CONTRACT FOR SERVICES
Amendment #2
Between the City of Tukwila and Electrical Services Northwest, LLC
That portion of Contract No. 25-180 between the City of Tukwila and Electrical Services Northwest,
LLC is hereby amended as follows:
Section 2:
The total amount to be paid for the contracted services is hereby increased to $39,896.07.
Exhibit A:
Exhibit A is hereby replaced by the version attached to this amendment, providing for
additional work necessary to perform Change Order #1, provision of an updated Electrical
Site Plan for the project as required by Seattle City Light.
All other provisions of the contract shall remain in full force and effect.
Dated this 23rd day of July, 2025.
CITY OF TUKWILA
DS Signed by:
Thomas McLeod, Mayor
ATTEST/AUTHENTICATED:
Signed by:
Andy oun- arnett, City Clerk
APPROVED AS TO FORM:
Signed by:
So't'A
Office of e r5 Attorney
CONTRACTOR:
DocuSigned by:
Printed Name:Clinton Teem
Title: owner/operations Manager
CA Reviewed May 2020 Page 1 of 1
FPRr"
Ali
July 22, 2025
Matt Austin
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA. 98188
Re: City of Tukwila / Foster Park / Modular Building Power
Project Location: 13919 53rd Avenue South Tukwila, WA. 98168
ESNQ#250068 Rev. 1
Electrical Services NorthWest is pleased to offer this proposal for the scope of work listed below:
TOTAL: .............................................................................................................................. $31,870.96
CHANGE ORDER #1 (Engineering Elec. Site Plan)........................................................... $4,333.33
SALESTAX 10.1 %: .............................................................................................................. $3,692.74
GRANDTOTAL: ................................................................................................................. $39,896.07
Payment terms net 30 days from the date of invoice. All sales subject to Electrical Services NorthWest
standard terms and conditions dated 02-02-2024. All freight will be prepaid and added to the invoice.
EQUIPMENT.
1. Vac Truck for trenching included.
WORKSCOPE:
Matt Austin has requested a proposal to connect the power from the Utility source to the new modular
building being installed.
1. Seattle City Light Utility service connection included.
2. Trenching via Vac. Truck.
3. Completion of underground conduit from utility source to the new modular building.
4. New service connection at Modular building.
5. Start-up and testing included.
CHANGE ORDER #1:
1. Seattle City Light is requiring us to provide an updated Electrical Site Plan for this project.
Exclusions:
1. Any upgrades required due to unforeseen existing conditions.
SCHEDULE
Personnel will be scheduled upon written acceptance of this proposal in the form of a contract, work
order, purchase order, or similar documentation. All efforts will be made to accommodate the project
schedule; however, personnel and equipment are scheduled on a first come, first served basis.
Monday through Friday 6:OOAM until 4:30PM will be billed at a straight time (ST) rate.
Monday through Friday before 6:OOAM or after 4:30PM will be billed at an overtime (OT) rate.
Saturday and after eight consecutive ST hours worked will be billed at an OT rate.
Sunday and after twelve consecutive hours worked will be billed at a premium time (PT) rate.
Thank you for this opportunity to be of service. Should you have any questions please don't hesitate to
give me a call.
EDS
os
Respectfully Submitted by � C -r
Electrical Services NorthWest LLC.
Clinton Teem
Operations Manager
Electrical Services NorthWest
Iliilr.;glr;;;gir�r�,ellectiriicallseirvi cesnw,. corn