Loading...
HomeMy WebLinkAbout2025 - Declaration of Covenant for Inspection and Maintenance of Stormwater Facilities and BMPS - Cary Lang Construction - 20250924000387Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -I of 19 Record Datc:9/24/2025 10:51 AM Electronically Recorded King County, WA After Recording Return to: City Clerk City of Tukwila 6200 Southoenter Boulevard Tukwila, WA 98188 DOCUMENT TITLE: Declaration of Covenant for Inspection and Maintenance of Stormwater Facilities and BMPS REFERENCE NUMBER(S) OF RELATED DOCUMENTS: Additional reference numbers at page 2 of document, GRANTOR: CARR LANG CONSTRUCTION, INC. GRANTEE; City of Tukwila, a Washington Municipal Corporation ABBREVIATED LEGAL DESCRIPTION: HILLMANS MEADOW GARDENS DIV # I Plat Block* 2, Plat Lot. 88 Full legal on page 5 of aocoment, KING COUNTY TAX PARCEL NUMBER: 1 3347400470 Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -2 of 19 Record Datc:912412025 10:51 AM King County, WA 10 Ell 1019 X&EXIM OKI) W1 1-0) tm LMN-V 01 WIV911915-01111 I 1. Parties 1.1 This Covenant for Inspection and Maintenance of Stormwater Facilities and Best Management Practices ("Covenant") is made by and between [property owner(s)], as Grantor, and the City of Tukwila, a Washington Municipal Corporation, as Grantee. Grantor and Grantee (also denoted as City herein) are each a Party and collectively the Parties to this Agreement. 11 Grantor applied to City for issuance of _D24-0159 on 711512-025 — 2,2 Pursuant toTMC 14.30,060, application for and issuance of such permit requires the property owner to enter into this Covenant. 2.3 The subject of the Covenant is the real property located in King County, Washington, bearing King County Tax Parcel No. 3�4Z4o.Qand legally described in the attached Exhibit A incorporated herein C'Property"). 2.4 The City approved the applications which consist of the following documents, attached and incorporated herein: 2.4.1 City issued Permit No. D24-0159 , Exhibit B. 2.4.2 Stormwater Facility/BMP Site Plan, Exhibit C. 2.4.3 Operations & Maintenance Plan including schedule, Exhibit D. 3. Terms of Agreement NOW TBEREFORE, in consideration of the foregoing recitals and other good and valuable consideration including approval and issuance of City of Tukwila Permit (number and date), the sufficiency and receipt of which are acknowledged, Grantor hereby irrevocably covenants as follows: 3.1 The foregoing Recitals and references to documents are incorporated as material terms of this Covenant . 3.2 The Grantor(s) for itself and its successors in interest having any ownership interest in the Property (collectively Owners) shall at their sole cost and expense retain, uphold, operate, maintain, and repair the stormwater facilities and best management practices ("BMPs") located on the Property pursuant to the schedule within the Operations & Maintenance Plan. 33 The obligations required under Section 3.2 above shall be taken consistent the following: 3.11 The City shall have the right of ingress and egress over those portions of the Property necessary to perform inspections of the storrawater facilities and BMPs and conduct other activities specified in this Declaration of Covenant and in accordance with Tukwila Municipal Code ("TY[C") 14.30,80, This right of ingress and egress, right to inspect, and right to perform required maintenance or repair shall be as provided for in subsection 3.3.2 below. City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -3 of 19 Record Datc:912412025 10:51 AM King County, WA 3.3.2 If the City determines that maintenance or repair work is required to be done to any of the stormwater facilities or BMPs, the Director of Public Works or designee (the "Director") shall give notice of the specific maintenance and/or repair work required pursuant to TMC 14.30,080. The Director shall also set a reasonable time in which such work is to be completed by the Owner. If the above required maintenance or repair is not completed within the time set by the Director, the City may perform the required maintenance or repair, and is hereby granted access to the Property for such purposes. Written notice will be mailed to the Owner stating the City's intention to perform such work. This work will not commence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the Director, there exists an imminent or present danger, the seven (7) day notice period will be waived and maintenance and/or repair work will begin immediately. 3.4 If at any time the City reasonably determines that a stormwater facility or BMP on the Property presents an imminent hazard, as identified byTMC 14.30.080 and herein incorporated by reference, the Director or equivalent municipal successor's official may take measures specified therein. 15 The Owner shall assume all responsibility for the cost of any maintenance or repair work completed by the City as described in Covenant. Such responsibility shall include reimbursement to the City within thirty (30) days of the receipt of the invoice for any such work performed, Overdue payments will require payment of interest at the current legal rate as liquidated damages. All such costs and expense shall constitute a lien against the Property. 3.6 The Owners shall obtain a Type C Public Works permit from the City prior to filling, piping, cutting, or removing vegetation (except in routine landscape maintenance such as replacement of plants and pretreatment mulch) in open vegetated stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or modifications to the stormwater facilities and BMPs referenced in this Covenant, Prior to the final approval and issuance of the new permit, a new Covenant with updated exhibits reflecting the changes to the stormwater facilities shall be recorded at the Owner's sole cost, and a copy of the new recorded Declaration of Covenant provided to the City. 33 Any notice or consent required to be given or otherwise provided for by the provisions of this Declaration of Covenant shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail, return receipt requested, to the address listed below for that party: To Grantee: io—Qr—an—ton City Clerk CARY LANG CONSTRUCTION City of Tukwila 29815 24th Ave SW 6200 Southcenter Blvd, Federal Way, WA 98023 Tukwila, WA 98188 3.8 With regard to the matters addressed herein, this Covenant constitutes the entire agreement between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever whether oral or written. This Covenant shall, be governed by the laws of the State of Washington. Any suit to enforce or relating to this Covenant shall only be filed in King County Superior Court, King County, Washington, and the rarticu vonovia to t;hVjurtacl1QUun thin cut. In this vy%m of any legal avtivn by uFftlivr fart), xviating, to ttiio Covenant, the Parties shall pay their own costs or fees. City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -4 of 19 Record Datc:912412025 10:51 AM King County, WA 19 This Covenant is intended to protect the value and desirability of the real property described in Exhibit A, promote the efficient and effective management of stormwater drainage, and shall inure to the benefit of all the citizens of the City and its municipal successors and assigns. References herein to the TMC shall include subsequent amendments to such statutes and all successor statutes. 110 This Covenant shall run with the land and shall be binding upon the Owners as defined in Section 3.2 above. 3.11 This Covenant may be amended or terminated only with the advance express written consent of the City as determined pursuant to its discretion. EXECUTED AND EFFECTIVE as of the date last signed below. GARYLANG Owner DATE: e`09 112— City of Tukwila Stormwater Maintenance Declaration of Covenant FOR GRANTEE: City of Tukwila ne riti Public Works Director DATE -- Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -5 of 19 Record Datc:912412025 10:51 AM King County, WA STATE OF WASHINGTON COUNTY OF KING I certify that I know car have satisfactory evidence that CAr Leta is the person who appeared before me, and said person acknowledged that sgesigned this instrunhIn on Ohalf of the t,(,keo and acknowledged it to be her/bis free and voluntary art for the uses and purposes merftioneWin this RMMAMM GIVEN UNDER MY 14AND AND � M Po f i /fit t OT.4 le 101609 -A --7 R, 2Z STATE NGTON [Cowfty"IM-42 SEAL this e day of Printed Name NOTARY PUBLIC:-7iu, �dfbr e State of Washington, residing at_ My Co missy 214h ptresct—=--/— ss. On this day �rsqnally appeared before me J<tjgX to me known to be the V-6-Iff e--1"4 �Nxi� of the Crry OF TVK�JVLA, a municipal corporation and noncharter Yor form 01 code ciytVitbacoUUncil- yor form of government organized pursuant to RCW Title 35A, that executed the foregoing instrument, and acknowledged such instrument to be her free and voluntary act and deed of said city for the uses and purposes therein mentioned, and on oath stated that s/he was duly authorized to execute such instrument. GIVEN UNDER MY 14AND AND OFFICIAL SEAL this day of City of Tukwila Stormwater Maintenance Declaration of Covenant A,1 0A Printed Namc-' NOTARY PUBLIC in 2d �tb, th�,�Stt, of W�whin residing at My Commission Expires Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -6 of 19 Record Date:912412025 10:51 AM King County, WA EXHIBIT A Legal Description of .Property �r• «-M w Plat Block: Plat Lot: 88 City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000387 Document:COV Ree: 5321.50 Page -7 of 19 Record Date:912412025 10:51 AM King County, WA EXHIBIT B Permit City of Tukwila Storwater Maintenance Declaration of Covenant Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -8 of 19 Record Date:912412025 10:51 AM King County, WA �po0 Department of Community Development k n% r Southcenter Boulevard,ri Tukwila, Phone:t. Washington r inspection Scheduling: https.//tukw-egov.aspgov.com/BP`/Index.html Web site: b Parcel No. 3347400470 Address: 12017 44TH AVE S Project Name: Allentown Lot 2 Permit plumber: X724-0159 Issue Crate: 7/15/2025 Permit Expires On: 1/11/2026 Name: Cary Lang'. Construction .Address: 29815 24th Ave SW, Federal Way, WA, 98023 Contact Person: Name: Cary Lang Phone: (253) 740-3332 Address: 29815 24th Ave SW, Federal Way, WA, 98023 Contractor: Names CARY LANG CONSTRUCTION INC Phone: (253) 661-6880 Address: 2981.5 24Th AVE SW, FEDERAL WAY, WA, 98023-2300 License No: CARYLCII01OF Expiration Date: 9/26/2026 Lender: Name: n/a Address: DESCRIPTION OF WORK: Residential New Construction Single Family For Parcel 3347400470 Address 12017 44th Ave S. Project Valuation: $533,035,12 Fees Collected: $43,879.14 Type of Fire Protection: Sprinklers: NO Fire Alarm: Type of Construction: Occupancy per IBC. Electrical Service Provided by: Tukwila Water District. Tukwila Sewer District: Tukwila Electrical Service Provided by: Water District: Sewer District: ���� Current Codes adapted by the City of Tukwila: Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -9 of 19 Record Datc:912412025 10:51 AM King County, WA International Fire Code Edition: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition Uniform Plumbing Code Edition: International Fuel Gas Code: Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load', Land Altering: Landscape irrigation: Sanitary Side Sewer: Sewer Main Extension; Storm Drainage: Street Use. - Water Main Extension: 2021 2021 National Electrical Code: 2023 2021 WA Cities Electrical Code: 2023 2021 WAC 296-468: 2023 2021 WA State Energy Code: 2021 2021 Volumes: Cut: 300 Fill: 300 Water Meter: Yes Alt provisions of law and ordinances governing this work will be compiled with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. This permit shall become null and void if the work Is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Condition Notes 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not In accordance with the approved construction documents shall be resubmitted for approval. 3: All permits and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: The special Inspections and verifications for concrete construcCon shalt be as required by IBC Chapter 17, 5: When special Inspection Is required, eltherthe owner or the registered design professional in responsible charge, shall employ a special inspection agency and notifythe Building Official of the appointment prior to the first building inspection. The special Inspector shall furnish inspection reports to the Building Official in a timely manner. 6: A final report documenting required special Inspections and correction of any discrepancies noted in the Inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special Inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 7: All construction shall be done In conformance with the Washington State Building Code and the Washington State Energy Code, Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -10 of 19 Record Datc:912412025 10:51 AM King County, WA 9: All wood to remain in placed concrete shall be treated wood. 9: A Certificate of occupancy shall be issued for this building upon final inspection approval by Tukwila building inspector. 10: All construction noise to be in compliance with Chapter 9.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 11: Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. Strapping shall be at points within the upper one-third and lower one-third of the water heater's vertical dimension. A minimum distance of 4 -Inches shall be maintained above the controls with the strapping. 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approvalof, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 13; Under RCW 19.106,440 and RCW 19.27.110 the City of Tukwila Is required to provide this written notice to the building permit applicant that there are contractor registration laws and the potential risk and monetary liability to the homeowner for using an unregistered contractor. 14: ***PUBLIC WORKS PERMIT CONDITIONS"* 15: Prior to construction, all utilities in the vicinity shall be field located. NOTE: For City of Tukwila utility locates, call 811 or 1-800424-5555. 16: Work affecting traffic flows shall be closely coordinated with the Public Works Inspector. Traffic Control Plans shall be submitted to the inspector for prior approval, 17: The City of Tukwila has an undergrounding ordinance requiring the power, telecommunications, and cable service lines be underground from the point of connection on the pole to the house, IS: Flagging, signing and coning shall be in accordance with MUTCD for Traffic Control, Contractor shall provide certified flagmen for traffic control. Sweep or otherwise clean streets to the satisfaction of Public Works each night around hauling route (No flushing allowed). Notify Public works inspector before 12:00 Noon on Friday preceding any weekend work. 19: Clean and remove debris from City catch basin in and around hauling routes. Provide adequate temporary access as not to interfere with other vehicle movement or cause trucks to travel over curbs. All vehicles must make a complete stop prior to entering public right-of-way. 20: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off-site or into existing drainage facilities per Appendix D of the 2021 KCSWDM, 21: The site shall have permanent erosion control measures In place as soon as possible after final grading has been completed and prior to the Final Inspection. 22: From May I through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. 23: It Is strongly recommended that storm drainage designs be prepared and stamped by a Washington State licensed engineer. Otherwise, the owner assumes liability for the design and any subsequent related damages. 24: Downspouts, driveway, patio and drainage from other Impervious areas shall be collected in an on-site storm drain system. Drains shall be 4" minimum diameter, PVC schedule 40 or corrugated poly ethylene pipe with a minimum 1% slope for gravity discharge to location approved by the Public Works Department. Downspouts shall not connect to footing drains. Footing drain and downspouts may share a single discharge pipe downstream of the lowest footing drain, 25: All private storm drain pipe shall be either concrete or reinforced ADS pipe. Treated corrugated metal pipe may be used for detention facilities. 26: Pre -construction storm drainage patterns shall be met during and after construction. 27: The property owner Is responsible for the maintenance of its storm drainage system and, for this purpose, shall have a maintenance plan In place and the responsibility for maintenance assigned prior to Public Works final. Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -11 of 19 Record Datc:912412025 10:51 AM King County, WA 28: The applicant shall Install a Washington State Health Department approved backfiow device between the water meter and SFR. 29: The water meter box shall be located within City right-of-way at the property line or a recorded utility easement. 30: Driveways shall comply with City residential standards. Driveway width shall be a 10' minimum and 20' maximum, Slope shall be a maximum of 15%. Turning radii shall be a minimum of 5'. 31: The driveway shall be designed and sloped so that drainage from the driveway does not flow onto the existing road surface. 32: Driveways shall be paved for a minimum distance of 20'from the edge of the existing road pavement. 33: Provide overlay of matching asphalt within trenching. Grind pavement, to include pedestrian path, and provide 2" overlay at the discretion of the Project Inspector. 34: Pavement mitigation fees may apply to this permit. Amount estimated to be xxx sq. ft. x $xx.xx per sq, ft, $x,xxx.xx. Final measurement to be made in the field by the Public Works inspector prior to Public Works Final. 35: Prior to Public Works Final, provide storm drainage as -built plan, storm drainage maintenance plan and responsibility for maintenance assigned for stormwater treatment and flow control BMPS/Facilities. 36., A bond or cash equivalent in the amount of 150% x cost of construction within the City right-of-way made out to the City of Tukwila for possible property damages caused by activites. 37: A copy of the Certificate of Insurance Coverage (minimum of $2,000,000 naming the City of Tukwila as additionally insured). 38: Sewer lines shall be laid at least 10 feet horizontally, measured edge to edge, from any existing or proposed water supply line. Install all sanitary sewer crossings under water lines so that the top of the sewer pipe is at least 18 inches below the bottom of the water line. 39: Applicant shall execute and submit a King County Residential Sewer Use Certification form before building/plumbing permit final and list only new plumbing fixture units and not the ones replaced in kind. Located here https://www-tukwilawa.gov/wp-content/uploads/PW-2021-RES-FORM,pdf 40: Prior to issuance of this permit, Owner/Applicant shall provide a Traffic Concurrency Certificate Application and pay $400.00 under PW permit CXX-OXX. Fee for 1-3 residential units. 41: Install Sewer clean-out at building with required bends totaling no more than 90*. 42: Schedute mandatory pre -construction meeting with the Public Works Inspector, https://tukw- egov.aspgov.com/BP/`lindex.htrnl. Any questions please call 206-431-3670. 43: From October I through April 30, cover any slopes and stockpiles that are 311:1V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, If they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. 44: Schedule mandatory pre -construction meeting with the Public Works Inspector, https://tukw- egov,aspgov.com/BP/index.htrnt. Any questions please call 206-431-3670. 45: Prior to project final Inspection approval, the applicant shall execute a recording with King County records a completed Joint Side Sewer Easement and Maintenance Agreement, PERMIT INSPECTIONS REQUIRED BACKFLOW - WATER BIOX", 11101NA-6w EROSION MEASURES EROSION MEASURES FNL FRAMING Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -12 of 19 Record Date:912412025 10:51 AM King County, WA GAS PIPING FINAL GAS PIPING FINAL GAS PRESSURE TEST GLAZING LATH—GYPSUM BOARD MECHANICAL FINAL PAVING AND RESTORE PIPE—DUCT INSULATION PLUMBING FINAL PUBLIC WORKS FINAL. PUBLIC WORKS PRE -CON ROOF SHEATHING ROOF—CEILING INSUL ROUGH -IN GAS PIPING ROUGH -IN MECHANICAL ROUGH -IN PLUMBING SANITARY SIDE SEWER SI -CONCRETE CONST STORM DRAINAGE STREET USE UNDERFLOOR FRAMING UNDERGROUND WALL INSULATION WALL SHEATHING—SHEAR WATER METER- PERM Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -13 of 19 Record Date:912412025 10:51 AM King County, WA EXHIBIT "C!` - STORMWAER FACILITY / BMP SITE PLAN I f 155 x I&L x 4'D (ROCK) ' ROOF INFILTRATION DRYWFILL I p SCALE: NONE 1 I N I S' STORM DRAIN j f P 1 I r CATCH SASIN ! p ' I t � r j 1 4` ROOF DRAIN � I I t i DS I I I G�0 I PAIiO ROOF OVERHANG ! I I I I I 1 I ! � i I l 1 M NEW SFR I F I F I I I i t 1 A I 4 I ! t I E I E 1 I i Q ! t i 1 6 ! CONCRETE I I WALKWAY -m t F 1 I I a ! ! 3 1 I I I t 1 f I r _ i I t j j SP iS34'W 40", --- -- 2'W X 20'L X 2'0 GRAVEL STRIP WITH IS FLO"ATH wCONCRETE DRIVEWAY c, A VE S Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -14 of 19 Record Date:912412025 10:51 AM King County, WA S � i Operations & Maintenance Plan with Schedule City of Tukwila Stormwater :Maintenance Declaration of Covenant Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -15 of 19 Record Date:912412025 10:51 AM King County, WA ._.._-._W INSPECTION/MAINTENACE CHECKLIST 1 -Year) Augustor5e temberjand after major stormeve nts rmanufacture'srecommendations 2 -Twine a Year 3 - Monthl STRUCTURE INSPECTION iNSPEC DON RESULTS AND MA NTANCE DONE Ins ecflan resultslmalntenanae Date Comments Infiltration Drywell 2 Inspection Results: Maintenance Performed: Conveyance Pipes 1 Inspection Results: Maintenance Performed: CB #1 -Type 1 1 Inspection Results. Maintenance Performed: Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -16 of 19 Record Date:912412025 10:51 AM King County, WA f�{{ ai&. f x r �Ycaf m5x s a N®' 5 N z #T� t L3A JN l�1NC?�MRH, OLES � �, Maintenance Defector Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed_ Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no bottom of the catch basin to the invert of the sediment. lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Trash and debris Trash or debris of more than % cubic foot which No Trash or debris blocking or is located immediately in front of the catch basin potentially blocking entrance to opening or is blocking capacity of the catch basin catch basin. by more than 10%. Trash or debris in the catch basin that exceeds No trash or debris in the catch bask, 'fa the depth from the bottom of basin to invert the lowest pipe into or out of the basin. _ Dead animals or vegetation that could generate No dead animals or vegetation odors that could cause complairds or dangerous present within catch basin. gases (e.g., methane). Deposits of garbage exceeding 1 cubic foot in No condition present which would volume. attract or support the breeding of insects or rodents. Damage to frame Corner of frame extends more than % inch past Frame is even with curb. and/or top slab curb face Into the street (If applicable). _ Top slab has holes larger than 2 square Inches or Top slab is free of holes and cracks. cracks wider than % Inch, Frame not sitting flush on top slab, I.e., Frame is sitting flush on top slab. separation of more than % inch of the frame from the top slab. Cracks in walls or Cracks wider than % inch and longer than 3 feet, Catch basin is sealed and is bottom any evidence of soil particles entering catch structurally sound. basin through cracks, or maintenance person judges that catch basin Is unsound. Cracks wider than % inch and longer than 1 foot No cracks more than Y. inch wide tat at the joint of any inlettoutlet pipe or any evidence the joint of inlettoutiet pipe. of sol particles entering catch basin through cracks. Settlement) Catch basin has settled more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than %-inch at the joint of the No cracks more than %-Inch wide at inletioutlet pipes or any evidence of soil entering the joint of Inlet/outlet pipes. the catch basin at the joint of the inlet/oWet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. InletiOutlel Pipe Sediment Sediment filling 20% or more of the pipe. Inletfoutlet pipes clear of sediment. accumulation Trom Ono oebrls Tram ano netxla amumuietod In Inlevoutlet No trotnt or aeons Irl pipea. pipes (includes floatables and non-floatables). Damaged Cracks wider than 11 -inch at the joint of the No cracks more than Y«inch wide at intetroutlet pipes or any evidence of sal entering the joint of the inlet/outlet pipe. at the joints of the inletioutlet pipes. APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual — Appendix A A-9 7/23/2021 Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -17 of 19 Record Date:912412025 10:51 AM King County, WA APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 7/23/2021 A-10 2021 Surface Water Design Manual —Appendix A ��x�ii�L%f1l�tB'}.�r�R��.�•��,I i�4 � �{� �'�[Y'%.. BvY4.n�i+%�� lt•�rz l{�. f� �� �W}ir5 .� i��'%k� �AyR�Lf I�r��V Y£t5F.v4 ��.ra� SP,,h` Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Metal Grates Unsafe grate opening Grate with opening wider than rh inch. Grate opening meets design (Catch Basins) standards. j Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. Damaged or missing Grate missing or broken members) of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Manhole Cover/Lid Cover/lid not in place � Cover/lid Is missing or only partially in place. x Cover/lid protects opening to Any open structure requires urgent structure. maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. Not Working maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Cover/lid difficult to _ One maintenance person cannot remove Covedlid can be removed and Remove cover/lid after applying 80 lbs. of lift reinstalled by one maintenance person. APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 7/23/2021 A-10 2021 Surface Water Design Manual —Appendix A Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -18 of 19 Record Date:912412025 10:51 AM King County, WA APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual —Appendix A ] 1 9/23!2021 77;:, t'%.{" ti fiCi.�''`,,$$ GC3PJU YAN PAPE khiD�DplyT,CHE i6ir�,�u' R ky s$g bW�N�� Ys T.:'�'iY'.Ett'ki�,�.Y3.,.nR':rm'e��A Maintenance Defect or Problem+20% ditions When Maintenance is Needed Results Expected When Component Maintenance Is Performed Pipes Sediment & debrisumulated sediment or debris that exceeds Water flaws freely through pipes. accumulation of the diameter of the pipe. _ Vegetationfroots Vegetationfroots that reduce free movement of Water flows freely through pipes. water through pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective Protective coating is damaged; rust or corrosion Pipe repaired or replaced. coating or corrosion is weakening the structural integrity of any part of pipe. Damaged Any dent that decreases the cross section area of Pipe repaired or replaced. pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from square feet of ditch and slopes. ditches. yDitch Sediment Accumulated sediment that exceeds 20% of the cleaned/flushed of all sediment accumulation design depth. _ and debris so that I matches design. Noxious weeds Any noxious or nuisance vegetation which may Noxious and nuisance vegetation constitute a hazard to County personnel or the removed according to applicable public. regulations. No danger ofnoxious vegetation where County personnel or the public might normally be. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Vegetation Vegetation that reduces free movement of water w Waterflows freely through ditches. through ditches. Erosion damage to Any erosion observed on a ditch slope. Slopes are not eroding. slopes Rock lining out of One layer or less of rock exists above native soil Replace rocks to design standards. place or missing (If area 5 square feet or more, any exposed native Applicable) I soil. APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual —Appendix A ] 1 9/23!2021 Instrument Number: 20250924000387 Document:COV Rec: 5321.50 Page -19 of 19 Record Date:912412025 10:51 AM King County, WA APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES �� k:.. x, ....... �. 'i:. ^� �Yn ."Y"Fnz..r'.Yl�+.5''..Y�.�S•.Y"'.?.ti'tiT.'"`+v�v"TR �.:.���'.i��'ms t,5;.,..n�*.4S.,.v Lr'�i±�[' ?�4..-� �\,-t,,t;��r:� '2. ��. 7a'i..sn� c. .`.., ,`tr`Y,. Maintenano Defect or Problem Conditions When Maintenance Is Needed Results Expected n p Preventative ing, obstructions ppi�e 1!� flouring wet season. Site Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When Component Pipes Inlet is plugged Maintenance is Performed Preventative Plugging, obstructions Any cause limiting flow into drywell. Drywell able to receive full flow prior Vegetation/roots Vegetatio is that redu a movement of Water flows freely through pipes, to and during wet season. site Trash and debris Trash or debris that could end up in the drywell is No trash or debris that could get into evident. the drywell can be found. Pipes inlet is plugged The entrance to the pipe is restricted due to The entrance to the pipe is not ep oi it. other than at the outlet to the trench. Flows are not getting into the trench as des Water enters and exits trench as Structure sediment, trash, or debris. restricted. trench _ _ Vegetation/roots Vegetation/roots that reduce free movement of Water flows freely through pipes. The cleanout inspection access is not available. C trinspection access is water through pipes. auailab Plugged Sediment or other material prevents free flow of Water flows freely through pipes. of trench water through the pipe. _Fitter media Dinged Pater meuia plugged. f lorr urrvugn attar ma vrmal. Broken or joint leaks. Damage to the pipe or pipe joints allowing water Pipe does not allow water to exit — to seep out. other than at the outlet. Structure ',isin leaks Holes or breaks in the basin allow water to leave Basin is sealed and allows water to the basin at locations other than per design. exit only where designed. Filter Media Fitter media plugged Filter media plugged. Flow through filter media is normal. Inspection Frequency Annually and prior to and following significant Inspect drywell system for any storms. Idefects of deficiencies. APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES �� k:.. x, ....... �. 'i:. ^� �Yn ."Y"Fnz..r'.Yl�+.5''..Y�.�S•.Y"'.?.ti'tiT.'"`+v�v"TR �.:.���'.i��'ms t,5;.,..n�*.4S.,.v Lr'�i±�[' ?�4..-� �\,-t,,t;��r:� '2. ��. 7a'i..sn� c. .`.., ,`tr`Y,. Maintenano Defect or Problem Conditions When Maintenance Is Needed Results Expected n Component Maintenance -i ormed Preventative ing, obstructions ble to receive full Debris or trash limiting flow to infiltration trench. Intilnordebris flouring wet season. Site Trash and Trash or debris that could end up in the o that could get into infiltration trench is evident. the infiltration trench can be found. Pipes Inlet is plugged a entrance to the pipe Is restricted o The entrance to the pipe is not s nt, frac nr dahhs restricted. Vegetation/roots Vegetatio is that redu a movement of Water flows freely through pipes, water throug s. Plugged Sediment or of I prevents free flow of Water flows freely through pipes, water thro a pipe, Broken or joint leaks. D o the pipe or pipe €oin g water I Pipe does not allow water to exit ep oi it. other than at the outlet to the trench. Flows are not getting into the trench as des Water enters and exits trench as Structure F not r hin trench _ _ signed. Clean spection The cleanout inspection access is not available. C trinspection access is a does not allow auailab . ning or inspection of trench PIUP.r Meal _Fitter media Dinged Pater meuia plugged. f lorr urrvugn attar ma vrmal. Ins n Frequency Annually and prior to and following significant Inspect infiltration trench syste — storms. any defects of deficiencies. 2021 Surface Water Design Manual — Appendix A A-35 7/23/2021