HomeMy WebLinkAboutReg 2012-05-07 Item 5D - Final Acceptance - 2010-2011 Small Drainage Program by Green River Construction for $761,721.29C uT aL AGENDA S Y opsis
Initials ITEM NO.
Aleetirig Dale e�arel by Mayors review Coatncil revien)
05/07/12 BG
5.D.
ITEM INFORMATION
CAS NU\IBE'R: Si.vl Sl »SoR: BOB GIBERSON ORIGIN.II.AGEND.I 05/07/12
AGENDA ITENITITLE 2010/2011 Small Drainage Program
Project Completion and Acceptance
C.ITEGORY Discussion Motion Resolution Ordinance Bid-- 1.zvar PublicHearind Other
Mtg Date bltg Date 05107112 rbttg Date Altg Date Mtq Date Mtq Date A1tg Date
SPONSOR Council Mayor INR DCD .Finance fire IT Pe:R Police PIV
SPONSOR'S The contract with Green River Construction, Inc. of Tukwila, WA is complete for the
SUAI;II.IRY 2010/2011 Small Drainage Program. This project provided storm drainage improvements
at nine sites. Construction began September 1, 2011 and was completed on March 22,
2012. Eight change orders were issued for $30,330.99 and under -runs credited $56,615.20.
Council is being asked to accept and finalize the contract with Green River Construction in
the amount of $761,721.29.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 04124/12 CONINTITTEE CJL -1IR: DENNIS ROBERTSON
RECOMMENDATIONS:
SPONSOR /ADNIIN. Public Works
COMNIF "FEE Unanimous Approval; Forward to Regular Consent Agenda.
COST IMPACT FUND SOURCE
ExPENDrrU7u: REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$761,721.29 $906,206.33 $0.00
Fund Source: 412 SURFACE WATER (PG 138, 2012 CIP)
C0777ments:
MTG. DATE I RECORD OF COUNCIL ACTION
05/07/12 1
JMTG.DATEJ ATTACHMENTS
05/07/12 Informational Memorandum dated 04/20/12
Vicinity Map
State of WA Depart of Revenue Notice of Completion 11 -112
Minutes from the Utilities Committee meeting of 04/24/12
79
:1
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO:
Mayor Haggerton
Utilities Committee
FROM:
Bob Giberson, Public Works Director
BY:
Michael Ronda, Construction Project Manager
DATE:
April 20, 2012
SUBJECT:
2010/2011 Small Drainaqe Proqram
Project No. 91041201, Contract No. 11 -112
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 11 -112 with Green River Construction, Inc., of Tukwila,
Washington, was issued on September 1, 2011 for construction of the 2010/2011 Small Drainage
Program. This project is the continuation of the annual drainage program that the City has been
conducting to maintain the drainage systems within the City. For the 2010/2011 Small Drainage
Program, improvements were made at nine project locations; Wells Trucking (near E Marginal
Wy /128th), Tukwila International Blvd (Homeland Security), E Marginal Wy S (Museum of Flight),
44 Ave S (Allentown), TIB /138 (Evergreen Foods), S 122 St (Allentown), 40 Ave S (13600
bock), Regional Stormwater Detention Facility (behind The Boulevard Apartments on Southcenter
Blvd), and the Gilliam Creek Outfall (near Tukwila Pkwy /66
DISCUSSION
Construction was physically completed on March 22, 2012. Eight change orders were issued
during construction for a total of $30,330.99. The change orders can be summarized as minor
revisions that were offset by under -runs in quantities for various bid items.
The budget for this contract, with a 15% contingency, was $906,206.33. The retainage amount
is $38,086.07.
Contract Award Amount 788,005.50
Change Order Nos. 1 8 30,330.99
Cost Under -runs (56,615.20)
Total Amount 761.721.29
RECOMMENDATION
The Council is being asked for formal acceptance and retainage release authorization, subject to
standard claim and lien release procedures, for the contract with Green River Construction, Inc. in
the amount of $761,721.29 and to consider this item on the consent Agenda at the May 7, 2012
Regular Meeting.
Attachments: Vicinity Map
Dept of Revenue Notice of Completion
WAPW EngWROJECTSW DR Projects12 01 0 -201 1 SDP (91041201)IConstructlonl#.200 Correspondencel- DRAFTS12011 SDP -INFO MEMO Closeout DRAFT- 03- 30- 12.doc
i
m
u 2010/2011
Site Annual Neighborhood
Drainage Program
�e
L
Site 2 i Site 6 N
Site 4 W E
1
Site 1 ill o
Not to Scale
Site 7
it
4v
Site 5
s t�
m
1 a
S
N
Site 8
t
t Site 9
-L
4� wok=
11
i �1�
s j g
p y
e Date June 21, 2011
i
4T+Vfit•
dray ABR9 Y,��.
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 600 582 -949
Date: 3/23/12
Na e �lddess of Put�c Agenc3 �s n. B m ntUse nly,'
e art a e
City of Tukwila Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number: 179- 000 -208
Notice is hereby given relative to the completion of contract or project described below
Project Name Contract Number Job Order Contracting
2010/2011 Small Drainaqe Program 11 -112 Yes X No
Description of Work Done/include Jobsite Address(es)
Drainage improvements at 9 different locations within the City of Tukwila. No specific jobsite address is
available because of the various project locations.
Federally funded road transportation project?
Yes No
Contractor's Name
'Telephone Number
Green River Construction
206 246 -9456
Contractor Address
6402 S 144th St. Suite 1, Seattle WA 98168
If Retainage is Bonded, List Surety's Name (or attach a
copy)
N/A
Surety Agent's Address
N/A
Date Contract Awarded Date Work Commenced Date Work Completed
Date Work Accepted
8/9/11 9/1/11
3/22/12
Contract Amount
788,005.50
Additions
30,330.99 Liquidated
Damages 0.00
Reductions
56,615.20 Amount
Disbursed 723,635.22
Sub -Total
761,721.29 Amount
Retained 38,086.07
Amount of Sales Tax Paid at 0%
(If various rates apply, please send a breakdown)
0.00
TOTAL
761,721.29
TOTAL 761,721.29
NOTE: These two totals must be equal
Please List all Subcontractors Below:
Subcontractor's Name:
jUBI Number:
)Affidavit ID (if known)
AAA Striping and Legends
602 188 162
374240
Fraser Metal Works
602 750 157
368308
Group Four, Inc.
j 600 061 180
Not Obtained Yet
Insituform Technologies
701 880 220
375658 (may be revised)
Lakeside Industries
601 106 847
370715
Pacific Concrete Services LLC
602 126 314
373696
Rosso Nursery
602 326 543
375162
Totem Electric
278 043 550
373674
F215- 038 -000 08-2011
REV 31 002 (08/25/11)
Continued on page 2
84
UTILITIES COMMITTEE
Meeting Minutes
April 24, 2012 5: 00 p. m. Conference Room 1
City of Tukwila
Utilities Committee
PRESENT
Councilmembers: Dennis Robertson, Chair. Joe Duffie and Kate Kruller
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Pat Brodin, Ryan Larson, Mike Ronda,
Brandon Miles, Peggy McCarthy, Gail Labanara and Kimberly Matej
CALL TO ORDER: The meeting was called to order at 5:01 p.m.
L PRESENTATIONS
No presentations.
II. BUSINESS AGENDA
A. Proiect Completion and Acceptance: 2010/2011 Small Drainage Proaram
Staff is requesting Council approval for formal contract acceptance and release of retainage to Green River
Construction, Inc. in the amount of $38,086.07 for the 2010/2011 Small Drainage Program.
Eight change orders for minor revisions were issued during this project. Even with change orders, the
project came under budget by almost $144,000 due to cost under runs. Drainage improvements were made
at the nine different locations listed below:
Wells Trucking
Tukwila International Boulevard (near Homeland Security)
Museum of Flight
Allentown 44 Avenue South
Evergreen Foods
Allentown South 122n Street
40 Avenue South
Regional Stormwater Detention Facility
Gilliam Creek Inlet
Staff reviewed several of the project locations with the Committee and showed project work pictures.
UNANIMOUS APPROVAL. FORWARD TO MAY 7 REGULAR MEETING CONSENT AGENDA.
B. Proiect Completion and Acceptance: Enerev Efficiency Retrofit for City Facilities
Staff is requesting Council approval for formal contract acceptance and release of retainage to Ameresco
Quantum, Inc. in the amount of $6,60035 for energy upgrades made at the following City facilities:
Inside lighting and parking lot lights at City Hall
Inside lighting and parking lot lights at the 6300 Building
Parking lot lights at Fort Dent
Parking lot lights at Tukwila Community Center
Parking lot lights at Foster Golf Links
Inside lighting at Tukwila Heritage and Cultural Center
This project was funded largely through the Washington State Department of Commerce's Federal ARRA
grant. Initially it was anticipated that the City would be providing a match of approximately $15,000, but the
final cost to the City was approximately $100.00. UNANIMOUS APPROVAL. FORWARD TO MAY 7