Loading...
HomeMy WebLinkAboutTIS 2025-08-25 Item 1D - Contract Amendment #2 - Traffic Signal Assessment & Repair Recommendations with KPG PsomasTO: FROM: BY: CC: DATE: SUBJECT: Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM Transportation and Infrastructure Services Committee Jen Tetatzin, Public Works Director Adam Cox, Interim Traffic Engineer Mayor Thomas McLead August 22, 2025 Traffic Signal Assessment and Repair Recommendation Amendment #2 ISSUE Authorization to award Amendment #2 of the Traffic Signal Assessment and Preventative Maintenance Program contract. BACKGROUND The City is responsible for 64 signalized intersections that require routine maintenance and occasional repairs in response to damaged infrastructure. While updating the required timing sheets for each intersection during the traffic signal assessment, it was observed that a pedestrian clearance timing study was required. This study analyzed the signal phase timing to ensure they account for the additional pedestrian crossing times recommended by the Manual for Uniform Traffic Control Devices (MUTCD). The pedestrian clearance timing study was performed as part of the scope of work in Amendment No. 1. ANALYSIS Amendment #2 will update and reconfigure the City's traffic signal system to reflect the new pedestrian crossing times identified in Amendment #1. The scope of work includes: • Reviewing and updating the Tactics central database to ensure accurate configurations for all 34 intersections. • Adjusting signal coordination plans at 24 intersections to function properly with longer pedestrian clearance times. • Conducting a peer review of programming at 10 intersections where new M-60 controllers replaced older models, to ensure all settings were preserved. • Providing follow-up support to integrate the system with Lucity, establish remote access, and perform field testing. The City does not have the in-house expertise for these specialized updates, and consultant support from Psomas is required to complete the work. FINANCIAL IMPACT Amendment No. 2 will use the available funds programmed for the CIP Annual Traffic Signal Program Project: 80010404. Psomas Services Amendment #1 Amendment #2 Total: Cost $176,622.00 $44,748.00 $59,876.00 $281,246.00 ARPA Funds ARPA Funds CIP Project 80010404 Funding $176,622.00 $44,748.00 $59,876.00 $281,246.00 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 39 Traffic Signal Assessment and Repair Recommendation Amendment #2 August 22, 2025 Page 2 RECOMMENDATION The council is being asked to approve Amendment No. 2 for $59,876 to perform the additional scope of services. Attachments: Amendment No. 2 Exhibit A — Scope of Services Exhibit B — Cost Computations Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov 40 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 24-070 CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and PSOMAS That portion of Contract No. 24-070 between the City of Tukwila and PSOMAS is hereby amended as follows: Section 2, Scope of Services The following language shall be added to the end of the existing Section 2: In addition, work under this contract shall include reimbursement for services, direct expenses, and costs associated with the additional contract scope of services as described in Exhibit A attached. Section 4, Payment Section 4A is hereby amended to read as follows: Payment for the work provided by the Consultant shall be made as provided on Exhibit B provided that the total amount of payment to the Consultant for that work shall not exceed $281,246.00 without express written modification of the Agreement signed by the City. The maximum amount payable under this contract as amended inclusive of all fees and other costs shall not exceed $281,246.00 without express written modifications of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of , 20 CA Reviewed May 2020 Page 1 of 2 41 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 24-070 ** City signatures to be obtained by ** Contractor signature to be obtained by City Clerk's Staff ONLY. ** sponsor staff. ** CITY OF TUKWILA CONTRACTOR: Thomas McLeod, Mayor ATTEST/AUTHENTICATED: Andy Youn, City Clerk APPROVED AS TO FORM: Office of the City Attorney By: Printed Name: Title: 42 CA Reviewed May 2020 Page 2 of 2 PS O M A S Balancing the Natural and Built Environment Exhibit A — Scope of Services Supplement 2 — Tactics Database Updates 1. Task#1: Project management Project management, meetings and administrative tasks. 52hrs 2. Task #2: Tactics Database Assessment, Review and Updates: The pedestrian clearance timing task has revealed the need for a thorough review of the current Tactics database. Since the Tactics system was inoperable for several years, the information stored in the central database is not consistent with the current on -street configurations. 4 hours of additional time is needed to examine each of the 34 current intersections in Tactics Central for accuracy, compare database configurations to intersection configurations, and update configurations for each intersection to ensure central database accuracy. (34x4 hrs.=128). The pedestrian clearance timing study has created the need to modify the signal coordination plans of 24 intersections to accommodate the additional walk/don't walk time required for pedestrians. 3 hours per intersection is needed to ensure that the coordination plans of each intersection will function properly with the increased pedestrian clearance times. (24x3 hrs.=72). City Signal staff have replaced 10 Traconex controllers with new M-60 models. Conversions of controllers can be complex, requiring site analysis and extensive programming. These conversions warrant a configuration peer review to ensure undocumented configurations are maintained in the new controller conversions. (10x5 hrs.=50). Follow-up TMC assistance to establish remote access for tech support, Lucity integration, support and field testing. The Lucity integration requires additional coordination meetings and field testing. 60 hrs. 43 EXHIBIT B PRIME CONSULTANT COST COMPUTATIONS Client: Project Name: Psomas Inc. Project Number: Date: City of Tukwila City Wide Signal Assessment 9TUK010900 - Supplement 2 6/30/2025 Task No. Task Description Labor Hour Estimate Hours and Labor by Task Principal Engineering Manager Senior Engineer I1 Design Engineer I Engineering Technician Office Admin Total Cost Computlons $292.00 $228.00 $207.00 $134.00 $115.00 $111.00 Hours Totals Task 1 Project Management 1.1 Project Management and administrative services 8 12 10 2 32 $ 7,364.00 1.2 Meetings as needed 12 8 20 $ 3,656.00 Task Total 8 24 10 0 8 2 52 $ 11,020.00 Task 2 Tactics Database Assessment, Review, and Updates 2.1 (Tactics Database Assessment, Review, and Updates 8 80 8 106 108 310 $ 48,856.00 Task Total 8 80 8 106 108 0 310 $ 48,856.00 Total Labor Hours and Fee 16 104 18 106 116 2 362 $ 59,876.00 Total Estimated Budget $ 59,876.00 44