Loading...
HomeMy WebLinkAbout25-180 - Amendment B - Electrical Services Northwest, LLC - Electrical Installation: Joseph Foster Memorial Park RestroomCity of Tukwila 25-180(b) Council Approval N/A 6200 Southcenter Boulevard, Tukwila WA 98188 (D CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and Electrical Services Northwest, LLC That portion of Contract No. 25-180 between the City of Tukwila and Electrical Services Northwest, LLC is hereby amended as follows: Section 2: The total amount to be paid for the contracted services is hereby increased to $39,896.07. Exhibit A: Exhibit A is hereby replaced by the version attached to this amendment, providing for additional work necessary to perform Change Order #1, provision of an updated Electrical Site Plan for the project as required by Seattle City Light. All other provisions of the contract shall remain in full force and effect. Dated this 23rd day of July, 2025. CITY OF TUKWILA DS Signed by: Thomas McLeod, Mayor ATTEST/AUTHENTICATED: Signed by: Andy oun- arnett, City Clerk APPROVED AS TO FORM: Signed by: So't'A Office of e r5 Attorney CONTRACTOR: DocuSigned by: Printed Name:Clinton Teem Title: owner/operations Manager CA Reviewed May 2020 Page 1 of 1 FPRr" Ali July 22, 2025 Matt Austin City of Tukwila 6200 Southcenter Blvd. Tukwila, WA. 98188 Re: City of Tukwila / Foster Park / Modular Building Power Project Location: 13919 53rd Avenue South Tukwila, WA. 98168 ESNQ#250068 Rev. 1 Electrical Services NorthWest is pleased to offer this proposal for the scope of work listed below: TOTAL: .............................................................................................................................. $31,870.96 CHANGE ORDER #1 (Engineering Elec. Site Plan)........................................................... $4,333.33 SALESTAX 10.1 %: .............................................................................................................. $3,692.74 GRANDTOTAL: ................................................................................................................. $39,896.07 Payment terms net 30 days from the date of invoice. All sales subject to Electrical Services NorthWest standard terms and conditions dated 02-02-2024. All freight will be prepaid and added to the invoice. EQUIPMENT. 1. Vac Truck for trenching included. WORKSCOPE: Matt Austin has requested a proposal to connect the power from the Utility source to the new modular building being installed. 1. Seattle City Light Utility service connection included. 2. Trenching via Vac. Truck. 3. Completion of underground conduit from utility source to the new modular building. 4. New service connection at Modular building. 5. Start-up and testing included. CHANGE ORDER #1: 1. Seattle City Light is requiring us to provide an updated Electrical Site Plan for this project. Exclusions: 1. Any upgrades required due to unforeseen existing conditions. SCHEDULE Personnel will be scheduled upon written acceptance of this proposal in the form of a contract, work order, purchase order, or similar documentation. All efforts will be made to accommodate the project schedule; however, personnel and equipment are scheduled on a first come, first served basis. Monday through Friday 6:OOAM until 4:30PM will be billed at a straight time (ST) rate. Monday through Friday before 6:OOAM or after 4:30PM will be billed at an overtime (OT) rate. Saturday and after eight consecutive ST hours worked will be billed at an OT rate. Sunday and after twelve consecutive hours worked will be billed at a premium time (PT) rate. Thank you for this opportunity to be of service. Should you have any questions please don't hesitate to give me a call. EDS os Respectfully Submitted by � C -r Electrical Services NorthWest LLC. Clinton Teem Operations Manager Electrical Services NorthWest Iliilr.;glr;;;gir�r�,ellectiriicallseirvi cesnw,. corn