Loading...
HomeMy WebLinkAboutTIS 2025-04-28 Item 2D - Update - 2024 Pavement Condition Index StudyTO: FROM: BY: CC: DATE: SUBJECT: City of Tukwila Thomas McLeod, Mayor Public Works Department - Pete Mayer, Interim Director INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Pete Mayer, Interim Director David Baus, Transportation Project Manager Mayor Thomas McLeod April 25, 2025 2024 Pavement Condition Index (PCI) Study Update Presentation on the 2024 PCI Study Results Contract No. 24-072 ISSUE Provide the Transportation and Infrastructure Services Committee with an update on the condition of the City's roads, presenting findings from the 2024 PCI study and incorporating comparisons to the 2020 PCI Study. BACKGROUND PCI studies are essential for evaluating the condition of city roads and identifying pavement issues, such as cracks or potholes. They allow cities to prioritize maintenance, improve safety, and manage infrastructure budgets effectively. By providing a clear understanding of road conditions, PCI studies help cities plan strategic repairs and ensure long-term economic and public safety benefits ANALYSIS The City's average Pavement Condition Index (PCI) score has increased by one point since the 2020 study and now stands at 67, which is above the national average of 60 to 65. Key findings from the study include: 1. Streets rated as "excellent" account for 9.5%, falling short of the target of 15%. 2. The backlog amount is 6%, significantly below the national average of 12%. Looking ahead, the Capital Improvement Plan (CIP) budget of $2.5M through 2028 will be slightly below the steady-state funding required to maintain the city's current PCI level. FISCAL IMPACT The cost for 2024 PCI Study was $52,890, which was paid for by an ARPA Grant. RECOMMENDATION Although this is a discussion only presentation, we recommend performing a city PCI study every four (4) years with next occurring in year 2028. Attachments: 2024 PCI Study Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 33 Pavement Management Report December 2024 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY 1 1.1 PROJECT AND METHODS OVERVIEW 1 1.2 RESULTS OVERVIEW AND RECOMMENDATIONS 2 2.0 PRINCIPLES OF PAVEMENT MANAGEMENT 5 2.1 PAVEMENT MANAGEMENT PRINCIPLES 5 3.0 DATA COLLECTION AND ANALYSIS 7 3.1 FIELD SURVEY METHODOLOGY 7 3.2 DATA QUALITY ASSURANCE 8 3.3 PAVEMENT CONDITION SURVEY 9 3.4 ESA PAVEMENT MANAGEMENT SYSTEM 17 3.5 ICC INFORM PAVEMENT NETWORK CONDITION VIEWER 20 3.6 SUMMARY 20 4.0 PAVEMENT CONDITION SURVEY RESULTS 21 4.1 CITY STREET INVENTORY AND CONDITION SUMMARY 21 4.2 CITY NETWORK CONDITION IMAGERY 22 4.3 CITY NETWORK CONDITION DISTRIBUTION 29 4.4 CONDITION BY FUNCTIONAL CLASSIFICATION 30 4.5 SUMMARY 31 5.0 REHABILITATION PLAN & BUDGET DEVELOPMENT 32 5.1 KEY ANALYSIS SET POINTS AND ASSUMPTIONS 32 5.2 NETWORK BUDGET ANALYSIS MODELS 34 5.3 POST REHABILITATION CONDITION 38 5.4 SUMMARY 38 6.0 PROJECT RECOMMENDATIONS & COMMENTS 39 6.1 PROJECT SUMMARY AND RECOMMENDATIONS 39 6.2 CLOSING 39 35 APPENDED REPORTS Following Page 40 Appendix A Street Inventory and Condition Summary by Segment Appendix B 5-Year Rehab Plan Appendix C Full-size Maps APPENDED MAPS Functional Classification Current Pavement condition index (PCI) 5 Year Rehabilitation Plan: $1.4M Annual Budget 5 Year Post Rehabilitation PCI: $1.4M Annual Budget IMS Pavement Management Report Tukwila, WA 2024 Page i 36 1.o EXECUTIVE SUMMARY Li Project and Methods Overview In July of 2024, IMS Infrastructure Management Services, LP (IMS) utilized a cutting -edge Integrated Road Information System (IRISpro Pave) (Figure 1) to capture continuous, high -resolution pavement images that were used to assess pavement cracking, rutting, and roughness on 82 centerline miles of predominantly asphalt roadways in Tukwila, WA (City). IMS followed the American Society for Testing and Materials (ASTM) D6433 standard to analyze the images and distress data collected by the IRISpro to determine the Pavement Condition Index (PCI) for each segment of the road. PCI values were recorded to provide an indication of the surface conditions and structural integrity of a pavement. Using the Easy Street Analysis (ESA) pavement management system, IMS developed multi -year pavement maintenance and rehabilitation (M&R) recommendations for the roadways surveyed. The recommendations consider the severity, quantity, and type of pavement distresses, surface type, pavement strength and functional class. By utilizing these recommendations, the City can make informed decisions on how best to allocate their resources to ensure the longevity and safety of their roadways. Figure 1 - IMS Integrated Road Information System platform (IRISPro Pave) The PCI method was used in accordance with the ASTM D6433 standards to assess the condition of the City's pavements. This method is considered an objective and repeatable approach to assess pavement condition, which is preferrable to alternative methods that rely upon potentially biased human ratings. Based on the PCI results, ESA prioritizes funding using a cost -of -deferral approach, recommending M&R activities that optimize funding by selecting rehabilitation candidates only when they approach the critical point where a heavier maintenance activity will soon be needed to restore the roadway to full service. IMS Pavement Management Report Tukwila, WA 2024 Page 1 37 The analysis and data presented in this report are based on the inspections performed by IMS in July 2024 on the City's pavement network, using available work history and other assumptions that are elaborated on later in this report. 1.2 Results Overview and Recommendations PCI values provide an indication of the surface conditions and structural integrity of a pavement. The 0-100 PCI range is commonly divided into categories using descriptive terms: Very Poor, Poor, Marginal, Fair, Good, Very Good, and Excellent. Divisions between the terms are not fixed but are meant to reflect common perceptions of pavement conditions. These divisions are discussed in more detail in Section 3.0. The City's roadways were generally found to be in Good condition with an average PCI of 67. Figure 2 provides a visual breakdown of the distribution of pavement area across different PCI categories at the time of analysis. Approximately 49% of the City's roadways were found to be in Excellent or Very Good condition. If structurally sound, these pavements are often suitable candidates for cost- effective preventive maintenance treatments. On the other hand, pavements with a PCI below 40 (i.e., pavements in Poor or Very Poor condition) comprise the City's "backlog" of M&R. The City's backlog was found to be 6%. These pavements typically require full or partial reconstruction. Pavements falling within the middle categories, such as Fair or Marginal condition, often benefit from mill and overlay projects. It's important to note that these are general recommendations, and the specific M&R strategy may vary based on factors such as distress types, soil conditions, structural adequacy, and other project -specific details. V Poor (0 to 25) 0% Poor (25 to 40) 6% ■ V Poor (0 to 25) ■ Poor (25 to 40) ■ Marginal (40 to 50) ❑ Fair (50 to 60) ❑ Good (60 to 70) ■ V Good (70 to 85) ■ Excellent (85 to 100) Figure 2 - Distribution of the City's Pavement System on a Condition Scale IMS Pavement Management Report Tukwila, WA 2024 Page I2 38 Metrics of Health The following three metrics are frequently used as indicators of overall pavement network health. The pavement analysis uses these metrics as benchmarks when determining budget goals, such as the backlog control, PCI control, and recommended funding levels. Pavement Condition Index (PCI) - The PCI score is a ranking assessment on the overall health of a pavement segment on a scale of 0 to 100. The network average PCI is a good global indicator of a network's overall health. Percent of Excellent Roads - Roads with a condition category of Excellent are those that score between a PCI of 85 to 100. Backlog -Backlog is the Very Poor and Poor roads (between a PCI of 0 and 40) that represent a portion of the network in need of extensive rehabilitation such as full and partial reconstruction. Using sound pavement management and finance principles, a very healthy network will have a backlog of 10% or less. The City met two out of three of the metrics for evaluating the quality of its roadway network. ✓ The network average pavement condition score exceeds the national average currently seen by IMS of 60 to 65, with the City's average scoring a 67. o The number of streets rated Excellent is below the minimum recommended target of 15% at 9.5% ✓ The backlog amount is below the average value of 12% at 6%. The analysis conducted by IMS using the ESA pavement management system has provided the City with valuable insights into the condition of its roadways. To assess the effect of annual budget on PCI over a five-year period, Figure 3 has been generated to depict the anticipated PCI in five years relative to different annual budget allocations. The blue line allows the user to assess the effect of a given annual budget on the PCI in five years, serving as a valuable tool for understanding the potential effects of budget decisions on future pavement conditions. IMS Pavement Management Report Tukwila, WA 2024 Page 1 3 39 80 c 0 C 75 U 0) Oup L t 70 0 3 65 0 Z w 60 ce 0 o- 55 2025 to 2029 Rehab Analysis Results Target PCI Driven Budget: PCI = 75, Backlog = 3%, Annual Budget = $4.53M/Yr Steady State PCI: Final PCI = 67, Backlog = 5%, Annual Budget = $2.65M/Yr PCI Control Budget: Final PCI = 65, Backlog = 8%, Annual Budget = $2M/Yr Backlog Control Budget: Final PCI = 64, Backlog = 10%, Annual Budget = $1.62M/Yr Tukwila, WA Budget: Final PCI = 63, Backlog = 11%, Annual Budget = $1.4M/Yr Current PCI = 67 0.00 1.00 2.00 3.00 4.00 Annual Budget Each Year for Five Years ($1M/Yr) Figure 3 - PCI Based on Five -Year Annual Budget Funding Models It is important to note that the information presented in the Executive Summary is condensed from various sections of this report. Reviewers are encouraged to familiarize themselves with the detailed information provided in subsequent sections of the report prior to making any specific decisions based on these results. This will ensure that decisions regarding M&R activities are based on a comprehensive understanding of the conditions of the roadways and the recommendations provided in the report. IMS Pavement Management Report Tukwila, WA 2024 Page 4 40 2.o PRINCIPLES OF PAVEMENT MANAGEMENT This section provides an overview of pavement management, including its objectives and the best practices for M&R planning throughout the lifecycle of a pavement. It also highlights the integration of these concepts in the ESA pavement management system, which was used in this report to develop recommendations and analyze the City's pavement network. This context is important for understanding the content and findings of the report. 2.7 Pavement Management Principles Pavement management is the process of assessing, prioritizing, and preserving or rehabilitating pavements through a logical system that attempts to use available funds in the most cost-effective manner possible. The process is iterative, and as more data becomes available, prediction models are refined to improve accuracy. Figure 4 illustrates that pavements typically start deteriorating rapidly once they hit a specific threshold. Therefore, it is more cost-effective to invest in cheaper surface treatments during the first 40% of a pavement's lifespan than to defer maintenance until heavier overlays or reconstruction is required just a few years later. Streets that are repaired while in good condition will have an extended lifespan and will cost less to maintain over their lifetime than those left to deteriorate to a poor condition. Without an adequate routine pavement maintenance program, streets will require more frequent reconstruction, thereby requiring significantly greater funding. Pavement Condition 15% drop in quality in 40% of life Inexpensive surface treatment Costly pavement rehabilitation • Time 40% drop in quality in 15% of life Figure 4 - Pavement Deterioration and Life Cycle Costs The types of rehabilitation activities that the City chooses to deploy can have a significant effect on the longevity of a pavement. Depending on the PCI zone in which a pavement falls, a detailed rehabilitation strategy needs to be formed. Common rehabilitation types include localized preventive or stop gap activities (e.g. crack sealing, joint sealing, and patching), global preventive maintenance (e.g. fog seals, rejuvenators, slurry seals, microsurfacing, chip seals, cape seals, and thin overlays), major Rehabilitation (e.g. thin or thick mill and overlays), and major Reconstruction IMS Pavement Management Report Tukwila, WA 2024 Page5 41 (e.g. surface reconstruction or full reconstruction). Popular examples of cost-effective preventative activities include: • Crack and Joint Sealing • Patching • Microsurfacing • Fog Seal and Rejuvenators • Slurry and Chip Seals • Thin Overlays A proactive pavement management program focuses on the preventative maintenance category and advocates proper incorporation and application of cost-effective preventative activities. These activities help maintain and repair the surface integrity which can slow deterioration and, depending on the treatment, also extend the life of a pavement. The outcome of this exercise is to increase long-term cost savings and network -level pavement quality over time. When completed within the target zone for preventative maintenance, a pavement's lifespan can be conveniently extended. The dashed curves in Figure 5 show the typical lifespan of a pavement that does not undergo any preventive maintenance. Major reconstruction becomes necessary after approximately 20 years. The blue curves show the benefits of preventive maintenance during the first 40% of a pavement's lifespan. Eventually, all pavements will need to undergo reconstruction; however, proactive maintenance and rehabilitation can delay this process for up to an additional 40 years. Pavement Condition Pavement Life Cycle Target Zone for Pavement Preservation • • Increased Pavement Life •• Target Zone for Pavement Rehabilitation •• Target Zone for Pavement Reconstruction kvt rehabilitated Pavement Performance •.. Time Figure 5 - Pavement Life Cycle Curve The most effective approach to ensure optimal usage of available funds or to determine the necessary funding to achieve a predetermined level of service is by using a pavement management system. An effective pavement management system can assist agencies in developing an organized catalog of pavement assets, storing periodic condition assessments, and tracking spending and costs. This enables the City to compare trends in data to assess the effectiveness of maintenance activities and new technologies. IMS Pavement Management Report Tukwila, WA 2024 Page 6 42 3.o DATA COLLECTION AND ANALYSIS 3.1 Field Survey Methodology IMS deployed one of its IrisPro Pave Integrated Road Information Systems for data collection. IrisPro Pave integrates industry -leading subsystems, including 3D pavement imaging systems, lasers, accelerometers, right-of-way cameras, GPS antenna, distance measurement instruments, computers and more (Figure 6). All collected data is captured with DriveTM data collection software, which is designed to simplify the collection of quality road data with built-in calibration schedules, real-time quality control, GIS maps, section tracking, audible alerts and voice memos, fly -by events, and exception reporting. The custom -designed hardware and software on IrisPro Pave provides sub - millisecond synchronization between all subsystems. Teledyne FLIR Ladybug 5+ Captures 360° Imagery at Defined Intervals */ ASTM Class 1 IrisPRO Pavement Profiler Continuous Right and Left Wheel Path Roughness Measurements ✓ Pavement Distress Imaging LCMS-2 Continuous 3D Imaging, lmm Resolution Ne Driven Automated Data Coilection Paired with Field Observations • GPS Positioning GPS with Integrated IMU, Sub Meter Positional Accuracy Samsara Monitoring Real -Time Tracking and Reporting • Texture Continuous Surface Texture Measurements v Linear Distance Positioning DMI for Precise Linear Distance Measurements Safety Lighting Front and Back Facing Flashing Lights Ensure High Visibility IrisPRO Pave Figure 6 - LCMS-2 data collection vehicle IMS Pavement Management Report Tukwila, WA 2024 Page7 43 3D Pavement Imaging The Laser Crack Measurement System (LCMS-2) captures continuous 2D and 3D images at 1 mm resolution in the lane of travel up to 4 m (13 ft) wide at highway speeds, allowing for the visualization and characterization of all features on the road surface. The system allows for collection rates up to 28,000 profiles per second, five times faster than the first edition of LCMS. This allows smaller cracks, especially transverse cracks, to be detected more consistently than in the past. The vertical accuracy has also improved from 0.50 mm to 0.25 mm. High Quality Imaging The Ladybug 5+ captures high quality 30MP spherical images using six cameras for a 360-degree view of the roadway and surroundings. The images can be viewed in panoramic mode, 360 mode, or individual directional images can be extracted at any desired camera angle. Both the Pavement imaging and right of way cameras are triggered on a fixed -distance basis, image capture is precisely synchronized to GPSTime and DMI, and cameras are calibrated for asset inventory and geo- referenced image measurements. 3.2 Data Quality Assurance The collected data is processed in the office using the ConnectTM software. Connect provides a perfectly synchronized multi window platform to view and alter all collected data including profile, distress, slope, International Roughness Index (IRI), events, images, and GPS map. Figure 7 shows some examples of how data can be viewed in Connect. Using Connect, the LCMS-2 3D pavement images are analyzed to identify and classify distresses, and the longitudinal profile of the road is analyzed to determine the IRI and ride quality under the wheel paths according to industry standards. All processed data is matched to the segment ID of the roadway. To ensure the accurate determination of PCI scores, the field data undergoes a rigorous series of processing phases and quality checks. These checks encompass synchronized assessment of both processed and raw data streams. The automatic distress identification and classification process involves various steps: First, different rules and processing parameters are applied on different pavement types; next, the auto detected lane markings are manually adjusted to exclude non - pavement areas and limit the assessment area for cracking and rutting to between the lane markings and invalidation rules are applied to exclude additional anomalies (e.g. near railroad crossing or bridge decks) from the assessment area. Finally, a team of pavement raters who are well -versed in both the distress standards and the data in its digital format review images and make the necessary corrections on areas with gross under/over detection. IMS Pavement Management Report Tukwila, WA 2024 Page 8 44 Figure 7 - QC Image from ConnectTM Software To further confirm the accuracy of our condition data, spot checks are conducted on a network -wide basis by both the QC team and engineering staff. These spot checks are carried out on a random selection of road sections across the entire network to verify that the condition data is consistent and accurate. They also help to identify any potential issues that may have been missed during the initial data collection and review process. Once the QC team and engineering staff have established the integrity of the data, an initial condition spreadsheet with detailed data and summary tables and charts is prepared and submitted for review by the Client. This review process involves a careful examination of the condition data and includes a comprehensive analysis of the data's completeness, accuracy, and consistency before preparing data for import to City's pavement management system. 3.3 Pavement Condition Survey The goal of the pavement condition survey is to determine an accurate rating for each pavement section. The process of collecting and assessing data involves both automated and manual observations that originate from the data collected with the IrisPro Pave equipped with LCMS-2 downward imaging lasers, an array of 4k cameras, and trained rating personnel. Within the "Network Analysis" tab in ESA, IMS has populated values for Surface Distresses, Roughness score, and Strength Rating. These three indices form the foundation on which ESA operates. They allow weighing factors to be uniquely specified for PCI calculation. IMS Pavement Management Report Tukwila, WA 2024 Page9 45 Surface Distress Index (SDI) ASTM D6433 provides a method of categorizing surface distress observations for both asphalt and concrete pavements, based on the extent and severity of distresses along the roadway. The Surface Distress Index (SDI) is used to represent the observed pavement defects on a scale from 0 to 100. However, not all surface distresses are given equal weight. Load -associated distresses (LAD), such as rutting or alligator cracking on asphalt streets, and divided slabs on concrete streets, have a greater impact on the SDI than non -load associated distresses (NLAD), such as raveling or longitudinal and transverse cracking. Even when present in low extents and moderate severity, LAD can significantly decrease the SDI. The SDI inputs are shown in Figure 8. Distress Type Distress Quantity Surface Distress Index (SDI) I` Distress Severity Fair Very Good Excellent Figure 8 - SDI Inputs and Detailed Scale IMS Pavement Management Report Tukwila, WA 2024 Page 1 10 46 ASTM D6433 covers nearly forty unique distress types that may or may not be present in an agency's road network. For that reason, IMS uses a modified approach that collects the most common and relevant distresses. The descriptions in Table 1 outline some of the distresses collected for the City: Table 1 - Distress Descriptions Distress Type Pavement Type Description Example Alligator Cracking Asphalt • Quantified by severity and square footage • Caused by the repeated bending from vehicle loads • Propagate from the bottom, meaning that structural failure has occurred • An LAD with significant impact on the condition score, even at low extents Rutting Asphalt • Caused by the permanent deformation of the pavement and/or subgrade layers • Low densities can have a large impact on the final condition score due to their implication of possible structural failure Longitudinal & Transverse Cracking Asphalt • Quantified by their length and width • Results from pavement shrinkage due to natural daily and seasonal temperature cycles, construction issues, or other factors IMS Pavement Management Report Tukwila, WA 2024 Page 1 11 47 Block Cracking Asphalt • Quantified by their width and square footage • Form interconnected longitudinal and transverse cracks • Divides the pavement into rectangular pieces • Results from aging and environmental factors Y ; �� ��` Patching Asphalt • Quantified by the square footage and severity • Always considered a surface defect • Affects ride quality and condition of a pavement Raveling Asphalt • Measured by severity and square footage affected • Loss of coarse aggregate on pavement surface p -- Bleeding Asphalt • Measured by severity and square footage • Presence of free asphalt binder on the roadway surface • Results in a pavement surface with reduced skid resistance • Caused by either an excess of asphalt in the pavement or insufficient voids in the matrix , -.:-`+, ..} •;.., .._ a. "` :.:; _-.. IMS Pavement Management Report Tukwila, WA 2024 Page 12 48 Edge Cracking Asphalt • Measured in linear feet • Caused by traffic loading and weakened base conditions resulting from poor drainage • Run parallel to the road, usually within 1 to 2 feet of the outer edge of the pavement } `' '* - _ - 1' 4 -;�, '. Distortion Asphalt • Bumps and sags, depressions, swell, corrugation, and shoving • Caused by several factors, such as construction issues, subgrade mixture failure, environmental influence, etc. } .,, - ` Weathering Asphalt • Wearing away of asphalt binder and fine aggregate matrix • Quantified by severity and square footage ., rrx. Al R4 �` `'t' % •�. .. t. ',�w ,, -•%.,� , r'`"%• �► 4 , ' t ., ,;t ,, . ; '�' �� '"- .T. ' ' ,t t'+ . � .. . r Divided Slab Concrete • Slab divided by cracks into four or more pieces • Caused by overloading, inadequate support, or both • Categorized as a severe corner break if all pieces or cracks are contained within a corner break •— _ ;.�; = -� - �.- • Corner Breaks Concrete • Crack that intersects with a joint at less than 1/2 the slab length • Caused by repeated load on a surface with a failing base -- —_ - _ _ _ --_- - *, .�-: -_ IMS Pavement Management Report Tukwila, WA 2024 Page 113 49 Joint Spalling Concrete • A breakdown of the edges of a slab within 2ft of a joint • The depth of the cracking and area affected determine the severity _ Faulting Concrete • Identified by a difference in elevation across a joint • Severe faults have a >3/4 inch elevation difference between two adjacent concrete slabs Durability Cracking Concrete • Caused by the freeze - thaw expansion of the large aggregate • Breaks down concrete over -time • Typically runs parallel to a joint or linear crack • A high severity "D" crack covers more than 15% of the overall slab Scaling Concrete • A result of the surface layer of concrete being worn away over time by weathering • Measured by severity and total area affected ' Punchouts Concrete • Caused by heavy and repeat loads, inadequate slab thickness, and a deterioration of the base foundation • Measured by severity and number of individual cracks within the distress f IMS Pavement Management Report Tukwila, WA 2024 Page 114 50 Roughness Index (RI) The Roughness Index (RI) provides a quantifiable measure of ride quality, which is determined using the industry -standard ASTM E1926 for calculating the IRI. This value is derived from the longitudinal profile captured by the LCMS as it records the change in elevation over a distance. Once calculated, it is expressed as a slope and reported in millimeters per meter (mm/m). Typical IRI levels for new, older, and damaged pavements are displayed in Figure 9. The IRI is lower on average for roads or pavements that are normally used for higher speed travel. IRI (mm/m) 20 — 18- 16- 14- 12 10 8- 6- 4 2- 0 ■ Normal Use 20 mph 30 mph Airport New Older Maintained Damaged Rough Highways Pavements Pavements Unpaved Pavements Unpaved Road Road Road or Pavement Type 40 mph 50 mph 60 mph Figure 9 - IRI Scale Definitions To enable the use of a blended condition score that incorporates both PCI and IRI scores, the IRI value is converted to an equivalent scale for analysis purposes. This is achieved by converting the IRI value into a score on a scale from 0 to 100 and reporting it as the RI using the following formula: RI = (11 - 3.5 x In(IRI)) x 10 In(IRI) is the natural logarithm of IRI. Structural Index (SI) Structural adequacy testing was not requested by the City. Instead, IMS investigated the relationship between the PCI and the number of LAD observed in each pavement section to generate structural indices. Based on this analysis, each section was assigned a rating of Weak, Moderate, or Strong in terms of its strength. These ratings were represented by an SI of 30, 60, or 80, respectively. The established SI was not used in calculating the overall pavement condition score but rather to help determine appropriate rehabilitation strategies based on the pavement strength rating. IMS Pavement Management Report Tukwila, WA 2024 Page 115 51 Pavement condition index (PCI) - Following the field surveys, the condition data was imported to ESA for calculating the overall PCI. The PCI for each segment was calculated using the following percentages of weighing factors: PCI = 67% SDI + 33% RI Table 2 presents each PCI category along with a brief description of the typical distresses and recommended treatments for each. Table 2 - Pavement Condition Categories Category Typical Distresses and M&R Recommendations PCI Range Excellent Very Good Good Fair Marginal Very Poor Like new condition - little to no maintenance required. Monitor condition or preventive maintenance. 85<PCI<_100 Minor cracking, raveling, and other NLAD Routine or preventive maintenance. E.g., Crack sealing, surface treatment 70<PCI<_85 Minor to moderate cracking and low severity LAD such as alligator cracking and rutting. Surface treatments with localized repairs and overlays E.g., Surface treatments, localized surface patching, thin overlay 60<PCI<_70 More extensive and severe longitudinal and transverse cracking, as well as moderate severity LAD Localized repairs or major rehabilitation. E.g., Localized surface and/or full -depth patching, moderate overlays 50<PCI560 Localized high -severity alligator cracking, and rutting Major rehabilitation. E.g., Localized full -depth patching, mill and overlay, traditional overlay 40<PCI<_50 A greater extent of severe alligator cracking, rutting Major rehabilitation. E.g., More extensive full -depth patching, mill and overlay, traditional overlay 25<PCIS40 Extensive and severe alligator cracking, more extensive and deeper rutting, and potholes. Major rehabilitation. E.g., Full -depth reclamation, reconstruction O<PCIS25 IMS Pavement Management Report Tukwila, WA 2024 Page 16 52 3.4 ESA Pavement Management System The ESA software provides all the functionalities of a standalone software package while being user-friendly. It provides the City with a tool that can effectively catalog, classify, assess, track, and analyze condition data to aid in the processes of budget planning and pavement rehabilitation. More specifically the program helps the City streamline its pavement management by giving structure to the basic information required for a management system: Easy Street Analysis by IMS • Pavement Section Inventory • Pavement Deterioration Modeling • Prioritization • Funding Analysis Pavement Section Inventory An accurate inventory of all City -owned streets is necessary to make any determinations, assumptions, or projections within a management system. Individual attributes such as length, width, location, traffic use, surface type, condition, and other factors may be tracked and tied back to a single management segment within ESA. Thereafter, they are given a unique ID within the program. These attributes are critical in determining appropriate rehabilitation activities, prioritizing the management segments within the system, and facilitating placement and sorting during reporting. • Inspection Data • Rehabilitation Selections & History • Work Planning • Reporting Inspection Data ESA provides the City with the flexibility to use a blended condition index that can be tailored to meet specific goals and requirements. The inputs for this index rely on inspection data from the field survey. This custom reporting value is built based on various aspects considered while ranking the condition of a pavement. The inputs for this index are derived from inspection data collected during the field survey, including PCI and IRI data. Details on the individual components of the inspection are available earlier in Section 3.0. Pavement Deterioration Modeling Inspection data by itself is only capable of representing conditions at the time of collection. Nevertheless, within ESA there are customizable curves that can predict the rate of pavement deterioration based on a streets functional class, pavement type, and strength rating. These deterioration curves are critical in predicting future pavement conditions and determining appropriate rehabilitation strategies. The model assumes that pavements with similar attributes and usage will deteriorate at similar rates. For instance, high volume asphalt arterials that are already in poor condition are expected to deteriorate faster and are represented in Figure 10 by a purple line. In contrast, low volume concrete local streets are expected to deteriorate slowly and are represented by a blue dashed line. IMS Pavement Management Report Tukwila, WA 2024 Page 117 53 Pavement Condition Index 100 90 80 70 60 50 40 30 20 10 z - 2 ```'` —ACP Curve-1 —ACP Curve Curve - 3 ,`1a `,` ``~'... —ACP - —ACP Curve-4 — ACP Curve 5 -fi - 9 NILIN , —ACP Curve PCC Curve I—PCCCurve PCC Curve-11 - 10 10 20 30 40 Time (Years) 50 60 70 Figure 10 - Asphalt Concrete Pavement (ACP) and Portland Cement Concrete (PCC) Deterioration Curves Rehabilitation Work Selections & History ESA uses a set of protocols that allow for activities to be assigned to PCI ranges based on filter criteria that give the City the ability to create detailed rehabilitation strategy sets for each functional class and pavement type according to the best practices determined for that pavement. As planned rehabilitation work is completed, a record of the work should be added to the pavement management system. This ensures that conditions are up to date for future selections and creates a repository of information to aid in planning. Prioritization Within ESA, the option is available to prioritize pavement projects for rehabilitation based on six main criteria: PCI, Cost of Deferral, Pavement Strength, Pavement Type, Functional Class, and the Area of a segment. Depending on the goals set forth at the beginning of the project, these criteria can be weighted differently based on their definition to create an overall priority factor for a project. Additional details on these factors are available in Section 5. Project planning The ability to plan work as needed allows the management program to better reflect the realities of a paving program. Certain constraints may be applied to funds that require their use within a certain year and activities relating to other assets may dictate the time and type of work to be performed. ESA allows for predefined projects to be entered into the management plan to account for work that is known. This ensures that the outcome is consistent with overall City planning and accurately reflects current funding allocations. IMS Pavement Management Report Tukwila, WA 2024 Page 118 54 In terms of pavement management efficiency, a program based on worst -first, that is starting at the lowest -rated street and working up towards the highest, does not achieve an optimal expenditure of funds. Generally, under this scenario, agencies cannot sufficiently fund pavement rehabilitation and lose ground despite injecting large amounts of capital into the network. The preferred basis of rehabilitation candidate selection is to examine the cost of deferral of a street against increased life expectancy. Funding analysis The actual process of determining where and when to spend funds is a function of the inputs mentioned in this section. Information from the street section inventory, condition survey, deterioration modeling, rehabilitation activity protocols, prioritization, and project planner are all assessed to predict the potential outcomes of funding scenarios. These can either be goal -based or budget -based. A more detailed description is available in Section 5.0. Reporting ESA has the ability to generate basic reports for common data requests through a set of predefined layouts. This allows for quick access to section condition summaries, inspection data, budget scenario summaries, and data charts. The GIS data used to generate this report is also linked to the section summary information to allow for quick and easy visualizations of the data if imported into a GIS utility. An example of data, as presented in ESA, can be seen in Figure 11. .111112 0102 1t SO •4.Y•..- 44176 pal .4N4 .p L6.7•6•66 Gm pi ism se 6.7. 666 67.i 1.112 +72n MI Yeas AV an 6477 NON 40 us.. h.. 4i2. 4 21744 144 L.e....,. u,-11, µ-141 14ner i. C.4Y'•r. UM. Art woe. a. •..1544 4y.141T Mner i. I(Mal S< 4.14 If ow be •r-1,1 .u.-1S4 u i4 Y ..e Now i. AA$61 , r4 S4 •.•r 31 4441 44W leis. 019 Lamm.. 4Ti4 12407 .0 l.el.r•a. I.8.1,ple• h.. 1,.. W h.. bi1u4 •Y-asEt i1M.w•w 76 Pi 76 Figure 11 - Example of ESA City Data IMS Pavement Management Report Tukwila, WA 2024 Page 19 55 3.5 ICC Inform Pavement Network Condition Viewer Included with every IMS pavement management project is an out -of -the -box, user friendly, browser - based image and condition viewer toll called ICC Inform. Inform provides a convenient medium through which the City may view the imagery collected during the pavement survey. This includes a forward view of the pavement, the downward LCMS view, and a panoramic 360-degree view allowing the City to view each pavement observation from several perspectives. Lastly, a complete map of the City will track the location of every pavement image, providing additional context to the individual pavement segments. An example of Inform can be seen in Figure 12 below. INFORM ► ., zoz. 0, o •�Ams��0 7—err �.....,�e� Ir0 oL Elmo awa l MILE. E MB,[BIF WILLEM Figure 12 - ICC Inform Image Viewer The "play" button in the top left of the Inform application provides the user a means to follow the RST as it drives the City streets. The drop -down menus in the top -center portion of the screen allow the user to quickly search for a particular street segment by GISID, and to even compare images from multiple years of surveys _if data is available from previous survey years). The entirety of this proprietary image -viewing application can be accessed through a web browser by following a link that has been provided to the City staff. 3.6 Summary This section outlined the fundamental concepts of pavement management and described the implementation process for the City's pavement management system. The operating parameters of ESA were reviewed, and the inputs provided by the LCMS-2 technology were explained to provide context for calculating PCI, Roughness Index, and Pavement Strength. IMS Pavement Management Report Tukwila, WA 2024 Page 120 56 4.0 PAVEMENT CONDITION SURVEY RESULTS This section will review the results of the pavement condition survey performed in July 2024. The segments were deteriorated using the defined pavement deterioration models to reflect the conditions of the roadways at the time of analysis (January 2025). This section includes a summary of conditions in the functional classes used in the City's analysis, followed by a review of network photos taken from the survey vehicle. A series of charts will then summarize the findings of the condition survey and provide an overview of the PCI distribution across the City's pavement network. 4.1 City Street Inventory and Condition Summary The City of Tukwila is currently responsible for approximately 82 centerline miles of pavement with an overall PCI of 67 and a backlog of 6%. The following Table 3 presents the City's inventory and pavement condition breakdown across different functional classes. Detailed information for each pavement segment is available in Appendix A. Table 3 - Network Inventory Summary by Functional Class and Pavement Type Pavement Type Network Principal Arterial Minor Arterial Collector Local Segment (Block) Count All Streets Asphalt Concrete 803 783 96 89 114 121 472 108 118 468 6 3 4 20 7 Network Length (mi): All Streets 82 14 15 13 41 Asphalt 81 13 14 12 41 Concrete 2 1 1 0 0 60311 Network Area (yd2): All Streets 1652585 441300 358634 249533 8 59742 Asphalt 1612013 424962 346514 243111 6 Concrete 40572 16338 12120 6422 5692 Current Pavement Condition All Streets 67 70 66 67 66 Index (CPCI) Asphalt 67 69 65 66 66 1/1/2025 Concrete 84 84 84 81 86 Current Backlog (%) All Streets 6 Percentage of Network with a PCI < 40 1/1/25 IMS Pavement Management Report Tukwila, WA 2024 Page I21 57 4.2 City Network Condition Imagery The images presented in this section provide a sampling of the City's streets that fall into various condition categories. A discussion of potential rehabilitation strategies is included for each category. Very Poor (PCI = 0 to 25) - Complete Reconstruction South 141st Street from 56th Avenue to 56th Place (GISID 1591, PCI = 22) - Rated as Very Poor, this street displays a large quantity of alligator and edge cracking severe enough to suggest that the pavement structure is inadequate for current traffic loads. The rehabilitation of roads in this condition through a mill and overlay is generally ineffective, as the failures usually extend to the bottom of the pavement layer. Streets in this condition require rehabilitation that involves removal and replacement of the asphalt layer, base stabilization, or complete reconstruction based on design requirements. Deferral of reconstruction of streets rated as Very Poor will not cause a substantial decrease in overall pavement quality. The streets have passed the opportunity for overlay -based strategies, meaning that reconstruction, which can be expensive, is the most suitable solution. Thus, Very Poor streets are often deferred in favor of rehabilitating more streets at lower costs, resulting in a greater net benefit to the City. This strategy, however, must be sensitive to citizen complaints that may demand the prioritization of these street repairs. In addition, this type of street can pose a safety hazard for motorists since severe potholes and distortions may develop. It is important to consistently monitor these streets and check for potholes or other structural deficiencies until the street is eventually rebuilt. IMS Pavement Management Report Tukwila, WA 2024 Page 1 22 58 Poor (PCI = 25 to 40) - Last Opportunity for Surface and Base Rehabilitation West Marginal Place from City Limit to South 102nd Street (GISID 1518, PCI = 26) - Rated as Poor, this segment still has some remaining life before it becomes a critical reconstruction need. As evident in the imagery, a fair amount of the segment contains alligator cracking. There are also deep longitudinal and transverse cracks, particularly along the edges of the pavement. If left untreated, a partial to full reconstruction would be required within a short period of time. On heavily trafficked roadways, Poor streets often require partial to full reconstruction. On local roadways, they generally require removal of the pavement surface through grinding or excavation, base repairs, restoration of the curb line and drainage, and then placement of a new surface. IMS Pavement Management Report Tukwila, WA 2024 Page 123 59 Marginal (PCI = 40 to 50) - Thick Overlay Orillia Road from South 188th Street to South 200th Street (GISID 1371, PCI = 47) - This street displays transverse and longitudinal cracking across the middle and edges of the pavement. There are sections of alligator cracking dispersed along the segment as well. Marginal streets that display high amounts of load associated distresses (LAD) are selected as a high priority for rehabilitation as they generally provide the best cost/benefit ratio to the City. If left untreated, Marginal streets with high amounts of LAD will deteriorate to become partial reconstruction candidates. Marginal streets that are failing due to materials issues or non -load associated failures may become suitable candidates for thick overlays if deferred, without a significant cost increase. IMS Pavement Management Report Tukwila, WA 2024 Page 1 24 60 Fair (PCI = 50 to 60) - Moderate Overlay East Marginal Way from Tukwila Boulevard to Boeing Access Road (GISID 1423, PCI = 55) - Fair streets have similar characteristics to Marginal streets in that the distresses present tend to be localized and moderate in severity; however, the distresses will predominately be non -load related (i.e., caused by environmental or other factors). This street displays block cracking towards the middle of the pavement. There are moderate amounts of longitudinal and transverse cracking, with some cracks being deep but localized. Like Marginal streets, Fair streets can provide a good cost/benefit ratio to an agency if addressed with an adequate rehabilitation technique. Stretching the application for surface treatments into this range can pose a cheap alternative to overlays but does not provide the appropriate renewal to the structural capacity of the pavement and may allow load related deterioration to continue unabated. IMS Pavement Management Report Tukwila, WA 2024 Page 1 25 61 Good (PCI = 60 to 70) - Surface Treatments e • Southcenter Parkway from Strander Boulevard to South 168th Street (GISID 1775, PCI = 66) - Rated as Good, the primary cause of deterioration for this street is the longitudinal and transverse cracking. The pavement surface could be restored with spot patching to remedy the more heavily distressed areas. Preventive measures on streets considered Good can have a positive impact on the City's funding needs. While the expected life of a slurry seal is not as long as that of an overlay, its ability to slow deterioration and relatively low cost can free up funding for streets in worse condition. IMS Pavement Management Report Tukwila, WA 2024 Page 126 62 Very Good (PCI = 70 to 85) - Surface Treatments and Localized Rehabilitation Klickitat Drive from 51st Avenue to 53rd Avenue (GISID 1397, PCI = 77) - Rated as Very Good, this street displays minor amounts of longitudinal cracking. It is an example of a candidate for preventive maintenance to extend the life of the roadway. Also, routine maintenance prevents water intrusion by sealing and slowing crack growth. By keeping water out of the base layers, the pavement life is extended without the need for heavier rehabilitations. IMS Pavement Management Report Tukwila, WA 2024 Page 1 27 63 Excellent (PCI = 85 to 100) Inerurban Avenue from 143rd Place to 144th Street (GISID 1424, PCI = 91) - Rated as Excellent, this pavement displays little to no surface distresses. The ride is smooth, and the surface and the base are intact. Excellent roads should be periodically assessed for crack development that would trigger routine maintenance activities. IMS Pavement Management Report Tukwila, WA 2024 Page 1 28 64 4.3 City Network Condition Distribution Figure 13 shows the distribution of pavement condition for the roadway network in Tukwila. • Approximately ten percent (9.5%) of the network can be considered in Excellent condition and should be closely monitored to ensure timely application of early localized preventive measures. • Approximately forty percent (39.5%) of the network falls into the PCI range considered Very Good. These are roads that benefit most from preventive maintenance techniques, such as spot patching and slurry seals. • Twenty-three percent (23.3%) of the streets are rated as Good and may still be candidates for slurry seals or thin overlays. • Approximately twenty-one percent (21.3%) of the network can be considered in Fair to Marginal condition and represents candidates for progressively thicker overlay -based rehabilitation. If left untreated, they will decline rapidly into reconstruction candidates. • Less than six percent (6.4%) of the network is rated as Poor or Very Poor, meaning these roadways have deteriorated to the point where surface rehabilitation can no longer restore the pavement to a point of structural adequacy. Rehabilitation of the entire pavement structure is required for these segments. 45 40 35 ra a) Q 30 m 25 L O 20 a) Z 15 Current Network Average Condition = 67, Backlog = 6.4% 39.5 Backlog 0.4 5.9 9.7 11.6 23.3 9.5 V Poor Poor Marginal Fair Good V Good Excellent (0 to 25) (25 to 40) (40 to 50) (50 to 60) (60 to 70) (70 to 85) (85 to 100) Current Pavement Condition Using Descriptive Terms Figure 13 - Roadway Network Present Status Using Descriptive Terms IMS Pavement Management Report Tukwila, WA 2024 Page 1 29 65 4.4 Condition By Functional Classification Analyzing subsets of data in addition to the overall pavement condition can provide a better understanding of where an agency should focus its resources. Figure 14 displays the distribution of pavement conditions for each functional class. 50 40 ris a 30 m Y L O 2 M d w 20 O 01 110 RI M C 01 U O. 10 • Principal Arterial, PCI = 70 • Minor Arterial, PCI = 66 • Collector, PCI = 67 • Local, PCI = 66 V Poor (0 to 25) 1 Poor Marginal (25 to 40) (40 to 50) 1 Fair (50 to 60) (60 to 70) (70 to 85) (85 to 100) Good V Good Pavement Condition Using Descriptive Terms Excellent Figure 14 - Condition Rating by Functional Classification When evaluating the condition of pavement based on the percentage of network it covers, the proportion of each class in the overall network must also be considered. This distribution is illustrated in Figure 15. IMS Pavement Management Report Tukwila, WA 2024 Page 1 30 66 Figure 15 - Functional Classification Distribution By Area 4.5 Summary Section 4.0 of the report provided a detailed analysis of the results obtained from the pavement condition survey conducted in the City of Tukwila. The section covered the functional classifications in the City and their respective PCI values, which were further illustrated with pavement photographs taken during the survey. Additionally, the section provided a breakdown of the pavement condition distribution for each functional class and pavement type. Overall, the network average PCI for Tukwila was found to be 67 with a backlog of 6%. IMS Pavement Management Report Tukwila, WA 2024 Page 1 31 67 5.o REHABILITATION PLAN & BUDGET DEVELOPMENT This section discusses the results of the pavement management analysis that was performed using the ESA pavement management system, starting with an overview of the assumptions that were used when implementing the system, such as the unit rates and the selection methodology for rehabilitation candidates. The subsequent section, 5.2, details the results of each of the various budget runs, along with their predicted conditions. This is highlighted further through a series of charts that are used to demonstrate the advantages and disadvantages of various funding models. 5.i Key Analysis Set Points and Assumptions Pavement management analysis requires user input to complete its condition forecasting and prioritization. A series of operating parameters were developed to create an efficient program that is tailored to the City's needs. Selecting Segments for Rehabilitation The selection of rehabilitation candidates through a worst -first approach or subjective committee input is neither efficient nor cost effective. It is important to establish a set of criteria and determine their importance in the selection process. ESA has defined commonly used criteria within the program that allows different weighting factors to be applied depending on the City's goals. This approach can lead to more objective and effective selection of rehabilitation candidates. • PCI — As mentioned earlier in this section, the results of the pavement condition survey are used to generate a PCI that ranges from 0-100 where 0 is considered the worst and 100 the best. This factor can be given a higher weight to give greater priority to poor condition streets. • Cost of Deferral — As time passes a pavement will deteriorate and require more costly repairs as it ages. ESA can be configured to prioritize streets nearing the point where this cost increase occurs. • Pavement Strength — Through the use of deflection testing or the prevalence of LAD, the relative strength of a pavement can be determined. A prioritization factor can be applied that gives preference to streets that may deteriorate faster in order to apply more cost-effective rehabilitation early in the life cycle. • Pavement Type — Depending on costs, design life, and the City's goals, a weighting factor can be applied based on the materials used to construct the pavement. • Functional Class — Generally higher volume streets are given the greatest priority within a program since they serve the most vehicles. • Planned or Committed Projects — When developing the rehabilitation plan, projects that are already scheduled to be completed are taken into consideration. This is done by adjusting the PCI scores to reflect the expected improvement resulting from these projects. For the City, the weighting factors for these categories were established with the aim of maximizing the cost savings associated with the concept of deferred maintenance and addressing Weak pavements with lower PCI scores. The goal is to minimize the growth of the backlog. IMS Pavement Management Report Tukwila, WA 2024 Page 32 68 Rehabilitation Strategies and Unit Rates The funding requirements for the City are mainly determined by the rehabilitation strategies and unit rates used in the budget analysis. Table 4 presents a breakdown of the costs associated with different pavement rehabilitation activities and their application. The table also suggests a recommended rehabilitation funding sequence based on the cost of deferral. A lower number in this column indicates a higher priority for rehabilitation based on the cost of deferral. The parameters to consider when forming rehabilitation strategies include: • Rehab Activity - This includes the assigned identifier and name of each rehabilitation strategy. Various degrees of slurry sealing are outlined to highlight the increasing cost associated with additional patching requirements for lower PCI streets. • Min, Max, and Critical PCI - The PCI range for the application of a specific rehabilitation activity is determined by the Min and Max values that set the upper and lower limits, while the Critical PCI indicates the threshold at which rehabilitation becomes a higher priority to leverage the cost of deferral factor. There can be overlap in the PCI range to allow for further differentiation based on pavement strength. • Unit Rates - The cost of rehabilitation is presented per square yard for each combination of pavement type, functional class, and rehabilitation activity. A base unit rate is set for the lowest assumed cost of a work type, and it is adjusted for each functional class to account for additional work such as traffic control, intersection improvements, landscaping, utility adjustments, and right-of-way (ROW) infrastructure. IMS worked closely with the City to determine rates that accurately represent the cost of work. Table 4 - Rehabilitation Rates Critical PCI Paveme Min (Need Max nt Type Rehab Activity PCI Year) PCI Base Principal Minor Unit Arterial Arterial Local Rate Unit Unit Collector Unit ($/yd2 Rate Rate Unit Rate Rate ) ($/yd2) ($/yd2) ($/yd2) ($/yd2) FunCL Rate Premium 110 108 105 103 All Routine Maintenance 85 100 100 0.00 0.00 0.00 0.00 0.00 Asphalt Slurry Seal / Seal Coat 80 82 85 4.95 5.40 5.30 5.20 5.10 Asphalt MicroSurface / Chip Seal 70 73 80 7.37 8.00 8.00 7.75 7.50 Asphalt Edge Dill + Thin Overlay (1.5 - 2.0) 60 63 70 24.48 27.00 26.25 25.75 25.00 Asphalt EMWFWM + Moderate Overlay (2.0 - 3.0) 50 54 60 32.73 38.00 36.50 35.00 34.00 Asphalt FWM + Thick Overlay (> 2.0 - 3.0) 40 44 50 41.25 50.00 47.50 45.50 43.50 Asphalt Surf Recon + Base Rehab / FWM + Strctrl Ptch + Olay 25 30 40 68.75 83.00 79.50 76.00 72.00 Asphalt ACP Full Depth Reconstruction 0 15 25 102.30 113.00 110.00 107.00 105.00 Concrete PCC Jnt Rehab & Crk Seal 80 82 100 9.63 10.50 10.25 10.00 9.75 Concrete PCC Localized Rehab 70 73 80 20.63 23.75 23.00 22.25 21.50 Concrete PCC Slight Fhl Rplcrmt (<10%) 60 63 70 42.35 51.00 49.00 46.50 44.50 Concrete PCC Moderate Pnl Rplcmnt (< 20%) 50 54 60 64.35 81.50 77.00 72.50 68.50 Concrete PCC Extensive Pnl Rplcrrnt (<33%) 40 44 50 89.10 118.50 110.50 103.00 96.00 Concrete PCC Partial Reconstruction 25 30 40 119.90 152.00 144.00 135.00 128.00 Concrete PCC Full Depth Reconstruction 0 15 25 180.40 240.00 224.00 209.00 194.00 IMS Pavement Management Report Tukwila, WA 2024 Page 133 69 5.2 Network Budget Analysis Models The pavement management analysis using the ESA system involved combining the condition assessment, deterioration model, prioritization factors, and rehabilitation assignments to conduct a budget analysis. With this information, the program can predict the outcomes of different funding levels or suggest the funds necessary to achieve specific goals. To model network trends and estimate the funding levels needed to reach certain condition and distribution targets, IMS conducted an analysis using a series of budgets. The results of this analysis are detailed in this section. Budget Targets The following scenarios were generated to forecast the outcomes of the current estimated City budget compared to City's target PCI goals over the next five years. The models determine what level of funding may be appropriate going forward. The values for backlog and PCI have been rounded to the nearest whole number to improve legibility. Varying budget figures will have slightly different outcomes that are visible in the charts but may not be completely represented in the legend text. Five-year Models: • Tukwila Budget (Green Line) - This represents the City's current average annual budget of $1.4M/Yr. dedicated to pavement preservation and rehabilitation. This level of funding will result in a network average PCI score of 63 and a backlog of around 11% after five years. • Target PCI Driven (Light -green Line) - The Target PCI model projects the anticipated annual investment needed to increase the average network PCI to 75 over 5 years. The level of funding needed to reach this goal is approximately $4.53M/Yr. and will also reduce the backlog to 3%. • Steady State PCI (Red Line) - This is simply the funds required to maintain the current network average PCI at around 67. The annual budget required to do so is approximately $2.65M/Yr. Backlog will increase to 5% of the network after five years. • PCI Control (Purple Line) - The PCI Control model determines the funding required to maintain the PCI at a minimum level of 65. This budget is $2M/Yr. and will result in a backlog of 8% after five years. • Backlog Control (Purple Dashed Line) - The Backlog Control budget was developed in order to restrict the backlog at 10%. The funding required to achieve this backlog goal is $1.62M/Yr. and will also decrease the PCI to 64 after five years. IMS Pavement Management Report Tukwila, WA 2024 Page 34 70 The results of the analysis are summarized in Figure 16. The x-axis highlights the annual budget, while the y-axis plots the five-year Post Rehab Network Average PCI values. The diagonal blue line is the network trend model developed to show estimated PCI along with a funding range up to $4.6M/Yr. 80 c 0 o 75 U aJ to to >L 70 Q - L 0 3 65 0 Z co w 60 cc V▪ I 0 a 55 2025 to 2029 Rehab Analysis Results Target PCI Driven Budget: PCI = 75, Backlog = 3%, Annual Budget = $4.53M/Yr Steady State PCI: Final PCI = 67, Backlog = 5%, Annual Budget = $2.65M/Yr PCI Control Budget: Final PCI = 65, Backlog = 8%, Annual Budget = $2M/Yr Backlog Control Budget: Final PCI = 64, Backlog = 10%, Annual Budget = $1.62M/Yr Tukwila, WA Budget: Final PCI = 63, Backlog = 11%, Annual Budget = $1.4M/Yr Current PCI = 67 0.00 1.00 2.00 3.00 4.00 Annual Budget Each Year for Five Years ($1M/Yr) Figure 16 - Five-year Post Rehab Network PCI Analysis Results IMS Pavement Management Report Tukwila, WA 2024 Page 135 71 Figure 17 presents the resultant network backlog against the annual budget. It is similar to Figure 16, but instead of plotting the average PCI score, it displays the total backlog after five years with a blue diagonal line. The City currently maintains a backlog of 6%. As the backlog grows, the funding required to return to the current level will increase. Post Rehab Network Percentage Backlog % (PCI < 40) 20 15 10 2025 to 2029 Backlog Analysis Results Target Backlog Driven Budget: PCI = 70, Backlog = 4%, Annual Budget = $3.42M/Yr - Steady State PCI: Final PCI = 67, Backlog = 5%, Annual Budget = $2.65M/Yr - - - - • Maintain Current Backlog: Final PCI = 66, Backlog = 6%, Annual Budget = $2.44M/Yr PCI Control Budget: Final PCI = 65, Backlog = 8%, Annual Budget = $2M/Yr - - - - • Backlog Control Budget: Final PCI = 64, Backlog = 10%, Annual Budget = $1.62M/Yr - Tukwila, WA Budget: Final PCI = 63, Backlog = 11 %, Annual Budget = $1.4M/Yr Current Backlog = 6% (2025) J 0 0.00 1 1.00 2.00 Annual Budget Each Year for Five Years ($1M/Yr) 3.00 Figure 17 - Five-year Post Rehab Network Backlog Results IMS Pavement Management Report Tukwila, WA 2024 Page 36 72 Figure 18 presents the analysis results on an annual basis. This shows that if the budget falls below $2.65M/Yr. (Steady State PCI Budget), over time the overall condition of the roads is expected to deteriorate as the backlog grows. Network Average Pavement Condition Index 95 90 85 80 75 70 65 60 55 Fix All Budget = $41.7M Over 5 Years Target PCI Driven Budget: PCI = 75, Backlog = 3%, Annual Budget = $4.53M/Yr Steady State PCI: Final PCI = 67, Backlog = 5%, Annual Budget = $2.65M/Yr PCI Control Budget: Final PCI = 65, Backlog = 8%, Annual Budget = $2M/Yr - - - Backlog Control Budget: Final PCI = 64, Backlog = 10%, Annual Budget = $1.62M/Yr Tukwila, WA Budget: Final PCI = 63, Backlog = 11%, Annual Budget = $1.4M/Yr Do Nothing 2024 2025 2026 Year 2027 Figure 18 — Five-year Annual PCI 2028 2029 IMS Pavement Management Report Tukwila, WA 2024 Page 1 37 73 5.3 Post Rehabilitation Condition Figure 19 compares the percentage of the City's network area separated into each pavement condition category for two scenarios: the current network average condition (shown in red) and the projected condition in five years with the City's budget (shown in blue). The analysis shows that if the City's current budget is maintained, the average PCI is expected to decrease to 63 by the end of the five-year analysis period, and the backlog is projected to increase to approximately 11 %. 50 Percentage of Network By Area ■ Current Network Average Condition = 67, Backlog = 6.4% ■ Post Rehab Network Average Condition = 63, Backlog = 11.2% Annual Budget = $1400 k/Year V Poor Poor Marginal Fair Good (0 to 25) (25 to 40) (40 to 50) (50 to 60) (60 to 70) Pavement Condition Using Descriptive Terms V Good (70 to 85) li Excellent (85 to 100) Figure 19 - Comparison of Pavement Condition (Current to 5-year Projection) 5.4 Summary The pavement analysis models conducted using the ESA program showed that the current annual budget of $1.4M for pavement management would result in a decrease in pavement condition over a period of five years, resulting in a five-year post rehab PCI of 63 and a backlog of 11 %. Maintaining the current PCI level at 67 would require an annual budget of approximately $2.65M and reduce the backlog to 5%. IMS Pavement Management Report Tukwila, WA 2024 Page 138 74 6.o PROJECT RECOMMENDATIONS & COMMENTS 6.1 Project Summary and Recommendations A pavement condition survey was performed in July 2024 on the full City pavement network. The results of the condition survey were aggregated into the ESA pavement management system. This system facilitated the creation of a georeferenced pavement inventory, enabled the development of a precise model of the network's current condition and anticipated future deterioration, and provided recommendations for funding to meet various level -of -service goals. The following broad recommendations are presented to the City as an output from the pavement analysis and must be read in conjunction with the previous sections. • The City should make efforts to keep the ESA spreadsheet up to date. By maintaining and updating the rehabilitation unit rates, work history of the segments, and accuracy of the inventory, the City will be able to reliably forecast funding needs for future years. This allows the City to be proactive in maintaining the condition of the pavement network at an acceptable level. • The City should periodically resurvey the pavement network. Pavement performance over time involves many variables, such as traffic volumes, environmental factors, maintenance timing, and design standards. As these variables change, the rate at which a pavement deteriorates will change with them. The periodic resurvey of pavement conditions allows the City to track these changes and update models accordingly, ensuring that appropriate rehabilitation measures are being planned. • The City should investigate new and additional rehabilitation activities. Advancements in pavement rehabilitation technology are constantly being made, and it is recommended that the City periodically update its planned rehabilitation activities in the ESA program to take advantage of these advances. • The City should strive to maintain or better its current condition if possible. Maintaining a pavement network in good condition is more cost-effective than restoring conditions after deterioration. The City's current pavement network has an overall PCI of 67 with a backlog value of 6%. If the current annual budget of $1.4M is maintained, the models show the PCI will decrease to 63 and the backlog will hover around 11 % after five years. 6.2 Closing The IMS Team greatly appreciates the opportunity to work with the City on this pavement management update. Over the course of this project, the team has observed the City staff's dedication to offering the best possible service to their community. IMS stands ready to assist the City with training and technical support as necessary and welcomes the opportunity to work with the City on future pavement management projects. IMS Pavement Management Report Tukwila, WA 2024 Page 39 75 Appendix A Street Inventory and Condition Summary by Segment 76 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N -Cs re ,13 N X N , E c C UI O d N C o L w � J O rn � Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1810 16th Ave S CITY LIMIT CITY LIMIT Principal Arterial Concrete 54 892 268 5,621 90 63 60 V Good 80 1957 27th Ave S S 102nd St SOUTH END Local Asphalt 24 1,756 234 4,917 80 72 60 V Good 77 1792 32nd Ave S S 135th St S 136th St Local Asphalt 20 319 35 744 83 58 60 V Good 74 1791 32nd Ave S S 137th St SOUTH END Local Asphalt 20 135 15 315 85 62 60 V Good 77 1787 32nd Ave S S 130th St S 133rd St Local Asphalt 19 763 81 1,691 95 55 60 V Good 82 2013 32nd Ave S S 133rd St S 133rd Ln Local Asphalt 19 306 32 679 89 72 60 V Good 83 1786 32nd Ave S S 136th St S 137th St Local Asphalt 19 274 29 606 90 69 60 V Good 83 2011 32nd Ave S S 133rd Ln S 135th St Local Asphalt 19 345 36 766 87 82 60 Excellent 85 1446 33rd Ave S S 130th St S 132nd St Local Asphalt 19 755 80 1,674 69 56 60 Good 64 1447 33rd Ave S S 140th St 34th PI S Local Asphalt 19 993 105 2,202 92 70 60 V Good 84 1582 33rd PI S NW END S 130th St Local Asphalt 20 326 36 760 56 46 60 Fair 52 1463 33rd PI S 33rd PI S 33rd PI S Local Asphalt 19 130 14 289 99 11 80 Good 69 1474 33rd PI S S 140th St S 141 st St Local Asphalt 20 358 40 836 96 50 60 V Good 80 1205 34th Ave S S 144th St Military Rd S Local Asphalt 22 582 71 1,493 45 61 60 Fair 49 1208 34th Ave S S 130th St S 132nd St Local Asphalt 25 693 96 2,020 50 54 60 Fair 50 1207 34th Ave S S 126th St SOUTH END Local Asphalt 24 628 84 1,758 59 51 60 Fair 55 1204 34th Ave S 33rd Ave S S 144th St Local Asphalt 29 511 82 1,730 87 61 60 V Good 78 1211 34th Ave S S 132nd St S 133rd St Local Asphalt 25 285 40 832 84 69 60 V Good 79 1206 34th Ave S S 133rd St S 135th St Local Asphalt 30 664 111 2,324 86 73 60 V Good 81 1203 34th Ave S S 136th St S 137th St Local Asphalt 28 286 44 933 88 69 60 V Good 82 1212 34th Ave S S 137th St S 140th St Local Asphalt 28 1,067 166 3,486 91 74 60 Excellent 85 1210 34th Ave S S 135th St S 136th St Local Asphalt 28 327 51 1,069 93 73 60 Excellent 86 1209 34th PI S S 141st St 33rd Ave S Local Asphalt 25 478 66 1,395 66 53 60 Good 61 1236 35th Ave S S 133rd St S 135th St Local Asphalt 32 663 118 2,475 31 47 60 Poor 36 1233 35th Ave S S 146th St SOUTH END Local Asphalt 30 294 49 1,029 42 50 60 Marginal 43 1099 35th Ave S S 128th St S 130th St Local Asphalt 21 636 74 1,559 50 42 60 Marginal 46 1730 35th Ave S S 132nd St S 133rd St Local Asphalt 32 441 78 1,648 62 45 60 Fair 56 1733 35th Ave S S 126th St S 128th St Local Asphalt 22 423 52 1,085 62 62 60 Good 61 1235 35th Ave S S 140th St S 142nd PI Local Asphalt 29 833 134 2,819 84 57 60 V Good 75 1732 35th Ave S S 124th St S 126th St Local Asphalt 21 869 101 2,130 82 69 60 V Good 77 1234 35th Ave S S 135th St S 137th St Local Asphalt 28 592 92 1,934 94 69 60 Excellent 86 1741 35th Ln S S 130th St S 132nd St Local Asphalt 19 483 51 1,070 17 0 80 V Poor 11 1064 37th Ave S S 128th St S 130th St Local Asphalt 22 621 76 1,595 29 52 60 Poor 36 2008 37th Ave S Tukwila Intl Blvd S 135th St Local Asphalt 25 652 91 1,902 44 59 60 Marginal 48 1071 37th Ave S S 135th St S 137th St Local Asphalt 32 590 105 2,203 76 70 60 V Good 73 1066 37th Ave S S 137th St S 138th St Local Asphalt 32 321 57 1,200 77 68 60 V Good 73 1107 37th Ave S S 126th St S 128th St Local Asphalt 19 434 46 962 83 61 60 V Good 75 1072 37th Ave S S 132nd St SOUTH END Local Asphalt 30 347 58 1,214 91 51 60 V Good 78 1068 37th Ave S S 138th St S 140th St Local Asphalt 32 721 128 2,692 84 69 60 V Good 79 1065 37th Ave S S 130th St S 132nd St Local Asphalt 30 418 70 1,462 82 85 60 V Good 83 1069 37th Ave S S 142nd St S 142nd PI Local Asphalt 26 156 23 473 92 70 60 V Good 84 1063 37th Ave S S 141 st St S 142nd St Local Asphalt 24 461 61 1,290 96 72 60 Excellent 88 1067 37th Ave S S 140th St S 141 st St Local Asphalt 32 230 41 858 97 73 60 Excellent 89 IMS Infrastructure Management Services Appendix A 77 page 1 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N C o L w � J O rn � Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1070 37th Ave S S 142nd PI S 144th St Local Asphalt 26 502 72 1,522 97 74 60 Excellent 89 1308 38th Ave S S 130th St SOUTH END Local Asphalt 22 603 74 1,547 31 72 30 Marginal 44 1309 38th Ave S S 138th St S 140th St Local Asphalt 30 632 105 2,213 92 66 60 V Good 82 2094 38th Ln S S 130th St SOUTH END Local Asphalt 24 169 23 474 75 49 80 Good 66 1006 38th Ln S 38th Ln S 38th Ln S Local Asphalt 19 162 17 360 90 20 80 Good 66 1918 38th PI S NORTH END S 132nd PI Local Asphalt 20 163 18 379 17 9 60 V Poor 14 1970 39th Ave S S 116th St S 117th St Local Asphalt 22 294 36 754 90 71 60 V Good 83 1842 40th Ave S S 114th St S 115th St Local Asphalt 19 310 33 686 21 18 80 V Poor 19 1379 40th Ave S S 152nd St Southcenter Blvd Local Asphalt 24 632 84 1,769 31 45 60 Poor 35 1143 40th Ave S S 126th St S 128th St Local Asphalt 25 317 44 924 65 43 60 Fair 56 1256 40th Ave S Southcenter Blvd S 154th Ln Local Asphalt 25 142 20 414 73 30 80 Fair 58 1825 40th Ave S East Marginal Way S S 132nd PI Collector Asphalt 26 881 127 2,672 61 69 60 Good 63 1861 40th Ave S Interurban PI S Interurban Ave S Local Asphalt 25 109 15 318 84 26 80 Good 64 2096 40th Ave S S 132nd PI 42nd Ave S Collector Asphalt 27 1,544 232 4,863 66 72 60 Good 67 1254 40th Ave S S 154th Ln DS@337S S 154th Ln Local Asphalt 25 337 47 983 96 42 60 V Good 78 1855 40th Ave S S 117th PI Interurban PI S Local Asphalt 24 480 64 1,345 85 70 60 V Good 79 1169 40th Ave S NORTH END S 116th PI Local Asphalt 20 243 27 568 91 66 60 V Good 82 1831 40th Ave S S 116th PI S 117th St Local Asphalt 24 202 27 565 92 71 60 V Good 84 1156 40th Ave S S 117th St S 117th PI Local Asphalt 25 181 25 528 95 67 60 Excellent 85 1953 40th PI S NORTH END S 119th St Local Asphalt 25 262 36 765 86 50 60 V Good 73 1178 41st Ave S S 113th St S 114th St Local Asphalt 26 240 35 729 69 23 80 Fair 53 1180 41st Ave S S 130th St S 131st PI Local Asphalt 25 421 58 1,228 87 65 60 V Good 79 1181 41st Ave S NORTH END S 139th St Local Asphalt 24 588 78 1,646 90 67 60 V Good 82 1647 42nd Ave S S 124th St Macadam Rd S Collector Asphalt 28 1,063 165 3,473 32 63 30 Marginal 41 1517 42nd Ave S S 115th St S 116th St Collector Asphalt 34 152 29 604 52 59 80 Fair 53 1860 42nd Ave S S 152nd St Southcenter Blvd Collector Asphalt 29 349 56 1,180 62 65 60 Good 62 1515 42nd Ave S S 144th St S 146th St Collector Asphalt 31 666 115 2,408 63 70 60 Good 64 1859 42nd Ave S S 151st St S 152nd St Collector Asphalt 28 362 56 1,182 67 68 80 Good 66 1516 42nd Ave S 40th Ave S S 139th St Collector Asphalt 25 794 110 2,315 65 74 60 Good 67 1521 42nd Ave S S 116th St Pedestrian Bridge S 119th St Access Collector Asphalt 35 1,145 223 4,677 66 76 60 Good 69 1163 42nd Ave S S 146th St S 148th St Collector Asphalt 32 661 118 2,469 65 79 60 Good 69 1523 42nd Ave S S 150th St S 151st St Collector Asphalt 29 305 49 1,031 72 67 60 V Good 70 1389 42nd Ave S S 148th St S 150th St Collector Asphalt 28 661 103 2,160 67 78 60 V Good 70 1648 42nd Ave S Southcenter Blvd S 158th St Collector Asphalt 28 1,648 256 5,383 73 69 60 V Good 71 1179 42nd Ave S S 126th St SE END Local Asphalt 25 164 23 478 81 56 60 V Good 72 1195 42nd Ave S S 122nd St S 124th St Collector Asphalt 25 713 99 2,079 74 74 60 V Good 74 1663 42nd Ave S S 142nd St S 144th St Collector Asphalt 31 646 111 2,337 81 69 60 V Good 77 1557 42nd Ave S Pedestrian Bridge S 119th St Access S 122nd St Collector Asphalt 25 987 137 2,879 78 80 60 V Good 78 1639 42nd Ave S S 158th St S 160th St Collector Asphalt 29 654 105 2,211 86 67 60 V Good 79 1388 42nd Ave S S 140th St S 141st St Collector Asphalt 30 318 53 1,113 89 64 60 V Good 80 1196 42nd Ave S S 139th St S 140th St Collector Asphalt 26 281 41 852 91 70 60 V Good 84 1530 42nd Ave S S 141st St S 142nd St Collector Asphalt 30 362 60 1,268 95 62 60 V Good 84 1524 42nd Ave S S 139th St S 139th St Collector Asphalt 32 41 7 153 97 61 60 Excellent 84 IMS Infrastructure Management Services Appendix A 78 page 2 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N C o L w � J O rn � Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1519 42nd Ave S S 140th St S 140th St Collector Asphalt 28 38 6 123 99 69 60 Excellent 88 1963 43rd Ave S S 140th St S 142nd St Local Asphalt 27 671 101 2,113 63 47 60 Fair 57 1962 43rd Ave S Macadam Rd S SOUTH END Local Asphalt 26 814 118 2,468 66 52 60 Good 61 1961 43rd Ave S NORTH END S 160th St Local Asphalt 29 352 57 1,191 73 41 60 Good 62 1964 43rd Ave S S 122nd St S 124th St Local Asphalt 25 713 99 2,078 73 86 60 V Good 77 1972 43rd PI S S 137th St S 137th PI Local Asphalt 23 375 48 1,005 85 49 60 V Good 72 1748 43rd PI S S 116th St 44th Ave S Local Asphalt 30 340 57 1,189 94 59 60 V Good 82 1795 44th Ave S S 131st PI S 133rd St Local Asphalt 23 293 37 787 55 55 60 Fair 54 1788 44th Ave S S 137th St S 139th St Local Asphalt 19 641 68 1,421 62 51 80 Fair 58 1790 44th Ave S S 140th St S 142nd St Local Asphalt 19 650 69 1,440 70 67 60 Good 69 1796 44th Ave S 43rd PI S S 118th St Local Asphalt 19 535 56 1,185 72 71 60 V Good 71 1793 44th Ave S S 118th St S 122nd St Local Asphalt 20 1,407 156 3,284 72 72 60 V Good 71 1789 44th Ave S S 122nd St S 124th St Local Asphalt 23 710 91 1,904 79 74 60 V Good 77 2021 44th Ave S S 156th St S 158th St Local Asphalt 19 475 50 1,052 90 64 60 V Good 81 1260 44th PI S S 118th St 46th Ave S Local Asphalt 19 705 74 1,562 82 64 60 V Good 76 1266 44th PI S 46th Ave S S 122nd St Local Asphalt 19 1,145 121 2,538 83 66 60 V Good 77 1399 45th Ave S S 137th St S 139th St Local Asphalt 26 766 111 2,324 58 44 60 Fair 52 1247 45th Ave S S 139th St S 140th St Local Asphalt 23 209 27 560 63 41 80 Fair 55 1897 45th Ave S S 122nd St S 124th St Local Asphalt 26 711 103 2,157 79 64 60 V Good 74 1217 45th PI S 45th PI S DS@65S 45th PI S Local Asphalt 26 65 9 198 94 0 80 Good 62 1231 45th PI S DS@65S 45th PI S 45th PI S Local Asphalt 25 60 8 174 75 39 80 Good 63 1232 45th PI S S 163rd PI SOUTH END Local Asphalt 25 150 21 437 74 52 60 Good 66 1230 45th PI S S 136th St S 137th St Local Asphalt 24 277 37 776 84 49 60 V Good 72 1782 46th Ave S S 146th St S 148th St Local Asphalt 20 659 73 1,538 30 51 60 Poor 36 1277 46th Ave S S 148th St SOUTH END Local Asphalt 19 220 23 487 34 53 30 Marginal 39 1781 46th Ave S S 144th St S 146th St Local Asphalt 20 666 74 1,554 48 50 60 Marginal 47 1836 46th Ave S S 160th St S 162nd St Local Asphalt 21 603 70 1,477 59 43 60 Fair 52 1914 46th Ave S S 163rd PI S 162nd St Local Asphalt 25 132 18 384 76 29 80 Good 59 1276 46th Ave S NORTH END S 150th St Local Asphalt 19 304 32 674 73 49 80 Good 65 1783 46th Ave S S 122nd St S 124th St Local Asphalt 23 712 91 1,911 80 56 60 V Good 72 1275 46th Ave S 44th PI S S 122nd St Local Asphalt 21 870 102 2,132 83 77 60 V Good 81 1274 46th Ave S S 124th St S 125th St Local Asphalt 24 176 23 493 90 71 60 V Good 83 1832 47th Ave S S Ryan Way S 109th St Local Asphalt 22 642 79 1,649 20 48 60 Poor 28 1383 47th Ave S NE END S 134th PI Local Asphalt 25 292 41 851 38 24 80 Poor 32 1385 47th Ave S S 104th PI S 107th St Local Asphalt 22 744 91 1,908 34 49 60 Poor 38 1846 47th Ave S S 160th St S 162nd St Local Asphalt 25 608 84 1,774 56 43 60 Fair 51 1828 47th Ave S CITY LIMIT S 104th PI Local Asphalt 21 229 27 560 51 62 60 Fair 54 1142 47th Ave S S 156th St S 158th St Local Asphalt 26 510 74 1,547 76 65 60 V Good 72 1840 47th Ave S S 158th St SOUTH END Local Asphalt 24 579 77 1,621 86 57 60 V Good 76 1856 47th Ave S S 122nd St S 124th St Local Asphalt 21 713 83 1,747 83 72 60 V Good 79 1448 48th Ave S S 162nd St SOUTH END Local Asphalt 19 165 17 366 43 7 80 Poor 30 1452 48th Ave S S 160th St S 162nd St Local Asphalt 19 601 63 1,332 65 50 80 Good 59 1453 48th Ave S NORTH END S 109th St Local Asphalt 19 308 33 684 60 74 30 Good 64 IMS Infrastructure Management Services Appendix A 79 page 3 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1109 48th Ave S NE END S 134th PI Local Asphalt 23 118 15 317 79 48 60 Good 68 1451 48th Ave S S 122nd St S 124th St Local Asphalt 19 714 75 1,583 74 62 60 Good 69 1110 48th Ave S NE END Interurban Ave S Local Asphalt 25 2,049 285 5,975 75 70 60 V Good 73 1111 48th Ave S S 134th PI 48th PI S Local Asphalt 19 222 23 492 86 50 60 V Good 73 1449 48th Ave S 48th PI S Macadam Rd S Local Asphalt 19 437 46 968 86 65 60 V Good 78 1050 48th PI S 48th PI S DS@85N 48th PI S Local Asphalt 25 85 12 247 69 0 80 Marginal 45 1049 48th PI S DS@85N 48th PI S 48th PI S Local Asphalt 24 89 12 248 80 13 80 Fair 57 1047 48th PI S S 145th St NW END Local Asphalt 24 191 25 534 85 33 80 Good 67 1051 48th PI S 48th Ave S S 136th St Local Asphalt 19 291 31 645 90 47 60 V Good 76 1048 48th PI S S 146th St S 145th St Local Asphalt 19 240 25 532 88 63 60 V Good 79 1666 49th Ave S NORTH END S 164th St Local Asphalt 27 405 61 1,276 50 35 80 Marginal 44 1667 49th Ave S S 122nd St S 124th St Local Asphalt 26 714 103 2,166 82 69 60 V Good 77 1699 49th Ave S S 107th St S 114th St Local Asphalt 25 2,254 313 6,574 94 70 60 Excellent 86 1808 50th Ave S NORTH END S 112th St Local Asphalt 19 273 29 605 78 60 60 V Good 71 1809 50th Ave S 51st PIS S 122nd Ln Local Asphalt 20 499 55 1,165 89 54 60 V Good 76 1146 50th PI S S 125th St S 130th PI Collector Asphalt 35 977 190 3,989 23 61 60 Poor 34 1386 50th PI S S 124th St S 125th St Collector Asphalt 35 257 50 1,051 43 61 60 Marginal 47 2058 51st Ave S SR 518 Ramp 1-5 Ramp Minor Arterial Asphalt 30 279 46 976 36 67 60 Marginal 45 1044 51st Ave S S 144th St S 151st St Collector Asphalt 35 2,319 451 9,469 41 61 60 Marginal 46 1951 51stAve S S 151st St S 152nd St Collector Asphalt 35 329 64 1,344 50 91 30 Good 63 1200 51stAve S S 139th St SOUTH END Local Asphalt 21 487 57 1,193 69 54 60 Good 64 1046 51stAve S NORTH END S 159th St Local Asphalt 25 424 59 1,236 69 55 80 Good 64 1045 51st Ave S S 160th St S 161st St Collector Asphalt 35 284 55 1,158 70 64 60 Good 67 1201 51st Ave S S 163rd PI S 164th St Collector Asphalt 35 200 39 817 76 74 60 V Good 75 1949 51st Ave S S 161st St S 163rd PI Collector Asphalt 35 702 137 2,867 76 80 60 V Good 77 1952 51st Ave S S 152nd St Southcenter Blvd Collector Asphalt 34 569 108 2,258 76 81 60 V Good 77 1202 51st Ave S S 164th St S 166th St Collector Asphalt 35 621 121 2,535 78 79 60 V Good 78 1950 51stAve S NORTH END S 138th St Local Asphalt 22 722 88 1,852 91 77 60 Excellent 86 1199 51st Ave S S 138th St S 139th St Local Asphalt 20 338 38 789 100 60 60 Excellent 86 2051 51st Ave S SR 518 SR 518 Ramp Minor Arterial Concrete 30 192 32 673 100 67 60 Excellent 89 1653 51st Ave S Southcenter Blvd SR 518 Ramp Minor Arterial Concrete 30 291 48 1,017 100 71 60 Excellent 90 2099 51st PI S S 122nd Ln S 124th St Local Asphalt 20 128 14 300 56 66 60 Fair 58 1060 51st PI S S 124th St SE END Local Asphalt 20 815 91 1,903 80 65 60 V Good 75 1670 51st PI S 50th Ave S S 122nd Ln Local Asphalt 20 586 65 1,367 84 63 60 V Good 76 1700 51st PI S S 122nd St 50th Ave S Local Asphalt 20 199 22 464 87 58 60 V Good 77 1325 52nd Ave S NORTH END S 142nd St Local Asphalt 22 269 33 692 64 32 80 Fair 52 1324 52nd Ave S 53rd Ave S S 136th St Local Asphalt 22 268 33 687 72 59 60 Good 67 1331 52nd Ave S S 136th St S 137th St Local Asphalt 22 294 36 756 77 49 60 Good 67 1326 52nd Ave S Interurban Ave S 53rd Ave S Local Asphalt 20 288 32 673 94 37 60 V Good 75 1329 52nd Ave S NORTH END S 164th St Local Asphalt 21 173 20 424 86 59 60 V Good 77 1327 52nd Ave S S 151st St Southcenter Blvd Local Asphalt 21 914 107 2,240 84 67 60 V Good 78 1328 52nd Ave S S 137th St S 138th St Local Asphalt 22 261 32 669 93 53 60 V Good 79 1330 52nd Ave S S 142nd St SOUTH END Local Asphalt 22 333 41 856 97 67 60 Excellent 87 IMS Infrastructure Management Services Appendix A 80 page 4 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d a) C o L • O7 7 O rn C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1594 52nd PI S 52nd Ave S S 137th St Local Asphalt 21 261 31 641 69 70 60 Good 69 1113 53rd Ave S S 170th St S 172nd Ln Local Asphalt 22 863 105 2,215 45 56 60 Marginal 47 1112 53rd Ave S Klickitat Dr S 159th St Collector Asphalt 27 519 78 1,635 62 73 60 Good 65 1114 53rd Ave S S 159th St S 160th St Collector Asphalt 28 552 86 1,802 66 70 60 Good 66 1116 53rd Ave S S 166th St S 170th St Local Asphalt 22 1,112 136 2,854 70 68 60 Good 68 2163 53rd Ave S Southcenter Blvd DS@355S Southcenter Blvd Local Asphalt 22 355 43 912 76 72 60 V Good 74 1890 53rd Ave S S 139th St S 140th St Collector Asphalt 35 303 59 1,237 94 63 60 V Good 83 1174 53rd Ave S S 140th St S 142nd St Collector Asphalt 34 621 117 2,464 89 75 60 V Good 84 1891 53rd Ave S S 142nd St S 144th St Collector Asphalt 33 787 144 3,028 90 77 60 Excellent 85 1115 53rd Ave S 52nd Ave S S 136th St Local Asphalt 21 274 32 672 100 57 60 Excellent 85 1117 53rd Ave S S 137th St S 139th St Collector Asphalt 35 484 94 1,977 96 73 60 Excellent 87 1889 53rd Ave S S 136th St S 137th St Local Asphalt 21 213 25 522 95 100 60 Excellent 95 1684 53rd PI S 53rd PI S SPUR 53rd PI S SPUR Local Asphalt 36 48 10 200 33 46 60 Poor 37 1250 53rd PI S 53rd PI S 53rd PI S Local Asphalt 21 151 18 371 59 22 80 Marginal 45 1736 53rd PI S Slade Way 53rd PI S SPUR Local Asphalt 22 410 50 1,053 74 57 60 Good 68 1683 53rd PI S 53rd PI S SPUR SW END Local Asphalt 21 168 20 413 87 59 60 V Good 77 1971 53rd PI S SPUR 53rd PI S 53rd PI S Local Asphalt 21 176 20 430 77 20 80 Fair 58 1487 54th Ave S Slade Way S 166th St Local Asphalt 22 965 118 2,477 91 55 60 V Good 78 1475 55th Ave S S 140th St S 144th St Local Asphalt 20 1,418 158 3,308 37 48 60 Marginal 40 1411 56th Ave S S 139th St S 141st St Local Asphalt 20 712 79 1,662 55 47 60 Fair 51 1408 56th Ave S S 137th St 56th PI S Local Asphalt 20 761 85 1,776 57 71 60 Good 61 1407 56th Ave S S 130th PI S 133rd St Local Asphalt 20 784 87 1,829 75 57 60 Good 68 1410 56th Ave S S 141st St S 144th St Local Asphalt 21 1,048 122 2,568 77 57 60 V Good 69 1409 56th Ave S S 133rd St Interurban Ave S Local Asphalt 20 1,195 133 2,789 79 55 60 V Good 71 1406 56th Ave S S 144th St S 147th St Local Asphalt 21 1,016 119 2,489 83 56 60 V Good 73 1992 56th PI S 56th Ave S S 141st St Local Asphalt 21 768 90 1,882 86 52 60 V Good 75 1403 57th Ave S S 144th St S 147th St Local Asphalt 23 975 125 2,617 14 60 60 Poor 29 1568 57th Ave S S 141st St S 142nd St Local Asphalt 22 319 39 819 33 59 60 Marginal 41 1566 57th Ave S S 150th PI SOUTH END Local Asphalt 23 232 30 622 41 50 60 Marginal 43 1571 57th Ave S S 152nd St S 152nd PI Local Asphalt 23 320 41 859 49 50 60 Marginal 48 2162 57th Ave S SW END Interurban Ave S Local Asphalt 22 199 24 512 69 28 80 Fair 55 1402 57th Ave S S 142nd St S 144th St Local Asphalt 22 668 82 1,716 55 67 60 Fair 59 1570 57th Ave S Pamela Dr S 133rd St Local Asphalt 21 335 39 820 80 60 60 V Good 73 1567 57th Ave S S 149th St S 150th PI Local Asphalt 23 533 68 1,429 84 54 60 V Good 74 1569 57th Ave S S 130th PI Pamela Dr Local Asphalt 21 378 44 927 80 66 60 V Good 75 1572 57th Ave S S 147th St S 149th St Local Asphalt 23 518 66 1,389 95 69 60 Excellent 86 1227 58th Ave S 59th Ave S S 144th St Collector Asphalt 35 668 130 2,726 65 69 60 Good 65 1226 58th Ave S Interurban Ave S 59th Ave S Collector Asphalt 35 577 112 2,354 77 51 60 Good 68 1224 58th Ave S S 144th St S 147th St Collector Asphalt 35 975 190 3,981 70 71 60 V Good 70 1362 59th Aly S S 147th St SOUTH END Local Asphalt 19 643 68 1,426 38 31 60 Poor 35 1644 59th Ave S S 144th St S 147th St Local Asphalt 21 997 116 2,442 60 46 60 Fair 55 1738 59th Ave S S 142nd St S 144th St Local Asphalt 20 928 103 2,165 64 50 60 Fair 58 1824 59th Ave S S 147th St S 149th St Local Asphalt 22 611 75 1,567 82 66 60 V Good 77 IMS Infrastructure Management Services Appendix A 81 page 5 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N o L w � J O rn � Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1969 61st Ave S Southcenter Blvd Tukwila Pkwy Minor Arterial Asphalt 40 587 130 2,738 15 59 30 Poor 28 1004 62nd Ave S S 151st St DS@131S S 151st St Local Asphalt 20 131 15 305 6 37 60 V Poor 16 1093 62nd Ave S S 149th St S 149th PI Collector Asphalt 35 278 54 1,136 70 62 60 Good 66 1094 62nd Ave S S 149th PI S 151st St Collector Asphalt 34 416 79 1,652 66 71 60 Good 67 1096 62nd Ave S S 153rd St Sunwood Blvd Local Asphalt 20 158 18 369 80 47 80 Good 68 1091 62nd Ave S Sunwood Blvd Southcenter Blvd Local Asphalt 20 750 83 1,749 77 52 60 Good 68 1095 62nd Ave S 59th Ave S S 149th St Collector Asphalt 33 816 150 3,140 69 71 60 Good 69 1558 63rd PI S S 151st St S 151st PI Local Asphalt 22 174 21 447 81 66 60 V Good 76 1216 64th Ave S S 153rd St SOUTH END Local Asphalt 22 321 39 825 81 65 60 V Good 75 1040 65th Ave S S 153rd St Southcenter Blvd Collector Asphalt 35 951 185 3,885 61 63 60 Good 61 1041 65th Ave S S 151st St S 153rd St Collector Asphalt 35 916 178 3,738 76 72 60 V Good 74 1198 65th Ave S S 153rd St S 153rd St Collector Asphalt 34 128 24 506 84 69 60 V Good 78 1955 66th Ave S Southcenter Blvd 1-405 Ramp Minor Arterial Concrete 35 246 48 1,003 100 53 60 V Good 84 1651 Airport Way S DS@581E Boeing Access Rd Boeing Access Rd Minor Arterial Asphalt 32 641 114 2,392 9 67 60 Poor 27 1640 Airport Way S Boeing Access Rd Airport Way S Minor Arterial Asphalt 32 625 111 2,334 20 61 60 Poor 33 1641 Airport Way S DS@355S CITY LIMIT Boeing Access Rd Minor Arterial Asphalt 30 584 97 2,044 56 60 60 Fair 56 1514 Airport Way S CITY LIMIT Boeing Access Rd Minor Arterial Asphalt 30 1,068 178 3,737 53 71 60 Fair 58 1848 Airport Way S Airport Way S Boeing Access Rd Minor Arterial Concrete 30 982 164 3,436 84 67 60 V Good 78 1560 Airport Way S Boeing Access Rd DS@581 E Boeing Access Rd Minor Arterial Concrete 32 581 103 2,168 88 65 60 V Good 80 1166 Airport Way S CITY LIMIT DS@355S CITY LIMIT Principal Arterial Concrete 44 355 87 1,824 85 70 60 V Good 80 1713 Andover Park E Costco Dr S 180th St Minor Arterial Asphalt 32 1,022 182 3,816 56 75 60 Good 62 1710 Andover Park E Strander Blvd Treck Dr Minor Arterial Asphalt 30 715 119 2,504 68 61 60 Good 65 1712 Andover Park E Evans Black Dr Baker Blvd Minor Arterial Asphalt 30 465 78 1,628 69 67 60 Good 67 1711 Andover Park E Treck Dr Minkler Blvd Minor Arterial Asphalt 32 1,934 344 7,221 68 75 60 V Good 69 1714 Andover Park E Minkler Blvd Costco Dr Minor Arterial Asphalt 32 1,473 262 5,499 71 81 60 V Good 74 1708 Andover Park E Baker Blvd Strander Blvd Minor Arterial Asphalt 30 876 146 3,067 81 63 60 V Good 74 1709 Andover Park E Tukwila Pkwy Evans Black Dr Minor Arterial Asphalt 30 782 130 2,738 81 70 60 V Good 77 1901 Andover Park W Strander Blvd Corporate Dr N Minor Arterial Asphalt 33 1,852 340 7,132 42 62 60 Marginal 47 1240 Andover Park W Corporate Dr N Corporate Dr S Minor Arterial Asphalt 33 518 95 1,993 46 62 60 Fair 50 1983 Andover Park W Corporate Dr S Minkler Blvd Minor Arterial Asphalt 33 235 43 903 54 60 60 Fair 55 1237 Andover Park W Upland Dr Midland Dr Collector Asphalt 35 756 147 3,087 54 73 60 Good 60 1980 Andover Park W Minkler Blvd Upland Dr Minor Arterial Asphalt 33 421 77 1,622 62 61 60 Good 61 1979 Andover Park W Minkler Blvd Minkler Blvd Minor Arterial Asphalt 33 51 9 196 78 43 60 Good 66 1238 Andover Park W Triland Dr S 180th St Minor Arterial Asphalt 30 620 103 2,169 67 68 60 Good 66 1902 Andover Park W Baker Blvd Strander Blvd Minor Arterial Asphalt 32 871 155 3,253 72 63 60 Good 68 1982 Andover Park W Midland Dr Triland Dr Minor Arterial Asphalt 30 845 141 2,957 73 72 60 V Good 72 2062 Andover Park W Tukwila Pkwy Southcenter Mall Minor Arterial Asphalt 32 327 58 1,222 75 71 60 V Good 73 1984 Andover Park W Southcenter Mall Baker Blvd Minor Arterial Asphalt 32 843 150 3,149 86 71 60 V Good 80 1694 B Line Southcenter Pkwy C Line Local Asphalt 20 271 30 633 69 70 60 Good 69 1042 Baker Blvd Andover Park W Andover Park E Local Asphalt 20 1,080 120 2,521 58 71 60 Good 61 1102 Baker Blvd Andover Park E Christensen Rd Local Asphalt 20 343 38 801 74 63 80 V Good 69 1632 Beacon Ave S S Ryan Way S 107th St Local Asphalt 22 943 115 2,420 58 59 60 Fair 57 1630 Beacon Ave S CITY LIMIT S Ryan Way Local Asphalt 20 60 7 140 83 32 80 Good 65 IMS Infrastructure Management Services Appendix A 82 page 6 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 N X N C ,13 N X N , E c C UI O d a) C o L w � J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1975 Boeing Access Rd Martin L King Jr Ramp Martin L King Jr Way S Principal Arterial Asphalt 44 292 71 1,498 31 48 60 Poor 36 1753 Boeing Access Rd DS@220E East Marginal Way S Airport Way S Principal Arterial Asphalt 44 113 28 581 29 67 60 Marginal 40 1977 Boeing Access Rd Airport Way S Airport Way S Principal Arterial Asphalt 44 330 81 1,695 30 72 60 Marginal 42 1752 Boeing Access Rd East Marginal Way S DS@220E East Marginal Way S Principal Arterial Asphalt 44 220 54 1,132 35 75 30 Marginal 47 1978 Boeing Access Rd Airport Way S Airport Way S Principal Arterial Asphalt 44 377 92 1,933 39 75 30 Fair 49 1755 Boeing Access Rd 1-5 Ramp Martin L King Jr Ramp Principal Arterial Asphalt 42 395 92 1,937 44 80 60 Fair 54 1754 Boeing Access Rd 1-5 Ramp Airport Way S Principal Arterial Asphalt 44 168 41 862 55 63 60 Fair 56 1749 Boeing Access Rd Airport Way S Airport Way S Principal Arterial Asphalt 44 224 55 1,151 53 76 60 Good 59 1976 Boeing Access Rd East Marginal Way S East Marginal Way S Principal Arterial Asphalt 44 176 43 902 79 62 60 V Good 73 1751 Boeing Access Rd East Marginal Way S Boeing Access Rd Principal Arterial Asphalt 44 592 145 3,038 78 70 60 V Good 75 1974 Boeing Access Rd East Marginal Way S East Marginal Way S Principal Arterial Asphalt 44 173 42 886 87 67 60 V Good 79 1973 Boeing Access Rd 1-5 Ramp 1-5 Ramp Principal Arterial Concrete 44 492 120 2,526 100 61 60 Excellent 86 1750 Boeing Access Rd 1-5 Ramp 1-5 Ramp Principal Arterial Concrete 44 371 91 1,905 100 64 60 Excellent 88 1772 C Line UnNamed-01534 Southcenter Pkwy Local Asphalt 20 730 81 1,703 21 61 30 Poor 33 1698 Cascade Ave S Riverside Dr Todd Blvd Local Asphalt 20 864 96 2,017 62 71 60 Good 64 1697 Cascade Ave S Todd Blvd S Glacier St Local Asphalt 20 738 82 1,722 75 79 60 V Good 76 1176 Christensen Rd Strander Blvd Christensen Rd Local Asphalt 19 802 85 1,777 48 57 60 Fair 50 1734 Christensen Rd NORTH END Baker Blvd Local Asphalt 20 1,253 139 2,924 64 66 80 Good 64 1395 Christensen Rd Christensen Rd Christensen Rd Local Asphalt 19 82 9 183 94 34 80 V Good 74 1177 Christensen Rd Christensen Rd Christensen Rd Local Asphalt 19 82 9 182 97 31 60 V Good 75 1175 Christensen Rd Baker Blvd Christensen Rd Local Asphalt 19 249 26 552 84 72 60 V Good 79 1149 Corporate Dr N Corporate Dr N Corporate Dr N Local Asphalt 19 206 22 457 91 40 80 V Good 73 1150 Corporate Dr N WEST END Andover Park W Local Asphalt 19 424 45 939 87 70 60 V Good 81 1577 Corporate Dr S Corporate Dr S Corporate Dr S Local Asphalt 20 203 23 474 44 27 60 Poor 38 1249 Corporate Dr S WEST END Andover Park W Local Asphalt 20 427 47 997 51 66 60 Fair 56 1001 Costco Dr Andover Park E DS@280E Andover Park E Local Asphalt 20 280 31 652 62 67 60 Good 63 1010 East Marginal Way S Tukwila Intl Blvd S 112th St Minor Arterial Asphalt 30 1,358 226 4,752 28 61 60 Poor 38 2092 East Marginal Way S Interurban Ave S SR 599 Minor Arterial Asphalt 30 312 52 1,090 32 52 60 Poor 38 1869 East Marginal Way S S 115th St S 116th St Minor Arterial Asphalt 30 671 112 2,349 36 64 60 Marginal 44 1882 East Marginal Way S S 96th PI S Norfolk St Principal Arterial Asphalt 44 1,742 426 8,944 41 67 60 Marginal 48 1687 East Marginal Way S S 116th St Interurban Ave S Minor Arterial Asphalt 30 392 65 1,370 39 70 60 Marginal 48 1868 East Marginal Way S S 128th St S 128th St Minor Arterial Asphalt 30 170 28 596 42 66 60 Marginal 48 1427 East Marginal Way S S 112th St S 115th St Minor Arterial Asphalt 30 713 119 2,494 40 71 60 Fair 49 1864 East Marginal Way S East Marginal Way S Tukwila Intl Blvd Local Asphalt 19 747 79 1,656 47 71 60 Fair 54 1866 East Marginal Way S S 128th St S 130th St Minor Arterial Asphalt 30 519 86 1,816 50 66 60 Fair 54 1423 East Marginal Way S Tukwila Intl Blvd Boeing Access Rd Principal Arterial Asphalt 44 52 13 268 55 57 60 Fair 55 1528 East Marginal Way S S Norfolk St S 102nd St Principal Arterial Asphalt 44 386 94 1,980 50 75 60 Fair 57 1877 East Marginal Way S Boeing Access Rd Tukwila Intl Blvd Principal Arterial Asphalt 43 242 58 1,212 49 77 30 Fair 57 1162 East Marginal Way S CITY LIMIT S 81st PI Principal Arterial Asphalt 44 723 177 3,711 53 72 60 Fair 58 1158 East Marginal Way S S 130th St 40th Ave S Minor Arterial Asphalt 30 113 19 396 53 72 60 Fair 58 1874 East Marginal Way S S 102nd St S 104th St Principal Arterial Asphalt 44 587 144 3,014 51 78 60 Good 59 1008 East Marginal Way S Boeing Access Rd Tukwila Intl Blvd Minor Arterial Asphalt 30 197 33 690 60 65 60 Good 61 2086 East Marginal Way S SR 599 S 120th PI Minor Arterial Asphalt 30 603 100 2,109 58 73 60 Good 62 IMS Infrastructure Management Services Appendix A 83 page 7 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N C o L w � 7 O rn C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1165 East Marginal Way S S 104th St DS@507S S 104th St Principal Arterial Asphalt 44 507 124 2,600 58 76 60 Good 63 1160 East Marginal Way S S 126th St S 128th St Minor Arterial Asphalt 30 353 59 1,235 64 69 60 Good 65 1881 East Marginal Way S DS@507S S 104th St Boeing Access Rd Principal Arterial Asphalt 44 314 77 1,609 62 74 60 Good 65 1426 East Marginal Way S 40th Ave S S 133rd St Minor Arterial Asphalt 30 893 149 3,127 62 76 60 Good 66 1428 East Marginal Way S S 81st PI S 87th PI Principal Arterial Asphalt 44 2,601 636 13,350 65 73 60 Good 67 1157 East Marginal Way S S 90th St S 94th PI Principal Arterial Asphalt 44 1,667 408 8,560 68 72 60 Good 68 1883 East Marginal Way S Tukwila Intl Blvd Boeing Access Rd Local Asphalt 30 309 52 1,082 74 60 60 Good 69 1875 East Marginal Way S S 124th St S 126th St Minor Arterial Asphalt 30 899 150 3,147 68 76 60 V Good 70 1997 East Marginal Way S S 87th PI S 90th St Principal Arterial Asphalt 44 524 128 2,688 72 74 60 V Good 72 1391 East Marginal Way S S 120th PI S 124th St Minor Arterial Asphalt 30 1,254 209 4,390 75 68 60 V Good 72 1009 East Marginal Way S Tukwila Intl Blvd Tukwila Intl Blvd Principal Arterial Asphalt 44 82 20 421 87 46 80 V Good 73 1531 East Marginal Way S S 94th PI S 96th PI Principal Arterial Asphalt 44 718 176 3,688 79 70 60 V Good 75 1508 Evans Black Dr WEST END Andover Park E Local Asphalt 30 567 94 1,984 93 66 60 V Good 84 1954 Fort Dent Way Interurban Ave S Starfire Way Local Asphalt 29 688 111 2,329 92 72 60 Excellent 85 1341 Frager Rd S 204th St S 204th St Collector Asphalt 32 3 1 11 77 0 80 Fair 50 1364 Fun Center Way DS@447E Interurban Ave S SW Grady Way Local Asphalt 20 112 12 261 45 11 60 Poor 33 1510 Fun Center Way Interurban Ave S DS@447E Interurban Ave S Local Asphalt 22 447 55 1,148 86 69 60 V Good 80 1696 Gateway Dr Interurban Ave S S 133rd St Local Asphalt 21 2,527 295 6,192 91 70 60 V Good 84 1002 Industry Dr Andover Park E DS@355E Andover Park E Local Asphalt 22 355 43 911 70 69 60 Good 69 1998 Interurban Ave S Macadam Rd S Gateway Dr Minor Arterial Asphalt 30 997 166 3,488 32 64 60 Marginal 41 1872 Interurban Ave S SW Grady Way West Valley Hwy Principal Arterial Asphalt 55 141 43 906 37 61 60 Marginal 43 1167 Interurban Ave S 58th Ave S S 143rd St Principal Arterial Asphalt 56 615 191 4,015 46 57 60 Marginal 48 1562 Interurban Ave S Fun Center Way SW Grady Way Principal Arterial Asphalt 55 231 70 1,480 48 53 60 Marginal 48 1159 Interurban Ave S 40th Ave S Macadam Rd S Minor Arterial Asphalt 30 2,868 478 10,037 37 83 60 Fair 51 1559 Interurban Ave S 48th Ave S 1-5 Ramp Principal Arterial Asphalt 55 127 39 817 53 56 60 Fair 53 1880 Interurban Ave S S 140th St 58th Ave S Principal Arterial Asphalt 55 829 253 5,322 52 62 60 Fair 54 1876 Interurban Ave S West Valley Hwy SW Grady Way Local Asphalt 22 164 20 421 59 55 60 Fair 57 1878 Interurban Ave S 1-5 Ramp 56th Ave S Principal Arterial Asphalt 55 607 186 3,897 59 65 60 Good 60 1871 Interurban Ave S 56th Ave S S 140th St Principal Arterial Asphalt 55 2,142 655 13,745 58 69 60 Good 60 1392 Interurban Ave S 1-405 Ramp DS@490E 1-405 Ramp Principal Arterial Asphalt 56 490 152 3,198 60 67 60 Good 61 1994 Interurban Ave S East Marginal Way S 40th Ave S Minor Arterial Asphalt 30 1,013 169 3,544 58 77 60 Good 63 1999 Interurban Ave S S 149th St 1-405 Ramp Principal Arterial Asphalt 56 1,953 608 12,761 65 65 60 Good 64 1873 Interurban Ave S 1-5 Ramp 1-5 Ramp Principal Arterial Asphalt 55 573 175 3,675 66 64 60 Good 64 1879 Interurban Ave S S 133rd St SR 599 Ramp Minor Arterial Asphalt 30 276 46 966 73 65 60 V Good 70 1867 Interurban Ave S DS@490E 1-405 Ramp Fun Center Way Principal Arterial Asphalt 56 125 39 815 77 60 60 V Good 70 1161 Interurban Ave S SR 599 Ramp 48th Ave S Minor Arterial Asphalt 30 767 128 2,683 71 72 60 V Good 71 1011 Interurban Ave S S 143rd St S 143rd PI Principal Arterial Asphalt 56 339 106 2,218 72 70 60 V Good 71 1996 Interurban Ave S Interurban Ave S Southcenter Blvd Local Asphalt 22 387 47 992 82 57 80 V Good 73 1865 Interurban Ave S S 147th St S 149th St Principal Arterial Asphalt 56 604 188 3,946 79 65 60 V Good 74 1164 Interurban Ave S SR 599 Ramp S 133rd St Minor Arterial Asphalt 30 284 47 993 76 75 60 V Good 75 1218 Interurban Ave S Gateway Dr SR 599 Ramp Minor Arterial Asphalt 30 500 83 1,749 73 83 60 V Good 76 1870 Interurban Ave S S 144th St S 147th St Principal Arterial Asphalt 56 916 285 5,983 86 77 60 V Good 82 1424 Interurban Ave S S 143rd PI S 144th St Principal Arterial Asphalt 56 344 107 2,248 95 87 60 Excellent 91 IMS Infrastructure Management Services Appendix A 84 page 8 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N C o L w � c O co Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1839 Interurban PI S 40th Ave S SE END Local Asphalt 22 478 58 1,226 62 43 60 Fair 55 1398 Klickitat Dr I-5 Ramp Southcenter Pkwy Minor Arterial Asphalt 30 1,052 175 3,682 51 71 60 Fair 56 1248 Klickitat Dr 53rd Ave S 1-5 Ramp Minor Arterial Asphalt 30 1,089 181 3,811 72 87 60 V Good 76 1397 Klickitat Dr 51st Ave S 53rd Ave S Minor Arterial Asphalt 30 877 146 3,068 79 73 60 V Good 77 1375 Longacres Way West Valley Hwy Nelsen PI Local Asphalt 22 400 49 1,028 70 72 60 V Good 70 1944 Macadam Rd S S 136th St S 137th St Collector Asphalt 34 308 58 1,222 38 53 60 Marginal 41 1948 Macadam Rd S Interurban Ave S SR 599 Collector Asphalt 35 123 24 502 36 66 60 Marginal 44 1317 Macadam Rd S 43rd Ave S S 136th St Collector Asphalt 35 1,710 333 6,984 41 58 60 Marginal 45 1945 Macadam Rd S S 138th St S 144th St Collector Asphalt 34 1,997 377 7,922 46 64 60 Fair 51 1315 Macadam Rd S S 137th St S 138th St Collector Asphalt 34 783 148 3,105 49 58 60 Fair 51 1947 Macadam Rd S SR 599 S 128th St Collector Asphalt 35 192 37 784 80 53 80 V Good 71 1316 Macadam Rd S SR 599 SR 599 Collector Asphalt 35 104 20 426 80 73 60 V Good 77 1495 Macadam Rd S S 130th St S 131st PI Collector Asphalt 35 531 103 2,170 86 65 60 V Good 78 1946 Macadam Rd S S 133rd St 43rd Ave S Collector Asphalt 35 338 66 1,379 86 65 60 V Good 79 1314 Macadam Rd S S 131st PI S 133rd St Collector Asphalt 35 534 104 2,180 89 65 60 V Good 80 1312 Macadam Rd S S 128th St S 130th St Collector Asphalt 35 271 53 1,107 89 68 60 V Good 82 1098 Macadam Rd S S 144th St S 149th Ln Collector Asphalt 34 1,662 314 6,592 90 77 60 Excellent 85 2064 Macadam Rd S S 149th Ln S 150th St Collector Asphalt 34 195 37 773 99 67 60 Excellent 87 1943 Macadam Rd S S 150th St S 152nd St Collector Asphalt 34 867 164 3,439 97 77 60 Excellent 89 1313 Macadam Rd S S 152nd St Southcenter Blvd Collector Asphalt 34 1,451 274 5,754 99 85 60 Excellent 93 1319 Martin L King Jr Way S 1-5 Ramp 1-5 Ramp Principal Arterial Asphalt 56 1,943 604 12,692 57 80 60 Good 63 1812 Martin L King Jr Way S Boeing Access Rd 1-5 Ramp Principal Arterial Asphalt 56 163 51 1,062 71 59 60 Good 66 1813 Martin L King Jr Way S 1-5 Ramp 1-5 Ramp Principal Arterial Asphalt 56 586 182 3,831 70 82 80 V Good 74 1148 Martin L King Jr Way S 1-5 Ramp CITY LIMIT Principal Arterial Asphalt 56 1,935 602 12,643 73 89 60 V Good 77 1811 Martin L King Jr Way S DS@413S S 104th PI Boeing Access Rd Principal Arterial Concrete 55 158 48 1,017 93 56 60 V Good 81 1318 Martin L King Jr Way S CITY LIMIT S 104th PI Principal Arterial Concrete 56 114 35 744 97 65 60 Excellent 86 1332 Martin L King Jr Way S S 104th PI DS@413S S 104th PI Principal Arterial Concrete 56 413 129 2,701 100 71 60 Excellent 90 1323 Martin L King Jr Way S CITY LIMIT Martin L King Jr Way S Local Concrete 25 526 73 1,535 100 80 60 Excellent 93 1593 Midland Dr WEST END Andover Park W Local Asphalt 22 900 110 2,311 8 69 60 Poor 28 1614 Military Rd S S 158th St EAST END Local Asphalt 25 187 26 546 73 52 80 Good 66 1355 Minkler Blvd Southcenter Pkwy Bauch Dr Collector Asphalt 35 1,314 255 5,365 68 63 60 Good 65 1365 Minkler Blvd Andover Park W Andover Park E Collector Asphalt 33 903 165 3,475 75 69 60 V Good 73 2019 Minkler Blvd Bauch Dr Andover Park W Collector Asphalt 35 672 131 2,743 80 66 60 V Good 75 1357 Minkler Blvd Andover Park E Industry Dr Local Asphalt 22 585 72 1,503 87 57 60 V Good 77 1378 Nelsen PI S 156th St Longacres Way Local Asphalt 24 571 76 1,599 31 45 60 Poor 35 1633 Olympic Ave S Todd Blvd S Glacier St Local Asphalt 22 853 104 2,190 64 83 60 Good 69 1834 Olympic Ave S Riverside Dr Todd Blvd Local Asphalt 25 865 120 2,524 75 80 60 V Good 76 1371 Orillia Rd S S 188th St S 200th St Principal Arterial Asphalt 56 3,525 1,097 23,031 31 84 60 Marginal 47 1645 Orillia Rd S S 200th St S 204th St Principal Arterial Asphalt 56 1,602 498 10,465 69 87 60 V Good 74 1823 Pamela Dr 57th Ave S NE END Local Asphalt 19 405 43 898 73 61 60 Good 68 1664 Pamela Dr Pamela Dr Pamela Dr Local Asphalt 19 178 19 395 89 52 60 V Good 76 1213 Riverside Dr Olympic Ave S Cascade Ave S Local Asphalt 19 480 51 1,064 74 90 60 V Good 79 2161 S 102nd St 27th Ave S DS@644E 27th Ave S Local Asphalt 19 644 68 1,427 88 74 60 V Good 83 IMS Infrastructure Management Services Appendix A 85 page 9 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d u) C o L • O7 7 O rn C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1457 S 104th PI WEST END Martin L King Jr Way S Local Asphalt 19 751 79 1,665 54 57 60 Fair 54 1014 S 104th PI DS@258E 47th Ave S S 104th PI Local Asphalt 20 61 7 142 86 2 80 Fair 57 1015 S 104th PI DS@188E 47th Ave S DS@258E 47th Ave S Local Asphalt 20 69 8 162 80 14 80 Fair 57 1013 S 104th PI 47th Ave S DS@188E 47th Ave S Local Asphalt 20 188 21 440 85 63 60 V Good 77 1425 S 104th St 27th Ave S East Marginal Way S Local Asphalt 20 977 109 2,279 64 61 60 Good 62 1118 S 107th St S Ryan Way EAST END Local Asphalt 20 302 34 705 30 38 60 Poor 31 1119 S 107th St Beacon Ave S 51st Ave S Local Asphalt 22 130 16 333 89 37 80 V Good 71 1278 S 107th St 49th Ave S Beacon Ave S Local Asphalt 22 471 58 1,210 95 63 60 V Good 84 1799 S 109th St Beacon Ave S Beacon Ave S Local Asphalt 24 1 0 3 62 22 80 Marginal 48 1940 S 109th St 50th Ave S Beacon Ave S Local Asphalt 22 217 26 556 51 52 60 Fair 50 2128 S 109th St Beacon Ave S 51st Ave S Local Asphalt 24 30 4 82 75 18 80 Fair 56 1800 S 109th St 47th Ave S 48th Ave S Local Asphalt 22 283 35 727 70 60 60 Good 66 1284 S 112th St 50th Ave S 51st Ave S Local Asphalt 20 294 33 686 52 43 60 Marginal 48 1286 S 112th St Tukwila Intl Blvd East Marginal Way S Collector Asphalt 35 995 193 4,063 62 75 60 Good 66 1285 S 112th St WEST END Tukwila Intl Blvd Local Asphalt 22 778 95 1,997 64 72 60 Good 66 1039 S 113th St WEST END 41st Ave S Local Asphalt 20 475 53 1,109 48 31 60 Marginal 41 1988 S 113th St WEST END 51st Ave S Local Asphalt 20 345 38 805 61 44 60 Fair 54 1444 S 114th St 40th Ave S 41 st Ave S Local Asphalt 22 219 27 562 39 27 80 Poor 35 1443 S 114th St WEST END 40th Ave S Local Asphalt 20 211 23 493 78 9 80 Fair 55 1442 S 114th St 41st Ave S EAST END Local Asphalt 22 148 18 380 83 0 80 Fair 55 1441 S 114th St 49th Ave S 51st Ave S Local Asphalt 22 918 112 2,356 80 58 60 V Good 72 1057 S 115th St East Marginal Way S 40th Ave S Collector Asphalt 33 1,096 201 4,219 51 73 60 Fair 57 1059 S 115th St 42nd Ave S NE END Local Asphalt 19 209 22 462 89 32 80 Good 69 1058 S 115th St 40th Ave S 42nd Ave S Collector Asphalt 32 764 136 2,852 71 71 60 V Good 70 1338 S 116th St WEST END East Marginal Way S Local Asphalt 19 1,114 118 2,469 62 56 60 Fair 59 2100 S 116th St East Marginal Way S 35th Ln S Local Asphalt 19 226 24 501 73 44 80 Good 63 1628 S 116th St 43rd PI S 42nd Ave S Local Asphalt 19 363 38 806 74 54 60 Good 67 2102 S 116th St 35th Ln S 39th Ave S Local Asphalt 19 488 52 1,082 90 72 60 V Good 83 1596 S 117th St 39th Ave S 40th Ave S Local Asphalt 20 315 35 736 87 77 60 V Good 83 1690 S 118th St 44th PI S EAST END Local Asphalt 20 201 22 469 17 28 60 V Poor 20 2098 S 118th St 44th Ave S 44th PI S Local Asphalt 20 94 10 220 84 91 60 Excellent 86 1360 S 119th St 40th Ave S 40th PI S Local Concrete 20 240 27 560 100 47 60 V Good 83 1370 S 119th St 40th PI S EAST END Local Concrete 21 224 26 549 100 55 60 Excellent 85 1987 S 120th PI WEST END East Marginal Way S Local Concrete 21 1,244 145 3,048 95 59 60 V Good 83 1229 S 122nd Ln 50th Ave S 51st PI S Local Asphalt 21 338 39 828 78 54 60 V Good 69 1430 S 122nd St 44th Ave S 44th Ave S Local Asphalt 22 98 12 251 63 57 60 Good 60 1432 S 122nd St 43rd Ave S 44th Ave S Local Asphalt 21 152 18 373 69 62 60 Good 66 1440 S 122nd St 42nd Ave S 43rd Ave S Local Asphalt 21 334 39 819 76 54 80 Good 68 1671 S 122nd St 46th Ave S 46th Ave S Local Asphalt 22 54 7 138 75 55 80 Good 68 1061 S 122nd St 45th Ave S 46th Ave S Local Asphalt 22 190 23 488 80 72 60 V Good 77 1436 S 122nd St 48th Ave S 44th PIS Local Asphalt 19 187 20 415 86 60 60 V Good 77 1433 S 122nd St 44th PI S 49th Ave S Local Asphalt 19 63 7 139 94 49 60 V Good 79 1431 S 122nd St 46th Ave S 47th Ave S Local Asphalt 22 248 30 638 88 72 60 V Good 82 IMS Infrastructure Management Services Appendix A 86 page 10 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d u) C o L • O] J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1434 S 122nd St 47th Ave S 48th Ave S Local Asphalt 19 255 27 565 88 74 60 V Good 83 1106 S 122nd St 49th Ave S 51st PIS Local Asphalt 19 130 14 287 95 65 60 Excellent 84 1435 S 122nd St 44th Ave S 45th Ave S Local Asphalt 22 252 31 646 93 70 60 Excellent 85 1336 S 124th St 50th PI S 51st PI S Local Asphalt 20 409 45 954 66 60 60 Good 63 1417 S 124th St 35th Ave S East Marginal Way S Local Asphalt 19 718 76 1,591 73 54 80 Good 66 1553 S 124th St 49th Ave S 50th PI S Collector Asphalt 34 253 48 1,002 74 64 30 V Good 70 1502 S 124th St 42nd Ave S 43rd Ave S Collector Asphalt 35 273 53 1,115 83 75 60 V Good 80 1990 S 124th St 44th Ave S 45th Ave S Collector Asphalt 35 257 50 1,050 84 74 60 V Good 80 1993 S 124th St 45th Ave S 46th Ave S Collector Asphalt 35 243 47 994 92 70 60 V Good 84 1816 S 124th St 48th Ave S 49th Ave S Collector Asphalt 34 253 48 1,005 89 77 60 V Good 84 1505 S 124th St 43rd Ave S 44th Ave S Collector Asphalt 35 244 47 995 91 77 60 Excellent 86 1414 S 124th St 46th Ave S 47th Ave S Collector Asphalt 34 249 47 987 91 79 60 Excellent 86 1991 S 124th St 47th Ave S 48th Ave S Collector Asphalt 34 254 48 1,008 90 81 60 Excellent 86 1310 S 125th St 46th Ave S 50th PI S Local Asphalt 20 1,156 128 2,697 88 79 60 V Good 84 1366 S 126th St 40th Ave S 42nd Ave S Local Asphalt 20 317 35 741 66 37 80 Fair 56 1512 S 126th St 35th Ave S 37th Ave S Local Asphalt 20 419 47 977 94 58 60 V Good 81 1643 S 126th St 37th Ave S East Marginal Way S Local Asphalt 20 549 61 1,282 93 66 60 V Good 83 1373 S 126th St 34th Ave S 35th Ave S Local Asphalt 20 405 45 944 94 70 60 Excellent 86 1241 S 128th St East Marginal Way S 40th Ave S Local Asphalt 19 87 9 192 70 44 80 Good 60 1906 S 128th St WEST END 35th Ave S Local Asphalt 22 218 27 560 84 18 80 Good 61 1455 S 128th St 40th Ave S Macadam Rd S Local Asphalt 19 854 90 1,892 73 58 60 Good 67 1904 S 128th St CITY LIMIT CITY LIMIT Local Asphalt 24 1 0 3 100 28 60 V Good 76 1903 S 128th St 35th Ave S 37th Ave S Local Asphalt 22 409 50 1,049 96 48 60 V Good 79 1905 S 128th St Military Rd S CITY LIMIT Local Asphalt 22 653 80 1,675 92 69 60 V Good 84 1242 S 128th St 37th Ave S East Marginal Way S Local Asphalt 22 786 96 2,017 98 59 60 Excellent 85 1103 S 129th St S 130th PI CITY LIMIT Collector Concrete 32 1,139 203 4,253 100 64 60 Excellent 88 1595 S 130th PI 57th Ave S SE END Local Asphalt 22 1,478 181 3,795 50 50 60 Fair 50 1549 S 130th PI 50th PI S 56th Ave S Local Asphalt 22 1,828 223 4,691 64 64 60 Good 64 1280 S 130th PI 56th Ave S 57th Ave S Local Asphalt 22 270 33 694 73 61 80 Good 69 1141 S 130th St 33rd PI S 34th Ave S Local Asphalt 22 99 12 254 62 4 80 Marginal 42 2095 S 130th St 38th Ln S East Marginal Way S Local Asphalt 25 282 39 823 61 59 60 Good 60 1635 S 130th St 35th Ave S 35th Ln S Local Asphalt 25 284 39 828 73 51 60 Good 65 1853 S 130th St 37th Ave S 37th Ave S Local Asphalt 24 21 3 57 83 30 80 Good 65 1140 S 130th St 41st Ave S Macadam Rd S Local Asphalt 25 493 68 1,438 80 52 80 V Good 70 1837 S 130th St 33rd Ave S 33rd PI S Local Asphalt 22 55 7 141 87 49 60 V Good 74 1857 S 130th St Tukwila Intl Blvd 35th Ave S Local Asphalt 22 215 26 551 82 58 80 V Good 74 1170 S 130th St 32nd Ave S 33rd Ave S Local Asphalt 22 335 41 860 95 39 60 V Good 76 1381 S 130th St East Marginal Way S 41st Ave S Local Asphalt 25 285 40 831 85 66 60 V Good 78 1387 S 130th St 35th Ln S 37th Ave S Local Asphalt 25 121 17 352 89 60 60 V Good 79 1155 S 130th St 37th Ave S 38th Ave S Local Asphalt 25 237 33 691 90 74 60 V Good 84 2093 S 130th St 38th Ave S 38th Ln S Local Asphalt 25 261 36 762 99 76 60 Excellent 91 1185 S 131 st PI 44th Ave S 44th Ave S Local Asphalt 20 133 15 311 55 40 60 Fair 49 1186 S 131st PI Macadam Rd S 44th Ave S Local Asphalt 20 336 37 784 88 57 60 V Good 77 87 IMS Infrastructure Management Services Appendix A page 11 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E C UI O d u) C o L • O] J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1893 S 131st PI 41st Ave S Macadam Rd S Local Asphalt 20 527 59 1,229 86 61 60 V Good 77 1007 S 132nd PI S 132nd PI S 132nd PI Local Asphalt 19 214 23 475 29 5 80 V Poor 20 1917 S 132nd PI NW END 38th PIS Local Asphalt 19 180 19 400 69 43 60 Good 60 2097 S 132nd PI 38th PI S 40th Ave S Local Asphalt 19 285 30 632 86 58 60 V Good 76 1618 S 132nd St 35th Ln S 37th Ave S Local Asphalt 22 132 16 340 25 10 80 V Poor 19 2005 S 132nd St 34th Ave S 34th Ln S Collector Asphalt 34 248 47 983 18 66 60 Poor 33 1615 S 132nd St 35th Ave S Tukwila Intl Blvd Collector Asphalt 35 98 19 402 47 16 80 Poor 36 1616 S 132nd St 33rd Ave S 34th Ave S Collector Asphalt 35 332 65 1,355 33 71 30 Marginal 45 2006 S 132nd St 34th Ln S 35th Ave S Collector Asphalt 33 96 18 368 42 73 60 Fair 51 1172 S 133rd St 31st Ave S 32nd Ave S Collector Asphalt 25 303 42 883 23 76 60 Marginal 39 1520 S 133rd St 34th Ave S 35th Ave S Local Asphalt 22 309 38 793 36 49 60 Marginal 39 1529 S 133rd St Military Rd S 30th PI S Collector Asphalt 25 449 62 1,311 29 68 60 Marginal 41 1642 S 133rd St 35th Ave S EAST END Local Asphalt 22 262 32 672 41 46 60 Marginal 41 1153 S 133rd St 30th PI S 31st Ave S Collector Asphalt 25 208 29 608 24 82 60 Marginal 42 1154 S 133rd St 32nd Ave S S 132nd St Collector Asphalt 25 388 54 1,131 56 64 60 Fair 58 1926 S 133rd St SR 599 Interurban Ave S Minor Arterial Asphalt 35 210 41 856 69 53 60 Good 63 1858 S 133rd St 56th Ave S 57th Ave S Local Asphalt 27 259 39 817 89 36 60 V Good 71 1919 S 133rd St S 134th PI SR 599 Ramp Minor Arterial Asphalt 35 388 75 1,583 75 90 60 V Good 80 1862 S 133rd St 44th Ave S S 134th PI Minor Arterial Asphalt 34 481 91 1,909 90 63 60 V Good 81 1851 S 133rd St East Marginal Way S Macadam Rd S Minor Arterial Asphalt 34 488 92 1,936 86 76 60 V Good 82 2001 S 133rd St 57th Ave S 57th Ave S Local Asphalt 24 12 2 33 100 49 60 V Good 83 1555 S 133rd St Macadam Rd S 44th Ave S Minor Arterial Asphalt 34 334 63 1,326 93 75 60 Excellent 87 1923 S 133rd St SR 599 SR 599 Minor Arterial Asphalt 35 60 12 244 82 100 60 Excellent 87 1921 S 133rd St SR 599 Ramp SR 599 Minor Arterial Asphalt 45 22 6 117 89 96 60 Excellent 90 1829 S 134th PI S 133rd St 47th Ave S Local Asphalt 26 977 141 2,964 72 54 60 Good 65 1638 S 134th PI 47th Ave S 48th Ave S Local Asphalt 26 215 31 653 83 67 60 V Good 78 1703 S 135th St Military Rd S 32nd Ave S Local Asphalt 26 835 121 2,532 65 64 60 Good 63 1701 S 135th St 34th Ave S 35th Ave S Local Asphalt 27 320 48 1,006 85 70 60 V Good 79 1702 S 135th St 32nd Ave S 34th Ave S Local Asphalt 27 637 96 2,007 90 68 60 V Good 82 1214 S 135th St 35th Ave S 37th Ave S Local Asphalt 27 309 46 973 92 68 60 V Good 84 2084 S 136th St WEST END 52nd PI S Local Asphalt 28 80 12 262 54 19 80 Marginal 41 2083 S 136th St 52nd PI S 52nd Ave S Local Asphalt 28 284 44 927 43 45 60 Marginal 43 1900 S 136th St Macadam Rd S 48th PI S Local Asphalt 28 302 47 986 64 45 60 Fair 57 1675 S 136th St 48th PI S EAST END Local Asphalt 28 250 39 817 76 52 60 Good 67 1676 S 136th St WEST END 45th PI S Local Asphalt 28 410 64 1,340 84 53 80 V Good 73 1899 S 136th St 32nd Ave S 34th Ave S Local Asphalt 27 670 100 2,110 96 63 60 V Good 84 1896 S 137th PI S 137th PI S 137th PI Local Asphalt 26 188 27 571 92 38 80 V Good 74 1898 S 137th PI 43rd PI S NORTH END Local Asphalt 28 136 21 445 88 50 60 V Good 75 1637 S 137th St 53rd Ave S 56th Ave S Local Asphalt 27 224 34 705 71 42 60 Good 61 1849 S 137th St 45th PI S Macadam Rd S Local Asphalt 25 163 23 475 66 73 30 Good 67 1139 S 137th St 40th Ave S 43rd PI S Local Asphalt 26 150 22 455 88 41 80 V Good 72 1636 S 137th St 53rd Ave S 53rd Ave S Local Asphalt 27 152 23 480 89 39 80 V Good 72 1847 S 137th St 52nd PI S 53rd Ave S Local Asphalt 27 127 19 400 97 33 60 V Good 76 IMS Infrastructure Management Services Appendix A 88 page 12 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d u) C o L • O] J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1171 S 137th St 43rd PI S 43rd PI S Local Asphalt 25 285 40 833 82 69 60 V Good 77 1850 S 137th St 44th Ave S 45th Ave S Local Asphalt 25 387 54 1,129 95 53 60 V Good 81 1835 S 137th St 43rd PI S 44th Ave S Local Asphalt 25 420 58 1,225 90 64 60 V Good 81 1830 S 137th St 34th Ave S 35th Ave S Local Asphalt 26 206 30 626 96 61 60 V Good 84 1173 S 137th St 45th Ave S 45th PI S Local Asphalt 25 248 34 724 99 58 60 Excellent 85 1145 S 137th St 35th Ave S 37th Ave S Local Asphalt 26 300 43 910 96 69 60 Excellent 87 1634 S 137th St 32nd Ave S 34th Ave S Local Asphalt 26 767 111 2,327 95 78 60 Excellent 89 1854 S 137th St 52nd Ave S 52nd PI S Local Asphalt 27 208 31 654 100 75 60 Excellent 91 1959 S 138th St Macadam Rd S NE END Local Asphalt 27 268 40 846 24 34 60 Poor 26 2085 S 138th St 51 st Ave S 51 st Ave S Local Asphalt 27 114 17 359 98 61 60 Excellent 85 1958 S 138th St 37th Ave S 38th Ave S Local Asphalt 27 340 51 1,070 93 77 60 Excellent 87 1127 S 139th St 53rd Ave S 55th Ave S Local Asphalt 26 374 54 1,134 32 49 60 Poor 37 1122 S 139th St 56th Ave S 56th PI S Local Asphalt 26 183 26 556 38 46 60 Marginal 40 1125 S 139th St 42nd Ave S 44th Ave S Local Asphalt 24 620 83 1,737 55 54 60 Fair 54 1123 S 139th St 45th Ave S EAST END Local Asphalt 24 295 39 827 65 48 60 Fair 58 1126 S 139th St WEST END 45th Ave S Local Asphalt 24 113 15 316 93 40 60 V Good 75 1121 S 139th St Tukwila Intl Blvd 41st Ave S Local Asphalt 24 382 51 1,068 84 67 60 V Good 78 1128 S 139th St 51st Ave S 53rd Ave S Local Asphalt 26 546 79 1,657 98 41 60 V Good 78 1124 S 139th St 41st Ave S 42nd Ave S Local Asphalt 24 348 46 975 90 66 60 V Good 82 1605 S 140th St 44th Ave S 45th Ave S Local Asphalt 26 364 53 1,105 59 50 60 Fair 55 1486 S 140th St 42nd Ave S 43rd Ave S Local Asphalt 26 326 47 990 59 68 60 Good 61 1482 S 140th St Interurban Ave S NE END Local Asphalt 24 207 28 581 80 39 80 Good 66 1599 S 140th St 43rd Ave S 44th Ave S Local Asphalt 26 329 48 999 74 60 60 Good 69 1603 S 140th St Tukwila Intl Blvd 42nd Ave S Local Asphalt 26 646 93 1,959 75 60 60 Good 69 1484 S 140th St 38th Ave S Tukwila Intl Blvd Local Asphalt 27 336 50 1,057 71 69 60 V Good 70 1600 S 140th St Military Rd S 33rd Ave S Local Asphalt 26 358 52 1,086 75 62 60 V Good 70 1483 S 140th St 35th Ave S 34th Ave S Local Asphalt 27 59 9 185 94 37 60 V Good 74 1598 S 140th St 53rd Ave S 55th Ave S Local Asphalt 24 540 72 1,512 87 60 60 V Good 78 1485 S 140th St 33rd PI S 35th Ave S Local Asphalt 27 537 81 1,693 84 71 30 V Good 79 1604 S 140th St 37th Ave S 38th Ave S Local Asphalt 27 307 46 966 97 53 60 V Good 82 1602 S 140th St 33rd Ave S 33rd PI S Local Asphalt 26 426 61 1,291 94 75 60 Excellent 87 1601 S 140th St 34th Ave S 37th Ave S Local Asphalt 27 369 55 1,163 100 77 60 Excellent 91 1591 S 141st St 56th Ave S 56th PI S Local Asphalt 24 239 32 670 24 22 60 V Poor 23 1587 S 141st St Tukwila Intl Blvd 42nd Ave S Local Asphalt 24 589 79 1,649 40 52 60 Marginal 43 1590 S 141st St 56th PI S 57th Ave S Local Asphalt 25 167 23 486 60 48 60 Fair 55 1589 S 141st St 37th Ave S Tukwila Intl Blvd Local Asphalt 24 690 92 1,933 82 69 60 V Good 77 1588 S 141st St 33rd PI S 34th PI S Local Asphalt 24 178 24 498 99 61 60 Excellent 86 1279 S 142nd PI 35th Ave S 37th Ave S Local Asphalt 25 436 60 1,270 81 71 30 V Good 77 1089 S 142nd PI Military Rd S EAST END Local Asphalt 25 208 29 607 91 74 60 Excellent 85 1090 S 142nd PI S 142nd PI S 142nd PI Local Asphalt 25 146 20 427 98 100 60 Excellent 98 1737 S 142nd St 57th Ave S 59th Ave S Local Asphalt 26 426 62 1,292 38 46 60 Marginal 40 1744 S 142nd St 52nd Ave S 53rd Ave S Local Asphalt 26 272 39 825 49 46 60 Marginal 47 1743 S 142nd St 42nd Ave S 43rd Ave S Local Asphalt 26 318 46 965 50 55 60 Fair 51 89 IMSInfrastructureManagementServices AppendixA page 13 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d u) C o L • O] J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1739 S 142nd St WEST END 52nd Ave S Local Asphalt 26 85 12 258 82 53 60 V Good 72 1742 S 142nd St 37th Ave S Tukwila Intl Blvd Local Asphalt 25 700 97 2,040 95 87 60 Excellent 92 1353 S 143rd PI Interurban Ave S EAST END Local Asphalt 26 839 121 2,545 75 54 60 Good 67 1138 S 143rd St Interurban Ave S EAST END Local Asphalt 26 1,107 160 3,357 11 57 60 Poor 25 1188 S 144th St 59th Ave S EAST END Local Asphalt 27 218 33 687 45 18 80 Poor 36 1194 S 144th St 46th Ave S 48th Ave S Collector Asphalt 29 653 105 2,210 30 70 30 Marginal 42 2073 S 144th St 44th Ln S 46th Ave S Collector Asphalt 29 545 88 1,843 31 69 30 Marginal 42 1190 S 144th St 48th Ave S Macadam Rd S Collector Asphalt 29 654 105 2,213 38 70 60 Marginal 47 1193 S 144th St 57th Ave S 58th Ave S Collector Asphalt 31 427 74 1,544 57 44 60 Fair 52 1243 S 144th St 58th Ave S 59th Ave S Local Asphalt 27 420 63 1,322 59 52 60 Fair 56 2074 S 144th St 42nd Ave S 44th Ln S Collector Asphalt 29 777 125 2,630 52 70 60 Fair 57 1187 S 144th St 37th Ave S Tukwila Intl Blvd Collector Asphalt 30 540 90 1,891 59 63 60 Good 59 1677 S 144th St Military Rd S 34th Ave S Collector Asphalt 30 319 53 1,117 51 80 60 Good 60 1192 S 144th St 56th Ave S 57th Ave S Collector Concrete 31 425 73 1,538 69 46 60 Good 61 1244 S 144th St 54th PI S 55th Ave S Collector Asphalt 31 129 22 466 63 61 80 Good 62 1678 S 144th St Tukwila Intl Blvd 41st Ave S Collector Asphalt 30 392 65 1,372 73 43 60 Good 62 2015 S 144th St 34th Ln S 37th Ave S Collector Asphalt 30 495 82 1,732 61 71 60 Good 64 1245 S 144th St Macadam Rd S 54th PI S Collector Asphalt 31 343 59 1,241 68 61 60 Good 65 1679 S 144th St 55th Ave S 56th Ave S Collector Asphalt 31 421 73 1,523 66 75 60 Good 68 1246 S 144th St Interurban Ave S EAST END Local Asphalt 27 651 98 2,049 81 56 60 V Good 72 2016 S 144th St 34th Ave S 34th Ln S Collector Asphalt 30 289 48 1,012 78 74 60 V Good 76 2079 S 144th St Macadam Rd S 1-5 Fwy Collector Concrete 29 187 30 631 100 51 60 V Good 84 1189 S 144th St 53rd Ave S Macadam Rd S Collector Asphalt 31 106 18 385 94 65 60 V Good 84 1191 S 144th St 41st Ave S 42nd Ave S Collector Asphalt 30 390 65 1,365 92 71 60 V Good 84 2076 S 144th St 1-5 Fwy 53rd Ave S Collector Asphalt 29 254 41 860 100 68 60 Excellent 89 1361 S 145th St DS@63E S 145th St S 145th St Local Asphalt 27 95 14 300 90 11 80 Good 63 1367 S 145th St S 145th St DS@63E S 145th St Local Asphalt 27 63 9 198 98 9 80 Good 68 1509 S 145th St 48th PI S EAST END Local Asphalt 27 231 35 727 97 48 60 V Good 80 1942 S 146th St Tukwila Intl Blvd 41st Ave S Local Asphalt 25 659 92 1,922 39 48 60 Marginal 41 1803 S 146th St 46th Ave S 48th PI S Local Asphalt 25 793 110 2,312 37 54 60 Marginal 42 1802 S 146th St 48th PI S EAST END Local Asphalt 26 316 46 958 51 49 60 Fair 49 1801 S 146th St 41st Ave S 42nd Ave S Local Asphalt 25 347 48 1,013 48 65 60 Fair 53 1804 S 146th St 35th Ave S Tukwila Intl Blvd Local Asphalt 25 681 95 1,986 63 76 60 Good 66 1805 S 146th St Military Rd S 35th Ave S Local Asphalt 25 435 60 1,267 73 66 60 V Good 70 1806 S 146th St 42nd Ave S 46th Ave S Local Asphalt 25 1,318 183 3,845 82 78 60 V Good 80 1757 S 147th St Interurban Ave S EAST END Local Asphalt 32 120 21 449 78 10 80 Fair 55 1759 S 147th St 59th Ave S 59th Ave S Collector Asphalt 35 131 25 535 68 48 60 Good 61 1251 S 147th St 57th Ave S 58th Ave S Local Asphalt 26 427 62 1,296 91 55 60 V Good 79 1756 S 147th St 59th Aly S 59th Ave S Collector Asphalt 35 99 19 404 94 68 60 Excellent 85 1252 S 147th St 58th Ave S 59th Aly S Collector Asphalt 35 205 40 838 93 70 60 Excellent 85 1758 S 147th St 56th Ave S 57th Ave S Local Asphalt 26 377 54 1,143 97 65 60 Excellent 86 1272 S 148th St Tukwila Intl Blvd 42nd Ave S Local Asphalt 32 1,233 219 4,604 54 54 60 Fair 53 2071 S 148th St 46th Ave S 46th Ln S Local Asphalt 32 255 45 951 69 60 60 Good 65 90 IMS Infrastructure Management Services Appendix A page 14 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d N C o L w � J O rn � Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1578 S 148th St Military Rd S Tukwila Intl Blvd Local Asphalt 32 817 145 3,051 83 70 60 V Good 78 1273 S 148th St 42nd Ave S 46th Ave S Local Asphalt 32 1,314 234 4,907 85 73 60 V Good 80 2070 S 148th St 46th Ln S 46th Ln S Local Asphalt 32 153 27 572 92 61 60 V Good 81 1345 S 149th St DS@480E NW END Interurban Ave S Local Asphalt 32 537 95 2,005 37 28 60 Poor 34 1335 S 149th St WEST END 57th Ave S Local Asphalt 32 656 117 2,447 78 38 60 Good 64 1506 S 149th St 59th Ave S 62nd Ave S Local Asphalt 32 674 120 2,518 86 64 60 V Good 78 1501 S 150th PI WEST END 57th Ave S Local Asphalt 32 767 136 2,864 88 63 60 V Good 79 1350 S 150th St 42nd Ave S 43rd PI S Local Asphalt 32 527 94 1,966 70 52 60 Good 63 1354 S 150th St Macadam Rd S EAST END Local Asphalt 32 767 136 2,865 79 48 60 Good 68 1369 S 150th St Tukwila Intl Blvd 38th Ave S Local Asphalt 32 530 94 1,977 85 55 60 V Good 74 1349 S 150th St 43rd PI S 46th Ave S Local Asphalt 32 788 140 2,941 84 64 60 V Good 77 1376 S 150th St 41st PI S 42nd Ave S Local Asphalt 32 242 43 903 84 64 60 V Good 77 1358 S 150th St 46th Ave S EAST END Local Asphalt 32 898 160 3,353 87 60 60 V Good 77 1359 S 150th St Military Rd S Tukwila Intl Blvd Local Asphalt 32 523 93 1,951 93 64 60 V Good 83 1374 S 150th St 38th Ave S 41st PI S Local Asphalt 32 688 122 2,570 97 75 60 Excellent 89 1662 S 151st PI EAST END EAST END Local Asphalt 32 183 32 682 48 29 80 Marginal 41 1607 S 151st PI WEST END 63rd PI S Local Asphalt 32 98 17 365 47 41 60 Marginal 44 1546 S 151st PI 63rd PI S EAST END Local Asphalt 32 161 29 600 69 65 60 Good 67 1606 S 151st PI EAST END EAST END Local Asphalt 32 182 32 680 69 83 60 V Good 73 1299 S 151st St DS@90E S 151st St S 151st St Local Asphalt 32 44 8 164 74 9 80 Fair 52 1544 S 151st St S 151st St DS@90E S 151st St Local Asphalt 32 90 16 334 80 32 80 Good 63 1542 S 151st St 51st Ave S 52nd Ave S Local Asphalt 32 375 67 1,401 71 50 60 Good 63 1543 S 151st St WEST END 42nd Ave S Local Asphalt 32 220 39 822 85 52 60 V Good 74 1298 S 151st St 62nd Ave S 63rd PI S Collector Asphalt 35 310 60 1,266 75 76 60 V Good 75 1300 S 151st St 63rd PI S 65th Ave S Collector Asphalt 35 332 65 1,357 75 77 60 V Good 75 1995 S 152nd PI 57th Ave S EAST END Local Asphalt 26 458 66 1,391 60 47 60 Fair 55 1718 S 152nd St International Blvd 37th PI S Local Asphalt 26 717 104 2,176 26 50 60 Poor 33 1720 S 152nd St WEST END 51st Ave S Local Asphalt 25 271 38 791 59 59 80 Fair 58 1108 S 152nd St 40th Ave S 42nd Ave S Local Asphalt 25 315 44 919 79 50 80 Good 69 1716 S 152nd St 57th Ave S EAST END Local Asphalt 26 537 78 1,628 93 34 80 V Good 73 1717 S 152nd St Macadam Rd S 57th Ave S Local Asphalt 26 895 129 2,714 92 60 60 V Good 81 1719 S 152nd St 37th PI S 40th Ave S Local Asphalt 26 656 95 1,989 96 63 60 Excellent 85 1661 S 153rd St 65th Ave S EAST END Local Asphalt 27 659 99 2,075 72 43 60 Good 62 1585 S 153rd St 64th Ave S 65th Ave S Local Asphalt 26 410 59 1,245 66 61 60 Good 63 1584 S 153rd St 62nd Ave S 64th Ave S Local Asphalt 26 590 85 1,789 76 50 60 Good 67 2023 S 156th St 44th Ave S 44th PI S Local Asphalt 27 407 61 1,283 72 63 60 Good 69 1197 S 156th St 1-405 Ramp Nelsen PI Local Asphalt 26 431 62 1,306 85 77 60 V Good 82 2022 S 156th St 44th PI S 47th Ave S Local Asphalt 25 415 58 1,210 98 76 60 Excellent 90 1525 S 158th St 42nd Ave S 44th Ave S Local Asphalt 25 740 103 2,160 80 60 60 V Good 73 1526 S 158th St Military Rd S 38th PI S Local Asphalt 27 870 131 2,741 85 62 60 V Good 77 1556 S 158th St 40th Ln S 42nd Ave S Local Asphalt 26 350 51 1,062 90 62 60 V Good 81 1650 S 158th St 38th PI S 39th PI S Local Asphalt 25 100 14 290 94 62 60 V Good 83 1852 S 158th St S 160th St Military Rd S Local Asphalt 27 135 20 425 79 94 60 V Good 84 IMS Infrastructure Management Services Appendix A 91 page 15 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O d u) C o L • O7 7 O rn C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1527 S 158th St 44th Ave S 47th Ave S Local Asphalt 25 856 119 2,497 93 71 60 Excellent 85 1649 S 158th St 38th PI S 38th PI S Local Asphalt 28 38 6 125 95 81 60 Excellent 90 1646 S 158th St 40th PI S 40th Ln S Local Asphalt 27 184 28 581 100 72 60 Excellent 90 1522 S 158th St 39th PI S 40th PI S Local Asphalt 25 277 38 807 100 79 60 Excellent 92 1807 S 159th St 51st Ave S 53rd Ave S Local Asphalt 25 721 100 2,103 76 60 80 V Good 70 1907 S 160th St 42nd Ave S 43rd Ave S Collector Asphalt 29 348 56 1,178 69 53 60 Good 63 1476 S 160th St 43rd Ave S 46th Ave S Collector Asphalt 29 1,029 166 3,482 63 74 60 Good 66 1909 S 160th St 51st Ave S Slade Way Collector Asphalt 28 802 125 2,620 65 74 60 Good 67 1468 S 160th St 48th Ave S 51st Ave S Collector Asphalt 28 689 107 2,251 71 66 60 Good 68 1469 S 160th St 46th Ave S 47th Ave S Collector Asphalt 29 302 49 1,023 70 69 60 Good 69 1908 S 160th St 47th Ave S 48th Ave S Collector Asphalt 28 300 47 979 73 64 60 V Good 69 1545 S 161st St S 161st St DS@78W S 161st St Local Asphalt 24 78 10 219 69 15 80 Fair 50 1797 S 161st St DS@78W S 161st St S 161st St Local Asphalt 24 79 11 221 82 22 80 Good 61 1798 S 161st St WEST END 51st Ave S Local Asphalt 24 364 49 1,020 84 70 60 V Good 79 1219 S 162nd St 48th Ave S EAST END Local Asphalt 25 301 42 879 29 14 60 V Poor 23 1220 S 162nd St 46th Ave S EAST END Local Asphalt 24 125 17 350 64 11 80 Marginal 45 1261 S 163rd PI S 163rd PI S 163rd PI Local Asphalt 26 139 20 421 34 0 80 V Poor 22 1263 S 163rd PI 51stAve S EAST END Local Asphalt 26 483 70 1,465 41 41 60 Marginal 40 1262 S 163rd PI 45th PI S 46th Ave S Local Asphalt 25 140 19 409 79 25 80 Good 60 1264 S 163rd PI 45th Ave S 45th PI S Local Asphalt 25 142 20 413 72 63 60 Good 68 1493 S 164th St 48th PI S 49th Ave S Collector Asphalt 32 202 36 756 47 60 30 Fair 50 1492 S 164th St 51st Ave S 52nd Ave S Local Asphalt 25 545 76 1,590 63 45 60 Fair 56 1490 S 164th St 42nd Ave S 47th Ave S Collector Asphalt 31 1,551 267 5,609 60 68 30 Good 62 1491 S 164th St 49th Ave S 51st Ave S Collector Asphalt 32 379 67 1,413 75 58 60 Good 69 1404 S 164th St 47th Ave S 47th PI S Collector Asphalt 31 121 21 436 85 57 60 V Good 75 1489 S 164th St 47th PI S 48th PI S Collector Asphalt 31 389 67 1,406 84 69 60 V Good 79 1565 S 166th St 53rd Ave S 54th Ave S Local Asphalt 26 270 39 820 56 51 60 Fair 54 2155 S 166th St S 166th St 51st Ave S Collector Asphalt 35 152 30 622 44 79 30 Fair 54 1215 S 166th St CITY LIMIT 53rd Ave S Local Asphalt 25 190 26 554 64 54 60 Good 60 1910 S 168th St WEST END Southcenter Pkwy Local Asphalt 27 276 41 869 26 3 80 V Poor 18 1003 S 168th St Southcenter Pkwy DS@359E Southcenter Pkwy Local Asphalt 25 359 50 1,047 81 66 60 V Good 76 1101 S 180th St West Valley Hwy S 180th St Principal Arterial Asphalt 45 1,234 308 6,478 42 55 60 Marginal 45 1723 S 180th St Andover Park W Andover Park E Minor Arterial Asphalt 45 918 229 4,818 44 62 60 Fair 49 1223 S 180th St Andover Park E Sperry Dr Minor Arterial Asphalt 45 881 220 4,624 46 63 60 Fair 51 1222 S 180th St Sperry Dr West Valley Hwy Minor Arterial Asphalt 45 528 132 2,775 55 60 60 Fair 56 1100 S 180th St Southcenter Pkwy Andover Park W Minor Arterial Asphalt 45 1,434 358 7,526 68 69 60 Good 67 1465 S 184th PI 54th PI S Southcenter Pkwy Minor Arterial Asphalt 45 2,072 518 10,880 75 71 60 V Good 73 1097 S 200th St 46th Ave S Southcenter Pkwy Principal Arterial Asphalt 56 1,315 409 8,593 95 81 60 Excellent 89 1888 S 200th St Orillia Rd S 46th Ave S Principal Arterial Asphalt 56 247 77 1,617 99 75 60 Excellent 90 1454 S 200th St Southcenter Pkwy CITY LIMIT Principal Arterial Asphalt 56 1,439 448 9,399 93 91 60 Excellent 91 1120 S 204th St Orillia Rd S Frager Rd Local Asphalt 25 3,339 464 9,737 20 57 60 Poor 31 1494 S Glacier St WEST END Olympic Ave S Local Asphalt 27 250 38 788 86 66 60 V Good 79 1405 S Glacier St Olympic Ave S Cascade Ave S Local Asphalt 26 609 88 1,848 78 87 60 V Good 81 92 IMS Infrastructure Management Services Appendix A page 16 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O N u) C o L • 7 O rn C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1707 S Norfolk St East Marginal Way S CITY LIMIT Local Asphalt 25 737 102 2,150 64 78 60 Good 68 1420 S Ryan St Beacon Ave S 51st Ave S Minor Arterial Asphalt 45 349 87 1,832 30 67 60 Marginal 41 1377 S Ryan Way 47th Ave S S 107th St Minor Arterial Asphalt 45 227 57 1,189 15 56 60 Poor 28 1826 S Ryan Way S 107th St Beacon Ave S Minor Arterial Asphalt 45 1,126 281 5,910 13 60 60 Poor 28 1827 S Ryan Way Martin L King Jr Way S 47th Ave S Minor Arterial Asphalt 45 978 244 5,132 21 54 60 Poor 31 1394 S Wallace St NW END CITY LIMIT Local Asphalt 26 328 47 996 54 31 80 Marginal 45 1621 Slade Way 53rd PI S 54th Ave S Local Asphalt 25 314 44 915 54 59 60 Fair 55 1622 Slade Way S 160th St 53rd PI S Local Asphalt 26 837 121 2,539 65 54 80 Good 61 1168 Southcenter Blvd 40th Ave S 42nd Ave S Minor Arterial Asphalt 44 566 138 2,906 44 58 60 Marginal 48 1342 Southcenter Blvd 38th Ln S 40th Ave S Minor Arterial Asphalt 42 432 101 2,118 52 57 60 Fair 53 1413 Southcenter Blvd 40th Ave S 40th Ave S Minor Arterial Asphalt 42 145 34 711 54 64 60 Fair 56 1340 Southcenter Blvd 42nd Ave S 51st Ave S Minor Arterial Asphalt 44 2,694 658 13,828 62 72 30 Good 64 1818 Southcenter Blvd International Blvd 38th Ln S Minor Arterial Asphalt 45 838 210 4,402 70 66 60 Good 68 2043 Southcenter Blvd 53rd Ave S 1-5 Ramp Minor Arterial Asphalt 45 171 43 898 69 67 60 Good 68 1507 Southcenter Blvd Interurban Ave S Interurban Ave S Local Asphalt 25 261 36 761 72 62 60 Good 68 2031 Southcenter Blvd 1-5 Ramp 1-405 Ramp Minor Arterial Asphalt 40 362 80 1,688 68 73 60 Good 69 1348 Southcenter Blvd 1-405 Ramp 1-405 Ramp Principal Arterial Asphalt 45 452 113 2,374 71 71 60 V Good 70 1337 Southcenter Blvd 52nd Ave S 53rd Ave S Minor Arterial Asphalt 45 301 75 1,582 75 63 60 V Good 70 1820 Southcenter Blvd 62nd Ave S 65th Ave S Principal Arterial Asphalt 44 1,142 279 5,860 70 78 30 V Good 72 2025 Southcenter Blvd 51st Ave S 52nd Ave S Minor Arterial Asphalt 45 371 93 1,948 76 71 60 V Good 74 1416 Southcenter Blvd 61st Ave S 62nd Ave S Principal Arterial Asphalt 44 469 115 2,406 81 65 60 V Good 75 2039 Southcenter Blvd 1-5 Fwy 1-5 Fwy Minor Arterial Asphalt 41 99 23 474 71 88 60 V Good 76 1629 Southcenter Blvd 65th Ave S 66th Ave S Principal Arterial Asphalt 44 587 144 3,015 78 77 60 V Good 77 2042 Southcenter Blvd 1-5 Ramp 1-5 Fwy Minor Arterial Asphalt 45 69 17 360 81 78 60 V Good 79 2033 Southcenter Blvd 1-5 Fwy 1-5 Ramp Minor Arterial Asphalt 39 29 6 131 83 77 60 V Good 81 2035 Southcenter Blvd 1-5 Ramp 1-5 Fwy Minor Arterial Asphalt 41 76 17 365 86 75 60 V Good 82 1686 Southcenter Blvd 66th Ave S 1-405 Ramp Local Asphalt 25 649 90 1,894 87 74 60 V Good 82 2037 Southcenter Blvd 1-5 Fwy 1-5 Ramp Minor Arterial Asphalt 41 68 16 326 83 86 60 V Good 84 1347 Southcenter Blvd 1-405 Ramp DS@398E 1-405 Ramp Principal Arterial Asphalt 45 398 99 2,088 90 77 60 Excellent 85 1821 Southcenter Blvd DS@398E 1-405 Ramp 61st Ave S Principal Arterial Asphalt 44 779 190 3,999 90 81 60 Excellent 86 1554 Southcenter Blvd 1-405 Ramp Interurban Ave S Local Asphalt 27 77 12 242 92 85 60 Excellent 89 2041 Southcenter Blvd 1-5 Fwy 1-5 Fwy Minor Arterial Asphalt 56 38 12 248 90 93 60 Excellent 90 1415 Southcenter Blvd 1-405 Ramp 1-405 Ramp Local Asphalt 26 60 9 183 98 86 60 Excellent 93 1685 Southcenter Blvd 1-5 Ramp Southcenter Blvd Principal Arterial Asphalt 45 300 75 1,575 100 83 60 Excellent 93 1691 Southcenter Pkwy Wig Blvd Minkler Blvd Minor Arterial Asphalt 45 599 150 3,146 48 62 60 Fair 52 1464 Southcenter Pkwy S 168th St S 168th St Minor Arterial Asphalt 45 64 16 337 49 62 60 Fair 52 1774 Southcenter Pkwy S 168th St Wig Blvd Minor Arterial Asphalt 45 666 167 3,497 53 72 60 Fair 59 1776 Southcenter Pkwy 1-5 Ramp Strander Blvd Minor Arterial Asphalt 45 218 54 1,144 61 61 60 Good 60 1775 Southcenter Pkwy Strander Blvd S 168th St Minor Arterial Asphalt 45 1,313 328 6,894 69 61 60 Good 66 1767 Southcenter Pkwy 1-5 Ramp 1-5 Ramp Minor Arterial Asphalt 45 162 41 851 77 63 80 V Good 72 2063 Southcenter Pkwy Minkler Blvd S 180th St Minor Arterial Asphalt 45 2,716 679 14,257 72 74 60 V Good 72 1769 Southcenter Pkwy Southcenter Mall 1-5 Ramp Minor Arterial Asphalt 45 622 156 3,267 73 82 60 V Good 75 1467 Southcenter Pkwy S 180th St A Line Minor Arterial Asphalt 45 900 225 4,728 85 78 60 V Good 82 IMS Infrastructure Management Services Appendix A 93 page 17 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) 1768 Southcenter Pkwy 1352 Southcenter Pkwy 1770 Southcenter Pkwy 1693 Southcenter Pkwy 1472 Southcenter Pkwy 1778 Southcenter Pkwy 1773 Southcenter Pkwy 1343 Southcenter Pkwy 1695 Southcenter Pkwy 1764 Southcenter Pkwy 1704 Starfire Way 1705 Starfire Way 1302 Strander Blvd 1304 Strander Blvd 1305 Strander Blvd 1306 Strander Blvd 1303 Strander Blvd 1307 Strander Blvd 1551 SW Grady Way 1346 SW Grady Way 1819 SW Grady Way 1291 Todd Blvd 1290 Todd Blvd 1845 Treck Dr 1384 Treck Dr 1129 Triland Dr 1104 Tukwila International Blvd 2002 Tukwila International Blvd 1082 Tukwila Intl Blvd 1075 Tukwila Intl Blvd 1077 Tukwila Intl Blvd 1073 Tukwila Intl Blvd 1081 Tukwila Intl Blvd 1885 Tukwila Intl Blvd 1080 Tukwila Intl Blvd 2123 Tukwila Intl Blvd 2124 Tukwila Intl Blvd 1715 Tukwila Intl Blvd 1884 Tukwila Intl Blvd 1437 Tukwila Intl Blvd 1078 Tukwila Intl Blvd 2126 Tukwila Intl Blvd 1886 Tukwila Intl Blvd Klickitat Dr UnNamed-01545 1-5 Ramp Segale Park C Dr A Line S 19400 Block S 19000 Block UnNamed-01543 B Line C Line Starfire Way DS@1178E Starfire Way West Valley Hwy Christensen Rd Andover Park W Andover Park E Southcenter Pkwy 61st PI S Interurban Ave S Interurban Ave S Fun Center Way Cascade Ave S Olympic Ave S Treck Dr WEST END WEST END SR 99 Ramp Tukwila Intl Blvd DS@172S Boeing Access Rd DS@608S East Marginal Way S SR 99 Ramp S 112th St Tukwila Intl Blvd S 144th St S 116th Way DS@36W Boeing Access Rd DS@91S East Marginal Way S SR 599 S 146th St S 150th St SR 599 Ramp East Marginal Way S S 142nd St 1-5 Ramp S 200th St Klickitat Dr B Line Segale Park C Dr UnNamed-01543 S 19400 Block UnNamed-01545 C Line S 19000 Block DS@1178E Starfire Way Fort Dent Way EAST END West Valley Hwy Andover Park E Christensen Rd 61st PI S Andover Park W Interurban Ave S Fun Center Way CITY LIMIT West Valley Hwy S Cascade Ave S Treck Dr Andover Park E Andover Park W Tukwila Intl Blvd S 132nd St DS@608S Boeing Access Rd S 112th St SR 99 SR 99 Ramp East Marginal Way S S 146th St SR 99 DS@172S Boeing Access Rd DS@509S East Marginal Way S S 116th Way S 148th St S 152nd St SR 99 Ramp DS@91 S East Marginal Way S S 144th St Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Local Local Local Minor Arterial Minor Arterial Minor Arterial Minor Arterial Minor Arterial Local Minor Arterial Minor Arterial Local Local Local Local Local Principal Arterial Principal Arterial Local Principal Arterial Principal Arterial Principal Arterial Principal Arterial Principal Arterial Principal Arterial Local Principal Arterial Principal Arterial Principal Arterial Principal Arterial Principal Arterial Principal Arterial Principal Arterial Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Concrete Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt Asphalt 45 45 45 45 45 45 45 45 45 45 25 27 26 48 48 48 47 47 27 45 32 25 32 27 25 27 56 56 25 44 56 56 56 56 56 32 56 56 56 56 56 56 56 361 752 383 977 613 1,150 1,030 540 650 770 1,178 1,353 239 847 1,077 771 1,350 662 154 117 1,024 353 642 204 543 1,174 2,111 302 436 1,027 230 1,193 144 699 634 136 418 121 699 704 196 91 679 90 188 96 244 153 287 257 135 163 192 164 203 34 226 287 206 353 173 23 29 182 49 114 31 75 176 657 94 61 251 72 371 45 218 197 24 130 38 217 219 61 28 211 1,894 3,945 2,012 5,130 3,217 6,037 5,407 2,835 3,413 4,042 3,437 4,262 724 4,744 6,031 4,319 7,404 3,630 485 612 3,823 1,028 2,398 642 1,584 3,698 13,794 1,973 1,272 5,271 1,502 7,794 942 4,569 4,143 507 2,734 790 4,567 4,600 1,281 592 4,434 Condition Summary 0 X N 'CS re ,13 N X N , E c C UI O N N C o L w � J O rn Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 81 87 91 88 87 92 91 92 93 93 23 86 9 44 45 50 58 65 48 66 100 71 71 30 65 29 77 88 34 43 51 46 67 52 55 71 59 65 68 70 69 79 69 91 81 79 88 92 86 90 89 88 91 58 55 29 54 62 63 62 65 52 59 73 71 74 64 73 63 88 86 60 73 63 75 47 79 81 49 80 77 73 71 75 58 81 V Good Excellent Excellent Excellent Excellent Excellent Excellent Excellent Excellent Excellent Poor V Good V Poor Marginal Fair Fair Fair Good Marginal Good Excellent V Good V Good Marginal Good Poor V Good Excellent Marginal Fair Fair Fair Good Good Good Good Good Good Good V Good V Good V Good V Good 84 85 86 88 88 89 90 90 91 91 34 76 15 46 49 53 58 64 48 62 91 71 71 40 67 39 80 86 42 51 54 55 59 60 62 63 65 68 69 69 70 72 72 94 IMS Infrastructure Management Services Appendix A page 18 of 19 City of Tukwila, WA Street Inventory and Condition Summary - Sorted by Street Name E A Easy Street Analysis by IM• GISID On Street From Street To Street FunCL Pavetype Pavement Width (ft) Pavement Length (ft) Add Area (yd2) Pavement Area (yd2) Condition Summary 0 X N 'CS re ,13 N X e , E c C UI O N a) C o L • O7 7 O Er) C Structural Index (SI) Condition Rating Current Segment PCI (CPCI) 1079 Tukwila Intl Blvd SR 99 Ramp SR 599 Ramp Principal Arterial Asphalt 56 107 33 696 74 71 60 V Good 72 2125 Tukwila Intl Blvd East Marginal Way S DS@36W Boeing Access Rd Local Asphalt 24 36 5 101 87 45 80 V Good 72 1439 Tukwila Intl Blvd S 148th St S 150th St Principal Arterial Asphalt 56 700 218 4,571 73 76 60 V Good 74 1084 Tukwila Intl Blvd DS@193S East Marginal Way S Tukwila Intl Blvd Local Asphalt 32 209 37 781 80 68 60 V Good 75 1083 Tukwila Intl Blvd DS@509S East Marginal Way S Tukwila Intl Blvd Principal Arterial Asphalt 56 146 45 955 76 78 60 V Good 76 1105 Tukwila Intl Blvd S 141st St S 141st St Principal Arterial Asphalt 56 127 39 829 76 79 60 V Good 76 1074 Tukwila Intl Blvd East Marginal Way S DS@193S East Marginal Way S Local Asphalt 22 193 24 496 87 61 60 V Good 78 1438 Tukwila Intl Blvd S 139th St S 140th St Principal Arterial Asphalt 56 340 106 2,223 77 82 60 V Good 78 2003 Tukwila Intl Blvd S 130th St 35th Ave S Principal Arterial Asphalt 56 346 107 2,257 82 72 60 V Good 78 1887 Tukwila Intl Blvd S 140th St S 141st St Principal Arterial Asphalt 56 238 74 1,553 76 87 60 V Good 79 1672 Tukwila Intl Blvd S 141st St S 142nd St Principal Arterial Asphalt 56 344 107 2,247 76 86 60 V Good 79 1076 Tukwila Intl Blvd SR 99 SR 599 Principal Arterial Asphalt 56 192 60 1,255 78 86 60 V Good 80 2010 Tukwila Intl Blvd S 132nd St 37th Ave S Principal Arterial Asphalt 56 604 188 3,947 84 79 60 V Good 82 1429 Tukwila Intl Blvd SR 99 SR 99 Ramp Principal Arterial Asphalt 56 1,468 457 9,590 78 92 60 V Good 82 2009 Tukwila Intl Blvd 37th Ave S S 139th St Principal Arterial Asphalt 56 2,015 627 13,167 83 87 60 V Good 83 1055 Tukwila Pkwy 61st Ave S 1-405 Ramp Minor Arterial Asphalt 65 506 183 3,835 81 78 60 V Good 79 1056 Tukwila Pkwy 1-405 Ramp Andover Park W Minor Arterial Asphalt 66 574 210 4,418 85 75 60 V Good 81 2133 Tukwila Pkwy Andover Park E 1-405 Ramp Minor Arterial Asphalt 67 458 171 3,582 91 63 60 V Good 81 1053 Tukwila Pkwy Andover Park W Andover Park E Minor Arterial Asphalt 68 1,088 411 8,632 88 76 60 V Good 83 1054 Tukwila Pkwy Southcenter Mall 61st Ave S Minor Arterial Asphalt 70 1,193 464 9,740 90 82 60 Excellent 87 1746 Upland Dr WEST END Andover Park W Local Asphalt 20 919 102 2,144 81 80 60 V Good 80 1518 West Marginal PI S CITY LIMIT S 102nd St Local Asphalt 21 2,203 257 5,397 8 63 30 Poor 25 1550 West Valley Hwy Longacres Way Strander Blvd Principal Arterial Asphalt 56 1,529 476 9,991 67 74 30 Good 68 1292 West Valley Hwy Interurban Ave S 1-405 Ramp Principal Arterial Asphalt 55 556 170 3,567 70 75 60 V Good 71 1295 West Valley Hwy 1-405 Ramp Longacres Way Principal Arterial Asphalt 56 594 185 3,884 80 75 30 V Good 78 1293 West Valley Hwy Strander Blvd S 180th St Principal Arterial Asphalt 58 5,933 1,912 40,149 75 86 30 V Good 78 1294 West Valley Hwy S 180th St Todd Blvd Principal Arterial Asphalt 60 2,082 694 14,573 83 81 60 V Good 81 1498 West Valley Hwy S Todd Blvd CITY LIMIT Principal Arterial Asphalt 59 975 319 6,708 74 79 60 V Good 75 1665 Wig Blvd Southcenter Pkwy Bauch Dr Local Asphalt 22 1,325 162 3,401 73 62 60 Good 69 95 IMSInfrastructureManagementServices AppendixA page in of in Appendix B Rehabilitation Plan 96 City of Tukwila, WA Street Inventory and Five Year Rehabilitation Plan By Year $1400k/Year Rehabilitation Plan ESA Easy Street Analysis by tem GISID On Street From Street To Street Year of First Rehab Rehab Activity Avg Unit Rate ($/yd2) Segment Pavement Cost ($) Segment Total Cost ($) Whole Project Cost ($) 5 Year Post Rehab PCI 1832 47th Ave S S Ryan Way 1568 57th Ave S S 141 st St 1403 57th Ave S S 144th St 1651 Airport Way S DS@581E Boeing Access Rd 1341 Frager Rd S 204th St 1593 Midland Dr WEST END 1799 S 109th St Beacon Ave S 1520 S 133rd St 34th Ave S 1642 S 133rd St 35th Ave S 1637 S 137th St 53rd Ave S 1959 S 138th St Macadam Rd S 1739 S 142nd St WEST END 1138 S 143rd St Interurban Ave S 1827 S Ryan Way Martin L King Jr Way S 1377 S Ryan Way 47th Ave S 1826 S Ryan Way S 107th St 2125 Tukwila Intl Blvd East Marginal Way S 1233 35th Ave S S 146th St 1308 38th Ave S S 130th St 1179 42nd Ave S S 126th St 1217 45th PIS 45th PI S 1231 45th PI S DS@65S 45th PI S 1448 48th Ave S S 162nd St 1566 57th Ave S S 150th PI 1118 S 107th St S Ryan Way 2100 S 116th St East Marginal Way S 2001 S 133rd St 57th Ave S 2084 S 136th St WEST END 2083 S 136th St 52nd PI S 1587 S 141st St Tukwila Intl Blvd 2073 S 144th St 44th Ln S 1194 S 144th St 46th Ave S 1190 S 144th St 48th Ave S 1942 S 146th St Tukwila Intl Blvd 1801 S 146th St 41 st Ave S 1803 S 146th St 46th Ave S 1802 S 146th St 48th PI S 1120 S 204th St Orillia Rd S 2008 37th Ave S Tukwila Intl Blvd S 109th St S 142nd St S 147th St Boeing Access Rd S 204th St Andover Park W Beacon Ave S 35th Ave S EAST END 56th Ave S NE END 52nd Ave S EAST END 47th Ave S S 107th St Beacon Ave S DS@36W Boeing Access Rd SOUTH END SOUTH END SE END DS@65S 45th PI S 45th PI S SOUTH END SOUTH END EAST END 35th Ln S 57th Ave S 52nd PI S 52nd Ave S 42nd Ave S 46th Ave S 48th Ave S Macadam Rd S 41 st Ave S 42nd Ave S 48th PI S EAST END Frager Rd S 135th St 28 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 41 1 FWM + Thick Overlay (> 2.0 - 3.0) 29 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 27 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 50 1 Edge Mill + Thin Overlay (1.5 - 2.0) + Strctrl Ptch 28 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 48 1 EM/FWM + Moderate Overlay (2.0 - 3.0) + Strctrl Ptch 39 1 FWM + Thick Overlay (> 2.0 - 3.0) 41 1 FWM + Thick Overlay (> 2.0 - 3.0) 61 1 Edge Mill + Thin Overlay (1.5 - 2.0) 26 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 72 1 MicroSurface / Chip Seal 25 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 31 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 28 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 28 1 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 72 1 MicroSurface / Chip Seal 43 2 FWM + Thick Overlay (> 2.0 - 3.0) 44 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 72 2 MicroSurface / Chip Seal 62 2 MicroSurface / Chip Seal + Strctrl Ptch 63 2 MicroSurface / Chip Seal + Strctrl Ptch 30 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 43 2 FWM + Thick Overlay (> 2.0 - 3.0) 31 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 63 2 MicroSurface / Chip Seal + Strctrl Ptch 83 2 Slurry Seal / Seal Coat 41 2 FWM + Thick Overlay (> 2.0 - 3.0) 43 2 FWM + Thick Overlay (> 2.0 - 3.0) 43 2 FWM + Thick Overlay (> 2.0 - 3.0) 42 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 42 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 47 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 41 2 FWM + Thick Overlay (> 2.0 - 3.0) 53 2 FWM + Thick Overlay (> 2.0 - 3.0) 42 2 FWM + Thick Overlay (> 2.0 - 3.0) 49 2 FWM + Thick Overlay (> 2.0 - 3.0) 31 2 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 48 3 FWM + Thick Overlay (> 2.0 - 3.0) 47.50 78,328 78,328 78,328 89 43.50 35,627 35,627 35,627 89 47.50 124,308 124,308 124,308 89 52.50 125,580 125,580 125,580 88 29.27 322 322 322 87 47.50 109,773 109,773 109,773 89 37.67 113 113 113 88 43.50 34,496 34,496 63,728 89 43.50 29,232 29,232 63,728 89 25.00 17,625 17,625 17,625 87 47.50 40,185 40,185 40,185 89 7.50 1,935 1,935 1,935 83 47.50 159,458 159,458 159,458 89 52.50 269,430 269,430 642,128 88 52.50 62,423 62,423 642,128 88 52.50 310,275 310,275 642,128 88 7.50 758 758 758 84 44.80 46,104 46,104 46,104 91 46.86 72,500 72,500 72,500 90 7.73 3,693 3,693 3,693 84 9.27 1,835 1,835 3,448 85 9.27 1,613 1,613 3,448 85 48.93 17,907 17,907 17,907 91 44.81 27,869 27,869 27,869 91 48.92 34,492 34,492 34,492 91 9.27 4,644 4,644 4,644 85 5.24 173 173 173 84 44.81 11,739 11,739 53,273 91 44.80 41,534 41,534 53,273 91 44.80 73,883 73,883 73,883 91 48.93 90,169 90,169 306,564 90 48.92 108,124 108,124 306,564 90 48.92 108,271 108,271 306,564 90 44.80 86,115 86,115 131,502 91 44.80 45,387 45,387 131,502 91 44.80 103,589 103,589 146,512 91 44.80 42,923 42,923 146,512 91 48.93 476,383 476,383 476,383 91 46.15 87,776 87,776 87,776 92 IMS Infrastructure Management Services Appendix B 97 Page lof 3 City of Tukwila, WA Street Inventory and Five Year Rehabilitation Plan By Year $1400k/Year Rehabilitation Plan ESA Easy Street Analysis by tem GISID On Street From Street To Street Year of First Rehab Rehab Activity Avg Unit Rate ($/yd2) Segment Pavement Cost ($) Segment Total Cost ($) Whole Project Cost ($) 5 Year Post Rehab PCI 1383 47th Ave S NE END S 134th PI 32 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1386 50th PI S S 124th St S 125th St 47 3 FWM + Thick Overlay (> 2.0 - 3.0) 1146 50th PI S S 125th St S 130th PI 34 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1113 53rd Ave S S 170th St S 172nd Ln 47 3 FWM + Thick Overlay (> 2.0 - 3.0) 1571 57th Ave S S 152nd St S 152nd PI 48 3 FWM + Thick Overlay (> 2.0 - 3.0) 1004 62nd Ave S S 151st St DS@131S S 151st St 16 3 ACP Full Depth Reconstruction 1640 Airport Way S Boeing Access Rd Airport Way S 33 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1364 Fun Center Way DS@447E Interurban Ave S SW Grady Way 33 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1744 S 142nd St 52nd Ave S 53rd Ave S 47 3 FWM + Thick Overlay (> 2.0 - 3.0) 1345 S 149th St DS@480E NW END Interurban Ave S 34 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1718 S 152nd St International Blvd 37th PI S 33 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1723 S 180th St Andover Park W Andover Park E 49 3 FWM + Thick Overlay (> 2.0 - 3.0) 1704 Starfire Way Starfire Way DS@1178E Starfire Way 34 3 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1551 SW Grady Way Interurban Ave S Interurban Ave S 48 3 FWM + Thick Overlay (> 2.0 - 3.0) 1208 34th Ave S S 130th St S 132nd St 50 4 FWM + Thick Overlay (> 2.0 - 3.0) 1205 34th Ave S S 144th St Military Rd S 49 4 FWM + Thick Overlay (> 2.0 - 3.0) 1236 35th Ave S S 133rd St S 135th St 36 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1064 37th Ave S S 128th St S 130th St 36 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1379 40th Ave S S 152nd St Southcenter Blvd 35 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1362 59th Aly S S 147th St SOUTH END 35 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1630 Beacon Ave S CITY LIMIT S Ryan Way 65 4 MicroSurface / Chip Seal + Strctrl Ptch 1975 Boeing Access Rd Martin L King Jr Ramp Martin L King Jr Way S 36 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1772 C Line UnNamed-01534 Southcenter Pkwy 33 4 Surf Recon + Base Rehab / FWM + Strctrl Ptch + Olay 1176 Christensen Rd Strander Blvd Christensen Rd 50 4 FWM + Thick Overlay (> 2.0 - 3.0) 1577 Corporate Dr S Corporate Dr S Corporate Dr S 38 4 FWM + Thick Overlay (> 2.0 - 3.0) 1249 Corporate Dr S WEST END Andover Park W 56 4 FWM + Thick Overlay (> 2.0 - 3.0) 1378 Nelsen PI S 156th St Longacres Way 35 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1284 S 112th St 50th Ave S 51 st Ave S 48 4 FWM + Thick Overlay (> 2.0 - 3.0) 1444 S 114th St 40th Ave S 41 st Ave S 35 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 2098 S 118th St 44th Ave S 44th PI S 86 4 Slurry Seal / Seal Coat 1595 S 130th PI 57th Ave S SE END 50 4 FWM + Thick Overlay (> 2.0 - 3.0) 1185 S 131 st PI 44th Ave S 44th Ave S 49 4 FWM + Thick Overlay (> 2.0 - 3.0) 1243 S 144th St 58th Ave S 59th Ave S 56 4 FWM + Thick Overlay (> 2.0 - 3.0) 1188 S 144th St 59th Ave S EAST END 36 4 FWM + Thick Overlay (> 2.0 - 3.0) 1493 S 164th St 48th PI S 49th Ave S 50 4 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1582 33rd PI S NW END S 130th St 52 5 FWM + Thick Overlay (> 2.0 - 3.0) 1385 47th Ave S S 104th PI S 107th St 38 5 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 1846 47th Ave S S 160th St S 162nd St 51 5 FWM + Thick Overlay (> 2.0 - 3.0) 1051 48th PI S 48th Ave S S 136th St 76 5 MicroSurface / Chip Seal 50.39 42,884 42,884 42,884 92 48.27 50,733 50,733 50,733 92 53.05 211,597 211,597 211,597 92 46.15 102,220 102,220 102,220 92 46.15 39,642 39,642 39,642 92 111.39 33,975 33,975 33,975 95 55.70 129,997 129,997 129,997 91 50.39 13,153 13,153 13,153 92 46.15 38,073 38,073 38,073 92 50.39 101,037 101,037 101,037 92 50.39 109,655 109,655 109,655 92 50.39 242,792 242,792 242,792 91 50.39 173,200 173,200 173,200 92 46.15 22,382 22,382 22,382 92 47.53 96,018 96,018 96,018 94 47.53 70,968 70,968 70,968 94 51.90 128,464 128,464 128,464 94 51.90 82,788 82,788 82,788 94 51.90 91,819 91,819 91,819 94 51.90 74,016 74,016 74,016 94 9.84 1,377 1,377 1,377 87 60.10 90,030 90,030 90,030 93 78.68 133,986 133,986 133,986 95 47.53 84,467 84,467 84,467 94 47.53 22,531 22,531 69,922 94 47.53 47,391 47,391 69,922 94 51.90 82,995 82,995 82,995 94 47.53 32,608 32,608 32,608 94 51.90 29,170 29,170 29,170 94 5.57 1,226 1,226 1,226 84 47.53 180,390 180,390 180,390 94 47.53 14,783 14,783 14,783 94 47.53 62,839 62,839 95,495 94 47.53 32,656 32,656 95,495 94 51.90 39,240 39,240 39,240 94 48.96 37,209 37,209 37,209 96 53.46 102,005 102,005 102,005 96 48.96 86,854 86,854 86,854 96 8.44 5,445 5,445 5,445 88 IMS Infrastructure Management Services Appendix B 98 Page 2of 3 City of Tukwila, WA Street Inventory and Five Year Rehabilitation Plan By Year $1400k/Year Rehabilitation Plan ESA Easy Street Analysis by tem GISID On Street From Street To Street Year of First Rehab Rehab Activity Avg Unit Rate ($/yd2) Segment Pavement Cost ($) Segment Total Cost ($) Whole Project Cost ($) 5 Year Post Rehab PCI 1684 1411 1423 2092 1868 1866 1158 1940 1127 1743 1108 1223 1222 1342 1413 1168 53rd PI S 56th Ave S East Marginal Way S East Marginal Way S East Marginal Way S East Marginal Way S East Marginal Way S S 109th St S 139th St S 142nd St S 152nd St S 180th St S 180th St Southcenter Blvd Southcenter Blvd Southcenter Blvd 53rd PI S SPUR S 139th St Tukwila Intl Blvd Interurban Ave S S 128th St S 128th St S 130th St 50th Ave S 53rd Ave S 42nd Ave S 40th Ave S Andover Park E Sperry Dr 38th Ln S 40th Ave S 40th Ave S 53rd PI S SPUR S 141 st St Boeing Access Rd SR 599 S 128th St S 130th St 40th Ave S Beacon Ave S 55th Ave S 43rd Ave S 42nd Ave S Sperry Dr West Valley Hwy 40th Ave S 40th Ave S 42nd Ave S 37 5 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 51 5 FWM + Thick Overlay (> 2.0 - 3.0) 55 5 FWM + Thick Overlay (> 2.0 - 3.0) 38 5 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 48 5 FWM + Thick Overlay (> 2.0 - 3.0) 54 5 FWM + Thick Overlay (> 2.0 - 3.0) 58 5 FWM + Thick Overlay (> 2.0 - 3.0) 50 5 FWM + Thick Overlay (> 2.0 - 3.0) 37 5 FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch 51 5 FWM + Thick Overlay (> 2.0 - 3.0) 69 5 MicroSurface / Chip Seal + Strctrl Ptch 51 5 FWM + Thick Overlay (> 2.0 - 3.0) 56 5 FWM + Thick Overlay (> 2.0 - 3.0) 53 5 FWM + Thick Overlay (> 2.0 - 3.0) 56 5 FWM + Thick Overlay (> 2.0 - 3.0) 48 5 FWM + Thick Overlay (> 2.0 - 3.0) 53.46 10,692 10,692 10,692 96 48.96 81,371 81,371 81,371 96 56.28 15,082 15,082 15,082 96 59.09 64,407 64,407 64,407 96 53.46 31,863 31,863 150,120 96 53.46 97,086 97,086 150,120 96 53.46 21,171 21,171 150,120 96 48.96 27,222 27,222 27,222 96 53.46 60,626 60,626 60,626 96 48.96 47,246 47,246 47,246 96 10.13 9,309 9,309 9,309 88 53.46 247,207 247,207 395,563 96 53.46 148,356 148,356 395,563 96 53.46 113,232 113,232 306,603 96 53.46 38,011 38,011 306,603 96 53.46 155,360 155,360 306,603 96 IMS Infrastructure Management Services Appendix B 99 Page 3of 3 Appendix C Full -Size Maps 100 ,ark rail Site Shorewood Elementary School Shorewood Park Seola Beach Eagle Landing Park Steve Cox Memorial Park White Center Heights Elementary School Lakewood Park Evergreen High School Salmon Creek Elementary Shorewood - School Burien Seahurst Park Seahurst Gregory Heights Salmon Creek Ravine Inglesea Gregory Heights Elementary School Lake Burien Mount View Saint Bernadette Parish School Chelsea Park Burien Burien City Center k\cs)-sz Linde Hill Park Functional Class Local Collector Minor Arterial Principal Arterial IMS Infrastructure Management Services 2024 Highline Medical Center -Main Campus Marvista Elementary School Hazel Valley Elementary School Sunnydale / \ 509 White Center Beverly Park Arbor Lake Park Evansville John F. Kennedy High School Highline High School Five Corners 509 509 Resurrection Lutheran Church Noah Hill Esp 509 NP RR 509 Glendale Boulevard Beverly Park •• Park -Glendale Elementary School Glen Acres Golf & Country Club Boulevard Park 15091 // [509] Sunnydale Elementary F09i Airport Park 15091 Manhattan Park & Playfield North Hill 0.25 5091 Southminster Presbyterian 0.5 Southern Heights Elementary School Pac West Little League 1 Lake Reba Miles SCORE Comm u Center King County International Airport Newholly Van Asselt Othello 0 Wing Luke South Beacon Hill 73 Rainier Golf & Country Club Southern Heights North SeaTac Park Ryan Field Seattle -Tacoma International Airport Des Moines Creek Park Latona - SeaTac Riverton Heights Cecil Moses Memorial Park 99 1905 X 12th St 1286 Cascade —Behriora I Hospdal 529 1153 1172 16% Riverton Heights Park 1 51 8 1 Washington Memorial Park and Cemetery SeaTac/Airport SeaTac 99 Angle Lake Park Madrona Elementary School \ 7.6 East Duwamish 'Greenbelt -0 13 VP 01 Dunlap 0111 South Shore East Duwamish Greenbelt Seat AirPort .,;g7 W soon\ 1457 Boeing 1973 Access Rd 1750 e tight Rat Allentown-Duwamish 1338 5 116th 5t 1987 $ 120th PI S 117th St 1417 5 124th St 1373 v, 1512 S 126th St 1643 1635 1387 S 35th St 1702 a- 899 S 136th 634 S 137th St 1830 1145 Riverton Crest Cemetery 602 S 140th St 1485 1483 1601 142nd PI 1089 immeot% 1279 2016 2015 18 8 Tukwila International Boulevard Military Rd S Angle Lake 4 128tO St 1242 1155 2093 2095 S 132hd PI igw 209 S 141st St 1589 P. ; 142nd St 1742 152nd St 1719 1381 5 13001 St 110 uthgate Park 148th St 74 5 150th St 1376 755 S 122nd 975 S 18th St 430 1435 1061 .1671 1431434 143 1502 1505 1990 1993 1414 1991 1816 1553 1310 5 125th St • Tukwila Community Center 189, 676 835 850 1173 84 486 1599 Foster High School 4411h St 2074 leth St 1543 S151stSr 650 1522 1646 1556 $ 158t McVan-McMicken Heights St 1525 2023 S 156th St 2022 2071 2020 S 145th St 1509 Rainier Beach SFD 33 Kubota Gardens Natural Area Ryan St 1278 S 107th S S 109th St 2128 1284 S 122nd Ln Southcenter BI Crystal Sprin Park 476 $ 160th St 1469 1908 1468 Crestview Park - Tukwila 1490 S 162nd St 1220 264 164th St 1404 1489 1493 Bow Lake Elementary Seattle School Christian School 1 — —Valley Ridge — Park 5 888 1 S 20001 S 204th S S l6lst St ce St Codiga F Park 1128 139th St 1127 1739 • 1744 2079 2076 189 1245 1244 1542 -C r'Zr S 159th St 1807 5 66th St 2039 2035 215 1565 Pritchard Island Beach Beer Sheva Park Boat Launch Chinook Beach Park Emerson Rainier Beach Rainier View Elementary School Foster Golf Links 717 1716 S 152nd PI ; 168111 St Rainier View 19001 43 1188 1252 1756 900 506 S 149thSt Tukwila Elementary School Southcenter Mall 1665 Wig Blvd 1355 MInkler Blvd Parkway upercenter Briscoe Park Campbell Hill Elementary School 298 1300 746 Upland D 593 Midland D 29 TrIland D 589 S 153rd St 1585 Ikawa Park 19001 o D t Park ukwila Park Evans Black Dr 150 1,42 Baker Blvd Strander Blvd 1305 ndustry 84 Dr 1002 po tc0 Dr 1001 123 Green $ Glacier St 1405 Riverside Dr Lakeridge Park tennia; rk 19001 Longacres WeY 1375 01 Skyway Park \.6 Skyway Black River Forest Waterworks Gardens rn cific Railroad Tukwila Station Amtrak rt, CU _C 0 0 475/ Springbrook Greenbelt Black River Alternative High School 0 Bryn Bryn 1\/1 Tukwila WA1 Pavement AnalysislIglbps 2024 Sark rail Site Shorewood Elementary School Shorewood Park Seola Beach Eagle Landing Park Shorewood - Burien Seahurst Park Seahurst Gregory Heights Salmon Creek Ravine Inglesea Gregory Heights Elementary School Lake Burien White Center Heights Elementary School Steve Cox Memorial Park Lakewood Park Mount View Saint Bernadette Parish School Chelsea Park Burien Burien City Center Current PCI (1-25) Very Poor (26-40) Poor (41-50) Marginal (51-60) Fair (61-70) Good (71-85) Very Good (86-100) Excellent Evergreen High School Salmon Creek Elementary School Linde Hill Park Nature Trails Park N Highline Medical Center -Main Campus Marvista Elementary School Hazel Valley Elementary School Sunnydale NP RR 509 White Center Beverly Park Arbor Lake Park Evansville John F. Kennedy High School Highline High School Five Corners 509 509 Resurrection Lutheran Church Noah Hill Esp - 509 15091 // [509] Sunnydale Elementary F91 Airport Park 15091 Manhattan Park & Playfield North Hill 0.25 5091 509 Southminster Presbyterian 0.5 Glendale Boulevard Beverly Park Park -Glendale Elementary School Glen Acres Golf & Country Club Boulevard Park Southern Heights Elementary School Pac West Little League 1 Lake Reba Miles SCORE 3 ro Rainier Golf & Country Club Southern Heights North SeaTac Park Ryan Field Seattle -Tacoma International Airport Des Moines Creek Park King County International Airport C. e,. Latona - SeaTac Riverton Heights 5 Z 6" Cecil Moses Memorial Park 1905 Commu Z -73 Center Z 119 1285 Newholly S 112th St 1286 Cascade —Behavioral Hospital 1529 1153 1172 703 Ma 25 Van Asselt 752 1753 Wing Luke South Beacon Hill East Duwamish Greenbelt .73 73 Seat Ai °5 978 1754 e Light Rat Boeing 1973 Access Rd 1750 Allentown-Duwamish 1338 5116th St 987 S 120th PI S 135th St 1702 899 S 136th Othello Dunlap 111 r South Shore East Duwamish Greenbelt 10Ae% 1457 5 11M 1755 Duwamish H's113I39 Preserve 19g3 1444� 1442 1057 $~ s llSrh ~ s)2 1629 417 S 124th v, 1512 S 126th St 1693 635 1387 1520 1692 1634 S 137th St 18301 Riverton Crest Cemetery 600 1602 5 140th St 1485 14.3 Riverton Heights Park 15181 Washington Memorial Park and Cemetery SeaTac/Airport SeaTac 99 Angle Lake Park Madrona Elementary School S 142nd PI 1089 1677 S 142nd St 1742 3.6 .63 Rainier Beach S Ryan St 1289 S 122nd Ln Crystal Sprin Park 1219 2039 2035 1215 1565 578 1818 Tukwila International Boulevard Military Rd 5 1614 Inv 128t0 sr 1242 uthgate Park 601 1604 Angle Lake S 148th St 1342 Heights 146th St Slst St St 525 430 1435 106 1505 1990 Tukwila Community Center 1126 1123 MIL 2023 S 156th St 2022 1490 1194 2071 2070 Bow Lake Elementary Seattle School Christian School — —Valley Ridge — Park 1888 Z _I St Park SFD 33 Kubota Gardens Natural Area re. 636 St 1127 Pritchard Island Beach Beer Sheva Park Boat LYunch Chinook Beach Park Emerson Rainier Beach Rainier View Elementary School Foster Golf Links 717 1716 Rainier View 19001 Tukwila Elementary School 900 298 1300 Campbell Hill Elementary School sr goo 1313 2025 1337 2043 166 2031 1589 S 153rd St 1585 c_ 66th St 5 • 168th St Southcenter Mall 1303 1665 Wig Blvd Parkway upercenter Briscoe Park Ikawa Park 1307 Corpomte tio 71110 746 Upland D ukwila Park Evans Mack Dr 150t 1042 Baker Blvd 1845 1365 123 Costco Dr 1001 S Glacier St 1405 o ndustry Dr 1002 357 Lakeridge Park 1222 rk 19001 1346 40 197 Longacres 302 1101 Skyway Park .33 cu 0 Skyway Black River Forest Waterworks Gardens cific Railroad Tukwila Station Amtrak CU 9-0 0 0 Springbrook Greenbelt 10 0 0 sp- Black River Alternative High School 0 B ry n Bryn IMS Infrastructure Management Services 2024 NP RR Community Center Newholly Othello Sark rail Site Shorewood Elementary School Shorewood Park Seola Beach Eagle Landing Park Shorewood - Burien Seahurst Park Seahurst Gregory Heights Salmon Creek Ravine Inglesea Gregory Heights Elementary School Lake Burien White Center Heights Elementary School Steve Cox Memorial Park Lakewood Park Mount View Saint Bernadette Parish School Chelsea Park Burien Burien City Center Year of First Rehab 1 2 3 Evergreen High School Salmon Creek Elementary School Linde Hill Park Highline Medical Center -Main Campus Hazel Valley Elementary School Sunnydale 509 White Center Beverly Park Arbor Lake Park Evansville John F. Kennedy High School Highline High School Five Corners [509] ,509, 1 509 1 // Sunnydale Elementary Glendale Boulevard Beverly Park Park -Glendale Elementary School Glen Acres Golf & Country Club Boulevard Park Southern Heights Elementary School Pac West Little League Lake Reba Rainier Golf & Country Club Southern Heights North SeaTac Park Ryan Field King County International Airport Latona - SeaTac Riverton Heights cc of Cecil Moses Memorial Park o3 -73 Wing Luke Van Asselt z \V1 Cascade —Behaioral H�ital �� 99 South Beacon Hill East Duwamish Greenbelt e Light Rail Allentown-Duwamish Duwamish Hill Preserve 6mst \\ Riverton Heights Park 15181 Washington Mewa ial Park ry rt 4 5 Rehab Activity Slurry Seal / Seal Coat MicroSurface / Chip Seal; MicroSurface / Chip Seal + Strctrl Ptch Edge Mill + Thin Overlay (1.5 - 2.0) + Strctrl Ptch; Edge Mill + Thin Overlay (1.5 - 2.0) EM/FWM + Moderate Overlay (2.0 - 3.0) + Strctrl Ptch FWM + Thick Overlay (> 2.0 - 3.0) + Strctrl Ptch; FWM + Thick Overlay (> 2.0 - 3.0) Surf Recon + Base Rehab / FWM + Strctrl Ptch + Olay ACP Full Depth Reconstruction Il l t_ 11 l.d ty School N 509 Resurrection Lutheran Church Noah Hill Esp - North Hill 0.25 Southminster Presbyterian 0.5 1 Miles SCORE Des Moines Creek Park Seattle Light Rail eaTac Bow Lake jle Lake Park Madrona Elementary School Riverton Riverton Crest Cemetery S 133rd St 1642 sQ Tukwila International Boulevard 1942 1718 5 152nd St S 114th St 1444 599 5991 I I Southgate Park 158] 514 McVan-McMicken Heights 1801 108 5 14 Foster t Dunlap m - -1 South Shore East Duwamish Greenbelt [900 slest Tukwila Community Center `S1 Foster High School 2073 Thorndyke Elementary School Crestview Park - Tukwila 19001 l e�SV III jq59 s� L 1194 5 144th St 1190 1803 5 146th St 1802 Bow Lake Elementary Seattle School Christian School — —Valley Ridge Park Crystal Springs Park 1493 5 164th St Rainier Beach SFD 33 Kubota Gardens Natural Area S 112th St Codiga Fa. .1 Park Pritchard Island Beach Beer Sheva Park Boat Launch Chinook Beach Park Emerson Rainier Beach Rainier View Elementary School Foster Golf Links zo94 _ 1739 1794 � r I i 5 Rainier View 19001 Tukwila 1293 1188 Tukwila Elementary School Parkway Supercenter Briscoe Park Southcenter Mall 19001 1138 S 143rd St s 199th St 1345 Campbell Hill Elementary School 9001 Foii' De t Park Tukwila Park Ikawa Park corporate 1593 Midland Dr Sle green n V�Sr1223 1222 '!rL Lakeridge Park 05,e, bi��"'Rdennl al vrk 19001 181 181 Skyway Park Skyway Black River Forest Waterworks Gardens Tukwila Station Amtrak 1 O al 0 z 0 c Springbrook Greenbelt ra 0 L V !A 4=- U a = 0 r0 J z rc 0 3 ro v � 3 0 2 a Black River Alternative High School Bryn Bryn Ma M IMS Infrastructure Management Services 2024 Tukwila WAI Pavement Analysis1194s 2024 ,ark rail Site Shorewood Elementary School Shorewood Park Seola Beach Eagle Landing Park Salmon Creek Ravine White Center Heights Elementary School Steve Cox Memorial Park Lakewood Park Evergreen High School Salmon Creek Elementary School Inglesea Gregory Heights Elementary School Mount View Saint Bernadette Parish School Chelsea Park Linde Hill Park Lake Burien Burien Burien City Center Shorewood - Burien Seahurst Park Seahurst Gregory Heights Projected PCI (26 - 40) Poor (40 - 50) Marginal (50 - 60) Fair (60 - 70) Good (85 - 100) Excellent Nature Trails Park N Highline Medical Center -Main Campus Marvista Elementary School Hazel Valley Elementary School Sunnydale NP RR White Center Beverly Park Arbor Lake Park Evansville John F. Kennedy High School Highline High School Five Corners 509 509 Resurrection Lutheran Church Noah Hill Esp - 509 // [509] 15091 Highline Sunnydale Elementary F91 Airport Park 15091 Manhattan Park & Playfield North Hill 0.25 5091 509 Southminster Presbyterian 0.5 4/A *A 9p Glendale Boulevard Beverly Park Park -Glendale Elementary School Glen Acres Golf & Country Club Boulevard Park Southern Heights Elementary School Pac West Little League 1 Lake Reba Miles SCORE 3 ro Rainier Golf & Country Club Southern Heights North SeaTac Park Ryan Field Seattle -Tacoma International Airport Des Moines Creek Park King County International Airport C. e,. Latona - SeaTac Riverton Heights 5 Z Cecil Moses Memorial Park 1905 Commu Z Center Z 119 1285 Cascade —Behavioral Hospital Newholly 2th St 1286 529 1153 1172 Ma 1703 Riverton Heights Park 15181 Washington Memorial Park and Cemetery SeaTac/Airport -C 03 Cll SeaTac 99 Angle Lake Park Madrona Elementary School \tl 2S Wing Luke Van Asselt South Beacon Hill East Duwamish Greenbelt Boeing 1973 Access Rd 1750 e ugh t Rai Allentown-Duwamish 1338 5116th St 987 S 120th PI 5 135th St 1702 Ye NIMI=1=1=.3t 899 S 136th Duwamish H'S113th St 1839 Preserve 1493 1444 05' m S 117th St 5 119th St 1370 73 v, 1512 S 126th St 1643 13 1906 1903 S 1286, St 1242 -, 635 1387 634 S 137th St' 1830; Riverton Crest Cemetery 602 5 140th St 1485 5 142nd PI 1089_ _ �o 4 y6 S 122nd Ln 110 Crystal Spring i2 Park 1908 1468 219 HI 1491 Park 2079 2076 SFD 33 Kubota Gardens Natural Area Pritchard Island Beach Beer Sheva Park Boat LYunch Chinook Beach Park Emerson Rainier Beach Rainier View Elementary School Foster Golf Links 1910 900 sr 246 45 298 1300 Campbell Hill Elementary School Ikawa Park 629 1307 53 Corporate 8 1746 Upland Dr 1593 Midland Dr Evans Black Dr 150) 11342 Baker Blvd 65 Dr 1001 357 22 Lakeridge Park 222 rk Pe- 19001 Longacres 1302 01 1359 1818 Tukwila International Boulevard Military RdS 16 Angle Lake i. S 132nd PI 2 1917 2097 Othello s10 P1 1457 1893 S 131 outhgate Park s 148th St 1374 5 150th St 1376 152nd St 1719 Heights 5 122nd S .633 c, J Dunlap 111 r South Shore East Duwamish Greenbelt 118th St 430 1435 106 1505 1990 Tukwila Community Center 486 1599 1111 Foster High School S 144th St 2074 S 146th St 1350, St 525 .63 Rainier Beach Ryan St 1284 71 1431 1434 143 Fo d r 676 1173 '" 1849 2071 2070 1358 Elementary School Crestview Park - Tukwila 1490 Bow Lake Elementary Seattle School Christian School — —Valley Ridge — Park 1120 S 204th St S 152nd PI Rainier View 19001 Tukwila Elementary School Southcenter Mall 303 1665 Wig Blvd Parkway upercenter Briscoe Park Skyway Park 0 .13 0 cc Skyway Black River Forest Waterworks Gardens cific Railroad Tukwila Station Amtrak CU 0 0 Springbrook Greenbelt 3-13 0 0 3333 fo Black River Alternative High School 0 Bryn Bryn IMS Infrastructure Management Services 2024