Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Special 2025-08-25 Item 3C - Bid Award / Contract - 2025 Annual Small Drainage with Flowline LLP for $352,692.90 (Plus Contingency)
COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 08/25/25 JR ITEM INFORMATION ID MNo. Spec 3.C. STAFF SPONSOR: JOSH HOPKINS ORIGINAL AGENDA DAIL: 08/25/25 AGENDA ITEM TITLE Surface Water Fund - 2025 Annual Small Drainage Program - Bid Award CATEGORY ❑ Discussion Mtg Date ❑ Motion Mtg Date ❑ Resolution Mtg Date ❑ Ordinance Mtg Date a Bid Award 8/25/25 ❑ Public Hearing Mtg Date ❑ Other Mtg Date Mtg Date SPONSOR ❑Council ❑Mayor HR DCD ❑Finance ❑Fire TS ❑P&R ❑Police aPit ❑Court SPONSOR'S Bids were advertised July 30 and August 6, 2025, and opened July 15, 2025. Five (5) bids Su f L RY were received. The lowest responsive bidder was Flowline, LLP at $352,692.90. Council is being asked to award a construction contract to Flowline, LLP in the amount of $352,692.90. REVIEWED BY 0 Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Arts Comm. 08/25/25 ❑ Finance ❑ Parks Comm. ❑ Planning/Economic Dev. Comm. ❑ Planning Comm. CHAIR: ABDI ❑ LTAC DATE: COMMITTEE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $352,692.90 $0.00 $0.00 Fund Source: SURFACE WATER Comments: S 131st Pi Drainage Improvements CIP MTG. DATE RECORD OF COUNCIL ACTION 08/25/25 MTG. DATE ATTACHMENTS 08/25/25 Informational Memorandum dated 08/22/25 A. CIP Sheet - S 131st PI Drainage Improvements B. Vicinity map C. Bid Tabulation D. Psomas Recommendation of Award Letter 41 Thomas McLeod, Mayor Public Works Department - Jen Tetatzin, PE, PMP - Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Services Committee FROM: Jen Tetatzin, Public Works Director BY: Josh Hopkins, Surface Water Project Manager CC: Mayor Thomas McLeod DATE: August 14, 2025, SUBJECT:Surface Water Fund - 2025 Annual Small Drainage Program Project No. 82541201 Construction Bid Award ISSUE Council is being asked to award a construction contract in the amount of $352,692.90 to Flowline, LLP to construct the 2025 Annual Small Drainage Program project. BACKGROUND The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete but are smaller than a typical capital improvement project. The projects originate from citizen complaints and maintenance staff recommendations and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, expense, permitting requirements, and length of time on the list. The highest priority projects are then designed and constructed. The 2025 Annual Small Drainage Program includes three locations as noted in the attached vicinity map and will improve roadside drainage conveyance and water quality improvements at the 40th Ave S/42nd Ave S location. DISCUSSION The 2025 Annual Small Drainage Program was advertised for bids on July 30 and August 6, 2025. Five bids were received and opened on August 14, 2025. The bids were checked, tabulated, and no errors were found. Flowline, LLP, is the apparent low bidder with an overall bid of $352,692.90 including sales tax and is 15.6% below the engineer's estimate of $418,188.06. This contractor has not worked for the City before. Psomas, construction management consultant, and City staff analyzed and reviewed their bid and Psomas spoke directly with Flowline and felt comfortable moving forward. BUDGET AND BID SUMMARY (All amounts include sales tax) The project construction budget of $750,000 is sufficient to cover the costs for the contract with contingency. The project is funded through the Surface Water Enterprise Fund. Bid Results Engineer's Estimate Contract $352,692.90 $418,188.06 Contingency (10%) $35,269.29 Total $387,961.49 2025 Budget $ 750,000.00 RECOMMENDATION Council is being asked to award a construction contract to Flowline, LLP, in the amount of $352,692.90 plus contingency to construct the 2025 Annual Small Drainage Program and consider this item on the Consent Agenda at the August 25, 2025 Special Council Meeting. ATTACHMENTS: 2025 CIP Pg 142, Vicinity Map, Bid Tabulations, Psomas Recommendation of Award Letter 42 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2025 to 2030 111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.1111111 11.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.111.11111,1 PROJECT: S 131st Pi Drainage Improvements Project # 91641204 Project ,Manager Joshua Hopkins O ,partrnent .SurfaceWater DESCRIPTION: JUSTIFICATION: STATUS: MAINTENANCE IMPACT: COMMENT; Developing alternate horizontal alignment for Southgate Creek in conjunction with replacing a fish barrier culvert. Scope expanded in 2024 to increase hydraulic analysis limits to address persistent flooding not addressed with the preliminary hydraulic design. South C Qvertpe itbank several times per year during storm events and runs through private properly. Dear Is d wthn a private driveway and storm system. HPA permitted Id gi likellhoodl of lino ilng. n n the n talon to reduce the Project will include 1-year contract maintenance and typically 2-to4 years of plant establishment. Project improvements will be turned over to surface water division for routine maintenance. Project applied for D tmen* of Ecologydssign development funding an dl Conservation Futures property saluisitiOn grant to support the expand hydraulic anayais. Assumes tim 2028 construction. MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMO UMMMMMMMMMMI MEMEMEMEMEM.MMMMMMMMMMMMEMMEMEMEMEM N.MMMMMMMMMMI .1.MMMMMMMMII MMEMEMEMEMEMMEMEMEMEMEMEMIll FINANCIAL (in thousands) 2025 2026 2027 2028 2029 2030 Beyond TOTAL Project Costs Project Mgmt (Staff Time/Cost) Planning Land (RAN) Construction Mgmt. Construction $ 25 $ 780 $ 1,000 $ - $ - $ 25 $ 600 $ 1,000 $ $ $ 25 $ $ $ 400 $ 2,000 $ $ $ $ Total Project Costs $ 1,805 $ 1,625 $ 2,425 $ 75 $ 1,380 $ 2,000 400 $ 2,000 5,855 Project Funding Awarded Grant Proposed Grant Utility Revenues $ 706 $ 1,105 $ 205 $ - $ 1,600 $ 825 $ $ $ $ 706 $ 4,330 $ 1,030 Total Project Funding $ 2,016 1,625 $ 2,425 6,066 43 2025 SMALL DRAINAGE PROGRAM PROJECT NO. 8254/201 THOMAS MCLEOD DIRECTOR OF PUbLIC WORKS JET TETATZ1N, _E=. TOSH SHARP, COUNCIL PRE GENT ARMEN PAPYAN HANNAH HEFRICK. DENNIS MARTINEZ MNAMED ABDI JO\ TA MCCONNEL VERNA SEAL SCHEDULE OF r , "3 NGS SHEET T?TLE OMER LEGEND & ABB 1 Ga 3-4 SURVEY CONTROL TRO'L 5-9 DETAILS 10 MACADAM so£_=H 0E 5 1441H T — STORMVs TEE PLAN 400 PR 0 =LE II 0 0404 RD 5 (NORTH 5 144TH ST) — sTORMWATER PLAN 400 PROFILE 12 40TH 405 s — SITE 'REFAF ATI " & TE. - PLAN 13 40TH AVE 5 — S.00 W EP PLAN 4 F PROFILE 14 40TE Aye 5 E_EGE1 110 PLAN .ENOINEERTNG.S1._Et. LL DRAINAGE PRCT R C005 sty at Tukwila 2025 SmaU Drainge m city of TukwtIa Project Num€o Bid Tato 5114r2925 Bids °poled August 14 2025, 10 En &wen Montle Harkna N9N 010000e Erie RCM , Ntitl St00 Cclaeus-its Ca No, SCHEDULE 1 2 3 4 5 6 r 6 9 10 t 13 14 1. 1? 19 24 21 22 2.s 24 25 26 27 28 24 -- 31 32 33 34 35 36 nem Bestridden den Qtg Ufift A Unit 0r €e $9,000 03 $6,508 29 S1500 2V $26000C. a910 $9,3 1•-. $8,508._ MO50 900: $2. 2 $ 3 $200.09 3 PO $M,9W-L- saa=3 S80 163 $1 :;;j $3,509.0 $22 W2 .-3 $3,32 v3 a990 ='i $145,54 $10$008 $220,00 $3.0030 $6,0190.--- $:2.-3c5i C0 $..€ 56Ph 9750,OD $7 S089302 $141 7 $200:093 £92 MOW 299002 $ 320 8 950065 1 50 $ 26 0 00 S 28,000.91 1 2,00000 1 520CFO 3,2000 $ 2400 001 9020 Cs3 $ 1. 0 C920 mom 3. $ 000.43 $ 3,5200 1 4.00093 4,4 2 $ 3,0002 $ 5,5000 S t, 36: 3 $ 9 033 2124003 $ 45,285=¢0 $ 198055 $ 2000 -}7 $ 00003 35-30'90 s 62950 C7 $ 2,50002 $ 2,26000 $ 9720460 78.%-- s 14,00 $ 1000 $ 4,000 C93 $ 033000 Ur it4e 011?. 8 ;tr.1 T `W 5 131123.3 = : 6541 0 4 39.> . 309120 750 1 9 9 403 30 03 tF ix, so $ 5 0.2 05 3 X 36OS $ 12OS 3000 � $ 1.2 ,,. t _.60 $ =' ' 3 $ MPS 14-'_.`:-'?3 :`.-:C 197. : 1,$ 00 e, 00 500._' 2.. '--90 $ -1 597'--'. 5 2993,0 $ it2r'-_--`'c $ >. y"n9`'0 4 r $ 002 $ 6.0000 Amur $ 9, 0-5 10,093-080 1500 00 $ 5533-2. 5 15,222 €---5 $ 5 $ 1,50095 $ 300 00 $ 690-CB 1.150-00, 4 $ 15.E _5 $ 02(0 00 $ 6,00-00 $ S 2C.€}tt $ 1599- $ 03 J, 1 3,000 .�9, $ 300 = $ *1-6,493 $ tow 2€7 =09 1 ,62C.CXl $ 2 'S- $ $ 9036.-00 9, 7909=09 $ ; 909.033' 2,600-0 $ 0602 1 $ 10,99099 $ 10,00-00 $ 2,00 00. $ 900_00 $ =J $ 9,00 DS mite '.. a 9, .1 0 t 9-_.M1. i t -.f .= 2 7. .; 3543 '0: 39 00 03.: 15. T $ 03 $ 1 10 00 0 ;'-. =-'.-'0- u.1 3 t. 12.9) a 33 =. Lid . $ 293 .65 00.03 03.0 a 7_ t.: $ F?,$X9,7 b 3,C473C72 S 1,000 == $ t. $ 9057,5 r 55' .[ b 5,03.01 01 01 0000 900 U Assonwn $ 3 3.30 $ ?,'it:--3.3v $ 5 5-0000 $ 916.540N 5 9560..00 M=3_00 , =-500 4,0B 09 6CD_ 1 33 00 $ 5 1: :36 a 113,4031 00 $ 159000 0.0000 $ 2.2090 $ 2.5 .30 $ 23 .30 $ 3 a`3-3 $ = 375.30 $ 39090 $ sc43.30 $ at a9- $ 2 3,210 $ 9.02900 $ 3 3-v-60, $ 18,M.30 19.477930 $ 5.240.20 $ 1903.30 $ 3 9.3az $ 539500 $ 00 V91,20 $ S.- 0 $ 543:..0 $ 590000 $ 0.000 Unit f a g 869293 9'--- $ 3.21563 .T 1,5409) $ 53 21593 $ .538191 $ 7995593 $ -.fi 5W $ 79 3 IS 993 € 1.0,2 $ 1€9.4 $ 342,597 193 5 92-003 107 0701 T 12_' % 3 30 `9• 22,X 0231,03 =_`f % 72495 18497 g =45 $ 1T8eS7C4, $ 9922- , $ 2074 W $ I. 9001392 $ NW $ €33.003 $ 0,07099 $ 7 4` s $ 1003 64745 5039 CH A09000 $ 2 3 $ 3776. $ 3,&0-8. '- $ 56213.0 $ 43567 20 $ 3 5.W $ 5.535.00 $ 3969.99 $ 466.0 $ -'s. $ 16X.00 $ 19 434 W $ 920.00 $ 47e$. $ S.T 9. $.. 5.320.OS $ 3 .OD 5225 $ 7.4314 $ 105.00 $ 2822. $ 4125220 $ 7044.25 $ 209.00 $ 11.202.00 $ 4922.90 $ 6222 20 $ IMO Ti $ 2.09 $' 4.015.0 $ 4$ 6w $ 70.4$. $.. 1 9. $ 3 1000 $ 9.0000 B $ 2.,- X .0,3 §, 9, .0_ $ 1. .92 $ 45,99220 $ 6750 0 $ 5,63X.0,3 $ 4220 On $ $ HD.t $ 0. $ 7.00 $ 1,05.01 9 -- $ 4230 00 h4 N a $ 6 00 3 3. .CO S 5. $. 3 . $ .9) $ 1 20 $ 27i. $ 20 00 $.. 2.2`1T7. $ 8.00.P=. $ 2003 30 2 2.02 $ 3 $' 795.00 $ 146.7.ao $ 0005. $ 2,z,w $ $ 90090 19030904 $ 2_yW .00 $ 9.099.911$ $ 1.99000 $450595.50 $ 63 .;1.00 $ 6,02.9 $.. 4.93s0.40 $ 39 3:99 $ 90 90a $ 9150.00 $ 120. $ 17.M.0 0 ,. $ 4LX:3. t $ 49300 $ 4 r 3.io�- $ 2.20.ttu. $ 3 $ 229 643003 $ 1,00.01 $ 319520 3 52.614 20 # 11111 $ 3 $. 13,21M.00 $ 922521.9- $ 6.952 00 $ 2 400: $. 95,r-`000 $ €48,7so. $ 4 739:°311 $ 1.84500 $ 4! 1 Av $ 9.092.00 i [ r"rfix Amu% ROOD_`---3 2,430 00 S. $ 5061.CB t 000442 8 1, 1.60 36337 40 8 50,n7:0 324 1200 7 $ 103300 _`--- $ 1" 3d7.00 F 14872 Xi $ 14-872_B. 88. = 3,540.Cs7 2-WM- $ 1c 3=0 .4 $ 9520 NI T t 5,512435 F 2 $ 1300 $ _'.X 799 $ 300 110= $ 3,3442 es $ 4225€1.a 22 $ 018 3 0 -S:- .C'�-# '0 -3 0`0 DO 22Y 09S.00 IOW $ 3,00 0 3 1,332 94 $ 2 05 933 F $ 11. 0_93 539-$ 32,634.=60 '1 6,150 90 275.= $ 2,79300 7 Z 15,519235 F 2. 518 433 $ 5058 0444239 :i $ 7,M.7 32 01 $ 2, 2:3 1400 $ 402 -}7 $ f -45 CD $ 7,725.Cs3 5e 7:w $ 78,C247C93 $ 4284.7 3 $ 4. 4:." 3 8949 $ 991,f3 770 t 3400.C53 0 0 $ 009 nv .B h en 1''. t EST :F3 y g. t i N 1=9' en. [ =.= BB 1.50) i:$ ': 1 LS 23-r 93. :,. ='ri% L =z. ' t L P.- effy9.0tct 446 s L ns tpe-r a 31 4=5 C301 eF at €0 t -a Psi 01 '.8209,. Of Extra Ex5952m C SL 1 Ct 1-#3 TN €11A21 1,7 Pre, 50022 52 TN : f a 1 1 91I ': 2 Le EephoPC 5' 'a 00" 5w t 12- €7 A '., 4A CY €ateCw; .:mot541 -:-- L t tt s SY i ty R i t t 1 t - ; p 2`5 5 -_ Renoisw16010 St099 Sens53 Pipe ass IF n A 00o = €A 4c�n �'=k1�Li L��m ': 1 L€ Cn i 5€ :er 12 In. -04 3-r3 1.4 Ft 6i *s 5 r 12 In As: at LP 519 =er 1 In.. #2 14 `1;- tcn a r Ty 1 : €A 57 s T 2 48 in Dam 'F =311 C= t itn4 s1 0type 24, 3f t ----€a New Cwis 3 :€zst C. .HPr -. [tm.n i .. 10 e P 3 - r 3 - 12. ; :t 1y a0 09001 LS ' 3 TN POwnet0ty 5 % _ j EST ensin Bid d rn T I Amami $ 373,4114. 4 32 . ,416 '. $ 14.t 16 gh00091000ynate Sawa C n0act €iWaal Tu4 1rtse Mama it 1637) Cuter€17e61 Bid price 502 1a20% $a6sf Ton 352,441249© 677,294.71 [ 11647.232 w ftaa C- : C6. 3,74§., 2, 99219-99,1 09 18.,25 J999 009 T. PS O M A S Attachment D August 15, 2025 City of Tukwila Joshua Hopkins 6300 Southcenter Blvd., Ste. 100 Tukwila, WA 98188 RE: Letter of Recommendation Dear Joshua, As requested, Psomas has completed the verification of Flowline, LLP. for the 2025 Drainage Program project. We have checked the status of Flowline, LLP on the Washington State Labor and Industries website to confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records were discovered federally or statewide. It is our recommendation that the 2025 Drainage project be awarded to Flowline, LLP. We have enclosed the contractor verification package for your review. Respectfully, Jordan Perry Construction Services Psomas Cc: 46