Loading...
HomeMy WebLinkAbout2025-03-25 Bid Tabulations - Lift Station #2 Structural ModificationsBID TABULATION Owner: Project: Engineers: CITY OF TUKWILA LS #2 STRUCTURAL RETROFIT PACE ENGINEERS Bid Date: 3/25/25 Bid Time: 10:00 AM Job No. 80040201 ENGINEER'S ESTIMATE Combined Construction General Mechanical ITEM NO. ITEM OR TASK DESCRIPTION UNIT UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST 1 Mobilization LS 1 $14,750.00 $ 14,750.00 34,000.00 $ 34,000.00 40,000.00 $ 40,000.00 2 Structural Retofit of Existing Lift Station LS 1 $135,000.00 $ 135,000.00 $182,400.00 $ 182,400.00 $440,000.00 $ 440,000.00 3 Modification of Inlet Drop Pipe LS 1 $5,000.00 $ 5,000.00 $9,680.00 $ 9,680.00 $20,000.00 $ 20,000.00 4 Site Restoration and Cleanup LS 1 $7,500.00 $ 7,500.00 $10,680.00 $ 10,680.00 $7,500.00 $ 7,500.00 5 Unexpected Site Changes FA 1 $20,000.00 $ 20,000.00 $20,000.00 $ 20,000.00 $20,000.00 $ 20,000.00 $ - $ - $ - SUBTOTAL SALES TAX TOTAL BID $ 182,250.00 $ 18,589.50 $ 200,839.50 $ 256,760.00 $ 26,189.52 $ 282,949.52 $ 527,500.00 $ 53,805.00 $ 581,305.00 10.20% Error in Bid Apparent low bidder I hereby certify that this tabulation represents all bids received and that the total bid prices have been checked or corrected based on the unit prices provided in the bids. Corrections did not change the order of the bids, unless noted otherwise. https://tukwilawa.sharepoint.com/sites/publicworks/engineering/Shared Documents/Projects/A- SW Projects/LS2 Structural Modifications/01 - Preliminary Engineering/Draft Bid Documents/LS 2 Bid Tab Form 4/16/2025