Loading...
HomeMy WebLinkAboutAllentown Truck Reroute - Appendix B - Plans for Alternative Routes0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+0010+0011+0012+0012+18.21 BOP 0+00PC 0+29 .53PT 1+39.11PC 2+12.68PT 3+03.78PC 6+90.13PT 8+98.02EOP 12+18.21R=500.00' R=200.00' R=1000.00' -10 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 0+0018.10+5020.220.231+0015.220.951+5013.419.652+0012.717.612+5011.715.713+0011.914.283+5012.013.324+0011.712.834+5011.512.675+0011.612.525+5011.912.376+0012.012.226+5011.812.077+0011.812.087+5012.112.348+0011.812.858+5016.213.619+0042.014.479+5052.815.3310+0052.816.1310+5025.516.7111+0017.317.0711+5018.017.1912+0017.117.1412+50 1.71%-0.13%-4.08% -0.30% VPI STA = 7+43.53 VPI EL = 11.79 VCL = 200.00' K = 99.29 VPI STA = 3+10.72 VPI EL = 13.08 VCL = 200.00' K = 52.87 VPI STA = 10+65.65 VPI EL = 17.31 VCL = 200.00' K = 108.67 VPI STA = 0+92.35 VPI EL = 22.00 VCL = 100.00' K = 12.18 VPI STA 0+36.08EL 19.68VPI STA 12+18.03EL 17.12ALLENTOWN TRUCK REROUTE EISALTERNATIVE 2 CONCEPTUAL DESIGN NOT FOR CONSTRUCTION PLOTTED ON 10/11/2023 AIRPORT WAY S ALTERNATIVE 2 PROPOSED ROADWAY EXHIBIT TYPICAL ROADWAY SECTION A-A AIRPORT WAY S SCALE: NTSS BOEING ACCESS RDAI R P O R T W A Y S PROPOSED ROADWAY PROFILE AIRPORT WAY S STA 00+00 TO STA 12+18.03 RELOCATED ENTRY/EXIT FACILITY APPROXIMATE LOCATION ℄ 2.0%2.0% NB LANE 12' SHOULDER 5' SB LANE 12' SHOULDER 5' NST 4:1 NST 4:1SOUND TRANSITLIGHT RAILSPAA POLICE TRAINING AREA PROPOSED SIGNALIZED INTERSECTION BNSF PROPOSED GRADE EXISTING GRADE FULL DEPTH HMA WHITE/YELLOW EDGE LINE LEGEND MATCH EXISTING MATCH EXISTING S BOEING ACCESS ROAD AAAPPROXIMATE LOCATION OF PROPOSED TUNNEL ROADWAY BETWEEEN EXISTING SOUND TRANSIT LRT COLUMNS RETAINING WALL CONCEPTUAL DESIGN - NOT FOR CONSTRUCTION 21+86.9710+0015+0020+00BOP 10+00 EOP 21+86.97 PI 11+88.06 PC 12+63.99 PC 10+21.87 PT 2 0 + 6 6 . 9 4 PT 11+67.22 50+00 55+0 0 60+0 0 63+81.91 BOP 50+00 EOP 63+81.91PC 53+62.31PC 59+84.79PT 54+76.99PT 61+21.8310+0014+47.46BOP 10+00 PC 13+17.50 PT 14+11.62 EOP 14+47.46 80+0081+82.13BOP 80+00 EO P 8 1 + 8 2 . 1 3 -10 0 10 20 30 40 50 60 70 -10 0 10 20 30 40 50 60 70 -4.01% 0.27% 6.00% VPI STA = 57+27.59 VPI EL = 18.94 VCL = 120.00' K = 20.93 VPI STA = 61+27.39 VPI EL = 42.93 VCL = 150.00' K = 14.98 VPI STA 56+49.83EL 18.73VPI STA 63+81.91EL 32.7150+0018.350+5018.051+0018.251+5018.252+0018.252+5018.453+0018.253+5018.254+0018.154+5018.355+0018.655+5018.956+0018.856+5018.718.7357+0018.919.1257+5018.920.6258+0018.423.2858+5018.126.2859+0018.529.2859+5018.332.2860+0017.635.2860+5018.238.2861+0018.940.5361+5016.941.1062+005.340.0162+505.338.0163+005.336.0063+5013.833.9964+00 10 20 30 40 50 60 10 20 30 40 50 60 4.50%-3.64% VPI STA = 11+54 VPI EL = 23.07 VCL = 100.00' K = 24.25 VPI STA = 17+03.27 VPI EL = 23.68 VCL = 120.00' K = 32.92 VPI STA = 14+07.06 VPI EL = 34.45 VCL = 100.00' K = 12.30 VPI STA 11+03.64EL 22.88VPI STA 17+69.13EL 23.6910+0027.110+5024.011+0022.911+5022.123.4912+0022.325.1412+5022.827.3913+0022.229.6413+5022.231.8914+0022.333.3814+5022.332.8715+0022.431.0715+5022.929.2516+0022.927.4316+5023.125.6217+0023.424.2917+5023.723.7118+0023.918+5024.119+0024.719+5025.220+0025.620+5028.321+0025.721+5024.622+00 ALLENTOWN TRUCK REROUTE EISALTERNATIVE 3B CONCEPTUAL DESIGN NOT FOR CONSTRUCTION PLOTTED ON 10/19/23 48TH AVE S ALTERNATIVE 3B PROPOSED ROADWAY EXHIBITI5 NORTH48TH PL SINTERURBAN AVEPROPOSED ROAD UNDER 129TH ST FULL DEPTH HMA WHITE/YELLOW EDGE LINE LEGEND I5 SOUTHWA-59950TH PL SMARTIN LUTHER KING JR WAY SPROPOSED BRIDGE PROPOSED SIGNALIZED INTERSECTION PROPOSED NEW ROADWAY TWO 12' LANES, 5' SHOULDERS RAILROAD AVE TO BE RAISED TO NEW PROPOSED INTERSECTION GRADE PROPOSED RELOCATION OF CHECK-IN/CHECK-OUT LOCATION OF INTERMODAL FACILITY AA GATEWAY DR TYPICAL ROADWAY SECTION A-A 48TH PL S SCALE: NTS ℄ 2.0%2.0% NB LANE 12' SHOULDER 5' SB LANE 12' SHOULDER 5' NST 4:1 NST 4:115TH AVE SPROPOSED ROADWAY PROFILE NEW ROADWAY STA 00+00 TO STA 10+00.86 PROPOSED ROADWAY PROFILE RAILROAD AVE STA 10+00 TO STA 22+00.00 EXISTING GRADE EXISTING GRADE PROPOSED GRADE MATCH EXISTING MATCH PROPOSED ROADWAY GRADE AT RAILROAD AVE MATCH EXISTING MATCH EXISTING RAILROAD AVEPROPOSED GRADE GREEN RIVER TRAIL CROSSING UNDER PROPOSED STRUCTURE GREEN RIVERTRAILRETAINING WALL RETAINING WALL CONCEPTUAL DESIGN - NOT FOR CONSTRUCTION F F F F F 0+005+00 10 + 0 0 15+001 6 + 6 6 . 5 3 BOP 0+00PC 3+55.45PT 7+37.98PC 11+61.43PT 15+37.01EOP 16+66.53 11 1 + 8 2 . 9 2 100+00 10 5 + 0 0 110+00 BOP 100+00EOP 111+82.92PC 106+76.31PT 101+31PRC 109+19.20R=134.00' R=499.00' R=499.00' R=713.00'AABBDDC C DD210+02.85 20 0 + 0 0 20 5 + 0 0 21 0 + 0 0 326+16.01 300+00 305+00 310 +00315+00320+00325+0 0 R=800.00' R=842.26' R=1000.00' 403+50 400+00401+00402+00403+00C C C 10 20 30 40 50 60 70 80 90 100 110 120 130 140 10 20 30 40 50 60 70 80 90 100 110 120 130 140 0+0050.350.310+5049.048.991+0047.447.451+5046.246.152+0044.444.352+5042.642.613+0040.840.833+5039.439.434+0037.937.944+5036.336.335+0035.035.015+5033.433.426+0030.830.806+5029.629.577+0037.937.907+5049.349.298+0055.755.708+5064.664.609+0066.666.599+5078.077.9810+0086.286.2310+5094.794.6911+0099.799.7211+50110.2110.2212+00107.9107.8812+5092.692.5613+0052.052.0113+5036.436.4514+0035.335.3514+5041.541.5315+0045.545.4615+5046.346.2816+0043.143.1316+5022.122.1017+00 -3.00% 2.11% 1.66%1.66%1.62% VPI STA = 7+00 VPI EL = 29.31 VCL = 200.00' K = 39.14 VPI STA = 13+50 VPI EL = 43.02 VCL = 150.00' K = 333.21 VPI STA 0+00EL 50.31VPI STA 14+65.43EL 44.94VPI STA 15+36.86EL 46.13VPI STA 15+89.23EL 46.98STA 11+61.43, EL 39.05 STA 6+88.09, EL 30.66 20 30 40 50 60 70 80 90 100 110 120 130 140 20 30 40 50 60 70 80 90 100 110 120 130 140 100+0047.247.24100+5054.954.86101+0065.565.49101+5072.472.35102+0081.881.80102+5093.493.42103+00102.2102.21103+50108.1108.13104+00113.2113.18104+50116.3116.28105+00112.9112.89105+50102.7102.73106+0086.586.48106+5068.468.43107+0054.854.82107+5052.152.05108+0046.746.74108+5045.145.09109+0043.543.49109+5037.537.54110+0037.037.04110+5036.536.46111+0035.435.41111+5033.933.93112+00 -2.25%2.00% VPI STA = 106+80 VPI EL = 44.29 VCL = 200.00' K = 47.02 VPI STA 100+00EL 30.66VPI STA 111+82.92EL 32.97i5 truck ramp tying into boeing access road STA 104+24.13, EL 39.16 STA 109+50, EL 37.54 ALLENTOWN TRUCK REROUTE EISALTERNATIVE 4 CONCEPTUAL DESIGN NOT FOR CONSTRUCTION PLOTTED ON 14/11/2023 ℄ SHOULDER 6' TRAVEL LANE 12' SHOULDER 6' TYPICAL ROADWAY SECTION (A & B-LINE) A-A SR900 TO I5 NB/SB SCALE: NTS S 129TH ST ALTERNATIVE 4 PROPOSED ROADWAY EXHIBIT I5 SOUTH I5 NORTH SR900 - MLK J R W A Y S S 129TH STRAILROA D A V E 50TH PL S 51ST PL S S 124TH STS RYAN W A Y PROPOSED ROADWAY PROFILE (A-LINE) SR900 I5 TRUCK RAMP TO I5 STA 00+00 TO STA 15+89.23 PROPOSED ROADWAY PROFILE (B-LINE) SR900 I5 TRUCK RAMP TO BOEING ACCESS ROAD STA 100+00 TO STA 111+82.92 BNSF BNSF EDGE OF SHOULDER C-LINE PROPOSED SIGNALIZED INTERSECTION PROPOSED SIGNALIZED INTERSECTION PROPOSED SIGNALIZED INTERSECTION PROPOSED GRADE EXISTING GRADE EXISTING GRADE PROPOSED GRADE REPLACE EXISTING TIMBER BRIDGE BRIDGE WIDENING TO ACCOMMODATE EXTRA TRUCK LANE MATCH POINT OF STA 11+61.48 ON I5 TRUCK RAMP TURN AROUND MATCH POINT OF STA 104+24.18 ON I5 TRUCK RAMP TO BOEING ACCESS ROAD CONSTRUCT NEW DRIVEWAY TO ACCESS EXISTING PARKING LOT 2.0% PROPOSED WALL NST 4:1 D-LINE E-LINE B LINE A LINE POTENTIAL AREA OF IMPACT PROPOSED WALL 2:1 EG PROPOSED WALL RELOCATED ENTRY EXIT FACILITY APPROXIMATE LOCATION NOISE WALL SR900 - MLK JR WAY SS BOEING ACCESS RDA LINE FULL DEPTH HMA GRIND AND OVERLAY CONCRETE SIDEWALK NOISE WALL BRIDGE CONSTRUCTION WHITE/YELLOW EDGE LINE LEGEND PROPOSED WALL FILLF POTENTIAL AREA OF IMPACT CUTC MATCH EXISTING MATCH EXISTING MATCH EXISTING CONCEPTUAL DESIGN - NOT FOR CONSTRUCTION