HomeMy WebLinkAboutTIS 2025-05-28 Item 2A - Turnover - Underground Stormwater Bypass Pipelines & Appurtenant Facilities with Prologis-Exchange)City of Tukwila TO: FROM: BY: CC: DATE: SUBJECT: Department of Community Development - Nora Gierloff, AICP, Director Thomas McLeod, Mayor Transportation & Infrastructure Services Committee Pete Mayer, Interim Public Works Director Kerry Murdock, Development Engineer Mayor Thomas McLeod April 7th, 2025 Turnover of underground stormwater bypass pipelines and appurtenant facilities installed within Tukwila right-of-way ISSUE Accept the turnover of stormwater infrastructure improvements from Prologis-Exchange 3301 South Norfolk LLC. BACKGROUND Prologis-Exchange 3301 South Norfolk, LLC has completed installation of approximately 688 lateral feet of storm pipe in South Norfolk Street to connect the city storm system to the original point of connection just southwest of the Norfolk Street and Airport Way intersection. As conditions of Public Works permit PW22-0033, Prologis-Exchange has constructed storm drainage infrastructure within S. Norfolk St. to connect the existing city of Tukwila storm system to the existing storm stub. The storm system was routed through the Prologis site and with redevelopment, it was capped off. Now the city of Tukwila storm system needs to be reconnected to the original point of connection. This has been filed under the Bill of Sale as part of the city's turnover process. DISCUSSION The public improvements have been constructed to city standards and inspected by Public Works Project Inspectors and are ready for turnover. FISCAL IMPACT The value of the transferred improvements from Prologis-Exchange to the city totals $72,088 for the stormwater infrastructure constructed within S. Norfolk St. There will be no expense to the city for accepting the infrastructure other than normal expected maintenance. RECOMMENDATION City Council is being asked to authorize the Mayor to sign the turnover documents and consider this item on the New Business at the May 5th, 2024 Regular Meeting. Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 1 Title or Addressee Date Page 2 ATTACHMENTS Bill of Sale and as -built site plan Capital Asset Acquisition Form Material List Development Bulletin D3 Maintenance bond City Turnover Letter INFRASTRUCTURE • 688' of 18" PVC Storm Pipe • CB#1 Type 2- 48" Saddle Manhole Total Value: $72,088 NOTE: Prologis-Exchange Development Files are available at the Department of Community Development Permit Center. Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov 2 00 200 ti 400 SURVEY INFORMATION, REFERENCE RAT, DATES Of DRVEr: SNO.NASFSMF.ER 1 M41TINE. N,0= Pa WSOOT. WSW10008RJL PINT NO. NT WAS HELD FOR POTAXON BEND MN 62.07.05,EST. VERTIO.DOAArt% 'FOR MIS PROJECT NAVOB0808). WSOOT. WSOOT CONTROL POINT NO. HG17 WASH FOR 'FOVATNG 5119 ASSESSIR'S P,RCa NSN0R(S) NO SRE 60HWSS92) n H/A 5 NORFOLK SI 96166 o8t OUTSIDE SCO-iAM FLOao NrRL.s Dump. $11 Know what's below. Call before you dig. FRPORTION a1r/SIF/REAR CR MPL02020 PMPOR OF SIR M (0 CC OF K' wan .SECOND Fes. (LWA ) W INNROR SIDE A Er .tea LMArr,..N OR Of HAP E CROSS LOT APD: CROSS LOT TAM 2.,31,7554 SF (02711L ASS) nELD TRAVERSE SURVEY A DOPOON 41-1000. ROOM TOTAL STATION WM A CDR% PC-, OLU ND DAM. OF RECENT SR. OR SNOW CONSTRUCTION SOILS REPORT NOTES: 1 THE FOLLOWING ISE SOILS IREPPDOCUMENTS ORTRTME SHALL BE CONSIDERED PART OCONSTRUCTION SOILS REPORT. ROB NUMBERE3 CoHNol 2-OEoNGINEERING SERVICES PREPARED BY. GEOENGINEERS. INC. 17425 NE UNION HILL RD, SURE 250 REDMOND. WA 98052 (425) 862-6098 2. IT SHATHATALLLL BE PR THE VIE NESPONSOF TMBILIIY OF THEE SOILS REPOCONTRACTOR TO ENFR THE SUENSURE PREPPOBSERVED ATION, GRADING OPERATIONS, FOUNDATIONS SUB, AND PANNG FURTHER3. ANY PROVISIONS OF THE SOILS WHICH CONFLICT WITH INFORMATION SHOWN SEWHERER SEPORT HALL THESE DRAWINGS, OT ORWHICH RED. ATTENTION OF THE ARCHITECT/ENGINEER FOR DETERMINATION. 4 A REP ESENTAID OF THE SOILSENGINEER SHALL BE AVAILABLE O OBSERVE ANO OPERATIONS AND ET EW FIELD DOAPPRWORK PROCEEDS.ESHALL ALS OF THE OPERATIONSIN .CORDANCE ROIL THE RECOMMENDATIONSKOF THE SOILSSERE IGATION AND THAT THE WORK WAS PERFORMED TO HIS/HER SATISFACTION. DAYS SP SRS LENGINEER SHOULD OCLEARING BENOTIFIED GRADING. NATLEAST RYE (5) WORKING Date 92 CAM ,r. ion AT RAUB. SITE MD ROXIRDIONS: PORTION Of SITE ORIN CD Of TEMNLA DIE PORRON Of SIR MN OD Of NORM WAROIORSINR PAH110 SPACES RUNNER FLOOR LONE: DBE R. Elm WISuu15 513 OF 123, ERKO WY 6mt. NumFBR 53033CFA SIMP110 PARKING: 2)'I P4OWING 8Ne slws (6) wow. STALLS (610) TOTAL PARDO STALLS (PO,PE0) REPO, mom Dau, BARD 01 MM:`42 v66FEET 100 RAL 420 LLIrig:11 OF 85 REI Foe UNRELATED0101 / rz OF SITE N. CD OF ZiotilA If MD NOMA. LORD COVER SHEET FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E W.M., CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON _ _- AIRPOgT WAY40 n NOT OPPIXABLE SPECIFIED RR ME ILE :ae(4vuirea Nat SPECIFIED I COME PER 1000 1 SP. PER 2000 SF. (71 S06 �6)) 1 SPACE NM 200D SE 517 TOTAL PARKING SPACES INDEX OF CML SHEETS RI OF 9 DOVER SHEET R9 OF 9 SOUTH NORFOLK STREET PLAN AID PROF. M OF 9 SOUTH KSTREET PLAI AND PRCRE RS OF 9 SOUTH NORFOLK STREET PLNAND FROME Re OF 9 SOUTH NORFOLK STREET PUN AND PROFIE PO OF 9 SOUTH NORFOLK STREET PLAN APO PROFILE R K 9 SOUTH NM., K STREET PLAN AND MORE R9 OF 9 OONSTRUCTION NOTES AND DUALS 9/29/2 EP JEP DNB REVISED STORM DESIGN BOW row D= Do, 9/29/22 Scale: Horizontal 1 ZOO' Vertical EAST E A INAL WAY �UTH DEVELOPER/OWNER PROLOGIS STALE 11D iUNWIU. WA A98D60 E, SURVEYOR BARGHAUSEN CONSULTING ENGINEERS, INC 18215 2ND AVE LT PH:(25) 2( KENT WA, � CONTACT: DM BAWD, P.E. EMAIL: DBLLMEW®BARGHAUSENCOM ENGINEER BARGHAUSEN CONSULTING ENGINEERS, INC. KENTSWA, 98032 PH: (425) 251-6222 CONTACT: DAN EMAIL: INALMELLOBARGHAUSEN.COM ARCHITECT CRAFT ARCHITECTS 2505 THIRD AVENUE, 1 SUITE 324 SEATTLE,WASHINGTON 720-7001 (206) A% (206) 720-2949 LANDSCAPE ARCHITECT 1821G5 x, AVE S LT NG ENGINEERS, INC. KENT WA 98032 H: (425) 251-62222 CONTACT: EMAIL IPERRYOBARGHAUSEN.COM GEOTECH GEOENGMEUNOINC.7425 NEN HILL RD, SUITE 250 REDMOND, WA 98052 PH: (425) 862-sole UTILITY SOURCE NOTE: UTILITY INFORMATION SHOWN ON THESE PLANS ARE DRAWN BY THE SURVEY DEPARTMENT FROM BARGHAUSEN CONSULTING ENGINEERS, SEWER CARDS. EXISTING PLANS AND BASE MAPS FROM CITY PLAN VAULT. RECORD DRAWING C.O.T. STANDARD CONSTRUCTION NOTES ALL WORK IN ROADWAYS SHALL MEET TMC 11 IBC 2018, AND THE FOLLOWING A TRAFFIC CONTROL PLAN IN CRY RIGHT-OF-WAY, APPROVAAL PERMIT. HE TRAFFIC CONTROL PLATHE SHALL A IIANDLUDE THE MEET LOCATION MUMADDRES E AND DESCRIPTION OF TRAFFIC FLOW DURING THE WORK B ALL WORK REQUIRING UNE CLOSURES MUST BE BY PERMIT ONLYFROM THURSDAY IN ES N THE TO TUKWILA THE FOLLOWING UAR( 2ND, THE DIRECTOR DOES NOT ALLOW LANE DIRECTOR N CENT. iTI'V CLOSE TREE INS PERMISSIONIFROMSTHE BUILDING OWNER AND THE ACCESS D ROADWAYS FREE DIRTAND BPOVSTRE SWEEPERS OF WATRU KS FOR CLEANIGROADDWYRQUIRESREAPp.OM THE DIRECTOR. E INSTALL OPEN PULES OVER ANY TRENCH, AT ANY TIME WORK Is STOPPED AND THE TRENCH LEGEND. CONTACTOR SHALL BE FULLY RESPONSIBLE FOR OBTAINING PERM. FROM THE WASHINGTON STATE DEPARTMENT OF NAPJRAL RESOURCES FOR REMOVING AND REPUCING ALL SURVEY MONUMENTATION MAT BE AFFECTED BY ACID, PURSUANT TO RACCOMPLETED BY A NSTRUCTION REGISTERED LAND SURVEYOR. 3APPLIa P SLICATIONS FORYPERMITSSTO REMOVEOMONUMENTS MAY BE OBTAINED FROM THE WASHINGTON STATE DEPARTMENT OF NANRAL RESOURCES OR BY CONTACTING THEIR OFFICE BY TELEPHONE AT (200 902-1190. P BLiCGUN02TON UNVEYATE EOFFICEM OF NATURAL RESOURCES P.BOXHINGTO4,060ry STREET S.E. OLYMPI0. WASHINGTON 98504-7060 UPON COMPLETION OF CONSTRUCTION, ALL MONUMENTS DISPLACED, REMOVED. OR DESTROYED SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR, AT THE COST MID AT THE DIRECTION OF THE CONTRACTOR, PURSUANT TO THESE REGULATIONS. THE FORMS THFOR E REPLACEMENT OF SAID MONUMENTATION SHALL ALSO BE THE UfLRY CONRICT NOTE CAUNON THE CONTRACTOR ROEXISTING RESPONSIBLE F UTILITIES ON THESE PUNS OR DIMENSION,OR VERIFYING THE LOCATION, AND NOT BY DEPTHOFALL POTHOLING THE PRIOR TOCONSTRUCTIONS THISSHAL LINCLUDE CALLING UDLItt LOCATE ® LOCATION 24-5555 AND THEN POTHOLING L OF NEWUTILITYCROSSINGS TO PHYSICALLY HEXISTING UVERIFY WHETHER ovEs AT LOCATIONS OFEWNOT CONFLICTS EXIST. LOCATIONS OF SAD UTILITIES AS SHOWN ON THESE PUNS ARE BASED UPON THE IEDCCURI, THEPUBLIC CONTRACTORMATION SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. AND ME SUDJECT TO VARNTION. IF CONFLICTS LD OTO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING W. CONSTRUCTION SURVEY MONUMENT Ex. POWER VAULT IX. LUMINAIRE (LUM.) EX. LOT LIGHT EX. POWER POLE EX. JUNCTION BOX • PROPOSED DYE II CATCH BASIN © PROPOSED DYE I CATCH BASIN • PROPOSED STORM DRAIN FLOWARROW PROPOSED STORM DRAINAGE NPROPOSED TRENCH DRAIN PROPOSED SANITARY SENER UNE PROPOSED SANRARY SEWER CLEANOUT X. CATCH BASIN (CB) ❑ PROPOSED SANITARY SEWER MANHOLE EX. CATCH BASIN (00) TYPE 2 0 PROPOSED WATERMAIN E.SANITARY SEWER MANHOLE (SSMH) S METER VALVE E%. WATER VALVE (MO E%. FIRE HYDRANT (F11) MAIL BOX EX. WATER METER EX. SIGN Ex. WATER BE — -w- -w— PROPOSED CONTOURS X. SANITARY SEWER LINE s EXISTING CONTOURS E%. STORM DRAINAGE LINE so PROPOSEDiE AVY DUTY EK ol POWER UNDERGROUND —°w EX. POWER a(ox) PROPOSED CONCRETE E%. METAL FENCE OVERHEOD55 EX. WOOD FENCE 0 PROPOSED FIRE HYDRANT 02 PROPOSED WATER VALVE N • PROPOSED CONCRETE BLOCKING RPROPOSED 90, BEND PROPOSED SPOT ELEVATIONS EXISTING SPOT ELEVATIONS PROPOSED 2' OVERLAY 0 Barghausen Consulting Engineers, Inc. 1821572nd Avenue South Kent, WA98032 425251.6222 barghausencum F°r. PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title: COVER SHEET FOR PROLOGIS EMERALD GATEWAY Job Number 18182 9 Sheet 3 0 100 200 400 ��ammo o ssr. FRONTAGE IMPROVEMENTS OVERVIEW RECORD DRAWING FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E W.M., CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON AIRPORT WAY SOUTH EAST MARGINAL WAY SOUTI- \y LEGAL DESCRIPTION: (Pa MUTT xudAL Tr. MPUWACE Wwurc COMM.. w. 20a73268.18-08 DAM ...IT 28. 2018 n101T"N x µ o° "E oolliAL OWTZ,',E""N«6,1." o EBMN z NE1' "'c"aDE""`"` WM,D THENCE SOLTI 8811577 MST, .NO THE CEMEDDE Of SAD SOUTH NORME SIR. 3733 FEE SOUTH. ME EMIR Of INCH CUM EMS .TH 33151.087 WEST 48.00 .T. AHD THE TRUE POINT Of BEGIN.. RADIUS Of 48.00 EEL AN ARC WM. Of 29.1 EET TO A POINT OF TWO., ,z,,Tcr SO. 2112213. EAST, ALONG SAD WESTERLY MR., 1,1.01 TM ID A MINT Of WIDEN. N END ARM PENCE MI. 68137,17 KW ALONG S. MRIM. 3,00 FEET TO A POINT Of CURVE X SAD ATKIN THE ..T1 OF THENCE NORTH 7813597 MST, .N6 SAID SAIRDN, 500 , THE NORTH DAM Of THE 800. ACCESS THENCE SO. 051.8287 ME DWG SAD M.N. 7.00 FELE THDICE SO. 8.61327 WEST, ALONG MD MARGIN 447.92 FEET TO A PONT Of CURD.. Of A 102.80 FOOT RAMS CURVE TO ..111 IN SAD MARGIN 04,C,E WESER. AND IrTZLY.110= GENE 010 M.. 150.50 FEET TO A POINT Of M.. ON IRE TIME NORM 1112.2.1161... ITORMEASTERLY MARGIN 250 1,18234 FOOT RIOTS .VE TO THE LEG EDGE NORTHERLY, NON6 DM CURVE A. INa9M AI ARC DISTANCE OF 25a.0 Taa;Pan Of p"MaNa Of THEIGHLOONTNUNG .NG TM FELE MORE OR LESS. TO TIE LK 1016" I f YD ODERIMENT LOT P.61 WIB.xM1S,ZIA , O:0"Mf YD CMFAx"P",;70,& THENCE °WIN O 11111 MEM MONO sD RESULT BOUNDARY aE, 734]5 FEET TO MESOGH ALE OF SAD TIMOTHY TAMS WwN E THE. SOU. 875.57 MST, ALONG GO OT"NE,11n4 ET TO THE W. UNE a SAD SECTION. x 3 TIERCE $01.1.1211MIEST, ALONG S. MST uU1110-NEIZNOFDI 84511,21;1.1 TO A PCINT WHICH BEARS SOWN 8958112" EMT 1.00 FEET FROM THE .STERD MA.IN TOCE NORD ems' xest 168.16 Er TO HIE EASTERLY MARGIN Of . MEG. WAY SG. THDICE NORTH 23139967 MST. &ONG SAID TICCIT. M7.95 FEET TO ME INIBISECTION Of SAM .TERLY MINEGIN NTH THENCE NOREE 881007177 .ST, SND STONER, °ARM, 86207 FELD TO A POI. Of CM., THENCE EASTERLY, ALONG SAD MARG. FOLLOWNG 011 ARC OF A THE RIND MANG A RADIUS Of 140.71 FUT, 011 OPC DISTANCE OF 13. Ea TO A POINT OF TANGENCY; n N3[5a64 M.R195,A,ArroJIAT RIGHT .L. TO AO PAWLEL ME .TERLY LIWCAT OF DID PUGET SOUND GmBLE,WORITAZI7r111riZST(4011M, MANRATLEL LINE .01 ELT TO A POINT RICH BEARS NORTH EMIG, WEST THENCE SO. 8S406527 .11; 1.7 FIE TO THE TRUE PONT OF BEGINNING. PARCEL B-1. DM PORN. OF THE NOMINEE QUARTER OF SECTION 3, TOWNSHIP 23 NOM, 1.10E 4 EAST. WM. IN KING COMM M.L.SMITH MGM THE SO. Ea ME Timm, aDONATIONMDONATIONMS a N WO DAN MO TIE .11 OF AD n ORPON OF ,ERNMENT LOT 8, SMTION 4, .INSDP 23 NORTH, PAGE 4 OW, NAT IN KING COL, WASIANCEN. DESCRIBED AS F.. 1AEAST 0®YE LEDNNIN6 ON ME LKE D OCEAN.. LOT 8 AT .L POINT MI. IS OWE Uz1 zl . 200 FEET FF01 ME 0 ONErES7.10 THE NOROGISTERLY L. OF STATE ROM NO. 1 AS NOW ESTABUDED. S, TO A PONT NMI MARS 8910,41 TOME SOL. 6920.54. EMT O. PALNEL MM M MN ALE OF ASAE D 00 AxMEm w16, 2. lac MORE OR En TO ENE POINT OF MGMEING PARCEL B-31 A.INGTON. DE.MED AS MM. MTN:1°Z.= „LAILIF,,A0 GOVERNMENT LOT AT A POINT MIICH IS NORM 0211247 EMT .77 FEET RON OF WASHINGTON. RE.D. UNDER RECORDING NU, 3440535. IN KING .1.6 WASHINGTON. THENCE ...ASTER, AU. SAD NCRTH.ENLY LINE 195 FEET MORE OR TMS, TO A POINT DUE WTI Of THE POINT OF BEGINNIK THENCE EAST 375 ED. MORE OR LESS. TO THE PONT OF BEGINNING. OF.TION W. TOWNSHIP 23 NOAM RAM W EMT. WM. Ix M Lw IY. WwxxaM. TaOAaD AS FIMOM F DE TWO. GEMS DONATION LAND CM NMI zilr WEST ALONG SAD EAST u c xHE EAST uxE THENCE SOUW1 i3z:3 Fa* TO ME TR. PONTPan OF THENCE soot zrlr"En z"m aa: THENCE NORM arfE,N M .1 OLD. SAD MN TO A Paw .11 IIAS NOAM ar7 WEST .L01 FEE TO WE EASTERLY AMIN Of .T se 1z .T FROM ME TRUE THEM MUITI 89158112" EAST TO WE TRUE POINT OF OEIHNIN0. SECRON THENCE NOR. 7 WEST THENCE NORTI e'asvu MST 1iaro .T TO WO uSTEALY LAR. THENCE MLTI 2S391167 E. ALONG SAD EASTERLY MRGIN TO A POINT M. MARS NORTH 891581M .T FROM ME TRUE POINT OF MGM.; No. Dote CROW MP, 9/29/22 CEP CEP DNS Revision PRIAM STORM DESIGN Designed eDW I,eI. 9/29/22 Scale: Horizontal Vertical Bergheusen Consulting Engineers, Inc. 1821572nd Avenue South Kent, WA98032 425251.6222 Wreheuseneem 1 PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Tale FRONTAGE IMPROVEMENTS OVERVIEW FOR PROLOGIS EMERALD GATEWAY sheet R20,9 4 SOUTH NORFOLK STREET PLAN AND PROFILE RECORD DRAWING FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E WM, CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON 3s —, Rx' PEI n - ao .�9 1,1+6 96 F 25 ----- --- -- JE PW - _ _ ,_._-_-..-.n...�r,..-ram. .-,a..�a .,._:���r.�'�pp'■■ 15 ,2lm,we ✓ ■ ! F¢ W 10 6`ln71Ml wulmeul taw 1 6 r la 5 ea W`ha .I x rlu NU I Ill gi 2 s� xs F,m 0 0 0400 lisitis , 1100 2+00 - „krip.M- \ \ \ \ 4iT6,4 �� 4+ !. - A IcoNAL MONUMENT jQ / --s-s-m-n-m_a o E%]2•y CSO 1 �: a n-n \-a-s-a-®-a-a-ss-v-s-s- = }ss i _ _:-v-a--n-v-$- ��� " \ IX. CB STD GRARIM T4E6 i B. DI IE. 5-t5A4' I II �; 1 l 1{ VI E5.12WI0-,I \\ BOTT00 IWAlER-12' \� 6�Fu F � ja 1 C MITI TLEILLI'Le A MI B SAW.' OMPRExENSNE PUx) B N6707'19•E 902.02' �I ®I 11 ,r 9 / o I \\�Q ROW \\ a 1 Ip Q �I. Z 8W gtl"`~ ila / S. NORFOLK ST. PIui- .', WIFASUPE / / N B ENEO M / N6T07'19•E 902.02' // / LIxEMX j SWOT LINE- ENO DRIVEWAY- OFF: 2396'Ri 1 1 0 =£ y !« I a 1 CC I EX C B SOLID LID I '�^ I B' DI LE. NW=14.9p - Q RIM-n.2] N� g I B AD5 LE. 5-1..,9 /V CB SiD GRATE IWE I/ ANDP05FpERCURB N, OI I�E. w-t5.85' /S „� �, -- — — �iLH E%. GRAOEJ BEGIN ORNENAY CBn srA l.ez.5v P - GPI OF GG R = DDRT 128 IF 0-�; 12. PVC 5$—y -INSTALL vuLEY_____---A--- OIMER ' - � 0 ce n- . j ----'-1 e GI I.E. —15.,, ---- 0, ----- — — - - - T —1 / ° I ' \ I EX.1 L. UN E ■ 1 ��� iy i= 40?.\ � ,'� . _ °.Ex.1AL�Wiwm� - .rv., ,- > r ° nk,—m.a—mp mF,—nWt sum EX. TEL. LINE area+ E N"9 —..ice. EXfie >m i �� �/ I �nwi, L '' E% 1ELt� ._n,,,,L_ En51I ro n., mn—mx,— TNN mw, nw, nw,— 0, 6 �� \\ I . M �� �IUE� .. .fir IX.c�er.E .tw— EX IGN ` r PROPERtt UNE IYP. R2�mK, ) Rx5 J 1 \\. O 'G UNGEftNGR IELEPHOD'+0 Z 'Iw+'° PO / . O �\ �/ v / REMAIN \ O / — t 0OW GUTTER IX. SIGxnL �� UST RIM .IBOx O 1 \ N. O \ B BEGIN CURB OND GUTTER IX. STOP AND SIDEWALK •. $TA: 80a56.56 �j 2t0• t5 I l 1 \ OFF: 5212'- , + OFF OFF: 526J�Ri --/ 45 n BAR 4 I OFP 5.3,'Lil - '`a w =ns, Nrt, N YY — �, l Na. 0ala s 333 pP. RrvsmD BDw Scale: Horizontal D� Vertical ID P of w' , i�, cc . av' A.: sbv 2 Sill Z. .:AsrNMAL fH\ 9/29/2022 For PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Jab Number 18182 9/29/22 JEP JEP DUB REVISED STORM DESIGN ti8lgilausen Consulting Engineers, Inc. 1821572nd Avenue South Keno WA98032 425251.6222 bergheueenean BDw Sheet R3 al 9 D_ PoPrewb 9/29/22 Do, 5 30 Z 10 1 <11 5 O9 I 3+00 NOTE THE STORM LINE SHALL BE OWNED MNNTAINED BY THE CITY OF 911.1LA 0 LINE SEWER TO REMOIN SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E W.M., CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON EX CB STD GRATE TYPE 1 as (1911-exv) Pw ELEV t 230 4+00 x. CB S: GRATE TYPE II 48 Re CNC I.E.. s-11.491 E=1T.99 N6707'19'E 902.02' RECORD DRAWING lE% EDGE CF PAVEMENT/ / / 5+00 30 F 25 W 20 g215 gF�10 f 5 Ex LOGE 0 PAVEMENT T2' CNC��E. W=6.40 J2" CUC IE. _ a0' I Z NORFOLK ST 267 07'19'E 902.02' ___ r---= — — w uT i INSTALL VALLEY GU (MATCH EXc GRADE) 88 lS 1: PVC NN __ �_'C_���� 0 ROW- 1 I _\\_.. ``` ''• 0 �s WCUT LINE (MATCH EX GRADE) NEW LU GURER -. CB p I o , _.tw1Ex_IN=mp-mm-nWl-Awl-*.1-gym- -n.m-nu'-m..�-X. iELLME if 12' PVC SO In ° •x iEi uN n,W° nat—,aA1� -'R.7-=-- -°-,mr °�, w�-m-�.r-+-:ma-..�pn- — Tnwt • ° >--1s1wel-A °nW,._.�mW1/IO rnJy-rmoEl-uF>m-u1 =,o,u_ooe a,a°�_-2°-ms.-. m o ®1° m'm' '' EX B" • ! _ -. m '"m— �.-u :l - i� ro.o m m / E%. SI B--_mo-_ j El( CB STO GRATE E EX. SIGN) PROPERLY LINE TYR -, 1 E% CB STO E IJ R -1665 E LINE -nw -- twlJ2( PVC' I _ / E=1 45 (NEW\ a p' IN VALLEYUST GUTTTERGI /\ .a EPLACE WITH SOLID RAOJusi RIM TO FG \ ,� `- \ .r.�-nkt-mm- IX FGJ LB Si0 E IJ mh-mm -.rv.t- m USi ^0 n`_--- / nCMR EERIW 1161..8261' 111.1 .27 I.E. N0EIA0911H SOLID ADJURIIMTO te.',' / STA( 5+50.00-, I W 6 3 L Date 30 000 APP/ Revision 9/29/22 JEP JEP DNB REVISED STORM DESIGN n„an,„ 80W summ BOW JEP Dv 9/29/22 Ha _�o aml Vertical Barghausen Consulting Engineers, Inc. 1821572nd Avenue South Kent, WA98032 425251.6222 berghauten.celn F°r PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title' SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Job Number 18182 51199, R4 al 9 6 0. Dale Ck0 Mar. 20 Revision NOTE THE STORM TINE SHALL BE OWNED AND MAINTAINED BY THE CITY 0,U.. 35 1 ao n. 8 1 25 20 a I 15 10 §1 s 0 MI 9/29/22 JEP JEP DNB REVISED STORM DESIGN SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E W.M., CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON 1 TYPE 2-+8' SADD NH i ■ n an a, axl.no • ��'^"a___.... ._....__.ice 119 166 ••1 UST IN IE - 1 62 r6" E) sa (1e" s� a -IE = 1382 (68 IE 62 (16ADJUST RIM TO FG gi a 8 43+00 EX. CB STD GRATE TYPE II 48. 8'.OLJEE_JLIZ Ek e• DI LE. 8,162 I In-=-a-.-.---.-.-a mx. T Cso aoT� ycps 10 / SpTyA1 5+O5.72. ♦SS' Rr / .111 �IE �� Ex. CB STD CRATE TYPE 1 � <"�'/ P.OPSOSED MI' 9IN0 IEB 2' GRINO AND- 1 m ED LINO Lw INED 1 .. w_,200 ROP °:1in� YLAI°ae ry� �/ (OWN AND LEFT TURN LANE �SiA. 5+50.00 // IB INCH STORM LINE OFIMA BY THE TUKWILA) 0.55% 4B7-v 1f m: m • !F 1 ! 1 ill CRATE I _W is _ _ Mr4 �♦•♦•LOO*11�10 /��sR� _ T•_► a W 1 ! Oc 1 1 o EX. CB STD TYP 6' CNC CNCSI.E. E-1362' 16"ADJU I.E. M=TOO 62' IN.ALLEY_GUIIER EG ,. \�•®1 ��.�1�. lilt�141040 � B�D 1 .T ii'_ s® >��- _ �Are �1 ��`•�. ! H y� L. LINE n_.rvo,— —mw1— � .,.,.—nw1—�4a\� / /='^ —�1—�1— —n —nwl—� -6 �.�elrn"—�1N` 'LSD __ Ex_TE 1 .M—<` .-ew, mw1—nw1 Ex L. xN "'" • 6 Ex. 1 HCFENCE -nW Ex nwU�`mPROPERTY LINE C . m— TYPw, Designer) BOW BOW avow aw,oroe °— Dafe 9/29/22 Scale: Horizontal Vertical Ex. CB STD GRATE TYPE IJ —'--' H=1507' e N=1 ADJUST -4.RIM -�.-- nw1—TELINE m. PROPERTY rn UNE ,EXISTING wJ UNDERGROUND /ELT mp E% IEL. LINE 41.75' DJUST RM TOU (17 END/CURB AND OEEI 6+40. RT UIiER ITI Barghausen Consulting Engineers, Inc. 18215 72nd Avenue South Kent, WA98032 425251.6222 barghausineem BEGIN CURB, AND STw 6+G91. aN OFF: 55.13'12T For. PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA RECORD DRAWING Title SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Job Number 18182 Sheet R5 a, 9 7 20 05 30 NOM THE SEdal uE 9W1 EC OWED AND IMP. EO BY TIE MY DP TIIMIA SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E WM, CITES OF TUCWLA AND SEATTLE, KING COUNTY WASHINGTON 25 0. STA:T+28.08- END CURB, GUTTER eua PE. ! ts! 3 100 — 1 � Pi ..di•ie•♦ ♦♦. • ap ETML Oa 8r*. ♦♦♦0 NEW ,0 OxrvEwnv PER siD D iei IFle9w SD. Y — r..11—,Duo D— ..—. — All&- lip 8+00 / / 7 —r gegaso MO aauv —•- _•_._,___,—..- �., I LOT TIAN IOF PROMO NANE —NEWTl ARROWS 7 —a—•-9 —'� --n_N, T.AMZC �D>2�oAND LEGEND PER MKIP SYMBOLS % OF WAY IXci �.0w z_cxc9E wca S NORFOLK ST T, _ EET LIGHT PSDR�,0D TT81lHE5 ER STD P. M4188----___� BACK OF CURB C.P EMT OF WAY PER STD5. DETAIL 50 c^1�9+ooi 1g 1 5 RECORD DRAWING Date Ch Revision 9/20/a JEP ga RINSED STOMA DEMI Devirea Mo,o..a D= ,oD. 9/e2/e2 Scale: Horizontal Vertical Barghausen Consulting Engineers, Inc 1821572nd Avenue South Kent, WA98032 425.251022 b2rgh91o20n.Dom For PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Job Number 18182 Sheet R6 of 9 8 RECORD DRAWING SOUTH NORFOLK STREET PLAN AND PROFILE NOM E WED O B � °URN. PROLOGIS EMERALD GATEWAY {. 1° - 101 THMfM N BY TIP POLL 1 P! 5 \\®\ FF A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHP 23N, RANGE 4E WJd, 1 li CITES OF TU I LA AND SEATTLE, ICING COUNTY WASFNGTON !im 35 = — — 25 i iFa25 1 20 NI 20 _ --� -- 15 1 , 15 10 II'-- iE�-= - 10 1 5 5 C --- - (iz -----� 1 0 g� 1 22 i o 2 S 1g - 1 ,11. 3 _ Q mM=w�l= -.gym w.W—N.—K.—wm— — m_wm w�m mm .W. wm rn., �� � '''� -1\ -ru< �� ° nwl_ "' �w s —m�—r�w�—wm—qw� II NE mm �.ry _ —Lmm E% PDWIIt LIE --- ._-_- --- _�T. E%. GAS LeNE ° E% ° °�E °- % PowERIIN-°-=° SSMiuClrvE.m�___ `° FM nm—.m Fg F°N_« m wm m _wmrcmW/.. RN raniz �c.c 1 a' Ex LINE e seweR PER MMA SYMBOLS RxD IEGEND � .� G. sI' n cxc .w. --_ -m-m omlP 0 REMAIN _ �y-, 1r MI IL fY.WI-6 r (SEALED) % / Sp IOILlg4 LYI'L . IB° SD C� m-m-m-\ • \ , EX 1 Ex • 1B" SD • -. Ro.w. G - 9b ♦ S. S NORFOLK ST w PROPOSED, C ME..... R Mo IffT,Ba1 INC f -li m �\ . ♦ ,., \ t — ,"' — B zBSiRiRi `"- PROPOSED STORM i - STALL STREET LCHi `— d rvfvt - . ;LUA �— �. ° LINE — — � Vt HlIl4 AN CONDUITS AL THEirlite PASS NE (( �,y u O E .°DN€ U WI .. .. J MO M/ IXE '- - % = BACK OF CURB MP) —J� +-� _ gr. 7/ �iapy`t an a IuaW��• Wa� �� : - O �� _ �s�'„moil' i1 � j 'ti WIF)E �6""i ♦ �° iI 7w-©-° +=// 13 Git<P` ARP` _ ialk 3 ----- ill. • $t �`' �e°L ..,g+Az'R i�`I%.rP� cL�PJ ♦ . = •E a^`«� 11 S ., „_4-RElDSL4GTEDG BE _-° I ' 1 -\� l - �% .. —w, nu1, rem mw—nn� lie\ nrol—r�w� ^":'E% P WE uR xE "`°� I POWER ER ec*' RAISE �c�a_--=AiL� _ I\ a%TGU°NiGx D i N- �- //��� / 1 1l i l o. Date By Ckd Appr. Revision Dewed D,,,, Bow oar JEP PoarowJ DKB _ p,,, B/zs//zz $Dole' Horizontal vertical - K� Bq P oe was, ° a , ,rr'.t1 : (x5672 x . ''''' CN% 8/2. For PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Job Number 18182 1 9/29/22 ar JEP DIM IMBED STOMA DESIGN pi BaTghaUSen Consulting Engineers, Inc 18214 W dA 32ue5oulh 98 425.251= WfghouMn.corn 05901 R7 of CI g 9 RECORD DRAWING - SOUTH NORFOLK STREET PLAN AND PROFILE 1• -10' 20 PROLOGIS EMERALD GATEWAY ��� A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E WM, CITIES OF TUCWLA AND SEATTLE, ICING COUNTY WASHNGTON 1 1 35 25 25 la GIN ------- a - 20 1 —°' - 20 i 1 10 • I L1 Io fie Im _� mm _ - _� � aw �. ^_' 8R R� NR li 100 3 ___ _ _ ____________________ __ __ __ __ 1 EX. GAS LINE •-v-v-v-•-a-°-°°°-O-L-v-e-°-v-°-°-° EX. POYIER MNE nwl nun nW mm w) nw o _a= —__ S 13+00 METRo 4KC w)o /4 w/,o' RT. UPPED PE, ------=PIPEE PE /. S .' j IX GS LME °\ 19/ IX_. �8�5`1/ i xA i P `/^ e ®� 14+00 15-F00 15+10 / j / / r \NEW Y' MARKING / FO REFER TO / \ \ ; l 8" WHITE LSE N BARRIER R xE/TBNWB 93 _ —il ETF¢%NC W!0 4. F1My PER NMA SYMBOL�S� GEND x 20.obe "' ¢ \ 3b' GNC I.E. N-10.09' / Ae Cxc I.E. SE=)O.oA �1N\ I mm M4 Nun m4 m.) rry )J.!_—\ ,r, r " . r� dr_ DFE ‘ ‘,.,. 2b9rOOLL AIRPORT WAYS NJNRPo�RWAVK lei AA ,, EL STAATagTo➢5 VO J s NORFOLK 5T 5Tq I5+2]09 A . - 1 I. REFER TO TRAFFIC PUNS FOR DETAILS > sNORFOLK sr aowm_ m m w w O M,xu LOOP (3) NEW TURN ARROWS \\ 'T°LS �1�m E,e )�oO ®�� \� 1:2L FweTR ° aNCGPuxs POR ARKS E NNS 0 TO PAVE °I� �ico0 ox cmrE� PN LEGEND \ 00 - GI2L = OF 12DoRT Sill \ i1• T OFF 12 5 C� ¢ E%. G. LINE KmIX POWER LINEnw) STA 14+I1\8 25.7I'RL PC 41 -----\ NEw NRN ARaows FF \ I LAN NEW CURB AND GUTTER E%. GAS TINE PEP STD P B e A4,0 @ ¢tg \ \9y W, v v • .PER MMA SYMBOLS Ax� EN'11f' ° • v e ° IX p• II, ° ° °_ 2 OYERUT��.a...____,...„...._„ e� C/ rl3 E ��1 ��, r �I ° o\ &Bo N i ,„,:_._ .,.. All w i '�L — t�iL Zvi k N ` ��`p t GAR LNE \y \ FIGHT OF WRY FIGHT OF WRY g(31e w/STatWRO cnATE NEW "ONLY. / LLIROP 3 PER STD PUN gnoa - APJ ST EX CATC BASIN AND CRATE ,� TO BE IN INSTALL NEW 1 ROW CIF WAY 111�O - e r Ex. SIGNAL CABINETS EXISTING �LNE VP R� D iI $q'''• / \\` \ "ge mgry ARaows EM°`�M / -\ V\" 4 '. V ,� 4 svN Is MO LccENO RE cE Ex TREE ro w/RMIN sxs RHEIGHT a \��_� "Fk\+f �t x, e\use\\\ �5 e i •_._ — •_ •_•_•_•I�� TB No. Date By Ckd Appr. Revision sum BL o w, Bow Checked JEP MPro.ee 0— p,„ 9/29/22 Scale. Horizontal Vertical K� Bq oe wSIIC a , z P rIC55Tx Kf� I•° , S/OMAL CNK aroront For PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title SOUTH NORFOLK STREET PLAN AND PROFILE FOR PROLOGIS EMERALD GATEWAY Job Number 18182 1 a/A/22 ar JEP DIM L SOMA DESIGN Barghausen Consulting Engineers, Inc K8214W 9832ue5outh 425.251022 WEghausemoaRL sbPeF R8 of g 10 CONSTRUCTION NOTES AND DETAILS FOR PROLOGIS EMERALD GATEWAY A PORTION OF THE NW AND NE 1/4 OF SECTIONS 03 AND 04, TOWNSHIP 23N, RANGE 4E W.M., CITIES OF TUKWILA AND SEATTLE, KING COUNTY WASHINGTON MASTIC PIPE: GB MIN SEWED SYSTEM. ler MIN BELOW BOTTOM OF WATERMAN 2. NG BEDDING SMALL BE snr mows GRUBBED RocKICSTGPRW5DOT9smwanCOMPACTED TO 90. MAXIMUM DE say. Ue 4. PAVED MEAD: BAGINFILL WITH SW MINDS GRUBBED DDKIDSTO PERWSD0T 9asa*e. 5 UNPAVED ARENS! MCNEILL WM, WIVE MATERIAL APPROVED BE THE ENGINEER GO CRUSHED ROCK DER W5DOT WOG 6. SEP...9110N LESS THAN IS INCHES WW2, BE APPROVED BV THE ENGINEER 6 INCHED OF MAMMA MD SMALL BE DAME °BETWEEN DTILIGES. City of Tukwila UTILITY TRENCH 0-1 ,cz,liggr:grvg;r0= SIALLBEUSED Mil MATERIAL REACIIESP FIRM NO 2. UNPAVED AREA, BACKE. WITH NATIVE WEBER. APPROVED BEIGE ENGINEER OR City of Tukwila UTILITY ADJUSTMENT u" RECORD DRAWING Date Cha MPr. Revision 9/29/22 JEP JEP ONE REWSED STORM DESIGN Dest9n9J Ohm BDW Necked o 1. 9/29/22 Scale: Horizontal Vertical ITI Barghausen Consulting Engineers, Inc. 18215 72nd Avenue South Kent, WA98032 425251.6222 barghawan.com For. PROLOGIS EMERALD GATEWAY 3601 S. NORFOLK STREET SEATTLE, WA Title CONSTRUCTION NOTES AND DETAILS FOR PROLOGIS EMERALD GATEWAY Job Number 18182 Sheet R9 ar 9 11 BILL OF SALE For good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the undersigned, Prologis-Exchange 3301 South Norfolk LLC, a limited liability company organized under the laws of the state of Delaware ("Owner"), does hereby grant, bargain, transfer, sell, assign, convey, and deliver to the City of Tukwila, a Washington municipal corporation ("Grantee"), certain underground storm bypass pipelines and appurtenant facilities installed within the Grantee's right of way, as further described on Exhibit A ("Improvements"), to have and to hold the same for the said Grantee, its successors and assigns forever. Owner hereby covenants that they are the lawful owner of said Improvements; that the same is free from all encumbrances; that all bills for labor and material associated with the same have been paid; that it has the right to sell the same as aforesaid; and that it will warrant and defend the same against the claims and demands of all persons with respect to the foregoing covenants and will pay any costs, including reasonable attorney fees incurred by Grantee, arising out of any such claim or demand. The Improvements are hereby conveyed in consideration of the agreement of Grantee, for itself, its successors and assigns, to accept ownership of the Improvements and to maintain the same as provided for in applicable city ordinances. TO HAVE AND TO HOLD the same unto the said Grantee, its successors and assigns, forever. [Remainder of page intentionally left blank.] 12 IN WITNESS WHEREOF, the Owner has executed this Bill of Sale this day of , 2025. OWNER: PROLOGIS-EXCHANGE 3301 SOUTH NORFOLK LLC, a Delaware limited liability company By: PROLOGIS, L.P., a Delaware limited partnership, its sole member By: PROLOGIS, INC., a Maryland corporation, its general partner By: Jake Maxwell, Vice President STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that Jake Maxwell is the person who appeared before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to execute the instrument and acknowledged it as the Vice President of PROLOGIS, INC., a Maryland corporation, as the general partner of PROLOGIS, L.P., a Delaware limited partnership, as the sole member of PROLOGIS-EXCHANGE 3301 SOUTH NORFOLK LLC, a Delaware limited liability company, to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. DATED: , 2025. Notary Public for the State of Washington residing in (City) (State) Print name: Commission expires: 13 CITY OF TUKWILA, a Washington municipal corporation By: Title: Attest/Authenticated: City Clerk Approved As To Form by City Attorney STATE OF WASHINGTON ) ) ss. COUNTY OF On this day, this record was acknowledged before me by , known to me to be the of the City of Tukwila, the municipal corporation that executed the foregoing document, and acknowledged that they signed the same as their free and voluntary act for the purposes described herein. DATED December , 2025. Name: NOTARY PUBLIC in and for the state of Washington, residing at My commission expires: 14 EXHIBIT A PW22-0033 APPROVED PLAN SET SHEETS R1-R9 15 CITY OF TUKWILA CAPITAL ASSET ACQUISTION FORM INSTRUCTIONS. The Owner or Owner's Representative completes this form for transfer of a capital item to the City. The City Clerk processes the form. TRANSACTION. 1. El DEVELOPER'S AGREEMENT Name: Council Action Dated: 2. El BILL OF SALE Total Construction Cost of Capital Asset: $ $72,088 Grantor: Grantee: 3. 0 OTHER Description: ASSET DESCRIPTION. [ ] Water 0 Sewer ©✓ Storm 0 Curb/Gutter/Sidewalk 0 Other 688 LF of Storm pipe and one type 2 -48" catch basin with saddle manhole. I certify that to the best of my knowledge the above information is true and accurate. Signature — Department Head Date I hereby approve the acceptance of the named asset(s) on behalf of the City. Mayor Date Note: Assets over $40,000 in value require Council action and approval. By council action at a council meeting dated 20 0, the above assets were accepted. Council President ATTEST: City Clerk Date Date DOCUMENTATION ATTACHED: 8 Turnover Request Letter ID Bill of Sale 8 Easements 8 Material List 8 Title Report ID Record Drawings 8 ROW dedication 8 Other: DISTRIBUTION LIST: 8 City Clerk ID Utility Asset Acctg. ID Maint. Div I Utility 16 PROJECT NAME: Prologis Emerald Gateway Storm Bypass PERMIT NO: PW22-0033 MATERIAL LIST DESCRIPTION (length, size, material & type) QUANTITY AVERAGE UNIT COST DATE INSTALLED SERVICE LIFE TOTAL (YRS) ORIGINAL COST TOTAL DEPRECIATION PER YEAR ACCUMLATED DEPRECIATION 688 LF of 18" PVC Storm line 688 $101 05/01/2023 40 $69,488 $1,737.2 $3474.4 CB#1 Type 2- 48" Saddle Manhole 1 $2,600 05/01/2023 40 $2,600 $65 $130 TOTAL COSTS: $72,088 SIGNED: DATED: 3/10/2025 17 CITY OF TUKWILA Public Works Department 206-433-0179 DEVELOPMENT BULLETIN D3 TURNOVER PROCESS Permit Number Applicant/Owner Project Address Parcel Number(s) Date Submitted TURNOVER PROCESS AND DOCUMENT DESCRIPTIONS For turnover of privately built infrastructure to the City of Tukwila, the Owner, or the Owner's authorized agent, submits a completed turnover packet to Public Works 3 weeks before requesting Public Works final inspection. Using the enclosed City of Tukwila forms, provided for your convenience, will help ensure the turnover submittal is complete. Final Inspection will not be scheduled until Public Works receives the turnover submittal. Once the Public Works Department receives the turnover submittal, the Department reviews the submittal for completeness and accuracy. Public Works may request additional information or corrections to the submitted documents. Generally, the review will not hold up Final Inspection. When all the paper work is complete, the Public Works Director presents the request for turnover to the City Council. The acceptance process can take 2-6 weeks. Following acceptance, the City Clerk records the infrastructure documentation. If you have any questions regarding completion of these documents, please contact the Public Works Permit Technician at 206-433-0179. Approved 11/1999 1 18 DEVELOPMENT BULLETIN D3 TURNOVER PROCESS DOCUMENT DESCRIPTION TURNOVER LETTER Purpose: Provides formal request to the City to accept constructed infrastructure and any related rights -of -way and easements as public. Description: A letter addressed to the City of Tukwila requesting acceptance of constructed infrastructure. The letter includes a brief description of the infrastructure and reasons for turnover, for example, public infrastructure required due to development, and description of turnover paperwork being submitted. RECORD DRAWINGS, AS -BUILT PLANS, & VICINITY MAP Purpose: Provides permanent record for City Engineering and Maintenance Divisions. Used by Mayor/Utilities Committee and Council when reviewing the request for turnover. Description: Submit Record Drawing and As -built plans to Public Works on 3.5 diskette in AutoCAD and on 24" x 36 " mylar sheets drawn to scale, with the following inclusions: • Information on record drawings including: locations of existing and abandoned -in -place components, dimensions, slopes, materials, inverts, distances, finished grades and capped utilities • Construction Notes applicable to components of system • Easements • Rights -of -way • Stamped Engineer block with signature BILL OF SALE Purpose: Provides legal instrument for transferring infrastructure and easements/rights-of-way from the Owner to the City. Description: A brief summary of the installed system and attached legal descriptions of easements and rights -of -way. Bill of Sale form enclosed. Note: Documents will be recorded at King County Records. Please ensure all text and signatures are within a 1" margins on all four sides. 2 19 DEVELOPMENT BULLETIN D3 TURNOVER PROCESS CAPITAL ASSETS ACQUISITION FORM Purpose: Processing acceptance and signoff of infrastructure by Public Works/ Administration/Council/Finance. Description: A brief summary of all components installed or constructed and totals construction cost. Capital Asset Acquisition form enclosed. Note: State law requires assets acquired from a special service district to be transferred by ordinance. MATERIAL LIST/INFRASTRUCTURE SPREADSHEET Purpose: Provides complete description and constructed value of infrastructure. The Finance Department uses this to record value of City property. Description: A spreadsheet, which shows a description of each component of the system, the actual constructed cost for each component and the total construction, cost for the system. Spreadsheet must be signed and dated by Owner or authorized agent. Material List form enclosed. EASEMENTS Purpose: Grants City the right to operate, maintain, repair or reconstruct transferred infrastructure on private property. Description: Easement Form and two exhibits. The completed Easement Form must be signed, dated and notarized. The two exhibits are: Exhibit A, a written legal description of the easement and Exhibit B, a schematic plan (8-1/2 X 11) of the easement in relation to the project. Easement (Corporate Form) form enclosed. Note: Documents will be recorded at King County Records. Please ensure all text and signatures are within a 1" margins on all four sides. 3 20 DEVELOPMENT BULLETIN D3 TURNOVER PROCESS DEDICATION OF RIGHT OF WAY Purpose: Grants right of way to the City for the purpose of road classification. Description: Right of way Form and two exhibits. The completed right of way form must be signed, dated and notarized. The two exhibits are: Exhibit A, a written legal description of the Right of Way and Exhibit B, a schematic plan (8-1/2 x11) of the right of way in relation to the project. Dedication of Right-of-way form enclosed. Note: Documents will be recorded at King County Records. Please ensure all text and signatures are within a 1" margins on all four sides. MAINTENANCE BOND Purpose: Security that contractor will maintain and repair constructed infrastructure for a 2-year period. Maintenance Bond provides warranty. Description: Completed Maintenance Bond must be signed and dated. The City determines the bond amount and the Owner may secure the bond by submitting the completed and signed Maintenance Bond Form or by Assignment of Funds. Maintenance Bond Surety Agreement enclosed. 4 21 Bond No: TBD Maintenance Bond KNOW ALL MEN BY THESE PRESENTS, that we PROLOGIS-EXCHANGE 3301 SOUTH NORFOLK LLC hereinafter called Principal, as Principal, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois , hereinafter called Surety, as Surety, are held and firmly bound unto City of Tukwila hereinafter called Obligee in the sum of Ninety Three Thousand Three Hundred Fifteen Dollars and 60/100 ($93.315.60) DOLLARS, lawful money of the United States of America, to be paid to the said Obligee, or its successors or assigns, to the payment of which sum well and truly to be made, we do bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. SIGNED, sealed and dated this TBD day of WHEREAS, the Principal entered into a contract with the said Obligee, dated for Emerald Gateway Storm Bypass - Public Works Permit# PW22-0033 September 8, 2022 and, WHEREAS, the Obligee requires that these presents be executed on or before the final completion and acceptance of said contract and WHEREAS, said contract was completed and accepted on the TBD day of NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall remedy, without cost to the Obligee, any defects which may develop during a period of (01) one year from the date of completion and acceptance of the work performed under the contract, caused by defective or inferior materials or workmanship, then this obligation shall be void: otherwise it shall be and remain in full force and effect. ATTEST: ****PLEASE SEE ATTACHED CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT FOR THE SURETY **** CON130010ZZ060If PROLOGIS- EXCHANGE 3301 SOUTH NORFOLK LLC a Delaware limited liability company By: Authorized Person By: [Name, Title] of Prologis, Inc., a Maryland corporation FIDELITY AND DEPOSIT COMPANY OF MARYLAND By: Tanya Chinchilla , Attorney -in -Fact 22 BARGNAUSEN March 12, 2025 Kerry Murdock Development Engineer City of Tukwila Department of Public Works 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 RE: City Turnover Letter Public Works Permit Application Number PW22-0033 Emerald Gateway - 3301 South Norfolk Street Our Job No. 18182 Dear Kerry: The work associated with permit number PW22-0033 has been completed. The work was inspected and as -built to ensure that it meets or exceeds all city, state and federal requirements The installed infrastructure is ready to turn over ownership to the city of Tukwila. This work includes the installation of approximately 668' of 18" PVC storm line and a storm manhole. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Sincerely, James E. Pullicino Senior Civil Project Manager J P/jd/yg 18182c.065.docx enc: As Noted cc: BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72ND AVENUE SOUTH KENT, WA 98032 P) 425-251-6222 F) 425-251-8782 BRANCH OFFICES: TUMWATER, WA KLAMATH FALLS, OR LONG BEACH, CA ROSEVILLE, CA SAN DIEGO, CA barghausen.com 23