Loading...
HomeMy WebLinkAbout2025-08-14 - Bid Tabulations - 2025 Small Drainage ProgramCity of Tukwila 2025 Small Drainge Program City of Tukwila Project Number: 82541201 Bid Tabs 8/14/2025 Bids opened August 14, 2025, 10 AM Engineer's Estimate Flowline Harkness Construction NW Cascade Inc. RCNW Inc. RW Scott Construction Co. No. SCHEDULE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Item Description Qty Unit A Unit Price $9,000.00 $6,500.00 $1,500.00 $26,000.00 $26,000.00 $9,000.00 $8,500.00 $80.00 $400.00 $2.00 $62.00 $200.00 $40.00 $8,000.00 $5,000.00 $80.00 $80.00 $16.00 $3,000.00 $20.00 $22.00 $3,000.00 $118.00 $145.00 $180.00 $220.00 $3,000.00 $6,000.00 $2,000.00 $2,500.00 $750.00 $750.00 $68,000.00 $14,000.00 $200.00 $800.00 $6,000.00 Amount $ 9,000.00 $ 6,500.00 $ 1,500.00 $ 26,000.00 $ 26,000.00 $ 9,000.00 $ 8,500.00 $ 3,200.00 $ 2,400.00 $ 4,600.00 $ 9,920.00 $ 10,400.00 $ 3,680.00 $ 8,000.00 $ 5,000.00 $ 3,520.00 $ 4,000.00 $ 4,480.00 $ 3,000.00 $ 5,500.00 $ 7,436.00 $ 6,000.00 $ 21,240.00 $ 48,285.00 $ 7,380.00 $ 2,640.00 $ 18,000.00 $ 6,000.00 $ 6,000.00 $ 2,500.00 $ 2,250.00 $ 3,750.00 $ 68,000.00 $ 14,000.00 $ 1,800.00 $ 4,000.00 $ 6,000.00 Unit Price $ 9,000.00 $ 10,000.00 $ 1,500.00 $ 5,000.00 $ 15,000.00 $ 5,000.00 $ 1,000.00 $ 75.00 $ 100.00 $ 0.50 $ 40.00 $ 300.00 $ 100.00 $ 5,000.00 $ 100.00 $ 30.00 $ 30.00 $ 12.00 $ 3,000.00 $ 12.00 $ 1.00 $ 500.00 $ 150.00 $ 140.00 $ 60.00 $ 100.00 $ 1,500.00 $ 4,500.00 $ 500.00 $ 2,500.00 $ 1,500.00 $ 2,000.00 $ 100,000.00 $ 2,000.00 $ 100.00 $ 100.00 $ 6,000.00 Amount $ 9,000.00 $ 10,000.00 $ 1,500.00 $ 5,000.00 $ 15,000.00 $ 5,000.00 $ 1,000.00 $ 3,000.00 $ 600.00 $ 1,150.00 $ 6,400.00 $ 15,600.00 $ 9,200.00 $ 5,000.00 $ 100.00 $ 1,320.00 $ 1,500.00 $ 3,360.00 $ 3,000.00 $ 3,300.00 $ 338.00 $ 1,000.00 $ 27,000.00 $ 46,620.00 $ 2,460.00 $ 1,200.00 $ 9,000.00 $ 4,500.00 $ 1,500.00 $ 2,500.00 $ 4,500.00 $ 10,000.00 $ 100,000.00 $ 2,000.00 $ 900.00 $ 500.00 $ 6,000.00 Price $ 9,000.00 $ 9,000.00 $ 1,500.00 $ 105,000.00 $ 20,000.00 $ 52,000.00 $ 60,000.00 $ 100.00 $ 100.00 $ 1.00 $ 35.00 $ 200.00 $ 15.00 $ 30,000.00 $ 5,000.00 $ 50.00 $ 50.00 $ 10.00 $ 3,000.00 $ 5.00 $ 10.00 $ 400.00 $ 220.00 $ 250.00 $ 220.00 $ 280.00 $ 3,000.00 $ 10,000.00 $ 3,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 85,000.00 $ 5,000.00 $ 60.00 $ 1,000.00 $ 6,000.00 Amount $ 9,000.00 $ 9,000.00 $ 1,500.00 $ 105,000.00 $ 20,000.00 $ 52,000.00 $ 60,000.00 $ 4,000.00 $ 600.00 $ 2,300.00 $ 5,600.00 $ 10,400.00 $ 1,380.00 $ 30,000.00 $ 5,000.00 $ 2,200.00 $ 2,500.00 $ 2,800.00 $ 3,000.00 $ 1,375.00 $ 3,380.00 $ 800.00 $ 39,600.00 $ 83,250.00 $ 9,020.00 $ 3,360.00 $ 18,000.00 $ 10,000.00 $ 9,000.00 $ 1,000.00 $ 3,000.00 $ 5,000.00 $ 85,000.00 $ 5,000.00 $ 540.00 $ 5,000.00 $ 6,000.00 Unit Price $ 9,000.00 $ 3,778.00 $ 1,646.00 $ 56,218.00 $ 43,887.00 $ 7,065.00 $ 5,835.00 $ 79.00 $ 78.00 $ 1.00 $ 106.00 $ 382.00 $ 1.00 $ 9,243.00 $ 9,405.00 $ 107.00 $ 107.00 $ 19.00 $ 3,000.00 $ 19.00 $ 22.00 $ 923.00 $ 89.00 $ 124.00 $ 194.00 $ 245.00 $ 1,867.00 $ 4,622.00 $ 2,074.00 $ 1,686.00 $ 803.00 $ 803.00 $ 98,076.00 $ 7,445.00 $ 140.00 $ 642.00 $ 6,000.00 Amount $ 9,000.00 $ 3,778.00 $ 1,646.00 $ 56,218.00 $ 43,887.00 $ 7,065.00 $ 5,835.00 $ 3,160.00 $ 468.00 $ 2,300.00 $ 16,960.00 $ 19,864.00 $ 92.00 $ 9,243.00 $ 9,405.00 $ 4,708.00 $ 5,350.00 $ 5,320.00 $ 3,000.00 $ 5,225.00 $ 7,436.00 $ 1,846.00 $ 16,020.00 $ 41,292.00 $ 7,954.00 $ 2,940.00 $ 11,202.00 $ 4,622.00 $ 6,222.00 $ 1,686.00 $ 2,409.00 $ 4,015.00 $ 98,076.00 $ 7,445.00 $ 1,260.00 $ 3,210.00 $ 6,000.00 Price $ 9,000.00 $ 9,000.00 $ 1,900.00 $ 45,000.00 $ 67,500.00 $ 5,000.00 $ 4,000.00 $ 85.00 $ 90.00 $ 0.50 $ 75.00 $ 340.00 $ 9.00 $ 4,000.00 $ 4,000.00 $ 94.00 $ 94.00 $ 8.00 $ 3,000.00 $ 8.00 $ 25.00 $ 925.00 $ 95.00 $ 158.00 $ 271.00 $ 292.00 $ 2,200.00 $ 8,000.00 $ 2,000.00 $ 2,000.00 $ 800.00 $ 700.00 $ 148,750.00 $ 4,000.00 $ 205.00 $ 900.00 $ 6,000.00 Amount $ 9,000.00 $ 9,000.00 $ 1,900.00 $ 45,000.00 $ 67,500.00 $ 5,000.00 $ 4,000.00 $ 3,400.00 $ 540.00 $ 1,150.00 $ 12,000.00 $ 17,680.00 $ 828.00 $ 4,000.00 $ 4,000.00 $ 4,136.00 $ 4,700.00 $ 2,240.00 $ 3,000.00 $ 2,200.00 $ 8,450.00 $ 1,850.00 $ 17,100.00 $ 52,614.00 $ 11,111.00 $ 3,504.00 $ 13,200.00 $ 8,000.00 $ 6,000.00 $ 2,000.00 $ 2,400.00 $ 3,500.00 $ 148,750.00 $ 4,000.00 $ 1,845.00 $ 4,500.00 $ 6,000.00 Unit Price $ 9,000.00 $ 5,181.00 $ 1,500.00 $ 30,337.00 $ 32,480.00 $ 10,340.00 $ 14,872.00 $ 88.50 $ 280.50 $ 3.00 $ 40.70 $ 250.00 $ 10.00 $ 3,200.00 $ 2,420.00 $ 76.00 $ 85.00 $ 2.20 $ 3,000.00 $ 2.20 $ 10.00 $ 1,332.50 $ 66.00 $ 98.00 $ 150.00 $ 225.25 $ 2,586.00 $ 6,678.00 $ 2,423.00 $ 2,832.00 $ 1,544.00 $ 1,545.00 $ 78,047.00 $ 4,284.00 $ 89.00 $ 770.00 $ 6,000.00 Amount $ 9,000.00 $ 5,181.00 $ 1,500.00 $ 30,337.00 $ 32,480.00 $ 10,340.00 $ 14,872.00 $ 3,540.00 $ 1,683.00 $ 6,900.00 $ 6,512.00 $ 13,000.00 $ 920.00 $ 3,200.00 $ 2,420.00 $ 3,344.00 $ 4,250.00 $ 616.00 $ 3,000.00 $ 605.00 $ 3,380.00 $ 2,665.00 $ 11,880.00 $ 32,634.00 $ 6,150.00 $ 2,703.00 $ 15,516.00 $ 6,678.00 $ 7,269.00 $ 2,832.00 $ 4,632.00 $ 7,725.00 $ 78,047.00 $ 4,284.00 $ 801.00 $ 3,850.00 $ 6,000.00 Minor Changes 1 EST Roadway Surveying 1 LS Record Drawings (Minimum Bid $1,500) 1 LS Mobilization 1 LS Project Temporary Traffic Control 1 LS Clearing and Grubbing 1 LS Removal of Structures and Obstructions 1 LS Pavement Removal Incl. Haul 40 CY Unsuitable Foundation Excavation Incl. Haul 6 CY Shoring or Extra Excavation Class B 2,300 SF Crushed Surfacing Top Course 160 TN HMA Cl. 12" PG 58H-22 52 TN HMA Thickened Edge 92 LF Erosion Control and Water Pollution Prevention 1 LS Protect Utility Pole 1 LS Topsoil Type A 44 CY Fine Compost 50 CY Seeded Lawn Installation 280 SY Property Restoration 1 EST Restoration Seeding 275 SY Remove Existing Storm Sewer Pipe 338 LF Pipe Anchor Assembly 2 EA Storm Sewer Pipe 12 In. Diam 180 LF Ductile Iron Storm Sewer Pipe 12 In. Diam 333 LF HDPE Storm Sewer Pipe 12 In. Diam 41 LF HDPE Storm Sewer Pipe 18 In. Diam 12 LF Catch Basin Type 1 6 EA Catch Basin Type 2 48 In. Diam. 1 EA Concrete Inlet 3 EA Outfall Connection to Existing Catch Basin Type 2 48 In. 1 EA New Pipe Connection to Existing Storm Drain Structure 3 EA Existing Pipe Connection to Proposed Storm Drain Struct 5 EA Filterra Peak Diversion 7'x13' 1 EA Temporary Water Bypass System 1 LS Quarry Spells 9 TN Pothole Utility 5 EA Resolution of Utility Conflicts 1 EST Base Bid Item Total Amount $ 379,481.00 $ 320,048.00 $ 614,605.00 $ 436,159.00 $ 496,098.00 $ 350,746.00 Engineer's Estimate Flowline Harkness Construction NW Cascade Inc. RCNW Inc. RW Scott Construction Co. Base Contract Subtotal bid Price (Items #1 - #37) 379,481.00 320,048.00 614,605.00 436,159.00 496,098.00 350,746.00 Contract Total Bid Price (Incl. 10.20% Sales Tax) 418,188.06 352,692.90 677,294.71 480,647.22 546,700.00 386,522.09 Certified By: 4-4ua- 8/18/25 Josh Hop kins City of Tukwila