HomeMy WebLinkAboutReg 2025-06-16 Item 4E - Resolution - 2026-2031 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS Initials [Meeting Date Prepared by Mayor's review Conned review 06/09/25 JR 06/16/25 JR ITEM INFORMATION ITEM No. 4.E. STAFF SPONSOR: CYNDY KNIGHTON ORIGINAL AGENDA DATE: 06/09/25 AGENDA ITEM TITLE Resolution for Six -Year Transportation Improvement Program (TIP) (2026 - 2031) CATEGORY ❑ Discussion Mtg Date ❑ Motion Mfg Date L Resolution ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date II Public Hearing ❑ Other Mtg Date Mtg Date 6/16/25 Mtg Date 6/9/25 SPONSOR ❑Council ❑Mayor HR DCD ❑Finance Fire ❑TS P&R Police 11 PW ❑Court SPONSOR'S The TIP is primarily a financial planning document for projects competing for grants and SUMMARY generally lists only those transportation -related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Council is being asked to approve the Resolution for the 2026 - 2031 Six -Year Transportation Improvement Program. REVIEWED BY r Trans&Infrastructure CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev. ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. 05/28/2025 COMMITTEE CHAIR: JOVITA MCCONNELL ❑ LTAC DATE: RECOMMENDATIONS: SPONsoR/ADMIN. COMMITTEE Public Works Department Majority Approval; Forward to the Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/09/25 Forward to next Regular Meeting Consent Agenda 06/16/25 MTG. DATE ATTACHMENTS 06/09/25 Informational Memorandum dated 5/23/25 Draft 2026-2031 TIP Summary Draft Resolution 2026-2031 Draft Transportation Improvement Program Minutes from the 5/28/25 Transportation and Infrastructure Services Committee Meeting 06/16/25 Final Resolution 143 City of Tukwila Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2026- 2031), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2026-2031); and WHEREAS, on June 9, 2025, a public hearing was held regarding the City's Six -Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2026 to 2031, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington 2025 Legislation: 2025-2030 TIP Version: 03/25/2025 Staff: C. Knighton 144 Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2025. ATTEST/AUTHENTICATED: Andy Youn-Barnett, CMC, City Clerk Tosh Sharp, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Office of the City Attorney Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2026 to 2031 2025 Legislation: 2025-2030 TIP Version: 03/25/2025 Staff: C. Knighton Page 2 of 2 145 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 / 1037(004) TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over the Duwamish River Interurban Ave S to Northern end of bridge Design and construct a replacement structure for the existing 42nd Ave S Bridge adjacent to the Tukwila Community Center 06/09/25 06/16/25 2117 11 0.100 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 BR 1,400,694 0 100,000 1,500,694 S RW 2027 0 0 100,000 100,000 P CN 2027 BR 13,000,000 0 1,000,000 14,000,000 S CN 2027 BR 10,599,306 MAW 17,000,000 200,000 27,799,306 Totals 25,000,000 17,000,000 1,400,000 43,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 1,500,694 0 0 0 0 RW 0 100,000 0 0 0 CN 0 0 20,899,653 20,899,653 0 Totals 1,500,694 100,000 20,899,653 20,899,653 0 Report Date: June 09, 2025 Page 1 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 WA-15812 42nd Avenue S Bikeway 42nd Avenue S Southcenter Blvd to S 150th Street Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and Southcenter Blvd. On the west side of the street, add striped southbound bike lane between Southcenter Blvd and S 150th St. On the east side of the street, add striped bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to widen the sidewalk on the east side of the street between S 151 st St and S 150th St, creating a shared path; add shared lane markings to the roadway 06/09/25 06/16/25 2117 28 C G P S T W No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2026 0 0 295,000 295,000 Totals 0 0 295,000 295,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 295,000 0 0 0 0 Totals 295,000 0 0 0 0 Report Date: June 09, 2025 Page 2 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-1111: 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/09/25 06/16/25 2117 05 C G P S T W 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 SRTS 170,000 80,000 250,000 P RW 2026 0 SRTS 65,000 10,000 75,000 P CN 2027 0 SRTS 1,660,000 410,000 2,070,000 Totals 0 1,895,000 500,000 2,395,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 250,000 0 0 0 0 RW 75,000 0 0 0 0 CN 0 2,070,000 0 0 0 Totals 325,000 2,070,000 0 0 0 Report Date: June 09, 2025 Page 3 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/25 06/16/25 2117 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2026 0 0 600,000 600,000 Totals 0 0 600,000 600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 61,000 61,000 61,000 61,000 122,000 Totals 61,000 61,000 61,000 61,000 122,000 Report Date: June 09, 2025 Page 4 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/09/25 06/16/25 2117 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 190,000 190,000 S RW 2026 0 0 75,000 75,000 P CN 2027 0 TIB 1,920,000 493,000 2,413,000 Totals 0 1,920,000 758,000 2,678,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 190,000 0 0 0 0 RW 75,000 0 0 0 0 CN 0 2,400,000 0 0 0 Totals 265,000 2,400,000 0 0 0 Report Date: June 09, 2025 Page 5 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 WA-15107 Andover Park East/Industry Dr Intersection Andover Park E Industry Drive to Design and construct traffic signal with Andover Park East left turn lanes and crosswalks. 06/09/25 06/16/25 2117 03 C G P S T W 0.100 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 180,000 180,000 S RW 2026 0 0 70,000 70,000 P CN 2027 0 TIB 1,100,000 300,000 1,400,000 Totals 0 1,100,000 550,000 1,650,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 110,000 0 0 0 0 RW 70,000 0 0 0 0 CN 0 1,400,000 0 0 0 Totals 180,000 1,400,000 0 0 0 Report Date: June 09, 2025 Page 6 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA-03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/09/25 06/16/25 2117 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2026 0 0 1,380,000 1,380,000 Totals 0 0 1,380,000 1,380,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 222,000 232,000 237,000 242,000 489,000 Totals 222,000 232,000 237,000 242,000 489,000 Report Date: June 09, 2025 Page 7 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID co t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/09/25 06/16/25 2117 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2026 0 0 16,100,000 16,100,000 Totals 0 0 16,100,000 16,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 2,520,000 2,520,000 2,720,000 5,730,000 Totals 0 2,520,000 2,520,000 2,720,000 5,730,000 Report Date: June 09, 2025 Page 8 1,7wasningtan state 40 Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-15104 Annual Traffic Signal Program Varies to Design and construct traffic signal upgrades and repairs of signals that exceed routine maintenance work;loop replacement, head replacement, and controllers. Replace direct bury cable for existing lighting system. 06/09/25 06/16/25 2117 44 P No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2026 0 0 1,120,000 1,120,000 Totals 0 0 1,120, 000 1,120, 000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 130,000 160,000 160,000 170,000 370,000 Totals 130,000 160,000 160,000 170,000 370,000 Report Date: June 09, 2025 Page 9 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1380(005) TUK-68 Boeing Access Road Overlay Boeing Access Road East Marginal Way S to Martin Luther King Jr Way S Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF railway. 06/09/25 06/16/25 2117 05 0.560 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 564,000 0 0 564,000 S CN 2027 NHPP 3,426,000 0 0 3,426,000 Totals 3,990,000 0 0 3,990,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 564,000 0 0 0 0 CN 0 3,426,000 0 0 0 Totals 564,000 3,426,000 0 0 0 Report Date: June 09, 2025 Page 10 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID co t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 WA-15109 E Marginal Way S (BAR - S 112 St) E Marginal Way S Boeing Access Road to S 112th St Planning phase to determine project parameters. Goal is to design and construct full street improvements and traffic control. Could include additional lanes and bike lanes to support the new Sound Transit Link Light Rail infill station. 06/09/25 06/16/25 2117 03 C G O P S TW 0.270 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2026 0 0 75,000 75,000 Totals 0 0 75,000 75,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 75,000 0 0 0 0 Totals 75,000 0 0 0 0 Report Date: June 09, 2025 Page 11 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1391(004) TUK-66 Interurban Avenue S Overlay Interurban Avenue S E Marginal Way S to S 143rd Street Complete pavement repairs, overlay, and curb and gutter repair. 06/09/25 06/16/25 2117 05 2.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 668,386 0 0 668,386 S CN 2027 NHPP 4,288,614 0 271,386 4,560,000 Totals 4,957,000 0 271,386 5,228,386 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 668,386 0 0 0 0 CN 0 4,560,000 0 0 0 Totals 668,386 4,560,000 0 0 0 Report Date: June 09, 2025 Page 12 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m co g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA-1111( Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/10/24 06/17/24 2117 04 0.350 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 Ped/Bike Program 350,000 50,000 400,000 P RW 2028 0 Ped/Bike Program 90,000 10,000 100,000 P CN 2029 0 Ped/Bike Program 2,800,000 300,000 3,100,000 Totals 0 3,240,000 360,000 3,600,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 300,000 100,000 0 0 RW 0 0 100,000 0 0 CN 0 0 0 3,100,000 0 Totals 0 300,000 200,000 3,100,000 0 Report Date: June 09, 2025 Page 13 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 / 1230(007) TUK-67 Orillia Road South Overlay Orillia Road S S 188th Street to S 204th Street Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail repair. 06/09/25 06/16/25 2117 05 0.750 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 NHPP 105,000 0 0 105,000 S CN 2026 NHPP 1,204,000 0 0 1,204,000 Totals 1,309,000 0 0 1,309,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 105,000 0 0 0 0 CN 0 1,224, 000 0 0 0 Totals 105,000 1,224,000 0 0 0 Report Date: June 09, 2025 Page 14 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID co co g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA13494 S 119th St Pedestrian Bridge Painting S 119th Street Bridge West bank Duwamish River to East bank Duwamish River Ongoing maintenance of the S 119th Street Pedestrian Bridge in the Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance needed. 06/09/25 06/16/25 2117 06 0.040 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2026 0 0 200,000 200,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 200,000 0 0 0 0 Totals 200,000 0 0 0 0 Report Date: June 09, 2025 Page 15 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 WA-16476 S 124th St/50th PI S Reconfiguration S 124th Street 49th Ave S to 51 st PI S Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to 51 st, new paved shoulder walkway on south side of 124th connecting to existing walkway on west side of 50th Pk, new stormwater treatment/rain garden in old slip lane ROW. 06/09/25 06/16/25 2117 21 0.140 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 275,000 275,000 P CN 2027 0 TIB 1,300,000 550,000 1,850,000 Totals 0 1,300,000 825,000 2,125,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 275,000 0 0 0 0 CN 0 1,850,000 0 0 0 Totals 275,000 1,850,000 0 0 0 Report Date: June 09, 2025 Page 16 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 WA-15108 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 SB Ramp to Design and construct intersection improvements, which could include a new traffic signal or a roundabout, lighting, pedestrian facilities, and drainage. 06/09/25 06/16/25 2117 03 C G O P S TW 0.100 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 0 400,000 400,000 P RW 2028 0 0 150,000 150,000 P CN 2029 0 TIB 1,620,000 1,080,000 2,700,000 Totals 0 1,620,000 1,630,000 3,250,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 400,000 0 0 RW 0 0 150,000 0 0 CN 0 0 0 2,700,000 0 Totals 0 0 550,000 2,700,000 0 Report Date: June 09, 2025 Page 17 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 05 TUK-65 S 144th Street Bridge Sidewalks S 144th Street Bridge 51 st Ave S to 53rd Ave S The project entails replacing approximately 320 feet of raised bridge deck on the S 144th street bridge with 6-foot-wide sidewalks, which will be separated from the traffic lanes by a crash tested barrier and a pedestrian railing. Sharrows will also be added to the traffic lanes for bicycle traffic. 06/09/25 06/16/25 2117 28 0.060 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 STBG(UL) 500,000 0 79,000 579,000 P CN 2027 SRTS 2,000,000 0 720,000 2,720,000 Totals 2,500,000 0 799,000 3,299,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 579,000 0 0 0 0 CN 0 2,720,000 0 0 0 Totals 579,000 2,720,000 0 0 0 Report Date: June 09, 2025 Page 18 Wwasningtan state A Tr Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-1111; S 152nd Street Pedestrian and Bike Improvements S 152nd Street Tukwila International Blvd to 42nd Avenue S Install curb, gutter, shared use path and sidewalks on S 152nd Street, including widening pavement and construction of a buffer between the roadway and sidewalk on the south side. 06/09/25 06/16/25 2117 05 C G O P S TW 0.300 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 274,000 274,000 S RW 2026 0 0 200,000 200,000 P CN 2027 0 TIB 2,500,000 500,000 3,000,000 Totals 0 2,500,000 974,000 3,474,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 270,000 0 0 0 0 RW 230,000 0 0 0 0 CN 0 3,000,000 0 0 0 Totals 500,000 3,000,000 0 0 0 Report Date: June 09, 2025 Page 19 Wwasningtan state A Tr Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID co t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 WA-15829 S Ryan Way SR 900 to 51st Ave S Resurface and rechannel S Ryan Way to improve failing pavement and improve safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection with 47th Avenue S to accommodate future growth and improve safety. 06/09/25 06/16/25 2117 06 C G P S T W 0.500 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 500,000 500,000 P PE 2026 SRTS 100,000 0 0 100,000 P RW 2026 SRTS 200,000 0 100,000 300,000 P CN 2027 SRTS 5,000,000 TIB 5,000,000 2,800,000 12,800,000 Totals 5,300,000 5,000,000 3,400,000 13,700,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 600,000 0 0 0 0 RW 300,000 0 0 0 0 CN 0 12,800,000 0 0 0 Totals 900,000 12,800,000 0 0 0 Report Date: June 09, 2025 Page 20 waraningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-64 South King County TDM South King County N/A to N/A This project will provide TDM programming and services at selected activity centers in Tukwila and partnering South King County jurisdictions. Activity centers include community hubs, commercial areas, business parks, multifamily housing complexes, and educational institutions. For example, places such as Tukwila International Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation resources and incentives, the project will encourage people to choose sustainable transportation options that reduce drive -alone travel and traffic congestion in South King County. TDM services will be provided to residents, commuters, and visitors, targeting those willing and able to try sustainable modes of transportation. The program will work in partnership with partner agencies, nonprofits, employers, and community organizations. 06/09/25 06/16/25 2117 24 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2026 CMAQ 449,567 OTHER 20,164 50,000 519,731 Totals 449,567 20,164 50,000 519,731 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PL 129,933 0 0 0 0 Totals 129,933 0 0 0 0 Report Date: June 09, 2025 Page 21 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 WA-15813 Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades Southcenter Boulevard International Boulevard to 42nd Avenue S Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half - mile of Tukwila International Boulevard Station (TIBS). Re-channelize to 11 ft general purpose lanes to accommodate separated (tuff curb and post) bike lanes. Tighten intersection with 40th Ave S to shorten crossing distance. Add bike channelization and upgrade to high -visibility crosswalk markings at Southcenter Blvd/TIBS station entrance and Southcenter Blvd/42nd Ave S intersections. 06/09/25 06/16/25 2117 28 C G P S T W No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2026 0 0 325,000 325,000 Totals 0 0 325,000 325,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 325,000 0 0 0 0 Totals 325,000 0 0 0 0 Report Date: June 09, 2025 Page 22 1,7wasningtan state 40 Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID in t g. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 WA-16478 Southcenter Blvd Road Diet (with Lake to Sound Regional Trail) Southcenter Boulevard S 66th Ave to 53rd Ave S As part of the King County led Lake to Sound Regional Trail F1 Phase, narrow Southcenter Blvd from 5 lanes to 3 lanes between approx. 62nd Ave S and 66th Ave S. Reconfigure signal operations at 66th Ave S to include dual WB left turn lanes and a single WB thru lane. All lanes will generally shift to the south of the existing ROW to allow for construction of the Lake to Sound trail and trail buffering. 06/09/25 06/16/25 2117 28 C G O P S TW 0.930 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 0 0 135,000 135,000 P CN 2027 0 OTHER 2,383,000 372,000 2,755,000 Totals 0 2,383,000 507,000 2,890,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 135,000 0 0 0 0 CN 0 2,755,000 0 0 0 Totals 135,000 2,755,000 0 0 0 Report Date: June 09, 2025 Page 23 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-13491 Transportation Demand Management Implementation to Provision of TDM services to Commute Trip Reduction -affected employment sites. Facilitate employer reporting and records associated with biennial CTR survey. Engage CTR employment sites with opportunities for improvement and remain connected via technical meetings with other CTR jurisdictional representatives. 06/09/25 06/16/25 2117 44 0.000 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2026 0 WSDOT 93,300 0 93,300 P ALL 2027 0 WSDOT 186,600 0 186,600 Totals 0 279,900 0 279,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 46,650 46,650 46,650 46,650 4,665,093,300 Totals 46,650 46,650 46,650 46,650 4,665,093,300 Report Date: June 09, 2025 Page 24 wasningtan state Departmental Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2026 to 2031 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 TUK-69 Tukwila and South King County TDM Tukwila and South King County N/A to N/A This project will provide TDM programming and services to help people access sustainable transportation options that reduce drive -alone travel and traffic congestion in Tukwila and South King County. Tukwila's TDM Program reaches people regionally at employment centers, community hubs, multifamily housing complexes, and educational institutions. 06/09/25 06/16/25 2117 24 0.000 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PL 2026 0 WSDOT 416,000 10,700 426,700 S PL 2027 CMAQ 550,000 0 0 550,000 P PL 2028 0 WSDOT 416,000 10,700 426,700 Totals 550,000 832,000 21,400 1,403,400 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 213,350 350,850 350,850 350,850 137,500 Totals 213,350 350,850 350,850 350,850 137,500 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 44,055,567 39,090,064 32,140,786 115,286,417 Report Date: June 09, 2025 Page 25