Loading...
HomeMy WebLinkAboutRes 2124 - 2025 Consolidated Permit Fee Schedule - Permit Types and Fees UpdateCity of Tukwila Washington Resolution No. .2/ z A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHIINGTON, AMENDING RESOLUTION NO. 2105; TO UPDATE PERMIT TYPES AND FEES IN ALIGNMENT WITH RECENT CHANGES TO THE TUKWILA MUNICIPAL CODE. WHEREAS, the City Council adopted Resolution No. 2105 in 2024, establishing the City's current consolidated permit fee schedule; and WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City is authorized by RCW 82.02.020 to recover the City's costs for reviewing and processing permit applications: and WHEREAS, repeated correction cycles for permit applications create additional staff workload beyond what is covered by standard intake and review fees, and recovering costs for these cycles ensures a fair allocation of staff resources and promotes higher -quality submittals; and WHEREAS, certain sections of Title 18, "Zoning" were updated earlier this year to establish a new "Critical Areas Designation" permit process; and WHEREAS, the City's Land Use Fee Schedule needs to be updated to reflect these changes. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Resolution No. 2105 is hereby amended to revise Section 7, "Land Use Fee Schedule," of the Consolidated Permit Fee Schedule under the section "Environmental Review" to add the following row: 2025 Legislation: DCD Update - Citywide Consolidated Fee Schedule Version: 10/20/25 Staff: M. Baker Page 1 of 3 Critical Areas Designation2,568.30 State Environmental P oicy Act (SEPA) SEPA Checklist $ 2.518.64 $2,616.09 SEPA-BS $4,581.56 SEPA'Planned Action 901.12 SEPA'Addendum $ S01]2 SEPAExemption Letter $ 514.53 Environmentally Critical Areas Critical Areas Deviation, Buffer Reduction $ 2.198.44 2 Reduced fee for owner occupied propertno associated short plat ies, ° $864.80 $901.12 2 Critical Areas Reasonable Use Exception +HE4,396.89 Environmentally Critical Area Master PlOverlay an +HE nsolidated Permit Fee Schedule to add the following row: ns OTHER INSPECTIONS AND FEES Inspections outside ofnormal business hours (four hour minimum charge) 2 $124per hour Re -inspection fee (minimum charge one hour) $12Oper hour Inspection for which no fee is specifically indicated —investigations or safety inspections $120per hour Additional plan review required by changes, additions, or revisions to approved plans s12O,erhour Correction review fee — assessed for each additional review cycle after second correction letter *120per hour Work commencing before permit issuance shall bosubject toeninvestigation fee equal 10 1OO96ofthe permit fee. 1O096ofthe permit fee Plan review fee —Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered prior toinspection orwork not ready ut the time nfinspection may bocharged u re -inspection fee of$120. Expired permit fina|—inu|udeahwoinapectione s160 Expired permit fina|—eoohoddihona|inupaction $80 Minor residential remodel plan review and permit (projects valued up to $25,000 including buiNing, monhoniva|, e|mcthua|. and plumbing within 1 year) $100 Certificate ofOccupancy replacement $120 Pennitoxtennionforiuuuadpermit-whenaUowedbyoode $120 Permit extension for expired permit- when allowed bycode $240 025LegislaVon: oCoUpdam Citywide Consolidated Fee Schedule Version:1o/2O 5 Section 3. Effective Date. This resolution and the fee schedules contained shall be effective from the date of this ordinance. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this jO day of 0 CA-06W- , 2025. ATTEST/AUTHENTICATED: Andy Youn, CMC, City Clerk APPROVED AS TO FORM BY: Office of the biky Attorney 2025 Legislation: DCD Update - Citywide Consolidated Fee Schedule Version: 10/20/25 Staff: M. Baker Tosh Sharp, ounc ent Filed with the City Clerk: Passed by the City Council: to-2/0 2-5-- Resolution Number: Page 3 of 3