Loading...
HomeMy WebLinkAboutCOW 2025-06-09 Item 4A / 5A - Public Hearing - Resolution Adopting 2026-2031 Transportation Improvement PlanCOUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 06/09/25 JR 06/16/25 JR ITEM INFORMATION ITEM No. 4.A. & 5.A. STAFF SPONSOR: CYNDY KNIGHTON ORIGINAL AGENDA DATE: 06/02/25 AGENDA ITEM TITLE Resolution for Six -Year Transportation Improvement Program (TIP) (2026 - 2031) CATEGORY ❑ Discussion Mtg Date ❑ Motion Mtg Date 0 Resolution ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date 1 Public Hearing ❑ Other Mtg Date Mtg Date 6/16/25 Mtg Date 6/9/25 SPONSOR ❑Council ❑Mayor ❑HR DCD Finance ❑Fire TS P&R ❑Police 0 PW/ ❑Court SPONSOR's The TIP is primarily a financial planning document for projects competing for grants and SUMMARY generally lists only those transportation -related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Council is being asked to approve the Resolution for the 2026 - 2031 Six -Year Transportation Improvement Program. REVIEWED BY r Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ LTAC ❑ Arts Comm. ❑ Parks Comm. DATE: 05/28/2025 COMMITTEE CHAIR: JOVITA ❑ Planning/Economic Dev. ❑ Planning Comm. MCCONNELL RECOMMENDATIONS: SPONSOR/ADMIN. CoMMITrEE Public Works Department Unanimous Approval; Forward to the Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/09/25 06/16/25 MTG. DATE ATTACHMENTS 06/09/25 Informational Memorandum dated 5/23/25 Draft 2026-2031 TIP Summary Draft Resolution 2026-2031 Draft Transportation Improvement Program Minutes from the 5/28/25 Transportation and Infrastructure Services Committee Meeting 06/16/25 1 City of Tukwila Thomas McLeod, Mayor INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Pete Mayer, Interim Public Works Director BY: Cyndy Knighton, Senior Program Manager CC: Mayor McLeod DATE: May 23, 2025 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2026 - 2031) ISSUE Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for 2026 - 2031. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW) 35.77.010. The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer, and local funds. Projects "roll" as funds or stages occur (design report, final design, and construction). Tukwila's Six Year TIP, the Capital Improvement Program (CIP), the Transportation Element, and the Local Road Safety Plan list many of the same transportation -related projects. The TIP generally lists only those transportation -related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. ANALYSIS The attached spreadsheet is the "Draft" 2026 - 2031 TIP and was created by modifying the 2025 - 2030 TIP to add or remove projects and adjust project costs. No prioritization was assigned, and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the current CIP. Three projects were removed. Two new projects were added, all but one fully funded with recently awarded grants. Added: Deleted Southcenter Blvd Road Diet Allentown Truck Reroute EIS S 124th St/50th PI S Reconfiguration Southcenter Blvd/65th Ave S Signal Keeping South King County Moving w/TDM FINANCIAL IMPACT None. RECOMMENDATION Council is being asked to approve the Resolution for the 2026 - 2031 Six -Year Transportation Improvement Program and consider this item at a Public Hearing at the June 9, 2025, Committee of the Whole and subsequent June 16, 2025, Regular Meeting. ATTACHMENTS: • Draft 2026-2031 TIP Summary • Draft Resolution • Resolution Exhibit: 2026-2031 Draft Transportation Improvement Program • Current Adopted 2025-2030 TIP (Res. 2099) (Link Only) 2 DRAFT 2026 - 2031 TIP SUMMARY 2025-2030 CIP Sheet PROJECT TITLE Project Costs in Thousands of Dollars Funding Sources Unsecured 2026 2027 2028 2029 2030 2031 TOTAL Federal State/TIB City/Local Grant City* 39 '42nd Avenue S Bridge Replacement 1,501 100 20,900 20,900 0 0 43,401 25,000 17,000 1,401 13,000 1,000 47 42nd Avenue S Bikeway 295 0 0 0 0 0 295 295 30 46th Avenue Safe Routes to School 325 2,070 0 0 0 0 2,395 1,895 500 1,895 410 49 ADA Improvements 61 61 61 61 61 61 366 366 305 54 APE/Minkler Blvd Intersection 265 2,400 0 0 0 0 2,665 1,920 745 1,920 493 58 APE/Industry Drive Intersection 180 1,400 0 0 0 0 1,580 1,100 480 1,100 300 45 Annual Bridge Inspections and Repairs 222 232 237 242 245 245 1,423 1,423 1,158 35 Annual Overlay and Repair Program 0 2,520 2,520 2,720 2,860 2,870 13,490 13,490 13,490 43 Annual Traffic Signal Program 130 160 160 170 180 190 990 990 860 38 Boeing Access Road Overlay 564 3,426 0 0 0 0 3,990 3,990 - 57 E Marginal Way S (BAR - S 112th St) 75 0 0 0 0 0 75 75 52 Interurban Avenue S Overlay 669 4,560 0 0 0 0 5,229 4,958 271 271 31 Macadam Road S Complete Streets 0 300 200 3,100 0 0 3,600 3,240 360 3,240 360 44 Orillia Road S Overlay 105 1,204 0 0 0 0 1,309 1,309 - 41 S 119th St Pedestrian Bridge Painting 200 0 0 0 0 0 200 200 55 S 124th St/50th PIS Reconfiguration 275 1,850 0 0 0 0 2,125 1,300 825 1,300 550 59 S 133rd St/SR 599 SB Intersection 0 0 550 2,700 0 0 3,250 1,620 1,630 1,620 1,630 53 S 144th St Bridge Sidewalks 579 2,720 0 0 0 0 3,299 2,500 799 2,000 720 28 S 152nd Street Ped & Bike Improvements 500 3,000 0 0 0 0 3,500 2,500 1,000 2,500 500 37 S Ryan Way 900 12,800 0 0 0 0 13,700 5,300 5,000 3,400 10,300 2,900 South King County Regional TDM 130 0 0 0 0 0 130 116 4 10 48 Southcenter Blvd Bikeway and Ped Xing Upgrades 325 0 0 0 0 0 325 325 46 Southcenter Blvd Road Diet 135 2,755 0 0 0 0 2,890 2,383 507 2,383 372 TDM Implementation 46 47 47 47 46 46 279 279 187 Tukwila and South King County TDM 213 351 351 351 138 1,404 550 832 22 416 11 TOTAL 7,695 41,956 25,026 30,291 3,530 3,412 111,910 43,723 38,794 28,585 41,258 25,319 PROJECTS REVISED FROM 2025-2030 TIP New Southcenter Blvd Road Diet S 124th St/50th PI S Reconfiguration Deleted/Completed: Allentown Truck Reroute EIS Project Southcenter Blvd/65th Ave S Signal Keeping South King County Moving w/TDM * Unsecured City funding includes all funds necessary outside of the current biennial budget cycle Modified S 152nd Street Ped & Bike Improvements (name change) W May 22, 2025 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTIN SIX -YEAR TRANSPORTATION IMPROVEMENT P - RAM (2026- 2031), AND DIRECTING THE SAME T' - FILED WITH THE STATE SECRETARY OF TR ' 0 TION AND THE TRANSPORTATION IMPR• ENT BC). RD. WHEREAS, pursuant to the requirements ' , ' Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously - •ted a Transportation Improvement Program and thereafter periodically moa aid portation Improvement Program by resolution; and WHEREAS, the City Cou program, determined curren these findings, has prepare ensuing six calendar ye. 20 re mowed the work accomplished under said Cit 'treet and arterial needs and, based upon 'nsportation Improvement Program for the 31); and WHEREAS, o . ne 9, 2 a . , blic hearing was held regarding the City's Six -Year Transportation Imp NOW, THEREFORE E CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY SOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2026 to 2031, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington 2025 Legislation: 2025-2030 TIP Version: 03/25/2025 Staff: C. Knighton 4 Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2025. ATTEST/AUTHENTICATED: Andy Youn-Barnett, CMC, City Clerk Tosh Sharp, Council President APPROVED AS TO FORM BY: Filed with thr City Clerk: Passed b% .iie City Council: Resoluf ,r, 'umber: Office of the City Attorney Exhibit A: City of Tukwila Six -Year Transportation vement Program for 2026 to 2031 2025 Legislation: 2025-2030 TIP Version: 03/25/2025 Staff: C. Knighton Page 2 of 2 5 0) wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 / 1037(004) TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Design and construct a replacement structure for the existing 42nd Ave S Bridg adjacent to the Tukwila Community Center 06/09/25 06/16/25 11 0.100 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S PE 2026 BR 1,40� 0 100,000 1,500,694 S RW 2027 0 0 100,000 100,000 P CN 2027 BR 13,000,000 0 1,000,000 14,000,000 S CN 2027 BR 10,599,306 A 17,000,000 200,000 27,799,306 Totals 25,000,000 ilk00,000 1,400,000 43,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 51 h PE 1,500,694 0 0 0 0 RW 0 100,000 0 0 0 CN 0 0 20,899,653 20,899,653 0 Totals 1,500,694 100,000 20,899,653 20,899,653 0 Report Date: May 22, 2025 Page 1 Wwasningtan state A Tr Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 -15812 42nd Avenue S Bikeway 42nd Avenue S Southcenter Blvd to S 150th Street Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and Southcenter Blvd. On the west side of the street, add striped southbound bike lane between Southcenter Blvd and S 150th St. On the east side of the street, add striped bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to widen the sidewalk on the east side of the street between S 151 st St and S 150th St, creating a shared path; add shared lane markings to the roadway 06/09/25 06/16/25 28 C G P S T W No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Stand Co to Funds Local Funds Total Funds S CN 2026 0 Totals 0 0 295,000 295,000 0 295,000 295,000 Expenditure Schedule )00IrN 0 0 Phase 1st 2nd 3rd 4th CN 295,000 0 0 0 Totals 295,000 0 0 0 Report Date: May 22, 2025 Page 2 00 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 -1111: 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/09/25 06/16/25 05 C G P S T W 0.370 Yes Funding ' Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds F Code State Funds Local Funds Total Funds P PE 2026 0 S 170,000 80,000 250,000 P RW 2026 0 TS 65,000 10,000 75,000 P CN 2027 0 RT 1,660,000 410,000 2,070,000 Totals 0 �95,000 500,000 2,395,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5 th PE 250,000 0 0 0 0 RW 75,000 0 0 0 0 CN 0 2,070,000 0 0 0 Totals 325,000 2,070,000 0 0 0 Report Date: May 22, 2025 Page 3 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjuncts with a City developed plan. 06/09/25 06/16/25 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S ALL 2026 . 0 600,000 600,000 Totals 0 0 600,000 600,000 Expenditure Schedule �441‘ .10 Phase 1st 2nd 3rd 5t th ALL 61,000 61,000 61,000 61,000 122,000 Totals 61,000 61,000 61,000 61,000 000 Report Date: May 22, 2025 Page 4 CO wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 -07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/09/25 06/16/25 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu le ode State Funds Local Funds Total Funds S PE 2026 . 0 190,000 190,000 S RW 2026 0 0 75,000 75,000 P CN 2027 0 IB 1,920,000 493,000 2,413,000 Totals 0 1,920,000 758,000 2,678,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & PE 190,000 0 0 0 RW 75,000 0 0 0 0 CN 0 2,400,000 0 0 0 Totals 265,000 2,400,000 0 0 0 Report Date: May 22, 2025 Page 5 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 -15107 Andover Park East/Industry Dr Intersection Andover Park E Industry Drive to Design and construct traffic signal with Andover Park East left turn lanes and crosswalks. 06/09/25 _ 06/16/25 03 C G P S T W 0.100 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun to F Code State Funds Local Funds Total Funds S PE 2026 0 0 180,000 180,000 S RW 2026 0 0 70,000 70,000 P CN 2027 0 IB 1,100,000 300,000 1,400,000 Totals 0 1,100,000 550,000 1,650,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th PE 110,000 0 0 0 0 RW 70,000 0 0 0 0 CN 0 1,400,000 0 0 0 Totals 180,000 1,400,000 0 0 0 Report Date: May 22, 2025 Page 6 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/09/25 06/16/25 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S ALL 2026 . 0 1,380,000 1,380,000 Totals 0 0 1,380,000 1,380,000 Expenditure Schedule Phase 1st 2nd 3rd 4tN1‘ 5t th ALL 222,000 232,000 237,000 242,000 489,000 Totals 222,000 232,000 237,000 242,000 000 Report Date: May 22, 2025 Page 7 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/09/25 06/16/25 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S ALL 2026 . 0 16,100,000 16,100,000 Totals 0 0 16,100,000 16,100,000 Expenditure Schedule �441‘ .10 Phase 1st 2nd 3rd 505 ALL 0 2,520,000 2,520,000 2,720,000 730,000 Totals 0 2,520,000 2,520,000 2,720,000 000 Report Date: May 22, 2025 Page 8 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 -15104 Annual Traffic Signal Program Varies to Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work;loop replacement, head replacement, and controllers. Replace direct bury cable for existing lighting system. 06/09/25 _ 06/16/25 44 P No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun to F Code State Funds Local Funds Total Funds S ALL 2026 0 0 1,120,000 1,120,000 Totals 0 0 1,120, 000 1,120, 000 Expenditure Schedule Phase 1st 2nd 3rd 5th ALL 130,000 160,000 160,000 170,000 0,000 Totals 130,000 160,000 160,000 170,000 0 Report Date: May 22, 2025 Page 9 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1380(005) TUK-68 Boeing Access Road Overlay Boeing Access Road East Marginal Way S to Martin Luther King Jr Way S Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF railway. 06/09/25 06/16/25 05 0.560 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S PE 2026 NHPP 56• .. 0 0 564,000 S CN 2027 NHPP 3,426,000 0 0 3,426,000 Totals 3,990,000 0 0 3,990,000 Expenditure Schedule Phase 1st 2nd 3rd 4 5th & PE 564,000 0 0 0 0 CN 0 3,426,000 0 0 Totals 564,000 3,426,000 0 0 0 Report Date: May 22, 2025 Page 10 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 -15109 E Marginal Way S (BAR - S 112 St) E Marginal Way S Boeing Access Road to S 112th St Planning phase to determine project parameters. Goal is to design and construct I street improvements and traffic control. Could include additional lanes and bike lanes to support the new Sound Transit Link Light Rail infill station. 06/09/25 06/16/25 03 C G O P S TW 0.270 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds F Code State Funds Local Funds Total Funds S PL 2026 0 0 75,000 75,000 Totals 0 0 75,000 75,000 Expenditure Schedule N Phase 1st 2nd 3rd 4t 5th & PL 75,000 0 0 0 0 Totals 75,000 0 0 0 Report Date: May 22, 2025 Page 11 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1391(004) TUK-66 Interurban Avenue S Overlay Interurban Avenue S E Marginal Way S to S 143rd Street Complete pavement repairs, overlay, and curb and gutter repair. 06/09/25 06/16/25 05 2.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S PE 2026 NHPP .. 0 0 668,386 S CN 2027 NHPP 4,288,.14 0 271,386 4,560,000 Totals 4,957,000 0 271,386 5,228,386 Expenditure Schedule Phase 1st 2nd 3rd 5th 11* 0 0 PE 668,386 0 0 CN 0 4,560,000 0 0 0 Totals 668,386 4,560,000 0 0 0 Report Date: May 22, 2025 Page 12 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m co g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 -1111( Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widenin and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides o the roadway. Includes illumination, curb, and storm drainage. 06/10/24 _ 06/17/24 2099 04 0.350 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun to F Code State Funds Local Funds Total Funds P PE 2027 0 Pe rogram 350,000 50,000 400,000 P RW 2028 0 Ped/ Progra 90,000 10,000 100,000 P CN 2029 0 Pe e Pr 2,800,000 300,000 3,100,000 Totals 0 £240,000 360,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th PE 0 300,000 100,000 0 0 RW 0 0 100,000 0 0 CN 0 0 0 3,100,000 0 Totals 0 300,000 200,000 3,100,000 0 Report Date: May 22, 2025 Page 13 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1230(007) TUK-67 Orillia Road South Overlay Orillia Road S S 188th Street to S 204th Street Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardr repair. 06/09/25 06/16/25 05 0.750 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fu ode State Funds Local Funds Total Funds S PE 2026 NHPP 10 .. 0 0 105,000 S CN 2026 NHPP 1,204,000 0 0 1,204,000 Totals 1,309,000 0 0 1,309,000 Expenditure Schedule Phase 1st 2nd 3rd 4 5th & PE 105,000 0 0 0 0 CN 0 1,224, 000 0 0 Totals 105,000 1,224,000 0 0 0 Report Date: May 22, 2025 Page 14 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m co g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 13494 S 119th St Pedestrian Bridge Painting S 119th Street Bridge West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. 06/09/25 _ 06/16/25 06 0.040 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun to F Code State Funds Local Funds Total Funds P CN 2026 0 0 200,000 200,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd Sth CN 200,000 0 0 0iii Totals 200,000 0 0 0 0 Report Date: May 22, 2025 Page 15 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 -16476 S 124th St/50th PI S Reconfiguration S 124th Street 49th Ave S to 51 st PI S Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th 51 st, new paved shoulder walkway on south side of 124th connecting to existing walkway on west side of 50th Pk, new stormwater treatment/rain garden in old slip lane ROW. 06/09/25 06/16/25 21 0.140 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Code State Funds Local Funds Total Funds S PE 2026 0 0 275,000 275,000 P CN 2027 0 IB 1,300,000 550,000 1,850,000 Totals 0 1300,000 825,000 2,125,000 Expenditure Schedule lN)i 0 0 Phase 1st 2nd 3rd 4th PE 275,000 0 0 0 CN 0 1,850,000 0 0 Totals 275,000 1,850,000 0 0 Report Date: May 22, 2025 Page 16 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 -15108 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 SB Ramp to Design and construct intersection improvements, which could include a new traffic signal a roundabout, lighting,, peddestrianian facilities, and drainage. 06/09/25 06/16/25 03 C G O P S TW 0.100 Yes Funding ' Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds F Code State Funds Local Funds Total Funds P PE 2028 0 0 400,000 400,000 P RW 2028 0 0 150,000 150,000 P CN 2029 0 TIB 1,620,000 1,080,000 2,700,000 Totals 0 �20,000 1,630,000 3,250,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5 th PE 0 0 400,000 0 0 RW 0 0 150,000 0 0 CN 0 0 0 2,700,000 0 Totals 0 0 550,000 2,700,000 0 Report Date: May 22, 2025 Page 17 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 TUK-65 S 144th Street Bridge Sidewalks S 144th Street Bridge 51st Ave S to 53rd Ave S The project entails replacing approximately 320 feet of raised bridge deck on the 144th street bridge with 6-foot-wide sidewalks, which will be separated from the traffic lanes by a crash tested barrier and a pedestrian railing. Sharrows will also be added to the traffic lanes for bicycle traffic. 06/09/25 06/16/25 28 0.060 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Code State Funds Local Funds Total Funds S PE 2026 STBG(UL) 500,000 0 79,000 579,000 P CN 2027 SRTS 2,000,000 0 720,000 2,720,000 Totals 2,500,000 0 799,000 3,299,000 Expenditure Schedule j0 Phase 1st 2nd 3rd 4th PE 579,000 0 0 0CN 0 2,720,000 0 0 Totals579,0002,720,0000 00 Report Date: May 22, 2025 Page 18 Wwasningtan state A Tr Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 -1111; S 152nd Street Pedestrian and Bike Improvements S 152nd Street Tukwila International Blvd to 42nd Avenue S Install curb, gutter, shared use path and sidewalks on S 152nd Street, including widening pavement and construction of a buffer between the roadway and sidewalk on the south side. 06/09/25 06/16/25 05 C G O P S TW 0.300 Yes Funding ' Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds F Code State Funds Local Funds Total Funds S PE 2026 0 0 274,000 274,000 S RW 2026 0 0 200,000 200,000 P CN 2027 0 TIB 2,500,000 500,000 3,000,000 Totals 0 ri00,000 974,000 3,474,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5 th PE 270,000 0 0 0 0 RW 230,000 0 0 0 0 CN 0 3,000,000 0 0 0 Totals 500,000 3,000,000 0 0 0 Report Date: May 22, 2025 Page 19 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 -15829 S Ryan Way SR 900 to 51st Ave S Resurface and rechannel S Ryan Way to improve failing pavement and improve safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection with 47th Avenue S to accommodate future growth and improve safety. 06/09/25 06/16/25 06 C G P S T W 0.500 No Funding ' Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds F Code State Funds Local Funds Total Funds S PE 2026 0 0 500,000 500,000 P PE 2026 SRTS 100,000 0 0 100,000 P RW 2026 SRTS 200,000 0 100,000 300,000 P CN 2027 SRTS 5,000,000 00,000 2,800,000 12,800,000 Totals 5,300,000 000 3,400,000 13,700,000 Expenditure Schedule Phase 1st 2nd 3rd 4th & 6th PE 600,000 0 0 0 0 RW 300,000 0 0 0 0 CN 0 12,800,000 0 0 0 Totals 900,000 12,800,000 0 0 0 Report Date: May 22, 2025 Page 20 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-64 06/09/25 South King County TDM South King County N/A to N/A This project will provide TDM programming and services at selected activity cen in Tukwila and partnering South King County jurisdictions. Activity centers include community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions. For example, places such as Tukwila International Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation resources and incentives, the project will encourage people to choose sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM services will be provided to residents, commuters, and visitors, targeting those willing and able to try sustainable modes of transportation. The 1111(lict program will work in partnership with partner agencies, nonprofits, employers, and community organizations. 06/16/25 A' 24 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State F d Code StatLocal Funds Total Funds S PL 2026 CMAQ 449,567 OTHER 4 50,000 )J*IIIIIL 519,731 Totals 449,567 0, 50,000 519,731 Expenditure Schedule ih Phase 1st 2nd 3rd 4th & 6th PL 129,933 0 0 0 0 Totals 129,933 0 0 0 0 Report Date: May 22, 2025 Page 21 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 -15813 Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades Southcenter Boulevard International Boulevard to 42nd Avenue S Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half - mile of Tukwila International Boulevard Station (TIBS). Re-channelize to 11 ft general purposeslanes accommodate separatedrten f curb and .post)dd bike lanes. Tighten intersection with 40th Ave S to shorten crossing distance. Add bike channelization and upgrade to high -visibility crosswalk markings at Southcenter Blvd/TIBS station entrance and Southcenter Blvd/42nd Ave S intersections. 06/09/25 06/16/25 28 C G P S T W No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Stand Co to Funds Local Funds Total Funds S CN 2026 0 Totals 0 0 325,000 325,000 0 325,000 325,000 Expenditure Schedule )00IrN 0 0 Phase 1st 2nd 3rd 4th CN 325,000 0 0 0 Totals 325,000 0 0 0 Report Date: May 22, 2025 Page 22 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 -16478 Southcenter Blvd Road Diet (with Lake to Sound Regional Trail) Southcenter Boulevard S 66th Ave to 53rd Ave S As part of the King County led Lake to Sound Regional Trail F1 Phase, narrow Southcenter Blvd from 5 lanes to 3 lanes between approx. 62nd Ave S and 66th Ave S. Reconfigure signal operations at 66th Ave S to include dual WB left turn lanes and a single WB thru lane. All lanes will generally shift to the south of the existing ROW to allow for construction of the Lake to Sound trail and trail buffering. 06/09/25 06/16/25 28 C G O P S TW 0.930 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Stat d Cod tate Funds Local Funds Total Funds S PE 2026 0 0 135,000 135,000 P CN 2027 0 T 372,000 2,755,000 Totals 0 %8k3,000 3,000 507,000 2,890,000 Expenditure Schedule Phase 1st 2nd 3rd 4thdN e PE 135,000 0 0 0 0 CN 0 2,755,000 0 0 0 Totals 135,000 2,755,000 0 0 0 Report Date: May 22, 2025 Page 23 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 -13491 Transportation Demand Management Implementation to Provision of TDM services to Commute Trip Reduction -affected employment sit Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. 06/09/25 06/16/25 44 0.000 No Funding Nislo Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Code State Funds Local Funds Total Funds S ALL 2026 OT 93,300 0 93,300 P ALL 2027 0 DOT 186,600 0 186,600 Totals 0 279,900 0 279,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th ALL 46,650 46,650 46,650 46,650 , 65,09 , Totals 46,650 46,650 46,650 46,650 4,665,093,300 Report Date: May 22, 2025 Page 24 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-69 Tukwila and South King County TDM Tukwila and South King County N/A to N/A This project will provide TDM programming and services to help people access sustainable transportation options that reduce drive -alone travel and traffic in alyaTukwila and South nt King Conty. Tukwila's TDM l Program roushes people regionally people regionally at employment centers, community hubs, multifamily housing ing complexes, and educational institutions. 06/09/25 06/16/25 24 0.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Sta d Code State Funds Local Funds Total Funds S PL 2026 0 DOT 416,000 10,700 426,700 S PL 2027 CMAQ 550,000 0 0 550,000 P PL 2028 0 416,000 10,700 426,700 Totals 550,000 000 21,400 1,403,400 Expenditure Schedule Phase 1st 2nd 3rd 4th 6th ALL 213,350 350,850 350,850 350,850 137,500 Totals 213,350 350,850 350,850 350,850 137,500 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 44,055,567 39,090,064 32,140,786 115,286,417 Report Date: May 22, 2025 Page 25 Transportation & Infrastructure Services Committee Minutes May 28, 2025 F. Grant Award: Gilliam Creek Fish Barrier Removal and Habitat Enhancement Staff is seeking approval to accept a Recreation and Conservation Office Brian Abbot Fish Barrier Removal Board award in the amount of $300,000 for preliminary design of the project. Committee Recommendation Majority approval. Forward to June 2, 2025 Regular Meeting Consent Agenda. G. Resolution: Annual Six -Year Transportation Improvement Program *Staff is seeking approval of the annual resolution adopting the TIP for 2026-2031. Committee Recommendation Majority approval. Forward to June 9, 2025 Committee of the Whole The meeting adjourned at 6:35 p.m. IfVf Committee Chair Approval Minutes by LH 31