Loading...
HomeMy WebLinkAbout24-070 - Amendment A - KPG Psomas - Design Services: Traffic Signal Assessment and Preventative Maintenance ProgramCity of Tukwila Agreement Number: 24-070(b) Council Approval 9/8/25 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and PSOMAS That portion of Contract No. 24-070 between the City of Tukwila and PSOMAS is hereby amended as follows: Section 2, Scope of Services The following language shall be added to the end of the existing Section 2: In addition, work under this contract shall include reimbursement for services, direct expenses, and costs associated with the additional contract scope of services as described in Exhibit A attached. Section 4, Payment Section 4A is hereby amended to read as follows: Payment for the work provided by the Consultant shall be made as provided on Exhibit B provided that the total amount of payment to the Consultant for that work shall not exceed $281,246.00 without express written modification of the Agreement signed by the City. The maximum amount payable under this contract as amended inclusive of all fees and other costs shall not exceed $281,246.00 without express written modifications of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this 10th day of September 2025 22 CA Reviewed May 2020 page I of 2 141LAA iy4� o J 4 1 2905 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 CITY OF TUKWILA Signed by: Thomas McLeod, Mayor ATTEST/AUTHENTICATED: Signed by: FFRR 1 IF FGP I99 Andy Youn-Barnett, City Clerk APPROVED AS TO FORM: Signed by: �U.tit, 0-4. C>a n Office of the City Attorney CONTRACTOR: Signetl by: N Printed Name:andez Miller Title: Vice President CA Rcvimcd May 2020 page 2 of 2 23 Balancing the Natural and Built Environment Exhibit A — Scope of Services Supplement 2 — Tactics Database Updates 1. Task #1: Project management Project management, meetings and administrative tasks. 52hrs 2. Task #2: Tactics Database Assessment, Review and Updates: The pedestrian clearance timing task has revealed the need for a thorough review of the current Tactics database. Since the Tactics system was inoperable for severalyears, the information stored in the central database is not consistent with the current on -street configurations. 4 hours of additional time is needed to examine each of the 34 current intersections in Tactics Central for accuracy, compare database configurations to intersection configurations, and update configurations for each intersection to ensure central database accuracy. (34x4 hrs.=128). The pedestrian clearance timing study has created the need to modify the signal coordination plans of 24 intersections to accommodate the additional walk/don't walk time required for pedestrians. 3 hours per intersection is needed to ensure that the coordination plans of each intersection will function properly with the increased pedestrian clearance times. (24x3 hrs.=72). City Signal staff have replaced 10 Traconex controllers with new M-60 models. Conversions of controllers can be complex, requiring site analysis and extensive programming. These conversions warrant a configuration peer review to ensure undocumented configurations are maintained in the new controller conversions. (10x5 hrs.=50). Follow-up TMC assistance to establish remote access for tech support, Lucity integration, support and field testing. The Lucity integration requires additional coordination meetings and field testing. 60 hrs. 24 EXHIBIT B PRIME CONSULTANT COST COMPUTATIONS Client: Project Name: Psomas Inc. Project Number: Date: City of Tukwila City Wide Signal Assessment 9TUK010900 - Supplement 2 6/30/2025 25 Labor Hour Estimate Total Hours and Labor Task Task Description °' �+' a, a R t c � c ° � Cost Computions by Task No. _ a _:= w w a3 _� 0 d w o c Lu r : N O $292.00 $228.00 $207.00 $134.00 $115.00 $111.00 Hours Totals Task 1 Project Management 1.1 Project Management and administrative services 8 12 10 2 32 $ 7,364.00 1.2 IMeetings as needed 12 8 20 $ 1 3,656.00 Task Total 8 24 10 0 8 2 52 $ 11,020.00 Task 2 Tactics Database Assessment, Review, and Updates 2.1 ITactics Database Assessment, Review, and Updates 8 80 8 106 108 310 $ 48,856.00 Task Total 8 80 8 106 108 0 310 $ 48,856.00 Total Labor Hoursand Fee 16' 104 18 106 116 2 362 $ 59,876.00 Total Estimated' Budget $ 59,876.00 25