Loading...
HomeMy WebLinkAbout25-044 - Amendment A - Anchor QEA - Duwamish Hill Preserve Phase 3 & S 104th St Shoreline Restoration ProjectAmendment # 1 Between the City of Tukwila and Anchor QEA That portion of Contract No. 25-035 between the City of Tukwila and Anchor QEA is hereby amended as follows: Section 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. Section 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $468,201.00 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this 15th day of May 2025 CA Reviewed May 2020 Page 1 of 2 0 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 CITY OF TUKWILA el—Signed by: DS VaKAaS .. Thomas McLeod, Mayor ATTEST/AUTHENTICATED: Signed by: EB'<7�4FFb-K�4 Andy Youn-Barnett, City Clerk APPROVED AS TO FORM: FSigned by: '-�. a.,& Office o t�eify ttorney CONTRACTOR: BY Printed N nle: Anna Spooner Title: Shareholder CA Rcvimcd May 2020 Page 2 of 2 Exhibit A Amendment 1 - Scope of Work L AmendmentopApril 28, 2025 South 104th Street Shoreline Restoration and Duwarnish Hill This amendment has been prepared to add a contingency in the amount of $15,000 as Task 4 to the South 104th Street Shoreline Restoration and Duwamish Hill Preserve Phase 3 project contract. This contingency will allow Anchor QEA and subconsultants to respond to minor requests for additional services. The addition of this contingency brings the total contract amount to $468,201.00 for all tasks. Task Fee Breakdown Table with Added Task 4 I aslk "1: Souflh Mflh Stireet 111'lirqposed Sub�as�,:� I 1� PrL-P�o�cd Support $S,,14: 8 Subtas'<� �1� PrujUt PIAWbOgCM12W� 6, 8 1) 0 S hN � 1 t a s I<� 3 ! Site nvn stiqMun 9,669 Sub1< 1 4! Engagement und Dutreudi 1 1,11 41) S b J S I C�mk,cph�,� Desip 0cmuiivus $6 �, 126 S a;I mpkmenk3iion Roadmap $ 2 1, 944 MYAi IASK I R�: $204,869 aslk 2: Duwaimisl[i I illlllll 'Iirqposed IIC S1..qb9asI<,:' 1P"'UjCd &Aflask� 2 2Siie 8: 1 Subtas�, ' B::m,pLp!rncnt und Outn!dLh & 2 1 Ba. -,is o4 Desiqn S 9 N b t a s , I 1� uni� cptua�� Dcsqri A]tcrnutivcs P I "), 3' 1 2 &Aflask� 2 u mp��::menkflion Ro,vlm;�ir,!� $,2 1,3ds�� I 0 Ai I ASK 2 RE $229, 79S iii I as�k 3: Sou fli "104 fli Sim eet Site Assessimeint 0Iptioin Pirqposed A� 'A S K 3 R: ::B I a's M NEW - Task 4: Contingency Proposed Fee TOTAL TASK 4 FEE $15,000 1201 3rd Avenue, Suite 2600 ANCHOR Seattle, Washington 98101 206.287.9130 April 28, 2025 Mike Perfetti, PLA Surface Water Sr. Program Manager, City of Tukwila 6300 Southcenter Blvd Suite 200 Tukwila, WA 98166 Re: South 104th Street Shoreline Restoration and Duwamish Hill Preserve Phase 3 — Contingency Authorization for Added Survey Dear Mr. Perfetti, Anchor QEA is requesting authorization to allocate $6,905 of the Task 4, $15,000 contingency (see Table 1) for additional survey work. The survey will cover two parcels adjacent to the Duwamish Hill Preserve that are in the process of being acquired by the City. The additional survey will include road rights-of-way, man-made surface features, limits of vegetation, trees 6" DBH or larger, overhead utility lines, underground utilities from painted locates, and topography from LIDAR. The supplemental survey will be integrated into the previously scoped survey to be used as a basemap for conceptual design. This work will not affect the overall project schedule. The proposed fee for the additional survey work includes: • Anchor QEA contracting and coordination support for the additional work. • Fieldwork and mapping of the additional area as described in Attachment 1 from Anchor QEA's subconsultant, KPG Psomas. Table 1 Fee for Additional Work Staff Hours Rate Subtotal Anna Spooner, PM and Landscape Architect of Record 1 $292 $292 Arielle Farina -Williams, Landscape Architect 4 $269 $1,076 Megan Prebil, Senior Project Controls Analyst 1 $156 $156 KPG Psomas Fee (see Attachment 1) $4,892 10% Subconsultant Markup $489 Total Fee $6,905 April 28, 2025 Page 2 Please reach out with any questions. Sincerely, Anna Spooner Principal Landscape Architect and Project Manager