Loading...
HomeMy WebLinkAbout2025 - Declaration of Covenant for Inspection and Maintenance of Stormwater Facilities and BMPS - Cary Lang Construction - 20250924000393Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -I of 21 Record Datc:9/24/2025 10:55 AM Electronically Recorded King County, WA After Recording Return to: City Clerk City of Tukwila 6200 Southeenter Boulevard Tukwila, WA 98188 DOC( ENT TITLE: Declaration of Covenant for Inspection and Maintenance of Starinwater Facilities and BMPS REFERENCE NUMBER(S) OF RELATED DOCUMENTS: Additional reference numbers at page 2 of document. GRANTOR: CARY LANG CONSTRUCTION, INC. -GRANTEE: City of Tukwila, a Washington Municipal Corporation ABBREVIATED LEGAL DESCRIPTION: HILLMAN$ MFADOW GARDENS DIV # I Plat Block: 2, Plat Lot. So Full legal on page, 5 of cocument. KING COUNTY TAX PARCEL NUMBER.- 1 3347400475 Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -2 of 21 Record Datc:912412025 10:55 AM King County, WA TOY176 I 71 WRT Parties 1.1 This Covenant for Inspection and Maintenance of Storrawater Facilities and Best Management Practices ("Covenant") is made by and between [property owner(s)], as Grantor, and the City of Tukwila, a Washington Municipal Corporation, as Grantee. Grantor and Grantee (also denoted as City herein) are each a Party and collectively the Parties to this Agreement. 2. Recitals 2.1 Grantor applied to City for issuance of 1724-Q1. on 8/11/2025 - 2.2 Pursuant to TMC 14,30,060, application for and issuance of such permit requires the property owner to enter into this Covenant, 2.3 The subject of the Covenant is the real property located in King County, Washington, bearing King County Tax Parcel No. 15474j 4 . and legally described in the attached Exhibit A incorporated herein ("Property'). 2.4 The City approved the applications which consist of the following documents, attached and incorporated herein: 2A 1 City issued Permit No, D24-0168 , Exhibit B. 2.4.2 Stormwater Facility/BMP Site Plan, Exhibit C. 2.4.3 Operations & Maintenance Plan including schedule, Exhibit D. 3. Terms of Agreement NOW THERE -FORE, in consideration of the foregoing recitals and other good and valuable consideration including approval and issuance of City of Tukwila Permit [number and date], the sufficiency and receipt of which are acknowledged, Grantor hereby irrevocably covenants as follows: 3.1 The foregoing Recitals and references to documents are incorporated as material terms of this Covenant. 32 The Grantor(s) for itself and its successors in interest having any ownership interest in the Property (collectively Owners) shall at their sole cost and expense retain, uphold, operate, maintain, and repair the stormwater facilities and best management practices ("BMPs") located on the Property pursuant to the schedule within the Operations & Maintenance Plan. 3.3 The obligations required under Section 3.2 above shall be taken consistent the following: 3.3.1 The City shall have the right of ingress and egress over those portions of the Property necessary to perform inspections of the stormwater facilities and BMPs and conduct other activities specified in this Declaration of Covenant and in accordance with Tukwila Municipal Code ("TMC") 14.30.80. This right of ingress and egress, right to inspect, and right to perform required maintenance or repair shall be as provided for in subsection 33.2 below, City of Tukwila Stormwatcr Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -3 of 21 Record Datc:912412025 10:55 AM King County, WA 3.12 If the City determines that maintenance or repair work is required to be done to any of the stormwater facilities or BMPS, the Director of Public Works or designee (the "Director") shall give notice of the specific maintenance and/or repair work required pursuant to TMC 14.30.080, The Director shall also set a reasonable time in which such work is to be completed by the Owner, If the above required maintenance or repair is not completed within the time set by the Director, the City may perform the required maintenance or repair, and is hereby granted access to the Property for such Purposes. Written notice will be mailed to the Owner stating the City's intention to perform such work. Titis work will not commence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the Director, there exists an imminent or present danger, the seven (7) day notice period will be waived and maintenance and/or repair work will begin immediately. 3A If at any time the City reasonably determines that a stormwater facility or BMP on the Property presents an imminent hazard, as identified by TMC 14.30.080 and herein incorporated by reference, the Director or equivalent municipal successor's official may take measures specified therein. 3.5 The Owner shall assume all responsibility for the cost of any maintenance or repair work completed by the City as described in Covenant. Such responsibility shall include reimbursement to the City within thirty (30) days of the receipt of the invoice for any such work performed. Overdue payments will require payment of interest at the current legal rate as liquidated damages. All such costs and expense shall constitute a lien against the Property, 3.6 The Owners shall obtain a Type C Public Works permit from the City prior to filling, piping, cutting, or removing vegetation (except in routine landscape maintenance such as replacement of plants and pretreatment mulch) in open vegetated stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or modifications to the stormwater facilities and BMPS referenced in this Covenant. Prior to the final approval and issuance of the new permit, a new Covenant with updated exhibits reflecting the changes to the stormwater facilities shall be recorded at the Owner's sole cost and a copy of the new recorded Declaration of Covenant provided to the City. 3.7 Any notice or consent required to be given or otherwise provided for by the provisions of this Declaration of Covenant shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail, return receipt requested, to the address listed below for that party: To Grantee- To _Grantor. City Clerk CARY LANG CONSTRUCTION City of Tukwila 29815 24th Ave SW 6200 Southcenter Blvd. Federal Way, WA 98023 Tukwila, WA 98188 3,9 With regard to the matters addressed herein, this Covenant constitutes the entire agreement between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever whether oral or written. This Covenant shall be governed by the laws of the State of Washington. Any suit to enforce or relating to this Covenant shall only be filed in IS County Superior Court; King County, Washington, and the Parties consent to the jurisdiction triereor, in the event of any Icyaj action ay vivior rarEy rotating to thio Covenant, the Parties shall pay their own costs or fees. City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -4 of 21 Record Datc:912412025 10:55 AM King County, WA STATE OF WASHINGTON COUNTY OF KING I certify that I know or have satisfactory evidence thatr to person w AL is ho a,�peared igncdthi instrkL nent 0 before me, and said person acknowledged that sd9s _ behalf of the rn and acknowledged it to be her is free and voluntary act for the uses and purposes, me �ti,' �ithif� instrument. GIVEN UNDER MY 14AND AND OFF[5�LU SEAL this R day of ?LOG "It,, 0, Ncj'Z� ou o% F ST F 'ON COUNTY OF KING Printed Name NoTmtyptmni-.1n.1,df--M— §� for residing at MY Commission Expire Ss. On this day personally appeared before me 6, i�L yu LX�V('t, to me known to be the Ott lr � �%vAjj of the CITY OF TuKNNq a municipal corporation and noncharter j 0 C'TY 0 o RCW Title 3 SA, that executed the U' of� a In n code,a c— of go foregoing .'go -ty i --uncil- y r f h in tuent t and voluntary act and de6d of said ':d on s/he was duty authorized to execute 'i�f g instrument, and acknowledged is or s purposes a the e and es therei mentioned, such instrument. GIVEN UNDER My HAND AND OrFIcIAL SEAL this _�j� day of • 20n Wj.�5 City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -5 of 21 Record Datc:912412025 10:55 AM King County, WA 3,9 This Covenant is intended to protect the value and desirability of the real property described in Exhibit A, promote the efficient and effective management of stormwateT drainage, and shall inure to the benefit of all the citizens of the, City and its municipal successors and assigns. References herein to the TMC shall include subsequent amendments to such statutes and all successor statutes. 110 This Covenant shall run with the land and shall be binding upon the Owners as defined in Section 3.2 above. 111 This Covenant may be amended or terminated only with the advance express written consent of the City as determined pursuant to its discretion. EXECUTED AND EFFECTIVE as of the date last signed below. GARY LANG Owner DATE: cllel- City of Tukwila Stormwater Maintenance Declaration of Covenant FOR GRANTEE: City of Tukwila ,—Hari, -6hiii Public Wor s Dire tor ke� DATE: �L- 0 Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -6 of 21 Record Date:912412025 10:55 AM King County, WA Legal Description of Property 14 TI ► Plat Block: 2 Plat Lot: 89 City of Tukwila. Storwater Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -7 of 21 Record Date:912412025 10:55 AM King County, WA EXMBIT B Permit City of Tukwila 5tormwater Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -8 of 21 Record Datc:912412025 10:55 AM King County, WA City nf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone206-431-3670 Inspection Scheduling: https://tukw-egov,aspgov.com/BP/index.html Web site: hJtg.jLwwvvTukw laV &v— Parcel No: 3347400475 Address: 12015 44TH AVE 5 Project Name: Allentown Lot 3 Name: RIVERA ROMEO E Address: 3932 S LUOLE ST, SEATTLE, WA, 98118 Contact Person: Name: CARY LANG CONSTRUCTION INC Address: 29815 24TH AVE SW, FEDERAL WAY, WA, 98023-2300 Contractor: Name; Cary Lang Address: 29915 24th Ave SW, Federal Way, WA, 99023 Permit Number: D24-0168 Issue Date: 8/11/2025 Permit Expires On: 217/2026 Phone: (253) 661-6880 License No, Expiration Date, Lender: Name, N/A Address: DESCRIPTION OF WORK: New single family residential for Parcel tt3347400475, Address 12015 44th Avenue S. Project Valuation: $582,239.57 Fees Collected, $50,922.16 Type of Fire Protection: Sprinklers: YES Fire Alarm: Type of Construction: Occupancy per IBC: Electrical Service Provided by: Tukwila Water District: Tukwila Sewer District: Tukwila Fees Collected. Electrical Service Provided by: Water District: Sewer District: Current Codes adopted by the City of Tukwila-. Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -9 of 21 Record Date:912412025 10:55 AM King County, WA International Fire Code Edition: 2021 International Building Code Edition: 2021 National Electrical Code: 2023 International Residential Code Edition: 2021 WA Cities Electrical Code: 2023 International Mechanical Code Edition: 2021 WAC 296-468: 2023 Uniform Plumbing Code Edition: 2021 WA State Energy Code: 2021 International Fuel Gas Code: 2021 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Haulingloversize Load: Land Altering: Volumes: Cut: 300 Fill: 300 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: PUBLIC Water Meter: Yes All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Condition Notes 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: The special inspections and verifications for concrete construction shall be as required by IBC Chapter 17, Table 1705.3. S: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 6: A final report documenting required special Inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final Inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -10 of 21 Record Date:912412025 10:55 AM King County, WA 7: Truss shop drawings shall be provided with the shipment of trusses delivered to the job site. Truss shop drawings shall bear the seal and signature of a Washington State Professional Engineer. Shop drawings shall be maintained on the site and available to the building inspector for inspection purposes. 8: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 9: All wood to remain in placed concrete shall be treated wood. 10: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building Inspector. No exception. 11: A Certificate of Occupancy shall be issued for this building upon final inspection approval by Tukwila building inspector. 12: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 13: Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. Strapping shall be at points within the upper one-third and lower one-third of the water heater's vertical dimension. A minimum distance of 4 -inches shall be maintained above the controls with the strapping. 14: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 15: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is placed unless a tremae Is to be used or unless otherwise permitted by the building official. All debris and ice shall be removed from spaces to be occupied by concrete. 16: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 17: Under RCW 18.106.440 and RCW 18.27.110 the City of Tukwila is required to provide this written notice to the building permit applicant that there are contractor registration laws and the potential risk and monetary liability to the homeowner for using an unregistered contractor. 18: Manufacturers installation instructions shall be available on the job site at the time of inspection. 19: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division, 20: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 21: ***MECHANICAL PERMIT CONDITIONS*** 22: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 23: Manufacturers installation instructions shall be available on the job site at the time of inspection. 24: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -fired appliances shall not be located in, or obtain combustion air from, any of the following rooms or spaces: Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms. 2S: Equipment and appliances having an ignition source and located in hazardous locations and public garages, PRIVATE GARAGES, repair garages, automotive motor -fuel dispensing facilities and parking garages shall be elevated such that the source of ignition is not less than 18 inches above the Floor surface on which the equipment or appliance rests. 26: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 27: FIRE PERMIT REGI- FIRE SPRINKLER 28: Schedule mandatory pre -construction meeting with the Public Works Inspector, https://tukw- egov.aspgov.com/BP/index.html. Any questions please call 206-431-3670. 29: Prior to construction, all utilities in the vicinity shall be field located. NOTE: For City of Tukwila utility locates, call 811 or 1-800-424-5555. Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -II of 21 Record Date:912412025 10:55 AM King County, WA 30: Work affecting traffic flows shall be closely coordinated with the Public Works Inspector. Traffic Control Plans shall be submitted to the Inspector for prior approval. 31: The City of Tukwila has an undergrounding ordinance requiring the power, telecommunications, and cable service lines be underground from the point of connection on the pole to the house. 32: Flagging, signing and coning shall be in accordance with MUTCD for Traffic Control. Contractor shall provide certified flagmen for traffic control. Sweep or otherwise clean streets to the satisfaction of Public Works each night around hauling route (No flushing allowed). Notify Public Works Inspector before 12:00 Noon on Friday preceding any weekend work. 33: Any material spilled onto any street shall be cleaned up immediately. 34: Clean and remove debris from City catch basin in and around hauling routes. Provide adequate temporary access as not to interfere with other vehicle movement or cause trucks to travel over curbs. All vehicles must make a complete stop prior to entering public right-of-way. 35: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off-site or into existing drainage facilities per Appendix D of the 2021 KCSWDM. 36: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 37: From October 1 through April 30, cover any slopes and stockpiles that are 30:1V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. 38: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. 39: It is strongly recommended that storm drainage designs be prepared and stamped by a Washington State licensed engineer. Otherwise, the owner assumes liability for the design and any subsequent related damages. 40: Downspouts, driveway, patio and drainage from other impervious areas shall be collected in an on-site storm drain system. Drains shall be 4" minimum diameter, PVC schedule 40 or corrugated polyethylene pipe with a minimum 1% slope for gravity discharge to location approved by the Public Works Department. Downspouts shall not connect to footing drains. Footing drain and downspouts may share a single discharge pipe downstream of the lowest footing drain. 41: All private storm drain pipe shall be either concrete or reinforced ADS pipe. Treated corrugated metal pipe may be used for detention facilities. 42: Pre -construction storm drainage patterns shall be met during and after construction. 43: The property owner is responsible for the maintenance of its storm drainage system and, for this purpose, shall have a maintenance plan in place and the responsibility for maintenance assigned prior to Public Works final. 44: The water meter box shall be located within City right-of-way at the property line or a recorded utility easement. 4S: Driveways shall comply with City residential standards. Driveway width shall be a 10' minimum and 20' maximum. Slope shall be a maximum of 150. Turning radii shall be a minimum of S'. as: The drivewav shall be designed and sloped so that drainage from the driveway does not flow onto the existing road surface. 47: Driveways shall be paved for a minimum distance of 20' from the edge of the existing road pavement. 48: An overlay of matching asphalt within trenching. Grind pavement, to include pedestrian path, and provide 2" overlay may be required at the discretion of the Project Inspector, 49: Pavement mitigation fees may apply to this permit. Amount estimated to be xxx sq. ft. x $xx.xx per sq. ft. _ $x,xxx.xx. Final measurement to be made in the field by the Public Works Inspector prior to Public Works Final. 50: Prior to Public Works Final, provide storm drainage as -built plan, storm drainage maintenance plan and responsibility for maintenance assigned for stormwater treatment and flow control BMPSJFacilities, Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -12 of 21 Record Date:912412025 10:55 AM King County, WA 51: A bond or cash equivalent in the amount of 150% x cost of construction within the City right-of-way made out to the City of Tukwila for possible property damages caused by activites. 52: A copy of the Certificate of Insurance Coverage (minimum of $2,000,000 naming the City of Tukwila as additionally insured). 53: Prior to issuance of this permit, Owner/Applicant shall provide a Traffic Concurrency Certificate Application and pay $400.00 under PW permit CXX-OXX. Fee based on 54: Applicant shall execute and submit a King County Residential Sewer Use Certification form before building/plumbing permit final and list only new plumbing fixture units and not the ones replaced in kind. Located here https://v4ww.tukwilawa.gov/wp-content/uploads/PW-2021-RES-FORM.pdf 55: Sewer lines shall be laid at least 10 feet horizontally, measured edge to edge, from any existing or proposed water supply line. Install all sanitary sewer crossings under water lines so that the top of the sewer pipe is at least 18 inches below the bottom of the water line. 56: Install Sewer clean-out at building with required bends totaling no more than 90". 57: Prior to project final inspection approval, the applicant shall execute a recording with King County records a completed Joint Side Sewer Easement and Maintenance Agreement. PERMIT INSPECTIONS REQUIRED Permit Inspection scheduling: https://tukw-egov.aspgov.com/BP/index.htmi BACKFLOW - WATER BUILDING FINAL"* CONCRETE SLAB DAMPPROOF AND WATERPROOF ENERGY EFF CERT EROSION MEASURES EROSION MEASURES FNL FIRE D PERMIT FINAL FOOTING FOOTING DRAINS FOUNDATION WALL FRAMING GAS PIPING FINAL GAS PIPING FINAL GAS PRESSURE TEST GLAZING LATH GYPSUM BOARD MECHANICAL FINAL MECHANICAL FINAL PAVING AND RESTORE PIPE INSULATION PIPE DUCT INSULATION PLUMBING FINAL PUBLIC WORKS FINAL PUBLIC WORKS PRE -CON Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -13 of 21 Record Date:912412025 10:55 AM King County, WA ROOF SHEATHING ROOF _CEILING INSUL ROUGH -IN GAS PIPING ROUGH -IN MECHANICAL ROUGH -IN PLUMBING SANITARY SIDE SEWER SLAB—FLOOR INSUL STORM DRAINAGE STREET USE UNDERFLOOR FRAMING UNDERGROUND WALL INSULATION WALL SHEATHING—SHEAR WATER METER - PERM Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -14 of 21 Record Date:912412025 10:55 AM King County, WA lwalla a will CONCRETE LANDING - - - �il - -- - 44TH AVE S GRAVEL STR96' PATH ! i I f I 1 1 I I I f Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -15 of 21 Record Date:912412025 10:55 AM King County, WA Operations & Maintenance Plan with Schedule City of Tukwila Stormwater Maintenance Declaration of Covenant Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -16 of 21 Record Date:912412025 10:55 AM King County, WA INSPECTMON(MAINTENACE CHECKLIST 1- YearlyiA ust or September and after malar storm events gser manufacture's recommendations �-Twicea ear 3 -Monthly „.,------ STRUCTURE INSPECTICEN INSPECTION RESULTS AND MAINTANCE DONE Inspection results/maintenance Date Comments Infiltration DeYwe1G 1 Ins ection Results: Maintenance Performed: Conveyance Pipes 1 kns ec¢ion Results; Maintenance Performed: C8 N1- Type 1 1 lnspectlan Resufts: MaintenanceParformed; Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -17 of 21 Record Date:912412025 10:55 AM King County, WA APPENDIX A MAINTENANCE REQLWMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual — Appendix A A-9 7/23/2021 y iN * ^., �.,` t 4 �L S � �G i xi « ,Y � * JF.` a �',.y,{��'`� Ftp Y >''`i: R`b ✓ " S �Ut a'd�� } ! Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance Is Performed Structure Sediment Sediment exceeds 60% of the depth from the Sump of catch basin contains no bottom of the catch basin to the invert of the sediment. lowest pipe'into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. _ Trash and debris Trash or debris of more than ''%: cubic foot which No Trash or debris blocking or is located immediately in front of the catch basin potentially blocking entrance to opening or Is blocking capacity of the catch basin catch basin. by more than 10%. _ Trash or debris in the catch basin that exceeds No trash or debris in the catch basin. % the depth from the bottom of basin to invert the lowest pipe into or out of the basin. _ Dead animals or vegetation that could generate No dead animals or vegetation odors that could cause complaints or dangerous present within catch basin. gases (e.g., methane). Deposits of garbage exceeding 1 cubic foot In No condition present which would volume. attract or support the breeding of insects or rodents. Damage to frame Corner of frame extends more than % inch past Frame is even with curb. and/or top slab curb face into the street (If applicable). Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks. cracks wider than '%. inch. Frame not sifting flush on top stab, ke., Frame is sitting flush on top slab. separation of more than '%. Inch of the frame from the top slab. Cracks in walls or Cracks wrier than Y inch and longer than 3 feet, Catch basin is sealed and is bottom any evidence of soil particles entering catch structurally sound. basin through cracks, or maintenance person judges that catch basin is unsound. Cracks wider than Y. inch and longer than 1 foot No cracks more than'/. inch wide at at the joint of any inleVoutiet pipe or any evidence the joint of intet/outlet pipe. of soil particles entering catch basin through cracks. Settlement/ Catch basin has settled more than 1 inch or has Basin replaced or repaired to design misalignment rotated more than 2 inches out of alignment. standards. Damaged pipe joints Cracks wider than %cinch at the joint of the No cracks more than 36 -inch wide at inlet/outlet pipes or any evidence of soil entering the joint of Inlet/outlet pipes, the catch basin at the joint of the inlettoutlet pipes. Contaminants and Any evidence of contaminants or pollution such Materials removed and disposed of pollution as oil, gasoline, concrete slurries or paint. according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants _ _ present other than a surface oil film. InlettOutlet Pipe Sediment Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. accumulation Trash and debris Trash and debris accumulated in inlat/outlat No trach or debris In plpos. pipes (includes floatables and non-floatables). Damaged Cracks wider than %-inch at the joint of the No cracks more than Y. -inch wide at inlettoutlet pipes or any evidence of soil entering the joint of the inlet/outlet pipe. at the joints of the inlet/outlet pipes. APPENDIX A MAINTENANCE REQLWMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual — Appendix A A-9 7/23/2021 Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -18 of 21 Record Date:912412025 10:55 AM King County, WA APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 7123/2021 A-10 2021 Surface Water Design Manual —Appendix A �{ 5Vc 5 (^. 'M CpyY�,`�{' {C{"yAr��'.�� 4 '?"►�.l�"`n.�i`43� '�� '�4iu �,"�". ^'i .'� Mh �.t � 7"� f..'�x Y"� ,P".7^`li.�j f;,"'i �a y"M1 6"�;^a a1 �.,y s' , ;'%a3,to-uak4 i f v`:.7.u,,4xa v.A..`s4. ,�.4`„$,✓ qu .YY."Rr«r'e'vd 7fi.Y`'99 i*{uw"tt£�.rFL d''e"t .? dfi..tivx"�"'"}x "t;'t ”' n. Maintenance Defect or Problem Condition When Maintenance is Needed Results Expected When Component Maintenance is Performed Metal Grates unsafe grate opening Grate with opening wider than r/e inch. Grate opening meets design (Catch Basins) standards. Trash and debris Trash and debris that is blocking more than 20% Grate free of trash and debris. of grate surface. Damaged or missing Grate missing or broken member(s) of the grate. Grate is in place and meets design Any open structure requires urgent standards. maintenance. Manhole Cover/Lid Coverflid not in place Covedlid is missing or only partially In place. Coverflid protects opening to Any open structure requires urgent structure. maintenance. Locking mechanism Mechanism cannot be opened by one Mechanism opens with proper tools. Not Working maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Coverilid difficult to One maintenance person cannot remove Cover/lid can be removed and Remove cover/lid after applying 80 lbs. of lift. reinstalled by one maintenance person. APPENDIX A MAINTENANCE REQUIREMENTS FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 7123/2021 A-10 2021 Surface Water Design Manual —Appendix A Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -19 of 21 Record Date:912412025 10:55 AM King County, WA APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES 2021 Surface Water Design Manual — Appendix A A-11 7(2312021 Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -20 of 21 Record Date:912412025 10:55 AM King County, WA face Water Desi Manual — Appendix A A-35 7/23/2021 x1y�.. � Maintenance Defector Problem Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Preventative Plugging, obstrudlons Any cause limiting flow into drywell. Orywell able to receive full flow prior to and during wet season. Site Trash and debris ' Trash or debris that could end up in the drywell is No trash or debris that could get into evident. the drywell can be found. Pipes Inlet is plugged The entrance to the pipe is restricted due to The entrance to the pipe is not sediment, trash, or debris. restricted. Vegetation/roots Vegetationlroots that reduce free movement of Water flows freely through pipes. water through pipes. Plugged Sediment or other material prevents free flow of Water flows freely through pipes. water through the pipe. Broken or joint leaks. Damage to the pipe or pipe joints allowing water Pipe does not allow water to exit to seep out. other than at the outlet. Structure Basin leaks Moles or breaks in the basin allow water to leave Basin is sealed and allows water to the basin at locations other than per design. exit only where designed. Fitter Media Fuer media plugged Fitter media plugged. Flow through filter media is normal. Inspection Frequency Annually and prior to and following significant Inspect drywell system for any storms, defects of deficiencies. APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES face Water Desi Manual — Appendix A A-35 7/23/2021 Instrument Number: 20250924000393 Document:COV Rec: 5323.50 Page -21 of 21 Record Datc:912412025 10:55 AM King County, WA C.2.4 BASIC DISPERSION 0.2.4.6 MAINTENANCE INSTRUCTIONS FOR BASIC DISPERSION If the basic dispersion flow control BMP is proposed furs project, the following maintenance and operation instructions must be recorded as art attachment to the required declaration of covenant and grant of casement per Requirement 3 of Section C. 1,14 (p. C-23). The intent of these instructions is to explain to future property owners, the purpose of the BMP and how it must be maintained and operated. These instructions are intended to be a minimum; DLS-Permitting may require additional instructions based on site-specific conditions. Also, as the County gains more experience with the maintenance and operation of these BMPs, future updates to the instructions will be posted on King County's Surface Water Design Manual website. A reproducible copy of the instructions, prepared for inclusion with the declaration of covenant, is located in Reference M. Your property contains a stormwater management flow control BMP (best management practice) called "basic dispersion," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious surfaces or non-native pervious surfaces on your property. Basic dispersion is a strategy for utilizing any available capacity of onsite vegetated areas to retain, absorb, and filter the runoff from developed surfaces. This flow control BMP has two primary components that must be maintained: (1) the devices that disperse runoff from the developed surfaces and (2) the vegetated area over which runoff is dispersed. The dispersion devices used on your property include the following as indicated on the flow control BMP site plan: 0 splash blocks, 0 rock pads,A gravel filled trenches, U sheet flow. The size, placement, composition, and downstream flowpaths of these devices as depicted by the flow control BMP site plan and design details must be maintained and may not be changed without written approval either from the King County Water and Land Resources Division or through a future development permit from King County. Dispersion devices must be inspected annually and after major storm events to identify and repair any physical defects. When native soil is exposed or erosion channels are present, the sources of the erosion or concentrated flow need to be identified and mitigated. Concentrated flow can be mitigated by leveling the edge of the pervious area and/or realigning or replenishing the rocks in the dispersion device, such as in rock pads and gravel filled trenches, Vegetated Flowpaths The vegetated area over which runoff is dispersed must be maintained in good condition free of bare spots and obstructions that would concentrate flows. 2021 Surface Water Design Manual — Appendix C 7/23/2021 C-65