HomeMy WebLinkAboutRes 2117 - 2026-2031 Transportation Improvement ProgramCity of Tukwila
Washington
Resolution No. -I
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2026-
2031), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2026-2031); and
WHEREAS, on June 9, 2025, a public hearing was held regarding the City's Six -Year
Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA.
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2026 to 2031, attached hereto as Exhibit A, is hereby adopted,
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington
2025 Legislation. 2025-2030 TIP
Version: 03/25/2025
Star' C. Knighton
Page 1 of 2
PASSED BY THE CITY COoNCIL OF THE CITY OF TU KWILA, WASHINGTON, at
a Regular Meeting thereof this J' day of WA& , 2025.
ATTEST/AUTHENTICATED:
\AeW4tP',,,,i
n y o BarneMC, City Clerk
A RO D AS TO FORM BY:
Yecity Attorne
Tosh Sharp, Counc. resident
Filed with the City Clerk: CU
Passed by the City Council: Lite
Resolution Number:
Exhibit A. City of Tukwila Six -Year Transportation Improvement Program for 2026 to 2031
2025 Legislation. 2025-2030 TIP
Version: 03/25/2025
Staff. C. Knighton
Page 2 of 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
/ 1037(004) TUK-62
42nd Ave S Bridge Replacement
42nd Ave S over the Duwamish River
Interurban Ave S to Northern end of bridge
Design and construct a replacement structure for the existing 42nd Ave S Bridge
adjacent to the Tukwila Community Center
06/09/25
06/16/25
2117
11
0.100
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
BR
1,400,694
0
100,000
1,500,694
S
RW
2027
0
0
100,000
100,000
P
CN
2027
BR
13,000,000
0
1,000,000
14,000,000
S
CN
2027
BR
10,599,306
MAW
17,000,000
200,000
27,799,306
Totals
25,000,000
17,000,000
1,400,000
43,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
1,500,694
0
0
0
0
RW
0
100,000
0
0
0
CN
0
0
20,899,653
20,899,653
0
Totals
1,500,694
100,000
20,899,653
20,899,653
0
Report Date: June 09, 2025
Page 1
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-15812
42nd Avenue S Bikeway
42nd Avenue S
Southcenter Blvd to S 150th Street
Develop a traffic -calmed bikeway along 42nd Ave S between S 150th St and
Southcenter Blvd. On the west side of the street, add striped southbound bike lane
between Southcenter Blvd and S 150th St. On the east side of the street, add striped
bike lane between Southcenter Blvd and S 151st St. Remove on -street parking to
widen the sidewalk on the east side of the street between S 151st St and S 150th St,
creating a shared path; add shared lane markings to the roadway
06/09/25
06/16/25
2117
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2026
0
0
295,000
295,000
Totals
0
0
295,000
295,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
295,000
0
0
0
0
Totals
295,000
0
0
0
0
Report Date: June 09, 2025
Page 2
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-1111:
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/09/25
06/16/25
2117
05
C G P S T
W
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
0
SRTS
170,000
80,000
250,000
P
RW
2026
0
SRTS
65,000
10,000
75,000
P
CN
2027
0
SRTS
1,660,000
410,000
2,070,000
Totals
0
1,895,000
500,000
2,395,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
250,000
0
0
0
0
RW
75,000
0
0
0
0
CN
0
2,070,000
0
0
0
Totals
325,000
2,070,000
0
0
0
Report Date: June 09, 2025
Page 3
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/09/25
06/16/25
2117
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2026
0
0
600,000
600,000
Totals
0
0
600,000
600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
61,000
61,000
61,000
61,000
122,000
Totals
61,000
61,000
61,000
61,000
122,000
Report Date: June 09, 2025
Page 4
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/09/25
06/16/25
2117
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
190,000
190,000
S
RW
2026
0
0
75,000
75,000
P
CN
2027
0
TIB
1,920,000
493,000
2,413,000
Totals
0
1,920,000
758,000
2,678,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
190,000
0
0
0
0
RW
75,000
0
0
0
0
CN
0
2,400,000
0
0
0
Totals
265,000
2,400,000
0
0
0
Report Date: June 09, 2025
Page 5
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15107
Andover Park East/Industry Dr Intersection
Andover Park E
Industry Drive to
Design and construct traffic signal with Andover Park East left turn lanes and
crosswalks.
06/09/25
06/16/25
2117
03
C G P S T
W
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
180,000
180,000
S
RW
2026
0
0
70,000
70,000
P
CN
2027
0
TIB
1,100,000
300,000
1,400,000
Totals
0
1,100,000
550,000
1,650,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
110,000
0
0
0
0
RW
70,000
0
0
0
0
CN
0
1,400,000
0
0
0
Totals
180,000
1,400,000
0
0
0
Report Date: June 09, 2025
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/09/25
06/16/25
2117
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2026
0
0
1,380,000
1,380,000
Totals
0
0
1,380,000
1,380,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
222,000
232,000
237,000
242,000
489,000
Totals
222,000
232,000
237,000
242,000
489,000
Report Date: June 09, 2025
Page 7
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/09/25
06/16/25
2117
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2026
0
0
16,100,000
16,100,000
Totals
0
0
16,100,000
16,100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
2,520,000
2,520,000
2,720,000
5,730,000
Totals
0
2,520,000
2,520,000
2,720,000
5,730,000
Report Date: June 09, 2025
Page 8
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-15104
Annual Traffic Signal Program
Varies
to
Design and construct traffic signal upgrades and repairs of signals that exceed
routine maintenance work;loop replacement, head replacement, and controllers.
Replace direct bury cable for existing lighting system.
06/09/25
06/16/25
2117
44
P
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2026
0
0
1,120,000
1,120,000
Totals
0
0
1,120,000
1,120,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
130,000
160,000
160,000
170,000
370,000
Totals
130,000
160,000
160,000
170,000
370,000
Report Date: June 09, 2025
Page 9
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/ 1380(005) TUK-68
Boeing Access Road Overlay
Boeing Access Road
East Marginal Way S to Martin Luther King Jr Way S
Grind and overlay roadway, replace concrete overlay of bridge deck over BNSF
railway.
06/09/25
06/16/25
2117
05
0.560
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
564,000
0
0
564,000
S
CN
2027
NHPP
3,426,000
0
0
3,426,000
Totals
3,990,000
0
0
3,990,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
564,000
0
0
0
0
CN
0
3,426,000
0
0
0
Totals
564,000
3,426,000
0
0
0
Report Date: June 09, 2025
Page 10
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15109
E Marginal Way S (BAR - S 112 St)
E Marginal Way S
Boeing Access Road to S 112th St
Planning phase to determine project parameters. Goal is to design and construct full
street improvements and traffic control. Could include additional lanes and bike lanes
to support the new Sound Transit Link Light Rail infill station.
06/09/25
06/16/25
2117
03
C G O P S
TW
0.270
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2026
0
0
75,000
75,000
Totals
0
0
75,000
75,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
75,000
0
0
0
0
Totals
75,000
0
0
0
0
Report Date: June 09, 2025
Page 11
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/ 1391(004) TUK-66
Interurban Avenue S Overlay
Interurban Avenue S
E Marginal Way S to S 143rd Street
Complete pavement repairs, overlay, and curb and gutter repair.
06/09/25
06/16/25
2117
05
2.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
668,386
0
0
668,386
S
CN
2027
NHPP
4,288,614
0
271,386
4,560,000
Totals
4,957,000
0
271,386
5,228,386
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
668,386
0
0
0
0
CN
0
4,560,000
0
0
0
Totals
668,386
4,560,000
0
0
0
Report Date: June 09, 2025
Page 12
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-1111(
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/10/24
06/17/24
2117
04
0.350
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2027
0
Ped/Bike Program
350,000
50,000
400,000
P
RW
2028
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2029
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,240,000
360,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
300,000
100,000
0
0
RW
0
0
100,000
0
0
CN
0
0
0
3,100,000
0
Totals
0
300,000
200,000
3,100,000
0
Report Date: June 09, 2025
Page 13
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
/ 1230(007) TUK-67
Orillia Road South Overlay
Orillia Road S
S 188th Street to S 204th Street
Complete pavement repairs; overlay; and curb and gutter, sidewalk, and guardrail
repair.
06/09/25
06/16/25
2117
05
0.750
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
NHPP
105,000
0
0
105,000
S
CN
2026
NHPP
1,204,000
0
0
1,204,000
Totals
1,309,000
0
0
1,309,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
105,000
0
0
0
0
CN
0
1,224,000
0
0
0
Totals
105,000
1,224,000
0
0
0
Report Date: June 09, 2025
Page 14
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA13494
S 119th St Pedestrian Bridge Painting
S 119th Street Bridge
West bank Duwamish River to East bank Duwamish River
Ongoing maintenance of the S 119th Street Pedestrian Bridge in the
Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance
needed.
06/09/25
06/16/25
2117
06
0.040
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2026
0
0
200,000
200,000
Totals
0
0
200,000
200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
200,000
0
0
0
0
Totals
200,000
0
0
0
0
Report Date: June 09, 2025
Page 15
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
WA-16476
S 124th St/50th PI S Reconfiguration
S 124th Street
49th Ave S to 51 st PI S
Reconfigure intersection to remove EB slip lane, new c/g/s on S 124th from 49th to
51st, new paved shoulder walkway on south side of 124th connecting to existing
walkway on west side of 50th Pk, new stormwater treatment/rain garden in old slip
lane ROW.
06/09/25
06/16/25
2117
21
0.140
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
275,000
275,000
P
CN
2027
0
TIB
1,300,000
550,000
1,850,000
Totals
0
1,300,000
825,000
2,125,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
275,000
0
0
0
0
CN
0
1,850,000
0
0
0
Totals
275,000
1,850,000
0
0
0
Report Date: June 09, 2025
Page 16
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-15108
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 SB Ramp to
Design and construct intersection improvements, which could include a new traffic
signal or a roundabout,
lighting, pedestrian facilities, and drainage.
06/09/25
06/16/25
2117
03
C G O P S
TW
0.100
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2028
0
0
400,000
400,000
P
RW
2028
0
0
150,000
150,000
P
CN
2029
0
TIB
1,620,000
1,080,000
2,700,000
Totals
0
1,620,000
1,630,000
3,250,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
400,000
0
0
RW
0
0
150,000
0
0
CN
0
0
0
2,700,000
0
Totals
0
0
550,000
2,700,000
0
Report Date: June 09, 2025
Page 17
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
05
TUK-65
S 144th Street Bridge Sidewalks
S 144th Street Bridge
51st Ave S to 53rd Ave S
The project entails replacing approximately 320 feet of raised bridge deck on the S
144th street bridge with 6-foot-wide sidewalks, which will be separated from the
traffic lanes by a crash tested barrier and a pedestrian railing. Sharrows will also be
added to the traffic lanes for bicycle traffic.
06/09/25
06/16/25
2117
28
0.060
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
STBG(UL)
500,000
0
79,000
579,000
P
CN
2027
SRTS
2,000,000
0
720,000
2,720,000
Totals
2,500,000
0
799,000
3,299,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
579,000
0
0
0
0
CN
0
2,720,000
0
0
0
Totals
579,000
2,720,000
0
0
0
Report Date: June 09, 2025
Page 18
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-1111;
S 152nd Street Pedestrian and Bike Improvements
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Install curb, gutter, shared use path and sidewalks on S 152nd Street, including
widening pavement and construction of a buffer between the roadway and sidewalk
on the south side.
06/09/25
06/16/25
2117
05
C G O P S
TW
0.300
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
274,000
274,000
S
RW
2026
0
0
200,000
200,000
P
CN
2027
0
TIB
2,500,000
500,000
3,000,000
Totals
0
2,500,000
974,000
3,474,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
270,000
0
0
0
0
RW
230,000
0
0
0
0
CN
0
3,000,000
0
0
0
Totals
500,000
3,000,000
0
0
0
Report Date: June 09, 2025
Page 19
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15829
S Ryan Way
SR 900 to 51 st Ave S
Resurface and rechannel S Ryan Way to improve failing pavement and improve
safety. Add pedestrian and bicycle facilities where appropriate. Signalize intersection
with 47th Avenue S to accommodate future growth and improve safety.
06/09/25
06/16/25
2117
06
C G P S T
W
0.500
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
500,000
500,000
P
PE
2026
SRTS
100,000
0
0
100,000
P
RW
2026
SRTS
200,000
0
100,000
300,000
P
CN
2027
SRTS
5,000,000
TIB
5,000,000
2,800,000
12,800,000
Totals
5,300,000
5,000,000
3,400,000
13,700,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
600,000
0
0
0
0
RW
300,000
0
0
0
0
CN
0
12,800,000
0
0
0
Totals
900,000
12,800,000
0
0
0
Report Date: June 09, 2025
Page 20
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-64
South King County TDM
South King County
N/A to N/A
This project will provide TDM programming and services at selected activity centers
in Tukwila and partnering South King County jurisdictions. Activity centers include
community hubs, commercial areas, business parks, multifamily housing complexes,
and educational institutions. For example, places such as Tukwila International
Boulevard District, Southcenter, and Sea-Tac Airport. By providing transportation
resources and incentives, the project will encourage people to choose sustainable
transportation options that reduce drive -alone travel and traffic congestion in South
King County. TDM services will be provided to residents, commuters, and visitors,
targeting those willing and able to try sustainable modes of transportation. The
program will work in partnership with partner agencies, nonprofits, employers, and
community organizations.
06/09/25
06/16/25
2117
24
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2026
CMAQ
449,567
OTHER
20,164
50,000
519,731
Totals
449,567
20,164
50,000
519,731
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PL
129,933
0
0
0
0
Totals
129,933
0
0
0
0
Report Date: June 09, 2025
Page 21
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
ira
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
WA-15813
Southcenter Blvd Bikeway and Pedestrian Crossing Upgrades
Southcenter Boulevard
International Boulevard to 42nd Avenue S
Improve the existing bike lanes and crosswalks on Southcenter Blvd within a half -
mile of Tukwila International Boulevard Station (TIBS). Re-channelize to 11 ft general
purpose lanes to accommodate separated (tuff curb and post) bike lanes. Tighten
intersection with 40th Ave S to shorten crossing distance. Add bike channelization
and upgrade to high -visibility crosswalk markings at Southcenter Blvd/TIBS station
entrance and Southcenter Blvd/42nd Ave S intersections.
06/09/25
06/16/25
2117
28
C G P S T
W
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2026
0
0
325,000
325,000
Totals
0
0
325,000
325,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
325,000
0
0
0
0
Totals
325,000
0
0
0
0
Report Date: June 09, 2025
Page 22
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
WA-16478
Southcenter Blvd Road Diet (with Lake to Sound Regional Trail)
Southcenter Boulevard
S 66th Ave to 53rd Ave S
As part of the King County led Lake to Sound Regional Trail F1 Phase, narrow
Southcenter Blvd from 5 lanes to 3 lanes between approx. 62nd Ave S and 66th Ave
S. Reconfigure signal operations at 66th Ave S to include dual WB left turn lanes and
a single WB thru lane. All lanes will generally shift to the south of the existing ROW
to allow for construction of the Lake to Sound trail and trail buffering.
06/09/25
06/16/25
2117
28
C G O P S
TW
0.930
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
0
0
135,000
135,000
P
CN
2027
0
OTHER
2,383,000
372,000
2,755,000
Totals
0
2,383,000
507,000
2,890,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
135,000
0
0
0
0
CN
0
2,755,000
0
0
0
Totals
135,000
2,755,000
0
0
0
Report Date: June 09, 2025
Page 23
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
rQ
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-13491
Transportation Demand Management Implementation
to
Provision of TDM services to Commute Trip Reduction -affected employment sites.
Facilitate employer reporting and records associated with biennial CTR survey.
Engage CTR employment sites with opportunities for improvement and remain
connected via technical meetings with other CTR jurisdictional representatives.
06/09/25
06/16/25
2117
44
0.000
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2026
0
WSDOT
93,300
0
93,300
P
ALL
2027
0
WSDOT
186,600
0
186,600
Totals
0
279,900
0
279,900
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
46,650
46,650
46,650
46,650
4,665,093,300
Totals
46,650
46,650
46,650
46,650
4,665,093,300
Report Date: June 09, 2025
Page 24
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2026 to 2031
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
al
io
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
TUK-69
Tukwila and South King County TDM
Tukwila and South King County
N/A to N/A
This project will provide TDM programming and services to help people access
sustainable transportation options that reduce drive -alone travel and traffic
congestion in Tukwila and South King County. Tukwila's TDM Program reaches
people regionally at employment centers, community hubs, multifamily housing
complexes, and educational institutions.
06/09/25
06/16/25
2117
24
0.000
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PL
2026
0
WSDOT
416,000
10,700
426,700
S
PL
2027
CMAQ
550,000
0
0
550,000
P
PL
2028
0
WSDOT
416,000
10,700
426,700
Totals
550,000
832,000
21,400
1,403,400
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
213,350
350,850
350,850
350,850
137,500
Totals
213,350
350,850
350,850
350,850
137,500
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
44,055,567
39,090,064
32,140,786
115,286,417
Report Date: June 09, 2025
Page 25
Andy Youn-Barnett
From: Andy Youn-Barnett
Sent: Tuesday, June 17, 2025 12:57 PM
To: amarkley@psrc.org
Cc: Cyndy Knighton; Jennifer Marshall
Subject: Tukwila - Transportation Improvement Program 2026-2031
June 17, 2025
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2117, passed June 16, 2025, adopting the Transportation
Improvement Program for 2026-2031.
R 211 "7" - 2026 -2031 Transport. n Illlnnpr of Pr
Regards,
Andy Youn-Barnett
City Clerk 1 Office of the City Clerk
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
a.. 77U..."� j 1.:uIkyf..iII rr: a f!' .! ✓.
206.433.1830 and��u�P"�:I��rr�� ...
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public
Records Act (Chapter 42.56 RCW).
1
Andy Youn-Barnett
From: Andy Youn-Barnett
Sent: Tuesday, June 17, 2025 12:57 PM
To: roger.millar@wsdot.wa.gov
Cc: Cyndy Knighton; Jennifer Marshall
Subject: Tukwila - Transportation Improvement Program 2026-2031
June 17, 2025
TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
RE: CITY OF TUKWILA 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2117, passed June 16, 2025, adopting the Transportation
Improvement Program for 2026-2031.
R 211 "7" - 2026 -2031 Transport. n Illlnnpr of Pr
Regards,
Andy Youn-Barnett
City Clerk 1 Office of the City Clerk
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
a.. 77U..."� j 1.:uIkyf..iII rr: a f!' .! ✓.
206.433.1830 and��u�P"�:I��rr�� ...
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public
Records Act (Chapter 42.56 RCW).
1
Andy Youn-Barnett
From: Andy Youn-Barnett
Sent: Tuesday, June 17, 2025 12:57 PM
To: GREGA@TIB.WA.GOV
Cc: Cyndy Knighton; Jennifer Marshall
Subject: Tukwila - Transportation Improvement Program 2026-2031
June 17, 2025
TO: TRANSPORTATION IMPROVEMENT BOARD
RE: CITY OF TUKWILA 2026-2031 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #2117, passed June 16, 2025, adopting the Transportation
Improvement Program for 2026-2031.
R 211 "7" - 2026 -2031 Transport. n Illlnnpr of Pr
Regards,
Andy Youn-Barnett
City Clerk 1 Office of the City Clerk
City of Tukwila
6200 Southcenter Blvd Tukwila WA 98188
a.. 77U..."� j 1.:uIkyf..iII rr: a f!' .! ✓.
206.433.1830 and��u�P"�:I��rr�� ...
NOTICE: All emails and attachments sent to and from the City of Tukwila are public records and may be subject to disclosure pursuant to the Public
Records Act (Chapter 42.56 RCW).
1