVA08O27*Tel. (425)881-743OwFax (425)
124
American Surveying & Environmental, LCC
Land Su~eyorsuCons"ltam
Cleveland Construction Waterline
Location: City of Redmond:
Project Owner: FritOLay Company
Contract Value: $10,000
Project Description: The Frito-Lay Company has a product distribution center in Redmond
Washington along with 8 truck service and maintenance shop. Frito-Lay was planning to
construct an additional truck service and maintenance shop. The proposed location of the
building was over an existing underground water line. In order for the City of Redmond to issue a
building permit, the city required Frito-Lay tOrelocate the water line.
Under the supervision and direction of.a professional engineer, ASE produced the construction
plans for the waterline relocation. After construction approval was granted by the city, ASE
provided construction layout services for the new water line and for the proposed truck .service
and maintenance shop. After the waterline was constructed ASE conducted an as -built survey
and produced 'Record Drawings' from the field data. ASE provided the CAD files on state plane
coordinates tothe City ofRedmond G|Sdepartment for their use.
---------------�-�����- |�
1:
u
~�
-+- ^ ^
' /__~__.
'� ]
�
�
__7
-TT�T9�
RECORD DRAWING
Cowt�Ew=ECTCm
/
um
,0('
1495NW Gilman Blvd Ste 14 Issaquah, WA 98027wTel. (425) 881-743OwFax (425)
125
American Surveying & Environmental, LCC
Land Surveyors &Consultants
Stone Creek Homes Flood Study
Location: King County, WA (Redmond):
Project Owner: Stone Creek Homes, Jeff Christopherson
Contract Value: $2,000
Project Description: The property owner of this 20+ acre parcel of land was in the process of
acquiring a building permit from King County to build a second residence on the parcel. Directly
abutting the proposed building location runs a seasonal drainage course that drains the surface
water from higher elevations. The King county review engineer required that a flood study be
prepared by a professional engineer to approve the proposed building location.
ASE Provided land surveying services to provide mapping and topography of the stream sections
and the proposed building location for the engineer to prepare a flood study analysis.
N.Y.. 1/4 !It TIM. K., 1/I IN smanua a. II/W.111V 0 tAtat. kr.
KING COUNT% IVASIIINtilDN
VS.4:3,1a,MLIZ,,,r4=;!alUZ114==41
1495 NW Gilman Blvd Ste 14 Issaquah, WA 98027 • Tel. (425) 881-7430 • Fax (425)
881-7731. www.american-engineering.net
126
American Surveying & Environmental, LCC
Land Surveyors 8, Consultants
Cleveland Short Plat
Location: City of Sammamish
Project Owner: Cleveland Construction
Contract Value: $22,000
Project Description: This project is a 2-lot short plat on a parcel of land that is approximately 2.4
acres in area. The parcel is heavily wooded and contains and existing single family residence.
ASE provided boundary, mapping and topography services for lot design layout, civil and septic
design. ASE had a professional engineer on staff for oversight of civil design and management
throughout the review process. ASE prepared all of the preliminary and final construction
documents for short plat.
/ Lo.r
.............
'L.OT 1
NE4, SW4 OF SECTION 20, TOWNSHIP 25 NORTH, RANGE 5 EAST, W.M
71130311
AEC HO 55011191C/0
LoT
nrc HO 2061,11113901,100
6
1495 NW Gilman Blvd Ste 14 Issaquah, WA 98027 • Tel. (425) 881-7430 • Fax (425)
881-7731 www.american-engineering.net
127
American Surveying & Environmental, LCC
--- Land mNey~&Co=ltant.
Brown Sewer As -Built and Boundary Survev
Location: City ofSQn1nlarni5h
Project Owner: Mr. and Mrs. Ian Brown
Contract Value: $1/400
Project Description: This project was provided in two parts. The client intended to construct a
septic system on the property for future construction. The Sanornarnish Plateau Water and
Wastewater District required a survey to determine the distance of the closest property corner
to manhole in the local vicinity in order 'todetermine mfthe property owner was legally able t8
construct private septic system rather than be required to connect to the public wastewater
district sevv2[ system. ASE was also requested to provide a boundary survey of the parcel in
question. `
Due to the position of Pine Lake, the North -South section centerline, which is one of the parcel
boundary lines, was not r0onurnentedQDthe ground during the original Government Land Office
Survey conducted during 1864.This project required an exhaustive search of the public records
along with a diligent field 'search For survey evidence to hest determine the location of this |lne-
ASE was able to overcome the challenges of the project to complete the survey the client
committed timeline.
� NEv«n' R.
=~
mm
)
°
Wain-
�
Jill
El
UP
nur LEGM
1495 NWGilman Blvd Ste 14Issaquah, WA 98027 * Tel.(425) 881-743U*Fax (425)
128
American Surveying & Environmental, LCC
and Suweyors&Consultants
Schafer Lot Line Alteration, BounrUarv& Topographic Surfev
Location: City ofKirkland
Project Ovvner. Mr. Maurice Schafer
~
Contract Value: �
Project Description: This project was provided in two parts. The client primarily requested lot
line alteration in order to provide an abutting parcel additional area to meet zoning compliance
for planned future land use. ASE was also requested to provide a boundary and topographic
survey of both parcels for marketing purposes. ASE conducted 8 complete boundary, mapping
and topography survey of both parcels maintaining the promised delivery timeline for the Lot
line Alteration documents along with the plat of survey for each of the parcels topography
survey's.
~^114 W"==w
�_.,�~�y_�--__-,
=~=` �n,~^~~~^~~. `
i~, /
.~ .~~
. ., . . .
n~~~~~~ //--_r— /
/
^
i;6i���
�
/
� '
�
�
�
I Of I
1495 NVVGilman Blvd Ste 14Issaquah, VVA98O27 *Tel. (425) 881-7430 * Fax(425)
129
nWM
Federal Aid Number
Contract Number
Firm Gross Receipts
0
E
M
()
Firm Age
cv
Scope of Work
Construction Surveying
Agency Name
Prime Contractor Name
Contract Name
NAICS
Codes
co
O
Q
ti
co
r-
c7'
Lt)
Gender
O
d
o
f3
t
:c
CO '
0
o
z
Address
(incl. Zipcode)
1495 NW Gilman Blvd.
14, Issaquah, Wa 98027
Firm/
Subcontractor
Name
American
Surveying & Enviro
0)
Prime Contractor Representa
130
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
February 24, 2025, 5:30 p.m. - Hybrid Meeting; City Council Conference Room & MS Teams
Councilmembers Present Jovita McConnell, Chair; Hannah Hedrick, Mohamed Abdi
Staff Present Pete Mayer, Griffin Lerner, Catrien de Boer, Shawn Christie, Laurel
Humphrey, Brandon Miles, Adib Altallal, David Baus
Guests Laura Maman, Justine Kim, John Palewicz, Ryan Duckworth, Mike Herzog
1. BUSINESS AGENDA
A. Tukwila Maintenance and Operations East Campus Project Update
Staff and consultants presented an update on the project's revised scope.
Committee Recommendation
Discussion only. Forward to March 10, 2025 Committee of the Whole.
B. Bid Award: S. 149th St & S. 150th Watermain Replacement
Staff is seeking approval of a construction contract with Pape & Sons Construction, Inc. in the
*amount of $1,214,012.98.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
C. Design Contract: Ryan Hill Water System Connection
Staff is seeking approval of a contract with Carollo Engineers in the amount of $601,505.00
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
D. Project Completion: 2024 Overlay and Repair
Staff is seeking approval of contract completion and release of retainage with ICON Materials,
Inc. in the final amount of $867,537.54.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
E. Consultant Contract: 2025 Annual Overlay Program
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $487,198.99 for
design and construction management services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
131
132
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.1.
STAFF SPONSOR: DAVID BAUS
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE 2025 Annual Overlay Program - Engineering Services Contract
Design and CM Consultant Selection and Agreement
CATEGORY ❑ Discussion
Mtg Date
Motion
Date
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
lltg
3/3/2025
SPONSOR Council ❑Mayor ❑HR EIDCD Finance Fire ❑T5 ❑P&R ❑Police ®PIS ECourt
SPoNsoR's Every year, Public Works issues a construction project to grind and overlay several blocks
SUMMARY of roadway in the City. This work is intended to preserve and maintain the street structure,
preventing premature failure. City staff issued a Request for Qualifications for this project
in January 2025 and received one response from Psomas. Psomas was interviewed and met
all the qualification and the City's objectives. Council is being asked to approve a new
contract for Psomas on the 2025 Annual Overlay Program in the amount of $487,198.99.
REVIEWED BY ® Trans&Infrastructure C CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
I"IEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$487,198.99 $500,000.00 $0.00
Fund Source:
Comments: 2025 CIP — Annual Over/ay and Repair Program
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/21/25
2025 CIP — Annual Overlay and Repair Program
Psomas 2025 Overlay Consultant Contract
Proposed 2025 Overlay Map
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
133
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation & Infrastructure Services Committee
FROM: Pete Mayer, Public Works Interim Director
BY: David Baus, Public Works Transportation Project Manager
CC: Mayor McLeod
DATE: February 21, 2025
SUBJECT: 2025 Annual Overlay Program - Engineering Services Contract
Project No. 82510401
Design and CM Consultant Selection and Agreement
ISSUE
Execute a contract with Psomas, Inc. to provide design and CM services for the 2025 Overlay and Repair Program.
BACKGROUND
Every year, Public Works issues a construction project to grind and overlay several blocks of roadways in the City of Tukwila.
The annual overlay program is intended to preserve and maintain the street structure in a safe and useable state by
resurfacing before failure, which also minimizes costs. Before work can commence, an engineer of record is required to
prepare, design, and manage construction of the project. Psomas provides a unique blend of knowledge and understanding of
the City's overlay program that provides efficiency and benefits which cannot be matched at this time by any other firm.
Psomas has also performed very well in providing construction management services.
DISCUSSION
City staff issued a Request for Qualifications for this project in January 2025 and received one response from Psomas. City
staff interviewed Psomas in January and determined that Psomas staff meet project requirements and the City's objectives.
Psomas has provided a contract, scope of work, and fee estimate to complete the design of the 2025 Overlay and Repair
Program and advertise for construction bids. The preliminary location for the 2025 Overlay is shown on the attached map.
The final selections of relevant roadways will be made after the design cost estimates have been completed. Specific roadway
segments are based on several factors, including but not limited to Pavement Condition Index which accounts for the condition
of the pavement surface distress, roughness, structural conditions, community complaints, and street classification. Water
District 125 recently upgraded the water main under Macadam Road, resulting in damage to the road. Their project initially
included partial asphalt overlays. However, we've collaborated with them to perform a full -width overlay, with Water District
125 covering part of the cost.
FINANCIAL IMPACT
2025 Design and CM Contract
Psomas Contract Budget
$487,198.99 $500,000.00
RECOMMENDATION
Council is being asked to approve a new contract for Psomas on the 2025 Annual Overlay Program in the amount of $487,198.99
and consider this item on the Consent Agenda at the March 03, 2025 Regular Council Meeting.
ATTACHMENTS: 2025 CIP page
Psomas 2025 Overlay Consultant Contract
2025 Overlay Map
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
134
2025 - 2026 Biennial Budget
City of Tukwila, Washington
PROJECT:
A CAPITAL PROJECT SUM
2025 to 2030
Annual Overlay and Repair Program
Project Manager David Bads
DESCRIPTION:
JUSTIEICATION:
STATUS:
:MAINTENANCE
COMMENT:
PACT:
NARY
Project # 80010401
Department
Arterial Streets
Select, design, and construct asphalt and concrete pavement overlays of arterial and residential streets.
Preserve and maintain the street struc
minimizes costs. Some individual site:
Each year var"lous sections of road
urn: in asafe and useabte
may be coordinated with
ythroughou
the C
Roughly 1,300 Man Hours go to filling in potholes per year, so
Ongoing prof t. Only oneyi
ec
a
actu
hown"in fi
otu'
n
e by resurfacing before failure which also
er, sewer, and surface water projects.
and
0
ruc
d
or
sphatt ove
hence
FINANCIAL(inthousands)
2025
2026
2027
2028
2029
2030
Beyond
TOTAL
Project Costs
Project Mgmt (Staff Time/Cost)
$ 50
$
$ 20
$ 20
$ 20
$ 20
$ 20
$ 150
Design
$ 300
$
$ 150
$ 150
$ 150
$ 150
$ 150
$ 1,050
Construction Mgmt.
$ 200
$
$ 200
$ 200
$ 200
$ 200
$ 200
$ 1,200
Construction
$ 2,000
$
$ 2,000
$ 2,000
$ 2,200
$ 2,200
$ 2,400
$ 12,800
Contingency
$ -
$
$ 150
$ 150
$ 150
$ 150
$ 150
$ 750
Total Project Costs
$ 2,550
$ -
$ 2,520
$ 2,520
$ 2,720
$ 2,720
$ 2,920
$ 15,950
Project Funding
Dedicated/Restricted Rev
$ 2,550
$ -
$ 1,520
$ 1,520
$ 1,650
$ 1,650
$ 1,650
$ 10,540
General Fund Transfer
$ -
$ -
$ 1,000
$ 1,000
$ 1,070
$ 1,070
$ 1,360
$ 5,500
Total Project Funding
$ 2,550
$ -
$ 2,520
$ 2,520
$ 2,720
$ 2,720
$ 3,010
$ 16,040
e designed c nst to f rl
if budget is increased this could be cut in hal
363
135
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Contract Number:
PROFESSIONAL SERVICES AGREEMENT
(Includes consultants, architects, engineers, accountants, and other professional services)
THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter
referred to as "the City", and Psomas Inc., hereinafter referred to as "the Consultant", in consideration
of the mutual benefits, terms, and conditions hereinafter specified.
1. Project Designation. The Consultant is retained by the City to perform Survey, Design, and
Construction Management services in connection with the project titled 2025 Annual
Overlay Program .
2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A"
attached hereto, including the provision of all labor, materials, equipment, and supplies.
3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and
effect for a period commencing upon execution and ending December 31, 2026, unless sooner
terminated under the provisions hereinafter specified. Work under this Agreement shall
commence upon written notice by the City to the Consultant to proceed. The Consultant shall
perform all services and provide all work product required pursuant to this Agreement no later
than December 31, 2026, unless an extension of such time is granted in writing by the City.
4. Payment. The Consultant shall be paid by the City for completed work and for services
rendered under this Agreement as follows:
A. Payment for the work provided by the Consultant shall be made as provided on Exhibit
"B" attached hereto, provided that the total amount of payment to the Consultant shall not
exceed $487,198.99 without express written modification of the Agreement signed by the
City.
B. The Consultant may submit vouchers to the City once per month during the progress of
the work for partial payment for that portion of the project completed to date. Such
vouchers will be checked by the City and, upon approval thereof, payment shall be made
to the Consultant in the amount approved.
C. Final payment of any balance due the Consultant of the total contract price earned will be
made promptly upon its ascertainment and verification by the City after the completion of
the work under this Agreement and its acceptance by the City.
D. Payment as provided in this section shall be full compensation for work performed,
services rendered, and for all materials, supplies, equipment and incidentals necessary to
complete the work.
E. The Consultant's records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City and the state of Washington for a
period of three (3) years after final payments. Copies shall be made available upon
request.
136
5. Ownership and Use of Documents. All documents, drawings, specifications and other
materials produced by the Consultant in connection with the services rendered under this
Agreement shall be the property of the City whether the project for which they are made is
executed or not. The Consultant shall be permitted to retain copies, including reproducible
copies, of drawings and specifications for information, reference and use in connection with
the Consultant's endeavors. The Consultant shall not be responsible for any use of the said
documents, drawings, specifications or other materials by the City on any project other than
the project specified in this Agreement.
6. Compliance with Laws. The Consultant shall, in performing the services contemplated by
this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances
and regulations, applicable to the services rendered under this Agreement.
7 Indemnification. The Consultant shall defend, indemnify and hold the City, its officers,
officials, employees and volunteers harmless from any and all claims, injuries, damages,
losses or suits including attorney fees, arising out of or resulting from the acts, errors or
omissions of the Consultant in performance of this Agreement, except for injuries and damages
caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence. It is further specifically
and expressly understood that the indemnification provided herein constitutes the Consultant's
waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this
indemnification. This waiver has been mutually negotiated by the parties. The provisions of
this section shall survive the expiration or termination of this Agreement.
8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from
or in connection with the performance of the work hereunder by the Consultant, its agents,
representatives, or employees. Consultant's maintenance of insurance as required by the
agreement shall not be construed to limit the liability of the Consultant to the coverage provided
by such insurance, or otherwise limit the City's recourse to any remedy available at law or in
equity.
A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the
types and with the limits described below:
1. Automobile Liability insurance with a minimum combined single limit for bodily injury
and property damage of $1,000,000 per accident. Automobile Liability insurance
shall cover all owned, non -owned, hired and leased vehicles. Coverage shall be
written on Insurance Services Office (ISO) form CA 00 01 or a substitute form
providing equivalent liability coverage. If necessary, the policy shall be endorsed to
provide contractual liability coverage.
2. Commercial General Liability insurance with limits no less than $2,000,000 each
occurrence, $2,000,000 general aggregate. Commercial General Liability
insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall
cover liability arising from premises, operations, stop -gap independent contractors
and personal injury and advertising injury. The City shall be named as an
additional insured under the Consultant's Commercial General Liability insurance
policy with respect to the work performed for the City using an additional insured
endorsement at least as broad as ISO endorsement form CG 20 26.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
CA revised May 2020
Page 2
137
4. Professional Liability with limits no Tess than $2,000,000 per claim and $2,000,000
policy aggregate limit. Professional Liability insurance shall be appropriate to the
Consultant's profession.
B. Public Entity Full Availability of Contractor Limits. If the Contractor maintains higher
insurance limits than the minimums shown above, the Public Entity shall be insured for the
full available limits of Commercial General and Excess or Umbrella liability maintained by
the Contractor, irrespective of whether such limits maintained by the Contractor are greater
than those required by this Contract or whether any certificate of insurance furnished to
the Public Entity evidences limits of liability lower than those maintained by the Contractor.
C. Other Insurance Provision. The Consultant's Automobile Liability and Commercial
General Liability insurance policies are to contain, or be endorsed to contain that they shall
be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance
pool coverage maintained by the City shall be excess of the Consultant's insurance and
shall not be contributed or combined with it.
D. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best rating of not less than A:VII.
E. Verification of Coverage. Consultant shall furnish the City with original certificates and a
copy of the amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of the Contractor
before commencement of the work. Upon request by the City, the Consultant shall furnish
certified copies of all required insurance policies, including endorsements, required in this
Agreement and evidence of all subcontractors' coverage.
F. Notice of Cancellation. The Consultant shall provide the City with written notice of any
policy cancellation, within two business days of their receipt of such notice.
G. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the
insurance as required shall constitute a material breach of contract, upon which the City
may, after giving five business days notice to the Consultant to correct the breach,
immediately terminate the contract or, at its discretion, procure or renew such insurance
and pay any and all premiums in connection therewith, with any sums so expended to be
repaid to the City on demand, or at the sole discretion of the City, offset against funds due
the Consultant from the City.
9. Independent Contractor. The Consultant and the City agree that the Consultant is an
independent contractor with respect to the services provided pursuant to this Agreement.
Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the parties hereto. Neither the Consultant nor any employee of the
Consultant shall be entitled to any benefits accorded City employees by virtue of the services
provided under this Agreement. The City shall not be responsible for withholding or otherwise
deducting federal income tax or social security or for contributing to the state industrial
insurance program, otherwise assuming the duties of an employer with respect to the
Consultant, or any employee of the Consultant.
10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or
retained any company or person, other than a bonafide employee working solely for the
Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any
company or person, other than a bonafide employee working solely for the Consultant, any
fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon
or resulting from the award or making of this contract. For breach or violation of this warrant,
the City shall have the right to annul this contract without liability, or in its discretion to deduct
from the contract price or consideration, or otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift, or contingent fee.
CA revised May 2020
138
Page 3
11. Discrimination Prohibited. Contractor, with regard to the work performed by it under this
Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin,
age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation,
the presence of any disability, or any other protected class status under state or federal law,
in the selection and retention of employees or procurement of materials or supplies.
12. Assignment. The Consultant shall not sublet or assign any of the services covered by this
Agreement without the express written consent of the City.
13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation
provided for in this Agreement shall not constitute a waiver of any other provision.
14. Termination.
A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days
written notice to the Consultant.
B. In the event of the death of a member, partner or officer of the Consultant, or any of its
supervisory personnel assigned to the project, the surviving members of the Consultant
hereby agree to complete the work under the terms of this Agreement, if requested to do
so by the City. This section shall not be a bar to renegotiations of this Agreement between
surviving members of the Consultant and the City, if the City so chooses.
15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the
Consultant shall at all times comply with, all applicable federal, state and local laws,
regulations, and rules, including the provisions of the City of Tukwila Municipal Code and
ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is
instituted to enforce any term of this Agreement, the parties specifically understand and agree
that venue shall be properly laid in King County, Washington. The prevailing party in any such
action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising
from or related to this Agreement shall be exclusively in King County Superior Court.
16. Severability and Survival. If any term, condition or provision of this Agreement is declared
void or unenforceable or limited in its application or effect, such event shall not affect any other
provisions hereof and all other provisions shall remain fully enforceable. The provisions of this
Agreement, which by their sense and context are reasonably intended to survive the
completion, expiration or cancellation of this Agreement, shall survive termination of this
Agreement.
17. Notices. Notices to the City of Tukwila shall be sent to the following address:
City Clerk
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Notices to Consultant shall be sent to the following address:
Psomas Inc.
3131 Elliott Avenue, Suite 400
Seattle, WA 98121
18. Entire Agreement; Modification. This Agreement, together with attachments or addenda,
represents the entire and integrated Agreement between the City and the Consultant and
supersedes all prior negotiations, representations, or agreements written or oral. No
amendment or modification of this Agreement shall be of any force or effect unless it is in
writing and signed by the parties.
CA revised May 2020
Page 4
139
DATED this day of , 20
** City signatures to be obtained by
City Cleric's Staff ONLY. **
CITY OF TUKWILA
Allan Ekberg, Mayor
ATTEST/AUTHENTICATED:
Christy O'Flaherty, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
** Consultant signature to be obtained by
sponsor staff **
CONSULTANT:
By:
Printed Name: Nandez Miller
Title: Vice President
CA revised May 2020
140
Page 5
EXHIBITA
City of Tukwila
2025 Annual Overlay Program
Scope of Work
February 10, 2025
The Consultant shall prepare final Plans, Specifications and Estimates for the 2025 Annual
Overlay. The project extents shall be Macadam Rd S/ 51st Ave S from Interurban Ave S to
Klickitat Dr. Project length may be adjusted based on the Construction Cost Estimate. The
design work will involve survey and basemapping, pavement evaluation, ADA ramp design, and
channelization design. Construction Administration during construction will also be included in
this scope of work.
The 2025 Annual Overlay Program will be bid as a single bid package as budget allows. Detailed
estimates will be prepared at the 30% design to verify the final project extents to be included in
the 2025 Overlay Program.
The Consultant shall utilize the data collection and analysis provided by Infrastructure
Management Service (IMS) to identify additional roadway segments to be included in the
design and construction of the 2025 Overlay Program.
The City of Tukwila may require other services of the consultant. These services could include
additional design, right of way, environmental documentation, or other work tasks not included
in the scope of work. At the time these services are required, the Consultant will provide the City
City of Tukwila
PSOMAS
2025 Annual Overlay Page 1 of 12 February 2025
141
with a detailed scope of work and an hour and fee estimate. The Consultant will not proceed
with the work until the City has authorized the work and issued a Notice to Proceed.
Assumptions for the 2025 Overlay Program Bid Package
• Roadway and utility casting mapping will be based on aerial photography, GIS, and
field reviews by the Consultant. Topographic field survey may be required for ADA
ramp improvements and will be performed by the Consultant as required.
• Typically, only surface utilities requiring adjustment to grade will be shown.
• No utility upgrades are anticipated in the project design.
• No signal upgrades are anticipated in the project design.
• Drainage & Water Quality Reports will not be required.
• Environmental Documentation will not be required.
• Consultant shall not be responsible for printing and supplying City or Contractor with
hard copies of plans and specifications at interim submittals or contract award.
• Anticipated Sheet Set is as follows:
o Cover 1
o Details 2
o Roadway and Channelization Plans 13
o Curb Ramp Details 4
o Traffic Control Plans 4
(for WSDOT Limited Access Only)
o Total 24
T,S roject anae ent
1.1 The Consultant shall provide continuous project management and administration for the
duration of the Project. (Estimate 6 months).
• Hold project coordination meetings with the City to update progress and review
submittals. Assume six (6) meetings.
• The Consultant shall provide monthly status reports and billings.
• The Consultant shall provide independent QA/QC reviews by senior in-house staff
of all deliverables prior to submittal to the City.
1.2 The Consultant shall coordinate with WSDOT to get approval needed for work within
limited access. (Estimate 4 months)
• Distribute 90% Plans for review
• Hold project coordination meetings with WSDOT to review traffic control plans.
Assume three (3) meetings
City of Tukwila PSOMAS
2025 Annual Overlay Page 2 of 12 February 2025
142
TASK 2 - Survey an ase ain
Limits of survey: Intersection of Macadam Ave S/ S 144th St/ 515t Ave S
2.1 Generate a project basemap based on field survey, available GIS, aerial imagery, and field
verification.
• Establish horizontal and vertical control points along the corridor for field
topographic survey. Basis of control will be NAD83(2011) and NAVD88. The
Consultant will locate, field survey, and calculate positions for all monuments and
control points throughout the survey limits, using the Washington State plane
coordinate system. Conventional or GPS surveying methods will be used on this
project.
• Detailed survey within survey extents including invert elevations of gravity utilities
present.
• Right of Way will be determined based on publicly available information and
existing street monuments.
• Features in areas not surveyed will be drawn in based a combination of aerial
imagery, GIS, street view, and field verification.
TASK 3 relj inary and Final L}esj; n
3.1 Complete Macadam Speed and Safety Study
• The Consultant shall complete the speed and safety study to inform the City of
potential opportunities to install traffic calming and safety installations along the
corridor.
3.2 The Consultant shall prepare 30% Plans
• Ramp grading will not be included in 30% Plans.
• Incorporate desired potential speed and safety management installations from task
3.1.
• Traffic Control Plans will not be included in 30% Plans.
3.3 The Consultant shall calculate quantities and prepare a Preliminary Engineers Estimate of
Probable Construction Cost for the 30% Plans.
3.4 The Consultant shall prepare 90% Plans. The proposed improvements including the
following:
City of Tukwila PSOMAS
2025 Annual Overlay Page 3 of 12 February 2025
143
• The Consultant shall perform site walkthroughs with the City staff to determine extent
of roadway improvements / resurfacing (Estimate 2 meetings) and to optimize the
available budget.
• Plans shall be prepared with such provisions in such detail as to permit field layout
and construction within a degree of accuracy acceptable to the City and per industry
standards.
• Typical sections and details will be prepared for items not available as standard details
from the City, State, or WSDOT standard drawings.
• Plans will identify curb ramp replacement limits and pedestrian push button
modifications in accordance with ADA requirements.
• The plans shall illustrate complete details of construction of the proposed
improvements including limits of construction and removals, utility adjustments,
surfacing depths and details, and applicable channelization and signing for the
segments selected for final design.
• Plans and specifications will include required criteria for traffic control plans and
pedestrian traffic control during construction. Criteria will be developed in
collaboration with the City.
• Pavement sections will be determined through consultation with the City's
maintenance staff and previous experience. No geotechnical investigations are
anticipated.
3.5 The Consultant shall calculate quantities and prepare an Engineers Estimate of Probable
Construction Cost for the 90% Plans.
3.6 The Consultant shall prepare the Contract Specification per 2025 WSDOT Standard
Specifications for the 90% Review Submittal and the Bid Documents.
3.7 The Consultant shall prepare Final Plans, Engineers Estimate of Probable Construction
Cost, and Contract Documents including Project Special Provisions.
Deliverables
• Updated Macadam Speed and Safety Study Memorandum
• 30% Plans & Cost Estimate (pdf)
• 90% Plans, Cost Estimate, & Project Special Provisions (pdf)
• Final Plans, Cost Estimate, & Contract Documents including Project Special Provisions
(pdf)
City of Tukwila PSOMAS
2025 Annual Overlay Page 4 of 12 February 2025
144
TASK 4 - i Period Services
4.1 The Consultant shall assist the City with Project Advertisement and Award by uploading
plans and specifications to bxwa.com, preparing addenda, bid tabulation, and
recommendation for award.
Deliverables
• Recommendation of Award Letter (pdf)
• Bid Tabulation (excel and pdf)
• Addenda, as required
T.S 5 - Construction inistration
anae
ent
Provide overall project management, coordination with the City, monthly progress reports, and
invoicing. This effort will include the following elements.
5.1 Organize and layout work for project staff. Prepare project instructions on contract
administration procedures to be used during construction.
5.2 Review monthly expenditures and CM team scope activities. Prepare and submit monthly
project progress reports to the City along with invoices describing CM services provided each
month. Prepare and submit reporting required by funding source(s), if any.
Deliverables:
• Monthly invoices and progress reports
T S re -construction Services
6.1 Administrative Services up to Contractor Notice to Proceed (NTP): Psomas will provide
support startup of the project with any miscellaneous administrative needs as further
detailed below:
a. Preconstruction (PreCon) Photos: Psomas staff shall collect and log a
comprehensive set of precon photos, prior to City Contractor mobilizing to the
site, for the purpose of documenting pre-existing site conditions. These shall be
delivered to the City in digital form as part of the final project files.
b. Review Plans and Specs: Psomas staff shall familiarize themselves with all plans,
specs, and City standards that will be incorporated into this project, in order to
familiarize themselves with project limits, elements of work to be performed,
measurement and payment, and other project -specific considerations, prior to
the first working day.
City of Tukwila PSOMAS
2025 Annual Overlay Page 5 of 12 February 2025
145
c. Prepare Hard and Electronic Files: The Consultant will prepare all electronic and
hard copy files in preparation for the project. SharePoint will not be utilized on
this contract.
d. Prepare Record of Materials (ROM): Consultant shall modify WSDOT-provided
ROM, to algin with LAG manual exceptions and to improve ease of use by all
project parties. In the absence of a WSDOT-provided ROM, Psomas can generate
a ROM from scratch, however creation of a complete project ROM is outside the
scope of the current budget and may require a supplement.
e. Preconstruction Conference: Psomas will prepare an agenda for, distribute
notices of, and conduct a preconstruction conference in the City's offices or via an
on-line platform of the City's choice. The Consultant's team will attend the
preconstruction conference. Pertinent City staff and private utilities will also be
present at this meeting. Psomas will prepare a written record of the meeting and
distribute copies of the minutes to all attendees and affected agencies, staff, etc.
At the Preconstruction conference, the Consultant shall help facilitate discussions
with the Contractor concerning the plans, specifications, schedules, pay estimate
timelines and cutoff dates, issues with utilities, any unusual conditions, State and
local requirements and any other items that will result in better project
understanding among the parties involved.
f. Prepare Templates: Psomas will pre -populate all electronic forms, either
Consultant or City provided, in preparation for contract administration. This
includes pay estimate templates, weekly working days statements, inspector daily
reports, change management tracking templates, etc.
g•
Utility Coordination: Consultant will assist with external and internal
communications regarding utility coordination required for successful completion
of the project, including utility relocations, required service interruptions, etc.
Deliverables:
• Preconstruction conference meeting minutes
Pre -construction Photos
TASK 7 Construction ffice Su pso t
7.1 Construction Management Office Support: Original documentation will be housed at the
Consultant's office and filed in accordance with standard filing protocol. Document Control
will consist of the following:
City of Tukwila PSOMAS
2025 Annual Overlay Page 6 of 12 February 2025
146
a. Project Coordination: Liaison with City, construction Contractor, engineer,
utilities and property owners on a regular basis to discuss project issues and
status.
b. Plan Interpretations: Provide technical interpretations of the drawings,
specifications, and Contract Documents, and evaluate requested deviations from
the approved design or specifications. Coordinate with City for resolution of
issues involving scope, schedule, and/or budget changes.
c. Submittals: Consultant shall take lead on submittal reviews/ approvals.
Consultant shall coordinate review process for shop drawings, samples, traffic
control plans, test reports, and other submittals from the Contractor for
compliance with the contract documents. Submittals shall be logged and tracked
by Consultant.
d. Requests for Information (RFI): Consultant shall review and respond to RFI's. RFI's
shall be logged and tracked by Consultant.
e. Weekly Meetings: Consultant will lead weekly meetings. Consultant will prepare
agenda for City review and distribute meeting minutes to attendees. Outstanding
issues to be tracked on a weekly basis. Weekly Statement of Working Days will be
reviewed/accepted by Contractor during the Weekly Meeting.
f. Change Orders: The Consultant will develop change orders and the Consultant
will provide technical assistance to negotiate change orders, and assist in
resolution of disputes which may occur during the course of the project. The City
will approve all change orders before being fully executed. Each change order will
be executed in accordance with WSDOT Standard Specifications.
g•
Field Work Directives: The Consultant will prepare field work directives as
necessary to keep the Contractor on schedule.
h. Force Account: The Consultant will track Contractor force account labor,
equipment and materials. All force account calculations will be verified by the City
and double checked by the Consultant. The City shall have final authority to
approve any Force Account work prior to agreement with the Contractor.
i. Schedule Review: Consultant shall perform review of initial Contractor provided
CPM for conformance with the Contract Documents. Any discrepancies, conflicts
or unreasonable work durations will be brought to the attention of the Contactor
and City. Consultant will provide one (1) intermediate review of Contractor's
updated schedule and compare with field -observed progress and duration of the
project.
j•
Lump Sum Breakdown: Consultant shall evaluate construction Contractors'
Schedule of Values for lump sum items. Review the Contract Price allocations and
verify that such allocations are made in accordance with the requirements of the
City of Tukwila PSOMAS
2025 Annual Overlay Page 7 of 12 February 2025
147
Contract Documents. Lump Sum Breakdowns for payment each month will be
calculated.
k. Monthly Pay Requests: Consultant shall prepare monthly requests for Contractor
payment based on field note records prepared by Consultant field inspector in
accordance with contract documents.
I. Weekly Statement of Working Days: Consultant shall prepare, and issue weekly
statement of working day report each week to the Contractor and City for review
and approval. Weekly statement of working days will be based on field inspection
reports provided by Consultant.
m. Subcontractor Documentation: Process / approve all required subcontractor
documentation. Request to Sublets will be verified and logged. This includes
checking System Award Management System (SAMS), verifying business licensing,
reviewing insurance documentation, verifying city business licensing, Intent to Pay
Prevailing Wage and Affidavit of Wages Paid. All subcontractor documentation will
be logged into PSOMAS's subcontractor logs.
7.2 Certified Payroll: The Consultant will process and check the Contractor and Subcontractor's
certified payroll per State Prevailing Wage Requirements. Tracking of payroll shall consist of
recording each payroll received from the Prime and Subcontractors and checking pay rates
against Contract requirements. Any discrepancies will be brought to the Contractor and City.
Deliverables:
• Approved Submittals and Submittal log
• Responded RFIs and RFI Log
• Weekly Meeting minutes
• Fully -executed Change Orders and Field Work Directives, with Change Management Log
• Force Account Documentation and Tracking Log
• Fully -executed Monthly Progress Payments
• Subcontractor Packets
• Weekly Statements of Working Days
• Certified Payroll Tracking Log (hard copy binder not included)
• Contractor -generated As-builts, if required by Contract
All other project documentation generated during the course of project construction duration.
City of Tukwila PSOMAS
2025 Annual Overlay Page 8 of 12 February 2025
148
T S Construction se v tion
8.1 Construction Observation: The Consultant will provide one (1) inspector during construction
activities and other tasks necessary to monitor the progress of the work. The Inspector will
ensure that the daily inspection reports and working days reporting are completed in a timely
manner and contain sufficient information to assess whether the work is being conducted in
compliance with the Contract Documents per City, WSDOT,. Consultant will make IDR's
available to the City by Friday of the same work week upon request.
The Inspector may perform the following duties as a matter of his daily activities:
i. Observe technical conduct of the construction, including providing day-to-day
contact with construction contractor, City, utilities, and other stakeholders, and
monitor for adherence to the Contract Documents. The Consultant's personnel
will act in accordance with Sections 1-05.1 and 1-05.2 of the WSDOT Standard
Specifications.
ii. Observe material, workmanship, and construction areas for compliance with the
Contract Documents and applicable codes, and notify construction contractor of
noncompliance. Advise the City of any non -conforming work observed.
iii. Document all material delivered to the job site in accordance with the Contract
Documents.
iv. Prepare daily inspection reports, recording the construction contractor's
operations as actually observed by the Consultant; includes quantities of work
placed that day, contractor's equipment and crews, and other pertinent
information.
v. Interpret Contract Documents in coordination with the City, Contractor, and
PSOMAS.
vi. Resolve questions which may arise as to the quality and acceptability of material
furnished, work performed, and rate of progress of work performed by the
construction contractor.
vii. Support the Contractor's communication and responsibilities to answer questions
from property owners and the general public as needed.
viii. Monitor compliance of approved permits per the project specifications, if
applicable.
ix. Prepare field records and documents to ensure the Project is administered in
accordance with the plans and specifications.
x. Collect and calculate delivery tickets and scaleman's daily reports of aggregate. All
tickets will be initialed with correct bid item and stationing identified
(Construction Manual 10-2).
xi. Attend and actively participate in regular on -site weekly construction meetings.
City of Tukwila PSOMAS
2025 Annual Overlay Page 9 of 12 February 2025
149
xii. Take digital photographs during the course of construction, and record locations.
Assumptions:
• Consultant will provide observation services for the days/hours that the contractor's
personnel are on -site.
• Assumption is Client's Contractor shall work normal 40-hour work weeks. For this project
the "normal" work week may occur at night. Psomas does not differentiate day shift from
night shift. However, if the City's Contractor works a double shift (both day and night)
within a single 24-hour period this will constitute two working days. Consultant's hours
for inspection are based on one shift for number of working days allowed per Contract.
• Assumption is if Contractor is working at multiple sites within the City of Tukwila, the
Consultant will split their time at the multiple locations and prioritize what location to be
at for observation.
• The Consultant's monitoring of the construction contractor's activities is to ascertain
whether they are performing the work in accordance with the Contract Documents; in
case of noncompliance, Consultant will reject non -conforming work, and pursue the other
remedies in the interests of the client, as detailed in the Contract Documents.
Deliverables:
• Daily Construction Reports with project photos.
• Field Note Records for all field -measurable pay items.
• Review material test reports for compliance.
TASK 9Project Closeout
9.1 Closeout Office Support: Consultant shall assist with generation of closeout documentation
and pursuit of successful project final completion, as detailed below:
a. Substantial Completion Letter: Following full and unrestricted use of the project status
being obtained by the Contractor and agreed to by the City, Consultant shall draft
Substantial Completion Letter on City letterhead, for issuance to Contractor.
b. Physical Completion Letter: Following completion of all punch list work verified by the
Consultant and any stakeholders required the Consultant shall prepare physical
completion letter to the Contractor and the City shall issue the final contract voucher.
c. Final Pay Estimate: Consultant shall prepare final payment estimate, along with any final
quantity adjustments needed to existing bid items, for issuance to Contractor, in
conjunction with the final contract voucher, issued by the City.
City of Tukwila PSOMAS
2025 Annual Overlay Page 10 of 12 February 2025
150
d. Closeout Inspection and Punchlist: Consultant shall assist in a punchlist walkthrough
with Contractor, City staff, and any other necessary agencies for the purposes of
developing a final project punchlist. The Consultant shall assemble walkthrough
comments and provide the preliminary list to the City for concurrence, prior to issuing
the list to the Contractor. On notification of completion of the punchlist, Consultant shall
perform a final walkthrough to confirm satisfactory completion of all items on the list
and shall note any remaining discrepancies. Subsequent project walkthroughs are
beyond the scope of this agreement, but will be accommodated should the request be
made by the City, and sufficient remaining budget allows.
e. Certified Payroll Closeout: Consultant shall attempt to ensure that all certified payrolls
and affidavits of wages paid are current and complete at the time of project physical
completion. This will include regular checks of the L&I portal and frequent reminders to
the Contractor to provide any missing information in a timely manner. As the task of
gathering the final documentation from Contractors and their Subcontractors can
sometimes be an extended process, outside the control of the City or Consultant, after 8
weeks post -physical completion, the Consultant shall perform a final status update of
the CP tracking log, along with memos to file of any missing documentation, and shall
hand off the remaining verification process to the Client.
f. Prepare Documentation to Deliver to City: Consultant shall perform QA/QC on all
project documentation deliverables as outlined in Task 4.1, as well as any documentation
generated in the course of completion of Task 5, and shall transfer all project documents
to the City for permanent storage.
• Substantial Completion Letter
• Physical Completion Letter
• Final Payment Invoice
• Project Punchlist
• Final Project Documents
itional Services
The City may require additional services of the Consultant in order to advance all or portions of
the project. This work may include items identified in the current task authorizations as well as
other items, which may include, but are not limited to the following:
• Planning of future City Street overlay candidates
• Permitting or environmental studies
• Additional design services
• Right of Way services
City of Tukwila PSOMAS
2025 Annual Overlay Page 11 of 12 February 2025
151
These services will be authorized under a future contract supplement if necessary. At he time
these services are required, the Consultant shall provide a detailed scope of work and an
estimate of the costs. The Consultant shall not proceed with the work until the City has
authorized the work and issued a notice to proceed.
City of Tukwila PSOMAS
2025 Annual Overlay Page 12 of 12 February 2025
152
EXHIBIT B
PRIME CONSULTANT COST COMPUTATIONS
Client:
Project Name:
Psomas Project Number:
Date:
City of Tukwila
2025 Annual Overlay
9XXX0X0X00
2/10/2025
PS OMAS
Task
No,
$50 00
abar Hour Estimate
$94.00
$70,70
03 at
c;a
$42.43
$65.15
50.00
Total Hours and Labor
Cost Computations by Task
Hours
Task 1- Project Management
1.1
Project Management
8
20
20
8
8
64
4,116.40
1.2
WSDOT Coordination
8
12
16
12
8
56
3,756.00
0
Task Total
16
32
0
36
0
0
0
0
0
0
0
12
0
16
8
120
$ 7,872.40
Task 2 - Survey and Basemapping
2.1
Survey and Basemapping
40
20
16
16
92
5,315.76
0
Task Total
0
0
40
0
0
20
16
16
0
0
0
0
0
0
0
92
5,315.76
Task 3 - Preliminary and Final Design
3.1
Update Complete Traffic Calming Memorandum
8
8
32
48
96
5,262.40
3.2
30% Plans
40
80
40
60
220
11, 726.40
3.3
30% Cost Estimate
20
40
20
80
4,363.20
3.4
90% Plans
8
40
80
60
16
204
12,144.20
3.5
90% Cost Estimate
40
30
40
110
6,282.90
3.6
90% Special Provisions
16
80
40
136
7,065.28
3.7
Final Contract Documents
8
20
40
32
100
$ 5,674.20
0
Task Total
16
184
230
288
72
60
0
0
32
48
16
0
0
0
0
946
52,518.58
Task 4 - Bid Period Services
4.1
Bid Assistance
2
8
4
2
16
32
$ 1,997.20
0
Task Total
2
8
0
4
0
0
0
0
0
0
2
0
0
16
0
32
1,997.20
Task 5
- Construction Administration Management
5.1
Project Management
4
20
4
28
$ 2,250.52
5.2
Monthly Progress Reports
8
8
$ 400.00
0
$ -
Task Total
0
4
0
0
0
0
0
0
0
0
20
0
0
0
12
36
$ 2,650.52
Task 6 - Pre -Construction Services
6.1
Admin up to NTP
2
30
20
30
82
$ 4,720.50
0
$ -
Task Total
0
0
0
0
0
0
0
0
0
0
2
30
20
30
0
82
$ 4,720.50
Task 7 - Construction Office Support
7.1
Construction Management Office Support
8
14
20
200
200
442
$ 27,311.82
7.2
Certified Payroll
28
28
$ 1,400.00
0
$ -
Task Total
8
14
0
0
0
0
0
0
0
0
20
200
0
200
28
470
$ 28,711.82
Task 8
- Construction Observation
8.1
Construction Observation
500
500
$ 24,550.00
0
$ -
Task Total
0
0
0
0
0
0
0
0
0
0
0
0
500
0
0
500
$ 24,550.00
Task 9 - Project Closeout
9.1
Closeout Support
8
50
20
60
138
$ 8,165.50
0
$ -
Task Total
0
0
0
0
0
0
0
0
0
0
8
50
20
60
0
138
$ 8,165.50
Total Labor Hours and Fee
42
242
270
328.
72
80
16
16
32
48
60
242
20
262
48
1,778
$ 16,02.28
ICR Overhead @ '[74.17% _
$ 23,746.02
Fixed Fee @ 30% =
$ 40,950.68
rr uw
.....,.> r '.....a. ..:.� .w._ ... .:<'._.r,..,>,/>_.....,rr,... ,>,.., ate .. .. .. ............. ..w....e.,�,:.`>', ,.,- ,.n. ..,.. tea,.. r ,.:.., e...r ..,. ,:. ,'C
P .: ✓ ,.. ," ,. a w r a. 'ra c
�
.. ,,, .m ,r_.... _ rw.,, a._ . ,.wr �...
..,v ..>r...
5
f
.,:.,-n. ....., r ..„ >-.. .... ,. u..w , ... �. ..� ...v_..=.>„� at."�. ,... ... ...,,.. .. , . .... .... .,✓ ,:, �, ,> .. ,..�, r, .. .. ,.,
u >" .-.,- ... >. . ,.,
..a .. ...
J
.a,?_ >e. <. ....�, ,v,
< � ,qz
5^
eet .. .. ..mot -a aw. mar,,.__.. o<._
.vim,.. .,.� ,,.,. ..v,... r. r<ra ,..�-,. ,r ,....... ., ,.� .�. r. r _ ... _ _a.> .,.+ ,. .. '^»,,..>. a ..'wa ... ..... .,,,,-,....,.. ;n��'x,�r,
r, ,..,. .,o_.,,� ,. ..r>r�_-...k , . .-.,. ,;,.
av e ..
Subconsultants
Materials Testing (HWA)
$ 50,000.00
Subtotal
$ 50,000.00
�
r Y
..:,.. % .w:,
.. «a'--> u, _. n. . ..... .. ... .uu. .,.... r.. ...., .w-.v "-., .., u.ur.o .. ..,c..,.>. .. > .... ..,-.,._ <. a..- _ <.,
2 3
,�sa.--,., .aw
.e,. .a. w. _ , ....+., ... ,�.... .. >�.,>, .. ,,,
}
r �.
C
'.. ,e- w �>..:�, r..,...'� ,aa2�n.?:,--`x,`a.,.e. a.>,.
, u ,..> «x.. ,ec:' ., a a.. .,.,...r. ... ,...,✓u, v v, -v a x,.-, a,
-.. .....
„srw.,.sww-r.✓>f,�=a.,
_ ..v .v`�-+..s%Ac,=av/>., v..
,a{
4
.". .v. _,..,a._..�r„
,.. k"" ... .. .. / f� >,. � �.... ... ,.. .+.,,..' � _ .,.... .., ....-� ..e. ... .. ",. u'r 'za '..P.,,...F.,,,
_a,.>. ., .. ..... ... ., .a
.,
Reimbursable Direct Non -Salary Costs
Mileage at current IRS rate
$ 1,500.00
Reproduction Allowance
$ 500.00
> ww
} ., ..>.. ... .. it .a, ,....r.,r, ..,.,...,.� .'
I vww
may,
.,..�,,. ,. wa,�� „�rU,_,a,a.M...a,..,aaar.,a:.. "-,v,, .:,,�-,rc,. v7e�r.-:�."f-,,...�r,,ra.w,a.,...�,a. �.,., r
�.,+„ z.,�,> o-,.,s,. ''�
wa �a�
,..-.... a..aa...�waa' .2✓.C,>„g „-.. >:
} a
i .✓.
C' c'.
tau
u.,, "
�
r
7' 5, r s
ti
7
t. & r tw
C
m' >w .aa ^,. r... rr�.,,.w✓..rr„,» „ �.»,'..>, i,a ....'.�«,�., :. ,,.;.�...—... r.,, .^,_. ..,-�..'.r<.."t-:. -. ..,.. .. r.'..
r..s, .ate .. .�.. .. ,,. v. w,,.,v
r
yr 2r- a
.. >.> .. .. ti..-:">">. .u, a.. ..,-. r..a.. .. ,...<,., ._._ ,,:. .< ,
r..l.v_
�f _�.. ,., ...>..-.. S,_
� /
__ .>..�.. ,, .., ..,. _�,.. .-> .r, .�..... ........=y, ,. >, ...,.% >, ,.,, „_,, ..?.
Total Estimated Budget
., -.. .,. c_.. ..�...r .. ,��'v ,., �.. ev
$ 487,198.99
City of Tukwila
Public Works Department - Pete Mayer, Interim Director
Thomas McLeod, Mayor
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
155
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
February 24, 2025, 5:30 p.m. - Hybrid Meeting; City Council Conference Room & MS Teams
Councilmembers Present Jovita McConnell, Chair; Hannah Hedrick, Mohamed Abdi
Staff Present Pete Mayer, Griffin Lerner, Catrien de Boer, Shawn Christie, Laurel
Humphrey, Brandon Miles, Adib Altallal, David Baus
Guests Laura Maman, Justine Kim, John Palewicz, Ryan Duckworth, Mike Herzog
1. BUSINESS AGENDA
A. Tukwila Maintenance and Operations East Campus Project Update
Staff and consultants presented an update on the project's revised scope.
Committee Recommendation
Discussion only. Forward to March 10, 2025 Committee of the Whole.
B. Bid Award: S. 149th St & S. 150th Watermain Replacement
Staff is seeking approval of a construction contract with Pape & Sons Construction, Inc. in the
amount of $1,214,012.98.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
C. Design Contract: Ryan Hill Water System Connection
Staff is seeking approval of a contract with Carollo Engineers in the amount of $601,505.00
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
D. Project Completion: 2024 Overlay and Repair
Staff is seeking approval of contract completion and release of retainage with ICON Materials,
Inc. in the final amount of $867,537.54.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
E. Consultant Contract: 2025 Annual Overlay Program
*Staff is seeking approval of a contract with Psomas, Inc. in the amount of $487,198.99 for
design and construction management services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
156
COUNCIL A GRNDA SYNOPSIS
Initials
Meeting Date
Prepared (y
Mayor's review
Council review
03/03/25
JR
ITEM INFORMATION
ITEM No.
5.J.
STAFF SPONSOR: DAVID BAUS
ORIGINAL AGENDA DATE: 03/03/25
AGENDA ITEM TITLE 2024 Overlay and Repair Project — Proj. #82410401, Contract No. 24-055
Project Completion and Acceptance
CATEGORY ❑ Discussion
Mtg Date
Motion
Date
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
lltg
3/3/2025
SPONSOR Council ❑Mayor ❑HR EIDCD Finance Fire ❑TS EIP&R ❑Police ®PIS ECourt
SPoNsoR's The Notice to Proceed with ICON Materials was issued on July 8, 2024, for the 2024
SUMMARY Overlay Project with physical completion on December 10, 2024. Council is being asked to
formally accept the project as complete and authorize the release of the insurance, and
performance bonds, subject to standard claim and lien release procedures, for the 2024
Overlay and Repair Project with ICON Materials in the final amount of $867,537.54.
REVIEWED BY ® Trans&Infrastructure C CommunitySvs/Safety ❑ Finance Comm. E Planning/Economic Dev.
❑ LTAC C Arts Comm. ❑ Parks Comm. E Planning Comm.
DATE: 02/24/2025 COMMITTEE CHAIR: JOVITA MCCONNELL
RECOMMENDATIONS:
SPONSOR/ADMIN.
Comm
Public Works Department
I"IEE Unanimous Approval; Forward to the Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/03/25
MTG. DATE
ATTACHMENTS
03/03/25
Informational Memorandum dated 02/24/25
2024 Annual Overlay Project Sites Map
Post construction pictures
Minutes from Transportation and Infrastructure Committee meeting of 02/24/25
157
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
INFORMATIONAL MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Pete Mayer, Interim Public Works Director
BY: David Baus, Project Manager
CC: Mayor Tom McLeod
DATE: February 24, 2025
SUBJECT: 2024 Overlay and Repair Project — Proj. #82410401, Contract No. 24-055
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of insurance, and performance bond.
BACKGROUND
The Notice to Proceed for Contract No. 24-055 with ICON Materials, of Pacific, Washington was issued
on July 8, 2024, for the 2024 Overlay Project. The project included pavement overlay and repair of
seven sites within the City of Tukwila. Approximately combined total of 6,300 centerline feet of paving.
The attached maps show the areas of work.
ANALYSIS
Construction was Physically Complete on December 10, 2024. The budget for the 2024 Overlay &
Repair was $1,144,013.20 including a contingency of 10%. No formal Change Orders were executed
for the work since all changes fit within existing bid items or were performed under allowable Force
Account items. Under -runs were primarily due to reduced quantities of Asphalt Roadway Planning and
Reuse, Crushed Surfacing Base Course and various Force Account items not used.
Construction Contract Amount
Total Amount to be Paid
$1,144,013.20
$ 867,537.54
RECOMMENDATION
Council is being asked to formally accept the project as complete and authorize the release of the
insurance, and performance bonds, subject to standard claim and lien release procedures, for the 2024
Overlay and Repair Project construction contract with ICON Materials in the final amount of $867,537.54
and consider this item on the Consent Agenda at the March 3, 2025 Regular Meeting.
ATTACHMENT
- 2024 Project Sites Map
- Post construction pictures
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
158
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
159
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
160
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
161
Thomas McLeod, Mayor
Public Works Department - Pete Mayer, Interim Director
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
162
City of Tukwila
City Council Transportation & Infrastructure Services Committee
Meeting Minutes
February 24, 2025, 5:30 p.m. - Hybrid Meeting; City Council Conference Room & MS Teams
Councilmembers Present Jovita McConnell, Chair; Hannah Hedrick, Mohamed Abdi
Staff Present Pete Mayer, Griffin Lerner, Catrien de Boer, Shawn Christie, Laurel
Humphrey, Brandon Miles, Adib Altallal, David Baus
Guests Laura Maman, Justine Kim, John Palewicz, Ryan Duckworth, Mike Herzog
1. BUSINESS AGENDA
A. Tukwila Maintenance and Operations East Campus Project Update
Staff and consultants presented an update on the project's revised scope.
Committee Recommendation
Discussion only. Forward to March 10, 2025 Committee of the Whole.
B. Bid Award: S. 149th St & S. 150th Watermain Replacement
Staff is seeking approval of a construction contract with Pape & Sons Construction, Inc. in the
amount of $1,214,012.98.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
C. Design Contract: Ryan Hill Water System Connection
Staff is seeking approval of a contract with Carollo Engineers in the amount of $601,505.00
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
D. Project Completion: 2024 Overlay and Repair
*Staff is seeking approval of contract completion and release of retainage with ICON Materials,
Inc. in the final amount of $867,537.54.
Committee Recommendation
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
E. Consultant Contract: 2025 Annual Overlay Program
Staff is seeking approval of a contract with Psomas, Inc. in the amount of $487,198.99 for
design and construction management services.
Committee Recommendation:
Unanimous approval. Forward to March 3, 2025 Regular Meeting Consent Agenda.
163
164
COUNCIL AGENDA SYNOPSIS
Initialr
Meeting Date
Prepared by
Mayor's review
Council review
2/10/25
LH
2/24/25
LH
3/03/25
LH
ITEM INFORMATION
IrEMNo.
6
STAFF SPONSOR: LAUREL HUMPHREY
ORIGINAL AGENDA DATE: 2/10/25
AGENDA ITEM TITLE Resolution adopting revised City Council Rules of Procedure.
CATEGORY ® Discussion
Mtg Date 2/10/25
Motion
Mtg Date
Resolution
Mtg Date 2/24/25
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
E Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ►1 Council ❑ Mayor ❑ Adrin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Po/ice ❑ PW
SPONSOR'S
SUMMARY
The proposed resolution adopts revisions to the Rules of Procedure, incorporating changes
previously discussed by the City Council in December 2024 and other staff proposals.
REVIEWED BY
❑ Trans&Infrastructure Svcs ❑ Community Svcs/Safety ® Finance & Governance ❑ Planning & Community Dev.
❑ LTAC ❑ Arts Comm.
❑ Parks Comm. ❑ Planning Comm.
DATE: 1/27/25 COMMITTEE CHAIR: PAPYAN
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED
$0 $
APPROPRIATION REQUIRED
$
Fund Source:
Comments:
MTG. DATE RECORD OF COUNCIL ACTION
2/10/25 Forwarded to next Special Meeting
2/24/25 Forwarded to next Reg Meeting
MTG. DATE ATTACHMENTS
3/3/25
Draft Resolution
Draft Proposed Rules of Procedure (updated after the 2/24 Special Meeting)
165
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 2093;
ADOPTING REVISED CITY COUNCIL RULES OF ROCEDURE.
WHEREAS, RCW 35A.11.020 gives the City Council o Code City the power to organize
and regulate its internal operations within the provisions of RCW; and
WHEREAS, the City Council intends to periodit update its
procedures to align with state law, the current env modern
ting and other business
est practices;
NOW, THEREFORE, THE CITY COUNCIL OF CITY OF TUKWILA, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. The revised Rules of Proced Council, attached hereto as Exhibit A,
are hereby adopted.
Section 2. The Rules of
as necessary.
iewed on at least a biennial basis and updated
Section 3. Reso reby repealed.
PASSED BY TH Y COU IL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular
Meeting thereof this of , 2025.
ATTEST/AUTHENTICATED:
Andy Youn-Barnett, CMC, City Clerk Tosh Sharp, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Office of the City Attorney
Attachment: Exhibit A, "Rules of Procedure of the Tukwila City Council"
2025 Legislation: Council Rules of Procedure
Version: 01/21/2025
Staff: L. Humphrey
Page 1 of 1
166
Exhibit A
Rules of Procedure of the Tukwila City Council
Introduction
The Rules of Procedure set forth herein are adopted for the sole benefit of the members
of the City Council to assist in the orderly conduct of Council business. These Rules of
Procedure do not grant rights or privileges to members of the public or third parties.
Failure of the City Council to adhere to these rules shall not result in any liability to the
City, its officers, agents, and employees, nor shall failure to adhere to these rules result
in invalidation of any Council act.
I. City Council Powers and Duties
A. City Council Authority
1. As the legislative branch of city government, �' City Council is responsible
for passing laws, setting the municipal bud. ' establishing policy, and other
responsibilities defined by state law.
2. Decisions are made as a collective •, and no i 'dual member has any
extraordinary powers beyond tho f oft memo �, except as described
in Section I.B.
3. Members of the Council sh refrain becoming directly involved in the
administrative affairs of ncl erg intervening in staff decision -
making, scheduling or dire g ,'� '�r, d executing priorities without the
prior knowledge a �f �rova t he City Council as a whole.
is v
4. The City Counc ection over judicial matters and members
may not interfe it cesses or decisions.
B. Council PrePro Tempore
1. At th ng in January of each year, members of the City
Coun rom their number a Council President who shall hold
office at pl ure of the Council. The general practice is to elect
presidents i 34 +eating order by seniority, which is determined by the:
a. Greatest consecutive number of years served;
b. Greatest consecutive number of years plus months or years served
prior to the current term(s);
c. Number of votes when elected.
2. If the Councilmember who is next in line is unable to serve as Council
President, they will notify the City Council in writing by the last Regular
Meeting of the previous year. If this opt -out request is approved by the City
Council, service will fall to the next Councilmember in the order of seniority.
The Councilmember whose opt -out was accepted by the City Council will
remain at the top of the rotation with the opportunity to serve as Council
President the following year.
167
3. In the absence of the Mayor, the Council President shall become the Mayor
Pro Tempore and perform the duties of the Mayor except that the Council
President shall not have the power to appoint or remove any officer or to
veto any ordinance.
4. If a vacancy occurs in the office of Council President, the City Council, at
their next Regular Meeting, shall select a new Council President to serve
the remainder of the year.
5. If a vacancy occurs in the office of the Mayor, the City Council, at their next
Regular Meeting, shall elect from their number a Mayor who shall serve until
a Mayor is elected and certified at the next municipal election.
C. Working Relationship with City Administration
1 Councilmembers should approach work 'th a collaborative spirit,
assuming that city staff also want a successutcome toward what is best
for the City of Tukwila.
2. Councilmembers should communica with st. a respectful tone that
acknowledges their professionalis k-xperience, expertise.
3. If a Councilmember has a conce
member says in any setting they w
City Administrator.
4. The City Council expects th
that questions are
D. id'iyidul Reque
Individual re
asslista
Anal
that a
and
D.2 be
aff behavior or something a staff
ress that concern to the Mayor and
pntations be clear and concise, and
ctly and efficiently.
ion Staff Assistance
the form o
or .duct should generally be dire
uestipns,m
oslative
stupor, and/or Department Head. This helps ensure
ve response can be provided, provides transparency
be evaluated for impacts pursuant to subsection
R q-uests-ter„-s f tirne im-Art
c....th-rcugh.s.r.... R.
the n¢:t� °.. f...:
ar cc —or a
h..a errn4
2. Requests for staff time are either minimal, with limited impact, or
significant, meaning requiring one or more hours to complete and/or
requiring the creation of a new work product, thereby affecting schedules,
work assignments, or staffing levels.
3. No Councilmember shall request or direct staff to initiate any significant
action, project or study without the consent of a majority of the Council
obtained during a Committee of the Whole or Regular or Special Meeting.
2 2/25/25
168
4. The City Council should consider existing City priorities, budget and staffing
levels when deliberating such a request. If approved by the full Council, the
request will be noted on an appropriate committee work plan.
5. Regardless of the level of staff assistance, written information provided by
staff should be distributed to all Councilmembers.
E. Consequences
1. The Council has power under state law to impose punishment on its
members, short of removal of office, for violation of state law or these
Council rules.
2. If a Councilmember violates state law or these rules, the Presiding Officer
shall call such member to order, in which case such member shall be silent
except to explain or continue in order.
3. If the Presiding Officer violates state law e rules, or fails to call an out
of order member to order, then any othem::.f the Council may, under
a point of order, call the Presiding 0 er or such < ,'er member to order, in
which case the Presiding Officer tuber, ahe case may be, shall
be silent except to explain or cont zt.s �' :rder.
4. Additional consequences
reprimand, censure, expul
occurring, removal of
positions or co
duties. Expulsi
the affirmative
of expuls
I1. City Counci
A. Regular Me
1. The City Co shall meet regularly on the first and third Mondays of each
month, excep those designated as City holidays, at 7:00 p.m. unless an
alternative starting time is set and notice is provided to the public.
2. Regular Meetings will be held at Tukwila City Hall, 6200 Southcenter
Boulevard, unless otherwise publicly noticed.
3. During Regular Meetings the City Council may take formal actions including,
but not limited to, adopting ordinances or passing motions or resolutions.
B. Committee of the Whole Meetings
1. The City Council shall meet as a Committee of the Whole on the second
and fourth Mondays of each month, except those designated as City
a verbal admonition, written
eeting at which the conduct is
em r from the Council committee chair
ships, or removal of intergovernmental
or in the Council's presence shall require
of the entire Council, specifying in the order
3 2/25/25
169
holidays, at 7:00 p.m. unless an alternate starting time is set and notice is
provided to the public.
2. The Committee of the Whole shall meet at Tukwila City Hall, 6200
Southcenter Boulevard, unless otherwise publicly noticed.
3. Meetings of the Committee of the Whole shall be held primarily to consider
current issues, discuss policy matters in detail, and coordinate the work of
the City Council. The Committee of the Whole will have no power to take
final actions including, but not limited to, adopting ordinances or passing
motions or resolutions.
C. Special Meetings
Special meetings may be called by the Mayor, Council President, or any
three Councilmembers by delivering written
fax, or by electronic mail to each membe
before the time specified for the propo
made pursuant to RCW 42.30.080.
D. Executive Sessions
1. The City Council may hold an Exe
Special Meeting, or Comm e of
confidential concern as set
2. Before convening
announce the pu
be concluded.
public announc
3. Council
infor
to app
ce personally, by mail, by
he Council at least 24 hours
ng and with public notice
ession during a Regular Meeting,
ole to consider certain matters of
.30.110.
a ecuti ssio " the Presiding Officer must publicly
d th'' ime upon which the Executive Session will
sion may be extended to a later time by
esiding Officer.
keep confidential all written materials and verbal
d d "`ng Executive Sessions. This prohibition continues
vidual no longer serves on the City Council.
E. Retreats and „ ' essions
1. The entire Co ncil may meet periodically in a retreat or work session setting
as deemed appropriate by the Council President or a quorum of the Council,
respectively.
2. No final action will be taken at a retreat or work session.
3. Retreat and work session meetings are open to the public and subject to
the requirements of RCW 42.30.
F. Attendance
1. Councilmembers are expected to maintain reliable attendance at all types
of meetings described above.
4 2/25/25
170
2. Pursuant to RCW 35A.12.060, a City Council position shall be forfeited if
the Councilmember fails to attend three consecutive Regular Meetings
without being excused by the Council.
3. A Councilmember wishing to be excused from a Regular Meeting will
provide advance notice to the Council President or Legislative Analyst, who
will in turn notify the other members of the City Council in advance of the
meeting.
G. Councilmember Remote Attendance at Meetings
1. In the event of an emergency as declared by the City, State and/or Federal
government, the City Council may arrange for electronic participation at a
Regular Meeting, Committee of the Whole, Special Meeting, Executive
Session, retreat, standing committee meeting, 'r work session.
a. During a fully -remote meeting, Coun mbers may attend by phone
or other electronic means that participants to hear one
another.
b. Fully -remote meetings are o'' ' to t - public .=°r"d arrangements must
be conducted such that th b an hear the meeting while it is
occurring, subject to the requir nts of RCW 42.30.
2. In times of non-emergenc ity cil prefers and recognizes the
value of in -person attenda gs as integral to public service.
However, remote ance' s . Councilmember not physically able to be
present, wheth ,t'.r a ,nor p� of a meeting, is allowed subject to the
following provi
a. Coun mr' may attend remotely a maximum of five Regular or
C�itte '�llf t ` = Whole meetings per calendar year; provided the
by majority vote, allow a Councilmember to attend
atings remotely in excess of five per year due to medical
or of +rs beyond the individual's control.
b. A Counc ember planning to attend a meeting remotely should notify
the Legislative Analyst and/or Council President no later than two
hours prior to the meeting start time or 15 minutes prior to an
emergency meeting.
c. A Councilmember attending remotely will be marked present, counted
toward a quorum, and can vote just as if physically present.
d. If a Councilmember's virtual connection should become lost during the
meeting, the meeting should continue unless quorum is no longer met.
A Councilmember's loss of a virtual connection will not be counted
toward the maximum limit described in Section 2.a.
e. Councilmembers are expected to follow current pandemic quarantine
procedures as recommended by Public Health — Seattle & King
5 2/25/25
171
County. Remote attendance for this purpose will not be counted
toward the maximum limit described in Section 2.a.
I11. Legislative Process
A. City Council Business
1. Matters to be considered by the Council shall be placed on a standing
committee, Committee of the Whole, or Regular Meeting agenda and
include items required by law to be presented to Council, items requested
by a majority of the Council, staff -initiated items in accordance with the
City's strategic priorities and work plan, and items referred from previous
meetings.
2. As a general practice, legislative actions to come before the City Council for
a decision should appear first before a ding committee, then the
ng. Informational items not
flexibility as the situation
Committee of the Whole, then a Regular
requiring a decision may be schedule
requires.
3. Items may be placed directly on ag -�da of a Committee of the Whole
or a Regular Meeting when the, s are approved by the Council
President, and the items a •utine o' the event of an emergency.
B. Legislative Actions
1. Ordinances are le
such as land u
safety issues.
Washington S
Many o
be in
the CI
ordinanc
e ite ,.. sed to regulate matters of local concern,
local law enforcement and health and
comply with the terms of the U.S. and
stitution ` and the general laws of the City and State.
assified as "codifiable," meaning the ordinance will
ukwila Municipal Code, which makes the laws of
ssible by subject matter. Examples of non-codifiable
he annual property tax levy and adoption of the budget.
Public eme"cy ordinances may take effect immediately upon final
passage if passed by an affirmative vote of 5 Councilmembers.
2. Resolutions are legislative items that are advisory or policy -oriented in
nature. Resolutions may be used to offer support for ballot measures, set
hearing dates for a street vacation or update fee schedules. Resolutions
are not a part of the Tukwila Municipal Code. Resolutions are signed by the
Council President but are sometimes signed jointly with the Mayor, or
prepared for signature by all Councilmembers, particularly when ceremonial
or honorary in nature.
3. Motions are generally short statements to direct that a specific course of
action be taken on behalf of the City.
6 2/25/25
172
4. All proposed ordinances and resolutions shall be reviewed by the City
Attorney--and--bear-th t-they-a-ro-km-corFek -oems
befor< _fin —pa ge.
C. Meeting Agendas
1. The City Clerk shall be responsible for preparing agendas for Regular,
Special, and Committee of the Whole meetings, and presented in a timely
manner to the Council President or designee for approval. After the
proposed agenda has been approved, the City Clerk shall publish the final
agenda in accordance with the provisions of RCW 42.30.
2. The order of a Regular Meeting agenda shall be:
a.
b.
c.
d.
e.
f.
g.
h.
Call to Order
Pledge of Allegiance
Roll Call
Land Acknowledgement
Public Comments — Includin
the meeting agenda.
Appointments and Proclamati
Presentations — Ite rtinen
agenda business,
speakers extern
Consent A.
nature a • . ved
the Whole,
Co
lUr
dire
Impro
moratoria, and quasi-judicial decisions.
j. Unfinished Business — Items of a general nature, including resolutions
and ordinances previously before a standing committee, the
Committee of the Whole or entire Council.
k. New Business — Items of a general nature, including resolutions and
ordinances not previously before a standing committee, the Committee
of the Whole or entire Council.
I. Reports — Brief summaries up to 5 minutes of significant City -related
activities from the Mayor, City Council, and City Administrator.
m. Miscellaneous — Significant City -related items that may need further
Council discussion, action, or City Administration follow-up.
n. Executive Session
inc
to th
mment on
s both on and not on
the City but not relating to other
of guests, special awards, or
hat are routine or non -controversial in
by the Council President, Committee of
by unanimous Committee action. Any
ay request to remove an item from the Consent
nder New Business for further discussion.
s — May be required by City, State, or Federal law or
Council. Examples include but are not limited to Local
t Districts, zoning changes, biennial budget, annexation,
7 2/25/25
173
o. Adjournment
3. The order of a Committee of a Whole meeting agenda shall be:
a. Call to Order
b. Pledge of Allegiance
c. Land Acknowledgment
d. Public Comments — including comment on items both on and not on
the meeting agenda.
e. Presentations
f. Public Hearings
g. Special Issues — Items referred from Council committees, referred at
a previous Council meeting, or approved for discussion by the Council
President.
h. Reports
i. Miscellaneous
Executive Session
k. Adjournment or Adjournme' • a` cial Meeting
4. The order of a Special Meeting age follows the same order of Regular
Meetings based on what ' ed e addressed, The City Council
may not take action on anyte g on a Special Meeting agenda.
IV. Meeting Conduct
A. Presiding Office
1. All Regula
by the
Meetings of the City Council shall be presided over
ayor's absence, by the Mayor Pro Tempore.
2. If net the May ; nor the Mayor Pro Tempore is present at a Regular or
Special •tin e PresidingOfficer for that meetingshall be appointed
9 PP
by a major =, e of those Councilmembers present, provided there is a
quorum, and e appointment of a Councilmember as Mayor Pro Tempore
shall not abridge their right to vote on matters before the Council.
3. All Committee of the Whole meetings shall be presided over by the Council
President. The Council President may ask another Councilmember to fill in
in the event of a temporary absence. If the Council President will be absent
for an extended period of time (at least three meetings), the Council will
elect a Councilmember to serve in that capacity until the Council President
returns.
4. The Presiding Officer shall preserve strict order and decorum, state all
questions coming before the Council, provide opportunity for discussion on
each item on the table, and announce the decision of the Council on all
8 2/25/25
174
subjects. Procedural decisions made by the Presiding Officer may be
overruled by a majority vote of the Council.
B. Parliamentary Procedure
Questions of parliamentary procedure not covered by these Rules of
Procedure shall be governed by Robert's Rules of Order, Newly Revised
(latest edition).
C. Quorum
1. At all meetings of the City Council, four members shall constitute a quorum
for the transaction of business.
2. Confirmations of appointments by the Mayor, budget transfers, personnel
levels, and formal motions, resolutions, ordinances, and amendments
thereto shall require the affirmative votes of f'( ' Councilmembers.
D. Seating
Members of the City Council will be at "' Council dais in order of
seniority, except that the Council fir sident will seated in the center
during Committee of the Whole etm• nd has the option to sit tom the
right of the Mayor during Regular ecial Meetings.
E. General Meeting Decorum
1. While the City Council is in as3� embers must preserve order and
decorum and a me
the peace of the
2. Meeting partici
remarks t
4. A Counc
when recog
shal er delay nor interrupt the proceedings or
rupt any member that has the floor.
us on the meeting agenda and confine
or matter under discussion.
uld first call upon Chairs and members of standing
k on items referred from committees.
desiring to speak shall address the Presiding Officer and
d shall confine their remarks to the question under debate.
5. Councilmembers should aim to keep their initial round of comments to no
more than 5 minutes, and staff or presenter responses to questions will not
count against that time.
6. Councilmembers shall not be interrupted unless it is to be called to order.
7. No Councilmember shall speak a second time on the same item until each
Councilmember has been given an opportunity to speak.
8. Councilmembers should speak respectfully to one another, to staff, and to
members of the public.
9. Councilmembers should be attentive to speakers, minimizing distractions
and refraining from side conversations.
9 2/25/25
175
10. Councilmembers should keep remarks brief, relevant, and nonduplicative.
11. Toward the goal of effective and efficient meetings, Councilmembers should
arrive prepared, having reviewed materials in advance of the meeting.
Clarifying questions may be directed to City Administration in advance of
the meeting to allow for staff preparation.
12. To prevent Councilmembers from stepping out of the room and missing key
information, repeating questions that they missed, or asking staff to repeat
information, the Presiding Officer should call for a five-minute recess at
approximately 90 minute intervals and between agenda items where
possible.
F. Motions, Debate, and Voting at Regular or Sp
1. Prior to discussion of an action item, a Co
which must be seconded by another .unc
table, except those motions descnn sub
not require a second.
2. Motions are generally encouraged `r } made by a Committee Chair and
seconded by a Commit t y tuber �those action items previously
discussed in standing com
3. Motions not requiri
request for a rol
4. After a motion
may disc
will vo
5. Coun
staff prio
al Meetings
ember must make a motion,
i `r ber, to place it on the
par. ph 3 below, which do
lude nominations, withdrawal of a motion,
nt of order.
d seconded (if required), Councilmembers
ons on the issue prior to the vote, including why they
e motion.
y request a presentation or ask clarifying questions of
ing debate.
6. If a resolutio ordinance, the City Clerk may read the item by title only or,
if requested by any Councilmember, the document may be read in its
entirety.
7. A motion may be withdrawn by the maker of the motion at any time.
8. A motion to amend is defined as amending a motion that is on the floor and
has been seconded, by inserting or adding, striking out, striking out and
inserting, or substituting.
9. A motion to call for the question shall close debate on the main motion and
is nondebatable. This motion requires a second and fails without a two-
thirds majority. Debate is reopened if the motion fails.
10. Motions shall be entertained in the order of precedence outlined in the
current edition of Robert's Rules of Order Newly Revised (latest edition).
10 2/25/25
176
11. The Regular or Special Meeting Consent Agenda is adopted by a single
motion.
12. When the discussion is concluded, the Presiding Officer shall repeat the
motion prior to voting.
13. Unless otherwise provided for by statute, ordinance, or resolution, votes will
be taken by voice, unless a roll call vote is requested by the Presiding
Officer or any Councilmember. Voting normally shall be by seniority;
however, this procedure may be changed by the Presiding Officer.
14. Each member present must vote on all questions before the Council and
may abstain only by reason of conflict of interest.
15. Silence of a Councilmember during a voice vote shall be recorded as an
affirmative vote except where such a Counc mber abstains because of
a stated conflict of interest.
16. No vote may be cast by proxy.
17. The City Council votes on the mo
will state the results of the vote.
he Presiding Officer
18. In case of a tie vote on a otion,motion fails subject to conditions
outlined in RCW 35A.12.1
19. In cases where ther eem 'S' • s ��'- n• pposition, or on questions of little
importance, the g icer may seek approval by unanimous
consent.
20. When the Cou
motion,
conc
G. Questions
All questio der shall be decided by the Presiding Officer with the right
of appeal to tU'$'= majority of Councilmembers present.
H. Adjournments
1. All meetings of the Council shall adjourn no later than 10:00 p.m., unless
extended by majority approval of the Councilmembers present. Items not
acted on by the 10:00 p.m. deadline shall be deferred to the next respective
Council meeting as Unfinished Business, unless Council, by a majority vote
or consensus of members present, determines otherwise.
2. Any Committee of the Whole, Regular, adjourned Regular, Special, or
adjourned Special Meeting may be adjourned in the manner as set forth in
RCW 42.30.090.
ncurs"ith an item that does not require a formal
icer will summarize the Council's consensus at the
ion.
11 2/25/25
177
V. Public Participation
A. Public Hearings: The following procedures shall apply to public hearings,
except public hearings subject to Tukwila Municipal Code Chapters 18.104 through
18.116, which shall be subject to the procedures specified therein.
1. The Presiding Officer will formally open the public hearing.
2. City staff will provide a report summarizing and providing context to the
issue at hand.
3. Proponents, opponents, and all other individuals who wish to speak to the
matter may address the City Council for up to 5 minutes each.
4. City Councilmembers may ask further clarifying questions of proponents,
opponents, other commenters, or staff.
5. Speakers are asked to sign in on forms ' •ed by the City Clerk or, for
those participating remotely, via email i . dva of the meeting start time.
6. If a large number of people wish to ak to the is the Council may limit
the total amount of comment tim dic • to the ublic Hearing.
7. Once the Presiding Officer closes blic hearing, no further comments
will be accepted, and the
8. Any hearing being held or
continued in the mar '�- as
B. Public Comment
1. Time is set as
members of the • ` o ad
not inc l � t,., a -nda.
2. Publ
the Ci
to condu
Councilme
is ope Councilmember discussion.
e eld by the City Council may be
CW 42.30.100.
tee of the Whole and Regular Meeting for
ss the Council about items both included and
to a ow members of the community to provide input to
should not interfere with the ability of the City Council
ness. It is just one of many ways to engage with
3. The Presiding Officer will open the public comment period by explaining
how to sign up as well as how any necessary follow-up may occur.
4. Speakers will be limited to commenting once per item during the meeting.
5. Speakers are asked to sign in on forms provided by the City Clerk.
6. Speakers must wait to be recognized by the Presiding Officer.
7. Speakers are requested to first state their name for the record.
8. The total tine for ublic comment should not eneral6 exceed 30 rnir utes.
If six or_fewer pe ple have signed up to speak comments will be limited to
s. If more � have signed .�..�.�.�� �.�
5 minutes or less. , than six eo le hav ; up, comments will
be limited to 3 minutes or less. Additional time maybe grantedeby aemcajorlity
of the CouSpeakers- :�c�l. ��.�..w. �
auld- fi 4+t 4eir--E ema-rks-.._to--- -mi e s re less-,
12 2/25/25
178
4-ease-qr.. t i n fig . tie P g Offi e or Gouneik
m
i4p
9. All remarks should be addressed to the Council as a whole and not to
individual Councilmembers, City staff, or members of the audience.
10. No speaker may donate speaking time to another individual.
11. If a large number of people wish to speak to a particular issue, the Council
may limit the total amount of comment time dedicated to that issue.
12. Comments should not be taken on items subject to quasi-judicial
consideration unless it is during a specified public hearing.
13. Written comments may be submitted to the City Clerk or designee for
distribution to the City Council. If seven copies are not provided by the
submitter, copies will be distributed to the Cit ouncil by the next day.
14. The Council has the right to invite anyon eak at times other than the
public comment period, which is done ����co �� �rsus, unanimous consent
or majority vote.
15. 1n= ----ge 17---Councilmembers s :d re 'in from ngaging in dialogue,
responding to, or sharing_ opir��� commenters,, but m _brdctly
r , pest clarifyin informatio
1-r -Gouoc' I : , n� Ik�ers c
1:16.Councilmembers
commenters on t
.formation -only.
all •''" staff to give answers to public
8-17. The Presink each speaker in turn, reiterating how
follow-up may o �� en . • opriate.
C. Disruption
1. Disrumeeting are prohibited and include but are not
limited t.,,e folio g:
a. Failu pecker to comply with the allotted public comment time.
b. Outburs from members of the public who have not been recognized
by the Presiding Officer.
c. Interfering with other individuals desiring to provide public comment.
d. Behavior that intentionally disrupts or impedes attendance or
participation at a meeting.
2. If an individual is disruptive, the Presiding Officer may terminate that
individual's comment period, request assistance to direct an individual to
their seat or, in extreme cases, request assistance in removing the individual
from the meeting room.
3. If a meeting has become disrupted to the point of a failure of resuming
business, the Presiding Officer should call for a motion to recess.
13 2/25/25
179
4. If order cannot be restored, the City Council may order the meeting room
cleared and continue in session or may adjourn the meeting and reconvene
at another location selected by majority vote of the members pursuant to
RCW 42.30.050. Members of the press, except those participating in the
disturbance, are allowed to attend, and final disposition may be taken only
on matters appearing on the agenda.
VI. City Council Committees
A. Standing Committees
1. The City Council may choose to implement a framework of standing
Committees, comprising three Councilmembers each, to aid in the
transaction of its business.
2. The standing Committee titles, scopes of aut
adopted by resolution in January of each ye
3. The scopes of the standing Committees
the City's workload.
4. The Council President shall app. ,`�s the hair an
ity, and schedule will be
lanced in accordance with
embership of each
Committee by the second Regula �� -e y' of each year.
5. The standing Committees s II consi
to the City Council. Com
Council with no recommend
nd make policy recommendations
times refer items to the entire
6. Each Committee hal ' w '� port to the Council the findings of the
committee.
7. Each Committe
will approv
can aut
w and approve the Committee agenda and
minutes before distribution. The Committee Chair
ation of a Committee meeting.
8. In the nt a Co ittee member is unable to attend a meeting, another
Council *•er attend in the absent member's place. If no replacement
can be founeeting may still take place with two members.
9. Public comment is typically not accepted at Council committee meetings, but
the Chair may make an exception in limited circumstances when an attendee
may offer a necessary perspective or subject matter expertise.
B. Ad Hoc Committees
The City Council may establish such ad hoc committees as may be
appropriate to consider special matters that do not readily fit the standing
committee structure or that require a special approach or emphasis.
14 2/25/25
180
VII. Council Vacancies
A. Vacancy
A Council position becomes vacant upon the resignation, recall, forfeiture of
position, or death of a Councilmember. The remaining members of the
governing body shall appoint a qualified person to fill the vacant position.
B. Resignation
1. A resignation including an effective date must be submitted to the City
Council in writing.
2. = -City'
C. Appointment
If a vacancy occurs in the office of Cou
the procedures outlined in RCW 35
most qualified person available u tip" an
widely distribute and publish a not
application form for applying. T
conjunction with an intervi -ach
of the new Councilmember.
VIII. Other Responsibilities
A. Public Records A
1. Each Councilme
that gover
2. Paper
recipie
subject
the Council will follow
.050. II the vacancy with the
lection i eld, the Council will
acancy, the procedure, and any
pplication forms will be used in
idate to aid the Council selection
ible for complying with RCW 42.56, laws
ds that relate to the functional responsibility of the
s a public official constitute a public record, which is
ection in accordance with RCW 42.56.
3. Councilmem ." ` should send and receive messages related to City
business through the City's email system.
4. Emails and/or text messages transmitted through personal accounts and
devices are public records and must be retained accordingly.
5. Social media posts are a public record. Wherever possible, posting should
contain links directing users back to the City's official website for in-depth
information, forms, documents, or online services necessary to conduct
official City business.
6. Public records created or received by a Councilmember will be transferred
to the Legislative Analyst for retention by the City in accordance with
retention requirements under state law.
°. Public records that are duplicates of those in the possession of City staff,
such as meeting agendas, are not required to be retained.
15 2/25/25
181
B. Open Public Meetings Act Compliance
1. Each Councilmember is responsible for complying with RCW 42.30, laws
that govern public meetings.
2. If a quorum of the City Council is anticipated at a community or regional
event or meeting, the Legislative Analyst or designee will evaluate the
circumstances to determine if a notice of attendance or Special Meeting is
needed.
3. For events not related to City business, four or
attend, but may not discuss City business.
4. For events related to City business where a
Meeting has not been issued, only three
5. Councilmembers should not enga• ema
communications involving a quoru � theou
more Councilmembers may
ice of attendance or Special
embers may attend.
il`=v,. text threads or other
ncil.
6. Councilmembers should refrain �,�''"commenting on
conversations involving oth ouncil 1., bers.
7. Councilmembers shall sile
during meetings. To
and deliberation
communicate i
Council meeting
social media
nand other electronic devices
are cy and to ensure that all discussion
bon the record, Councilmembers shall not
at with another Councilmember during a
1. Counc -tubers .t comply with the Code of Ethics for Elected Officials as
codified a � kwila nicipal Code Chapter 2.97
2. Councilmem: hall not attempt to coerce or influence staff to engage in
any act that is in conflict with, or creates an appearance of conflict with, the
performance of official duties as cited in the City's Code of Ethics for
Employees and Appointed Officials as codified at Tukwila Municipal Code
Chapter 2.95.
IX. Joining the City Council
A. Swearing -in
1. As provided for in RCW 29A.60.280, Councilmembers shall take an official
oath of office upon commencement of their term of office. The oath may be
given by the Mayor, City Clerk, or a judicial officer and will be recorded with
King County.
16 2/25/25
182
a. Newly elected Councilmembers will take an oath of office up to ten
days before taking office, at the last Regular Meeting held before
assuming office, or at the first Regular or Special Council meeting after
the first of the year.
b. Newly appointed Councilmembers will take an oath of office before or
during the first Regular or Special Council meeting following their
appointment.
B. Orientation
1. New Councilmembers will be scheduled for orientation meetings with the
Mayor, City Administrator, Legislative Analyst, City Clerk, each Department
Director, and the City Attorney. Meetings should take place within 30 days,
but if scheduling challenges arise, may occur up to 60 days within election or
appointment.
2. New Councilmembers are expected to. iew the City of Tukwila
Councilmember Handbook, City Counci �� ' u�.f Procedure, the Equity
Policy, the AWC Mayor and Council '' ber Haok, and other relevant
information.
C. Required Training
Councilmembers shall rec
Washington on the fundame
Public Records Act (PRA),
42.56.150.
D. General Training
Councilmembers
Council
Cities.
X. Councilmembs. avel a �. Training
A. Purpose
1.
ng required by the State of
n Public Meetings Act (OPMA),
etention requirements per RCW
d to attend training on the role of a City
hat which is offered by Association of Washington
Councilmembers are encouraged to be actively involved in city, county, state,
regional and national organizations for the benefit of the Tukwila community.
2. Councilmembers may travel and attend training, education sessions,
conferences, and meetings, and reasonable expenses will be reimbursed in
accordance with city procedures applicable to employees and officials,
subject to budgetary limit set by the full Council.
3. Councilmembers should report out on conferences and trainings attended.
B. Travel Budget
1. Budgets for City Council travel and training will be set during the biennial
budget adoption and adjusted through the annual budget amendment
process, if necessary.
17 2/25/25
183
2. All Councilmembers will have discretionary access to travel funds.
. The entire Council, by majority, will make the final decision on use of funds
should issues arise.
C. Travel Expenses
1. Councilmembers should exercise prudent judgment in incurring travel
expenses on official city business.
2. Expenses eligible for reimbursement include standard (coach) airfare,
baggage fees, ground transportation, mileage, registration, lodging, and
meals (except alcohol).
3. All receipts must be retained and submitted for processing in accordance with
current procedures established by the Finance '�partment.
4. Councilmembers may reserve a City v t � for business travel when
available.
XI. Voucher Review
A. Purpose
hich the s ity pays its bills. Before the entire
genda at a Regular or Special
multiple layers of review, starting
ponsible for the payment, to supervisor,
t Director depending on dollar threshold.
by designated Finance Department staff
ce. These checks and balances help protect
the City surance that all claims presented for payment are
comple in c�pli.` e with established budget and policies.
2. At the b �ning of 'ch year, the Legislative Analyst will create a schedule
rotating th } k . ing all Councilmembers.
3. The obligation e Councilmember providing the review is to gain a general
understanding of City expenditures and ensure alignment with city budget
and policies.
4. If the Councilmember has a concern about any expenditure and how it fits
with established budget and policies, they should request background
information or clarification from the Finance Director or designated staff. In
rare cases, the Councilmember may want to alert the full Council prior to
voucher approval.
5. The reviewing Councilmember should verbally attest to their review prior to
the City Council's approval of vouchers on a Consent Agenda.
1. Vouchers are the checks w
Council approves vouchers
meeting, each transaction has
with the individual s rso
and, if appropnat ' •a
Each transactio
for final authorizatiW`"; 'd issu
18 2/25/25
184
City of Tukwila
City Council Finance & Governance Committee
Meeting Minutes
January27, 2025 - 5:30 p.m. - Hybrid Meeting; Hazelnut Conference Room & MS Teams
Councilmembers Present:
Staff Present:
1. BUSINESS AGENDA
Armen Papyan, Chair; De'Sean Quinn, Dennis Martinez
Marty Wine, Aaron BeMiller, Laurel Humphrey, Tony Cullerton.
Megan Marks
A. Resolution: City Council Rules of Procedure
Staff seeking approval of amendments to the Rules of Procedure regarding working with
Administration staff, legislative actions, seating, and public c' ent. The City Council
*previously gave direction at the 12/16/24 work session to ure public comment in such a
way that the total time spent would be 30 minutes and in. al time limit should be 3
minutes depending on the number of signups.
Item(s) for follow-up:
• Clarify that the I.D.1 amendment arou reques
Councilmembers making requests out
• Add language referencing a total public
Committee Recommendation
Unanimous approval. Forwar
MISCELLANEOUS
New Fiscal Manager Megan s introduced to the committee members.
The meeting adjourned at 5:46 p.m.
AP
assistance refers to individual
eeting.
e of 30 minutes to Rule V.B.B.
25, 2024 Committee of the Whole.
Committee Chair Approval
185
186
COUNCIL A GRNDA SYNOPSIS
Inrtrals
Meeting Date
Prepared by
Mayor's review
Council review
3/3/25
BJM
ITEM INFORMATION
ITEM No.
8.B.
STAFF SPONSOR: B.MILES
ORIGINAL AGENDA DATE: 3/3/25
AGENDA ITEM TITLE Update on the City's ongoing response to asylum seekers in the community and to
seek authorization for the Mayor to enter into contracts for the City's ongoing
response.
CATEGORY ® Discussion
Mtg Date 3/3/25
® Motion
Mtg Date 3/3/25
7 Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
7 Other
Mtg Date
SPONSOR ❑ Council 11 Mayor ❑ Admin Svcs ❑ DCD ❑ Finance ❑ Fire ❑ P&R ❑ Police ❑ PW
SPONSOR'S
SUMMARY
Administration is asking the City Council to authorize the expenditures and contracts,
subject to review and approval by the Mayor and City Attorney, in the amounts shown in
Table "A" of the staff memo.
REVIEWED BY
Trans&Infrastructure Svcs
❑ LTAC
DATE: N/A
Community Svcs/Safety u Finance & Governance
❑ Arts Comm.
❑ Parks Comm.
11 Planning & Community Dev.
❑ Planning Comm.
COMMITTEE CHAIR: N/A
RECOMMENDATIONS:
SPONSOR/ADMIN. Mayors Office, Strategic Intiatives
COMM I"I BE N/A
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED
$$1,095,423
AMOUNT BUDGETED
$N/A
APPROPRIATION REQUIRED
$$1,095,423
Fund Source: GRANT FROM THE STATE OF WASHINGTON AND/OR KING COUNTY
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
3/3/25
MTG. DATE
ATTACHMENTS
3/3/25
Informational Memorandum, dated February, 22, 2025
PowerPoint Presentation
187
188
City of Tukwila
Thomas McLeod, Mayor
INFORMATIONAL MEMORANDUM
TO: Tukwila City Council
FROM: Brandon Miles, Mayor's Office
CC: Thomas McLeod
DATE: February 22, 2025
SUBJECT: Update on Asylum Seeker Response
ISSUE
City Administration would like to provide an update on the City's ongoing response to asylum
seekers in the community and to seek authorization for the Mayor to enter into contracts for the
City's ongoing response.
BACKGROUND
In the Spring of 2023, a large number of asylum seekers began to seek services at the Riverton
Park United Methodist Church (RPUMC) in Tukwila. In October of 2023, the City overwhelmed
by the need at RPUMC, declared an emergency. At the time there were nearly 350 people living
at RPUMC, both indoors and in small tents on the property.
City Response
Following the City's emergency declaration, the City began a coordinated, multi -department
response to what was growing into a humanitarian crisis at RPUMC. The City contracted with
Innovative Impact Strategies (i2), a firm experienced in working with unhoused individuals, to
assist the City with the site conditions at RPUMC and to work on the City overall response.
Based on the recommendation from i2, the City began to take immediate actions to improve the
conditions at RPUMC, including renting a FEMA style tent to provide better short-term housing
for people at the site.
INFORMATIONAL MEMO
Page 2
The City Cdv also began to advocate to the State of Washington for o statewide avatum to address
the growing influx of asylum seekers coming LO TUkvv|8 and Washington State. As part Of |@St
year's legislative aeaaiun. the State directed the Office of Immigrant and Refugee Assistance
(ORIA) to assume responsibility for the statewide response. Additionally, funds were allocated
LO C)R|AtO Set Up the \8A-K8/\G8 SySLeOn, which |8UDChed in October 0f2O24. The WA -MASS
program has the Immigrant Rescue Committee (|A|C)serving 8Sthe initial triage agency for
asylum seekers. Unfortunately, there was a significant backlog in getting people through the
system. Additionally, there was OOshort-term sheltering available, and many new arrivals seem
to have been directed towards RPUMC for shelter. The lack of shelter for unhoused individuals
regiOnvvid9also creates capacity issues for asylum seekers.
The City OfTukwila also received 8Dappropriation Of$2.5million from the State OfWashington
to assist with the City's response. The funds are only available for expenses incurred after July
1.2O24and funds must be expended bvJune 3O.2U25.(]fthe funds, $1.875million must b9
used for housing and $500,000 is H|iQib|8 to be used to [8i0bU[SH the City for direct and indirect
coo[e,
Relationship with RPUMC8nd City
The City contracted with i2to begin todraw down the people living inthe white tent. At its peok.
there were nearly 70people living inthe tent. BvOctober 0f2O24i2and the city were able to
help people in the tent find better housing options and locate new shelter space. The tent was
removed atthe end ofOctober.
The City also continued to work to assist RPUMC with drawing down those living inside the
building. The City's Building Official and Fire Marshall have significant concerns with the number
of people sleeping inside the main building. There one a significant number ofbuilding and fire
code issues with the church building, including @ kitchen that does not have 8 Cnrnrnenni2| hood.
z The Washington Department of Commerce takes an administrative fee of
$125,000 from the award.
189
INFORMATIONAL MEMO
Page 3
To assist RPUMC, the City's Building Official created a floor plan and identified the maximum
number of people that safety sleep in the building at 37 individuals2.
The City has offered to assist RPUMC reduce the numbers in the building by funding staff at
RPUMC, paying for long term rentals, and paying for capital improvements to the building that
improve safety. The City would use the State funds outlined above to pay for the improvements.
The City funds would be conditioned on RPUMC reducing the numbers of people sleeping
indoors to 37 and an agreement not to backfill above the 37 number. RPUMC will not agree to
this limit on the people sleeping indoors. As of February 12, 2025, RPUMC self -reported 60
people sleeping indoors. The City's Building Department and Puget Sound Regional Fire
reported 65 people sleeping indoors that same night after conducting a planned walkthrough.
Initially, there was progress in lowering the numbers at RPUMC, even without an agreement.
Staff was optimistic the numbers would get at or below the 37 number. However, in early
January there was a significant spike in the numbers and City staff expressed our frustration to
RPUMC with the current situation. Following that meeting, RPUMC refused to continue weekly
meetings with the City regarding site conditions.
Econo Lodge
Since Spring of 2024, the Econo Lodge at 13910 Tukwila International Blvd has housed asylum
seekers. Several of the families were placed by RPUMC. RPUMC was unable to pay for some
of the initial rooms, with RPUMC and Access to Our Communities3 disagreeing on what was
owed through June of 2024. In October there was another large move of people to the site and
it's unclear who or which organization authorized the move.
Following the October move, the City began to take an active role at coordinating the site,
similar to the work occurring at RPUMC. The City's consultant, i2 completed a detailed census
on the property to understand the situation of the people living there and to identify possible
housing alternatives. The City Council authorized funding for December and January to pay for
rooms at the Econo Lodge. This allowed i2 time to begin looking for alternative housing options
and working with ATOC to move people out.
Through a collaborative effort with ATOC, the City and i2 have moved @ people from Econo
Lodge and currently only @ rooms are still being used by asylum seekers. Several families were
moved by the City from the Econo Lodge to the Interurban Suites in the Tukwila.
Setting Up a Network of Support
i2 and the City have worked to set up a network of churches willing to provide safe and culturally
appropriate congregated sheltering for asylum seekers. The City currently has two churches
under contract to provide sheltering in Pierce County and i2 is working to bring on an additional
two churches into the system. These churches can provide housing and support services at a
significant value compared to placing people in hotels or long-term housing.
Additional Grants
2 This should not be confused with the "occupancy load" for the building,
which can be higher during the daytime.
3 Owners of the Econo Lodge.
190
INFORMATIONAL MEMO
Page 4
The City received additional funds from King County of $2 million for homelessness and asylee
response. These funds allow the City to get reimbursement for some expenses from late May of
2024 through December of 2025.
The City was also notified by ORIA that the City was going to receive an additional $1 million
from the Federal government through FEMA. These funds were eligible to be back dated to
October, 2023. With the change in Administration and recent actions by the Federal
Government, it's unclear if these funds are still going to be made available to the City.
Financial Impact To Date
The City began tracking its cost, including staff time, in the fourth quarter of 2023.
Period
Amount
Notes
2023 Total Expenses
$163,092
Expenses prior to July 1, 2024 are not
eligible to be reimbursed under the
State Grant. The City may get some of
the expenses reimbursed under the
Federal or County grant.
2024 Expenses Through
June:
$501,020
2024 Expenses from
July 1 through
December 31, 2024:
$799,703
Housing expenses will be 100%
recovered. City expenses will be
reimbursed up to $500,000 from July 1,
2024 through June 30, 2025.
2025 estimated
expenses from January
1, 2025 through
February 28, 2025.
$218,536
Housing expenses will be 100%
recovered. City expenses will be
reimbursed up to $500,000 from July 1,
2024 through June 30, 2025.
Total:
$1,682,351
General Fund (May not
Be Reimbursed):
$664,112
This is the total of the funds and staff
time that occurred prior to July 1, 2024.
If the City does not receive the Federal
grant, these funds will not be
reimbursable.
Previous Expenses
Eligible for
Reimbursement:
$1,018,239
$1,682,351-$664,112
To get through June of 2025 an additional $1,095,423 is forecasted to be needed in funding
authorization. These funds will go to housing support, contracted services with i2 Strategies,
supporting the shelters that have been set up, rental assistance, and direct client assistance
funds. All expense shown below are eligible for reimbursement from the various grants the City
has in place.
Table A
Entity Name
Contract No.
Current
Amount of
Agreement
Requested
Increase
New
Amount
Notes
First United
Methodist
Church of
Tacoma
24-138
$58,000
$105,000
$163,000
Temporary
Housing.
191
INFORMATIONAL MEMO
Page 5
ATOC
Various
Contracts
$432,000
$50,000
$482,000
Temporary
Housing.
Interurban
Suites
Not Yet
Assigned
$58,000
$273,000
$331,000
Temporary
Housing.
SureHouse
25-055
$58,000
$81,000
$139,000
Temporary
Housing.
New Covenant
Church
25-050
$58,000
$81,000
$139,000
Temporary
Housing.
House of
Shalom
Not Yet
Assigned
$0
$80,000
$80,000
Temporary
Housing
Bryn Mawr
United
Methodist
Church
Not Yet
Assigned
$0
$80,000
$80,000
Temporary
Housing.
I2-Strategies
23-166
$400,000
$345,423
$745,423
Supportive
services
and pass
through
funds for
rental
assistance
and direct
client
assistance.
The total estimate expenditure since the City started tracking expenses for the asylum response
is estimated to be $2,427,774 of which staff is estimating that $2,113,662 (this includes the
requested amount increases outlined above) will be reimbursed by the various grants the City
has secured. The final amount is still dependent on if the City will be able to secure the FEMA
grant which will allow the City to backdate some expenses back to October of 2023. Staff
believes that the $2,113,682 is a conservative number and does not depend on the Federal
funds being made available.
Source of Funds
Amount of Revenue
Notes
Washington State Commerce
Grant
$1,875,000
Housing funds. Only
reimburses eligible expenses
from July 1, 2024 through
June 30, 2025. Department
of Commerce takes an
administrative fee of
$125,000
$500,000
City Expenses. Only
reimburses eligible expenses
from July 1, 2024 through
June 30, 2025.
King County Grant
$2,000,000
Various Uses. Only
reimburses eligible expenses
from May, 2024 through
December, 2025
Total Funds Available
$4,375,000
192
INFORMATIONAL MEMO
Page 6
Eligible Expenses Charged to
the City from July 1,2O24
through February, 2O25.
/$1.010.239\
Additional Spending
Authorization Being
requested onMarch 3
/$1.095.423\
Total Estimated Eligible
Expenditures from July 1.
2O24through June, 30.2O25.
/$2.113.002\
Total Remaining Grant Funds
(State and COUntvC)n|y/\
$2.261.338
$4.375.000+/2.113.002\
Other Activities
Staff is also exploring standing up a tiny home village in partnership with the Low Income
Housing Institute and Church Bythe Side Ofthe Road. Atthis time staff iSnot seeking Council
authorization tomove forward with the village and plans tocome back tothe City Council with o
briefing and contract authorization.
Additionally, the City ianot requesting any funding for RPUMC at this time given that weare
have been unable to secure an agreement regarding the allowable number of people that can
sleep inthe church.
RECOMMENDATION
Administration is asking the City Council to authorize the expenditures and contracts, subject to
review and approval bvthe Mayor and City Attorney, iDthe amounts shown iOTable "A"Ofthis
memo.
ATTACHMENTS
w POwe[POiOt
193
Tukwila Asylum Seeker Response:
Program Updates & Funding
Authorization Request
MARCH 3, 2025
Vision
Create a safe environment for families and children accessing asylum
seeker services
Increase resource access to shelter/housing for asylum seekers
Asylum seekers services are tailored to their unique needs
Agenda
Overview of asylum seeker services network established by the
City of Tukwila.
Riverton Park United Methodist Church Updates
EconoLodge Updates
Funding Authorization Request
Asylum Seeker Shelter &
Housing Network
Goal to create safe environments for families and children
accessing resources.
The City has contracted for shelter & housing services — this
directly increases shelter beds and supportive services for
asylum seekers.
The City has a spectrum of housing options and opportunities
available.
Shelter &
Housing
Services
Riverton Park United
Methodist Church
• EconoLodge Hotel
Alternative Location
Interurban Hotel
SureHouse
New Covenant
Hilltop House
Bryn Mawr
Rental Assistance Program
Direct Client Assistance
•- Housing Navigation
Shelter &
Housing Services
Framework:
Housing Stability
Asylum Seeker Services Network
The Bridge — First United
Methodist
SureHouse
New Covenant
Interurban Hotel
House of Shalom
Bryn Mawr
Rental Assistance Program
Shelter for Singles & Couples
Shelter for Families
Shelter for Families
Temporary Hoteling
Transitional Housing — Large, two
story home
Shelter for Families
Short-term rental assistance
program for working households
who need assistance to stabilize
in their new homes
15 beds
15 beds
15 beds
30 beds
8 beds
6 beds
10 households
N
O
O
Census: As of 2/21/2025
Total: 65 individuals
Updates:
• City staff conducted a building analysis and provided RPUMC with
a safe, maximum capacity indoors — 37 individuals
• City staff continue to conduct fire -life safety inspections and
issued a Notice of Violation & Order
Ongoing Challenges:
• The City offered funding to RPUMC to increase supportive
services for asylum seekers, but RPUMC has not complied with
the capacity limit provided by the City's Building Official and the
number of households sleeping indoors continues to increase
• There are outstanding, significant fire -life safety violations that
have not been resolved — significant risk to families and children
Census: As of February 24, 2025
11 rooms are being used, for a total of 42 individuals
Updates:
• I2-strategies continues with downsizing efforts onsite:
39 rooms (125 individuals) 4 11 rooms (42 individuals)
• Households have moved into Tukwila's Shelter & Housing Services
Network , permanent housing, or alternative housing with
community programs
• The City funded ATOC for hotel rooms used by asylum seeker
households for a total of $432,000.
Ongoing Challenges:
• Larger families are taking a longer time to find adequate housing
and placement matches
• Identification of affordable housing options for newly working
households
• School transportation and enrollment challenges for both children
and parents (ESL classes)
Expenses Through February, 2025
$163,092 Expenses prior to July 1, 2024 are not eligible to be
$501,020 reimbursed under the State Grant. The City may get
some of the expenses reimbursed under the
Federal or County grant.
$799,703 Housing expenses will be 100% recovered. City
expenses will be reimbursed up to $500,000 from
July 1, 2024 through June 30, 2025.
$218,536 Housing expenses will be 100% recovered. City
expenses will be reimbursed up to $500,000 from
July 1, 2024 through June 30, 2025.
$1,682,351
$664,112
$1,018,239
This is the total of the funds and staff time that
occurred prior to July 1, 2024. If the City does not
receive the Federal grant, these funds will not be
reimbursable.
$1,682,351-$664,112
24-138 $58,000
Various Contracts $432,000
$105,000
$50,000
Not Yet Assigned $58,000 $273,000
25-055 $58,000 $81,000
25-050 $58,000 $81,000
Not Yet Assigned $0 $80,000
Not Yet Assigned $0 $80,000
23-166 $400,000 $345,423
$163,000 Temporary
Housing.
$482,000 Temporary
Housing.
$331,000 Temporary
Housing.
$139,000 Temporary
Housing.
$139,000 Temporary
Housing.
$80,000 Temporary
Housing
$80,000 Temporary
Housing.
$745,423
Supportive
services and pass
through funds for
rental assistance
and direct client
assistance.
$1,875,000
$500,000
$2,000,000
$4,375,000
($1,018,239)
$1,095,423)
($2,113,662)
2,261,338
Housing funds. Only reimburses
eligible expenses from July 1, 2024
through June 30, 2025. Department of
Commerce takes an administrative fee
of $125,000
City Expenses. Only reimburses
eligible expenses from July 1, 2024
through June 30, 2025.
Various Uses. Only reimburses eligible
expenses from May, 2024 through
December, 2025
$4,375,000+(2,113,662)
Thomas McLeod, Mayor
TO:
Mayor's Office - Marty Wine, City Administrator
The city of opportunity, the community of choice
Mayor McLeod
Councilmembers
FROM: Marty Wine, City Administrator
DATE: February 25, 2025
SUBJECT: City Administrator's Report
The City Administrator Report is meant to provide the Council, staff, and the community with an
update on the activities of the City and on issues that concern Tukwila. Please let me know if you
have any questions or need additional information about any of the following items.
I. Intergovernmental Update
• Air & Space Roundtable Sub -Committee Meeting: On February 18 Economic Development
staff attended an Air & Space Roundtable sub -committee meeting that focused on business
needs for the workforce.
• Sound Cities Association Mayors Meeting: Mayor McLeod participated in a Sound Cities
Association Mayors meeting on February 18.
• Association of Washington Cities (AWC) City Action Days: Mayor McLeod, Councilmembers
Hedrick, Martinez, McConnell and Papyan, Deputy City Administrator Mayer and Director
Miles attended AWC City Action Days February 19-20 where they had the opportunity to meet
with State Legislators to discuss issues relevant to Tukwila.
• King County Flood Control District Advisory Board Meeting: On February 20 Public Works
and Economic Development staff attended a meeting of the King County Flood Control
District Advisory Board.
• South King Housing & Homelessness Partners (SKHHP)Board Meeting: Mayor McLeod
participated in a SKHHP Board meeting on February 21.
II. Community Events
• Green Tukwila: Green Tukwila continues to support neighborhoods through stewardship of
the city's natural environment. February featured the following restoration events:
o Restoration at Riverton on February 11 at Riverton Park
o Riverside Restoration with REI on February 12 at Bicentennial Park
o Forterra Blackberry Removal Event on February 21 at Duwamish Hill Preserve
Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov
205
City Administrator's Report
February 25, 2025
Page 2
• Presentation to Airport University Class: Transportation Demand Management staff
presented to an Airport University class on February 12 and distributed ORCA cards.
• Foster Golf Links Centennial Celebration: On February 13 Mayor McLeod and
Councilmembers Martinez, McConnell and Papyan participated in the Foster Golf Links
Centennial celebration. Approximately 80 people participated in the event.
• Miracle Temple Community Advisory Committee: Human Services staff participated in the
Community Advisory Committee meeting for Miracle Temple Tiny Village. The village is fully
staffed, and participants continue to move into a variety of housing.
• Community Police Academy: Registration will open soon for the annual Community Police
Academy. The academy will take place every Tuesday beginning March 4 through April 29,
from 5:30 PM -7:30 PM.
• State of the City Community Event: Mayor McLeod will hold his annual State of the City
Address on April 2 at the Foster High School Performing Arts Center. The event will begin at
5:30 PM. This is an opportunity to hear about what the City of Tukwila has accomplished in
the past year and highlights about the vision for 2025. The event will include informational
tables, providing you with opportunities to meet City staff and community partners and learn
more about services and programs available to members of the Tukwila community. Light
refreshments will be served.
hi. Staff Updates
Public Safety
• Community Safety Briefing at SHAG: On February 20, Chief Dreyer, CEC Brooke Lamothe,
and Officer Tran met with community members of SHAG for a community safety briefing.
Projects
• 6200 and 6300 Building Maintenance:
0 6300 Building:
■ HVAC Units: Three HVAC units are out of service, two of which we have parts for and
the third unit we're still seeking parts for. The units are over 40 years old. Employees
have moved to other offices where warmer interior temperatures can be achieved. We
don't yet have an ETA on restoration of the units.
■ Elevator: Extensive flooding was recently discovered in the 6300 Building elevator
shaft pit. Staff immediately moved to close the elevator and have engaged outside
experts to evaluate the pit, source of water intrusion, water extraction
• Roof Leak: A recurring and worsening roof leak that caused water damage on the first
and second floors- required the removal of a roof -top HVAC unit to properly seal the
roof. TIS Offices, PW Engineering and the DCD Building Official's Offices and west door
exit area were most directly impacted. Drywall was removed, water
extraction/dehydration efforts commenced and moisture testing of surfaces
conducted. Air testing was also conducted, and results are very favorable.
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
206
City Administrator's Report
February 25, 2025
Page 3
• Catch basins/Drain lines: A blocked drain line between the parking lot and the 6300
garage caused minor flooding in the garage area over the weekend- our Sewer/Surface
Water crews were able to TV the line and discovered some blockages that were
cleared through high velocity water jetting. Water is now draining properly.
o 6200 Building:
• Front Counter Water Leak- Preliminary investigation of a water leak near the front
counter has not resulted in pinpointing the location causing the leak. A second vendor
will be inspecting the roof to identify and resolve the problem.
■ Re -sealing of City Hall front windows- additional quotes are being collected and
evaluated on the re -sealing project for the glass front.
• Space Planning/Allocation: Planning has begun with an internal team to assess work spaces
between 6300 and 6200 with the goal of consolidating staff into the 6200 building and
completely vacating the 6300 building.
• TCC Window Replacement: Awaiting additional cost estimates for replacement of 3
windows impacted by a recent parking lot shooting incident. The first pane of the double
pane windows was impacted and the second pane has remained intact.
Boards, Commissions and Committees
We welcome the City Council to encourage community members to apply for vacant Board &
Commission positions.
• Arts Commission: The next meeting is scheduled for March 19, 2025.
3 resident position terms expire March 31, 2025.
No vacancies.
• Civil Service Commission: The next meeting is scheduled for March 20, 2025.
No vacancies.
• COPCAB: The next meeting is scheduled for March 13, 2025.
VACANT: 1 Business Position and Student Representative.
• Equity & Social Justice Commission: The next meeting is scheduled for March 6, 2025.
1 City Employee position term expires March 31, 2025.
1 Education/Community position term expires March 31, 2025.
2 Community position terms expire March 31, 2025.
No vacancies.
• Human Services Advisory Board: The next meeting is scheduled for April 17, 2025.
1 Resident position term expires March 31, 2025.
1 Faith -Based position term expires March 31, 2025.
VACANT: 1 Resident position and 1 Business Community Representative.
• Library Advisory Board: The next meeting is scheduled for March 4, 2025.
4 Resident position terms expire March 31, 2025.
No vacancies.
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
207
City Administrator's Report
February 25, 2025
Page 4
• Lodging Tax Advisory Committee: The next meeting is scheduled for March 14, 2025.
All positions are 1-year terms.
VACANT: 1 Business Collecting Tax Representative
• Park Commission: The next meeting is scheduled for March 12, 2025.
3 Community position terms expire March 31, 2025.
VACANT: 1 Community position and Student Representative.
• Planning Commission: The next meeting is scheduled for February 27, 2025.
No vacancies.
IV. Responses to Council/Community Inquiries
Date of
Inquiry
Inquiry
Response
February 3, 2025
Councilmember Papyan
asked what percentage
of Metro riders use Orca.
Overall, the vast majority of fares are paid via
orca (84%), which do offer a free transfer
between ST and Metro services. 11% of fares are
paid with cash and 5% are paid with mobile
tickets, which do not allow a transfer.
February 10, 2025
Community Services &
Safety Committee had
questions regarding
federal funding of
certain grants.
Additional information from the Washington
State Department of Natural Resources has been
provided in the February 24 Council packet.
February 10, 2025
Crosswalk Safety on
Tukwila International
Boulevard
The Police Department is completing its
investigation and forwarding to the County
Prosecutor. Public Works staff has assembled
traffic safety information and will be responding
to concerns expressed by community members
responsive to operability of street lights and
request for a cross -walk. Council will receive a
copy of relevant correspondence. 1,100 of wire
has been replaced and 10 junction boxes welded
shut in the vicinity of the recent fatality accident.
In the time Public Works Streets staff replaced
wire for 5 poles in the area, additional wire was
stolen on TIB north of 130th to the 12400 block
affecting multiple street lights.
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
208
City Administrator's Report
February 25, 2025
Page 5
February 24, 2025
Councilmember
Martinez requested
additional information
regarding copper wire
theft.
The City has not filed a claim for copper wire theft.
Here is a listing of locations where street light copper
wire has been stolen from:
• Southcenter Blvd from Tukwila International
Blvd -1-5 Currently a hot spot for wire theft.
• Southcenter pkwy (including extension)
Currently a hot spot for wire theft.
• S. 200th St from Orillia Rd. - the city limits and
is currently dark do to stolen wire, And the
wire has been stolen multiple times.
• W. Valley Hwy from S 180th St -Strander Is
currently dark.
• West Valley Pedestrian Bridge has had the
wire system vandalized multiple times.
• Tukwila International Blvd from S.132°d St-
12400 blk is a newer location for stolen wire
and is currently dark.
• Andover Park East from S.180th St-
Southcenter Pkwy Currently a hot spot for
wire theft.
• Andover Park West from Strander-S.180th Is a
hot spot for wire theft.
• Strander Blvd Minkler Blvd is currently a hot
spot for wire theft.
• S 180th St form West Valley -Southcenter
Pkwy streetlight have been stolen here a
couple of times.
Here is a listing of Stolen traffic signal wire for loop
detection:
• S 180th /Sperry drive had the signal loop
detection wires were cut in September.
• S 180th/ Andover Park West had the signal
loop detection wires were cut in September
• Minkler Blvd/ Andover west had the signal
loop wires cut in mid -September.
Staff is replacing copper wire with aluminum wire to
dissuade theft, as aluminum wire is not as
marketable. A public awareness campaign around
wire theft is being developed for use on the City's
website, social media and in partnership with local
media outlets and other partners.
Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov
209
210
Tentative Agenda Schedule
MEETING 1—
REGULAR
MEETING 2 —
C.OW.
MEETING 3 -
REGULAR
MEETING 4 —
C.0.1V.
MARCH 3
See below links for the agenda
packets to view the agenda items:
March 3, 2025
Special Meeting
March 3, 2025
Work Session - Cancelled
March 3, 2025
Regular Meeting - an de
MARCH 10
SPECIAL ISSUES
- Public Works Operations Facility
Phase 2 update.
- Interlocal Agreement for South
County Area Transportation Board.
- An ordinance amending the Phased
Binding Site Improvement Plan
Code.
Special Meeting will follow
Committee of the Whole
Meeting.
MARCH 17
WORK SESSION
REGULAR MEETING
PRESENTATION
- Oath of Office for Council Position #7.
- Recology 2024 Annual Report
presentatlon - discussioa only.
CONSENT AGENDA
- A resolution approving South King
Housing and Homelessness Partners
Capital.
- Authorize the Mayor to sign a
Professional Service Agreement with
to exceed $300,000.00.
- Approval of Lodging Tax funding
request for the City of Tukwila 2025
Juneteenth event.
- Interlocal Agreement for South County
Area Transportation Board.
- An ordinance amending the Phased
Binding Site Improvement Plan Code.
- Contracts for 2025-2026 Human
Services over $60,000.00.
MARCH 24
SPECIAL ISSUES
- An ordinance amending the STEP
Housing Code.
MEETING 1—
REGULAR
MEETING 2—
C.O.W.
MEETING 3 —
REGULAR
MEETING 4 --
APRIL 7
WORK SESSION
Multi -Family Property Tax Exemption
Program - discussion only.
REGULAR MEETING
APPOINTMENTS
- Board and Commission Appointments
and Reappointments.
CONSENT AGENDA
- An ordinance amending the STEP
Housing Code.
APRIL 14
SPECIAL ISSUES
- Local Road Safety Plan Adoption.
- Lease Agreements and Deeds with
Puget Sound Fire.
APRIL 21
WORK SESSION
REGULAR MEETING
PRESENTATION
- City of Tukwila and Recology Earth Day
Art Contest winner.
CONSENT AGENDA
- Contract for Parks, Recreation and
Open Space (PROS) Plan.
- Contract for On -Call Trails Paving.
UNFINISHED BUSINESS
- Local Road Safety Plan Adoption.
NEW BUSINESS
- Lease Agreements and Deeds with
Puget Sound Fire.
APRIL 28
UNFINISHED BUSINESS
- An ordinance amending the
Townhouse allowances in the Tukwila
Urban Center.
An ordinance amending the
Residential Conversions Code.