2025-05-13 Bid Tabulations - 65th Ave S & Southcenter Blvd Signal Improvements
CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS Opening 5/16/2023 I No. I Section No. Iltero I Quantity I Unit SCHEDULE A ROADWAY Al 1-04 Unexpected Site Changes A2 1-05 ADA Feature Surveying A3 1-05 Construction Surveying A4 1-05 Record Drawings (Minimum Bid $1,000) AS 1-07 Employee Apprenticeship Program (EAP) Utilization Plan A6 1-07 Apprenticeship Hours 180 A7 1-07 Apprenticeship Utilization Goal Assessment A8 1-09 Mobilization A9 1-10 Project Temporary Traffic Control 410 1-10 Work Zone Safety Contingency All 2-01 Clearing and Grubbing Al2 2-02 Removal of Structures and Obstructions A13 4-04 Crushed Surfacing Top Course 30 A14 5-04 HMA Cl. 12" PG 58H-22 45 A15 7-05 Adjust Catch Basin A16 8-01 Erosion Control and Water Pollution Prevention All 8-02 Landscape Restoration A18 8-04 Cement Conc. Traffic Curb and Gutter 110 A19 8-09 Raised Pavement Marker Type 1 5 A20 8-09 Raised Pavement Marker Type 2 A21 8-14 Cement Conc. Sidewalk 60 A22 8-14 Cement Conc. Curb Ramp Type Parallel A A23 8-14 Cement Conc. Curb Ramp Type Perpendicular A 2 A24 8-20 Traffic Signal System at 65th Ave S & South center Blvd, Complete A25 8-21 Temporary and Permanent Signing A26 8-22 Plastic Stop Line 100 A27 8-22 Plastic Crosswalk Line 380 A28 8-22 Plastic Traffic Arrow 6 FA LS LS LS LS HR CALC LS LS FA LS LS TN TN EA LS FA LF HUND HUND SY EA EA LS LS LF SF EA Item No. Section Description Quantitiy I Unit SCHEDULE B 131 1-04 Unexpected Site Changes B2 1-05 Construction Surveying B3 1-05 SPCC Plan B4 1-09 Mobilization B5 1-10 Project Temporary Traffic Control B6 1-10 Removal of Structures and Obstruction 87 2-01 Roadway Excavation Incl. Haul B8 2-02 Crushed Surfacing Top Course B9 4-04 HMA Cl. 1/2" PG 58h-22 2 810 4-04 Cement Concrete Pavement 45 1311 5-04 Modify Existing Storm Drainage System 5 B12 6-02 Erosion Control and Water Pollution Prevention 66 B13 6-10 Inlet Protection 40 B14 6-11 Property Restoration 12 B15 6-11 Cement Conc. Traffic Curb and Gutter 18 B16 6-11 Cement Conc. Traffic Curb 2720 1317 8-01 Cement Conc. Driveway Entrance B18 8-02 RPM, Type 1 B19 8-04 RPM, Type 2 40 B20 8-12 Cement Conc. Sidewalk 60 B21 8-12 Solar Powered RRFB System, Complete B22 8-14 Permanent Signing 17 B23 8-19 Plastic Crosswalk Line 3 B24 8-20 Plastic Yield Line Symbol B25 8-21 Bollards FA LS LS LS LS LS CY TN TN CY LS FA EA FA LF LF SY EA EA SY LS LS SF EA EA Engineer's Estimate Northwest Cascade Inc. Road Construction Northwest, Inc. TITAN Earthwork LLC Unit Cost I Total Cost Unit Cost I Total Cost Unit Cost I Total Cost Unit Cost I Total Cost $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 10,000.00 $ 10,000.00 $ 6,800.00 $ 6,800.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 $ 15,000.00 $ 15,000.00 $ 1,500.00 $ 1,500.00 $ 12,000.00 $ 12,000.00 $ 4,950.00 $ 4,950.00 $ 1,000.00 $ 1,000.00 $ 4,000.00 $ 4,000.00 $ 1,100.00 $ 1,100.00 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 10.00 $ 1,800.00 $ 71.00 $ 12,780.00 $ 75.00 $ 13,500.00 $ 30.00 $ 5,400.00 $ (5.00) $ (5.00) $ (5.00) $ (5.00) $ (5.00) $ (5.00) $ (5.00) $ (5.00) $ 90,000.00 $ 90,000.00 $ 87,000.00 $ 87,000.00 $ 90,000.00 $ 90,000.00 $ 92,500.00 $ 92,500.00 $ 100,000.00 $ 100,000.00 $ 133,000.00 $ 133,000.00 $ 170,000.00 $ 170,000.00 $ 120,000.00 $ 120,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 5,000.00 $ 5,000.00 $ 23,500.00 $ 23,500.00 $ 5,500.00 $ 5,500.00 $ 4,950.00 $ 4,950.00 $ 20,000.00 $ 20,000.00 $ 14,000.00 $ 14,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 85.00 $ 2,550.00 $ 125.00 $ 3,750.00 $ 165.00 $ 4,950.00 $ 100.00 $ 3,000.00 $ 250.00 $ 11,250.00 $ 435.00 $ 19,575.00 $ 695.00 $ 31,275.00 $ 450.00 $ 20,250.00 $ 1,500.00 $ 1,500.00 $ 850.00 $ 850.00 $ 1,400.00 $ 1,400.00 $ 300.00 $ 300.00 $ 2,400.00 $ 2,400.00 $ 18,000.00 $ 18,000.00 $ 8,100.00 $ 8,100.00 $ 4,950.00 $ 4,950.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 65.00 $ 7,150.00 $ 67.00 $ 7,370.00 $ 63.00 $ 6,930.00 $ 130.00 $ 14,300.00 $ 800.00 $ 4,000.00 $ 1,150.00 $ 5,750.00 $ 825.00 $ 4,125.00 $ 900.00 $ 4,500.00 $ 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 950.00 $ 950.00 $ 1,100.00 $ 1,100.00 $ 100.00 $ 6,000.00 $ 131.00 $ 7,860.00 $ 120.00 $ 7,200.00 $ 150.00 $ 9,000.00 $ 4,000.00 $ 4,000.00 $ 4,800.00 $ 4,800.00 $ 4,250.00 $ 4,250.00 $ 7,500.00 $ 7,500.00 $ 4,000.00 $ 8,000.00 $ 4,800.00 $ 9,600.00 $ 4,250.00 $ 8,500.00 $ 7,500.00 $ 15,000.00 $ 585,000.00 $ 585,000.00 $ 475,595.00 $ 475,595.00 $ 595,000.00 $ 595,000.00 $ 533,500.00 $ 533,500.00 $ 5,000.00 $ 5,000.00 $ 1,800.00 $ 1,800.00 $ 5,500.00 $ 5,500.00 $ 1,000.00 $ 1,000.00 $ 20.00 $ 2,000.00 $ 18.00 $ 1,800.00 $ 13.50 $ 1,350.00 $ 15.00 $ 1,500.00 $ 15.00 $ 5,700.00 $ 13.00 $ 4,940.00 $ 19.00 $ 7,220.00 $ 10.00 $ 3,800.00 $ 100.00 $ 600.00 $ 365.00 $ 2,190.00 $ 450.00 $ 2,700.00 $ 250.00 $ 1,500.00 TOTAL $ 933,945.00 TOTAL $ 888,455.00 TOTAL $ 1,049,045.00 TOTAL $ 917,995.00 Engineer's Estimate Northwest Cascade Inc. Road Construction Northwest, Inc. TITAN Earthwork LLC Unit Cost Total Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 2,500.00 $ 2,500.00 $ 2,600.00 $ 2,600.00 $ 500.00 $ 500.00 $ 2,500.00 $ 2,500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 1,100.00 $ 1,100.00 $ 1,000.00 $ 1,000.00 $ 12,000.00 $ 12,000.00 $ 24,000.00 $ 24,000.00 $ 19,000.00 $ 19,000.00 $ 27,500.00 $ 27,500.00 $ 12,000.00 $ 12,000.00 $ 47,000.00 $ 47,000.00 $ 28,500.00 $ 28,500.00 $ 40,000.00 $ 40,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 2,750.00 $ 2,750.00 $ 4,950.00 $ 4,950.00 $ 5,000.00 $ 5,000.00 $ 10,000.00 $ 10,000.00 $ 16,000.00 $ 16,000.00 $ 25,000.00 $ 25,000.00 $ 85.00 $ 170.00 $ 125.00 $ 250.00 $ 165.00 $ 330.00 $ 100.00 $ 200.00 $ 75.00 $ 3,375.00 $ 125.00 $ 5,625.00 $ 165.00 $ 7,425.00 $ 100.00 $ 4,500.00 $ 250.00 $ 1,250.00 $ 435.00 $ 2,175.00 $ 695.00 $ 3,475.00 $ 450.00 $ 2,250.00 $ 145.00 $ 9,570.00 $ 125.00 $ 8,250.00 $ 87.00 $ 5,742.00 $ 175.00 $ 11,550.00 $ 200.00 $ 8,000.00 $ 88.00 $ 3,520.00 $ 308.00 $ 12,320.00 $ 200.00 $ 8,000.00 $ 1,100.00 $ 13,200.00 $ 1,360.00 $ 16,320.00 $ 1,232.00 $ 14,784.00 $ 6,000.00 $ 72,000.00 $ 800.00 $ 14,400.00 $ 965.00 $ 17,370.00 $ 820.00 $ 14,760.00 $ 1,700.00 $ 30,600.00 $ 2.50 $ 6,800.00 $ 6.50 $ 17,680.00 $ 7.00 $ 19,040.00 $ 4.00 $ 10,880.00 $ 1,000.00 $ 1,000.00 $ 12,600.00 $ 12,600.00 $ 2,500.00 $ 2,500.00 $ 4,950.00 $ 4,950.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 65.00 $ 2,600.00 $ 80.00 $ 3,200.00 $ 77.00 $ 3,080.00 $ 130.00 $ 5,200.00 $ 100.00 $ 6,000.00 $ 128.00 $ 7,680.00 $ 132.00 $ 7,920.00 $ 100.00 $ 6,000.00 $ 1,000.00 $ 1,000.00 $ 1,850.00 $ 1,850.00 $ 1,925.00 $ 1,925.00 $ 1,500.00 $ 1,500.00 $ 160.00 $ 2,720.00 $ 212.00 $ 3,604.00 $ 211.00 $ 3,587.00 $ 500.00 $ 8,500.00 $ 500.00 $ 1,500.00 $ 2,700.00 $ 8,100.00 $ 2,340.00 $ 7,020.00 $ 1,250.00 $ 3,750.00 $ 3,500.00 $ 3,500.00 $ 15,500.00 $ 15,500.00 $ 8,550.00 $ 8,550.00 $ 4,950.00 $ 4,950.00 $ 1,000.00 $ 1,000.00 $ 4,850.00 $ 4,850.00 $ 825.00 $ 825.00 $ 100.00 $ 100.00 TOTAL $ 136,085.00 TOTAL $ 240,674.00 TOTAL $ 206,133.00 TOTAL $ 300,880.00 Engineer's Estimate Northwest Cascade Inc. Road Construction Northwest, Inc. TITAN Earthwork LLC $ 1,218,875.00 Schedule A+B Total $ 1,070,030.00 $ 1,129,129.00 $ 1,255,178.00 05/21/2025 I ATTEST TO THE ACCURACY AND INTEGRITY OF THIS DOCUMENT