HomeMy WebLinkAboutTrans 2012-05-07 Item 2C - Applications - Public Works Trust Fund LoanCity of Tukwila
Iz•�
FROM:
BY:
DATE:
SUBJECT:
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director
Robin Tischmak, City Engineer
May 4, 2012
Public Works Trust Fund Loan Applications
ISSUE
Authorize the submittal of four Public Works Trust Fund Loan (PWTF) applications.
BACKGROUND
The 2014 Construction Loan cycle has approximately $400 million available for eligible
applicants with up to $15 million available for each jurisdiction. Construction loan funding is
available for the following eligible systems: drinking water, sanitary sewer, storm water, solid
waste /recycling, bridges, and roadways. Public Works Trust Fund loans can be used to
construct capital projects at low interest rates. Obtaining construction loans would allow the City
to build capital projects in the near future without relying on significant amounts of general funds
or enterprise funds that may not be readily available. The $15 million per jurisdiction is expected
to be non competitive as the Department of Commerce feels that it can fund all eligible projects
for each jurisdiction as long as they total less than the $15 million.
DISCUSSION
Projects listed in the Capital Improvement Program were reviewed to determine if PWTF
financing was a reasonable and prudent funding source. Four eligible projects were identified
that would benefit from PWTF loans. They are as follows:
Reauested Amount Total Proiect Cost
Boeing Access Road Bridge Rehabilitation
$2.5 million
$12.5 million
Interurban Ave S (S 143 St to Fort Dent Way)
2.5 million
11.1 million
Andover Park East Water Main Replacement
1.8 million
1.8 million
Soils Reclamation Facility (Storm Water)
2.8 million
2.8 million
Totals
$9.6 million
$28.2 million
RECOMMENDATION
Committee approval for the submittal of PWTF loan funding applications for the four projects.
Attachments: PWTF Loan Information
CIP Sheets (4)
W: \PW Eng \OTHER \Robin Tischmak \PWTFLoan Applications memo 5- 4- 12.docx
53
Visit www.pwb.wa.gov
WELCOME TO THE REQUEST FOR FINANCIAL ASSISTANCE START PAGE!
E
Approximately $400 million
Elig A is availablel
Cities/ Towns
Counties Local match is not required!
Special Purpose Districts
Loan awards are contingent upon fund availability and approval by the Public Works Board (Board) and the Legislature.
'For the 2014 Construction Loan cycle, the maximum loan amount is $15 million per jurisdiction, with the possibility of
additional funds being awarded on a per project basis at the Board's discretion.
"Standard loan offer is 1% interest repaid over a 20 year term. Applicants may request alternative loan terms, as outlined in
this table. AH loan terms are subiect to neaotiation and Board approval Some applicants may qualify for additional
interest rate reductions based on financial distress.
Request Financial Assistance
54
March 15 May 11, 2012
Up to $15 million
per jurisdiction.*
Eligibly Systems`
Drinking water
Sanitary sewer
L
Storm water
�d ��,��e�tiing
t
years 0.50%
Bridges
Roadways
deas 0.
Streets
20 years 1.00%
25 yea 1.50%
30 years 2.00%
Loan awards are contingent upon fund availability and approval by the Public Works Board (Board) and the Legislature.
'For the 2014 Construction Loan cycle, the maximum loan amount is $15 million per jurisdiction, with the possibility of
additional funds being awarded on a per project basis at the Board's discretion.
"Standard loan offer is 1% interest repaid over a 20 year term. Applicants may request alternative loan terms, as outlined in
this table. AH loan terms are subiect to neaotiation and Board approval Some applicants may qualify for additional
interest rate reductions based on financial distress.
Request Financial Assistance
54
March 15 May 11, 2012
Funding Process
Applicant
works with
CSR* on
contract terms Applicant
and conditions notified of
progress
Applicant
notified of...i►
progress
Applicant notified o1e'►
of progress by PWB Board reviews
Contract recommends Legislative
Applicant Negotiation approval process
submits Managerial
request Financial
Project Review
Review by (simultaneous
PWB review)
March 15th
May 11th
Applicant
submits
request for
assistance
Jutt June -July August October
May
Staff review CSR* and Board review Legislative
projects applicant selection process
submitted negotiate approval
contract terms
conditions
*Client Service Representative
Questions? Contact a Client Service Representative
e
San Juan 4
Ins. A N k�� Ferry
StephenDipNc Kt ap Qo d Pend
(360)725-3157 Skagtt Oreille
Stephen.Dukocommm omagov l- Island
Stevens
ciytani
Snohmish
1 !}ftG•[s4R Chelan
Douglas
Lincoln Spokane
T 0"
=723 -3135
U"YAW60CM1Y UM-WILOW
JIIt u -c"mUf
.(3"_/2S4"7
NlMlhsyv .OJetxtus
OwN D
136%725
Chd$dfM.G"wrgJCO meme.Wa.gov
Skamania
Clark Ktickdat
Grant
Adams Whitman
Franklin
GarBel
S t Columba
W8119 Walla
Aso
b
I
55
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2013 to 2018
PROJECT: Boeing Access Rd over BNRR Bridge Rehabilitation Project No. 99410408
DESCRIPTION: Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to
curb and have sidewalks on both sides.
The existing bridge is structurally and seismically deficient. Several pedestals are leaning, have concrete
JUSTIFICATION: spalls, exposed rusty anchor bolts and reinforcements and some cracks. The existing railings do not meet
standards.
Type, size, and location draft report (specifically required for bridges) was completed in 2005. Federal grant
STATUS: applications were submitted in 2008 and 2010 and will continue to submit for funding in 2012 as federal bridge
funds are made available. A PWTF loan application will also be submitted in 2012.
MAINT. IMPACT: Maintenance will be reduced.
COMMENT: Bridge will be constructed in phases to allow continued traffic use. Construction of projects over
$10 million are only funded at 80% for federal funding. A Bond issue may be required for the City match.
FINANCIAL Through Estimated
(in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL
EXPENSES
Design 53 1,300 1,353
Land(R/W) 100 100
Const. Mgmt. 1,400 1,400
Construction 9,700 9,700
TOTAL EXPENSES 53 0 1,400 11,100 0 0 0 0 0 12,553
FUND SOURCES
Awarded Grant 0
Proposed Grant 1,120 8,880 10,000
Bond /PWTF Loan 280 2,220 2,500
Mitigation Expected 0
City Oper. Revenue 53 0 0 0 0 0 0 0 0 53
TOTAL SOURCES 53 0 1,400 11,100 0 0 0 0 0 12,553
Project Location T S
N
5 W*
oeYn cces_ `L o S
t
S1 2St W D
0
S 71 St
p� A
6 1 St
g z
TM
128 2
S 30
_1 t 5I w e
Rt
2013 2018 Capital Improvement Program 9
56
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
Project Location
p-
1 s 12A 11 1
2 s 128
N N
N
S-9� 01 4"
W
S 1 'St�$ S III
1337
ry I I S 139 §A
W 2
�4 N 8 144 St N (n St
m S 1 46 St
N
m/ C F 47 S$ J b .1— S a
n Is
'j i �it a
51 B m y d
9 St J `thcej�te� 1 9
a
1 5 158 St
S 16 SI �7 I j TukwllajPkwy .A t
2013 2018 Capital Improvement Program 28
57
2013 to 2018
PROJECT:
Interurban Ave S (S 143 St Fort Dent Way) Project No. 90310402
DESCRIPTION:
Design and construct sidewalks, pavement restoration, drainage, and lighting.
Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and
JUSTIFICATION:
pavement failure is accelerating.
Completed 90% of design in 2010. State TIB grant to be submitted in 2012. Federal STP construction
grant
STATUS:
submitted in 2012. City will also apply for a PWTF loan in 2012.
MAINT. IMPACT:
Reduce annual pavement repairs and increase pedestrian safety.
COMMENT:
Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB.
FINANCIAL
Through Estimated
(in $000's)
2011 2012 2013 2014 2015 2016 2017 2018 BEYOND
TOTAL
EXPENSES
Design
464 250
714
Land(R/W)
150
150
Const. Mgmt.
1,300
1,300
Construction
9,400
9,400
TOTAL EXPENSES
464 0 400 10,700 0 0 0 0 0
11,564
FUND SOURCES
Awarded Grant
389
389
Proposed Grant STP
5,000
5,000
Proposed Grant TIP
4,000
4,000
Impact Fees
0
City Oper. Revenue
75 0 400 1,700 0 0 0 0 0
2,175
TOTAL SOURCES
464 0 400 10,700 0 0 0 0 0
11,564
Project Location
p-
1 s 12A 11 1
2 s 128
N N
N
S-9� 01 4"
W
S 1 'St�$ S III
1337
ry I I S 139 §A
W 2
�4 N 8 144 St N (n St
m S 1 46 St
N
m/ C F 47 S$ J b .1— S a
n Is
'j i �it a
51 B m y d
9 St J `thcej�te� 1 9
a
1 5 158 St
S 16 SI �7 I j TukwllajPkwy .A t
2013 2018 Capital Improvement Program 28
57
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
Project Location
GIs
T 1
2013 2018 Capital Improvement Program 87 58
2013 to 2018
PROJECT:
Andover Park E Water Main Replacement Project No.
99940103
Design and construct 2,200 LF of new 16" ductile iron pipe along Andover Park East from
Tukwila Pkwy to
DESCRIPTION:
Strander Blvd and 900 LF of 10" DIP in Christiansen Rd.
JUSTIFICATION:
Aging cast iron system has suffered frequent and spectacular failures.
STATUS:
Survey and in -house design is complete. Construction is scheduled for 2013.
MAINT. IMPACT:
A new pipe will significantly reduce impact on crews from the risk of cataclysmic events.
COMMENT:
FINANCIAL
Through Estimated
(in $000's)
2011 2012 2013 2014 2015 2016 2017 2018
BEYOND
TOTAL
EXPENSES
Design
63 14
77
Land(R/W)
0
Const. Mgmt.
225
225
Construction
1,500
1,500
TOTAL EXPENSES
63 0 1,739 0 0 0 0 0
0
1,802
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
63 0 1,739 0 0 0 0 0
0
1,802
TOTAL SOURCES
63 0 1,739 0 0 0 0 0
0
1
Project Location
GIs
T 1
2013 2018 Capital Improvement Program 87 58
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2013 to 2018
PROJECT:
Soils Reclamation Facility Project No. 99441202
DESCRIPTION:
Construct soils reclamation facility to handle, treat, dispose and /or reuse non hazardous street sweepings
and catch basin cleanings, etc. (formerly named Drainage/Vactor Waste Facility).
To meet State NPDES regulations, City needs facilities to treat dispose of waste materials resulting from
JUSTIFICATION:
cleaning/ maintenance activities, including street sweepings and vactor truck wastes.
Temporary site is no longer an option and disposal is now being transported to a King County facility in
STATUS:
Renton. A PWTF loan application is being submitted in 2012. A site location is currently being investigated.
MAINT. IMPACT:
Expected to decrease maintenance.
COMMENT:
May be combined with future location of City Maintenance Facility.
FINANCIAL
Through Estimated
(in $000's)
2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL
EXPENSES
Design
49 311
360
Land (R/W)
561 1,200
1,761
Const. Mgmt.
207
207
Construction
40 1,136
1,176
TOTAL EXPENSES
610 40 311 2,543 0 0 0 0 0
3,504
FUND SOURCES
Awarded Grant 0
Proposed PWTF 2,800 2,800
Mitigation Actual 0
Mitigation Expected 0
Utility Revenue 610 40 311 (257) 0 0 0 0 0 704
TOTAL SOURCES 610 40 311 2,543 0 0 0 0 0 3,504
Note: Site Location is still under consideration.
2013 2018 Capital Improvement Program 150 59